Overview
The District’s Capital Improvement Program commands the largest portion of budgeted expenditures, and as such, is planned strategically and in great detail for all infrastructure projects in excess of the $15,000 infrastructure capitalization threshold. The District updates its ten-year Capital Improvement Program (CIP) annually to comply with state regulatory and bond order requirements. Objectives of constructing these capital projects include replacing and rehabbing structurally defective sewer lines, handling wet-weather flow conditions, improving the performance at the wastewater treatment plant, and preparing the system to handle expected future wastewater flows over the upcoming decade.
The process begins with engineering staff developing projects, which often originate from problem areas identified by field crews during emergency and preventative maintenance procedures and includes consideration of those projects outlined in the 20-year Wastewater System Master Plan. Engineers evaluate and prioritize each proposed project based upon the District’s short-term requirements and long-term mission. Engineering staff then prepare cost estimates for identified projects and a proposed timetable for construction.
Once the CIP is drafted, the CIP Committee, consisting of representatives from the member agencies, meet to review the costs, locations, and necessity of proposed projects and make a recommendation to the District’s Board. A copy of the CIP summary sheets follows in the succeeding pages of this budget document. A separate document compiling individual pages for each project with detailed costs and location map as presented to the CIP Committee and may be obtained upon request to W. Scott Powell, Director of Finance at (828)225-8211 or spowell@msdbc.org.
The District maintains a Ten-Year CIP and rehabilitates approximately 40,000 Linear Feet (LF) of the collection system every year. The ten-year CIP prioritizes projects identified by the Board as fulfilling the District’s mission but does not obligate District resources for their construction past the end of the current budget year.
Capital Improvement Program (continued)
Background
The Capital Improvement Program is essential to the efficient functioning of the District, as evidenced by the requirement from both the Bond Order and State Collection System Permit. A well-planned CIP provides customers with the assurance of having reliable and affordable wastewater collection and treatment both now and in the future.
The Board has consistently financed its Capital Improvement Program through revenue bonds and pay-as-yougo moneys. As of June 30, 2022, the District will have $88.4 million in outstanding revenue bond debt, with total debt service of $8.9 million due before the end of the fiscal year. Unlike counties and cities, the District does not have a legally mandated debt limit. However, the District does have a rate covenant. The covenant requires the District to set rates and charges so that income available for debt service will not be less than 120% of fiscal year debt service requirement.
Throughout the history of the District, staff has continued to seek increasingly effective ways of identifying and prioritizing individual projects, to ensure a more comprehensive and balanced CIP. In 1990, as part of the political process of forming the District, certain construction and rehabilitation projects were identified by the various member municipalities and sanitary districts.
Once these designated projects were completed, the District then focused on rehabilitating aging, undersized collection lines to minimize unregulated discharges of raw sewage (sanitary sewer overflows or SSOs) and inflow/infiltration (I/I). Inflow and infiltration are the intrusion of groundwater and storm water runoff into the collection system, which can deplete capacity in sewer mains and at wastewater treatment plants.
As part of this comprehensive evaluative process, the District developed and implemented a program to monitor wastewater flows from the various parts of the sewerage system. The flow monitoring data was used to develop a computer hydraulic model of the flows of the sewerage system to help identify and remediate the worst areas of inflow and infiltration.
Capital Improvement Program (continued)
Background (continued) In 1999, MSD began an aggressive line cleaning and television inspection program wherein the District contracted with outside companies to clean the pipes with water under high pressure and then to send a video camera (also known as closed circuit television or CCTV camera) through the line. The videotapes have enabled the District to more accurately determine the condition of the lines and to prioritize necessary repairs. Each year 10% of the pipes will be cleaned and then inspected by CCTV cameras to maintain the efficient operation of the collection system.
The District developed a proactive cost-effective rehabilitation strategy with the development of the Pipe Rating Program. Pipe rating is a proactive planning tool, which utilizes Closed Circuit Television (CCTV) information, GIS database, and actual maintenance history to view, rate, and computer-score pipe segments based on a number of factors. These factors, manhole-to-manhole, include work order history, number and severity of defects, and record overflows on that segment, which are combined to yield a numerical rating used to prioritize efforts. Staff recently updated the District’s Pipe Rating Program to include additional parameters over previous versions. Each line project now has an objective numerical rating based upon overflow history, structural issues, customer service requests, and impacts to surface waters. This rating is then used to objectively prioritize collection system projects within the CIP each fiscal year.
Pipe Rating minimizes costs by helping the District focus rehabilitation dollars where they are needed most, rather than the usual full-scale replacement of entire collector lines. In recognition of this innovative program, the Association of Metropolitan Sewerage Agencies (AMSA) awarded the District one of only two 2003 National Environmental Achievement Awards.
Wastewater System Master Planning Comprehensive Master Plan—This plan was prepared in 2001 by Camp, Dresser & McKee (CDM). It is a comprehensive sewer system management program, which was prepared to identify system improvements needed to handle wet-weather flow conditions, to improve performance at the wastewater treatment plant, and to prepare the system to handle future system wastewater flows.