Budget Document
Metropolitan Sewerage District of Buncombe County, North Carolina 2028 Riverside Drive ~ W. H. Mull Building Asheville, North Carolina 28804 Phone: (828) 254-9646 Website: www.msdbc.org
METROPOLITAN SEWERAGE DISTRICT OF BUNCOMBE COUNTY, NORTH CAROLINA
2016-2017 Budget Document
PRINCIPAL OFFICIALS Board Member M. Jerry VeHaun, Chairman Jackie W. Bryson, Secretary/Treasurer Matt Ashley, Jr,
Representative of Town of Woodfin Woodfin Sanitary Water & Sewer Town of Montreat
Joe Belcher
County of Buncombe
Jon Creighton
County of Buncombe
Ellen Frost
County of Buncombe
E. Glenn Kelly
Town of Biltmore Forest
Esther Manheimer
City of Asheville
Chris Pelly
City of Asheville
Al P. Root
Town of Weaverville
Don Collins Gwen Wisler
Town of Black Mountain City of Asheville
Roberts & Stevens, P.A.
Legal Counsel
Cherry Bekaert, LLP
Auditing Firm
McGill & Associates
Engineer of Record
Thomas E. Hartye, P.E. W. Scott Powell, CLGFO
General Manager Director of Finance
Phone: (828) 254-9646 Website: www.msdbc.org
2028 RIVERSIDE DRIVE • W.H. MULL BUILDING • ASHEVILLE, NORTH CAROLINA 28804
Certificate of Achievement The Government Finance Officers Association of the United States and Canada (GFOA) presented a Distinguished Budget Presentation Award to the Metropolitan Sewerage District of Buncombe County, North Carolina (MSD) for its annual budget for the fiscal year beginning July 1, 2015. This is the nineteenth consecutive year that the MSD has received this award. In order to receive this award, a governmental unit must publish a budget document that meets program criteria as a policy document, as an operations guide, as a financial plan, and as a communication device. This award is valid for a period on one year only. We believe our FY2017 budget continues to conform to the program requirements, and we are submitting it to the GFOA to determine its eligibility for another award.
Table of Contents INTRODUCTION
POLICIES & BUDGET PROCESS
OPERATION & MAINTENANCE FUND
INSURANCE FUNDS
1 15
43
97
Budget Message
1-7
About MSD, City of Asheville, and Buncombe County
8-14
Financial Plan
15-18
Rate Projections & Budgetary Forecast
19
Budgetary Forecast Based on Current Business Plan
20
Fiscal Policy Budget Process Budget Calendar
21-25
Budgetary Basis of Accounting
29-30
Fund Structure
31-33
26-27 28
Flow of Funds – Bond Order
34
Budget Summary
35
Component Fund Chart
36-37
Revenue
38-41
Operation & Maintenance Fund
43-45
FY17 Budget – All Department Summary
46
Office of the General Manager Department
47-50
Human Resources Department
51-56
Information Technology Department
57-64
Financial Services Department
65-70
Water Reclamation Facility Department
71-77
SS Maintenance Department
78-83
SS Construction Department
84-89
Engineering Department
90-95
Insurance Overview
97
Self-Funded Employee Medical Program Budget
98
Post-Employment Insurance Budget
99
Worker’s Compensation Financial Plan
99
General Liability Financial Plan
100
Table of Contents REPLACEMENT FUNDS
CIP PROGRAM
DEBT FINANCING
STATISTICAL INFORMATION
101 107 141 149
APPENDIX
157
GLOSSARY
167
Replacement Fund Overview
101
Fleet Equipment Replacement Fund
102
Wastewater Treatment Plant Replacement
103
Pump Maintenance Replacement Fund
104
Capital Reserve Fund
105
Capital Improvement Program
107-113
Program Summary
114-127
Impact of CIP on Operations
128
Operational Impact Summary
129-140
Debt Financing
141-142
Outstanding Debt as of June 30, 2016
143-144
Aggregate Debt Service
145-146
Current Debt Service Structure as of June 30, 2016
147
Net Position by Component
149
General Revenue by Source
150
Expenses by Function
151
Wastewater Flow Table
152
Demographics Statistics-Service Area Population
153
Demographic & Economic Statistics
154
Principal Commercial Users
155
Principal Employers
156
Classification of Accounts
157-162
Job Classification by Grade Order
163-165
Glossary of Terms
167-176
June 15, 2016 Members of the Board Metropolitan Sewerage District of Buncombe County, North Carolina W. H. Mull Building 2028 Riverside Drive Asheville, North Carolina 28804 Subject:
2017 Budget Document
Dear Members of the Board, We respectfully present the FY17 Budget for the Metropolitan Sewerage District of Buncombe County, North Carolina. The budget incorporates staff recommendations presented to and accepted by the Personnel Committee, which met on April 26, 2016, the Capital Improvement Program Committee, which met on April 28, 2016, and the Finance Committee, which met on May 5, 2016. We have developed the FY17 Budget to advance the organization’s mission “to provide wastewater collection and treatment to its users which promotes the health and safety of affected citizens in the most effective and efficient manner possible today and in the future”. The following Operational and Capital budget is designed to provide services meeting or exceeding all state regulations and Bond Order covenants with which the District must comply, with any rate changes to be at the lowest responsible level.
Current Year Highlights In FY16, the District’s domestic and industrial revenue is expected to meet budgeted projections. The District continues to achieve growth in the number of residential customers. By effectively controlling the increase in operating expenditures and strategically planning the timing of CIP projects, the District has been able to limit the proposed rate increase to 2.5% for the upcoming year. Additionally, the District’s long-range business plan incorporates these changes and projects that future rate increases will approximate 2.5% for the remaining nine (9) years. This budget continues several recent initiatives to maintain the District’s overall strategy of keeping collection lines and the plant functioning effectively while rehabilitating significant portions of aging infrastructure. 2017 Budget Document
Page 1
Metropolitan Sewerage District of Buncombe County, North Carolina
The most important goal remains meeting all regulatory permit requirements including minimizing the occurrence of sanitary sewer overflows (SSOs). The SS Construction Department continues to expand its participation in sewerline rehabilitation and replacement efforts to minimize SSOs. Goals for FY17 include utilizing Infrastructure Rehabilitation System (IRS) lining, pipe bursting, and dig-and-replacement construction to rehabilitate and replace at least 20,000 linear feet, while providing preventative maintenance for approximately 500,000 linear feet of the system by employing in-house jet wash cleaning and both chemical and mechanical root control. In addition, the SS Maintenance Department will manage the District’s Right-of-Way maintenance program whereby easements will be periodically cleared or mowed. The Wastewater Treatment Plant is continuing systematic improvements as part of the District’s detailed Facilities Plan. In FY16, the District will begin the construction phase of the $11.5 million Headworks project. This project includes installing new bar screens and grit removal systems along with fine screens and a surge system for peak flows.
Operating Budget The proposed $16.1 million Operating Budget represents routine expenditures and capital equipment acquisitions needed for the day-to-day operations of the District. Highlights of significant components and changes include: Compensation and Benefits—The staff and employees considered salary and health insurance increases together as part of a comprehensive compensation package.
A 3.0% salary adjustment—CPI increased 1.6% for the last twelve-month period; Division Directors in conjunction with Employee Advisory Committee have requested a cost of living increase to keep pace with industry salary increases as well as to encourage retention of valued employees. The Personnel Committee has recommended a wage increase, which has a $252,000 net impact on current year expenditures. An 8.7% increase in funding for North Carolina retirement cost—In 2016, the Local Governmental Employees’ Retirement Systems (LGERS) adopted a rate stabilization policy to allow for predictability and stability in the contribution rates, while continuing to keep the local retirement system one of the best-funded systems in the country. Subsequently, LGERS raised the District’s contribution rate from 6.67% to 7.25% of total salary and wages. Over the next five years, contribution rates are projected to increase to an amount slightly over 8.25%. This has a $48,737 impact on current year expenditures. A 10% increase in funding for Self-Insured Medical Plan—During FY16, staff worked with its consultant and initiated a top to bottom review of our medical insurance plan. The effort was to insure the District has a medical plan in line with our sister agencies as well as to limit certain benefits and increase cost sharing by employees in the amount of $175,000. These changes have been endorsed by the Employee Advisory Committee. The two groups continue to work on a 2017 Budget Document
Page 2
Metropolitan Sewerage District of Buncombe County, North Carolina
long-term strategic plan to address controllable medical issues. The 10% increase in the employer contribution is in line with medical and prescription trend and has a $173,512 impact on current year expenditures. Funding for Post-Employment Health Benefit—Starting in FY09, GASB 45 required recognition of cost for Post-Employment Health Benefits. An actuarial study was done in the current year, which stated that FY17 funding should be $270,000. Current funding has been implemented into the proposed FY17 budget and the current business plan and represents 1.7% of total operations. Materials, Supplies, and Service expenditures increased 0.68% over prior year—The
District has made a concerted effort to hold materials, supplies, and services cost close to the prior year’s level, taking into account inflationary cost increases. The District has increased specific line items to address regulatory and operational needs (i.e. Title V Air Permit). Discretionary expenditures have been limited where practicable. This has a $43,109 impact on current year expenditures.
Capital Improvement Program The District prepares a ten-year Capital Improvement Program as required by its State Collection System Permit and the Consolidation Agreements. The estimated construction expenditure for FY17 is $22 million, which is comprised of an estimated $20.9 million in construction, $100,000 of reimbursement and $1 million in contingency. A detailed list of individual projects and planned expenditures by year was presented at the April 28, 2016 CIP meeting. The Board has consistently financed its Capital Improvement Program through revenue bonds and payas-you-go moneys. As of June 30, 2016, the District will have $95.31 million in outstanding revenue bond debt, with total debt service of $7.96 million due before the end of the fiscal year. Unlike counties and cities, the District does not have a legally mandated debt limit. However, the District does have a rate covenant. The covenant requires the District to set rates and charges so that income available for debt service will not be less than 120% of fiscal year debt service requirement.
Collection System Capital Improvements:
MSD initiated and maintains an aggressive program to rehabilitate its Wastewater Collection System. This program will conform to the North Carolina Department of Environmental and Natural Resources (NCDENR) Collection System Permit requirements, and will improve the operational performance and extend the life of the collection system. The estimated cost over a 10-year period is approximately $184.8 million out of a total CIP budget of $211.5 million. In the previous decade, efforts had been directed to expediting completion of certain projects identified by the member agencies and assumed by the District during the consolidation process. For example, construction of the 23.8-mile North Swannanoa Interceptor begun in 1993 was completed during FY2004 at a cost in excess of $44 million. Now that most of these “consolidation” projects have been completed, our focus has been redirected to rehabilitation of the State-mandated 250,000 feet of sewerline every five (5) years and other projects identified in the Master Plan.
2017 Budget Document
Page 3
Metropolitan Sewerage District of Buncombe County, North Carolina
This rehabilitation has been made more cost-effective by the development of the Pipe Rating Program. Pipe Rating is a proactive planning tool, which utilizes Closed Circuit Television (CCTV) information, a GIS database, and actual maintenance history to view, rate, and computer-score pipe segments based on a number of factors. These factors, for any given manhole-to-manhole segment, include maintenance work order history, number, and severity of defects, and record of overflows on that segment, and are combined to yield a rating useful for prioritizing rehabilitation efforts. Pipe Rating minimizes costs by helping the District focus rehabilitation dollars where they are needed most, rather than the previous replacement of collector lines throughout an entire basin. In recognition of this innovative program, the Association of Metropolitan Sewerage Agencies (AMSA) awarded the District one of only two 2003 National Environmental Achievement Awards. Major projects for FY17 include the $588,000 South French Broad Interceptor Grouting Project with approximately 7,008 linear feet, $583,500 Arco Road with over 2,022 linear feet, $1,377,000 Lining Contract No. 8 with over 11,000 linear, $532,573 Sandhill at Russell/Davenport with over 2,341 linear feet, and $400,726 Stratford Road at Oxford Court, with over 1,960 linear feet. In FY17, Treatment Plant Headworks improvements are scheduled to cost $5.5 million. These are in addition to numerous smaller projects completed throughout the collection system. Further details are available in the CIP section of the budget document. The District’s Collection System Master Plan addresses the orderly extension of the District’s collection system into future service areas. The plan has been prepared in close cooperation with the District’s member agencies and regional stakeholders. The land use policies and zoning regulations of each agency were used for land usage, growth projections/densities, and line locations. For areas outside of corporate or jurisdictional limits, Buncombe County’s Zoning Ordinance has played an integral role in defining future service areas. The plan will serve as a basis to ensure that the sewer system will be extended in an orderly fashion, and is done so in accordance with the planning policies of the various local governments within the District’s service area.
Wastewater Treatment Plant Capital Improvements:
During FY15, the Treatment Facilities Plan was updated for the Water Reclamation Facility. This plan provides short, medium, and long-term recommendations for each specific process and facility This update primarily expanded on several of the original plan’s longer term recommendations. It focused specifically on improvements to the WRF Headwork’s (i.e. bar screens, influent pumping station, and the problematic grit & grease removal system), including surge control for short-term peak flows. It also investigated in detail the installation of a primary clarification process; and has evaluated alternatives for the biological treatment process. 2017 Budget Document
Page 4
Metropolitan Sewerage District of Buncombe County, North Carolina
Another key aspect of the Facility Plan Update was to gain a solid understanding of regulatory issues that may impact future treatment requirements, and identify long-term biological treatment alternatives to comply with anticipated future regulation changes. Near-term and mid-term project recommendations from the plan include: Plant Headworks Project: This $11.5 million project spans 2 years and consists of a new grit removal system to replace the existing problematic system, a fine screening facility which will supplement the WRF’s existing bar screens, and storage at the plant using existing decommissioned tanks to provide more effective treatment during peak flow events. In addition, by removing more grit than the current process, it will help to better protect downstream processes within the plant. Design is planned for FY16 and construction is scheduled to begin in FY17. High Rate Primary Treatment Project: This $9.61 million project will provide primary clarification by removing solids before the biological treatment stage. This will provide a more effective treatment, and will also help the Rotating Biological Contactors (RBC’s) to better perform. During high flow (storm) events, this treatment can be ramped-up in order to match the higher flows. Design is planned for FY17 and construction is scheduled to begin in FY18. Long-term alternatives focused on the biological treatment aspect (currently RBC’s). Specific alternatives will be evaluated if and when future regulatory requirements change over time. The two projects noted above allow for flexibility among the viable options for biological treatment.
Impact of CIP on Operations For most municipal and county governments, capital improvements often result in higher operating costs. For example, larger buildings increase utility expenses, and new facilities such as libraries or swimming pools involve hiring additional staff. The opposite holds true for the District. Through major rehabilitation projects to the sewer collection system, the District is expected to realize a modest cost reduction in wastewater treatment operations by reducing infiltration of groundwater and inflow of surface water into the sewer system. Mud and grit, which accompany infiltration/inflow, will also be reduced, thereby increasing the life of pumps and other treatment equipment adversely effected by abrasion. Other savings are realized from capital expenditures as new or rehabilitated sewer lines also require less maintenance and are not as susceptible to frequent blockages and overflows as older and smaller lines. The District’s major environmental responsibility is reduction of Sewer System Overflows (SSOs). Staff has estimated the average cost of responding to an SSO to be approximately $2,175. During FY 2000, the District experienced more than 289 SSOs, which have been reduced to less than 30 in recent years. Thus,
2017 Budget Document
Page 5
Metropolitan Sewerage District of Buncombe County, North Carolina
the District has been able to focus approximately $500,000 additional dollars annually on preventative maintenance as opposed to responding to spill events. Moreover, the North Carolina Department of Environment and Natural Resources has the discretion to levy fines up to $25,000 per day per SSO if the District does not follow through on renovations and rehabilitations planned for areas identified as requiring capital improvements. Therefore, the CIP has a positive impact on operations by reducing repair and replacement while avoiding environmental penalties.
Sewer Rate Increase Staff recommends a 2.5% increase in domestic sewer rates and meter fees for FY17, including a previously approved plan to achieve flow rate parity between industrial and domestic users. This amount is in line with past increases. We believe this rate increase is prudent under the current economic situation and is necessary to provide for the following District responsibilities and objectives:
Meet current and future regulations at the Water Reclamation Facility and for the Collection System Replace and rehabilitate approximately 50,000 linear feet of sewer mains a year Debt coverage ratio attractive to investors and rating agencies Support of the pay-as-you-go element of the CIP in addition to bonds Continue with goal of periodic smaller rate increases in lieu of large increase in future years Adequate current funding and maintenance of prudent reserves for Self-Insured Medical and Dental Plan In the past, the MSD Board has endeavored to keep rate increases to a minimum. The District’s Bond Order requires sewer rates be set to ensure that the excess of revenues over current expenditures is at least 120% of debt service. Additionally, the Board balances the bond order requirements while maintaining all regulatory and fiduciary responsibilities. Domestic sewer rates for the past five years as well as FY17 are shown below:
Rate Increase % Meter, Maintenance & Billing Fees Flow Rate (per ccf) Avg. Monthly Bill (5ccf)
FY12
FY13
FY14
FY15
FY16
FY17
3.0% $7.05 $3.88 $26.45
2.5% $8.34 $3.98 $27.14
2.5% $8.53 $4.08 $27.81
2.5% $8.73 $4.18 $28.49
2.5% $8.90 $4.28 $29.15
2.5% $9.08 $4.39 $29.88
Distinguished Budget Award The Government Finance Officers Association of the United States and Canada (GFOA) presented a Distinguished Budget Presentation Award to the Metropolitan Sewerage District of Buncombe County, 2017 Budget Document
Page 6
Metropolitan Sewerage District of Buncombe County, North Carolina
North Carolina for its annual budget for the fiscal year beginning July 1, 2015. This is the nineteenth consecutive year that the MSD has received this award. In order to receive this award, a governmental unit must publish a budget document that meets program criteria as a policy document, as an operations guide, as a financial plan, and as a communication device. This award is valid for a period of one year only. We believe our FY17 budget continues to conform to program requirements, and we are submitting it to GFOA to determine its eligibility for another award.
In Closing The Budget represents the combined efforts and guidance of the Board, its Committees and staff. A special thanks to Teresa Gilbert for assembling the budget documents, Jim Hemphill, HR Director, Ed Bradford, CIP Director, and Cheryl Rice for assembling the CIP Section of the Budget, We look forward to working with you, staff, and our ratepayers as we implement this financial plan and policy document. Respectfully submitted,
Thomas E. Hartye, PE General Manager
2017 Budget Document
W. Scott Powell, CLGFO Director of Finance
Page 7
Metropolitan Sewerage District of Buncombe County, North Carolina
About MSD, City of Asheville & Buncombe County About MSD The MSD is a public body and body politic and corporate of the State of North Carolina, exercising public and essential governmental functions and organized under the provisions of the North Carolina Metropolitan Sewerage Districts Act, being Article 5, Chapter 162A of the General Statutes of North Carolina, as amended. The District was established in 1962 by the North Carolina State Stream Sanitation Committee to construct and operate facilities for sewage treatment for municipalities and sanitary districts within Buncombe County. In 1967, the District completed the construction of a 25 million gallon per day (MGD) wastewater treatment plant adjacent to the French Broad River. Nineteen miles of interceptor sewer were initially built, connecting the collector sewer systems located within the municipalities and other political subdivisions, which comprised the District. Then, in the late 1980’s, the District expanded the capacity of the Water Reclamation Facility to its current capacity of 40 MGD, rehabilitated the hydroelectric dam and powerhouse to mitigate energy costs, and built a thermal converter for sludge disposal. In July 1990, the political subdivisions comprising the District transferred their respective sewerage systems to the District. These systems had been previously owned, operated, and maintained separately by each political subdivision. The purpose of this sewer consolidation was to create a consolidated sewerage system in the urbanized portion of Buncombe County with ownership of all components of the system and responsibility for their operation, maintenance, and capital improvement centralized with the District. Before the sewer consolidation, the District had little control over the condition, operation, and maintenance of individual collector systems, which significantly affect the operational efficiency of the wastewater plant. Buncombe County is located in the Blue Ridge Mountains of Western North Carolina. The District is comprised of the following political subdivisions located within Buncombe County: City of Asheville
Fairview Sanitary Sewer District
Town of Montreat
Skyland Sanitary Sewer District
Town of Biltmore Forest
Busbee Sanitary Sewer District
Town of Black Mountain
Swannanoa Water & Sewer District
Town of Weaverville
Caney Valley Sanitary Sewer District
Town of Woodfin
Woodfin Sanitary Water & Sewer District
Beaverdam Water & Sewer District
Crescent Hill Sanitary Sewer District
Enka-Candler Water & Sewer District
Venable Sanitary District
The District Board consists of twelve appointed members. Three (3) from the County of Buncombe, three (3) from the City of Asheville, and one (1) each from the Woodfin Sanitary Water & Sewer District, and the Towns of Biltmore Forest, Black Mountain, Montreat, Woodfin, and Weaverville. 2017 Budget Document
Page 8
Metropolitan Sewerage District of Buncombe County, North Carolina
About MSD, City of Asheville & Buncombe County (continued) About MSD (continued) Under the North Carolina Metropolitan Sewerage Districts Act, the District is authorized, among other things, to: (a) acquire, lease, construct, reconstruct, improve, extend, enlarge, equip, repair, maintain, and operate any sewerage system or part thereof (including facilities for the generation and transmission of electric power and energy) within or without the District; (b) to issue revenue bonds to pay the costs of any of the foregoing; and (c) to fix and revise from time to time and collect rents, rates, fees and other charges for the use of or the services and facilities furnished by any sewerage system.
District Boundary Map
2017 Budget Document
Page 9
Metropolitan Sewerage District of Buncombe County, North Carolina
About MSD, City of Asheville & Buncombe County (continued) Population and Growth Statistics Population growth in Buncombe County has occurred largely in a linear fashion along major transportation routes, which is reflected in the configuration of the District’s service area. The District is approximately a 180 square mile service area, comprising nearly 25% of the total land area of Buncombe County. The District’s service area corresponds generally with the urbanized core of Buncombe County, and includes small portions of northern Henderson County. The population of the area has steadily increased, as illustrated in the following chart: Buncombe
Henderson
County
County
1970
145,056
42,804
1980
160,897
58.580
1990
174,727
69,378
2000
206,316
89,173
2010
238,318
106,742
2015
253,178
111,149
Year
Located in approximately the geographic center of Buncombe County, the City of Asheville is the major population center in the District. About 35% of the County’s residents live in Asheville. Five (5) incorporated towns in Buncombe County-Black Mountain, Biltmore Forest, Weaverville, Woodfin, and Montreat are included in the District’s service area. Weaverville and Woodfin are north of Asheville, Black Mountain and Montreat are located in eastern Buncombe County, and Biltmore Forest is contiguous to the City of Asheville on its southern boundary. Approximately seven percent (7%) of the county’s population lives in these five towns. Buncombe County’s topography ranges from fertile valleys to rugged mountains. Mt. Mitchell, the highest point in eastern North America (6,684 feet), is located 35 miles northeast of the City of Asheville in adjacent Yancey County. The topography of Buncombe County’s urbanized core is, however, a long flat plain, which has allowed Buncombe County to develop differently from the more mountainous counties of Western North Carolina. The plain, with an elevation of 2,000 feet, averages about 45 miles in width. It is 2017 Budget Document
Page 10
Metropolitan Sewerage District of Buncombe County, North Carolina
About MSD, City of Asheville & Buncombe County (continued) Population and Growth Statistics (continued) bisected from south to north by the French Broad River and from east to west by the Swannanoa River and Hominy Creek, two major tributaries of the French Broad. Because of extremes in elevation, the climate varies significantly from one section of Buncombe County to another. The mean elevation of the City of Asheville is about 2,300 feet, and the summers are cool and the winters are moderate with small amounts of snow. The higher elevations in Buncombe County receive considerable amounts of snow and the summers are cooler. The average January temperature is 37° for the City of Asheville and the average temperature in July is 74°. The City of Asheville receives an average of 46 inches of rainfall a year. However, because the City of Asheville is located within a “rain shadow” caused by the shielding effect of the nearby mountain barriers, other areas of Buncombe County, especially to the south and southwest, receive significantly higher amounts of rainfall.
Employment and Major Industries Buncombe County serves as a regional economic center for Western North Carolina. Its diverse commercial and industrial base includes manufacturing, distribution, travel and tourism, retail trade, health care and governmental services. According to the North Carolina Employment Security Commission, 128,817 people were employed in Buncombe County as of April 2016. The number of persons in the labor force has increased by 3,150 over the previous year. Buncombe County’s economy has been expanding and becoming more diverse. Recognizing that textile industries no longer dominate the manufacturing base, the public and private sectors in Buncombe County have been working together to encourage the relocation and development of new industries and other economic endeavors. In addition, the Buncombe County Tourism Development Authority works to foster the continued growth of tourism and convention business. Downtown redevelopment efforts by the City of Asheville have also provided additional office, retail shop, and parking space. Employment in the service sector is increasing, but manufacturing remains a significant part of the local economy. The diverse products manufactured include food, textiles, apparel, wood products, printing and publishing, rubber and plastic products, fabricated metal products, industrial machinery and equipment, electrical equipment, and transportation equipment. Health care, retail sales, education, and government services are the principal employers in the growing service sector of Buncombe County’s labor force. Buncombe County serves as a regional medical center for most of western North Carolina. There are two major hospital complexes located in Buncombe County: Mission Health System & Hospital, an acute care medical center licensed for more than 735 beds on (2) two adjoining campuses, Memorial and St. Joseph, and the federally funded Veteran’s Administration Medical Center, Charles George VA Medical Center consisting of a 119-bed acute care hospital and 120-bed nursing facility serving veterans from a 19county area in Western North Carolina, parts of Eastern Tennessee, and upstate South Carolina and Georgia. 2017 Budget Document
Page 11
Metropolitan Sewerage District of Buncombe County, North Carolina
About MSD, City of Asheville & Buncombe County (continued) Employment and Major Industries (continued) Also located in Buncombe County is CarePartners Rehabilitation Hospital, a private, nonprofit 80-bed facility for the rehabilitation and treatment of stroke and ambulation dysfunction victims, traumatic brain/head injuries, and amputation. Tourism and the hospitality industry also constitute major segments of employment in the service sector and are projected to increase significantly. The impact of tourism is multi-dimensional and includes conventioneers, commercial visitors, and tourists taking advantage of the mountain scenery, moderate climate, and craft skills of persons living in the area. Closely related to the tourism industry is the growth of discount malls and outlet stores. The seasonal influx of persons from outside the region is strengthening Buncombe County’s position as the primary regional retail center for area and tourist commerce. To provide a source of funds for promoting the recreational, cultural, and other attractions of the area, Buncombe County has imposed an occupancy tax on hotel and motel rooms in Buncombe County. The revenues from this tax are used by Buncombe County’s Tourism Development Authority to promote the growth of tourism and convention business. Western North Carolina is known as a recreational area, which makes tourism and the hospitality industry a major contributing force to the economic vitality of Buncombe County. The Great Smoky Mountains National Park is located 70 miles west of the City of Asheville. Approximately 160 miles of the Blue Ridge Parkway are in western North Carolina, and the Parkway bisects Buncombe County from east to west. Two national forests, Pisgah and Nantahala, are located within an easy drive of the City of Asheville. These outdoor recreational resources attract thousands of visitors each year to the area for such activities as camping, hiking, canoeing, white-water rafting, fishing, and hunting. Also, immediately south of the City of Asheville is the 255-room “chateau” known as the Biltmore House. Constructed from 1889 to 1895 by George Vanderbilt, the Biltmore House is one of North Carolina’s most visited tourist attractions, which includes self-guided tours of the House & Gardens, Antler Hill Village, featuring the Winery, The Biltmore Legacy, Village Green, and Farm. Another attraction is the Grove Park Inn with 510 guest rooms, 42 meeting rooms, an 18-hole, 6,720 yard, par 70 Donald Ross designed golf course, a 43,000 square-foot spa with 31 treatment rooms and over 60 treatment selections which has augmented its appeal to the tourism and hospitality industry. This favorable economic environment has resulted in lower unemployment rates for Buncombe County than across the state and nation. In addition, median household income has increased by 13.6% in Buncombe County and 4.3% in the City of Asheville since 2009. According to the U. S. Department of Commerce, for the year 2014, median household income in the City of Asheville was $44,077 and in Buncombe County was $45,642. This compares with $46,693 for the State of North Carolina and $53,482 for the nation as a whole.
2017 Budget Document
Page 12
Metropolitan Sewerage District of Buncombe County, North Carolina
About MSD, City of Asheville & Buncombe County (continued) Education Buncombe County has two public school systems: the Asheville City Administrative Unit, which serves about 3,996 students, consisting of (5) elementary schools and (3) secondary (high schools) and the Buncombe County Administrative Unit, which serves approximately 25,597 students, consisting of (23) elementary schools, (17) secondary schools (high schools) and (2) combined schools. Asheville-Buncombe Technical Community College is a public, two-year college, serving more than 24,000 students in a variety of business, technical, and health care curricula. In addition, community enrichment classes, such as art, languages, and practical skills are offered year-round at each campus location throughout the College’s service area. Warren Wilson College is a private, four-year liberal arts college with an enrollment of about 1,000 students offering academics with work for the school (15 hours per week) and service to the community (100 hours over four years). Montreat College is a private four-year liberal arts college with an enrollment of about 1,100 students at the (4) campuses which strives to be Christ-centered, student-focused, and service-driven. In addition, Montreat College offers accelerated programs for adult students, including graduate, professional, and online degree programs. The University of North Carolina at Asheville (“UNCA”) is an undergraduate, state-supported liberal arts college with an enrollment of about 3,800 students from 38 states and 24 countries. UNCA is one of the nation's top public liberal arts universities and one of the (17) institutions in the University of North Carolina system offering more than 30 majors.
Transportation An integrated network of highway, rail, and air services serves Buncombe County. Interstate Highway 40, Interstate Highway 26, Interstate 240 (Billy Graham Freeway), U.S. Highway 19-23 and U.S. Highway 74 link Buncombe County to the Piedmont area of North Carolina (including the cities of Charlotte, Greensboro,
Raleigh, and Winston-Salem), the Piedmont area of South Carolina (including the cities of Greenville and Spartanburg), and the Tennessee-Ohio Valley area.
Rail service to Buncombe County is served by the Norfolk Southern Railroad Corporation providing rail
lines through Knoxville, Tennessee to the west and Greenville, South Carolina to the south. To the east, rail lines adjoin North Carolina’s 3,600-mile rail network approximately an hour away in Greer, South Carolina.
Major air passenger and cargo services are available through the Asheville Regional Airport and served by
Allegiant, Delta, United, and American. These carriers offer approximately 30 daily non-stop flights to 10
popular destinations and enplaned 392,713(787,037) passengers in the calendar year ending December 31, 2015.
2017 Budget Document
Page 13
Metropolitan Sewerage District of Buncombe County, North Carolina
This page intentionally left blank.
2017 Budget Document
Page 14
Metropolitan Sewerage District of Buncombe County, North Carolina
Financial Plan Guide to the Budget Document This Budget presentation has four major objectives: Policy Document—To show how resources have been allocated in response to the mission statement and supporting goals/objectives set forth by the Board of Directors. Financial Plan—To present the District's Financial Plan for the fiscal year, showing where the money will come from and how it will be spent. Operations Guide—To describe services provided along with goals and objectives for each unit within the District, and a method for measuring progress towards the District’s mission of providing cost-effective and efficient wastewater collection and treatment. In addition, a Budget is a required management tool for compliance with state wastewater management licensure and local government fiscal control regulations. Communications Device—To explain the District budgetary procedures and interactions with other District planning processes and within the larger context of local and regional economic and environmental conditions. This document has been divided into sections as follows to assist the reader’s understanding and ability to easily locate information: Introduction—The transmittal letter provides current year trends and highlights. Policies & Budget Process—Presents the policies forming the basis for all management decisions, a narrative of the overall budget process, the underlying fund structure, and a discussion of revenue. Operation & Maintenance Fund—Provides detail of departmental expenditure budgets including underlying goals and objectives, as well as accomplishments and performance measures. Insurance Funds—Describes internal service-type funds used to allocate premiums and associated expenses among various departments. Replacement Funds—Provides funding status of various replacement and reserve funds. CIP Program—Details the Capital Improvement Program, including budgetary process, current year highlights, and summarizes planned projects for the upcoming 10 years. Debt Financing—Provides further detail on debt philosophy and management, including current and future debt service. 2017 Budget Document
Page 15
Metropolitan Sewerage District of Buncombe County, North Carolina
Financial Plan (continued) Statistical Information—Includes historical summaries of District financial information, plant operational data, and local demographic and economic statistics. Appendix—Provides supplemental narrative about the District and local economy, details of capital equipment expenditures budgeted and staffing information. Glossary—Definitions of technical terms and acronyms.
Background of Entity The Metropolitan Sewerage District of Buncombe County, North Carolina (the District), established under an act of the state legislature, is a local governmental agency providing wastewater collection and treatment services to approximately 50,000 residences and businesses located in several municipalities and certain unincorporated areas in Buncombe County. The governing board is comprised of twelve members appointed by eight local governments who serve three-year overlapping terms. The District owns a 40 million gallon per day (MGD) wastewater treatment plant and the associated collection network of approximately 977 miles of collector sewers, 29,000 manholes, and 31 pump stations. The District is responsible for current operation and maintenance of this infrastructure, as well as for planning for future operations and capacity. An expanded section on the history and composition of the District along with an overview of the regional economy is located in the Appendix.
Mission Statement and Goals The budgetary process starts with the mission statement promulgated by the District Board. To achieve the purpose articulated in the mission statement, staff is charged with developing long-term goals and the short-term objectives designed to achieve these goals. Using this framework, annual operating and construction budgets are proposed to fulfill these short-term objectives and thus meet or reach toward long-term goals. Therefore, an understanding of the mission statement and the underlying goals and objectives provide a context for the decisions made in developing the annual budget. Each departmental goal and objective is tied to one or more of the non-financial or financial policies to coordinate and prioritize the District’s focus, initiatives, and efforts.
Mission Statement—To provide wastewater collection and treatment to its users which promotes the health and safety of affected citizens in the most effective and efficient manner possible today and in the future.
2017 Budget Document
Page 16
Metropolitan Sewerage District of Buncombe County, North Carolina
Financial Plan (continued) Long-Term Goals—Staff has developed four goals to be pursued in support of the Mission Statement adopted by the Board: 1. Protection of health, safety, and the environment 2. Excellence in customer service 3. Cost-effectiveness 4. Continuous improvement Managers and employees use these goals to determine appropriateness of and to enhance coordination and consistency of decisions, activities, and initiatives throughout the District.
Short-Term Objectives—Objectives are specific achievements or strategies, which support or lead to long-term goals and are used to determine how resources are allocated in this budget. 1. Maintain Collection System Permit. (Goal #1) 2. Maintain Discharge Permit to French Broad River for Water Reclamation Facility. (Goal #1) 3. Maintain a qualified and motivated workforce. (Goals #1-4) 4. Coordinate, to the extent practicable, with other governmental and private entities for cooperative provision of sewer service to gain optimum economies of scale, reduced capital cost, and improved efficiency. (Goals # 1-4) 5. Participate in two-way communications with customers, elected officials, and other stakeholders in matters of mutual concern such as regulations, policies, and fees. (Goals # 1-4) 6. Provision of information and education concerning stewardship of water resources. (Goals # 1-4) Authority for the District’s first goal of protection of health, safety, and the environment is received from the Collection System and Discharge Permits issued by the North Carolina Department of Environment and Natural Resources, Division of Water Quality. Therefore, the major emphasis of the District’s activities is to fulfill or comply with the terms of these permits. In addition to specifying certain measures of water quality and minimum standards for maintenance of lines, the permits expect steady progress towards rehabilitation of aged lines and planned replacement of plant assets. The remaining four objectives are strategies designed to complement the efforts to fulfill the requirements of the permits in achieving the District’s goals. Obviously, a competent, well-trained, and committed workforce will not only be technically accomplished, but will also provide excellent customer service, and will explore ways to do the job better and at less cost. Similarly, leveraging resources with others can improve service delivery and reduce costs. Finally, communication with and education of stakeholders is designed result in wide-ranging improvements to service delivery, customer relations, and cost containment. 2017 Budget Document
Page 17
Metropolitan Sewerage District of Buncombe County, North Carolina
Financial Plan (continued) Using key objectives identified as critical to the District’s mission, Departments develop their individual initiatives and objectives, and the performance measures by which to assess progress. As the budgets for each division or department are presented in the next section, each departmental goal will reference the number of the overall District’s goal, objective, or the fiscal policy supported. In this way, each department establishes its accountability and demonstrates the linkage between activities and the achievement of the District’s objectives. The Systems Services Division bears responsibility for maintaining the Collection System Permit (Objective #1) and the Water Reclamation Facility for maintaining the Discharge Permit (Objective #2). Details of the requirements of these permits and related performance measurements may be found in these respective departmental budgets behind the “Operation & Maintenance Fund” tab. The other objectives have no legal or regulatory basis, but are underlying principles of how the Board intends the District to carry out the primary mission, and are referenced as appropriate in the departmental goals and objectives.
2017 Budget Document
Page 18
Metropolitan Sewerage District of Buncombe County, North Carolina
Rate Projections & Budgetary Forecast The District is required by its Bond Order to set rates at such a level that the excess of revenues over current expenditures equals at least 120% of debt service. The Board established a revenue policy that the goal for debt coverage ratio be 150% or 1.5, and sufficient to meet all operating and capital needs with modest level increases. The Board has also established a budget policy that calls for a ten-year projected operating budget and capital improvement program for long-term planning purposes. Revenue and expenditure projections are integrated with anticipated capital expenditures to anticipate rate increases and timing of debt issuance based on cash flow levels and debt coverage ratios. Consumer revenue projections are based on consumption rates, growth in number of taps during the previous year, and projected rate increase. Industrial revenue is developed from anticipated fees of actual individual companies, since there are relatively few industrial customers and the charges are determined by effluent strength, as well as volume, which may vary greatly depending on the particular entity. As there are a limited number of large customers, any major change to a particular facility such as announced layoffs or closings, may be immediately factored into the industrial revenue computation. Operating expenditures are anticipated to increase at the regional cost of living rate, and capital expenditures at the general inflation rate. Future debt service is projected to be issued at slightly above prevailing rates. As this forecast is updated at least semiannually, management is able to adjust timing of capital projects and discuss in advance with Board members proposed timing and levels of rate increases. Using consumption data projected from the recent historical population growth statistics within the Asheville-Buncombe County area, the District anticipates annual rate increases of 2.5% for the next ten years. Construction costs are fairly level reflecting the District’s Master Plan to consistently rehabilitate approximately 50,000 linear feet of pipe per year. The CIP expenditure forecast for FY17 reflects a continuation of a major rehabilitation project at the Wastewater Treatment Plant. This long-range budgetary projection also shows how the District plans to finance these projects with a combination of bond proceeds and pay-as-you-go funding from sewer revenues. Overall, the ten-year projection indicates the District’s continuing ability to provide wastewater collection and treatment for customers, infrastructure maintenance in accordance with state regulations, and debt service in compliance with Bond Order, all with minimal, uniform rate increases.
2017 Budget Document
Page 19
2.5%
2.5%
2.5%
2.5%
2.5%
2.5%
2.5%
2.5%
2.5%
2.5%
2.5%
2.5%
Sewer Rate Increase
$28.49
$29.15
$29.88
$30.63
$31.39
$32.18
$32.98
$33.81
$34.65
$35.52
$36.41
$37.32
Average Monthly Bill
FY 2013
FY 2014
FY 2015
FY 2016
FY 2017
FY 2018
FY 2019
FY 2020
FY 2021
FY 2022
FY 2023
FY 2024
FY 2025
FY 2026
July 1- Available for Construction
Assumptions
26,606,688
20,669,346
48,486,528
44,585,099
39,085,709
28,907,128
16,483,603
33,443,078
26,216,912
18,568,520
39,206,353
29,894,591
17,592,887
36,199,190
Minimum of 365 Days Cash on Hands
REVENUE: Domestic Users (No growth) Industrial Users Billing and Collections (User Fee) Tap Fees Facility Fees Interest & Non-operating Revenues City of Asheville (annex.-Enka) Rental Income Transfer from Reserves (to / from) Miscellaneous Total Revenues State and Federal (EPA) Grants Revenue Bonds/Stimulus
25,743,801 1,824,034 701,015 313,040 2,253,595 160,909 37,023 70,356 (768,978) 219,456 30,554,251
26,913,949 2,656,078 717,413 373,800 4,056,675 121,357 37,126 71,081 (261,683) 225,275 34,911,071
Total Funds Available
57,160,939
83,580,417
28,154,062 3,725,584 738,239 389,090 3,922,165 180,162 37,167 71,226 (116,059) 177,248 37,278,884
28,959,278 3,276,044 750,000 500,000 5,000,000 180,000 37,000 69,950 0 140,000 38,912,272
29,922,929 2,943,043 772,500 200,000 1,500,000 339,964 37,000 71,399 0 140,000 35,926,836
30,902,466 2,980,220 795,675 105,000 1,500,000 340,430 37,000 71,641 0 140,000 36,872,432
31,898,172 2,963,369 819,545 105,000 1,500,000 374,450 37,000 71,641 0 140,000 37,909,177
85,765,412
83,497,371
75,012,545
65,779,560
82,392,780
28,000,000
32,968,443 3,033,315 844,132 105,000 1,000,000 447,450 37,000 71,641 0 140,000 38,646,981
34,056,344 3,104,773 869,456 105,000 1,000,000 335,891 37,000 71,641 0 140,000 39,720,105
35,162,188 3,178,017 895,539 105,000 1,000,000 577,749 37,000 71,641 0 140,000 41,167,134
72,090,059
65,937,016
87,735,654
28,000,000
36,286,298 3,253,093 922,405 105,000 1,000,000 691,009 37,000 71,641 0 140,000 42,506,446
37,488,870 3,330,045 950,078 105,000 1,000,000 474,875 37,000 71,641 0 140,000 43,597,509
38,711,272 3,408,921 978,580 105,000 1,000,000 537,921 37,000 71,641 0 140,000 44,990,335
81,712,799
73,492,099
90,583,222
28,000,000
40,128,858 3,314,769 1,007,937 105,000 1,000,000 577,808 37,000 71,641 0 140,000 46,383,013
28,000,000 82,582,203
EXPENSES: Operations & Maintenance 12,888,006 13,483,913 13,901,595 14,890,170 15,481,490 16,492,738 17,082,355 17,696,866 18,346,490 19,000,360 19,683,846 20,398,578 21,146,384 21,958,972 Replacement Funds (WRF & Fleet) 500,000 500,000 500,000 625,000 625,000 720,000 730,000 730,000 800,000 800,000 805,000 810,000 810,000 810,000 Debt Service 8,114,665 8,408,166 10,184,160 9,109,708 7,956,840 7,950,460 7,936,215 10,363,936 10,362,251 10,350,312 11,511,562 11,449,786 11,417,129 13,505,914 CIP (including Bond Projects) 14,988,922 12,701,810 16,594,558 19,786,784 22,042,087 24,132,760 23,201,132 17,082,346 17,859,756 18,378,629 19,817,800 23,240,848 21,010,519 24,725,729 44,411,662 48,949,702 47,368,497 48,529,301 55,899,212 54,384,032 Ju e 30 Ca y O e Total o CoExpenses st uct o 36,491,593 0,669,3 6 35,093,889 8, 86,5 8 41,180,313 ,585,099 39,085, 09 46,105,417 8,90 , 8 49,295,958 6, 83,603 33, 3,0 8 45,873,148 6, 6,9 8,568,5 0 39, 06,353 51,818,208 9,89 ,59 ,59 ,88 36, 99, 90 61,000,615 ,58 ,589 Pay-as-you-go
8,377,997
(Current Revenue only)
13,018,992
1.8 2.1
Debt Coverage (User Fees only) Debt Coverage with Total Revenue
13,193,129
2.0 2.5
14,623,235
1.8 2.3
2.0 2.6
12,488,506
2.3 2.5
12,429,235
2.3 2.5
12,890,608
10,586,179
2.3 2.6
11,011,364
1.8 2.0
1.9 2.0
11,816,462
1.9 2.1
11,311,038
1.8 2.0
11,749,145
1.9 2.0
12,426,822
1.9 2.1
10,918,127
1.7 1.8
Active Plan CIP Interceptor/Wet Weather Rehabilitation General Sewer Rehabilitation Private Sewer Rehabilitation Treatment Plant / Pump Stations Engineering Force Account Reimbursements Contingency Capital Improvement Program Totals
0.75% Increase
Bond Issues figured at: 5.0% yield FY19 5.5% yield FY22 5.5% yield FY25
3% inflation in O & M, Replacement Funds and Engineering Force Account ENR 10-year Construction Index @ 3.02% General Sewer Rehab to cover 50,000 lineal ft / year Target Debt Coverage 1.5
10-Year Capital Improvement Program
April 13, 2016
Consumption and Account Growth
FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 15,698 634,790 5,480 618,050 760,970 587,214 2,120,501 0 0 38,318 5,218,233 6,672,519 849,200 5,946,055 7,947,823 8,009,720 11,317,853 9,437,167 8,859,631 9,729,563 10,883,494 13,396,005 14,624,514 15,055,868 11,237,837 12,934,256 15,369,575 11,221,531 17,920 40,700 34,000 2,000 646,000 10,920 0 386,613 0 0 0 192,860 0 4,567,989 1,579,600 3,028,300 7,181,959 8,129,000 11,046,216 7,369,751 401,811 271,458 252,967 260,607 268,477 1,545,324 4,206,103 2,439,492 2,437,000 2,208,925 2,447,608 2,546,486 2,658,847 2,727,386 2,797,917 2,863,784 2,931,476 3,001,123 3,072,736 3,146,420 3,252,040 0 0 0 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 0 0 0 0 1,000,000 14,988,922 12,701,810 16,594,558 19,786,784 22,042,087 24,132,760 23,201,132 17,082,346 17,859,756 18,378,629 19,817,800 23,240,848 21,010,519 24,725,729
No growth in Industries Rate Parity for Flow in 2020 District 10yr CIP $211.5 Million District total 10yr Budget $509.2 Million
TOTAL CONSTRUCTION COSTS $25,000,000
CASH BALANCE & REVENUE Pay-as-you-go
$60,000,000
$20,000,000
$50,000,000 $15,000,000
Bond Money Used
$40,000,000
Revenue w/o Bonds
$30,000,000
$10,000,000
$20,000,000
Pay-as-you-go
Page 20
$5,000,000
Bond Issues
$10,000,000
$0
$0 13
14
15
16
17
18
19
20
21
22
23
24
25
26
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Cash Balance
Metropolitan Sewerage District of Buncombe County, North Carolina
2.5% $27.81
Budgetary Forecast Based on Current Business Plan
2017 Budget Document
2.5% $27.14
Business Plan FY17
Metropolitan Sewerage District of Buncombe County, North Carolina
Fiscal Policy Overview The Metropolitan Sewerage District of Buncombe County, North Carolina (the District) fiscal policies compiled below comprises the basic framework for the overall financial management of the District. These policies assist Board and Management decision-making and provide guidelines for evaluating both current and long-range activities and programs. They are reviewed annually in conjunction with the budgetary process to verify continued applicability and benefit to the District. The primary objectives of these policies are to ensure that moderate rate increases will be adequate to provide current and future funds to support the District’s mission and goals; and to provide accountability for cost-effective stewardship of ratepayer’s funds to stakeholders through fairly presented financial information supported by full disclosures.
Revenue Policy 1. Revenue Recognition—Revenues shall be recorded on the full accrual basis in accordance with Generally Accepted Accounting Principles (GAAP) for proprietary governmental entities.
2. Setting User Charges—Charges for domestic and industrial sewer users shall be set at such a level to
provide sufficient revenues to cover all annual operating and debt service expenditures, to accumulate funds for timely acquisition and replacement of capital equipment and facilities, and to finance the pay-as-you-go portion of the long-term Capital Improvement Plan as approved by the Board.
3. Revenue Projections—To assist in setting annual user rate charges, District staff will prepare projections of revenues and expenditures for a minimum of five years.
4. Daily Deposits—In accordance with NC General Statues Section 159-32, the Board shall require daily deposits of receipts only when the moneys on hand amount to at least two hundred fifty dollars ($250.00). Any funds not immediately deposited shall be appropriately safeguarded.
5. Monitoring Revenue—District staff shall monitor revenues as billed and collected by participating entities for reasonableness and completeness and shall report to the Board no less than quarterly.
6. Direct Billing—For those users who are billed directly by District staff, such bills shall be computed accurately, recorded properly, and distributed in a timely manner.
7. Billing Adjustments—The Billing Coordinator shall be authorized to create and post credit
memoranda for adequately documented adjustments incurred by customers billed directly by the District. The Billing Coordinator may also make adjustments of up to $10 to correct errors or remove disputed charges.
2017 Budget Document
Page 21
Metropolitan Sewerage District of Buncombe County, North Carolina
Fiscal Policy (continued) Revenue Policy (continued) 8. Bad Debt—The District shall consider as bad debt any domestic revenue for customers when written off by the member agencies who provide collection services. All delinquent customer accounts billed directly by the District shall be subject to reasonable collection efforts. After such efforts have been exhausted, writing off uncollectible accounts shall be authorized as follows: the Billing Coordinator may write off amounts up to $10, the Director of Finance amounts up to $1,000, and the General Manager amounts over $1,000. The Director of Finance shall prepare an annual reporting of bad debts to be submitted to the Finance Committee.
9. Authority for Revenue Procedures—The Director of Finance shall be responsible for designing, implementing, monitoring, and amending as necessary, accounting procedures, including internal
controls, for the billing, recording, and reporting of all revenues of the District in compliance with GAAP and State law. Any changes to revenue procedures will be reported to the Finance Committee at their next meeting.
Operating Budget Policy 1. Funding—Debt or bond financing will not be used to finance current expenditures. 2. Service Efforts and Accomplishments—The District will integrate performance measures and productivity indicators into its budgetary process.
3. Planning—The District will prepare a ten-year operating budget projection, which will include projections of annual growth plus allowances for operating costs of new capital facilities.
4. Risk Management—The District will utilize a risk management program to protect against loss and reduce exposure to liability. A comprehensive safety program shall be an integral component and will
investigate property damage and workers’ compensation incidents to minimize liability and take proactive measures to reduce the number and severity of future claims.
5. Authority for Budget Procedures—The District will prepare the budget in accordance with GAAP and the Local Government Budget and Fiscal Control Act (LGBFCA) established by the state legislature.
6. Periodic Reporting—The Finance Department shall submit quarterly budget to actual financial reports to the Board of Directors and monthly to Division Heads.
7. Balanced Budget—The District shall submit a balanced budget wherein budgeted expenditures shall equal budgeted revenues. Budgeted revenues may include transfers from another fund, reserves, or
fund equity (available funds) defined as the excess of revenues over expenditures accumulated from prior years that are present in the form of cash at the beginning of the fiscal year.
2017 Budget Document
Page 22
Metropolitan Sewerage District of Buncombe County, North Carolina
Fiscal Policy (continued) Asset Management Policy 1. Planning for Operational and Maintenance Assets—The District shall utilize an Equipment
Replacement Review Committee to plan major operational and maintenance asset acquisitions on a systematic, comprehensive, and entity-wide basis.
2. Asset Condition—The District will maintain all assets at a level adequate to comply with all regulatory requirements and to minimize future replacement and maintenance costs. This process will be coordinated with the planning in the Capital Improvement Program.
Capital Improvement Policy 1. Planning—The District will annually update and re-adopt a ten-year Capital Improvement Program, identifying and describing each capital project along with the estimated cost and funding source, in accordance with requirements of the State of North Carolina Collection System Permit.
2. Capitalization—The District will charge engineering division salaries and related costs used to plan for and oversee construction of major infrastructure to the Capital Improvement Program.
3. Reporting—The District will provide annual reports of expenditures by project to the Capital Improvement Program Committee.
4. Funding—The District will fund the construction program from revenue bonds and current revenues including grants as available.
Accounting Policy 1. Authority for Accounting Procedures—The District will establish and maintain the accounting
system according to the North Carolina Local Government Budget and Fiscal Control Act (LGBFCA), generally accepted accounting principles (GAAP) for governments, and in compliance with applicable provisions in the Bond Order.
2. Annual Audit—An annual audit will be performed by an independent public accounting firm, which
will issue an official opinion on the annual financial statements, and a management letter indicating any suggestions for improvement or areas of concern.
3. Transparency—Full disclosure will be provided in the financial statements and bond representations. 4. Due Diligence—The District will monitor the audited financial statements of member agencies and compare with reports of revenues remitted to the District and accounts receivable billed by member governments.
2017 Budget Document
Page 23
Metropolitan Sewerage District of Buncombe County, North Carolina
Fiscal Policy (continued) Accounting Policy (continued) 5. Financial Reporting—The District shall prepare a comprehensive annual financial report (CAFR) upon completion of the financial audit, which will be submitted to the Government Finance Officers’ Association (GFOA) for the Certificate of Achievement for Excellence in Financial Reporting award.
6. Written Accounting Procedures—The District will maintain currently updated written accounting procedures.
Debt Policy 1. Duration—Capital projects financed through the issuance of bonds shall be financed for a period not to exceed the lesser of the expected useful life of the project or thirty years.
2. Capitalization—Interest, operating, and/or maintenance expenses will be capitalized only for facilities of enterprise activities and will be strictly limited to those expenses incurred prior to actual operation of the facilities.
3. Ratings—The District will endeavor to maintain its financial condition at no lower than Moody’s “A1” and Standard & Poor’s “AA-” bond rating.
4. Unfunded Liabilities—The District’s debt policy extends beyond capital financing and includes not knowingly entering into any contracts creating significant unfunded liabilities.
5. Coverage Ratio—The District shall prepare an annual budget to maintain a debt ratio (coverage) of at least 1.5 net revenues to bonded debt. This exceeds the minimum 1.2 ratio as set forth in the Bond Order.
6. Compliance—The District shall follow terms and conditions of its Bond Order and any requirements of the Local Government Commission.
Cash Management and Investment Policy 1. Written Policy—The District Board’s investment policy, written to be in compliance with NC General Statutes and its Bond Order, shall be reviewed on an annual basis by the Board’s Finance Committee.
2. Objectives—The primary objectives of investment activities, in priority order, shall be preservation of principal, liquidity, and yield.
3. Periodic Reporting—The District shall provide monthly investment reports to its Board and submit semi-annual reports to the North Carolina Local Government Commission.
2017 Budget Document
Page 24
Metropolitan Sewerage District of Buncombe County, North Carolina
Fiscal Policy (continued) Cash Management and Investment Policy 4. Treasury Services—The District shall consider the advisability of preparing a Request for Proposal (RFP) for banking services every three (3) years.
Reserve Policy 1. Capital Reserves—The District shall maintain a Capital Reserve Fund in the amount of 6% of current expenses in the adopted annual Operation & Maintenance Fund Budget as set forth in the Bond Order. This fund may be used only for debt service payments in the event of inadequate revenues or for unusual and extraordinary repair and maintenance expenses.
2. Fleet—The District shall maintain a Fleet Equipment Replacement Fund for vehicles and rolling stock
with a value greater than $10,000. Periodic budgeted transfers from the operating fund along with proceeds from sale of equipment shall be deposited in said fund along with interest earnings to provide funding to replace vehicles on a systematic basis as required.
3. Plant Equipment—The District shall maintain a Wastewater Treatment Equipment Replacement Fund for capital expenditures of $10,000 or more with a useful life of at least (3) years. Periodic budgeted
transfers from operations are intended to stabilize rate increases by planning funding for major repairs and rehabilitations.
Purchasing Policy 1. Authority for Purchasing Procedures—The District will follow procedures and guidelines as prescribed by North Carolina General Statutes and Board approved resolutions.
2. Centralized Procurement—The District shall operate centralized purchase and warehouse functions to obtain materials, supplies, and services in the most cost-efficient manner for the District.
2017 Budget Document
Page 25
Metropolitan Sewerage District of Buncombe County, North Carolina
Budget Process Budgetary Adoption The District budget process must comply with North Carolina General Statutes and the MSD Revenue Bond Order as amended to date. The Bond Order requires that the District adopt its final budget on or before June 15 of each year. North Carolina General Statutes mandate an annual balanced budget ordinance based upon expected revenues, along with a budget message, to be presented to the governing board no later than June 1 and mandates a public hearing be held. The Bond Order calls for a preliminary budget hearing 30 days prior to adoption if requested by a certain percentage of bondholders. The budget calendar is designed to provide for input by all stakeholders into a systematic and deliberate process. For the Operations and Maintenance Budget, the process begins with the mission statement as approved by the Board. Each Division or section of the District develops a specific mission statement setting forth its role in supporting the overall mission of the District. Next, key responsibilities are defined for each unit, with associated goals and objectives. To evaluate progress, performance measures are identified and tracked for the previous three years. Once the District staff develops the operational activities required to implement the mission-directed strategies, necessary resources can be quantified and presented in a budgetary format. Because payroll and benefits represent such a large proportion of expenditures, and because an experienced and appropriately compensated, well-trained staff is necessary to accomplish the District’s mission, extra effort is made to ensure salaries and benefits are competitive without being excessive. To this end, a human resources consultant prepares a salary survey every three to five years that compares District pay scales with other utilities and governmental entities in the area. During those years a consultant is not retained, the Human Resources Director and other staff take surveys among regional governments and wastewater utilities of intended increases and types/levels of benefits considered. After reviewing comparative data, the Finance and Personnel Committees take an active role in ratifying increases of cost of living and merit pay, as well as contributions to health insurance and other employee benefit programs. Before approval of any new positions, the Board must be convinced of the cost-benefit, efficiency, and programmatic benefit. The Capital Budget incorporates short-term improvements mandated by the State-issued Collection System Permit with long-term needs identified and prioritized by the 20-year Wastewater System Master Plan to handle wet-weather flow conditions, to improve the performance at the wastewater treatment plant, and to prepare the system to handle expected future wastewater flows. Engineering staff prepare annual estimates of expenditures over the life of projects in a proposed timetable for construction in a 10year Capital Improvement Plan (CIP).
2017 Budget Document
Page 26
Metropolitan Sewerage District of Buncombe County, North Carolina
Budget Process (continued) Budgetary Adoption (continued) Meanwhile, Administrative staff prepares an update of the District’s ten-year financial forecast based on estimated revenues, expenditures, and debt issuance, which is integrated with the 10-year CIP, along with projections for fleet and wastewater plant replacement funds. The effect of current expenditures on cash flows and debt coverage ratios are verified for adequacy, and any indicated adjustments to expenditures are made to sustain services within the desired user rate levels, which are set annually in connection with budget adoption.
Budget Administration The Budget Resolution is adopted at the fund level and allows for the carry forward of encumbered contracts and purchase orders from the previous fiscal year. This budget book illustrates the initial allocations among departments and between line items for authorized expenditures not including carryover amounts. Authority for modifying these allocations varies. The General Manager has the authority to transfer amounts between departments within a fund without limitation. Division Directors may transfer amounts between line items and sections within their departments without limitation. The entire allocation is available at the beginning of the year, and the unexpended balance will remain available during the year, unless otherwise limited by the General Manager and Director of Finance due to cash flow considerations. Several strategies are used to monitor expenditures throughout the year. The General Manager and Division Directors receive monthly expenditure reports, which compare actual to budgeted amounts for the period and for the year to date. In addition, the procurement software is designed to require approval from the General Manager or Director of Finance if the line item has insufficient funds to cover the requisition or if the expenditure is over a certain amount. Purchasing staff make periodic reviews of outstanding inventory levels, requisitions, and purchase orders to update available line item balances.
Budget Amendment Budget Amendments require approval by the Board of Directors and as such are submitted through the agenda process for consideration at a regularly scheduled Board meeting.
2017 Budget Document
Page 27
Metropolitan Sewerage District of Buncombe County, North Carolina
Budget Calendar April S
M
T
W
D A T E
T
F
S
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
April 26
T I M E
9:00 a.m.
M
T
W
T
F
S
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
W
T
F
S
1
2
3
4
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
April 28
8:30 a.m.
T
CIP Committee Meeting
Update Construction Program Financing 2016-2017 Construction Fund Budget
May 5
9:00 a.m.
Finance Committee Meeting
Self-Funded Medical & Dental Program
W
T
F
S
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31 2017 Budget Document
Proposed FY17 Construction Fund Budget Proposed FY17 Operating Budget & Sewer Rates May 18
2:00 p.m.
Board Meeting Preliminary FY17 Budgets & Sewer Rates
July M
Personnel Committee Meeting
Nine Month Revenue/Expenditure Report
5
S
T
Benefit Allocations
June T
J E C
Update of Ten-Year Capital Improvement Program
S
M
U B
Cost of Living & Merit Pay
May
S
S
June 15
2:00 p.m.
Board Meeting Public Hearing Adoption of FY17 Budgets & Sewer Rates
July 1
Start of Fiscal Year 2016-2017 Page 28
Metropolitan Sewerage District of Buncombe County, North Carolina
Budgetary Basis of Accounting The District accounts for its activities as an Enterprise Fund, which is similar to that of a private business where the costs of providing wastewater collection and treatment on a continuing basis are recovered primarily from user charges. Therefore, the accrual basis of accounting is used for financial reporting purposes, where revenues are recognized as soon as they are earned and expenses at the time the liability is incurred. However, state law requires local governments to budget on the modified accrual basis, wherein revenues are only recognized to the degree that they are available to finance expenditures of the current period. Similarly, debt service payments and other liabilities are recognized when payment is due because it is only at that time that they normally are liquidated with expendable available financial resources. There are no significant differences between the full and modified accrual basis of budgeting for District revenues, because the majority of revenues are collected shortly after billing, and as such, are available to pay period liabilities. The major difference resulting from the modified accrual method is noted in budgeting debt service and capital expenditures. The Bond Order requires the District to have remitted all debt service to the Trustee at least one business day prior to the payment date, so that in the event of default, the Trustee will have time to secure payment for the bondholders from the Debt Service Reserve Fund for payment on the due date. Therefore, the District budgets for the amount of principal due on July 1 of the subsequent fiscal year, but reports the principal reduction paid on July 1 of the current year as reducing loans payable in the audited financial statements. Capital outlays, which are defined as equipment or construction with an acquisition value over $1,000 and a useful life of three years or longer, are budgeted as an expense in the year incurred, but depreciation is not budgeted, as it does not involve expenditure of cash. In the audited financial statements, buildings and equipment over $15,000 are capitalized and depreciated over future years. The District does not budget for barter transactions such as the exchange of building space for laboratory services, but the fair market value of such transactions are reflected as income and expense in the audited financial statements in accordance with generally accepted accounting principles. The ten-year Capital Improvement Plan presented in this budget manual documents the District’s longterm asset management strategy to achieve and maintain compliance with state environmental permit conditions, but does not authorize expenditures for any years beyond the current budget year. The Capital Improvement Plan identifies specific projects with anticipated expenditures broken down by each year, but based on the best estimates of the District. The General Manager is authorized to accelerate or postpone the start date of any particular project and to authorize the encumbrance of funds for projects continuing into a future fiscal year, provided that the total amount of funds expended and encumbered for any one year does not exceed the total appropriation in the Construction Fund for that fiscal year. 2017 Budget Document
Page 29
Metropolitan Sewerage District of Buncombe County, North Carolina
Budgetary Basis of Accounting (continued) However, any projects included in a Capital Projects Ordinance may have expenditures authorized for the entire project crossing fiscal years, regardless of when contracts are signed or costs are incurred or paid. In accordance with the District’s Bond Order, separate accounts for debt service and extraordinary maintenance reserves have been established. The District utilizes other reserve accounts to minimize or moderate the effect of unanticipated large expenditures and substantial equipment replacement on rate increases.
2017 Budget Document
Page 30
Metropolitan Sewerage District of Buncombe County, North Carolina
Fund Structure For financial statement purposes, all the District’s transactions are reported in one enterprise fund. However, to be in compliance with the District’s Bond Order, which prescribes certain procedures for financial planning and budgetary process, the enterprise fund is divided into several funds. Appropriated major funds whose expenditures exceed 10% of the budget include: the Revenue Fund from which operational and maintenance expenditures are made, the General Fund that transfers pay-as-you-go funding authorized for construction, the Construction Fund that incorporates CIP expenditures, the Insurance Funds that provides funding for self-funded employee medical, general liability, worker’s compensation and post-employment, the Replacement Funds that provides funding for Fleet and WRF equipment and the Debt Service Funds. Financial plans are prepared for other non-appropriated funds whose expenditures are determined by external parties and contractual agreements, namely the insurance funds, debt reserve, and the capital reserve fund.
Revenue Fund—The Bond Order requires all revenues from user charges to be deposited to a revenue fund. The first order of payments is current expenses, defined as the costs of controlling,
operating, managing, and maintaining the sewerage system and wastewater treatment plant, which are paid directly from the revenue fund. Remaining revenues may be transferred as budgeted to other funds for use in debt service, construction, or any other lawful purpose.
General Fund—The District may use funds from the General Fund for any lawful purpose. Due to
the provisions of the 1985 and 1999 Bond Orders, the former which provided that operating expenses were to be paid from the O&M fund, and the latter which calls for current expenditures to be paid from the Revenue Fund, the General Fund has been used primarily to accumulate pay-as-you-go financing for construction.
Construction Fund—This fund was established in accordance with the bond order to account for
construction projects funded by sewer revenue bonds. The fund is currently used to record expenditures of capital construction, regardless of funding source.
Insurance Funds—Financial plans for the four insurance funds – Self-Funded Employee Medical, General Liability, Worker’s Compensation, and Post Employment are included in the FY14 budget document. Each Department, Division, and Section budget is charged a proportionate share of employer insurance costs based upon the number of covered employees. Separate funds are maintained to track the excess or deficit of actual expenses over estimated cost. To ameliorate the effect of large unanticipated losses on the annual rate setting process, any excess of cost assessed over claims paid is retained by the fund as designated for any deficit in future years. There are no trust documents or other legal restrictions on these funds, and they are combined with other funds and accounts into one enterprise fund for financial reporting purposes. 2017 Budget Document
Page 31
Metropolitan Sewerage District of Buncombe County, North Carolina
Fund Structure (continued) A brief discussion of each follows. Self-Funded Employee
Medical—Revenues consist of both employee and employer
contributions. Expenditures include charges for stop-loss and aggregate premiums, third party administration of claims, as well as medical, dental, and prescription claims. Employer contributions are currently based on actuarially determined expected funding, which is approximately 80% of potential maximum cost if stop-loss and aggregate limits are reached. Prudent management of reserves should provide adequate funding for claims in excess of those anticipated, as well as for claims incurred during the year but paid after the year-end outside of the aggregate coverage. General Liability—The District purchases commercial coverage for Automobile, General Liability, Public Officials Liability, and Employee Blanket Bond. Each year, the Engineer of Record reviews the adequacies of the Districts’ insurance coverage to comply with the District’s Bond Order. Reimbursement for each loss is reduced by the amount of the particular coverage deductible, so the budgeted expenditure includes both contractual premiums and an estimate of the potential liability to be incurred from paying the deductible amount on each claim. Any excess of amounts transferred from the Operations and Maintenance Fund over premiums and deductibles expense is retained in the fund to be appropriated in a future year with unanticipated losses. Worker’s Compensation—The District purchases commercial insurance coverage for Worker’s Compensation. This policy also includes provisions for deductible amounts for each claim; so similarly, budgeted insurance expense includes both contractual premium and an estimate of deductible amounts. Any excess is retained in the fund to be appropriated in a future year in the event of unanticipated losses. Post-Employment—The District has established a post-employment insurance fund to accumulate funds now, which will reduce future operational expenditures when retirees begin taking advantage of this benefit. The District will annually fund the equivalent of the annual required contribution less expenses as determined by an actuarial study as required by GASB45.
Equipment Replacement Funds—Three equipment replacement funds are included with the
budget. Responsible departments are assessed proportional amounts to provide planned funding for
the systematic replacement of assets and to moderate the impact in any one year on sewer rates from major capital acquisitions. Any excess of revenues over expenditures are retained in fund equity to provide for large future capital expenditures, and for replacement or repair of any mission-critical equipment resulting from an accident, natural disaster, or other unforeseeable event.
2017 Budget Document
Page 32
Metropolitan Sewerage District of Buncombe County, North Carolina
Fund Structure (continued) Fleet Replacement—The District owns a variety of vehicles including pickup trucks, specialized vans, dump trucks, tankers, and excavating equipment, some costing up to $250,000. The Fleet Supervisor and WRF Director are responsible for maintaining an inventory of all equipment including anticipated replacement dates and cost for all items. Departments are assessed determined amounts in the annual budget, which are estimated to provide funding for new vehicles when those in their use may no longer be efficiently maintained. Wastewater Treatment Plant—Various specialized machinery require replacement from time to time, usually at costs well in excess of what may be budgeted as routine maintenance. The Plant Director and Supervisors have prepared a schedule by year of anticipated major projects needed to refurbish or replace obsolete equipment. The plant maintenance department is assessed amounts in the annual operations budget estimated to provide adequate funding for these projects when needed in the future. Pump Maintenance—Various large pumps require replacement from time to time, usually at costs well in excess of what may be budgeted as routine maintenance. The SS Maintenance Director and Supervisors have prepared a schedule by year of anticipated major projects needed to refurbish or replace obsolete equipment. The plant maintenance department is assessed amounts in the annual operations budget estimated to provide adequate funding for these projects when needed in the future.
Debt Service Funds—These funds are required under the District’s Bond Order to accumulate and transmit all District debt service payments.
Revenue Bond Fund—This fund is used to accumulate periodic deposits from the revenue fund to pay principal and interest as scheduled. Capital Reserve Fund—While technically not a debt service fund, this fund is mandated by the Bond Order to contain six percent (6%) or such greater percentage, as may be determined from time to time by the Board, of the amount shown by the annual budget to be necessary for current expenses for the current fiscal year. As this fund is to be kept for unusual and unforeseen expenditures, none is included in the financial plan as coming from this account.
2017 Budget Document
Page 33
Metropolitan Sewerage District of Buncombe County, North Carolina
Flow of Funds – Bond Order User Charges, Rental Income & Misc.
Revenue Fund
O&M paid from Revenue Fund
Insurance Funds Medical & Dental
Post Retirement
Worker’s Comp
Replacement Funds General Liability
Wastewater Treatment Plant
Fleet
Sale of Surplus Property
Employee Contributions
Capital Reserve Fund
Revenue Bond Fund
Sinking Fund Account Capitalized Interest Account Interest Account Principal Account Redemption Account Parity Reserve Account
General Fund
Tap Fees Facility Fees Grants
Priority of expenditures per Bond Order 1. Current Expenditures 2. Debt Service 3. Capital Reserve 4. Any Lawful Purpose
Flow of Funding
2017 Budget Document
Pump Stations Maintenance
Construction Fund
Income Sources Trustee Funds Expenditures
Flow of Funding if required for emergency repairs or maintenance
Page 34
Metropolitan Sewerage District of Buncombe County, North Carolina
Budget Summary The District utilizes a fund structure developed to accommodate mandates of the District’s Bond Order with generally accepted accounting principles for proprietary governments. Appropriated funds, which are those funds that must have a board-approved budget, include the Revenue Fund from which operational and maintenance expenditures are made, the General Fund that transfers pay-as-you-go funding authorized for construction, the Construction Fund that incorporates CIP expenditures, the Replacement Funds providing funding for Fleet and WRF equipment, and Debt Service Funds. Financial plans are approved for those other funds whose expenditures are determined by external parties or contractual agreements such as the insurance, debt reserve, and capital reserve funds. The budget summary chart below shows total activity for all funds and consolidates the effect of transfers between funds. FY 2017
FY 2015
FY 2016
Actual Total
Budget
Domestic User Fees Industrial User Fees Billing and Collection Facility and Tap Fees Interest and Misc. Income Rental Income City of Asheville (Enka Bonds) Employee Contributions to Health Fund Use of (Contributions to) Available Funds
$ 28,240,719 3,725,584 738,239 4,311,259 431,677 71,226 37,167 426,769 2,966,919
$ 28,962,278 3,155,799 734,708 1,605,000 485,094 69,950 37,000 413,000 12,021,748
$
960,651 29,922,929 $ (212,756) 2,943,043 37,792 772,500 95,000 1,700,000 113,938 599,032 1,449 71,399 37,000 2,000 415,000 (1,472,988) 10,548,760
Total Revenues & Financing Sources
$ 40,949,559
$ 47,484,577
$
47,009,663 $
(474,914)
-1.00%
Operations and Maintenance Construction Capital Equipment Bond Principal and Interest
$ 14,115,455 16,594,558 534,566 9,704,980
$ 15,745,161 21,849,858 779,850 9,109,708
$
293,127 16,038,288 $ 192,229 22,042,087 192,598 972,448 (1,152,868) 7,956,840
1.86% 0.88% 24.70% -12.66%
Total Expenditures
$ 40,949,559
$ 47,484,577
$
47,009,663 $
REVENUES & FINANCING SOURCES
EXPENDITURES
Proposed Budget
Increase
%
(Decrease)
Change
(474,914)
3.32% -6.74% 5.14% 5.92% 23.49% 2.07% 0.00% 0.48% -12.25%
-1.00%
NOTE: Both Operation and Maintenance and Capital Equipment expenditures represent actual amounts to be spent in the respective reserve funds. These amounts do not include current year reserve funds funding request.
2017 Budget Document
Page 35
Metropolitan Sewerage District of Buncombe County, North Carolina
Component Fund Chart The following chart shows revenues, expenditures, and transfers by individual fund and provides the detail supporting the summary amounts.
Operating and Construction Revenue/O&M
General
Debt Appropriated Services Funds
Equipment Replacement
Construction Fleet Repl. Reserve
WWTP Reserve
Pump Station Reserve
Bond Service
Projected Net Position at 6/30/16
30,130,080
8,916,220
250
594,258
469,597
-
5,115,182
45,225,587
Revenues and Other Financing Sources: Domestic User Charges Industrial User Charges Billing and Collection Fees Facility and tap fees Proceeds from Revenue Bonds Stimulus Loan/Grant Sale of Surplus Property Non-governmental Grants Capital Contributions Investment interest & misc. City of Asheville for Enka Bond Rental Income Employee/Retirees Medical Contributions Total Revenues and Fin. Sources
29,922,929 2,943,043 772,500 386,679 37,000 71,399 34,133,550
1,700,000 85,285 1,785,285
8,000 8,000
80,160 8,914 89,074
7,044 7,044
-
50 50
29,922,929 2,943,043 772,500 1,700,000 80,160 495,972 37,000 71,399 36,023,003
Expenditures and Other Financing Uses Operating Expenses Debt--Principal Debt--Interest Construction Capitalized Equipment Expenditures Total Expenditures and Other Financing Uses
(12,394,818) (87,298.00) (12,482,116)
-
(22,042,087) (22,042,087)
- (4,325,825) - (3,631,015) (55,000) (55,000) (7,956,840)
(12,394,818) (4,325,825) (3,631,015) (22,042,087) (972,448) (43,366,193)
Interfund/account transfers
(23,388,796) (10,701,505)
Excess (Deficit) of Revenues over Expenditures
(1,737,362)
Projected Net Position at 06/30/17
28,392,718
(8,916,220) -
22,034,087 250
(668,000) (162,150) (668,000) (162,150) 425,000
100,000
100,000
7,956,840
(3,474,374)
(153,926)
(55,106)
45,000
50
(10,817,564)
440,332
414,491
45,000
5,115,232
34,408,023
Funding comes primarily from the Revenue Fund, from which Operations and Maintenance expenditures are paid. Revenues are transferred to other funds, including construction, insurance internal funds, debt service and replacement reserve funds. Infrastructure over $15,000 is capitalized and budgeted through the Construction Fund. Capitalized equipment such as trucks and rolling stock are budgeted through the Fleet Replacement Fund and capitalized equipment such as pumps and plant machinery are budgeted through the Water Reclamation Facility Replacement Fund. While the O&M budget contains line items entitled “Capital Equipment,� while such expenditures are below the capitalization threshold, they are in excess of $1,000 and budgeted and tracked internally for managerial purposes.
2017 Budget Document
Page 36
Metropolitan Sewerage District of Buncombe County, North Carolina
Component Fund Chart (continued) The following chart shows revenues, expenditures, and transfers by individual fund and provides the detail supporting the summary amounts.
Bond NonBudget Covenant Appropriated Summary Requirement
Designated for Insurance Insurance Medical
Insurance Post Employment
Insurance Prop & Liab
Insurance Work Comp
Capital Reserve
District Totals
Projected Net Position at 6/30/16
825,665
166,352
592,352
303,204
955,886
2,843,459
48,069,046
Revenues and Other Financing Sources: Domestic User Charges Industrial User Charges Billing and Collection Fees Facility and tap fees Proceeds from Revenue Bonds Stimulus Loan/Grant Sale of Surplus Property Non-governmental Grants Capital Contributions Investment interest & misc. City of Asheville for Enka Bond Rental Income Employee/Retirees Medical Contributions Total Revenues and Fin. Sources
2,500 395,000 397,500
8,000 20,000 28,000
1,100 1,100
1,500 1,500
9,800 9,800
22,900 415,000 437,900
29,922,929 2,943,043 772,500 1,700,000 80,160 518,872 37,000 71,399 415,000 36,460,903
(2,737,631) (2,737,631)
(55,000) (55,000)
(577,839) (577,839)
(273,000) (273,000)
-
(3,643,470) (3,643,470)
(16,038,288) (4,325,825) (3,631,015) (22,042,087) (972,448) (47,009,663)
2,608,628
45,000
547,746
273,000
-
3,474,374
268,497
18,000
(28,993)
1,500
9,800
268,804
1,094,162
184,352
563,359
304,704
965,686
3,112,263
Expenditures and Other Financing Uses Operating Expenses Debt--Principal Debt--Interest Construction Capitalized Equipment Expenditures Total Expenditures and Other Financing Uses Interfund/account transfers Excess (Deficit) of Revenues over Expenditures Projected Net Position at 06/30/17
(10,548,760) 37,520,286
Now that the Districts’ financial overview has been presented, we will examine revenues and various expenditures in detail.
2017 Budget Document
Page 37
Metropolitan Sewerage District of Buncombe County, North Carolina
Revenue Overview The District has the authority to establish rates and charges for service to be approved by a budget resolution of the District Board of Directors. The District has established separate rates for domestic and industrial customers, adopted a schedule of facility and sewer connection fees applying to new customers, and receives minor amounts of income from rental of real property and investment of surplus cash. The various types of revenues and other financing sources are described in detail on the following page. A graph of historical revenues by type reveals the overwhelming percentage of the District’s income derives from domestic (residential & commercial) customers and has increased for the past ten consecutive years. Industrial user fees clearly show the effect of the shrinking textile industry in Buncombe County and are diminishing as larger industries wind down and are replaced with smaller new enterprises. Facility and tap fees testify to the growth fueled by population in-migration and expansion of nonindustrial type businesses. Overall, income for FY16 is estimated to be slightly higher than in FY15.
2017 Budget Document
Page 38
Metropolitan Sewerage District of Buncombe County, North Carolina
Revenue (continued) Revenue Summary
When projecting FY17 revenues, a 2.5% domestic customer rate increase was considered in conjunction with a projected .75% increase in domestic consumption. In addition, the budget reflects no growth in industrial users. Conservative assumptions based on recent income trends underlie other budgeted income amounts as explained below.
Domestic User Charges The primary source of District revenues are domestic charges. The District has approximately 53,000 accounts. The District direct bills approximately 350 of these domestic users all of which are on private well systems but are connected to MSD’s sewer collector system. Billing and collection of the remainder of District domestic customers is performed by the member agencies providing water, who charge a fee for this service, which is added to the monthly bill and paid by MSD customers. Domestic sewer rate increases for the past five years are shown below: 2011-2012
2012-2013
2013-2014
2014-2015
2015-2016
2016-2017
3.0%
2.5%
2.5%
2.5%
2.5%
2.5%
Industrial User Charges Prior to FY 2001, industrial users were charged decreasing tiered rates based on total volume so that actual rates charged were considerably below those paid by residential consumers. In FY 2001, the Board approved a plan to achieve rate parity between industrial and residential customers over the upcoming twenty years. The annual increases from this parity plan are incorporated in adopted rates. 2017 Budget Document
Page 39
Metropolitan Sewerage District of Buncombe County, North Carolina
Revenue (continued) Fortunately, the number of new residential customers continues to increase which is anticipated to mitigate the impact from the decline of industrial revenue.
Investment Interest This revenue source reflects interest earned on public funds held by the District and the Revenue Bond Trustee. Investment income is determined by interest rates and cash balances available for investment. Interest rates decreased rapidly during the current year due to adverse economic conditions. The projected yield for the current fiscal year will be 1.0%. All MSD investments conform to its Bond Order and the North Carolina General Statutes governing investments, and due to the minimum acceptable level of risk, produce fairly conservative rates of return.
Sewer Facility Fees This revenue source represents the buying of equity in completed wastewater facilities paid by consumers who are added to the sewer collection system. In June 2006, the actual cost was determined to be significantly greater than the fee charged. To moderate the impact on customers, the board determined to implement 20% of this increase over each of the subsequent five years. In FY10, the District instituted a one-year moratorium on the five-year sewer facility fee parity plan due to the recession. As of the end of FY12, the District has completed the aforementioned plan. Effective in FY17, sewer facility fees ranged from $670 to $2,500 for residential users based on size of structure, and from $2,500 to $237,500 for nonresidential customers based on meter size.
Sewer Connection Fees This revenue source represents the cost of physically installing new connections to the sewer system. Sewer Connection Fees were last changed in June of 2011. The cost for installing a tap is $650, with additional charges up to $2,200 if pavement disturbance is involved. The Sewer Connection Fee will apply to new home construction, as well as existing homes, which have been demolished or remodeled, and sewer service is reinstated under new property ownership. MSD reserves the right to require that a licensed utility contractor install any sewer connection, and such connections will be subject to MSD inspection. Sewer connections in excess of 75 feet will be evaluated on a case-by-case basis. If constructed by MSD, they will be billed at cost. Property owners may choose to utilize a licensed utility contractor, which will be subject to MSD inspection.
2017 Budget Document
Page 40
Metropolitan Sewerage District of Buncombe County, North Carolina
Revenue (continued) Billings & Collections The District will pay the municipalities $2.31 per customer bill for meter reading, billing, and collection services.
Rental Income Buncombe County Partnership for Children has entered into a lease to utilize the District’s former Administration Building. The District also leases land to a private company for a cell tower.
City of Asheville (Enka Bonds Annexation) In the Consolidation Agreements, MSD agreed to assume debt service on the $1,500,000 sanitary sewer bond issued by the Enka-Candler Water and Sewer District. This debt was used to pay a part of constructing the sewer system in Enka-Candler, which at that time was located in an unincorporated area of western Buncombe County. After the consolidation, the City of Asheville annexed a portion of the EnkaCandler Sewer District, so the City of Asheville reimburses the District for its proportionate amount (41%) of the annual principal and interest payment.
2017 Budget Document
Page 41
Metropolitan Sewerage District of Buncombe County, North Carolina
This page intentionally left blank
2017 Budget Document
Page 42
Metropolitan Sewerage District of Buncombe County, North Carolina
Operation & Maintenance Fund Organizational Chart Ratepayers of the Metropolitan Sewerage District
MSD Board Committees CIP Finance Personnel Planning Right of Way
Legal Counsel Roberts & Stevens
Auditing Firm Cherry Bekaert & Holland
Engineer of Record McGill Associates
General Manager Thomas E. Hartye, P.E. (# of employees: 6) Budget: $1,617,884
Executive Secretary Sondra Honeycutt
Director of Information Technology Matthew Walter
Information Technology Information Technology Management Information Systems Geographical Information Systems (# of employees: 10) Budget: $1,337,598
Director of Engineering Ed Bradford, P.E.
CIP Project Management Design & Drafting Right of Way Construction Allocations (# of employees: 15) Budget: $1,611,333
2017 Budget Document
Director of Financial Services W. Scott Powell, CLGFO
Financial Services Finance & Budget Accounting & Investments Purchasing Warehouse
(# of employees: 8) Budget: $795,395
Director of Human Resources James Hemphill
Director of SS Construction Mike Stamey, P.E.
Director of SS Maintenance Ken Stines
Human Resources
SS Construction
SS Maintenance
Employee Relations Payroll & Benefits Environmental Health & Safety
Construction Emergency Repair
Preventative
(# of employees: 6) Budget:$795,016
(# of employees: 33) Budget: $3,318,402
Director of Waste Treatment & Maintenance Peter Weed
Wastewater Treatment Services
Maintenance Technical Services
Operations Industrial Waste Electical/Mechanical Facilities Maintenance
(# of employees: 31) Budget: $3,303,859
(# of employees: 39) Budget: $7,364,686
Page 43
Metropolitan Sewerage District of Buncombe County, North Carolina
Operation & Maintenance Fund Overview The Operation & Maintenance Fund budget finances the program and administrative activities for the wastewater treatment plant, pump stations, and collection system. The FY17 Operation & Maintenance Fund budget totals $16,106,490. This represents a 1.98% increase over the previous year. The District budgets to the Departmental level and are as follows: Office of the General Manager
$ 1,617,884
Human Resources
$
Information Technology
$ 1,337,598
Financial Services
$
Wastewater Treatment Plant
$ 7,364,686
SS Maintenance
$ 3,303,859
SS Construction
$ 3,318,402
Engineering
$ 1,611,333
Total Expenditures
795,016 795,395
$20,144,173
Less: Capitalized in Construction Funds
( 4,037,683)
Net Operation & Maintenance Fund
$16,106,490
ACTUAL
APPROVED
ESTIMATED
PROPOSED
INC(DEC)
2014-2015
2015-2016
2015-2016
2016-2017
OVER
BUDGET
ACTUAL
BUDGET
PRIOR YR BUDGET
SALARIES & WAGES
$
8,072,675 $
8,403,022 $
8,401,547 $
8,645,077
2.88%
BENEFITS
$
3,840,699 $
3,852,946 $
3,852,735 $
4,197,072
8.93%
MATERIALS, SUPPLIES & SERVICES
$
5,386,014 $
6,343,000 $
6,039,850 $
6,387,509
0.70%
REPLACEMENT FUNDS & TRANSFERS
$
691,224 $
823,648 $
823,000 $
827,217
0.43%
CAPITAL EQUIPMENT
$
146,681 $
144,189 $
143,000 $
87,298
-39.46%
SUB-TOTAL O&M FUND
$
20,144,173
2.95%
18,137,293
$
19,566,804
$
19,260,132
$
LESS: Capitalized Construction Expenses NET OPERATION & MAINTENANCE FUND
$ $
(3,603,640) $ 14,533,654
$
(3,773,678) $ 15,793,126
$
(3,744,962) $ 15,515,170
$
(4,037,683)
7.00%
16,106,490
1.98%
The major factors that impact our operating and maintenance budget include:
1. Repairs and Maintenance—A majority of the Districts' approximately 1,000 miles of collection lines are between thirty and one hundred years old. While many capital projects are planned and in
process, these aging facilities often require frequent repairs and maintenance costs prior to commencement of a major rehabilitation funded in the CIP. The Asset Management Plan calls for periodic maintenance and repairs. The District has budgeted significant amounts for maintenance of equipment, buildings, and grounds as well as for in-house sewer line repair and maintenance. 2017 Budget Document
Page 44
Metropolitan Sewerage District of Buncombe County, North Carolina
Operation & Maintenance Fund (continued) 2. Salaries and Benefits—A 3.0% salary adjustment as well as a 10.0% increase for the Self-Funded Health Insurance Plan. Personnel costs represent over 64% of the Operating and Maintenance budget.
3. Post-Employment Health Benefit—Starting in FY09, GASB45 requires the recognition of cost for Post-Employment Health Benefits. Current funding represents 1.7% of total operations.
2017 Budget Document
Page 45
Metropolitan Sewerage District of Buncombe County, North Carolina
FY17 Budget – All Departments Summary No.
Name
Actual 2012-2013
Actual 2013-2014
Actual 2014-2015
Approved 2015-2016 Budget
Estimated Actual 6/30/2016
Percent Expended To Total Budget
Proposed 2016-2017 Budget
Inc (Dec) Over Prior Year
Salaries & Wages 51100 Salaries & Wages 51150 Overtime Total Salaries & Wages
$
Benefits 51200 51250
$
7,537,244.35
$
8,645,077.00
$ $
634,548.00 661,346.00
1,735,116.00
100.0% 100.0% 100.0%
$
1,908,628.00
261,500.00
100.0%
$
270,000.00
3.25%
$
215,312.00
100.0%
32,340.00
3,852,735.00
100.0% 100.0% 100.0%
273,000.00 32,340.00 -
26.79%
$
$ $ $
$ 12,254,282.00
$
7,822,788.68
$
8,107,122.00
$
8,107,122.00
$
7,867,266.45
$
8,072,674.60
$
8,403,022.00
$
8,401,547.00
$
558,541.37
$
569,223.92
$
560,482.00
$
560,383.00
1,782,116.00
$
1,833,116.00
$
2,045,496.63
$
1,735,116.00
$
175,900.00
$
156,800.00
$
77,100.00
$
261,500.00
$
$
215,312.00
$
215,312.00
$
201,145.36
$
215,312.00
State Unemployment Benefits Automobile Allowance 51500 401-K/457 Plan Total Benefits
$
21,632.38
$
48,039.49
$
23,962.99
$
32,340.00
303,860.03
$
310,161.48
$
Total Salaries, Wages & Benefits
$ 11,399,124.63
$
7,808,464.30
$
524,754.70
51300
North Carolina Retirement Payroll Taxes Medical, Dental & Life
$
51325
Post Retirement Insurance
$
51350
Worker's Compensation
51360 51450
Materials, Supplies & Services 52010 Advertising 52050 Dues & Subscriptions 52100 Postage 52150 Travel, Mtgs & Training 52160 Tuition Assistance 52170 Directors Fees & Expenses 52180 Liability Insurance 52200 Telephone/Telefax 52210 Communications 52240 Uniforms 52250 Office Supplies 52260 Special Dept Supplies 52270 Safety Equip/Supplies 52280 Maint Supp/Small Tools 52290 Chemical Supplies 52300 Line Cleaning Supplies 52330 Legal Fees 52350 Prof/Contractual Svcs 52410 Maint-Buildings & Grounds 52420 Maintenance-Equipment 52430 Landscape Restoration 52440 Pump Maintenance 52450 Equipment Rental 52460 Motor Fuel & Lubricants 52470 Outside Vehicle Maint 52500 Rents/Leases 52510 Permits/Fees/Software Licenses 52650 Utilities 52690 Freight 52715 Safety Incentive Program 52725 Wellness Program 52730 Employee Asst Program 52900 Other Operating Expenses 52910 Non-Capital Equipment 52915 Copiers Printers & Faxes 52920 Billing & Collections Total Materials, Supplies & Services Interfund Transfers 52340 Debt Administration Expenses 53040 Fleet Replacement Charges 53050 Wwtp Replacement Charges 53070 Pump Maintenance Replacement Total Interfund Transfers Capital Outlay 54010 Capital Equipment - New 54020 Capital Equip-Software
$
$ $
$
565,237.14
1,848.08
3,590,660.33
$
$ $
355,457.78
569,105.17
-
3,691,075.51
$ 11,558,341.96
$
$
$ $
249,885.92
584,714.82
$
$
-
$
339,055.67
$
3,840,699.39
$ 11,913,373.99
$
295,900.00
642,831.00
$
$
-
$
405,365.00
$
3,852,946.00
$ 12,255,968.00
$
294,425.00
642,719.00
-
405,365.00
$
31,010.30
$
21,019.18
$
25,523.03
$
24,103.00
$
23,603.00
$
7,252.03
$
11,195.11
$
9,452.22
$
11,000.00
$
11,000.00
$
150,242.00
$
139,776.55
$
33,500.00
$
33,500.00
$
47,654.78
$
105,335.73
$
42,108.87
$
605,434.00
$
79,331.49
$
$
$
$
468.50
$ $
114,203.86
$
22,620.01
$
605,434.00
$
88,223.00
$
36,119.13
$
62,558.89
$
28,039.19
$
391,430.23
$
120,497.91
$
35,067.94
$
1,822.38
119,168.81
61,508.17
$
$
439,167.21
$
463,133.22
$
$
$
$
$
$
406,339.32 40,270.87
138,346.20
29,318.53
$
3,746.03
$
435,585.13
$
$
$
$
4,255.00
1,240.91
421,393.22 49,270.37
125,264.57
$
4,756.12
$
1,228.64
8,010.44
4,255.00
1,286.28
$
87,573.72
$
88,938.23
$
701,014.95
$
717,412.77
$
5,302,730.26
$
$
338,507.16
$
100,000.00
$
$
$
-
400,000.00
-
$
838,507.16
468,576.15
98,452.80
$
$
$
$
$
946,729.40
$
420,368.31
5,877.23
$
$
$
$
35,412.41
125,999.81
114,000.00
54,000.00
$
53,750.00
$
604,871.53
$
561,150.00
$
485,300.00
$
477,575.00
$
$
$
$
9,368.84
$
189,637.60
$
176,658.06
$
37,393.63
$
$
17,000.00
$
26,450.00
$
15,000.00
$
238,397.59
$
40,000.00
$
32,500.00
140,600.00 17,000.00
40,000.00
26,421.00
$
200,000.00
$
45,000.00
15,000.00
234,846.69
1,202,750.00
$
1,095,000.00
$
1,845.91
$
2,500.00
$
1,800.00
$
$
$
4,592.67
4,255.00
467.94
$
$
$
$
$
$
220,782.82
$
100,000.00
720,782.82
$
518,750.00
$
6,737.82
5,290,849.87
$
$
67,950.00
1,026,485.57
$
-
$
$
60.41
$
141,000.00
47,208.00
738,238.51
400,000.00
47,500.00
$
$
$
530,845.91
271,148.15
140,310.15
-
68,542.21
$
$
$
26,835.19
73,975.00
$
$
5,922.50
$
$
31,396.80
415,763.67
$
33,951.84
605,434.00 114,438.00
$
9,180.32
$
6,000.00
$
$
$
388,293.43
48,700.00
$
76,970.00
53,527.63
$
60,727.31
$
$
122,464.00
$
34,432.92
$
$
$
31,396.80
$
$
4,500.76
$
$
6,000.00
419,578.00
$
42,718.44
$
$
14,858.44
234,550.21
$
4,128.82
58,885.91
$
4,976.68
$
30,300.00
407,042.69
$
1,069.45
$
$
$
$
$
18,892.49
$
62,640.92
$
119,522.17
903,570.19
117,105.00
43,272.40
$
$
$
605,434.00
$
109,319.52
$
$
$
93,518.10
30,645.80
$
$
5,658.74
239,881.43
497,820.01
407,240.20
$
$
$
$
4,229.42
$
13,728.61
23,104.28
22,791.28
$
$
53,934.71
50,310.00
119,837.27
66,863.89
399,078.28
$
$
$
25,199.60
46,092.18
$
$
32,231.84
$
$
$
5,000.00
8,000.00
4,500.00
4,000.00
$
$
$
$
4,950.00
7,000.00
4,355.00
3,000.00
$
95,583.31
$
94,005.32
$
750,000.00
$
750,000.00
5,386,014.26
$
6,342,999.50
$
6,039,850.22
$
191,223.71
$
198,648.00
$
$
100,000.00
$
200,000.00
$
$
$
400,000.00
$
5,000.00
$
4,775.00
198,000
$ 12,842,149.00
4.78%
97.9% 96.8% 100.0% 93.0% 100.0% 100.0% 100.0% 100.0% 97.7% 96.1% 88.6% 99.1% 99.1% 93.1% 97.7% 99.5% 68.4% 92.8% 99.7% 98.4% 100.0% 100.0% 99.9% 73.8% 100.0% 95.3% 98.5% 91.0% 99.0% 72.0% 87.5% 96.8% 75.0% 98.3% 95.5% 100.0% 95.2%
$
25,300.00
$
11,000.00
-
$
$
-
823,000.00
$
691,223.71
$
823,648.00
$
200,000.00
13.21% 2.88% 10.00%
100.0%
99.7% 100.0% 100.0% 99.9%
$
301,100.00
4,197,072.00
425,000.00
-
$
0.00% 2.92% 8.93%
$
425,000.00
2.92% 1.76% 2.88%
8,343,977.00
7,511,808.67
$
100.0% 99.5% 100.0%
$
$
271,219.95
$
$
$
417,210.00
51,240.00
$
144,018.00
$
35,000.00
$
547,746.00
$
121,460.00
$
$ $
$
7,000.00
31,800.00
80,250.00
30,450.00
$
429,550.00
$
127,000.00
$
53,750.00
$
$
$
72,450.00
531,900.00 56,500.00
$
588,800.00
$
459,600.00
$
$
$
$
$
$
$
$
143,400.00 17,000.00
90,000.00
25,500.00
262,000.00 15,000.00
49,500.00
240,820.00
$
1,243,000.00
$
2,500.00
$
$
$
$
5,000.00
8,000.00
4,500.00
4,000.00
$
94,975.00
$
772,500.00
$
6,387,509.00
$
202,217.00
$
200,000.00
$
827,217.00
$
$
$
5,000.00
425,000.00 -
4.97% 1.85% 0.00% -4.14% 16.67% 4.48% -9.53% 1.28% 3.72% 4.26% 0.50% 2.38% 5.70% 3.70% 0.20% -0.46% 18.95% -2.66% 1.70% -5.30% 0.00% 125.00% -3.59% -3.37% 0.00% 4.86% 1.02% 3.35% 0.00% 0.00% 0.00% 0.00% 0.00% -0.64% 0.00% 3.00% 0.70%
1.80% 0.00% 0.00% 0.43%
-32.51%
$
192,750.73
$
36,871.65
$
57,871.48
$
30,300.00
$
30,300.00
100.0%
$
20,450.00
$
18,555.81
$
23,404.39
$
11,250.00
$
13,738.50
$
13,700.00
99.7%
$
13,248.00
-3.57%
54030 Capital Equip - Replacement Total Capital Outlay
$
81,003.95
$
233,361.46
$
77,559.66
$
100,150.00
$
99,000.00
143,000.00
98.9% 99.2%
$
53,600.00
-46.48% -39.46%
Sub-Total O&M Fund
$ 17,832,672.54
$ 19,260,132.22
98.4%
$ 20,144,173.00
2.95%
98.8% 100.0%
$
2.09% 16.04%
98.2%
$ 16,106,490.00
59200
LESS: Chargebacks to General Fund for CIP Chargebacks to General Fund for SSD
Net Operation & Maintenance Fund
2017 Budget Document
$
$
$
292,310.49
$
$ 17,863,612.15
(2,439,492.20) $
(1,294,092.88) $
$ 14,099,087.46
293,637.50
$
$ 18,137,293.10
(2,292,057.23) $
(1,279,053.00) $
$ 14,292,501.92
146,681.14
$
$ 19,566,804.00
(2,293,656.56) $
(1,309,983.00) $
$ 14,533,653.54
144,188.50
$
(2,447,046.00) $
(1,326,632.00) $
$ 15,793,126.00
(2,418,330.41)
(1,326,632.00)
$ 15,515,169.81
$
$
87,298.00
(2,498,272.00)
(1,539,411.00)
1.98%
Page 46
Metropolitan Sewerage District of Buncombe County, North Carolina
Office of the General Manager Organizational Chart General Manager Thomas E. Hartye, P.E.
Executive Secretary
SSD Administrator
Dispatcher II
2017 Budget Document
Office Assistant II
Page 47
Metropolitan Sewerage District of Buncombe County, North Carolina
Office of the General Manager (continued) Mission Statement The mission of Office of the General Manager is to provide overall direction, leadership and coordination of the District and Department activities to ensure that the most efficient and effective services possible are provided within the policies established by the District’s Board of Directors and the resources authorized.
Key Responsibilities Carry out policies and directives of the Board. Monitor and control resources to ensure that the District is operated in a responsible and cost-efficient manner. Operate and maintain a reliable wastewater, collection, and treatment system. Maintain effective communications and relationships with member agencies and the public. Maintain positive media relations through news releases and prompt, accurate responses to media inquiries. Represent MSD in various meetings, forums, and special events. Oversee intermediate and long-range planning. Review and submit the board and committee agenda items; prepare minutes for board meetings; coordinate travel arrangements for board members and staff; provide public relations assistance.
Staffing History Approved
Approved
Budgeted
Positions
Positions
Positions
14-15
15-16
16-17
1
1
1
1
1
1
1
1
1
Total Office Support
1
1
1
Total – Office of the General Manager Department
2
2
2
Division & Position Department of Office of the General Manager General Manager Total General Manager Office Support: Executive Secretary GM/Board
Accomplishments for FY 2015-2016 1. Completed 20-year Facilities Plan Update for the Treatment Plant 2. Completed heat exchange, multi-venturi, and new membrane technology for the Incinerator and Air Emissions System
3. Incorporated $35 million of Treatment Plant improvements within 10-year CIP 4. Replaced or rehabbed 50,000 feet of sewer line 2017 Budget Document
Page 48
Metropolitan Sewerage District of Buncombe County, North Carolina
Office of the General Manager (continued) Accomplishments for FY 2015-2016 (continued) 5. Upgraded Weaverville #1 Pump Station 6. Completed replacement of the adjustable frequency drives at the Influent Pump Station 7. Completed design of new $11.5 million Headworks Project 8. ISO Recertification for entire organization
Budget Highlights/Changes for FY 2016-2017 1. Keep rate increases low and consistent based on long-term financial model 2. Includes completing Capital Improvements of approximately $22 Million 3. Reflects 10% increase in medical plan costs, plus plan adjustments 4. A 3.0% salary adjustment 5. Increase GASB45 requirements and increase to LGERS contribution
Goals & Objectives Goal: Oversee compliance with all State & Federal requirements for collection, treatment, and disposal of wastewater. (MSD Objectives 1& 2)
Goal: Manage District in a financially sound manner. (MSD Goal 3) Goal: Implement District programs in accordance with Board approved schedules, as modified from time to time as appropriate to provide project flexibility and accommodate ongoing changes in the community. (MSD Goal 4)
Goal: Manage community relations and education efforts. (MSD Objective 5) Goal: Establish departmental goals & objectives. (MSD Goal 4)
Performance Measures 1. Oversight of compliance matters—see performance measures for Systems Services and Water Reclamation facility departments
2. Fiscal management—see performance measures for Finance Department
2017 Budget Document
Page 49
Metropolitan Sewerage District of Buncombe County, North Carolina
FY17 Budget – Office of the General Manager No.
Name
Actual 2012-2013
Actual 2013-2014
Actual 2014-2015
Approved 2015-2016 Budget
Estimated Actual 6/30/2016
Salaries & Wages 51100 Salaries & Wages Total Salaries & Wages
$ $
Benefits 51200 North Carolina Retirement 51250 Payroll Taxes 51300 Medical, Dental & Life 51325 Post Retirement Insurance 51350 Worker's Compensation 51360 State Unemployment Benefits 51500 401-K/457 Plan Total Benefits
$ $ $ $ $ $ $ $
14,746.57 14,892.81 23,920.87 2,361.13 2,890.00 7,783.89 66,595.27
$ $ $ $ $ $ $ $
15,663.24 13,000.36 24,605.00 2,105.00 2,890.00 428.00 7,975.13 66,666.73
Total Salaries, Wages & Benefits
$
285,274.43
$
287,793.90
Materials, Supplies & Services 52010 Advertising 52050 Dues & Subscriptions 52100 Postage
$ $ $
52150 Travel, Mtgs & Training 52170 Directors Fees & Expenses 52180 Liability Insurance 52210 Communications 52250 Office Supplies 52260 Special Dept Supplies 52330 Legal Fees 52350 Prof/Contractual Svcs 52410 Maint-Buildings & Grounds 52420 Maintenance-Equipment 52500 Rents/Leases 52510 Permits/Fees/Software Licenses 52650 Utilities 52690 Freight 52900 Other Operating Expenses 52910 Non-Capital Equipment 52920 Billing & Collections Total Materials, Supplies & Services
$ 4,411.87 $ 42,108.87 $ 116,167.00 $ 1,805.93 $ 646.65 $ 219.63 $ 40,090.37 $ 18,765.53 $ 111,772.55 $ 215.70 $ 3,803.32 $ 140.00 $ 107,236.64 $ 4,976.68 $ 1,240.91 $ $ 701,014.95 $ 1,183,148.82
Interfund Transfers 53040 Fleet Replacement Charges Total Interfund Transfers
$ $
6,937.00 $ 6,937.00 $
7,546.00 $ 7,546.00 $
Capital Outlay 54010 Capital Equipment - New Total Capital Outlay
$ $
-
-
Sub-Total O&M Fund
$ 1,475,360.25
$ 1,483,016.33
$ 1,495,493.27
$ 1,559,779.00
$ 1,537,496.00
$ $
$ $
$ $
$ $
$ $
59200
LESS: Chargebacks to General Fund for CIP Chargebacks to General Fund for SSD
Net Operation & Maintenance Fund
2017 Budget Document
218,679.16 $ 218,679.16 $
10,832.62 $ 10,447.57 $ 7,252.03 $
-
$ 1,475,360.25
221,127.17 $ 221,127.17 $
$ 4,828.47 $ 22,620.01 $ 116,167.00 $ 1,854.26 $ 568.70 $ 921.50 $ 45,918.92 $ 17,363.08 $ 113,538.60 $ 243.31 $ 4,391.48 $ 140.00 $ 101,862.29 $ 4,756.12 $ 1,286.28 $ $ 717,412.77 $ 1,187,676.43
$ $
-
$ 1,483,016.33
243,626.00
$
243,626.00
75,286.00
100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
$ $ $ $ $ $ $ $
17,882.00 18,637.00 25,792.00 3,649.00 3,689.00 440.00 12,182.00 82,271.00
$
306,916.00
100.0%
$
325,897.00
15.74% 5.17% 9.26% 2.56% 25.95% 0.00% 5.18% 9.28% 6.18%
13,000.00 $ 12,000.00 $ 11,000.00 $
13,000.00 12,000.00 11,000.00
100.0% 100.0% 100.0%
$ $ $
12,500.00 12,000.00 11,000.00
-3.85% 0.00% 0.00%
7,000.00 33,500.00 116,167.00 3,000.00 700.00 700.00 40,000.00 20,000.00 120,000.00 400.00 5,208.00 170.00 103,000.00 5,000.00 4,000.00
7,000.00 33,500.00 116,167.00 3,000.00 700.00 700.00 30,000.00 17,000.00 120,000.00 375.00 5,000.00 170.00 95,000.00 4,950.00 3,000.00 750,000.00
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
7,000.00 35,000.00 105,099.00 3,000.00 700.00 700.00 50,000.00 20,000.00 121,400.00 400.00 5,500.00 170.00 118,000.00 5,000.00 4,000.00 772,500.00
$ 1,244,845.00
$ 1,222,562.00
100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 75.0% 85.0% 100.0% 93.8% 96.0% 100.0% 92.2% 99.0% 75.0% 100.0% 98.2%
0.00% 4.48% -9.53% 0.00% 0.00% 0.00% 25.00% 0.00% 1.17% 0.00% 5.61% 0.00% 14.56% 0.00% 0.00% 3.00% 3.14%
100.0% 100.0%
$
8,018.00
$
8,018.00
-
$ $
231,630.00
231,630.00
$
231,630.00
$ $ $ $ $ $ $
16,737.26 14,255.65 27,829.86 1,048.99 2,736.28 326.03 8,545.50
$ $ $ $ $ $ $
15,450.00 17,720.00 23,607.00 3,558.00 2,929.00 440.00 11,582.00
$ $
15,450.00 17,720.00
$ $ $ $ $
23,607.00 3,558.00 2,929.00 440.00 11,582.00
$
71,479.57
$
75,286.00
$
$
308,535.14
$
306,916.00
12,241.81 $ 11,391.47 $ 9,452.22 $ 7,244.85 22,791.28 95,518.68 2,510.77 270.99 618.41 33,019.00 11,660.87 117,581.30 230.00 3,346.99 168.00 103,639.47 6,737.82 467.94 738.75 738,238.51
$ 1,177,869.13
$ $
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $
$ $
7,546.00 $
7,546.00
$
1,543.00 $ 1,543.00 $
-
$ 1,495,493.27
Inc (Dec) Over Prior Year
$
231,630.00 $
$
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
Proposed 2016-2017 Budget
100.0% 100.0%
237,055.57 $
237,055.57
11,816.63 $ 10,791.90 $ 11,195.11 $
Percent Expended To Total Budget
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 750,000.00 $
8,018.00 $
8,018.00
-
-
$ 1,559,779.00
$
$ $
8,018.00
8,018.00
-
-
$ 1,537,496.00
98.6%
98.6%
$ 1,283,969.00
-
$ 1,617,884.00
$ $
-
$ 1,617,884.00
5.18% 5.18%
0.00% 0.00%
3.73%
3.73%
Page 50
Metropolitan Sewerage District of Buncombe County, North Carolina
Human Resources Organizational Chart Director of Human Resources James Hemphill
Environmental, Health & Safety Manager
Public Relations Representative
Payroll/Benefits Manager
HR Programs Manager
EHS Safety Technician
2017 Budget Document
Page 51
Metropolitan Sewerage District of Buncombe County, North Carolina
Human Resources (continued) Mission Statement The mission of the Human Resource Management Division is to develop and implement a comprehensive, consistent program of human resource activities and maintain a qualified, diverse, career-oriented work force. The mission of the Payroll and Employee Benefits Division is to process bi-weekly payroll for the District employees and to provide an attractive employee benefits package at a reasonable cost to the District and employees. The mission of the Environmental Safety Division is to eliminate avoidable personal injuries and accidents through compliance with applicable federal, state, local and MSD rules and regulations governing environmental health and safety.
Key Responsibilities Human Resources—Includes compliance with all Federal/State regulations and MSD Personnel Policies; coordinate recruitment process and new employee orientation; coordinate employee six-month and annual evaluations; maintain employee personnel files; coordinate updates to personnel pay plan & job descriptions; maintain positive employer-employee relations and develop training program for supervisors.
Payroll & Benefits—Includes bi-weekly processing of payroll and related reports; administering the following benefits: group medical, dental and life insurance; social security, North Carolina Retirement Defined Benefit Plan, 401(k) and 457 Defined Contribution Plans, Section 125 Cafeteria Plan, and voluntary employee deductions such as cancer, disability and life insurance.
Environmental Safety—To ensure District compliance with laws of regulatory agencies such as OSHA, the North Carolina Department of Transportation, and EPA; to reduce losses to the District such as high worker’s compensation premiums, lost production time, damage to property, etc.; and to promote awareness of and participation in environmental, health and safety among all employees.
Staffing History Division & Position Department of Human Resources Management: Director of Human Resources Total Management 2017 Budget Document
Approved
Approved
Budgeted
Positions
Positions
Positions
14-15
15-16
16-17
1 1
1 1
1 1 Page 52
Metropolitan Sewerage District of Buncombe County, North Carolina
Human Resources (continued) Staffing History (continued) Approved
Approved
Budgeted
Positions
Positions
Positions
14-15
15-16
16-17
1 1 1 3
1 1 1 3
1 1 1 3
Environmental, Health & Safety: EHS Safety Technician Environmental, Health & Safety Manager Total Environmental, Health & Safety
1 1 2
1 1 2
1 1 2
Total – Human Resources Department
6
6
6
Division & Position Human Resources: Public Relations Representative HR Programs Manager Payroll/Benefits Manager Total Human Resources
Accomplishments for FY 2015-2016 1. Changed Pharmacy Benefit Manager to CIGNA 2. Added step therapy, mail order and pre-certification for high dollar drugs 3. Increased Wellness activities to reduce medical insurance costs 4. Coordinated retirement and replacement activities 5. Identified, provided training, and promoted employees as part of the Succession Plan 6. Rewrote and distributed Employee Handbook 7. Coordinated a variety of Safety Training programs: trenching, saw usage, rigging, PPE, gas monitor use, traffic flagger, confined space, lockout/ tag out,
8. Completed Arc Flash study & marked equipment per NFPA; Employee assessments under way 9. Piloted improved PPE (safety glasses, hearing protection, gloves, chemical protection 10. Initiated trials on safer cutoff saw blades, diamond blade pavement cutters
Budget Highlights/Changes for FY 2016-2017 1. Funds allocated for Wage survey 2. Funds allocated for additional atmosphere monitors 3. Funds allocated for Arc Flash training
2017 Budget Document
Page 53
Metropolitan Sewerage District of Buncombe County, North Carolina
Human Resources (continued) Goals & Objectives Goal: Provide supervisory leadership development training. (MSD Objective 3) Objective: Provide appropriate training sessions for employees Goal: Train supervisors in improving employee relations and managing employee personnel issues. (MSD Objective 3)
Goal: Maintain consistency throughout District on disciplinary actions. (MSD Objective 3) Objective: Train supervisors to keep personnel informed/involved in all dealings leading up to a disciplinary step.
Goal: Improve the pool of applicants to reflect the diversified community. (MSD Objective 3) Goal: Promote District employment opportunities at community job fairs. (MSD Objective 3) Objective: Attend at least one job fair annually in Buncombe and Madison Counties Goal: Ongoing review of new position classifications or positions with added responsibilities. (MSD Objective 3)
Objective: Review Labor Grade of new & existing positions as necessary Goal: Keep personnel policies up to date. (MSD Objective 3) Objective: Review 20% of policies per year Goal: Keep job descriptions up to date. (MSD Objective 3) Objective: Review 20% of job descriptions per year Goal: Promote Wellness Program.( MSD Objective 3) Objective: Have at least 75% of employees participate in Health Fair Goal: Minimize time positions are vacant. (MSD Goals 1 & 2) Objective: Have positions filled within 20 days Goal: Minimize cost to fill vacancies. (MSD Goal 3) Objective: Limit average cost to $400 Goal: Process payroll in a timely and accurate manner. (Objective 3) Objective 1: No errors in paychecks Goal: Promote efficient utilization of employee benefits. (Objective 3) Objective 1: Provide quarterly education or updates to employees concerning different types of benefits or other personal financial issues
Goal: Promote efficient utilization of employee benefits. (Objective 3) Objective 2: Resolve employee payroll and benefit concerns within two business days 2017 Budget Document
Page 54
Metropolitan Sewerage District of Buncombe County, North Carolina
Human Resources (continued) Goals & Objectives (continued) Goal: To guard the occupational health and safety of MSD’s workforce (MSD Goal #1) Objective: Maintain an “Incident Rate” below industry standards of 5.30 per 100 employees. Objective: Promote safety by focusing on training and compliance inspections. Objective: Maintain health focus including disease prevention and workers compensation. Objective: Continuously evaluate current safety practices and improve/change as needed. Objective: Manage safety related contractual efforts including Drug Testing, Hoist Testing, Fire Protection, and Hearing Conservation.
Goal: Maintain full compliance with all applicable legal requirements and governmental standards. Objective: Have zero (0) OSHA violations. Objective: Stay abreast of changes and regulations and how they apply to the District.
Performance Measures Task
13-14
14-15
15-16
est
1. 2.
Monitor and evaluate Skill Based Pay System
Yes
Yes
Yes
Assist in the administration of the Employee Wellness
Yes
Yes
Yes
3. 4. 5. 6. 7.
# of external vacancies
7
2
6
Avg. # of days to fill vacancies
25
25
30
Avg. advertising cost per vacancy
$500
$380
$400
Percentage of paychecks reissued or modified
<.1%
<.01%
<.1%
Percentage of payroll tax and benefit withholdings
100%
100%
100%
22
11
8
99%
99%
99%
Number of Injuries (calendar year)
12
5
5
Number of Lost Time Injuries (calendar year)
3
1
1
7.85
3.48
3.48
Inspections/Audits (calendar year)
36
23
33/100+
Random Alcohol and Drug Tests for CDL drivers
30
30
33
77
78
53
8. 9. 10. 11. 12. 13. 14. 15.
Program
timely remitted Number of employee benefit education sessions Percentage of employee payroll and benefit concerns resolved within two business days
Incident Rate NAICS (calendar year)
(calendar year) EHS Training classes conducted (calendar year)
2017 Budget Document
Page 55
Metropolitan Sewerage District of Buncombe County, North Carolina
FY17 Budget – Human Resources No.
Name
Actual 2012-2013
Actual 2013-2014
Actual 2014-2015
Approved 2015-2016 Budget
Estimated Actual 6/30/2016
Percent Expended To Total Budget
Proposed 2016-2017 Budget
Inc (Dec) Over Prior Year
Salaries & Wages 51100 Salaries & Wages 51150 Overtime Total Salaries & Wages
$ $ $
338,062.87 $ 280.01 $ 338,342.88 $
352,525.71 $ 310.93 $ 352,836.64 $
365,870.22 $ 138.78 $ 366,009.00 $
411,471.00 $ 250.00 $ 411,721.00 $
411,471.00 250.00 411,721.00
100.0% 100.0% 100.0%
$ $ $
427,776.00 250.00 428,026.00
3.96% 0.00% 3.96%
Benefits 51200 North Carolina Retirement 51250 Payroll Taxes 51300 Medical, Dental & Life 51325 Post Retirement Insurance 51350 Worker's Compensation 51360 State Unemployment Benefits 51450 Automobile Allowance 51500 401-K/457 Plan Total Benefits
$ $ $ $ $ $ $ $ $
22,525.34 24,323.75 71,762.61 7,083.39 8,670.00 1,848.08 16,497.85 152,711.02
25,016.54 27,326.22 73,816.00 6,314.00 8,670.00 1,281.96 17,306.22 159,730.94
25,845.65 28,506.74 83,489.58 3,146.97 8,209.78 978.08 18,173.41 168,350.21
27,462.00 31,497.00 70,821.00 10,674.00 8,788.00 1,320.00 20,574.00 171,136.00
$ $ $ $ $ $ $ $ $
27,462.00 31,497.00 70,821.00 10,674.00 8,788.00 1,320.00 20,574.00 171,136.00
100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
$ $ $ $ $ $ $ $ $
31,417.00 32,744.00 77,377.00 10,946.00 11,067.00 1,320.00 21,390.00 186,261.00
14.40% 3.96% 9.26% 2.55% 25.93% 0.00% 3.97% 8.84%
Total Salaries, Wages & Benefits
$
491,053.90 $
512,567.58 $
534,359.21 $
582,857.00 $
582,857.00
100.0%
$
614,287.00
5.39%
Materials, Supplies & Services 52010 Advertising 52050 Dues & Subscriptions 52150 Travel, Mtgs & Training 52160 Tuition Assistance 52180 Liability Insurance 52210 Communications 52240 Uniforms 52250 Office Supplies 52260 Special Dept Supplies 52270 Safety Equip/Supplies 52330 Legal Fees 52350 Prof/Contractual Svcs 52410 Maint-Buildings & Grounds 52420 Maintenance-Equipment 52510 Permits/Fees/Software Licenses 52715 Safety Incentive Program 52725 Wellness Program 52730 Employee Asst Program 52910 Non-Capital Equipment Total Materials, Supplies & Services
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
5,445.18 7,566.06 15,249.40 468.50 1,873.00 2,345.88 886.88 3,647.52 2,642.90 5,133.99 41,486.46 7,797.67 3,129.22 2,660.88 1,069.45 4,128.82 4,255.00 16,688.37 126,475.18
3,700.54 6,644.39 18,305.76 1,822.38 1,873.00 2,189.29 900.70 3,402.57 606.19 6,363.31 3,103.45 36,890.97 4,687.99 2,542.27 1,228.64 8,010.44 4,255.00 10,046.08 116,572.97
1,788.14 5,684.44 18,687.99 4,229.42 1,540.08 2,643.55 839.52 2,929.53 1,455.54 11,453.54 2,393.41 48,920.68 673.37 1,799.58 1,845.91 4,592.67 4,255.00 19,977.58 135,709.95
4,000.00 6,100.00 25,805.00 6,000.00 1,873.00 5,310.00 1,300.00 3,900.00 3,300.00 12,542.21 4,000.00 64,700.00 1,000.00 2,000.00 2,850.00 2,500.00 8,000.00 4,500.00 11,457.79 171,138.00
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
3,500.00 5,500.00 19,000.00 6,000.00 1,873.00 3,900.00 1,300.00 3,900.00 3,200.00 12,550.00 2,500.00 52,000.00 600.00 2,000.00 2,550.00 1,800.00 7,000.00 4,355.00 11,458.00 144,986.00
87.5% 90.2% 73.6% 100.0% 100.0% 73.4% 100.0% 100.0% 97.0% 100.1% 62.5% 80.4% 60.0% 100.0% 89.5% 72.0% 87.5% 96.8% 100.0% 84.7%
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
4,000.00 6,100.00 25,150.00 7,000.00 1,695.00 5,310.00 1,300.00 3,700.00 3,300.00 13,000.00 4,000.00 68,450.00 1,000.00 2,000.00 2,850.00 2,500.00 8,000.00 4,500.00 14,800.00 178,655.00
0.00% 0.00% -2.54% 16.67% -9.50% 0.00% 0.00% -5.13% 0.00% 3.65% 0.00% 5.80% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 29.17% 4.39%
Interfund Transfers 53040 Fleet Replacement Charges Total Interfund Transfers
$ $
-
$ $
1,952.00 $ 1,952.00 $
1,952.00 $ 1,952.00 $
2,074.00 $ 2,074.00 $
2,074.00 2,074.00
100.0% 100.0%
$ $
2,074.00 2,074.00
0.00% 0.00%
Capital Outlay 54010 Capital Equipment - New Total Capital Outlay
$ $
24,246.76 $ 24,246.76 $
2,047.42 $ 2,047.42 $
5,490.00 $ 5,490.00 $
-
-
$ $
Sub-Total O&M Fund
$
641,775.84 $
633,139.97 $
677,511.16 $
96.5%
$
-
$ $
96.5%
$
59200
LESS: Chargebacks to General Fund for CIP Chargebacks to General Fund for SSD
Net Operation & Maintenance Fund
2017 Budget Document
$ $ $
-
$ $ $ $ $ $ $ $ $
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
$ $
641,775.84 $
-
$ $ $ $ $ $ $ $ $
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
$ $
633,139.97 $
-
$ $ $ $ $ $ $ $ $
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
$ $
677,511.16 $
$ $
756,069.00 $
-
$ $
756,069.00 $
729,917.00
729,917.00
795,016.00
795,016.00
5.15%
5.15%
Page 56
Metropolitan Sewerage District of Buncombe County, North Carolina
Information Technology Organizational Chart Director of IT Matthew Walter
GIS Manager
IT Network Manager
IT Systems Administrator II GIS Analyst IT Technician I
Network Database/Administrator
Database Analyst
2017 Budget Document
GIS Technician I
Technical Services Data Manager
Page 57
Metropolitan Sewerage District of Buncombe County, North Carolina
Information Technology (continued) Mission Statement To provide information technology support, training, management, and development that will benefit the District divisions by facilitating completion of work objectives, improving communication, and creating better and easier access to information.
Key Responsibilities Information Technology (IT)—Support new systems development based on the plans of the District divisions. Provide ongoing support and enhancements to major on-line operational and administrative systems. Maintain the existing computer equipment and data communications network. Plan and manage the acquisition and installation of new computer equipment, software, and peripherals. Provide computer equipment support, including installations, moving and troubleshooting. Develop new software applications to meet specific MSD needs. Provide daily operations and product support. Develop longrange goals for computer systems development. Support responsibilities also include the telephone system, radio system, and process control equipment at the Plant. Offer computer software training programs for District staff. All IT work done 100% in-house. No vendor or contractors used for IT support.
Geographical Information Systems (GIS)—Develop, manage and maintain data sets and digital maps related to the operations of the District. Provide data access and data analysis services for all divisions. Coordinate the acquisition of updated information from the field, external sources (such as other governmental agencies), and the Engineering Division and incorporate it into the GIS data sets. Develop, maintain, and train others in the use of tools for accessing spatial information to support all District activities.
Staffing History Approved Positions 14-15
Approved Positions 15-16
Budgeted Positions 16-17
Department of Information Technology Management: Director of IT Total Management
1 1
1 1
1 1
Information Systems (IT): IT Technician I IT Systems Administrator II IT Network Manager Database Analyst Network Database Administrator Total IT
1 1 1 1 1 5
1 1 1 1 1 5
1 1 1 1 1 5
Division & Position
2017 Budget Document
Page 58
Metropolitan Sewerage District of Buncombe County, North Carolina
Information Technology (continued) Staffing History (continued) Approved Positions 14-15
Approved Positions 15-16
Budgeted Positions 16-17
Geographic Information Systems(GIS): Technical Services Data Manager GIS Analyst GIS Technician II GIS Manager Total GIS
1 1 1 1 4
1 1 1 1 4
1 1 1 1 4
Total – Information Technology Department
10
10
10
Division & Position
Accomplishments for FY 2015-2016 1. New Permits Licensing and Land module on Cityworks for Engineering that allows MSD customers to request service online through the Public Portal.
2. Dozens of custom reports on CityWorks and software customizations for MSD. 3. Implemented Freeance Mobile for CityWorks on iPads for offsite Field Operations. 4. Installed new Dell blade server to replace the Finance server and upgraded to the latest Navision software.
5. Increased Wi-Fi coverage on MSD campus from the Plant to the Warehouse. 6. Upgraded emissions monitoring PC and software for the Thermal Converter building. 7. Configuration and installation of 11 new SCADA PCs/servers to monitor systems at the Plant. 8. Rolled out over 10+ laptop replacements/installations, 30+ desktop replacements/installations for MSD users.
9. All MSD users have been migrated from Windows XP to Windows 7 or 10. 10. Ten (10) new scanner/copiers installed MSD wide. 11. Security gates/card readers installed at Fleet and Wash Bay. 12. Temperature monitors installed in three (3) IT server rooms with email alerts. 13. Improved road maintenance layer, depicting agencies of contact throughout the district 14. Produced a GIS layer capturing changes in parcel ownership and boundaries for assistance in tracking right-of-way transfers
15. Improved GIS video layers, reducing the number of pipe video re-inspections
2017 Budget Document
Page 59
Metropolitan Sewerage District of Buncombe County, North Carolina
Information Technology (continued) Accomplishments for FY 2015-2016 (continued) 16. Improved mobile navigation, reducing the amount of time to find assets in the field 17. Improved security of MSD GIS websites 18. Developed a GIS application and data layer to capture active projects being inspected, who is inspecting them, and show them on a common map
19. Developed a prototype GIS application and data layer to track underground utilities and obstructions affecting sewer pipes
20. Completed mobile and tablet application development and implementation. It is now a popular, stable product
21. Completion of custom GIS websites for P&D and Finance 22. Improved GIS desktop support and training for Engineering and System Services users 23. Training and supervision of Cane Creek Water and Sewer District staff to update their sewer GIS layer 24. Improvements to SL Rat inspection application, including improving the speed and accuracy of data entry and inspection query functions
25. Successful transfer from FLEX to HTML-based GIS websites 26. Production of Upstream Trace, Downstream Trace, and Flow Monitor custom widgets for HTML-based GIS website
27. Produced and maintain a data layer depicting gated communities, deployed on AR for Truck 28. Completed a first phase mapping of gravity mains and manholes in the Water Reclamation Facility 29. Developed a clickable GIS data layer of scanned as-builts, from which a user can quickly view as-built plans and see past projects
30. Tested and troubleshooting ArcGIS in the Windows 10 environment 31. Begun the improvement of right-of-way easements mapping and tracking
Goals & Objectives Goal: Provide all MSD staff with outstanding customer service. Goal: Continue to provide on-going training, support and application customization to all divisions. Maintain the servers, network, email, websites, public map access, phones, copiers, fax machines, printers, and security systems.
Goal: Continue testing and researching in preparation for upgrades, including Windows, Server, Cloud Computing, and Storage. 2017 Budget Document
Page 60
Metropolitan Sewerage District of Buncombe County, North Carolina
Information Technology (continued) Goals & Objectives (continued) Goal: Implement mobile solution for CityWorks to aid in paper reduction as well expanding use of Flex/ESRI Mapping systems
Goal: Assist in continued implementation and support of CityWorks software. Goal: Move completely away from using old Work Order Management System, (WOMS). Goal: Complete reporting structure for CityWorks. Goal: Normalize data within the CityWorks system. Goal: Create specific plans for projects in each area of MSD in regards to software needs so that endusers will know whom to contact.
Goal: Assist in providing IT hardware support as needed. Goal: Continue application and geospatial data support for CityWorks, Granite XP, Flex, ArcGIS Desktop, and AR for Trucks software and processes.
Goal: Implement tighter Quality Control measures on existing data as well as research and correct any errors founds through these tighter controls.
Goal: Quantify existing data sources such as As-Builts to ensure they have been entered into the GIS system and scanned for digital copies. Field edits and tap maps should already be archived through Granite XP and/or CityWorks software and attachments available in CityWorks.
Goal: Continue to input geospatial data changes as requested by users. Goal: Continue to process map requests and customer inquiries. Goal: Continue to implement Local Government Information Model for Water Utilities maps and apps as well as utilizing ArcGIS Online environment.
Goal: Develop GIS web applications for additional environments. Goal: Begin conversion from FLEX web mapping to HTML. ESRI no longer supports new development options for FLEX and plans to stop supporting the product in the future.
Goal: Continue application and geospatial data support for CityWorks, Granite XP, FLEX, ArcGIS Desktop, and AR for Trucks software processes.
2017 Budget Document
Page 61
Metropolitan Sewerage District of Buncombe County, North Carolina
Information Technology (continued) Goals & Objectives (continued)
Goal: Develop Desktop GIS Applications to meet user needs that cannot be met by web and mobile GIS applications.
Goal: Continue assessment of existing data sources, such as as-builts and past work orders to ensure that they have been entered into the GIS system.
Goal: Expand web and mobile solutions to assist workflows where needed. Goal: Continue to input geospatial data changes as requested by users. Goal: Continue to process map requests and customer data inquiries. Goal: Conduct pipe scoring on legacy video that has not been re-inspected by Granite or slated for capital improvement
Goal: Complete transfers of all FLEX-based GIS websites to HTML-based GIS websites Goal: Application development of HTML site widgets, to provide more tools to WebGIS users Goal: Continue application and Geospatial data support for CityWorks, Granite XP, FLEX, ArcGIS Desktop, and AR for Trucks software applications
Goal: Continue assessment of MSD hardcopy maps, survey, and standalone digital data that have not been entered into the system
Goal: Expand web and mobile solutions to assist workflows where needed Goal: Continue user support for MSD Web, Mobile, and Desktop GIS users Goal: Map Wastewater Reclamation Facility structures as they are changed and exposed by construction projects
Goal: Continue data entry of as-built sewer maps Goal: Continue to process map requests and customer data inquiries Goal: Improve Granite product visualization Goal: Continued application and geospatial data support for CityWorks, Granite XP, FLEX, ArcGIS Desktop, and AR for Truck
Goal: Expanded web and mobile solutions to help streamline field navigation and workflows 2017 Budget Document
Page 62
Metropolitan Sewerage District of Buncombe County, North Carolina
Information Technology (continued) Goals & Objectives (continued)
Goal: Continued data entry and process improvements Goal: Continued processing of map requests and customer data inquiries Goal: Continued pipe scoring of legacy video Goal: Continued assessment MSD hardcopy map and survey resources that have not been entered into the GIS system
Performance Measures Task
1. In-house direct labor (except fiber optic repairs) 2. Same day turnaround on user issues/assistance
2017 Budget Document
13-14 100% 93%
14-15 100% 95%
15-16
est
100% 95%
Page 63
Metropolitan Sewerage District of Buncombe County, North Carolina
FY17 Budget – Information Technology No.
Name
Actual 2012-2013
Actual 2013-2014
Actual 2014-2015
Approved 2015-2016 Budget
Estimated Actual 6/30/2016
Percent Expended To Total Budget
Proposed 2016-2017 Budget
Inc (Dec) Over Prior Year
Salaries & Wages 51100 Salaries & Wages 51150 Overtime Total Salaries & Wages
$ $ $
552,617.31 $ $ 552,617.31 $
547,024.17 $ 188.50 $ 547,212.67 $
622,852.62 $ $ 622,852.62 $
635,761.00 $ 500.00 $ 636,261.00 $
635,761.00 635,761.00
100.0% 0.0% 99.9%
$ $ $
654,765.00 654,765.00
2.99% -100.00% 2.91%
Benefits 51200 North Carolina Retirement 51250 Payroll Taxes 51300 Medical, Dental & Life 51325 Post Retirement Insurance 51350 Worker's Compensation 51360 State Unemployment Benefits 51500 401-K/457 Plan Total Benefits
$ $ $ $ $ $ $ $
37,214.43 40,068.67 119,604.35 11,804.65 14,450.00 7,472.00 14,688.43 245,302.53
38,806.61 39,498.51 123,027.00 10,523.00 14,450.00 15,770.67 16,886.60 258,962.39
43,988.92 45,255.70 139,149.31 5,244.95 13,683.29 1,630.13 25,100.28 274,052.58
42,439.00 48,674.00 118,035.00 17,790.00 14,647.00 2,200.00 31,789.00 275,574.00
$ $ $ $ $ $ $ $
42,405.00 48,636.00 118,035.00 17,790.00 14,647.00 2,200.00 31,789.00 275,502.00
99.9% 99.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
$ $ $ $ $ $ $ $
48,060.00 50,089.00 128,962.00 18,243.00 18,445.00 2,200.00 32,739.00 298,738.00
13.24% 2.91% 9.26% 2.55% 25.93% 0.00% 2.99% 8.41%
Total Salaries, Wages & Benefits
$
797,919.84 $
806,175.06 $
896,905.20 $
911,835.00 $
911,263.00
99.9%
$
953,503.00
4.57%
Materials, Supplies & Services 52050 Dues & Subscriptions 52150 Travel, Mtgs & Training 52180 Liability Insurance 52200 Telephone/Telefax 52210 Communications 52240 Uniforms 52250 Office Supplies 52260 Special Dept Supplies 52270 Safety Equip/Supplies 52350 Prof/Contractual Svcs 52500 Rents/Leases 52510 Permits/Fees/Software Licenses 52910 Non-Capital Equipment 52915 Copiers Printers & Faxes Total Materials, Supplies & Services
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $
50.00 2,417.92 11,670.00 33,597.07 4,714.59 159.53 400.41 390.41 78.52 3,357.81 25,515.21 63,988.14 49,422.27 195,761.88
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $
129.00 1,023.35 11,670.00 29,506.09 2,639.09 101.54 440.34 57.23 84.07 7,372.33 30,041.44 55,604.00 54,225.16 192,893.64
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $
377.00 2,272.00 9,595.69 28,692.57 2,899.47 93.41 51.39 77.28 17,345.05 34,046.64 140,882.76 68,416.01 60.41 304,809.68
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $
500.00 3,069.00 11,670.00 31,200.00 3,500.00 800.00 650.00 500.00 100.00 12,500.00 42,000.00 176,050.00 55,000.00 5,000.00 342,539.00
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $
350.00 2,925.00 11,670.00 31,200.00 3,500.00 625.00 500.00 100.00 9,500.00 40,000.00 173,000.00 55,000.00 4,775.00 333,145.00
70.0% 95.3% 100.0% 100.0% 100.0% 0.0% 96.2% 100.0% 100.0% 76.0% 95.2% 98.3% 100.0% 95.5% 97.3%
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $
440.00 3,500.00 10,557.00 31,600.00 3,500.00 800.00 700.00 500.00 200.00 12,500.00 44,000.00 179,800.00 55,000.00 5,000.00 348,097.00
-12.00% 14.04% -9.54% 1.28% 0.00% 0.00% 7.69% 0.00% 100.00% 0.00% 4.76% 2.13% 0.00% 0.00% 1.62%
Capital Outlay 54010 Capital Equipment - New 54020 Capital Equip-Software 54030 Capital Equip - Replacement Total Capital Outlay
$ $ $ $
86,521.91 13,598.61 17,977.12 118,097.64
$ $ $ $
23,404.39 66,688.27 90,092.66
$ $ $ $
3,055.26 11,250.00 40,732.62 55,037.88
$ $ $ $
5,500.00 13,738.50 22,000.00 41,238.50
$ $ $ $
5,500.00 13,700.00 21,850.00 41,050.00
100.0% 99.7% 99.3% 99.5%
$ $ $ $
5,950.00 13,248.00 16,800.00 35,998.00
8.18% -3.57% -23.64% -12.71%
Sub-Total O&M Fund
$ 1,111,779.36 $ 1,089,161.36 $ 1,256,752.76 $ 1,295,612.50 $ 1,285,458.00
99.2%
$ 1,337,598.00
3.24%
$ $
(255,974.39) $ $
(239,081.92) $ $
(278,052.43) $ $
(288,225.00) -
100.0% -
$ $
3.84% -
$
855,804.97 $
850,079.44 $
978,700.33 $ 1,007,387.50 $
997,233.00
99.0%
$ 1,038,314.00
59200
LESS: Chargebacks to General Fund for CIP Chargebacks to General Fund for SSD
Net Operation & Maintenance Fund
2017 Budget Document
$ $ $ $ $ $ $ $
$ $ $ $ $ $ $ $
$ $ $ $ $ $ $ $
(288,225.00) $ $
(299,284.00) -
3.07%
Page 64
Metropolitan Sewerage District of Buncombe County, North Carolina
Financial Services Organizational Chart Director of Financial Services W. Scott Powell
Budget Analyst I
Accounting Manager
Purchasing Supervisor
Accounting Technician II
Accounting Technician I
Purchasing Agent II
Purchasing Agent I
2017 Budget Document
Page 65
Metropolitan Sewerage District of Buncombe County, North Carolina
Financial Services (continued) Mission Statement The mission of the Finance, Accounting, and Budget Division is to provide timely, useful, and accurate financial data to all internal and external customers including but not limited to staff, division directors, Board, investors, and the public and to assure prudent control of District cash and investments. The mission of the Purchasing and Warehouse Division is to provide procurement services to District Departments in the timeliest and cost-effective manner in compliance with all requirements of the District’s Purchasing Policy and NC General Statutes while maintaining a complete and sufficient supply of parts and materials required for District operations and asset maintenance.
Key Responsibilities Finance, Accounting, and Budget—Coordinates and manages the District’s Operating and Capital budget preparation; monitors the annual budget through pre-audit of purchase orders and invoice payment; prepares monthly operation and capital projects financial reports for management and the Board; assists in financial analysis as directed by the General Manager or Board; monitors all debt financing obligations for timely payment and reporting; coordinates issuance of debt with professional advisors; oversees the Insurance Programs; prepares billing for industries and customers using well water.
Purchasing and Warehouse—To provide a proper system of internal control for all District acquisitions; to ensure compliance with the North Carolina General Statutes and the Board-approved District Purchasing Policy; to assist and train division requisitioners as required; to effect timely acquisitions and disposals of property.
Staffing History Approved
Approved
Budgeted
Positions
Positions
Positions
14-15
15-16
16-17
Department of Financial Services Management Director of Financial Services Total Management
1 1
1 1
1 1
Finance & Budget: Budget Analyst Total Finance & Budget
1 1
1 1
1 1
Accounting, Investments & Cash Flow Management: Accounting Technician I Accounting Technician II Accounting Manager Total Acct., Investments & Cash Flow Management
2 1 1 4
2 1 1 4
1 1 1 3
Division & Position
2017 Budget Document
Page 66
Metropolitan Sewerage District of Buncombe County, North Carolina
Financial Services (continued) Staffing History (continued) Division & Position Purchasing & Warehouse: Purchasing Agent I Purchasing Agent II Purchasing Supervisor Total Purchasing & Warehouse Total – Financial Services Department
Approved
Approved
Budgeted
Positions
Positions
Positions
14-15
15-16
16-17
1 1 1 3
1 1 1 3
1 1 1 3
9
9
8
Accomplishments for FY 2015-2016 1. Received the GFOA “Excellence in Financial Reporting” award for the Comprehensive Annual Financial Report (CAFR) for FY ending June 30, 2015.
2. Received the GFOA “Distinguished Budget” award for the Budget Document prepared for FY ending June 30, 2016.
3. Continue to offer high level of Customer Service to all customers internal and external to the District. 4. Purchasing and Finance Team continue to implement and enhance its E-Payables program with Bank of America.
5. Successfully auctioned MSD surplus materials. 6. Enhanced paper reduction initiative by scanning and attaching receipts, quotations, emails, and other
pertinent information and documentation to purchase orders and the vendor database. Also increased use of email and pdf for Request for Quotations (RFQ) and other communications with vendors.
Goals & Objectives Goal: Prepare and administer budget, which effectively meets the short and long-term needs of the District. (Operating Budget Policy #6)
Objective: Obtain outside verification of the effectiveness of the budget document as a policy, operations, and communications guide by earning GFOA Distinguished Award for Budget Document.
Objective: Maximize accuracy of budgeted revenues and expenditures by striving for variances between budget and actual amounts of less than 5%.
Objective: Maintain affordability of rate increases by limiting rate increase to southern urban cost of living percentage.
2017 Budget Document
Page 67
Metropolitan Sewerage District of Buncombe County, North Carolina
Financial Services (continued) Goals & Objectives Goal: Prepare CAFR and other financial information, which effectively meet manager, investor, regulator, and other user needs.
Objective: Obtain outside verification of the effectiveness of the CAFR by earning Government Finance Officers’ Association Award of Excellence.
Objective: Maximize availability of financial information to all users by offering CAFR and budget documents on District Website.
Goal: Manage the District’s debt rating to obtain the lowest cost of borrowing. (Debt Policy #3) Objective: Achieve compliance with all provisions of Bond Order. (Debt Policy #6) Objective: Maintain or improve District’s debt rating. Objective: Make efficient use of district funds used for debt service. Goal: Manage District’s investments to maximize rate of return while maintaining safety and meeting cash flow needs.
Objective: Achieve a total rate of return at least that of a 6-Month T-bill. Goal: Prepare sewage treatment bills, which are accurate and collected in a timely manner. Objective: Limit rebilling due to errors to less than 1% of total bills. Objective: Collect a minimum of 98% of all residential fees and 90% of industrial fees billed. Goal: Pay for all services rendered and goods delivered to the District in a timely and accurate manner.
Objective: Not be assessed any late charges on any District accounts. Objective: Limit voided accounts payable checks to 10% of total checks written. Goal: Operate Finance Department in an efficient manner. Objective: Minimize finance department expenditures in relation to total expenditures. Goal: Provide services and supplies in a timely manner (LT6 and Purchasing Policy #2) Objective: Place purchase orders within three business days of requisition. Objective: Bid capital equipment within two weeks of requisition. Goal: Maintain cost-effective and sufficient inventory levels. Objective: To maintain an inventory loss level below 3%. (Purchasing Policy #2) Objective: To minimize emergency purchases.
2017 Budget Document
Page 68
Metropolitan Sewerage District of Buncombe County, North Carolina
Financial Services (continued) Performance Measures 15-16
est
Task
13-14
14-15
1. Receive the Distinguished Budget Presentation Award 2. Receipt of GFOA Excellence in Financial Reporting Award
yes
yes
yes
yes
yes
yes
3. CAFR and budget document available on website 4. District debt rating Moody’s/Standard & Poor’s/Fitch
yes
yes
yes
Aa2/AA+/
Aa2/AA+/
Aa1/AA+/
AA+
AA+
AA+
yes
yes
yes
1.50%
1.60%
0.50%
2.50%
2.50%
2.50%
for CAFR
Ratings
5. Compliance with all provisions of bond order 6. Southern Urban COL % increase 7. MSD rate increase
Comments: Assesses affordability of sewer rate increases when compared to overall regional price increases.
8. 9.
Ratio of actual to budgeted sewer revenues
102.14%
105.48%
100.00%
Ratio of operating and maintenance total expenditures
95.29%
93.57%
98.20%
actual to budgeted
Comments: These illustrate the accuracy of financial projections and adequacy of revenues to meet expenditures.
10.
Interest and debt management costs as a percentage
11. 12. 13.
2.48%
3.71%
4.23%
MSD Investment Yield
0.57%
0.59%
0.51%
NC Cash Management Trust (Money Market)
0.01%
0.04%
0.37%
6-Month T-Bill Secondary Market (Calendar)
0.07%
0.09%
0.49%
of outstanding debt
Comments: Rates of return reflect overall declining interest rates in the fixed income market.
14. 15. 16.
Collection of internally billed residential accounts
95.25%
95.00%
95.25%
Collection of internally billed industrial accounts
100.00%
100.00%
100.00%
3.50%
3.25%
3.00%
5.32%
5.45%
4.94%
Percentage of voided accounts payable checks
Comments: This ratio illustrates the effectiveness of the cash disbursement process.
17.
Percentage of total O&M costs expended on Finance
18. 19.
Purchase orders placed within 3 business days
98%
99%
99%
Requisitions for capital equipment to be bid within two
99%
98.5%
98.5%
2.50%
2.50%
2.50%
11.90%
11.50%
11.50%
20. 21.
function
(2) weeks from receipt of detailed specifications from division Maintain loss of inventory at Warehouse below 3% in value (Goal 2) Obtain the 12% goal for purchases with minority owned/operated businesses
2017 Budget Document
Page 69
Metropolitan Sewerage District of Buncombe County, North Carolina
FY17 Budget – Financial Services No.
Name
Actual 2012-2013
Actual 2013-2014
Actual 2014-2015
Approved 2015-2016 Budget
Estimated Actual 6/30/2016
Percent Expended To Total Budget
Salaries & Wages 51100 Salaries & Wages 51150 Overtime Total Salaries & Wages
488,785.88 $ 514,431.00 $ 514,431.00 $ 464,619.84 $ 472,515.70 $ - $ 500.00 $ 275.00 $ - $ 100.62 $ $ 464,619.84 $ 472,616.32 $ 488,785.88 $ 514,931.00 $ 514,706.00
Benefits 51200 North Carolina Retirement 51250 Payroll Taxes 51300 Medical, Dental & Life 51325 Post Retirement Insurance 51350 Worker's Compensation 51360 State Unemployment Benefits 51500 401-K/457 Plan Total Benefits
$ 31,834.97 $ 33,569.24 $ 34,077.87 $ 33,759.69 $ 107,644.94 $ 110,730.00 $ 10,625.06 $ 9,471.00 $ 13,008.00 $ 13,008.00 $ - $ 1,883.89 $ 21,518.32 $ 21,643.47 $ 218,709.16 $ 224,065.29
$ $ $ $ $ $ $
$ 235,457.35
$ 236,865.00
Total Salaries, Wages & Benefits
$ 683,329.00
$ 696,681.61
$ 724,243.23
$ 751,796.00
Materials, Supplies & Services 52050 Dues & Subscriptions 52150 Travel, Mtgs & Training 52210 Communications 52240 Uniforms 52250 Office Supplies 52260 Special Dept Supplies 52350 Prof/Contractual Svcs 52910 Non-Capital Equipment Total Materials, Supplies & Services
$ $ $ $ $ $ $ $ $
$ $ $ $ $ $ $ $ $
$ $
Sub-Total O&M Fund
$ 754,074.44
59200
LESS: Chargebacks to General Fund for CIP Chargebacks to General Fund for SSD
Net Operation & Maintenance Fund
2017 Budget Document
$ $
1,575.00 6,236.40 1,316.88 869.24 3,086.60 597.02 56,121.44 942.86 70,745.44
$ 761,599.56
- $ - $
$ 754,074.44
1,863.95 6,129.72 1,158.25 674.08 2,780.02 1,422.49 49,408.31 1,481.13 64,917.95
$ $ $ $ $ $ $
$ $ $ $ $ $ $
1,715.00 $ 6,051.70 $
2,244.69 561.12 2,100.88 1,069.28 54,150.39 630.45 68,523.51
$ 792,766.74
- $ - $
$ 761,599.56
34,518.19 35,216.81 125,234.97 4,720.31 12,315.61 1,467.12 21,984.34
$ $ $ $ $ $ $
100.0% 55.0% 100.0%
$ $
$ 236,833.00
100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
$ 35,780.00 $ 37,292.00 $ 103,169.00 $ 14,594.00 $ 14,757.00 $ 1,760.00 $ 24,349.00 $ 231,701.00
$ 751,539.00
100.0%
$ 719,172.00
$ $
34,331.00 39,375.00
$ $ $ $ $
106,232.00 16,010.00 13,183.00 1,980.00 25,722.00
$
3,525.00
$
74,975.00
97.2% 99.3% 98.3% 82.8% 92.5% 97.9% 96.2% 92.8% 96.2%
$ 826,514.00
99.6%
1,800.00 $ 12,082.00 $
2,595.00 1,450.00 3,000.00 1,200.00 52,000.00 3,800.00 77,927.00
$ 829,723.00
- $ - $
$ 792,766.74
34,346.00 39,392.00 106,232.00 16,010.00 13,183.00 1,980.00 25,722.00
$ $ $ $ $
- $ - $
$ 829,723.00
Proposed 2016-2017 Budget
1,750.00 12,000.00
2,550.00 1,200.00 2,775.00 1,175.00 50,000.00
-
$ 826,514.00
99.6%
486,971.00 500.00
$ 487,471.00
$ $
1,800.00 12,173.00
$ $ $
2,600.00 1,450.00 3,000.00
$ $
1,200.00 52,000.00
$ $
2,000.00 76,223.00
$ 795,395.00
$ $
-
$ 795,395.00
Inc (Dec) Over Prior Year
-5.34% 0.00% -5.33%
4.18% -5.33% -2.88% -8.84% 11.94% -11.11% -5.34% -2.18% -4.34%
0.00% 0.75% 0.19% 0.00% 0.00% 0.00% 0.00% -47.37% -2.19% -4.14%
-4.14%
Page 70
Metropolitan Sewerage District of Buncombe County, North Carolina
Wastewater Treatment Plant Organizational Chart Director of Waste Treatment & Maintenance Peter Weed
WRF Superintendent
WRF Maintenance Manager
Field Operations Manager
Facilities Maintenance Manager
Fleet Maintenance Manager
Technician
Mechanic
SCADA/PLC Technician WRF Lead Operator Industrial Pretreatment Coordinator
Electrical Maintenance Crew Leader
Mechanical Maintenance Crew Leader
Technician
Technician
WRF Operators Industrial Waste Chemist
2017 Budget Document
Page 71
Metropolitan Sewerage District of Buncombe County, North Carolina
Wastewater Treatment Plant (continued) Mission Statement The mission of the Wastewater Treatment Facility Division is to maintain the highest level of wastewater quality by meeting Federal and State environment regulations; operating and maintaining facilities in a productive and cost effective manner; and above all to protect the environment. The mission of the Fleet Maintenance Division is to oversee the maintenance of all District rolling stock in a timely and cost efficient manner.
Key Responsibilities Include the operation of the District’s regional water reclamation facility and 32 remote pump stations; maintain 24 hour shift operation and emergency response; assure that all treated wastewater meets all discharge requirements; maintain all mechanical, electrical, pneumatic equipment and instrumentation; maintain a preventive & proactive maintenance program; assure that residuals management program complies with Federal and State regulations; operate and maintain the Craggy Dam Hydro Electric Power Generation facility. Provide fleet maintenance and management; coordinate Fleet Replacement; write specifications for new and replacement vehicles and equipment; manage fueling facilities; inspections at District owned facilities; maintain fleet inventory; service vehicles on a regular basis.
Staffing History Approved Positions 14-15
Approved Positions 15-16
Budgeted Positions 16-17
Department of Water Reclamation Facility Management: Director of Waste Treatment & Maintenance Facility Total Management
1 1
1 1
1 1
Office Support: WWTP Office Manager Total Office Support
0 0
1 1
1 1
Plant Operations: Lead Operator Operations Manager WWTP Operator Total Plant Operations
2 1 8 11
2 1 8 11
2 1 8 11
Division & Position
2017 Budget Document
Page 72
Metropolitan Sewerage District of Buncombe County, North Carolina
Wastewater Treatment Plant (continued) Staffing History (continued) Approved
Approved
Budgeted
Positions
Positions
Positions
14-15
15-16
16-17
3 1 4
3 1 4
3 1 4
Mechanical/Electrical Maintenance: Electrical Maintenance Crew Leader Electrical IV/Specialist Instrumentation Specialist Mechanic II Mechanical Maintenance Crew Leader Mechanical Specialist Senior Electrician Senior Mechanic Electrical Maintenance Manager Total Mechanical/Electrical Maintenance
1 1 1 2 1 1 2 2 1 12
1 1 0 2 1 1 2 2 1 11
1 1 0 2 1 1 2 2 1 11
Industrial Waste: Industrial Waste Chemist Industrial Pretreatment Coordinator SCADA/PLC Technician Field Operations Manager Total Industrial Waste
1 1 2 1 5
1 1 2 1 5
1 1 2 1 5
Facilities Maintenance: Facility Maintenance Technician Facilities Maintenance Manager Total Structural Maintenance
5 1 6
5 1 6
5 1 6
Total – Wastewater Treatment Plant Department
39
39
39
Division & Position Fleet Maintenance: Fleet Mechanic III Fleet/Mechanical Maintenance Supervisor Total Fleet Maintenance
Accomplishments for FY 2015-2016 1. Maintaining full compliance with NPDES and WNC Air Quality permits and standards. 2. Completion of WRF Headworks planning document for design of new fine screen facility, vortex grit removal system, and replacement of influent gates and ¾” bar screens.
3. Replacement of ten (10) failed RBCs’ extending treatment reliability (30 units have been restored within last 18 months).
4. Completion of WRF Influent pump station controls and variable speed drives for three 400hp pumps. All atmospherically sensitive electrical systems are now in a protective environment.
2017 Budget Document
Page 73
Metropolitan Sewerage District of Buncombe County, North Carolina
Wastewater Treatment Plant (continued) Accomplishments for FY 2015-2016 (continued) 5. Complete renovation of Incinerator air pollution control system; installation of state-of-the-art mercury removal filters, enhanced particulate and H2S scrubber installed, replacement of heat exchanger, and latest generation of computer-controlled SCADA instruments & technology.
6. Complete mechanical rehabilitation of southwest quadrant of the Intermediate Clarifier. 7. Demolition of obsolete gas chlorine building, anaerobic digester equipment and miscellaneous piping in preparation for new headworks installations.
8. Rehabilitation of the Weaverville 1 pump station; installation of third standby pump (diesel powered), bypass port for emergency pumping, relocation of H2S odor control station to site.
9. Completion of over 1,350 work orders; Motor Fleet, WRF Maintenance, and Facilities Maintenance combined.
Goals & Objectives Goal: Operate the Water Reclamation Facility in the most efficient and effective manner and in compliance with all requirements of the Discharge Permit (NPDES) (MSD Objective #2)
Objective: Achieve a carbonaceous biochemical oxygen demand (CBOD) removal efficiency of at least 85%
Objective: Achieve a total suspended solids (TSS) removal efficiency of 85% Objective: Have NPDES permit non-compliance occurrence of zero (0) Objective: Limit odor complaints by maintaining dissolved hydrogen sulfide (H2S) levels
below
0.5 mg/L.
Goal: Timely and cost-efficient maintenance and rehabilitation of plant buildings and equipment (MSD Goals # 1 and 3)
Objective: Maintain annual rehab and replacement of key Building systems according to longrange plan (roofs, HVAC systems, Mechanical systems, exteriors, etc.)
Objective: Maintain a preventative to corrective maintenance ratio of at least 60/40 Objective: Maintain an equipment availability ratio of at least >95% Objective: Maintain treatment costs (cost/MG) at/below NACWA average Goal: Continual improvement of operations (MSD Goal #4) Objective: Effectively manage divisional objective(s) identified in the ISO 14001 Environmental Management System
Objective: Continual development of WRF SCADA–integration of controls, reviews of standard operating procedures affecting Operations and Maintenance
2017 Budget Document
Page 74
Metropolitan Sewerage District of Buncombe County, North Carolina
Wastewater Treatment Plant (continued) Goals & Objectives (continued) Goal: For the MSD fleet to have minimal environmental impact to the service area (MSD Goal #1) Objective: Monitor all vehicles use of biodiesel (B20) and ethanol (E10) for any fuel related problems or repairs
Goal: Provide high level of quality of service and proficiency Objective: Continuous improvement and training on software upgrades, diesel engine maintenance, and repairs
Goal: Maintain and replace only vehicles and equipment required for efficient and effective operation Objective: With System Services, continue to evaluate heavy-duty vehicles essential for sewer line preventative maintenance
Budget Highlights/Changes for FY 2016-2017 1. Replace ten RBC's to fully restore total treatment to 100% service level. 2. Fine tune performance of new Incinerator air emission control systems and perform quarterly mercury sorbent trap testing for meeting air quality standards.
3. Begin construction on Fine Screens, Vortex Grit removal system, and replacement of Influent bar screens (timing of bar screens replacement may be extended into FY18).
4. Replace third Influent Pump (last in series) and replace impeller on first replacement; net result will be the complete restoration on all influent pumps for 8 additional feet of vertical lift.
5. Select engineering team to complete design for High-rate Primary Clarifiers with fiscal year. 6. Continue with planned roof replacements & structural rehab projects at WRF, Mull Building, & remote Pump Stations.
7. Maintain adequate capital purchases of replacement vehicles assuring maximum efficiency and effectiveness of service.
2017 Budget Document
Page 75
Metropolitan Sewerage District of Buncombe County, North Carolina
Wastewater Treatment Plant (continued) Performance Measures Task
1. Daily (average) flow, treated MGD 2. Maximum daily flow treated, MGD 3. Dry tons of bio-solids processed
4. Cost per million gallons (MG), treated 5. Energy costs per MG, treated 6. CBOD removal efficiency, % 7. TSS removal efficiency, %
8. Number of NPDES permit non-compliance 9. Preventative to corrective maintenance ratio 10. Equipment availability percentage 11. In-house direct labor 12. Direct labor spent on work orders 13. Same day turnaround PM vehicles
2017 Budget Document
15-16
est
13-14
14-15
22.9
19.1
19.5
74.6
39.0
67.1
5,608
5,886
6,400
$614
$735
$725
$101
$115
$115
92%
92%
92%
96%
97%
96%
0
0
0
30/70
35/65
30/70
>95%
>95%
>95%
97%
98%
97%
87%
85%
85%
96%
95%
95%
Page 76
Metropolitan Sewerage District of Buncombe County, North Carolina
FY17 Budget – Wastewater Treatment Plant No.
Name
Actual 2012-2013
Actual 2013-2014
Actual 2014-2015
Approved 2015-2016 Budget
Estimated Actual 6/30/2016
Percent Expended To Total Budget
Proposed 2016-2017 Budget
Inc (Dec) Over Prior Year
Salaries & Wages 51100 Salaries & Wages 51150 Overtime Total Salaries & Wages
$ 2,256,965.65 $ 2,309,119.86 $ 2,365,781.08 $ 2,449,197.00 $ 2,449,197.00 $ 99,472.40 $ 144,696.33 $ 113,250.91 $ 117,000.00 $ 117,000.00 $ 2,356,438.05 $ 2,453,816.19 $ 2,479,031.99 $ 2,566,197.00 $ 2,566,197.00
100.0% 100.0% 100.0%
$ 2,346,690.00 $ 105,000.00 $ 2,451,690.00
-4.19% -10.26% -4.46%
Benefits 51200 North Carolina Retirement 51250 Payroll Taxes 51300 Medical, Dental & Life 51325 Post Retirement Insurance 51350 Worker's Compensation 51360 State Unemployment Benefits 51500 401-K/457 Plan Total Benefits
$ 158,338.91 $ 170,288.59 $ 514,301.75 $ 50,763.25 $ 62,137.00 $ 1,004.38 $ 91,031.91 $ 1,047,865.79
$ 171,165.00 $ 196,313.00 $ 495,748.00 $ 74,713.00 $ 61,518.00 $ 9,240.00 $ 122,463.00 $ 1,131,160.00
100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
$ 179,954.00 $ 187,553.00 $ 502,949.00 $ 71,148.00 $ 71,940.00 $ 8,580.00 $ 117,338.00 $ 1,139,462.00
5.13% -4.46% 1.45% -4.77% 16.94% -7.14% -4.18% 0.73%
Total Salaries, Wages & Benefits
$ 3,404,303.84 $ 3,534,187.08 $ 3,605,408.76 $ 3,697,357.00 $ 3,697,357.00
100.0%
$ 3,591,152.00
-2.87%
Materials, Supplies & Services 52010 Advertising 52050 Dues & Subscriptions 52150 Travel, Mtgs & Training 52180 Liability Insurance 52210 Communications 52240 Uniforms 52250 Office Supplies 52260 Special Dept Supplies 52270 Safety Equip/Supplies 52280 Maint Supp/Small Tools 52290 Chemical Supplies 52350 Prof/Contractual Svcs 52410 Maint-Buildings & Grounds 52420 Maintenance-Equipment 52440 Pump Maintenance 52450 Equipment Rental 52460 Motor Fuel & Lubricants 52470 Outside Vehicle Maint 52510 Permits/Fees/Software Licenses 52650 Utilities 52910 Non-Capital Equipment Total Materials, Supplies & Services
$ 13,841.44 $ 16,107.20 $ 16,987.24 $ 258,200.00 $ 31,991.70 $ 23,112.09 $ 5,160.24 $ 384,297.97 $ 11,527.35 $ 30,504.65 $ 406,339.32 $ 242,145.68 $ 16,700.84 $ 408,056.34 $ 23,104.28 $ 3,337.94 $ 239,881.43 $ 3,746.03 $ 14,242.60 $ 796,333.55 $ 11,876.23 $ 2,957,494.12
100.0% 100.0% 94.2% 100.0% 100.0% 96.4% 96.4% 99.5% 95.6% 91.4% 97.7% 98.5% 100.0% 98.2% 100.0% 99.4% 73.8% 100.0% 99.1% 90.9% 96.4% 94.3%
$ 3,300.00 $ 15,750.00 $ 19,420.00 $ 233,598.00 $ 51,750.00 $ 25,150.00 $ 5,350.00 $ 414,500.00 $ 10,750.00 $ 36,250.00 $ 529,900.00 $ 305,400.00 $ 19,000.00 $ 395,000.00 $ $ 3,000.00 $ 262,000.00 $ 15,000.00 $ 20,700.00 $ 1,125,000.00 $ 8,250.00 $ 3,499,068.00
26.78% 3.21% -8.16% -9.53% -0.96% -2.59% -3.60% 1.60% -5.70% -2.59% -0.18% -9.56% -5.00% -6.55% -100.00% -34.07% -3.37% 0.00% -6.03% 2.30% -40.64% -3.21%
Interfund Transfers 53040 Fleet Replacement Charges 53050 Wwtp Replacement Charges Total Interfund Transfers
$ $ $
64,616.00 200,000.00 264,616.00
100.0% 100.0% 100.0%
$ $ $
64,616.00 200,000.00 264,616.00
Capital Outlay 54010 Capital Equipment - New 54020 Capital Equip-Software 54030 Capital Equip - Replacement Total Capital Outlay
$ $ $ $
8,500.00 41,500.00 50,000.00
100.0% 97.6% 98.0%
$ $ $ $
2,000.00 7,850.00 9,850.00
Sub-Total O&M Fund
$ 6,576,472.49 $ 6,835,357.24 $ 6,764,756.09 $ 7,627,990.50 $ 7,422,261.01
97.3%
$ 7,364,686.00
59200
LESS: Chargebacks to General Fund for CIP Chargebacks to General Fund for SSD
Net Operation & Maintenance Fund
2017 Budget Document
$ $
$ 174,212.36 $ 178,235.58 $ 516,716.00 $ 44,199.00 $ 60,691.00 $ 9,285.27 $ 97,031.68 $ 1,080,370.89
$ 2,474.93 $ 5,054.44 $ 15,544.27 $ 258,200.00 $ 42,408.21 $ 23,569.19 $ 5,309.78 $ 387,586.89 $ 11,939.78 $ 33,782.93 $ 421,393.22 $ 245,670.45 $ 6,584.98 $ 387,656.57 $ 42,718.44 $ 220.00 $ 234,550.21 $ 5,877.23 $ 14,972.00 $ 844,867.11 $ 3,803.89 $ 2,994,184.52
49,329.00 $ 100,000.00 $ 149,329.00 $
19,935.24 4,957.20 40,453.09 65,345.53
-
$ $ $ $
$ $
$ 174,084.23 $ 180,452.56 $ 584,428.28 $ 22,028.21 $ 57,470.37 $ 6,846.56 $ 101,066.56 $ 1,126,376.77
$ 6,101.58 $ 15,859.78 $ 20,506.02 $ 212,305.77 $ 40,108.14 $ 23,236.85 $ 3,576.10 $ 396,951.61 $ 10,161.26 $ 21,482.24 $ 388,293.43 $ 216,760.24 $ 7,745.14 $ 411,674.72 $ 33,951.84 $ 2,144.75 $ 176,658.06 $ 9,368.84 $ 15,125.35 $ 922,846.10 $ 36,934.46 $ 2,971,792.28
60,815.00 $ 100,000.00 $ 160,815.00 $
8,191.12 137,979.52 146,170.64
-
$ $ $ $
$ $
$ 171,165.00 $ 196,313.00 $ 495,748.00 $ 74,713.00 $ 61,518.00 $ 9,240.00 $ 122,463.00 $ 1,131,160.00
$ 2,603.00 $ 2,603.00 $ 15,260.00 $ 15,260.00 $ 21,146.00 $ 19,930.00 $ 258,200.00 $ 258,200.00 $ 52,250.00 $ 52,250.00 $ 25,820.00 $ 24,900.00 $ 5,550.00 $ 5,350.00 $ 407,984.00 $ 405,750.00 $ 11,400.00 $ 10,900.00 $ 37,214.00 $ 34,000.00 $ 530,845.91 $ 518,750.00 $ 337,671.53 $ 332,650.00 $ 20,000.00 $ 20,000.00 $ 422,700.00 $ 415,000.00 $ 40,000.00 $ 40,000.00 $ 4,550.00 $ 4,521.00 $ 271,148.15 $ 200,000.00 $ 15,000.00 $ 15,000.00 $ 22,027.59 $ 21,826.69 $ 1,099,750.00 $ 1,000,000.00 $ 13,897.32 $ 13,397.32 $ 3,615,017.50 $ 3,410,288.01
60,815.00 $ 100,000.00 $ 160,815.00 $
26,740.05 26,740.05
-
$ $ $ $
$ $
64,616.00 $ 200,000.00 $ 264,616.00 $
8,500.00 42,500.00 51,000.00
-
$ $ $ $
$ $
-
$ 6,576,472.49 $ 6,835,357.24 $ 6,764,756.09 $ 7,627,990.50 $ 7,422,261.01
97.3%
$ $
-
$ 7,364,686.00
0.00% 0.00% 0.00%
-76.47% -81.53% -80.69% -3.45%
-3.45%
Page 77
Metropolitan Sewerage District of Buncombe County, North Carolina
SS Maintenance Organizational Chart Director of SS Maintenance Ken Stines
Night Supervisor
Pump Station Maintenance Crew Leader
Technician
Maintenance Coordinator
Assistant Supervisor
First Responder
Assistant Supervisor
Located/Emergency TV T.S. Operator I
Code Red T.S. Worker III
HP Line T.S. Worker III
Floater T.S. Operator III
T.S. Worker I
T.S. Worker II
2017 Budget Document
Tanker T.S. Worker II
Flusher T.S. Oper. III T.S. Worker II
Flusher T.S. Operator III
Flusher T.S. Operator III
TV Van T.S. Operator III
T.S. Worker I
T.S. Worker III
T.S. Operator II
Rod Truck T.S. Worker II
TV Van T.S. Operator III
T.S. Operator II
Page 78
Metropolitan Sewerage District of Buncombe County, North Carolina
SS Maintenance (continued) Mission Statement The mission of the System Services Collection System Maintenance Division is to maintain MSD’s Collection System in a way to convey all wastewater to MSD’s Water Reclamation Facility without any stoppages, discharges, or spills of wastewater. In short, our mission is to “Keep it in the Pipe” while maintaining the highest level of customer service both internally and externally, to be continuous “Stewards of the Environment”, and provide exceptional service to the rate payers of the District.
Key Responsibilities Include preventive maintenance and inspection of over 1,000 miles of sanitary sewer lines and 31 pump stations; provide customer services and emergency response 24 hours/day, 365 days/year; maintain compliance with our Collection System Permit; work closely with MSD’s System Services Construction Division and Water Reclamation Facility Maintenance Department in achieving departmental goals.
Staffing History Approved Positions 14-15
Approved Positions 15-16
Budgeted Positions 16-17
Department of System Services - Maintenance Management: Director of SS Maintenance Total Management
1 1
1 1
1 1
Office Support: Dispatcher II Office Assistant II SSD Administrator Total Office Support
1 2 1 4
1 2 1 4
1 2 1 4
Pump Station Maintenance: Crew Leader Technicians Total Pump Station Maintenance
1 2 3
1 2 3
1 2 3
Maintenance: First Responder Technical Services Worker I Technical Services Worker II Technical Services Worker III Technical Services Operator I Technical Services Operator II Technical Services Operator III Night Supervisor
3 1 4 2 1 3 7 0
2 2 4 2 1 3 7 0
3 2 4 4 1 2 7 1
Division & Position
2017 Budget Document
Page 79
Metropolitan Sewerage District of Buncombe County, North Carolina
SS Maintenance (continued) Staffing History (continued) Approved Positions 14-15
Approved Positions 15-16
Budgeted Positions 16-17
Maintenance: (continued) Assistant Supervisor - SS Maintenance Collection System Maintenance Supervisor Maintenance Coordinator Total Maintenance
2 2 0 25
2 2 0 25
0 2 1 27
Total - SS Maintenance Department
33
33
35
Division & Position
Accomplishments for FY 2015-2016 1. Cleaned over 730,000 LF of pipeline with in-house crews. 2. CCTV’d over 400,000 LF of sanitary sewer lines. 3. Mechanically rodded over 80,000 lf of pipeline for root removal. 4. Achieved one-hour response time goal during working hours, nights, and weekends. 5. Performed over 166,000 LF of acoustic inspection on the Collection System. 6. Smoke tested over 73,000 LF of Collection System. Continuing to decrease I & I along with assisting Engineering in flow monitoring studies.
7. Performed routine maintenance of pump station wet wells and treatment plant. 8. Inspected over 700,000 LF of High Priority/Creek Crossings. 9. Continue public awareness education/FOG by handing out information packets to all customer service calls. Increase awareness of problem with disposable wipes through public education.
10. Cleaned all lines in a total of 8 basins throughout the District, 11. Reviewed and updated System Services Maintenance Division Standard Operating Procedures. 12. Assisted in grouting 6,000 LF of the 36� interceptor on the Biltmore Estate. 13. Constructed a more efficient bypass pump trailer for more efficient code red response.
Budget Highlights/Changes for FY 2016-2017 1. Replacement of combination flusher truck 2. Replacement of aging CCTV Inspection cameras.
2017 Budget Document
Page 80
Metropolitan Sewerage District of Buncombe County, North Carolina
SS Maintenance (continued) Goals & Objectives Goal: Promote safety first (MSD Goals #1 - 4) Objective: Training Personal Protective Equipment Traffic Control Confined Space Vehicle/Equipment Operation
Goal: Reduce number of Sanitary Sewer Overflows (MSD Goals #1 - 4) Objective: Continue to identify areas with heavy Inflow and Infiltration Flow Monitoring Investigation Smoke testing Investigation Identify major/minor sources of I & I
Objective: Continue implementation of Work Order Management System (CityWorks) Extend installation of CityWorks to next tier of employees Continue education on CityWorks to better utilize more of the program features
Objective: Maintain an aggressive Preventive Maintenance Program Clean 600,000 LF of sanitary sewer lines Utilize SL-RAT to help strengthen impact of lines cleaned Increase hydraulic root removal by utilizing new technology cleaning nozzles (Blue 100) Complete high priority system inspection
Objective: Evaluate/update priorities for increased preventive maintenance areas and recommendations ons of areas for rehabilitation CCTV Inspection/score 400,000 LF sewer pipeline Continue to expand pipe rating program Utilize SL-RAT to prioritize preventive maintenance program to gain optimal performance and save resources Completion of CCTVing and re-scoring of all current CIP lines in Collection System into new PACP format
Goal: Provide excellent customer service internal/external (MSD Goals #1 – 4) Objective: Maintain on call status 24 hours/day, 7 days/week Objective: Respond to all customer service ice requests within one hour Objective: Cross train to promote positive employee relationships and teamwork Objective: Maintain great relationship with outside entities and internal divisions
2017 Budget Document
Page 81
Metropolitan Sewerage District of Buncombe County, North Carolina
SS Maintenance (continued) Performance Measures Task
1. Customer Service Response calls during normal working hours
2. Average Response Time 3. Customer Service Request calls (after hours & holidays) 4. Average Response Time (after hours & holidays) 5. Lines Washed (lineal feet) 6. Root Control chemical & rod (lineal feet) 7. TV Report (lineal feet) 8. Sanitary Sewer Overflow Totals 9. Smoke Testing 10. SL Rat Testing
2017 Budget Document
est
13-14
14-15
15-16
1,337
1,242
1,225
0.5
0.55
0.52
956
870
710
0.67
0.70
0.63
699,543
729,451
730,000
71,533
65,403
80,000
377,022
329,935
325,650
36
37
53
88,221
23,153
73,000
142,346
190,433
166,000
Page 82
Metropolitan Sewerage District of Buncombe County, North Carolina
FY17 Budget – SS Maintenance No.
Name
Actual 2012-2013
Actual 2013-2014
Actual 2014-2015
Approved 2015-2016 Budget
Estimated Actual 6/30/2016
Percent Expended To Total Budget
Proposed 2016-2017 Budget
Inc (Dec) Over Prior Year
Salaries & Wages 51100 Salaries & Wages 51150 Overtime Total Salaries & Wages
$ 1,225,608.46 $ 1,227,513.09 $ 1,248,264.54 $ 1,280,836.00 $ 1,280,836.00 $ 110,610.38 $ 119,144.39 $ 90,811.15 $ 110,000.00 $ 110,000.00 $ 1,336,218.84 $ 1,346,657.48 $ 1,339,075.69 $ 1,390,836.00 $ 1,390,836.00
100.0% 100.0% 100.0%
$ 1,543,631.00 $ 125,000.00 $ 1,668,631.00
20.52% 13.64% 19.97%
Benefits 51200 North Carolina Retirement 51250 Payroll Taxes 51300 Medical, Dental & Life 51325 Post Retirement Insurance 51350 Worker's Compensation 51360 State Unemployment Benefits 51500 401-K/457 Plan Total Benefits
$ $ $ $ $ $ $ $
92,769.00 106,399.00 330,498.00 49,810.00 41,012.00 6,160.00 64,043.00 690,691.00
100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
$ $ $ $ $ $ $ $
122,478.00 127,650.00 425,572.00 60,203.00 60,872.00 7,040.00 77,183.00 880,998.00
32.02% 19.97% 28.77% 20.87% 48.42% 14.29% 20.52% 27.55%
Total Salaries, Wages & Benefits
$ 1,975,838.35
$ 2,009,498.12
$ 2,028,690.69
$ 2,081,527.00
$ 2,081,527.00
100.0%
22.49%
Materials, Supplies & Services 52010 Advertising 52050 Dues & Subscriptions 52150 Travel, Mtgs & Training 52180 Liability Insurance 52210 Communications 52240 Uniforms 52250 Office Supplies 52260 Special Dept Supplies 52270 Safety Equip/Supplies 52280 Maint Supp/Small Tools 52290 Chemical Supplies 52300 Line Cleaning Supplies 52350 Prof/Contractual Svcs 52410 Maint-Buildings & Grounds 52420 Maintenance-Equipment 52430 Landscape Restoration 52440 Pump Maintenance 52450 Equipment Rental 52510 Permits/Fees/Software Licenses 52910 Non-Capital Equipment Total Materials, Supplies & Services
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
477.56 4,523.51 23,005.22 81,849.00 20,141.80 15,845.25 6,980.62 14,763.35 36,994.92 61,054.79 28,046.72 69.99 50,142.91 3,854.73 23,830.90 4,090.11 375,671.38
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
4,000.00 5,000.00 26,000.00 81,849.00 27,400.00 22,000.00 6,500.00 1,200.00 21,000.00 30,000.00 53,000.00 50,500.00 58,000.00 5,300.00 1,900.00 20,300.00 5,525.00 419,474.00
100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 85.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 98.8%
$ 2,549,629.00 $ $ $ 5,000.00 $ 5,500.00 $ 31,125.00 $ 74,050.00 $ 32,400.00 $ 26,200.00 $ 7,500.00 $ 1,500.00 $ 25,000.00 $ 40,000.00 $ 2,000.00 $ 53,000.00 $ 67,450.00 $ 2,000.00 $ 60,000.00 $ 5,300.00 $ 90,000.00 $ 2,500.00 $ 20,300.00 $ 7,950.00 $ 558,775.00
Interfund Transfers 53040 Fleet Replacement Charges Total Interfund Transfers
$ $
176,348.00 $ 176,348.00 $
167,064.00 $ 167,064.00 $
167,064.00 $ 167,064.00 $
177,505.00 $ 177,505.00 $
177,505.00 177,505.00
100.0% 100.0%
$ $
177,505.00 177,505.00
0.00% 0.00%
Capital Outlay 54010 Capital Equipment - New 54030 Capital Equip - Replacement Total Capital Outlay
$ $ $
43,334.88 $ $ 43,334.88 $
19,271.11 $ 13,703.66 $ 32,974.77 $
8,941.17 $ 24,540.85 $ 33,482.02 $
3,300.00 $ 27,250.00 $ 30,550.00 $
3,300.00 27,250.00 30,550.00
100.0% 100.0% 100.0%
$ $ $
6,100.00 11,850.00 17,950.00
84.85% -56.51% -41.24%
Sub-Total O&M Fund
$ 2,571,192.61
$ 2,553,033.87
$ 2,581,463.23
$ 2,714,056.00
$ 2,709,056.00
99.8%
$ 3,303,859.00
21.73%
$ $
$ $
$ $
$ $
$ $
59200
LESS: Chargebacks to General Fund for CIP Chargebacks to General Fund for SSD
Net Operation & Maintenance Fund
2017 Budget Document
88,099.50 94,260.68 334,894.21 33,054.79 40,461.00 48,849.33 639,619.51
-
$ 2,571,192.61
$ $ $ $ $ $ $ $
93,848.70 94,917.30 344,478.00 29,466.00 40,461.00 8,675.48 50,994.16 662,840.64
2,527.08 3,315.70 20,162.97 81,849.00 20,838.04 18,228.80 6,635.86 19,690.16 33,726.81 42,744.05 24,782.42 46,387.14 2,301.32 13,630.93 6,676.70 343,496.98
-
$ 2,553,033.87
$ $ $ $ $ $ $ $
92,920.02 94,211.24 389,618.08 14,685.85 38,313.60 4,564.40 55,301.81 689,615.00
4,816.65 2,867.43 17,947.43 67,300.60 25,195.62 15,748.61 4,891.12 352.18 17,659.03 30,494.34 53,362.68 33,153.49 54,944.50 933.63 17,451.46 5,107.75 352,226.52
-
$ 2,581,463.23
$ $ $ $ $ $ $ $
92,769.00 106,399.00 330,498.00 49,810.00 41,012.00 6,160.00 64,043.00 690,691.00
4,000.00 5,000.00 26,000.00 81,849.00 27,400.00 22,000.00 6,500.00 1,200.00 21,000.00 35,000.00 53,000.00 50,500.00 58,000.00 5,300.00 1,900.00 20,300.00 5,525.00 424,474.00
-
$ 2,714,056.00
$ $ $ $ $ $ $ $
-
$ 2,709,056.00
99.8%
$ $
-
$ 3,303,859.00
25.00% 10.00% 19.71% -9.53% 18.25% 19.09% 15.38% 25.00% 19.05% 14.29% 0.00% 33.56% 3.45% 0.00% 31.58% 0.00% 43.89% 31.64%
21.73%
Page 83
Metropolitan Sewerage District of Buncombe County, North Carolina
SS Construction Organizational Chart Director of Construction Mike Stamey, P.E.
Construction Inspector IV
Construction Admin. Assistant
Construction Inspector III
Construction & Repair Supervisor Taps Planning
Manager of SS Construction
Senior Construction Crew Leader
Construction Crew Leader
Construction Crew Leader
Construction Crew Leader
Construction Crew Leader
Construction Crew
Construction Crew
Construction Crew
Construction Crew
Manhole Crew Construction Worker III Worker II
2017 Budget Document
Page 84
Metropolitan Sewerage District of Buncombe County, North Carolina
SS Construction (continued) Mission Statement The mission statement of the System Services Construction Division is to undertake construction and repair activities on the existing MSD Collection Sewer System as “Good Stewards of the Environment” to provide construction related support to other departments of the District and to demonstrate the highest level of customer service and professionalism in all internal and external interactions.
Key Responsibilities Include timely, quality, and cost effective connections, repairs, and rehabilitation to the existing MSD Collection Sewer System while protecting the waters of the state and the environment of Buncombe County and the District; working closely with the MSD System Services Maintenance Division in maintaining a properly operating collection system; and being exceptional public servants in all activities and interactions with others.
Staffing History Approved Positions 14-15
Approved Positions 15-16
Budgeted Positions 16-17
Department of System Services - Construction Management: Director of Construction Total Management
1 1
1 1
1 1
Construction Administration: Administrative Assistant – Construction Construction Inspector II Construction Inspector III Construction Inspector IV Total Construction Administration
1 1 2 1 5
1 1 2 1 5
1 0 3 1 5
Construction: Construction Worker I Construction Worker II Construction Worker III Construction Operator I Construction Operator II Construction Crew Leader Senior Construction Crew Leader Construction & Repair Supervisor Heavy Equipment Excavator I Heavy Equipment Excavator II Manager of SS Construction Total Construction
1 6 4 2 1 4 0 2 5 1 0 26
1 6 4 1 2 4 0 1 5 1 1 26
2 7 2 2 2 4 1 1 4 1 1 27
Total – SS Construction Department
32
32
33
Division & Position
2017 Budget Document
Page 85
Metropolitan Sewerage District of Buncombe County, North Carolina
SS Construction (continued) Accomplishments for FY 2015-2016 1. Rehabilitated 20,000 LF of main sewer line with in-house construction crews. 2. Utilized Trenchless Technologies for over 3,700 LF of mainline rehabilitation and 100 LF of service line
installation. Through these efforts approximately 2,500 LF of existing asphalt surfaces were maintained.
3. Cleared over 20,000 LF of sewer line Right-of-Way. 4. Completed over 1,100 work order requests during the year. 5. Coordinated (5) joint venture projects with the other public agencies (NCDOT, COA) to facilitate overall cost savings and/or other benefits for both agencies.
6. Continued annual paving contract with the City of Asheville Street Department to expedite economical, efficient repairs and restoration to City streets affected by MSD construction and repair work.
7. Utilized recycled asphalt and concrete materials for select backfill on current sewer rehabilitation projects.
8. SSD Construction continued participation in the Buncombe County Utility Coordinating Committee, which promotes safe digging and improved coordination between utility agencies. The activity
included the MSD Construction Director completing term as chairperson role for the committee for the year of 2015.
9. Two construction employees participated as members of MSD's ISO team. 10. MSD’s "Flow Motion" Operations Challenge Team won 2nd place overall in the statewide Operations Challenge Event which was held at the annual NC AWWA State Conference in Raleigh in November of 2015.
11. Assisted in District wide team effort to rehabilitate the Weaverville #1 Pump Station. SSD Construction activities included installation of new pump, force main replacement, installation of quick connect and replacement of valves.
12. Installed 1,056 LF of new 8-inch mainline sewer to serve the Erwin Hills Teacher Housing Project. 13. Partnered with Riverlink to perform needed sewer rehabilitation as part of their stream bank restoration program.
14. Participated on the City of Asheville joint task force for Infrastructure Committee. This committee plans and coordinates projects to facilitate cost savings for multiple utility departments.
15. The Construction Administration group provided inspection oversite for nine (9) Collection System CIP projects and six (6) Water Reclamation Facility related CIP projects.
2017 Budget Document
Page 86
Metropolitan Sewerage District of Buncombe County, North Carolina
SS Construction (continued) Budget Highlights/Changes for FY 2016-2017 1. Purchase Street Sweeper Broom attachment for skid steer to facilitate high quality and more efficient cleanup efforts in work zone areas.
2. Purchase Vermeer G2 Locator to help dig up crews locate private and/or unmarked utility lines in digging area as well as assist with jobsite safety.
3. Purchase Husqvarna Walk Behind Saw to improve quality of cuts and ensure that proper paving can occur.
Goals & Objectives Goal:: Operate collection system in compliance with all provisions of State Permit (MSD Goal #1) Objective: Clear a minimum of 20,000 LF of sewer line easement each year Objective: Rehabilitate 20,000 LF of sewer line with Dig Dig-and-Replace, IRS, and other trenchless technology rehabilitation methods
Goal: Work with City of Asheville Street, Storm Water, and Water Departments as well as other agencies where possible on strategic planning and joint projects. (MSD Goal #4)
Objective: Conduct yearly meetings with departments Objective: Remove service lines from water meter boxes Objective: Coordinate tap installation to reduce permit fees Objective: Establis Establish h joint ventures for paving overlays Objective: Coordination of service line renewals
Goal:: Promote a “Safety First” work environment. (MSD Goal #1) Objective: Continue developing the role and responsibilities of the Construction Safety e to facilitate discussion, review, and updates to safety procedures and policies for the Committee Construction Division
Objective: Continue working closely with the MSD Safety Division to insure safety policies and procedures are followed
Goal: Represent MSD in the Operations Challenge (Pipe Tapping) Competition at the North Carolina WEA State Conference in the fall of 2014 (MSD Goal #3) AWWA-WEA
Objective: Achieve the best place possible while maintaining a spirit of competition and team cooperation
Goal: Explore various cost savings options for the division. (MSD Goal #3) boring, and other trenchless Objective:: Continue exploring and developing pipe-bursting, pipe technology options
Objective: Facilitate cost savings through the recycling and reuse of excavated concrete and asphalt materials 2017 Budget Document
Page 87
Metropolitan Sewerage District of Buncombe County, North Carolina
SS Construction (continued) Goals & Objectives (continued) Goal: Maintain a qualified and motivated work force. (MSD Goal #1-4) Objective: Continue cross training schedule for “worker” and “operator” employees Objective: Continue training program for “excavator” employees Objective: Provide opportunities for additional trainings that promote increased knowledge and abilities for all construction staff
Performance Measures Task
13-14
14-15
15-16
est
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11.
Construction Repairs
588
543
500
Taps Installed
220
239
200
Manhole Repairs
354
376
300
58,811
23,199
20,000
64
460
1500
14,246
8,388
7,000
485
704
2,000
Construction Rehabilitation (lineal feet)
1,493
3,660
4,600
Pipebursting Main Line (lineal feet)
3,539
2,066
3,000
268
5,255
3,400
20,031
20,073
20,000
12.
Sewer Rehabilitation Inspected on CIP Projects (lineal
28,280
28,452
18,000
13.
Sewer Extensions Inspected from Development
17,817
28,442
22,000
Right-of-Way Clearing (lineal feet) Other Trenchless Line Rehabilitation (lineal feet) Dig & Replace Rehabilitation (lineal feet) IRS (lineal feet)
Boring Main Line (lineal feet) Total Construction Rehabilitation Footage (lineal feet) (Items 6, 7, 8. 9, 10)
feet) Projects (linear feet)
2017 Budget Document
Page 88
Metropolitan Sewerage District of Buncombe County, North Carolina
FY17 Budget – SS Construction No.
Name
Actual 2012-2013
Actual 2013-2014
Actual 2014-2015
Approved 2015-2016 Budget
Estimated Actual 6/30/2016
Percent Expended To Total Budget
Proposed 2016-2017 Budget
Inc (Dec) Over Prior Year
Salaries & Wages 51100 Salaries & Wages 51150 Overtime Total Salaries & Wages
$ 1,417,101.75 $ 1,483,748.47 $ 1,586,770.58 $ 1,598,606.00 $ 1,598,606.00 $ 60,596.16 $ 91,372.55 $ 45,317.85 $ 65,650.00 $ 65,650.00 $ 1,477,697.91 $ 1,575,121.02 $ 1,632,088.43 $ 1,664,256.00 $ 1,664,256.00
100.0% 100.0% 100.0%
$ 1,614,234.00 $ 69,000.00 $ 1,683,234.00
0.98% 5.10% 1.14%
Benefits 51200 North Carolina Retirement 51250 Payroll Taxes 51300 Medical, Dental & Life 51325 Post Retirement Insurance 51350 Worker's Compensation 51360 State Unemployment Benefits 51500 401-K/457 Plan Total Benefits
$ $ $ $ $ $ $ $
111,005.00 127,316.00 413,121.00 62,261.00 51,264.00 7,700.00 79,931.00 852,598.00
100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
$ $ $ $ $ $ $ $
123,549.00 128,767.00 451,366.00 63,852.00 64,561.00 7,700.00 80,713.00 920,508.00
11.30% 1.14% 9.26% 2.56% 25.94% 0.00% 0.98% 7.97%
Total Salaries, Wages & Benefits
$ 2,249,885.15 $ 2,386,738.62 $ 2,496,692.64 $ 2,516,854.00 $ 2,516,854.00
100.0%
$ 2,603,742.00
3.45%
Materials, Supplies & Services 52010 Advertising 52050 Dues & Subscriptions 52150 Travel, Mtgs & Training 52180 Liability Insurance 52210 Communications 52240 Uniforms 52250 Office Supplies 52260 Special Dept Supplies 52270 Safety Equip/Supplies 52280 Maint Supp/Small Tools 52300 Line Cleaning Supplies 52350 Prof/Contractual Svcs 52420 Maintenance-Equipment 52430 Landscape Restoration 52450 Equipment Rental 52510 Permits/Fees/Software Licenses 52910 Non-Capital Equipment Total Materials, Supplies & Services
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
413.50 2,360.00 21,783.37 97,275.00 14,837.32 20,665.56 3,264.44 530.37 22,212.09 52,998.34 453.38 5,181.07 1,589.05 9,873.88 2,320.80 14,439.05 4,553.88 274,751.10
Interfund Transfers 52340 Debt Administration Expenses 53040 Fleet Replacement Charges Total Interfund Transfers
$ $ $
338,507.16 $ 164,573.00 $ 503,080.16 $
220,782.82 $ 159,776.00 $ 380,558.82 $
Capital Outlay 54010 Capital Equipment - New 54030 Capital Equip - Replacement Total Capital Outlay
$ $ $
18,711.94 $ 22,573.74 $ 41,285.68 $
7,362.00 $ 14,990.01 $ 22,352.01 $
Sub-Total O&M Fund 59200
LESS: Chargebacks to General Fund for CIP Chargebacks to General Fund for SSD
Net Operation & Maintenance Fund
2017 Budget Document
101,325.68 108,862.62 406,657.84 40,138.16 49,131.00 13,156.00 52,915.94 772,187.24
$ $ $ $ $ $ $ $
113,628.51 116,066.16 430,596.14 36,832.00 50,576.05 7,430.83 56,487.91 811,617.60
$ $ $ $ $ $ $ $
117,028.97 119,886.82 487,020.82 18,357.15 47,891.04 5,705.47 68,713.94 864,604.21
$ $ $ $ $ $ $ $
111,005.00 127,316.00 413,121.00 62,261.00 51,264.00 7,700.00 79,931.00 852,598.00
$ $ $ $ $ $ $ $
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
500.00 4,150.00 37,340.00 97,275.00 20,675.00 23,600.00 4,000.00 1,000.00 23,200.00 50,000.00 750.00 9,500.00 2,200.00 11,700.00 20,000.00 17,000.00 5,100.00 327,990.00
100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 87.4% 100.0% 99.5% 75.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 99.8%
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
500.00 4,150.00 30,050.00 88,006.00 20,675.00 23,600.00 4,000.00 1,000.00 23,200.00 50,750.00 750.00 12,000.00 2,200.00 11,700.00 20,000.00 17,000.00 6,575.00 316,156.00
0.00% 0.00% -19.52% -9.53% 0.00% 0.00% 0.00% -12.59% 0.00% 1.00% -25.00% 26.32% 0.00% 0.00% 0.00% 0.00% 28.92% -3.80%
191,223.71 $ 159,776.00 $ 350,999.71 $
198,648.00 $ 172,787.00 $ 371,435.00 $
198,000 172,787.00 370,787.00
99.7% 100.0% 99.8%
$ $ $
202,217.00 172,787.00 375,004.00
1.80% 0.00% 0.96%
12,102.00 $ 12,286.19 $ 24,388.19 $
13,000.00 $ 8,400.00 $ 21,400.00 $
13,000.00 8,400.00 21,400.00
100.0% 100.0% 100.0%
$ $ $
6,400.00 17,100.00 23,500.00
-50.77% 103.57% 9.81%
$ 3,069,002.09 $ 3,076,414.06 $ 3,145,814.08 $ 3,238,323.00 $ 3,237,031.00
100.0%
$ 3,318,402.00
2.47%
$ (742,059.13) $ (758,459.66) $ (748,359.85) $ (773,007.00) $ (771,965.00) $ (1,294,092.88) $ (1,279,053.00) $ (1,309,983.00) $ (1,326,632.00) $ (1,326,632.00)
99.9% 100.0%
$ (748,639.00) $ (1,539,411.00)
-3.15% 16.04%
$ 1,032,850.08 $ 1,038,901.40 $ 1,087,471.23 $ 1,138,684.00 $ 1,138,434.00
100.0%
$ 1,030,352.00
-9.51%
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
500.00 2,846.25 31,717.20 97,275.00 15,200.64 21,991.80 1,744.05 620.90 20,632.52 51,659.07 528.35 2,297.00 1,298.11 12,557.12 4,280.76 11,343.00 10,272.84 286,764.61
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
574.85 4,003.50 26,161.68 79,984.67 16,332.61 21,453.40 1,440.13 1,081.46 21,230.82 57,342.94 164.95 8,486.01 1,726.93 8,246.69 3,777.75 14,210.45 7,514.70 273,733.54
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
500.00 4,150.00 37,340.00 97,275.00 20,675.00 23,600.00 4,000.00 1,144.00 23,200.00 50,250.00 1,000.00 9,500.00 2,200.00 11,700.00 20,000.00 17,000.00 5,100.00 328,634.00
Page 89
Metropolitan Sewerage District of Buncombe County, North Carolina
Engineering Organizational Chart Director of Engineering Ed Bradford, P.E.
Design & Drafting Manager
Engineering Tech III
Right of Way Manager
Right of Way Admin. Assistant
Right of Way Agent
Engineer III
Engineer I
Planning & Development Manager
System Coordinator III
Private Development Manager
Engineering Tech I
2017 Budget Document
Page 90
Metropolitan Sewerage District of Buncombe County, North Carolina
Engineering (continued) Mission Statement The mission of the Engineering Division is to produce, manage, and complete engineering projects for the planning, repair, and rehabilitation of the District’s Collection System and Water Reclamation Facility (WRF); and to provide quality control associated with expansion of the system. This shall be undertaken in the most efficient and effective manner necessary to ensure the reliable delivery and treatment of wastewater at an equitable price and in an environmentally sensitive manner.
Key Responsibilities Prepare a complete budget and schedule for all Capital Improvement Projects each fiscal year, and adhere to it. For all capital projects: Produce quality, timely, and cost-effective engineering designs, plans, and specifications; Acquire necessary rights-of-way; and Administer construction through each project’s completion. Prepare CIP cash flows quarterly to be submitted to the Finance Director for accurate cash flow management. Procure, manage, and direct design work performed by various consulting engineers, as needed. Provide various special studies and analyses, including master planning of collection system and treatment facilities, evaluation of projected flow allocations, plan review, and quality control of developer-constructed projects; perform specialized related duties; and serve as a technical resource for the District.
Staffing History Division & Position
Approved
Approved
Budgeted
Positions
Positions
Positions
14-15
15-16
16-17
Department of Engineering Management: Director of Engineering Total Management
1 1
1 1
1 1
Office Support: Office Manager Total Office Support
1 1
1 1
0 0
Engineers: Engineer I Engineer II Engineer III Senior Engineer/Construction Manager Total Engineers
2 1 1 1 5
2 1 0 1 4
3 0 1 0 4
2017 Budget Document
Page 91
Metropolitan Sewerage District of Buncombe County, North Carolina
Engineering (continued) Staffing History (continued) Approved Positions 14-15
Approved Positions 15-16
Budgeted Positions 16-17
Design and Drafting: Engineering Technician I Engineering Technician II Engineering Technician III Design & Drafting Manager Total Design and Drafting
1 1 0 1 3
1 1 0 1 3
1 1 1 1 4
Right of Way: Administrative Assistant – Right of Way Right of Way Agent Right of Way Manager Total Right of Way
1 1 1 3
1 1 1 3
1 1 1 3
Planning & Development: Systems Coordinator III Private Development Project Manager Private Development Coordinator/Plan Review Planning & Development Manager Total Planning and Development
2 0 1 0 3
2 1 1 0 4
2 0 0 1 3
Total – Department of Engineering
16
16
15
Division & Position
Accomplishments for FY 2015-2016 1. 46,729 Linear Feet (LF) of collection system were rehabilitated during FY15. This included 28,452 LF rehabilitated through contract construction, 17,522 LF rehabilitated in-house by System Services, and 755 LF rehabilitated through development projects.
2. Managed over 128 projects and line items within the CIP. Projects are within the various stages of lifecycles - from preliminary design, to active construction, to complete/closeout.
3. Processed over 1,177 applications and reviewed 66 plans for new connections and extensions to the collection system. (*)
4. Acquired Rights-of-Way across 92 properties. Settled one condemnation action, saving expense of trial. (*)
5. Designed ten in-house projects for System Services. These are designed and constructed by in–house forces. (*)
2017 Budget Document
Page 92
Metropolitan Sewerage District of Buncombe County, North Carolina
Engineering (continued) Accomplishments for FY 2015-2016 (continued) 6. Completed the $7.4M Incinerator System Emissions Upgrades at the treatment plant ahead of accelerated schedule, and met the EPA compliance deadline (March 21, 2016). A new mercury removal technology was implemented, which saved approx. $5M over traditional technology.
7. Completed the design of the Plant Headworks Project, which is a primary recommendation of the updated Facility Plan. Construction will begin in Fall 2016.
Goals & Objectives Goal: Rehabilitate approximately 50,000 feet of the collection system, in close collaboration with System Services. (MSD Objective #1)
Goal: Verify adequate capacity of lines prior to authorizing construction of new lines or connection of any new facility, and ensure that all developer-constructed projects conform to MSD requirements (MSD Goal #1)
Goal: Begin the construction phase of the first Facility Plan project at the WRF – Plant Headworks. Goal: Begin the design phase of the Plant High Rate Primary Treatment project. Goal: Meet the time and budget predictions established in the CIP for FY17. (MSD Goal #3) Goal: Utilize consulting engineers for unexpected rehabilitation projects, or those requiring specialized expertise, as necessary to produce a timely response for other Divisions’ engineering requests. (MSD Goal #2)
Goal: Coordinate projects with member agencies whenever possible. This is accomplished by sharing information on upcoming work.
Goal: Prepare special studies and designs as necessary for other Divisions. (MSD Goal #2) Goal: Safeguard the structural integrity and accessibility of MSD sewer lines against damage from grading activities by other jurisdictions and private parties (MSD Objective #4)
Goal: Obtain feedback from developers and engineers concerning the District's regulations and process for sewer lines to be accepted for public use. (MSD Objective #5)
Goal: Reduce use of paper and minimize file space needs.
2017 Budget Document
Page 93
Metropolitan Sewerage District of Buncombe County, North Carolina
Engineering (continued) Budget Highlights/Changes for FY2016-2017 1. Continue to develop and refine web-based project management/permitting system for Planning & Development.
2. Implement new paperless plan review system for Planning & Development. 3. Begin construction phase of Plant Headworks Project (construction cost estimated @ $10.3M).
Performance Measures Task
13-14
14-15
15-16 (*)
51,110
46,729
50,036
$12.7M
$16.6M
$19.8M
CIP projections vs. actual expenditures (**)
82%
76%
91%
Allocations
153
158
193
1,594
1,382
1,177
69
62
66
$1,345,187
$3,361,616
$2,425,000
1. Linear footage rehabilitated 2. CIP expenditures 3. 4. 5. 6. 7.
Sewer Tap Applications Plans Reviewed Value of accepted systems
(*) Estimated as of May 12, 2016 (**) CIP Projections annually include $1.1M for Contingency plus Developer Reimbursements
2017 Budget Document
Page 94
Metropolitan Sewerage District of Buncombe County, North Carolina
FY17 Budget – Engineering No.
Name
Actual 2012-2013
Actual 2013-2014
Actual 2014-2015
Approved 2015-2016 Budget
Estimated Actual 6/30/2016
Percent Expended To Total Budget
Proposed 2016-2017 Budget
Inc (Dec) Over Prior Year
Salaries & Wages 51100 Salaries & Wages 51150 Overtime Total Salaries & Wages
$ 1,063,589.31 $ $ 261.00 $ $ 1,063,850.31 $
898,234.50 $ (355.54) $ 897,878.96 $
907,408.19 $ 367.23 $ 907,775.42 $
985,190.00 $ 2,000.00 $ 987,190.00 $
985,190.00 1,250.00 986,440.00
100.0% 62.5% 99.9%
$ 1,026,284.00 $ 1,350.00 $ 1,027,634.00
4.17% -32.50% 4.10%
Benefits 51200 North Carolina Retirement 51250 Payroll Taxes 51300 Medical, Dental & Life 51325 Post Retirement Insurance 51350 Worker's Compensation 51360 State Unemployment Benefits 51500 401-K/457 Plan Total Benefits
$ $ $ $ $ $ $ $
63,796.17 66,301.35 209,147.86 17,890.00 24,565.95 3,283.39 41,836.31 426,821.03
64,100.68 66,929.30 208,725.73 7,867.57 20,525.39 2,445.20 40,169.83 410,763.70
65,846.00 75,520.00 177,054.00 26,684.00 21,971.00 3,300.00 49,261.00 419,636.00
65,796.00 75,463.00 177,054.00 26,684.00 21,971.00 3,300.00 49,261.00 419,529.00
99.9% 99.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
$ $ $ $ $ $ $ $
75,428.00 78,614.00 193,441.00 27,365.00 27,669.00 3,300.00 51,316.00 457,133.00
14.55% 4.10% 9.26% 2.55% 25.93% 0.00% 4.17% 8.94%
Total Salaries, Wages & Benefits
$ 1,511,520.12 $ 1,324,699.99 $ 1,318,539.12 $ 1,406,826.00 $ 1,405,969.00
99.9%
$ 1,484,767.00
5.54%
Materials, Supplies & Services 52050 Dues & Subscriptions 52150 Travel, Mtgs & Training 52180 Liability Insurance 52200 Telephone/Telefax 52210 Communications 52240 Uniforms 52250 Office Supplies 52260 Special Dept Supplies 52270 Safety Equip/Supplies 52330 Legal Fees 52350 Prof/Contractual Svcs 52410 Maint-Buildings & Grounds 52510 Permits/Fees/Software Licenses 52910 Non-Capital Equipment Total Materials, Supplies & Services
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $
85.3% 87.5% 100.0% 100.0% 49.0% 48.8% 49.8% 63.1% 66.7% 0.0% 69.0% 0.0% 76.9%
$ 5,500.00 $ 15,600.00 $ 34,741.00 $ 200.00 $ 2,225.00 $ 1,750.00 $ 5,500.00 $ 6,850.00 $ 300.00 $ 2,500.00 $ 51,000.00 $ $ $ 400.00 $ 126,566.00
0.00% -12.36% -9.53% 1.63% -6.32% -12.50% -8.33% 92.96% 0.00% -28.57% -12.07% -50.20% -8.57%
Interfund Transfers 53040 Fleet Replacement Charges Total Interfund Transfers
$ $
Sub-Total O&M Fund
$ 1,633,015.46 $ 1,431,889.76 $ 1,422,735.77 $ 1,545,251.00 $ 1,512,399.21
97.9%
$ 1,611,333.00
4.28%
$ (1,441,458.68) $ (1,294,515.65) $ (1,267,244.28) $ (1,385,814.00) $ (1,358,140.41) $ - $ - $ - $ - $ -
98.0% -
$ (1,450,349.00) $ -
4.66% -
$
96.8%
$ 160,984.00
0.97%
59200
LESS: Chargebacks to General Fund for CIP Chargebacks to General Fund for SSD
Net Operation & Maintenance Fund
2017 Budget Document
70,669.30 78,462.15 203,329.43 20,069.57 24,565.00 50,574.36 447,669.81
5,025.44 15,244.31 38,400.00 2,522.06 2,177.39 1,020.34 4,852.71 2,751.93 219.41 180.50 44,062.50 2,005.15 220.60 118,682.34
$ $ $ $ $ $ $ $
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $
2,813.00 $ 2,813.00 $
191,556.78 $
4,422.31 16,492.12 38,400.00 2,725.75 1,935.22 1,397.78 4,318.28 7,863.08 176.07 248.00 23,258.13 453.00 220.60 2,432.43 104,342.77
$ $ $ $ $ $ $ $
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $
2,847.00 $ 2,847.00 $
137,374.11 $
4,193.56 20,965.60 31,574.52 1,953.23 1,583.25 801.42 3,590.33 5,660.33 145.38 29,891.58 990.45 101,349.65
$ $ $ $ $ $ $ $
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $
2,847.00 $ 2,847.00 $
155,491.49 $
5,500.00 17,800.00 38,400.00 196.80 2,375.00 2,000.00 6,000.00 3,550.00 300.00 3,500.00 58,000.00 803.20 138,425.00
$ $ $ $ $ $ $ $
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $
4,690.00 15,581.55 38,400.00 196.80 1,163.00 975.00 2,985.19 2,238.67 200.00 40,000.00 106,430.21
- $ - $
-
159,437.00 $
154,258.80
-
$ $
-
-
Page 95
Metropolitan Sewerage District of Buncombe County, North Carolina
This page intentionally left blank
2017 Budget Document
Page 96
Metropolitan Sewerage District of Buncombe County, North Carolina
Insurance Funds Overview The Insurance Funds are funded through annual appropriations from the Operations and Maintenance Fund Budget. The District has established four (4) Insurance Funds as part of its sewer rate stabilization strategy. Background information and current year budget highlights of the insurance funds are discussed below and on the following pages.
Self-funded Employee Medical Program
The District offers medical, dental, and life insurance to all employees. Employees may purchase optional dependent coverage through payroll deduction. These benefits are funded by a combination of District contributions as well as commercial insurance premiums. The District has established a self-insured group health and dental insurance program, with premiums paid to commercial carriers for stop-loss and aggregate coverage to limit the amount of risk the District will assume. A third party administrator processes all claims, and a commercial healthcare provider network is retained to negotiate fees and authorize payments. Prescription benefits are administered through a private contractor. Employees pay a nominal amount for individual medical and dental coverage and pay approximately 30% to 36% of the cost for dependent coverage. After employee payment of specified deductibles and co-payments for medical and dental services, the Plan covers the remaining authorized charges in total. The budget for FY17 includes an employer contribution increase of 10% to cover anticipated expenditures needs.
Post-Employment Insurance
The District has established a post-employment insurance fund to accumulate funds now, which will reduce future operational expenditures when retirees begin taking advantage of this benefit. The District will annually fund the equivalent of the annual required contribution less expenses as determined by an actuarial study as required by GASB 45. The accumulated funds will only be used for post-employment insurance. However, the District’s Board does reserve the right to use the reserve funds for unforeseen emergencies. FY17 funding of $270,000 represents a 1.7% of total operations. As of May 2016, the District has eleven (11) eligible participants in the post-employment insurance plan.
Worker's Compensation
The District established a separate insurance fund for worker’s compensation, which will facilitate allocation of costs to respective department, division, and section budgets. The Safety Officer acts as liaison with the insurance carrier to administer claims and to minimize future claims by providing training and equipment designed to prevent injuries. The budget for FY17 includes a 26.8% increase to cover anticipated expenditure needs. 2017 Budget Document
Page 97
Metropolitan Sewerage District of Buncombe County, North Carolina
Insurance Funds (continued)
General Liability
The District’s general liability insurance fund was established to allocate insurance costs to all departments, divisions and sectional budgets, provide funds for payment of no-fault sewer backups and establish reserves to offset future unanticipated increases in sewer back-up liabilities in excess of budgeted amounts. The budget for FY17 includes a 9.5% decrease based on anticipated expenditure needs.
FY17 SELF-FUNDED EMPLOYEE MEDICAL PROGRAM BUDGET Estimated
Actual
Actual
2014-2015 Beginning Balance
$
1,344,342
Budget
2015-2016 $
1,142,038
2016-2017 $
825,665
Income: District Contributions Employee Contributions Transfer from Other Insurance Funds Interest Total Income
1,735,116 394,846 310,381 1,157 2,441,500
1,735,116 394,846 225,000 1,157 2,356,119
1,908,628 395,000 700,000 2,500 3,006,128
Total Funds Available
3,785,842
3,498,157
3,831,790
Expenses: Expected Claim Liability Fixed Costs (see note below) Total Expenses
2,231,754 412,050 2,643,804
2,260,442 412,050 2,672,492
2,315,983 421,648 2,737,631
Ending Balance
2017 Budget Document
$
1,142,038
$
825,665
$
1,094,162
Page 98
Metropolitan Sewerage District of Buncombe County, North Carolina
Insurance Funds (continued) FY17 POST EMPLOYMENT INSURANCE BUDGET Estimated
Beginning Balance
$
Actual
Actual
Budget
2014-2015
2015-2016
2016-2017
95,089
$
138,352
$
166,352
Income District Contributions Employee Contributions Interest Income Total Income
265,700 31,923 11,340 308,963
261,500 17,500 10,500 289,500
270,000 20,000 8,000 298,000
Total Funds Available
404,052
427,852
464,352
77,100 188,600 254,800
188,700 72,800 261,500
55,000 225,000 280,000
Expenses Transfer to Other Insurance Funds Total Expenses Ending Balance
$
135,352
$
166,352
$
184,352
FY17 WORKER’S COMPENSATION FINANCIAL PLAN Estimated
Beginning Balance
$
Actual
Actual
Budget
2014-2015
2015-2016
2016-2017
398,131
$
362,015
$
303,204
Income District Contributions Interest Income Total Income
215,312 1,091 216,403
215,312 1,000 216,312
273,000 1,500 274,500
Total Funds Available
614,534
578,326
577,704
Expenses Interfund Transfer Deductibles for Individual Claims Premiums to commercial carrier Total Expenses
14,167 2,665 235,689 252,520
5,000 270,123 275,123
10,000 263,000 273,000
Ending Balance 2017 Budget Document
$
362,015
$
303,204
$
304,704 Page 99
Metropolitan Sewerage District of Buncombe County, North Carolina
Insurance Funds (continued) FY17 GENERAL LIABILITY FINANCIAL PLAN Estimated
Beginning Balance
Actual
Actual
Budget
2014-2015
2015-2016
2016-2017
$
Income District Contributions Interest Income Total Income
478,893
$
487,098
$
592,352
605,434 1,309 606,743
605,434 1,300 606,734
547,746 1,100 548,846
Total Funds Available
1,085,636
1,093,832
1,141,198
Expenses Interfund Transfer Premiums to commercial carrier No Fault Sewer Back-Up Claims Claim Deductibles Flood Insurance Total Expenses
107,613.99 394,762 23,148 64,265 8,749 598,538
374,646 35,000 82,000 9,834 501,480
435,218 50,000 82,000 10.621 577,839
Ending Balance
2017 Budget Document
$
487,098
$
592,352
$
563,359
Page 100
Metropolitan Sewerage District of Buncombe County, North Carolina
Replacement Funds Overview The replacement funds are funded through annual appropriations from the Operations and Maintenance Fund Budget. The District has established three replacement funds as part of its sewer rate stabilization strategy, with fourth reserve fund required under the Bond Order. Background information and current year budget highlights of the replacement funds are discussed below and on the following pages.
Fleet Equipment Replacement
The District has projected replacement dates and estimated prices for all vehicles and constructiontype equipment over $10,000. This information has been used to develop a funding plan whereby relatively constant amounts are to be transferred in from the annual Operations and Maintenance budget, with annual expenditures to be made in varying amounts to secure new vehicles and equipment as indicated in the plan’s timetable. The projected balance in the fund at the end of FY16
is anticipated to approximate $594,258. The FY17 contribution is $425,000, with anticipated expenditures of $668,000, including (2) 1-Ton Pickup, c5550, Small Flusher, BobCat SkidSteer, and Custom Trailer.
Wastewater Treatment Plant Replacement
The replacement fund for the wastewater treatment plant was set up to develop a reserve to address general equipment replacement cost at these facilities. A similar strategy of periodic, uniform contributions from the Operations and Maintenance Fund and withdrawals for planned equipment rehabilitation or replacement are employed. The FY17 contribution is $200,000 with anticipated
expenditures of $262,150 including General Rehab–PLC Upgrades, Rebuild Southside Barscreens, RBC’s Bearings, Thickener–Seepex Pump, Belt Filter Press Overhauls, and Scrubber Ash Pump Replacements.
Pump Replacement
The replacement fund for the pump stations was set up to develop a reserve to address general equipment replacement cost at these facilities. A similar strategy of periodic, uniform contributions from the Operations and Maintenance Fund and withdrawals for planned equipment rehabilitation or replacement are employed. The FY17 transfer of $100,000 from Wastewater Treatment Plant Replacement Fund with anticipated expenditures of $45,000 including General Rehab and Lake Julian Pump Station Rehab.
Capital Reserve Fund
This fund is mandated by the Bond Order to contain six percent (6%) or such greater percentage, as may be determined from time to time by the Board, of the amount shown by the Annual Budget to be
necessary for current expenses for the current Fiscal Year. As this fund is to be tapped only for unusual and unforeseen expenditures, none are budgeted. There will be no contributions to this fund this year as the balance is in excess of that required. 2017 Budget Document
Page 101
Metropolitan Sewerage District of Buncombe County, North Carolina
Replacement Funds (continued) FY17 FLEET EQUIPMENT REPLACEMENT FUND BUDGET Actual 2014-2015 Beginning Balance:
$
Projected 2015-2016
334,534
$
Budget 2016-2017
537,009 $
594,258
400,000
425,000
425,000
49,250
44,949
80,160
1,651
2,300
8,914
450,901
472,249
514,074
248,426
415,000
(2) 1-Ton Pickup
-
-
88,000
c5500
-
-
75,000
Small Flusher
-
-
400,000
BobCat SkidSteer
-
-
80,000
Custom Trailer
-
-
25,000
248,426
415,000
668,000
594,258 $
440,332
Revenue: District Contributions Sale of Surplus Property Interest Income Total Revenue Expenditures: Various
Total Expenditure Replacements Ending Balance:
2017 Budget Document
$
537,009
$
Page 102
Metropolitan Sewerage District of Buncombe County, North Carolina
Replacement Funds (continued) FY17 WASTEWATER TREATMENT PLANT REPLACEMENT FUND BUDGET Actual 2014-2015 Beginning Balance:
$
Projected 2015-2016
Budget 2016-2017
455,412 $
417,797 $
469,597
100,000
200,000
200,000
1,843
1,800
7,044
101,843
201,800
207,044
139,458
150,000
Revenue: District Contributions Interest Income Total Revenue Expenditures: Various General Rehab – PLC Upgrades
30,150
Rebuild Southside Barscreens
12,000
RBCs Bearings
75,000
Thickner – Seepex Pump
15,000
Belt Filter Press Overhauls
15,000
Scrubber Ash Pump Replacements
15,000
Transfer Out Total Expenditure Replacements Ending Balance:
2017 Budget Document
$
-
-
100,000
139,458
150,000
262,150
417,797 $
469,597 $
414,491
Page 103
Metropolitan Sewerage District of Buncombe County, North Carolina
Replacement Funds (continued) FY17 PUMP REPLACEMENT FUND BUDGET Actual 2014-2015 Beginning Balance:
$
Projected 2015-2016
Budget 2016-2017
- $
- $
-
District Contributions
-
-
-
Transfer In
-
-
100,000
Interest Income
-
-
-
-
-
100,000
Revenue:
Total Revenue Expenditures: Various General Pump Station Rehab
35,000
Lake Julian Pump Station
20,000
Transfer Out Total Expenditure Replacements Ending Balance:
2017 Budget Document
$
-
-
-
-
-
55,000
- $
- $
45,000
Page 104
Metropolitan Sewerage District of Buncombe County, North Carolina
Replacement Funds (continued) FY17 CAPITAL RESERVE FUND Actual 2014-2015 Beginning Balance:
$
Projected 2015-2016
937,730 $
Budget 2016-2017
948,386 $
955,886
Revenue: Interfund Transfer Interest Income Total Revenue Ending Balance:
$
-
-
-
10,656
7,500
9,800
10,656
7,500
9,800
948,386 $
955,886 $
965,686
NOTE: Ending balance must be at least 6% of the annual O&M current expenses. FY2016-2017 O&M Budget ($16,106,490 - $625,000 transfer to reserves - $87,298 capital equipment) x 6% = $923,652
2017 Budget Document
Page 105
Metropolitan Sewerage District of Buncombe County, North Carolina
This page intentionally left blank.
2017 Budget Document
Page 106
Metropolitan Sewerage District of Buncombe County, North Carolina
Capital Improvement Program Overview The District’s Capital Improvement Program commands the largest portion of budgeted expenditures, and as such, is planned strategically and in great detail for all infrastructure projects in excess of the $15,000 infrastructure capitalization threshold. The District updates its ten-year capital improvement program (CIP) annually to comply with state regulatory and bond order requirements. Objectives of constructing these capital projects include replacing and rehabbing structurally defective sewer lines, handling wet-weather flow conditions, improving the performance at the wastewater treatment plant, and preparing the system to handle expected future wastewater flows over the upcoming decade. The process begins with engineering staff developing projects, which often originate from problem areas identified by field crews during emergency and preventative maintenance procedures, and includes consideration of those projects outlined in the 20-year Wastewater System Master Plan. MSD is mandated through its Collection System Permit to rehabilitate a minimum of 250,000 linear feet of collection system lines over a five-year period. Engineers evaluate and prioritize each proposed project based upon the District’s short-term requirements and long-term mission. Engineering staff then prepare cost estimates for identified projects and a proposed timetable for construction. Once the CIP is drafted, the CIP Committee, consisting of representatives from the member agencies, meet to review the costs, locations, and necessity of proposed projects and make a recommendation to the District’s Board. A copy of the CIP summary sheets follow in the succeeding pages of this budget document. A separate document compiling individual pages for each project with detailed costs and location map as presented to the CIP Committee and may be obtained upon request to W. Scott Powell, Director of Finance at (828)225-8211 or spowell@msdbc.org. In accordance with the State Collection System Permit, the District maintains a Ten Year CIP and rehabilitates a minimum of 50,000 Linear Feet (LF) of the collection system every year. The ten-year CIP prioritizes projects identified by the Board as fulfilling the District’s mission but does not obligate District resources for their construction past the end of the current budget year. The District has a capital projects ordinance, which is periodically updated as necessary, to make available funds for all projects scheduled for construction in the upcoming budget year and certain other projects to be begun in the current year but completed in a subsequent year.
2017 Budget Document
Page 107
Metropolitan Sewerage District of Buncombe County, North Carolina
Capital Improvement Program (continued) Current Year Highlights The proposed capital budget for FY17 is $22,042,087, which includes a contingency of $1,000,000. The $1,000,000 contingency line item is used for the entire program, rather than having a separate contingency for each project. This is more efficient and continues to provide sufficient reserves for the District’s capital program. A budget for Reimbursement Projects totaling $100,000 is proposed. There is one remaining annexation project - Craigmont Road in Black Mountain. This project will be formally budgeted by the District when the Town decides to design/construct it. Total project costs over the ten-year window are estimated at $211.5 million. Costs are updated each year during budget preparation in order to accurately reflect current bid pricing and market conditions. Included in future years' is an inflation factor of 3.02%, which utilizes the ENR Construction Cost Index as a basis. This factor is also updated each year. Approximately 118 infrastructure projects are included in the CIP for FY17, ranging in length from 115 linear feet to over 22,000 linear feet. In-house forces, as well as, outside contractors will be used to rehabilitate the regulated amounts as prescribed by the District’s Collection System Permit.
Collection System Capital Improvements MSD initiated and maintains a major program to rehabilitate its Wastewater Collection System. This program will conform to the North Carolina Department of Environmental and Natural Resources (NCDENR) Collection System Permit requirements, and will improve the operational performance and extend the life of the collection system. This Permit ushers in a change in focus of the District’s Capital Improvement Plan. In the previous decade, efforts had been directed to expediting completion of certain projects identified by the member agencies and assumed by the District during the consolidation process. For example, construction of the 23.8-mile North Swannanoa Interceptor begun in 1993 was completed during FY2004 at a cost in excess of $44 million. Now that most of these “consolidation” projects have been completed, our focus has been redirected to rehabilitation of the State-mandated 250,000 feet of sewerline every five (5) years and other projects identified in the Master Plan. Major projects for FY17 include the $588,000 South French Broad Interceptor Grouting Project with approximately 7,008 linear feet, $583,500 Arco Road with over 2,022 linear feet, $1,377,000 Lining Contract No. 8 with over 11,000 linear, $532,573 Sandhill at Russell/Davenport with over 2,341 linear feet, and $400,726 Stratford Road at Oxford Court, with over 1,960 linear feet.
2017 Budget Document
Page 108
Metropolitan Sewerage District of Buncombe County, North Carolina
Capital Improvement Program (continued) Wastewater Treatment Plant Capital Improvements There are two major projects at final completion at the plant - the EPA mandated Incinerator System Emissions Project, and the replacement/relocation of the adjustable frequency drives for the influent pumps. The planned replacement of a second influent pump is complete (the third and final pump replacement is scheduled for FY16-17). The construction of the Incinerator System Emissions Upgrades project is at final completion. This $7.4 million project was driven by a mandate from the EPA, and will reduce emissions from the incinerator – primarily mercury. A new mercury removal technology was utilized, which saved $5 million over traditional technology. Significant rehabilitation of high-wear components was also included in the project. The long-term improvements (replacement of the RBC Biological System) will be a major project. Now that the District is almost complete with refurbishment of the RBC process, the timing of this future project will be regulatory-driven. The plant Facility Plan is serving as guidance for planning significant capital projects at the plant. These projects include new bar screens and grit removal, a fine screening system, storage for peak flows using existing decommissioned digesters, and chemically enhanced primary clarification. Another key aspect of the Facility Plan Update was to gain a solid understanding of regulatory issues that may impact future treatment requirements, and identify long-term biological treatment alternatives to comply with anticipated future regulation changes. Near-term and mid-term project recommendations from the Facility Plan include: Plant Headworks Project: This $11.5 million project spans 2 years and consists of a new grit removal system to replace the existing problematic system, a fine screening facility which will supplement the WRF’s existing bar screens, and storage at the plant using existing decommissioned tanks to provide more effective treatment during peak flow events. In addition, by removing more grit than the current process, it will help to better protect downstream processes within the plant. Design is planned for FY16 and construction is scheduled to begin in FY17. High Rate Primary Treatment Project: This $9.61 Million project will provide primary clarification by removing solids before the biological treatment stage. This will provide a more effective treatment, and will help the Rotating Biological Contactors (RBC’s) to better perform. During high flow (storm) events, this treatment can be ramped-up in order to match the higher flows. Design is planned for FY17 and construction is scheduled to begin in FY18. 2017 Budget Document
Page 109
Metropolitan Sewerage District of Buncombe County, North Carolina
Capital Improvement Program (continued) Long-term alternatives focused on the biological treatment aspect (currently RBC’s). Specific alternatives will be evaluated if and when future regulatory requirements change over time. The two projects noted above allow for flexibility among the viable options for biological treatment.
Background The Capital Improvement Program is essential to the efficient functioning of the District, as evidenced by the requirement from both the bond order and state collection system permit. A well-planned CIP provides customers with the assurance of having reliable and affordable wastewater collection and treatment both now and in the future. The Board has consistently financed its Capital Improvement Program through revenue bonds and payas-you-go moneys. As of June 30, 2016, the District will have $95.3 million in outstanding revenue bond debt, with total debt service of $8.0 million due before the end of the fiscal year. Unlike counties and cities, the District does not have a legally mandated debt limit. However, the District does have a rate covenant. The covenant requires the District to set rates and charges so that income available for debt service will not be less than 120% of fiscal year debt service requirement. Throughout the history of the District, staff has continued to seek increasingly effective ways of identifying and prioritizing individual projects, to ensure a more comprehensive and balanced CIP. In 1990, as part of the political process of forming the District, certain construction and rehabilitation projects were identified by the various member municipalities and sanitary districts. Once these designated projects were completed, the District then focused on rehabilitating aging, undersized collection lines to minimize unregulated discharges of raw sewage (sanitary sewer overflows or SSOs) and inflow/infiltration (I/I). Inflow and infiltration are the intrusion of groundwater and storm water runoff into the collection system, which can deplete capacity in sewer mains and at wastewater treatment plants. As part of this comprehensive evaluative process, the District developed and implemented a program to monitor wastewater flows from the various parts of the sewerage system. The flow monitoring data was used to develop a computer hydraulic model of the flows of the sewerage system to help identify and remediate the worst areas of inflow and infiltration. In 1999, MSD began an aggressive line cleaning and television inspection program wherein the District contracted with outside companies to clean the pipes with water under high pressure and then to send a video camera (also known as closed circuit television or CCTV camera) through the line. The videotapes have enabled the District to more accurately determine the condition of the lines and to prioritize necessary repairs. Each year 10% of the pipes will be cleaned and then inspected by CCTV cameras to maintain the efficient operation of the collection system.
2017 Budget Document
Page 110
Metropolitan Sewerage District of Buncombe County, North Carolina
Capital Improvement Program (continued) The District developed a proactive cost-effective rehabilitation strategy with the development of the Pipe Rating Program. Pipe rating is a proactive planning tool, which utilizes Closed Circuit Television (CCTV) information, GIS database, and actual maintenance history to view, rate, and computer-score pipe segments based on a number of factors. These factors, manhole-to-manhole, include work order history, number and severity of defects, and record overflows on that segment, which are combined to yield a numerical rating used to prioritize efforts. Staff recently updated the District’s Pipe Rating Program to include additional parameters over previous versions. Each line project now has an objective numerical rating based upon overflow history, structural issues, customer service requests, and impacts to surface waters. This rating is then used to prioritize the District’s collection system projects. Pipe Rating minimizes costs by helping the District focus rehabilitation dollars where they are needed most, rather than the usual full-scale replacement of entire collector lines. In recognition of this innovative program, the Association of Metropolitan Sewerage Agencies (AMSA) awarded the District one of only two 2003 National Environmental Achievement Awards.
Wastewater System Master Planning
Comprehensive Master Plan—This plan was prepared in 2001 by Camp, Dresser & McKee (CDM). It is a comprehensive sewer system management program, which was prepared to identify system improvements needed to handle wet-weather flow conditions, to improve performance at the wastewater treatment plant, and to prepare the system to handle future system wastewater flows. The report contained recommendations for improvements to the collection system as well as the treatment plant. A CIP was developed which included specific projects and their associated costs. Reduction of Sanitary Sewer Overflows (SSO’s) was, and remains, a key objective of this plan. Over the past twelve years, this has been accomplished using a “three-prong” approach, which combines:
An effective Management, Operations and Maintenance (MOM) program to reduce line blockages and optimize response time when blockages do occur; An ongoing rehabilitation program to improve the structural condition of the system; and Providing capacity to handle flows during wet-weather and future projected dry-weather flows. This plan helped to establish the basis for the District’s on going, aggressive Preventative Maintenance and Capital Improvement Programs. These two programs have resulted in substantially reducing SSO’s over the past twelve years, in addition to greatly improved system integrity.
Facilities Plan—This plan was prepared in 2007 by Camp, Dresser & McKee (CDM). It is a focused, specific study of the Water Reclamation Facility (WRF). The plan is the result of a process evaluation of the WRF, including a detailed capacity evaluation of the Rotating Biological 2017 Budget Document
Page 111
Metropolitan Sewerage District of Buncombe County, North Carolina
Capital Improvement Program (continued) Contactors (RBCs). The report also includes a physical facilities evaluation for the major process equipment at the WRF. Recommendations to improve the performance of each process were included in the report. In March 2014, MSD began the process of updating this important plan. The Facilities Plan Update is now complete. This significant, comprehensive study examined the various unit processes within the plant, with a focus on headworks, biological treatment alternatives, and the future regulatory climate. After extensive research of various options, the plan recommends adding new grit removal, a fine screening system, storage for peak flows (using existing decommissioned digesters), and chemically-enhanced primary clarification. Collection System Master Plan—In 2008, McGill Associates completed a Collection System Master Plan (the “2008 Collection System Plan”). The 2008 Collection System Plan focuses on the District’s comprehensive growth issues by incorporating all of the recent planning and zoning changes from the District’s member agencies. This plan also describes where and how areas will be served and provides for orderly growth of the sewer system to meet the needs of the region as a whole for the future. The District’s Collection System Master Plan addresses the orderly extension of the District’s collection system into future service areas. The plan has been prepared in close cooperation with the District’s member agencies and regional stakeholders. The land use policies and zoning regulations of each agency were used for land usage, growth projections/densities, and line locations. For areas outside of corporate or jurisdictional limits, Buncombe County’s Zoning Ordinance has played an integral role in defining future service areas.
Types of Projects The projects in the CIP are classified into several types, based on the objective of the project. The projects are determined and scheduled based on the Master Plan, the pipe-rating score, and other factors impacting the overall well-being of the District. The District’s Capital Improvement Program is divided into the following six areas, generally based upon type of project or expense category: Interceptor & Wet Weather Rehabilitation General Sewer Rehabilitation Private Sewer Rehabilitation Treatment Plant, Pump Stations, and General Capital Improvements Design, ROW, and Const. Management Expenses Reimbursement Projects 2017 Budget Document
Page 112
Metropolitan Sewerage District of Buncombe County, North Carolina
Capital Improvement Program (continued) In accordance with the State Collection System Permit, the District maintains a Ten Year CIP and rehabilitates an average of 50,000 LF of the collection system each year. The Interceptor and Wet Weather Rehabilitation projects address the third prong of the Master Plan by providing increased system conveyance. The General Sewer Rehabilitation projects combine the first and second prongs by surveying all lines to plan maintenance activities and to improve the structural condition of the system. The Private Sewer Rehabilitation projects have the same objectives as the General but are separately presented to address environmental concerns resulting from sewers that were not publicly maintained at the time the District was formed. A limited amount of funding is budgeted annually to address the problem locations on a “worst first” basis as identified. The District’s Water Reclamation Facility (WRF) has a permitted capacity to treat up to 40 million gallons of wastewater a day, and uses roughly half of this capacity. In accordance with the Master Plan’s twenty year planning period, there are no plans to replace or expand the plant in the near future. However, Water Reclamation Facility & pump station improvements are included in the CIP to maintain these facilities at their optimum level and to replace equipment that has exceeded its maintenance level. Reimbursement projects include one Annexation Project from Consolidation, Developer Reimbursements, and NCDOT Reimbursements.
FY 2017 thru FY 2026 Projects Based on Type $30,000,000
$25,000,000
$20,000,000
$15,000,000
$10,000,000
$5,000,000
$-
INTERCEPTOR AND WET WEATHER REHABILITATION PRIVATE SEWER REHABILITATION DESIGN, ROW, & CONSTRUCTION MANAGEMENT EXPENSES CONTINGENCY
2017 Budget Document
GENERAL SEWER REHABILITATION TREATMENT PLANT, PUMP STATIONS & GENERAL CAPITAL IMPROVEMENTS REIMBURSEMENT PROJECTS
Page 113
FY 16-17 BUDGET
FY 17-18 BUDGET
FY 18-19 BUDGET
FY 19-20 BUDGET
FY 21-22 thru FY 25-26 BUDGET
PROJECT FOOTAGE
FY 20-21 BUDGET
Buncombe Co.
5,860
2,231,579
171,970
17,000
1,998,000
-
-
-
Asheville
7,871
2,780,592
1,000
-
-
-
-
2,708,526
Asheville
6,475
5,478,400
-
-
-
-
-
5,463,521
Biltmore Estate
21,950
1,912,146
588,000
553,000
-
-
-
-
Buncombe Co.
5,500
1,413,000
-
-
-
-
-
1,413,000
Biltmore
2,200
638,000
-
-
-
-
-
638,000
Biltmore Forest
3,400
884,000
-
-
-
-
-
884,000
Asheville
3,800
988,000
-
-
-
-
-
988,000
Asheville
8,040
2,939,600
-
-
-
-
-
2,939,600
19,265,317
760,970
570,000
1,998,000
-
15,034,647
INTERCEPTOR AND WET WEATHER REHABILITATION Christian Creek Int. This project includes the replacement of approximately 5,860 LF of existing 8-inch and 18-inch sewer pipe. The portions to be replaced are located Southwest of US Hwy 70 at Rowland Road in Swannanoa, and to Porters Cove Rd. at I-40. The lines are undersized and have experienced multiple SSO's.
Dingle Creek Interceptor This project is located along Dingle Creek between the Blue Ridge Parkway and the Ramble Subdivision. The existing 18-inch vitrified clay pipe main will be replaced with a new 18-inch ductile iron pipe main. The approximate length of this project is 7,871 LF.
Lower Swannanoa Int. This project is to eliminate problems associated with the splitter box and the downstream twin 36-inch lines.
South French Broad Int. - Grouting This project is located within the Biltmore Estate along the French Broad River. The southern terminus of the project is located where the Dingle Creek Interceptor flows into the South French Broad Interceptor. The project consists of grouting and lining joints along approx. 22,000 LF of existing 36-inch Reinforced Concrete Pipe. The line is a major source of inflow and infiltration. Construction will be phased over three years.
Beaverdam Creek WW (CDM #10) This was identified as a potential rehabilitation project to improve wet weather flow conveyance, as specified in the Master Plan developed by CDM. It is located in the North French Broad Interceptor area and is comprised of 5,500 LF of 8-inch through 12-inch diameter pipe.
Biltmore WW (CDM #3) This was identified as a potential rehabilitation project to improve wet weather flow conveyance, as specified in the Master Plan developed by CDM. It is located in the Biltmore area near the Swannanoa Interceptor, and is comprised of 2,200 LF of 18-inch diameter pipe.
Four Mile Creek WW (CDM #1) This was identified as a potential rehabilitation project to improve wet weather flow conveyance, as specified in the Master Plan developed by CDM. It is located in the Southeast French Broad Interceptor area, and is comprised of 3,400 LF of 12-inch diameter pipe.
Haw Creek WW (CDM #6) This was identified as a potential rehabilitation project to improve wet weather flow conveyance, as specified in the Master Plan developed by CDM. It is located in the Haw Creek area and is comprised of 3,800 LF of 12-inch diameter pipe.
South Swannanoa WW (CDM #4) This was identified as a potential rehabilitation project to improve wet weather flow conveyance, as specified in the Master Plan developed by CDM. It is located in the Biltmore area near Sweeten Creek, and is comprised of 8,040 LF of 18-inch through 42-inch diameter pipe.
Page 114
SUBTOTAL Inflation per ENR Const. Cost Index SUBTOTAL with inflation
65,096 3.02%
1.0000 65,096
19,265,317
1.0000 760,970
1.0302 587,214
1.0613 2,120,501
1.0934 -
1.1264 -
1.2454117 18,724,325
Metropolitan Sewerage District of Buncombe County, North Carolina
TOTAL ESTIMATED COST
LOCATION OF PROJECT
Program Summary
2017 Budget Document
PROJECT NAME
FY 16-17 BUDGET
FY 17-18 BUDGET
FY 18-19 BUDGET
FY 19-20 BUDGET
FY 21-22 thru FY 25-26 BUDGET
PROJECT FOOTAGE
FY 20-21 BUDGET
Asheville
2,550
695,400
8,900
64,000
-
610,500
-
-
E. Asheville
2,022
592,000
583,500
-
-
-
-
-
Asheville
2,600
747,000
-
-
-
8,000
-
739,000
Asheville
0
100,350
26,500
-
-
-
-
-
Arden
1,833
518,430
-
2,250
28,000
-
482,700
-
Asheville
4,027
1,157,425
15,000
93,700
-
1,033,000
-
-
W. Asheville
2,062
572,800
-
-
-
11,300
86,000
467,600
E. Asheville
1,370
396,700
13,000
1,000
-
-
382,700
-
South Asheville
860
223,000
3,000
5,000
23,000
192,000
-
-
Asheville
3,848
1,435,790
-
-
-
4,500
1,000
1,411,937
GENERAL SEWER REHABILITATION Adams Street This project is located in downtown Asheville near South French Broad Avenue and is comprised of 2,550 LF of 8-inch ductile iron pipe. The existing line is aging 6-inch vitrified clay pipe, is in poor condition, and runs under several houses.
Arco Road This project is located in the Haw Creek neighborhood of E. Asheville along Arco Road, adjacent to New Haw Creek Road. It consists of replacing approx. 1,871 LF of 6-inch vitrified clay pipe and 151 LF of 21-inch reinforced concrete pipe with 8-inch ductile iron pipe and 24-inch ductile iron pipe. The existing line is in very poor condition with offset joints, roots, and fractures.
Arlington Street This project runs along Arlington Street in downtown Asheville. The project begins on Furman Avenue and ends at Town Mountain Road. There are numerous structural problems within the lines which contribute to I/I issues.
Asheville Country Club (SS) This project is located in North Asheville and is comprised of 7,200 LF of 8-inch ductile iron pipe. The existing line is 8-inch vitrified clay pipe and PVC pipe in poor condition with repeated maintenance issues and SSO's.
Atkins Street This project is located in Arden just north of Lake Julian. Approximately 1,833 LF of existing 6inch vitrified clay pipe will be replaced with new 8-inch ductile iron pipe. The existing sewer line is in poor condition due to roots, fractures, and sags in the line. The line is undersized and has flooded houses in the area.
Beale Road at Copney Lane This project ties into the Lake Julian Ph. 4 project just west of Glen Bridge Road and extends northward to Ducker Road and Lower Glen Bridge Road. It serves several major manufacturing sites. The lines are in poor condition with broken segments and leaking joints, have resulted in SSO's, and are difficult to access for maintenance and repairs.
Bear Creek Rd. at School Rd. This project is located in W. Asheville and is comprised of 2,062 LF of 8-inch ductile iron pipe. The existing line is aging 8-inch vitrified clay pipe. The line has multiple fractures, sags, misaligned joints, and root intrusion.
Beaucatcher Rd @ Kenilworth Rd This project is located in East Asheville and is comprised of 1370 LF of 8-inch ductile iron pipe. The existing line is aging 6" orangeburg pipe in poor shape with a large amount of root intrusion.
Bellevue Road This project is located in South Asheville along properties on Bellevue Road and is adjacent to Round Top Road. The project will replace 860 LF of 6-inch VCP and PVC. The existing lines are in bad condition and have too many point repairs.
Braddock Way - PRP 20002
Page 115
This project will replace, line, and pipe burst several existing sewer mains in Park Avenue and Braddock Way subdivisions. Problems with these lines include leaking joints, broken pipes and high inflow and infiltration. In some areas, the existing lines will be relocated from private property to public rights of way for better access and maintenance.
Metropolitan Sewerage District of Buncombe County, North Carolina
TOTAL ESTIMATED COST
LOCATION OF PROJECT
Program Summary (continued)
2017 Budget Document
PROJECT NAME
FY 16-17 BUDGET
FY 17-18 BUDGET
FY 18-19 BUDGET
FY 19-20 BUDGET
FY 21-22 thru FY 25-26 BUDGET
PROJECT FOOTAGE
FY 20-21 BUDGET
Asheville
475
226,250
-
-
-
-
-
213,181
Asheville
1,400
403,500
-
-
-
7,000
500
396,000
Asheville
2,491
755,000
10,000
-
6,000
108,000
-
631,000
Asheville
990
282,100
-
-
-
5,000
1,600
275,500
Asheville
1,450
380,100
13,000
500
-
-
366,600
-
Asheville
1,960
605,200
4,230
75,000
-
506,000
-
-
Black Mtn.
4,150
1,002,600
39,000
74,000
854,600
-
-
-
Asheville
530
184,800
-
-
-
-
181,300
-
Black Mountain
1,000
298,750
4,000
-
-
-
-
294,750
Asheville
4,587
1,293,450
-
-
-
-
-
1,275,200
GENERAL SEWER REHABILITATION (continued) Broadway St. at Bordeau Place This project is on Broadway Ave. just north of I-240. The existing 18-inch sewer will be pipe bursted and replaced with 18-inch high density polyethelyne line. An aerial crossing, which is in poor condition and ties into the Broadway Avenue main, will also be replaced as part of this project.
Buchanan Ave. This project is located in downtown Asheville near Biltmore Avenue and is comprised of 1,400 LF of 8-inch ductile iron pipe. The existing line is 6-inch clay with heavy root intrusion, fractures, and one section exposed along a steep grade.
Caledonia Road This project is located at the Caledonia Road entrance to the Kenilworth neighborhood, approx. 0.3 mile south of the Mission Hospital campus. The project includes replacement of approx. 2,491 LF of 8-inch and 10-inch VCP and Transite pipe with new DIP. The existing pipe has structural defects which have resulted in multiple SSO's.
Central Ave. @ I-240 This project is located in downtown Asheville near Woodfin Street and is comprised of 990 LF of 12-inch ductile iron pipe. The existing line is 6, 10, and 12-inch vitrified clay pipe with a history of SSO's.
Chatham Road This project is located in North Asheville near W.T. Weaver Blvd. and is comprised of 1,450 LF of 8-inch ductile iron pipe. The existing line is 6-inch vitrified clay pipe in poor condition with heavy root intrusion.
Cherokee Road This project will replace (or pipe burst) the existing sewer main from the end of the Macon Avenue @ Sunset Parkway project to an existing manhole east of Cambridge Road in North Asheville. The line is old vitrified clay pipe and is in very poor condition. Several segments are under houses, walls or other physical features which make repairs very difficult.
Chestnut Lodge Rd. This project is located in Black Mountain near Blue Ridge Road and is comprised of 4,150 LF of 8inch ductile iron pipe. The existing line is 6-inch and 8-inch clay with root problems, fractures, and multiple SSO's.
Commerce Street This project is located in downtown Asheville near Church Street and is comprised of 8-inch ductile iron pipe. The existing 6-inch line contains both vitrified clay and PVC sections, and has had excessive maintenance problems due to multiple pipe defects.
Craggy Street @ Old US 70 This project is located in Black Mountain on Craggy Street, approx. 400 ft. west of US 70 Highway/Old US 70 Highway intersection. The existing 6" PVC line has multiple bends without manhole access, making maintenance and inspection difficult. The line will be replaced with new 8" DIP.
Page 116
Cumberland Ave. This project is located in Montford and runs the entire length of Cumberland Avenue. Approximately 4,587 LF of existing 6-inch vitrified clay pipe will be replaced with 8-inch ductile iron pipe. This line is in very poor condition and has required multiple, frequent point repairs.
Metropolitan Sewerage District of Buncombe County, North Carolina
TOTAL ESTIMATED COST
LOCATION OF PROJECT
Program Summary (continued)
2017 Budget Document
PROJECT NAME
PROJECT FOOTAGE
Asheville
436
N. Asheville
TOTAL ESTIMATED COST
FY 16-17 BUDGET
FY 17-18 BUDGET
FY 18-19 BUDGET
FY 19-20 BUDGET
FY 21-22 thru FY 25-26 BUDGET
FY 20-21 BUDGET
GENERAL SEWER REHABILITATION (continued) Dellwood Avenue
121,850
91,500
-
-
-
-
-
5,225
1,606,600
-
27,000
-
81,800
54,000
1,443,800
Woodfin
4,101
970,200
22,000
115,000
-
815,200
-
-
Woodfin
2,242
591,046
-
-
-
-
-
541,000
Woodfin
4,577
1,263,450
2,250
18,000
1,232,200
-
-
-
Woodfin
600
178,100
-
-
-
-
2,800
175,300
West Asheville
200
76,250
3,250
18,000
51,100
-
-
-
N. Asheville
3,600
1,094,250
15,000
-
6,750
59,500
-
1,013,000
S. Asheville
2,600
843,000
-
12,000
17,500
104,000
-
709,500
Asheville
3,400
956,100
-
-
17,000
500
-
938,600
This project is for the relocation of an existing sewer main between Dellwood Avenue and Northwest Avenue in Swannanoa (Grovemont) area. The existing 6-inch vitrified clay pipe is in very poor condition and runs between closely spaced houses making access for maintenance and repairs very difficult.
East Chestnut Ave @ Five Points This project is located in North Asheville and is comprised of 5,225 LF of 8-inch ductile iron pipe. The existing line is aging 6", 8", and 10" VCP in poor shape with multiple structural defects per segment.
Elk Mountain Place This project is located south of Elk Mountain Road. between I-26 and the French Broad River. It is comprised of approximately 4,101 LF of 8-inch ductile iron pipe. The existing vitrified clay pipe sewer line is in poor condition and has experienced SSO's.
Elk Park Drive - PRP 35001 This project is located in Woodfin and is comprised of 2,242 LF of 8-inch ductile iron pipe. The existing line is 6-inch vitrified clay pipe and PVC with numerous sags and root problems, as well as a PVC creek crossing, which will be replaced during construction of the new line.
Elkwood Ave. This project is located in Woodfin, east of I-26 along Elkwood Avenue and Old Burnsville Hill Road. It consists of replacement of approximately 4,577 LF of 8-inch ductile iron pipe. The existing line has offset joints, fractures, root intrusion, multiple point repairs, and is the source of frequent problems.
Elkwood @ Norman Austin Dr. This project runs through properties along Elkwood Ave., starting at Norman Austin Drive. The existing pipe is 4-inch and 6-inch, is undersized and has misaligned joints. There is a manhole that is located under a property owner's porch. The proposed 8-inch ductile iron pipe will run mainly on Elkwood Avenue to move the system in the road for easier maintenance.
Fairfax Avenue @ I-240 This project is located in north Asheville approximately 0.25 miles east of Charlotte Street. The project will run along roads and properties from Glendale Road. to Sunset Drive. The 6-inch clay lines are in poor condition which have caused manhole overflows and SSOs.
Fairmont Road This project is located in West Asheville off of Fairfax Avenue and adjacent to the I-240 west bound off ramp to Brevard Road. The project consists of replacing 200 LF of 8-inch VCP and a 10-inch DIP. The lines are in poor condition and have root problems that are creating SSOs.
Forestdale Drive This project begins at Carnell Street. and ends at Caribou Road. The system runs along side roads and properties parallel to Hendersonville Road. System Services crews have reported numerous problems including multiple SSO's. The existing pipes will be replaced with 8-inch ductile iron pipe.
Page 117
Forest Hill Dr. @ Warwick Rd. This project is in Asheville in the Kenilworth neighborhood and consists of 3,400 LF of 8-inch ductile iron pipe. The current pipe is undersized 6-inch clay in poor condition, with roots and fractures.
Metropolitan Sewerage District of Buncombe County, North Carolina
LOCATION OF PROJECT
Program Summary (continued)
2017 Budget Document
PROJECT NAME
Asheville
1,000
486,200
-
-
-
-
-
486,200
Asheville
908
291,600
-
-
-
253,500
-
-
Asheville
3,300
945,300
-
18,000
-
9,400
54,000
863,900
South Asheville
1,090
323,200
6,000
39,000
278,200
-
-
-
S. Asheville
1,100
220,200
-
-
-
213,000
-
-
Arden
4,163
1,294,450
91,285
1,038,000
9,500
-
-
-
W. Asheville
2,060
595,500
-
-
-
10,300
2,200
583,000
Asheville
1,600
452,600
9,000
1,000
-
-
442,600
-
Asheville
713
234,410
224,000
-
-
-
-
-
Asheville
1,033
376,600
-
4,500
51,000
-
313,600
-
FY 16-17 BUDGET
FY 17-18 BUDGET
FY 19-20 BUDGET
FY 21-22 thru FY 25-26 BUDGET
PROJECT FOOTAGE
FY 18-19 BUDGET
FY 20-21 BUDGET
GENERAL SEWER REHABILITATION (continued) Four Inch Main - College Street This project is located in downtown Asheville near Beaucatcher Tunnel and is comprised of 8inch ductile iron pipe. The existing line is 4-inch Orangeburg and 6-inch vitrified clay pipe in poor condition, with several buildings over the existing line.
Four Inch Main - Dry Ridge Rd. This project is a 4-inch main and extends from Dry Ridge Road to Lucky Lane and Windsor Road in Asheville. This project is in the area north of Merrimon Avenue and east of Stratford Road. The existing line is a 4-inch Orangeburg pipe which is in poor condition.
Hazel Mill Rd @ Richland St. This project is located in West Asheville, near the Bowen Bridge, and consists of 3,300 LF of 8inch ductile iron pipe. The current pipe is 6-inch and 8-inch clay and PVC. Lines are undersized and in poor condition with multiple pipe sags, cracks, and fractures.
Hendersonville Rd @ Blake Drive This project is located in South Asheville on Blake Drive off of Hendersonville Road. The project will replace 1,090 LF of 6-inch and 8-inch VCP. The existing lines are in bad condition and have too many point repairs.
Hendersonville Rd. @ Peachtree Rd. This project will replace an existing 6-inch vitrified clay line in Hendersonville Road (US 25 South) between Peachtree Road and the Racquet Club Village Condo development. The line condition is very poor.
Hendersonville Rd. @ Rosscraggon Ph. 2 This project begins at US 25 just south of the railway spur line that goes into the Duke Energy plant and will include lines on Old Furnace Road. and Azalea Road. The existing lines are in very poor condition with high infiltration due to cracks, broken pipes, and bad joints.
Herron Avenue This project is located in West Asheville near the intersection of Sand Hill Road. and Haywood Road. and is comprised of 2,060 LF of 8-inch ductile iron pipe. The existing line is 6-inch vitrified clay pipe in poor condition, with multiple pipe defects that cannot be adequately repaired by point repairs.
Hill Street This project is located in Asheville near Montford Avenue and is comprised of 1,600 LF of 8-inch ductile iron pipe. The existing line is 6-inch vitrified clay pipe in poor condition with multiple severe structural defects.
Horizon Hill Rd. (Hy-Vu Drive) This project is located in Asheville near Merrimon Avenue. It consists of 713 LF of 8-inch ductile iron pipe. The current 8-inch Orangeburg and vitrified clay line has had repeated overflows due to root intrusion and pipe collapse.
Page 118
Howland Rd. @ Sunset Trail This project will replace an existing 8-inch main from 5 Howland Road. up to the rear of 371 Sunset Drive. System Services recently completed another portion of this system due to SSO's and line condition.
Metropolitan Sewerage District of Buncombe County, North Carolina
TOTAL ESTIMATED COST
LOCATION OF PROJECT
Program Summary (continued)
2017 Budget Document
PROJECT NAME
FY 16-17 BUDGET
FY 17-18 BUDGET
FY 18-19 BUDGET
FY 19-20 BUDGET
FY 21-22 thru FY 25-26 BUDGET
PROJECT FOOTAGE
FY 20-21 BUDGET
W. Asheville
2,360
620,700
-
9,000
53,000
-
554,000
-
Woodfin
3,578
971,950
73,500
875,000
-
-
-
-
Asheville
2,135
597,350
-
8,250
41,000
-
541,300
-
E. Asheville
400
127,500
-
-
2,000
2,200
12,000
111,300
N. Asheville
838
340,450
-
3,000
-
6,750
109,000
221,700
N. Asheville
4,200
1,355,500
-
-
-
17,000
15,500
1,323,000
Asheville
280
97,200
-
-
-
1,200
-
96,000
Arden
1,496
379,307
-
-
-
-
-
358,000
Asheville
1,415
397,870
-
-
-
-
-
395,000
Various
11,000
1,377,000
1,377,000
-
-
-
-
-
GENERAL SEWER REHABILITATION (continued) Johnston Blvd. @ Providence Rd. This project is located in West Asheville, approx. 0.6 miles west of New Leicester Highway. The project consists of replacing 2,360 LF of existing 6-inch vitrified clay and PVC pipe with new 8inch ductile iron pipe. The existing line contains many offset joints and bends, and is in poor structural condition.
Jonestown Road This project is located in Woodfin between Elk Mountain Road. and Riverside Drive., specifically along portions of Jonestown Road. The project consists of replacing approximately 3,578 LF of existing 6-inch VCP with 8-inch DIP. The line has numerous structural defects and has a history of root intrusion and SSOs.
Kenilworth @ Springdale Rd. This project is located in Kenilworth at the intersection of Kenilworth Road. and Springdale Road. Approximately 2,135 LF of existing 6-inch vitrified clay pipe will be replaced with 8-inch ductile iron pipe. The existing line has voids, cracks, roots, and fractures, and has experienced multiple SSOs.
Knauth Rd This project is located in East Asheville and is comprised of 400 LF of 8-inch ductile iron pipe. The existing line is aging 8-inch VCP in poor condition.
Lakeshore Dr. @ Merrimon Ave. This project is located near the intersection of Lakeshore Drive and Merrimon Avenue in North Asheville. It consists of replacing approximately 838 LF of 6-inch VCP with 8-inch DIP. Portions of the line run beneath a collapsed storm drain, and also underneath a house on Lakeshore Drive. The existing pipe is fractured and generally in poor condition, and will be relocated as part of the project.
Lakeview @ Glen Falls Rd. This project is just south of Beaver Lake on Lakeview Road, Glen Falls Road, and through properties on Glen Falls Road. The existing 6-inch clay pipe will be replaced with 8-inch ductile iron pipe. System Services has experienced numerous problems with this line.
Lakewood Drive @ Dudley This project is located on Lakewood Drive in the Kenilworth neighborhood of Asheville. It consists of replacing approx. 280 LF of existing 8-inch VCP with new 8-inch DIP. The existing line runs adjacent to a house foundation and is difficult to maintain. This line has a history of root intrusion.
Laurel Road - Ph. 2 This project is located in Royal Pines in southern Buncombe County. Approximately 1,496 LF of 8inch ductile iron pipe will replace existing vitrified clay and Orangeburg pipe along Laurel Road and Laurel Court. The existing lines are in poor condition.
Lincoln Ave.
Page 119
This project is located in the Oakley neighborhood in southeast Asheville, just north of I-40. It consists of replacing approximately 1,415 LF of existing 6-inch vitrified clay pipe with 8-inch ductile iron pipe. The existing line is in very poor structural condition.
Lining Contract No. 8 This is a trenchless technology project that includes lining substandard sewer lines with either CIPP or Fold and Form pipe. Existing manholes will be repaired or replaced as part of this work.
Metropolitan Sewerage District of Buncombe County, North Carolina
TOTAL ESTIMATED COST
LOCATION OF PROJECT
Program Summary (continued)
2017 Budget Document
PROJECT NAME
FY 16-17 BUDGET
FY 17-18 BUDGET
FY 18-19 BUDGET
FY 19-20 BUDGET
FY 21-22 thru FY 25-26 BUDGET
PROJECT FOOTAGE
FY 20-21 BUDGET
Leicester
308
95,700
-
-
-
-
-
95,700
Arden
2,263
522,525
6,000
38,000
467,500
-
-
-
West Asheville
2,150
640,000
-
-
-
-
-
640,000
Asheville
2,400
543,185
8,800
10,120
509,500
-
-
-
E. Asheville
2,716
870,200
-
-
-
-
6,000
855,500
E. Asheville
1,180
352,900
-
-
-
-
8,000
338,000
Beaverdam
5,589
1,547,000
25,000
-
15,000
91,000
-
1,416,000
N. Asheville
6,500
1,885,700
-
-
-
33,000
7,000
1,845,700
Asheville
1,800
553,000
9,000
-
1,500
41,000
501,500
-
Black Mountain
0
46,850
33,800
-
-
-
-
-
GENERAL SEWER REHABILITATION (continued) Lionel Place This project runs between two properties from Lionel Place to New Leicester Highway. There are multiple bends in the line that make maintenance difficult.
Long Shoals Rd. @ Allen Ave. This project is located at the west end of Allen Avenue, close to the intersection of Hendersonville Road. and Long Shoals Road. in Arden. It is comprised of approximately 2,263 LF of 8-inch ductile iron pipe. There are structural problems at various locations, and the line is in poor condition overall.
Louisiana Avenue This project is located in West Asheville along Louisiana Avenue. The project will replace 2,150 LF of 6-inch VCP. The existing lines are undersized, in bad condition, and have too many point repairs.
Louisiana Ave. @ Brucemont Circle This project is for the replacement of an existing line from Louisiana Avenue to Brucemont Circle. The present line goes under at least two houses and will be relocated to an existing alleyway. System Services has had maintenance issues with blockages due to broken joints and pipes.
Lower Glendale Ave. This project is located in S.E. Asheville near the Oakley neighborhood. It consists of replacing approximately 2,716 LF of existing 10-inch and 12-inch vitrified clay pipe along Glendale Avenue. The existing line is subject to inflow and infiltration, is in poor condition, and undersized.
Lower Melody Lane This project is a continuation of Upper Melody Lane. The system runs through the back of properties on Melody Lane and along the right of way of Norfolk Southern Railroad. The existing 6-inch Orangeburg pipe will be replaced with 8-inch ductile iron pipe. The existing Orangeburg pipe is deteriorating and has extensive root problems.
Lynn Cove Road This project is located off of Beaverdam Road. The project runs through multiple properties along Lynn Cove Road from Governor Circle to 225 Lynn Cove Road. These lines and manholes have heavy I/I which have created multiple SSOs.
Manetta Rd. @ Johnson Dr. This project is located in North Asheville near Merrimon Avenue and consists of 6,500 LF of 8inch ductile iron pipe. The existing clay pipe is undersized and has voids, fractures, and root intrusions which have contributed to multiple SSO's.
Meadow Road @ Train Yard This project is located in Asheville on Meadow Road between the Biltmore Estate and AB Tech College. It consists of replacing 1,800LF of existing 6" VCP with new 8" DIP. The existing line is in poor condition, is undersized, and runs underneath various structures.
Page 120
Meadowbrook Drive (SS) This project includes complete replacement of existing 8-inch vitrified clay pipe with new 8-inch ductile iron pipe. The vitrified clay lines are in poor condition with cracks and bad joints and also run under two houses, making the line difficult to maintain.
Metropolitan Sewerage District of Buncombe County, North Carolina
TOTAL ESTIMATED COST
LOCATION OF PROJECT
Program Summary (continued)
2017 Budget Document
PROJECT NAME
FY 16-17 BUDGET
FY 17-18 BUDGET
FY 18-19 BUDGET
FY 19-20 BUDGET
FY 21-22 thru FY 25-26 BUDGET
PROJECT FOOTAGE
FY 20-21 BUDGET
Asheville
500
324,990
-
-
-
-
-
318,946
N. Asheville
2,800
820,000
-
-
-
-
-
820,000
Woodfin
2,930
1,293,650
-
7,070
-
3,250
34,000
1,241,900
W. Asheville
2,760
836,200
-
-
-
14,000
4,000
818,200
Asheville
2,800
592,615
-
49,000
-
526,000
-
-
E. Asheville
2,120
623,900
45,500
564,200
-
-
-
-
E. Asheville
1,900
555,900
7,100
36,000
-
-
503,300
-
E. Asheville
838
252,076
227,800
-
-
-
-
-
Woodfin
9,020
2,356,500
36,000
6,500
30,000
-
2,284,000
-
Asheville
450
163,700
-
2,000
-
-
159,400
-
GENERAL SEWER REHABILITATION (continued) Merrimon Ave. at Clearview Terrace This project is in two sections along Merrimon Avenue, in the area of Clearview Terrace and Farrwood Avenue. The existing line is an old 4-inch main and is in very poor condition. A roadway bore is proposed under Merrimon Avenue for the lower section of this project.
Merrimon Ave. @ Coleman Ave. This project is on Merrimon Avenue, Coleman Avenue, and Austin Avenue. Existing clay pipe is old and has numerous defects. The 6-inch clay pipe on Coleman and Austin, and the 8-inch clay pipe on Merrimon will all be replaced with 8-inch ductile iron pipe.
Middle Beaverdam Crk. @ US 19-23 This project will install 24-inch ductile iron pipe along Beaverdam Creek. It will also replace a 4inch main at rear of lots on Washington Avenue and along the east side of US 19-23 just north of the railroad. Lines are in poor condition, and the 4-inch lines are undersized.
Mitchell Avenue This project is located in West Asheville between Patton Avenue and Haywood Road. and is comprised of 2,760 LF of 8-inch ductile iron pipe. The existing line is 6-inch vitrified clay pipe in poor condition, with multiple pipe defects that cannot be adequately repaired by point repairs.
Mountainbrook Rd. @ Chunns Cove Rd. This project will relocate lines from the rear yards of lots fronting on Mountainbrook Road. (off Chunns Cove Road.) where access and maintenance is extremely difficult and will move those lines to public street rights of way. This project will also eliminate one high aerial creek crossing where existing support piers are failing due to erosion.
Mountainview Road This project is located in East Asheville between Tunnel Road. and New Haw Creek Road. The project consists of replacing approx. 2,120 LF of existing 4, 6 and 8-inch vitrified clay pipe with 8inch ductile iron pipe. The existing line has multiple fractures and small holes, and portions of the line are undersized.
New Haw Creek Rd. @ Dogwood Grove This project is in East Asheville near Haw Creek Road., and consists of 1,900 LF of 8-inch ductile iron pipe. Existing 4-inch and 6-inch clay pipe is undersized, with fractures, root intrusion, and misaligned joints. Existing 8-inch ductile iron pipe has corrosion issues. Existing manholes are in poor condition.
New Haw Creek Rd. @ Trinity Chapel Rd. This project is located in the Haw Creek neighborhood of East Asheville along New Haw Creek Road. It consists of replacing approx. 838 LF of existing 6-inch and 8-inch vitrified clay pipe and 21-inch reinforced concrete pipe with new 8-inch ductile iron pipe and 24-inch ductile iron pipe. This line segment has had multiple point repairs, backups, and overflows.
New Stock Road This project runs along New Stock Road in Woodfin. The project begins at Nichols Hill Drive & New Stock Road and runs under I-26 and ends at Weaverville Road. The existing 8-inch lines have structural issues that lead to root intrusion and multiple SSOs.
Page 121
North Lexington @ I-240 This project is located in downtown Asheville near the I-240 on ramp from Broadway Street and is comprised of 450 LF of 8-inch ductile iron pipe. The existing line is 4-inch vitrified clay pipe with a history of stoppages and overflows.
Metropolitan Sewerage District of Buncombe County, North Carolina
TOTAL ESTIMATED COST
LOCATION OF PROJECT
Program Summary (continued)
2017 Budget Document
PROJECT NAME
FY 16-17 BUDGET
FY 17-18 BUDGET
FY 18-19 BUDGET
FY 19-20 BUDGET
FY 21-22 thru FY 25-26 BUDGET
PROJECT FOOTAGE
FY 20-21 BUDGET
Asheville
1,050
352,000
1,500
68,000
-
-
277,200
-
Black Mountain
575
171,000
-
-
2,500
2,500
29,000
137,000
W. Asheville
976
305,750
-
-
-
-
3,500
302,250
E. Asheville
3,755
1,058,000
10,500
98,000
931,500
-
-
-
Asheville
14,800
2,196,000
14,000
1,379,000
767,000
-
-
-
Various
0
200,000
200,000
-
-
-
-
-
N. Asheville
700
220,600
-
-
-
-
4,000
216,600
Woodfin
400
120,920
-
-
-
5,000
-
114,000
Asheville
2,302
649,480
-
-
-
-
-
641,600
Arden
2,888
874,500
-
-
23,500
-
-
835,400
GENERAL SEWER REHABILITATION (continued) North Market Street This project is located in downtown Asheville and consists of 1,050 LF of 8-inch ductile iron pipe. The existing 6-inch clay line is undersized, has multiple structural issues, and has caused flooded structures.
Oakland Dr @ Church Street This project is located in Black Mountain running through properties from Pine Street to Oakland Drive. The project will replace 575 LF of 4-inch Orangeburg and 6-inch VCP. The existing lines are in bad condition and have too many point repairs.
Oakwood Street This project is located in West Asheville on Oakwood St., approximately 0.6 mile east of the Patton Ave./Haywood Rd. intersection. Approximately 976 LF of existing 6-inch VCP and Orangeburg pipe will be replaced with 8-inch DIP. The existing line has structural problems and is undersized for the neighborhood it serves.
Old Haw Creek Rd. @ Greenbriar Rd. This project is located in the Haw Creek neighborhood of E. Asheville along Old Haw Creek Rd. and Greenbriar Rd. It consists of replacing approximately 3,755 LF of existing 6-inch vitrified clay pipe with 8-inch ductile iron pipe. The existing line is in poor condition and has been subject to frequent overflows.
Old West Chapel Rd. This project is located near the intersection of Sweeten Creek Road. and I-40. The I-40 crossing will be performed by bore and jack construction. The existing 8-inch clay pipe will be replaced with 8-inch ductile iron pipe. There have been multiple sanitary sewer overflows on this line. This project has been phased for two years, FY 17-18 and FY 18-19. In FY17-18, this phase will consist of lining 10,090 of existing 8-inch and 10-inch pipes. In FY18-19, this phase will consist of replacing 4,680 LF by pipe bursting and dig & replace.
Point Repair Contract No. 1 This construction contract will cover point repairs performed by an outside contractor for Fiscal Year 2016-17. Point repairs covered under this contract are generated through work orders from the System Services Division.
Riverside Dr @ Norton Dr This project is located in North Asheville and is comprised of 700 LF of 8-inch ductile iron pipe. The existing line is a problematic 4" sewer line composed of PVC and VCP with many defects.
Riverside Dr. @ Silverline Plastic This project is located in Woodfin and is comprised of 400 LF of 8-inch ductile iron pipe. The existing line is 4-inch, 6-inch, and 8-inch vitrified clay pipe, runs under a building, and is in poor condition.
Riverview Drive
Page 122
This project is located in Asheville near the Haywood Road bridge. The project consists of replacing approx. 2,302 LF of existing 6-inch vitrified clay pipe with 8-inch ductile iron pipe. The existing line is in poor condition and has experienced multiple overflows.
Royal Pines Drive - PRP 47009 This project is located in South Asheville and is comprised of 2,888 LF of 8-inch ductile iron pipe. The existing line is 8-inch vitrified clay pipe which has had a history of root problems.
Metropolitan Sewerage District of Buncombe County, North Carolina
TOTAL ESTIMATED COST
LOCATION OF PROJECT
Program Summary (continued)
2017 Budget Document
PROJECT NAME
FY 16-17 BUDGET
FY 17-18 BUDGET
FY 18-19 BUDGET
FY 19-20 BUDGET
FY 21-22 thru FY 25-26 BUDGET
PROJECT FOOTAGE
FY 20-21 BUDGET
W. Asheville
550
165,500
-
-
-
4,000
-
161,500
W. Asheville
2,341
686,775
532,573
-
-
-
-
-
W. Asheville
361
109,000
-
108,500
-
-
-
-
W. Asheville
325
89,310
4,000
83,650
-
-
-
-
Enka
115
41,750
-
-
-
-
-
41,750
S. Asheville
4,500
1,299,200
2,000
100,200
-
1,176,000
-
-
Asheville
2,871
847,100
-
-
11,500
3,000
34,000
798,600
N. Asheville
1,770
495,500
-
-
8,000
-
10,000
477,500
Asheville
1,960
461,310
400,726
-
-
-
-
-
W. Asheville
1,350
381,000
5,500
8,000
63,000
-
304,500
-
GENERAL SEWER REHABILITATION (continued) Sand Hill Rd @ Baker Place This project is located in West Asheville and is comprised of 550 LF of 8-inch ductile iron pipe. The existing line is a 6-inch VCP with multiple structural defects and access issues due to being located under several houses.
Sand Hill Rd. @ Russell/Davenport This project is located in West Asheville and is comprised of 2,341 LF of 8-inch ductile iron pipe. The existing line is 8-inch vitrified clay pipe is in poor condition with a history of overflows at various sites.
School Rd. @ Cranford Rd. This project is located in West Asheville between Patton Avenue and Sand Hill Road and is comprised of 361 LF of 8-inch ductile iron pipe. The existing line is 6-inch PVC pipe that is full of roots, bends, and structural defects. Backups in this line have resulted in a flooded house.
Sheppard Drive This project is located at 45 Sheppard Drive in West Asheville, close to the intersection of Old County Home Road and New Leicester Highway. The project includes replacing approximately 325 LF of existing 6-inch VCP with 8-inch DIP. The existing line has structural defects and has experienced numerous backups due to root intrusion.
Smokey Park Hwy. @ I-40 This project is located in Enka near the I-40 on/off ramps, approximately 0.10 mile from Smokey Park Highway. The line crosses under Norfolk Southern railroad. There is a substantial hole along the bottom of the line that has created problems.
Springside Rd. @ Overlook Rd. This project is located in South Asheville near Overlook Road. and is comprised of 4,500 LF of 8inch ductile iron pipe. The existing line is 6-inch and 8-inch vitrified clay pipe in poor shape, with a history of SSO's at various points.
Starnes Avenue This project is located near downtown Asheville, just north of I-240. Approximately 2,871 LF of existing 6-inch VCP will be replaced with 8-inch DIP along portions of Short Street, Cumberland Avenue, Starnes Avenue, Harrison Street and Flint Street. Portions of the existing pipe were installed circa 1900, and have numerous structural defects.
Stratford Road This project is located in N. Asheville along Stratford Road. The project is a continuation of Stratford @ Oxford Court. The lines run though properties alongside a stream. The existing 6inch vitrified clay pipe is in poor structural condition which has allowed heavy infiltration.
Stratford Rd. @ Oxford Court This project will replace an existing 6-inch main which serves houses along Oxford Court, near the Merrimon Avenue @ Stratford project. Three SSO's have occurred at manholes on this line.
Sulphur Springs Rd. @ Covington St.
Page 123
This project begins in the area of the Sulphur Springs Road/Delaware Avenue intersection and runs through the back properties along Belmont Avenue. The existing 6-inch clay pipe will be replaced with 8-inch ductile iron pipe. The 6-inch clay line has had numerous problems and runs under a house.
Metropolitan Sewerage District of Buncombe County, North Carolina
TOTAL ESTIMATED COST
LOCATION OF PROJECT
Program Summary (continued)
2017 Budget Document
PROJECT NAME
FY 16-17 BUDGET
FY 17-18 BUDGET
FY 18-19 BUDGET
FY 19-20 BUDGET
FY 21-22 thru FY 25-26 BUDGET
PROJECT FOOTAGE
Black Mtn.
3,100
931,000
-
5,000
-
911,000
-
-
S. Asheville
1,330
406,170
1,500
56,000
-
344,000
-
-
Asheville
1,048
307,200
276,363
-
-
-
-
-
Asheville
2,325
703,800
-
15,500
80,000
608,300
-
-
S. Asheville
1,775
520,200
-
9,000
-
1,500
37,000
472,700
E. Asheville
1,000
287,710
-
-
2,000
18,000
-
262,500
Swannanoa
4,550
1,443,000
-
20,000
-
127,000
32,500
1,263,500
Asheville
364
361,200
152,500
-
-
-
-
-
Asheville
2,350
766,400
-
-
1,000
-
753,900
-
W. Asheville
4,100
1,258,500
-
20,500
500
63,500
124,000
1,050,000
FY 20-21 BUDGET
GENERAL SEWER REHABILITATION (continued) Sutton Avenue This project is on Sutton Ave. and extends up Ridgeway Avenue, Richardson Boulevard, and Broadway Street. The existing 6-inch and 8-inch clay pipe will be replaced with 8-inch ductile iron pipe. System Services crews report that the pipes are in poor condition, and have caused flooded structures and sanitary sewer overflows.
Sweeten Creek @ Buck Shoals This project is located in Royal Pines on Buck Shoals Rd. between Hendersonville Road. (US 25) and Sweeten Creek Road. (US 25A). Approx. 1,330 LF of existing 6-inch vitrified clay pipe will be replaced with 8-inch ductile iron pipe. The existing line is in poor condition and is undersized.
Sweeten Creek Rd. @ Busbee View This project is for the rehabilitation of an existing line which begins at Sweeten Creek Road and extends to Ona Berry Lane (off Busbee Lane). A portion of this line goes under a concrete loading dock and in some places the pipe cannot be located without extensive work on private property. There have been several service calls for repairs on this line.
Sweeten Creek @ Mills Gap This project is located in South Asheville near Mills Gap Road. and is comprised of 2,325 LF of 8inch ductile iron pipe. The existing line is 6-inch and 8-inch vitrified clay pipe in poor condition, with a history of SSO's.
Sweeten Creek Rd. @ Weston Rd. This project is located in South Asheville near Weston Road. and is comprised of 1,775 LF of 8inch ductile iron pipe. The existing line is 6-inch vitrified clay pipe and 4-inch PVC pipe in poor condition, with a history of SSO's.
Upper Grassy Br. Rd. @ Maxwell Rd. This project is located in East Asheville and is comprised of 1,000 LF of 8-inch ductile iron pipe. The existing sewer line is 6-inch clay with root and odor problems.
US 70 @ Jordan Road This project is located in Swannanoa along US 70. The project begins at McBrayer Ave., crosses under US 70 at Martin Road., and ends at Burgins Chapel Road. The existing 8-inch vitrified clay pipe is in poor condition. This is a potential lining project.
Venable Pump Station Elimination This project is along NC191 (Brevard Road) at the Ingles Market and Asheville Outlets Mall properties in southwest Asheville. This project will eliminate the existing Venable Pump Station and allow the flow from that pump station to flow into existing sewer lines on the Mall property which have recently become public MSD lines. This project will replace approximately 364 LF of existing 8-inch main and add approximately 313 LF of new 8-inch main.
Walnut Street @ Rankin Ave. This project is located in downtown Asheville and consists of 2,350 LF of 8-inch ductile iron pipe. The current 6-inch clay line is undersized and deteriorated, with many structural problems.
Waynesville Ave. @ Brownwood Ave.
Page 124
This project is located in West Asheville between Haywood Road and Craven Street and is comprised of 4,100 LF of 8-inch ductile iron pipe. The existing line is 8-inch vitrified clay pipe that is in poor condition with heavy root intrusion, structural defects, and I&I problems, resulting in a large history of SSO's.
Metropolitan Sewerage District of Buncombe County, North Carolina
TOTAL ESTIMATED COST
LOCATION OF PROJECT
Program Summary (continued)
2017 Budget Document
PROJECT NAME
FY 16-17 BUDGET
FY 17-18 BUDGET
FY 18-19 BUDGET
FY 19-20 BUDGET
FY 21-22 thru FY 25-26 BUDGET
PROJECT FOOTAGE
FY 20-21 BUDGET
Asheville
1,500
425,700
-
7,500
-
500
-
417,700
W. Asheville
1,720
503,000
8,000
37,000
455,500
-
-
-
Skyland
400
114,150
-
-
-
-
-
114,150
Arden
960
295,250
-
-
-
-
-
295,250
Weaverville
430
124,250
2,150
-
-
-
-
122,100
Asheville
1,050
357,100
-
-
-
5,500
49,000
302,600
Various
200,000
41,644,040
4,164,404
4,164,404
4,164,404
4,164,404
4,164,404
20,822,020
Various
N/A
500,000
50,000
50,000
50,000
50,000
50,000
250,000
Various
5,000
1,125,000
-
-
-
-
-
1,125,000
108,731,334
8,859,631
9,444,344
10,254,754
12,252,104
12,983,604
GENERAL SEWER REHABILITATION (continued) Wentworth Ave. This project is located in Asheville near the Oakley neighborhood and is comprised of 1,500 LF of 8-inch ductile iron pipe. The existing line is 6-inch PVC and 8-inch vitrified clay pipe that has many offset joints, protruding taps, and pipe defects.
West Crabapple Lane This project is on West Crabapple Lane which is a private road. The existing 8-inch clay pipe is in bad condition and will be replaced with 8-inch ductile iron pipe. System Services crews have reported multiple structural defects which are resulting in major infiltration and inflow.
Weston Road @ Tampa Blvd. This project is located in Skyland, approx. 1/2 mile northeast of the US 25/US 25A intersection. It consists of replacing 400LF of existing 6-inch VCP with 8-inch DIP. The existing pipe has bends and protruding taps in the line, is undersized, and is a source of I&I.
White Oak Road This project is located in Arden along White Oak Road, adjacent Hendersonville Road. The project will replace 960 LF of 6-inch Orangeburg and VCP. The existing lines are in bad condition and have too many point repairs.
Wildwood Park This project is located in Weaverville at the corner of N Main St. and Wildwood Park. It consists of replacing 430LF of 8-inch VCP with 8-inch DIP. The existing pipe has multiple fractures, root problems, and runs underneath multiple structures making maintenance difficult.
Wood Ave. @ Parker Rd. This project is located in Asheville between Fairview Road and Tunnel Road and is comprised of 1,050 LF of 8-inch ductile iron pipe. The existing line is 8-inch vitrified clay pipe that has access issues due to being built over. Backups on this line have resulted in a flooded house.
SSD Rehab. & Replacement This line item is for the replacement of capital assets using in-house construction crews and materials. This includes new taps, small repairs, lining, as well as larger rehabilitation projects. Also included is paving when required for these repairs and rehabilitation projects. The total estimated project cost shown is the total within the ten year window.
Surveys for Design New rehabilitation projects are generated continuously throughout the year. This line item provides for surveying needs for these new projects, in order that preliminary work may begin prior to being formally incorporated into the next year's CIP. This helps to ensure projects are completed efficiently.
Future Projects - General Rehab. Rehabilitation projects are added throughout each fiscal year based upon sanitary sewer overflows, structural condition, maintenance frequency, etc. This line item is a placeholder to budget for future (unidentified) projects within the ten year window.
Page 125
SUBTOTAL Inflation per ENR Const. Cost Index SUBTOTAL with inflation
439,470 3.02%
1.0000 439,470
108,731,334
1.0000 8,859,631
1.0302 9,729,563
1.0613 10,883,494
1.0934 13,396,005
1.1264 14,624,514
53,577,134 1.22849174 65,819,067
Metropolitan Sewerage District of Buncombe County, North Carolina
TOTAL ESTIMATED COST
LOCATION OF PROJECT
Program Summary (continued)
2017 Budget Document
PROJECT NAME
PROJECT FOOTAGE
FY 16-17 BUDGET
FY 17-18 BUDGET
FY 18-19 BUDGET
Asheville
588
166,312.0
Asheville
2,593
656,532.0
639,000.0
W. Asheville
1,400
373,932.0
7,000.0
10,600.0
4,581
1,196,776
646,000
10,600
FY 19-20 BUDGET
FY 21-22 thru FY 25-26 BUDGET
FY 20-21 BUDGET
PRIVATE SEWER REHABILITATION Douglas Place PSR
-
-
-
-
-
1,000.0
-
156,600
-
-
-
-
This project is located in West Asheville and is comprised of 1,400 LF of 8-inch ductile iron pipe. The existing line is a problematic 4-inch private sewer line composed of PVC and VCP with many defects.
Freno Drive PSR (Lower)
-
This project is located in West Asheville and is comprised of 1,400 LF of 8-inch ductile iron pipe. The existing line is a problematic 4-inch private sewer line composed of PVC and VCP with many defects.
Old County Home Rd PSR
-
352,600.0
This project is located in West Asheville and is comprised of 1,400 LF of 8-inch ductile iron pipe. The existing line is a problematic 4-inch private sewer line composed of PVC and VCP with many defects.
SUBTOTAL Inflation per ENR Const. Cost Index
3.02%
SUBTOTAL with inflation
1.0000 4,581
1.0000
1.0302
1.0613
353,600 1.0934
1.1264
156,600 1.231548
1,196,776
646,000
10,920
-
386,613
-
192,860
TREATMENT PLANT, PUMP STATIONS & GENERAL CAPITAL IMPROVEMENTS Biological Treatment
MSD-Treatment Plant
0
4,000,000
-
-
-
-
-
4,000,000
MSD-Treatment Plant
0
865,000
175,000
90,000
89,000
80,000
91,000
340,000
MSD-Treatment Plant
0
2,281,688
250,000
91,400
1,709,000
137,500
-
-
MSD-Treatment Plant
0
282,535
30,000
-
-
-
-
-
MSD-Treatment Plant
0
1,639,000
150,000
-
-
-
-
-
MSD-Treatment Plant
0
204,210
159,000
-
-
-
-
-
This project is the final and largest recommendation from the Plant Facilities Plan. It will replace the Rotating Biological Contactors (RBC's) with an alternative biological treatment technology. This project will be driven by regulatory requirements.
Building and Facility Rehabilitation This item is for the replacement of larger capital items such as roofing systems, HVAC, and subcontracts on buildings and structures within the MSD campus and treatment plant facility. Total estimated project cost shown is the total within the ten year window.
Carrier Bridge P.S. Bypass & Improvements This is part of the South French Broad Carrier Bridge PER project. A permanent bypass line will be installed at the Carrier Bridge Pump Station as an emergency backup to the existing 24-inch force main. Once installed, the new bypass line will allow for the pump station to be bypassed in the event of an emergency, or for major maintenance at the pump station. This project also includes increasing pump capacity for future growth within the service area.
Flow Monitoring This project is for expenses related to the continued operation, maintenance, and improvements of the District's flow monitoring program.
Influent Pump Station Rehabilitation This project is to rehabilitate the influent pump station at the plant. The existing motor controls have deteriorated over the years and must be replaced. New controls will be installed and the space will be air conditioned. One influent pump was replaced in FY13-14, and another in FY1516. The remaining pump has been re-built multiple times and is approximately 25 years old.
Mountain View P.S. Standby Generator
Page 126
This project is to add a permanent back-up generator to the District's Mountain View Pump Station. Gas and electrical lines will be extended down Pinehurst Circle to a new site on the Buncombe County Board of Education parcel. This project will allow for emergency operation and routine maintenance of this pump station.
Metropolitan Sewerage District of Buncombe County, North Carolina
TOTAL ESTIMATED COST
LOCATION OF PROJECT
Program Summary (continued)
2017 Budget Document
PROJECT NAME
PROJECT FOOTAGE
TOTAL ESTIMATED COST
FY 16-17 BUDGET
FY 17-18 BUDGET
FY 18-19 BUDGET
FY 19-20 BUDGET
FY 21-22 thru FY 25-26 BUDGET
FY 20-21 BUDGET
TREATMENT PLANT, PUMP STATIONS & GENERAL CAPITAL IMPROVEMENTS (continued) Plant Headworks Improvements
MSD-Treatment Plant
0
11,538,575
5,457,000
5,385,000
-
-
-
-
MSD-Treatment Plant
0
10,962,000
960,000
5,006,000
4,996,000
-
-
-
MSD-Treatment Plant
0
1,536,800
330,000
-
-
-
-
-
Buncombe County
0
400,000
400,000
-
-
-
-
-
Varies
0
1,500,000
150,000
150,000
150,000
150,000
150,000
750,000
Mull Building
0
68,000
68,000
-
-
-
-
-
35,277,808
8,129,000
10,722,400
6,944,000
367,500
241,000
This project is a recommendation from the Facilities Plan Update, a WRF master planning document completed by HDR in April 2015. This project consists of a new influent screening facility, new grit removal system, fine screening facility, and surge/equalization basins and pumping station at the French Broad River WRF. The upgrades will improve downstream water quality and shave peak flows into the WRF.
Plant High Rate Primary Treatment This project is a recommendation from the Facilities Plan Update, a WRF master planning document completed by HDR in April 2015. High rate primary treatment will improve water quality ahead of the RBC's thereby extending their useful life and improving treatment efficiency.
RBC Replacement This project is for the replacement of the existing Rotating Biological Contactors (RBC's). The existing RBC's were installed in the 1980's, and as time has progressed, units have required replacement. Twenty RBC's were replaced in FY14-15; ten will be replaced in FY15-16; and ten will be replaced in FY16-17.
South French Broad Carrier Bridge PER This will be a flow modeling evaluation of several large sewer interceptors in the South French Broad, Lower Swannanoa, and Carrier Bridge areas. The study will identify undersized lines based on current and future flow, and will include phased recommendations for improvements.
General Capital Equipment This is for the purchase of capital equipment in excess of $15,000. Examples include pumps, plant equipment, computer servers, large concrete saws, etc.
Mull Building Improvements This project is to improve the efficiency and customer service of the MSD plan review process. It will provide for a paperless plan review system, and is expected to speed review time and allow for easier communication among parties to the MSD development process. It will also provide for new carpet, furniture, and a monitor in the MSD Board Room, which is in need of replacement.
SUBTOTAL Inflation per ENR Const. Cost Index
13,743 3.02%
SUBTOTAL with inflation
1.0000 13,743
1.0000
1.0302
1.0613
1.0934
1.1264
5,090,000 1.2835911
35,277,808
8,129,000
11,046,216
7,369,751
401,811
271,458
6,533,479
0
28,998,216
2,546,486
2,658,847
2,727,386
2,797,917
2,863,784
15,403,795
0
28,998,216
2,546,486
2,658,847
2,727,386
2,797,917
2,863,784
15,403,795
522,890
193,469,451
20,942,087
24,032,761
23,101,132
16,982,347
17,759,757
106,673,526
DESIGN, ROW, & CONSTRUCTION MANAGEMENT EXPENSES Design, ROW, & Const. Mgmt. Exp.
MSD/ENG
This line item is for expenses related to the District's Capital Improvement Program (CIP). Included are salaries for the CIP Division, capital equipment, and bond debt expenses related to the financing of the CIP program.
SUBTOTAL
BUDGET SUMMARY
Page 127
SUBTOTAL with Inflation CONTINGENCY REIMBURSEMENT PROJECTS TOTAL
1,000,000 Various
0 522,890
1,000,000
100,000
100,000
100,000
100,000
100,000
500,000
194,469,451
22,042,087
24,132,761
23,201,132
17,082,347
17,859,757
107,173,526
Metropolitan Sewerage District of Buncombe County, North Carolina
LOCATION OF PROJECT
Program Summary (continued)
2017 Budget Document
PROJECT NAME
Metropolitan Sewerage District of Buncombe County, North Carolina
Impact of CIP on Operations One of the purposes of a budget document is to describe the impact of significant non-routine capital expenditures on a government’s current and future operating budgets. For most municipal and county governments, non-routine capital improvements consist of expansion of facilities, which often result in higher operating costs. For example, larger buildings increase utility expenses, and new structures such as libraries or swimming pools involve hiring additional staff. In addition, for most municipal and county governments, non-routine capital improvements are, for the most part, based upon the decisions of the local governing authority. The District’s CIP is different in two respects. First, almost all non-routine capital expenditures involve rehabilitation of already existing sewer pipe infrastructure, and secondly, the District’s capital improvements to infrastructure are mandated by the state environmental regulatory department, imposing limits on discretionary action and cost. Through major capital improvements to the sewer collection system, the District expects to realize longterm cost reduction in wastewater treatment operations. The following detail illustrates the impact of the Capital Improvement Program on the District’s current and future operational budgets.
2017 Budget Document
Page 128
FY 18-19 BUDGET
FY 19-20 BUDGET
FY 21-22 thru FY 25-26 BUDGET
FY 20-21 BUDGET
INTERCEPTOR AND WET WEATHER REHABILITATION Christian Creek Interceptor: No Impact to Operating Budget - efficiencies gained $ will be used in the District's collector system preventative maintenance program.
-
Dingle Creek Interceptor: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Lower Swannanoa Interceptor: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
South French Broad Interceptor - Grouting: No Impact to Operating Budget efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Beaverdam Creek WW (CDM #10): No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Biltmore WW (CDM #3): No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Four Mile Creek WW (CDM #1): No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Haw Creek WW (CDM #6): No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
-
-
-
-
-
-
South Swannanoa WW (CDM #4): No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
INTERCEPTOR AND WET WEATHER REHABILITATION
$
-
$
$
-
-
$
$
-
-
$
$
-
-
$
$
-
-
$
$
-
-
GENERAL SEWER REHABILITATION
Page 129
Adams Street: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Arco Road: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Metropolitan Sewerage District of Buncombe County, North Carolina
PROJECT NAME
FY 17-18 BUDGET
Operational Impact Summary
2017 Budget Document
FY 16-17 BUDGET
FY 18-19 BUDGET
FY 19-20 BUDGET
FY 21-22 thru FY 25-26 BUDGET
FY 20-21 BUDGET
GENERAL SEWER REHABILITATION (continued)
Page 130
Arlington Street: No Impact to Operating Budget - efficiencies gained will be $ used in the District's collector system preventative maintenance program.
- $
- $
- $
- $
- $
-
Asheville Country Club (SS): No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Atkins Street: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Beale Road @ Copney Lane: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Bear Creek Road @ School Road: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Beaucatcher Rd @ Kenilworth Rd: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Bellevue Road: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Braddock Way - PRP 20002 - No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Broadway Street @ Bordeau Place - No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Buchanan Avenue - No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Caledonia Road - No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Central Avenue @ I-240 - No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
-
-
-
-
-
-
Chatham Road - No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
Metropolitan Sewerage District of Buncombe County, North Carolina
FY 17-18 BUDGET
Operational Impact Summary (continued)
2017 Budget Document
PROJECT NAME
FY 16-17 BUDGET
FY 18-19 BUDGET
FY 19-20 BUDGET
FY 21-22 thru FY 25-26 BUDGET
FY 20-21 BUDGET
GENERAL SEWER REHABILITATION (continued)
Page 131
Cherokee Road - No Impact to Operating Budget - efficiencies gained will be $ used in the District's collector system preventative maintenance program.
-
Chestnut Lodge Road - No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Commerce Street - No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Craggy Street @ Old US 70: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Cumberland Avenue - No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Dellwood Avenue: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
East Chestnut Ave @ Five Points: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Elk Mountain Place: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Elk Park Drive - PRP 35001: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Elkwood Avenue: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Elkwood @ Norman Austin Drive: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Fairfax Avenue @ I-240: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Fairmont Road: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Forestdale Drive: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
$
-
$
-
$
-
$
-
$
-
Metropolitan Sewerage District of Buncombe County, North Carolina
FY 17-18 BUDGET
Operational Impact Summary (continued)
2017 Budget Document
PROJECT NAME
FY 16-17 BUDGET
FY 18-19 BUDGET
FY 19-20 BUDGET
FY 21-22 thru FY 25-26 BUDGET
FY 20-21 BUDGET
GENERAL SEWER REHABILITATION (continued)
Page 132
Forest Hill Drive @ Warwick Road: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance $ program.
- $
- $
- $
- $
- $
-
Four Inch Main - College Street: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Four Inch Main - Dry Ridge Road: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Hazel Mill Road @ Richland Street: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Hendersonville Rd @ Blake Drive: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Hendersonville Road @ Peachtree Road: No Impact to Operating Budget efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Hendersonville Road @ Rosscraggon Phase 2: No Impact to Operating Budget efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Herron Avenue: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Hill Street: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Horizon Hill Road (Hy-Vu Drive): No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Howland Road @ Sunset Trail: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Metropolitan Sewerage District of Buncombe County, North Carolina
FY 17-18 BUDGET
Operational Impact Summary (continued)
2017 Budget Document
PROJECT NAME
FY 16-17 BUDGET
FY 18-19 BUDGET
FY 19-20 BUDGET
FY 21-22 thru FY 25-26 BUDGET
FY 20-21 BUDGET
GENERAL SEWER REHABILITATION (continued)
Page 133
Johnston Boulevard @ Providence Road: No Impact to Operating Budget efficiencies gained will be used in the District's collector system preventative $ maintenance program.
- $
- $
- $
- $
- $
-
Jonestown Road: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Kenilworth @ Springdale Road: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Knauth Rd: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Lakeshore Drive @ Merrimon Avenue: No Impact to Operating Budget efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Lakeview @ Glen Falls Road: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Lakewood Drive @ Dudley: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Laurel Road - Phase 2: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Lincoln Avenue: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Lining Contract No. 8: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Lionel Place: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Long Shoals Road @ Allen Avenue: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Louisiana Avenue: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Metropolitan Sewerage District of Buncombe County, North Carolina
FY 17-18 BUDGET
Operational Impact Summary (continued)
2017 Budget Document
PROJECT NAME
FY 16-17 BUDGET
FY 18-19 BUDGET
FY 19-20 BUDGET
FY 21-22 thru FY 25-26 BUDGET
FY 20-21 BUDGET
GENERAL SEWER REHABILITATION (continued)
Page 134
Louisiana Avenue @ Brucemont Circle: No Impact to Operating Budget efficiencies gained will be used in the District's collector system preventative $ maintenance program.
- $
- $
- $
- $
- $
-
Lower Glendale Avenue: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Lower Melody Lane: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Lynn Cove Road: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Manetta Road @ Johnson Drive: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Meadow Road @ Train Yard: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Meadowbrook Drive (SS): No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Merrimon Avenue @ Clearview Terrace: No Impact to Operating Budget efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Merrimon Avenue @ Coleman Avenue: No Impact to Operating Budget efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Middle Beaverdam Creek @ US 19-23: No Impact to Operating Budget efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Mitchell Avenue: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Mountainbrook Road @ Chunns Cove Road: No Impact to Operating Budget efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Metropolitan Sewerage District of Buncombe County, North Carolina
FY 17-18 BUDGET
Operational Impact Summary (continued)
2017 Budget Document
PROJECT NAME
FY 16-17 BUDGET
FY 18-19 BUDGET
FY 19-20 BUDGET
FY 21-22 thru FY 25-26 BUDGET
FY 20-21 BUDGET
GENERAL SEWER REHABILITATION (continued)
Page 135
Mountainview Road: No Impact to Operating Budget - efficiencies gained will be $ used in the District's collector system preventative maintenance program.
-
New Haw Creek Road @ Dogwood Gr.: No Impact to Operating Budget efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
New Haw Creek Road @ Trinity Chapel Road: No Impact to Operating Budget efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
New Stock Road: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
North Lexington @ I-240: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
North Market Street: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Oakland Dr @ Church Street: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Oakwood Street: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Old Haw Creek Road @ Greenbriar Road: No Impact to Operating Budget efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Old West Chapel Road: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Point Repair Contract No. 1: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Riverside Dr @ Norton Dr: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Riverside Drive @ Silverline Plastic: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
$
-
$
-
$
-
$
-
$
-
Metropolitan Sewerage District of Buncombe County, North Carolina
FY 17-18 BUDGET
Operational Impact Summary (continued)
2017 Budget Document
PROJECT NAME
FY 16-17 BUDGET
FY 18-19 BUDGET
FY 19-20 BUDGET
FY 21-22 thru FY 25-26 BUDGET
FY 20-21 BUDGET
GENERAL SEWER REHABILITATION (continued)
Page 136
Riverview Drive: No Impact to Operating Budget - efficiencies gained will be used $ in the District's collector system preventative maintenance program.
- $
- $
- $
- $
- $
-
Royal Pines Drive - PRP 47009: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Sand Hill Rd @ Baker Place: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Sand Hill Road @ Russell/Davenport: No Impact to Operating Budget efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
School Road @ Cranford Road: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Sheppard Drive: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Smokey Park Highway @ I-40: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Springside Road @ Overlook Road: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Starnes Avenue: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Stratford Road: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Stratford Road @ Oxford Court: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Sulphur Springs Road @ Covington Street: No Impact to Operating Budget efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Metropolitan Sewerage District of Buncombe County, North Carolina
FY 17-18 BUDGET
Operational Impact Summary (continued)
2017 Budget Document
PROJECT NAME
FY 16-17 BUDGET
FY 18-19 BUDGET
FY 19-20 BUDGET
FY 21-22 thru FY 25-26 BUDGET
FY 20-21 BUDGET
GENERAL SEWER REHABILITATION (continued)
Page 137
Sutton Avenue: No Impact to Operating Budget - efficiencies gained will be used $ in the District's collector system preventative maintenance program.
- $
- $
- $
- $
- $
-
Sweeten Creek @ Buck Shoals: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Sweeten Creek Road @ Busbee View: No Impact to Operating Budget efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Sweeten Creek @ Mills Gap: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Sweeten Creek Road @ Weston Road: No Impact to Operating Budget efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Upper Grassy Branch Road @ Maxwell Road: No Impact to Operating Budget efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
US 70 @ Jordan Road: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Venable Pump Station Elimination: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Walnut Street @ Rankin Avenue: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Waynesville Avenue @ Brownwood Avenue: No Impact to Operating Budget efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Wentworth Avenue: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
West Crabapple Lane: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Metropolitan Sewerage District of Buncombe County, North Carolina
FY 17-18 BUDGET
Operational Impact Summary (continued)
2017 Budget Document
PROJECT NAME
FY 16-17 BUDGET
FY 18-19 BUDGET
FY 19-20 BUDGET
FY 21-22 thru FY 25-26 BUDGET
FY 20-21 BUDGET
GENERAL SEWER REHABILITATION (continued) Weston Road @ Tampa Blvd.: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
- $
- $
- $
- $
- $
-
White Oak Road: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Wildwood Park: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Wood Avenue @ Parker Road: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
SSD Rehabilitation & Replacement: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Surveys for Design: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Future Projects - General Rehabilitation: No Impact to Operating Budget efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
GENERAL SEWER REHABILITATION
$
$
-
$
-
$
-
$
-
$
-
$
-
PRIVATE SEWER REHABILITATION
Page 138
Douglas Place PSR: No Impact to Operating Budget - efficiencies gained will be $ used in the District's collector system preventative maintenance program.
- $
- $
- $
- $
- $
-
Freno Drive PSR (Lower): No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
Old County Home Rd PSR: No Impact to Operating Budget - efficiencies gained will be used in the District's collector system preventative maintenance program.
-
-
-
-
-
-
PRIVATE SEWER REHABILITATION
$
-
$
-
$
-
$
-
$
-
$
-
Metropolitan Sewerage District of Buncombe County, North Carolina
PROJECT NAME
FY 17-18 BUDGET
Operational Impact Summary (continued)
2017 Budget Document
FY 16-17 BUDGET
FY 18-19 BUDGET
FY 19-20 BUDGET
FY 21-22 thru FY 25-26 BUDGET
FY 20-21 BUDGET
TREATMENT PLANT, PUMP STATIONS & GENERAL CAPITAL IMPROVEMENTS Biological Treatment: Impact to Operating Budget will be de minimis.
$
- $
- $
- $
- $
- $
-
Building and Facility Rehabilitation: Impact to Operating Budget will be de minimis.
-
-
-
-
-
-
Carrier Bridge Pump Station Bypass & Improvements: Impact to Operating Budget will be de minimis.
-
-
-
-
-
-
Flow Monitoring: Impact to Operating Budget will be de minimis.
-
-
-
-
-
-
Influent Pump Station Rehabilitation: Impact to Operating Budget will be de minimis.
-
-
-
-
-
-
Mountain View P.S. Standby Generator: Impact to Operating Budget will be de minimis.
-
-
-
-
-
-
Plant Headworks Improvements: Impact to Operating Budget will be de minimis.
-
-
-
-
-
-
Plant High Rate Primary Treatment: Currently being studies. Impact to operating budget includes additional materials, energy, and disposal costs.
-
400,000
412,000
424,360
437,091
2,390,192
RBC Replacement: Impact to Operating Budget will be de minimis.
-
-
-
-
-
-
South French Broad Carrier Bridge PER: Impact to Operating Budget will be de minimis.
-
-
-
-
-
-
General Capital Equipment: Impact to Operating Budget will be de minimis.
-
-
-
-
-
-
Mull Building Improvements: Impact to Operating Budget will be de minimis.
-
-
-
-
-
-
TREATMENT PLANT, PUMP STATIONS & GENERAL CAPITAL IMPROVE $
-
$
400,000
$
412,000
$
424,360
$
437,091
$
2,390,192
DESIGN, ROW, & CONSTRUCTION MANAGEMENT EXPENSES
Page 139
Design, ROW, & Const. Mgmt. Exp.: No Impact to Operating Budget.
$
-
$
-
$
-
$
-
$
-
$
-
DESIGN, ROW, & CONSTRUCTION MANAGEMENT EXPENSES
$
-
$
-
$
-
$
-
$
-
$
-
Metropolitan Sewerage District of Buncombe County, North Carolina
PROJECT NAME
FY 17-18 BUDGET
Operational Impact Summary (continued)
2017 Budget Document
FY 16-17 BUDGET
FY 18-19 BUDGET
FY 19-20 BUDGET
FY 21-22 thru FY 25-26 BUDGET
FY 20-21 BUDGET
OPERATIONAL IMPACT SUMMARY Interceptor & Wet Weather Rehabilitation
$
-
$
-
$
-
$
-
$
-
$
-
General Sewer Rehabilitation
$
-
$
-
$
-
$
-
$
-
$
-
Private Sewer Rehabilitation
$
-
$
-
$
-
$
-
$
-
$
-
Treatment Plant, Pump Station and General Capital Improvements
$
-
$
437,091 $
2,390,192
Design, ROW, & Construction Management Expenses
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
400,000
$
412,000
$
424,360
$
437,091
$
2,390,192
Total
400,000 $
412,000 $
424,360 $
Metropolitan Sewerage District of Buncombe County, North Carolina
PROJECT CATEGORY
FY 17-18 BUDGET
Operational Impact Summary (continued)
2017 Budget Document
FY 16-17 BUDGET
Page 140
Metropolitan Sewerage District of Buncombe County, North Carolina
Debt Financing Debt Management Prior to the 1990s, the District’s policy was to fund capital improvements from user fees. Having inherited aging collector lines, some in excess of 100 years old, this policy forced the District to increase rates dramatically yet never provided enough funding to keep up with the magnitude of desperately needed repairs. Coming to realize the benefit of integrating capital-planning and debt-financing activities, the District Board developed a long-range plan to utilize bonds and pay-as-you-go in a coordinated capital improvement plan. This combined strategy allows for more equity between long-term and new ratepayers while providing the necessary funding for an adequately functioning system. Issuing debt provides the capital to rehabilitate crumbling infrastructure while allowing present and future ratepayers who will enjoy the benefit to share the cost through annual principal and interest payments. This contrasts with a strategy that uses only pay-as-you-go whereby a resident will pay higher rates for many years to accumulate the funds needed for rehabilitation before enjoying any benefit, yet new users joining after completion of a project will have immediate use of the new facilities without sharing in any of the cost. Another advantage of combining borrowed funds with current funding is the ability to structure debt repayment schedules to avoid dramatic rate increases otherwise needed to provide adequate amounts for multi-million dollar projects. The District’s bonds are rated by national rating agencies as follows: Moody's Investors Service
Standard & Poor's
Fitch Ratings
Aa1
AA+
AA+
In December 2015, the District received a ratings upgrade from Aa2 to Aa1 from Moody’s Investors Service. Moody’s Investors Service recognized the District’s sound financial performance characterized by ample liquidity, healthy debt service coverage, and comprehensive fiscal planning. The rating also incorporates MSD’s regional customer base, adequate system capacity, manageable debt levels, and satisfactory protections for bondholders. These high ratings enable the District to pay a lower rate of interest than many other utilities, which has a positive effect on the current and future budgets. Unlike North Carolina’s cities and counties, MSD does not have a debt limit. However, provisions in the District’s Bond Order require minimum debt coverage of 120% of net revenues to bonded debt service. The Board established a revenue policy, which sets a goal for debt coverage ratio to be approximately 150% for forecasting and planning purposes, realizing the impact of the increased debt coverage ratio on bond ratings.
2017 Budget Document
Page 141
Metropolitan Sewerage District of Buncombe County, North Carolina
Debt Financing (continued) The District maintains a ten year forecast to budget capital improvements financed by a combination of debt and current fees. Based on projections using modest, consistent rate increases and capital improvement projects as outlined in the District’s 10-year Capital Improvement Plan, an additional $28 million in debt is anticipated to be issued in FY2019 without affecting the planned rate of user charge increases.
Capital Projects Funding Funding for capital projects comes from a combination of revenue bonds and pay-as-you-go financing. Details may be found in the Policies & Budget Process tab of this budget document where Debt Policy is presented and in the schedule, “Budget/Rate Forecast” which illustrates the timing of debt issues and accumulation of revenues over expenditures anticipated to be available for capital financing. Generally speaking, half of the funds for capital improvements come from debt financing, with the other half funded by the excess of revenues over expenditures (pay-as-you-go). During FY14, the District issued $26.2 million fixed rate revenue bonds. The District has expended the entire amount of proceeds from the aforementioned debt issuance. The District will accumulate funding from operations to finance a portion of the capital budget until the next debt issuance, anticipated to be in FY19. As of June 30, 2016, the District will have $95.3 million par value of outstanding revenue bond debt. During FY17, over $5.3 million in principal will be repaid. The District anticipates issuing an additional $28 million in revenue bonds in FY19. Debt service from this future bond issue has been included in the District’s long-term business plan and sewer rate increases. A summary of outstanding debt at June 30, 2016 and anticipated principal repayment during FY17 are on the following two (2) pages.
2017 Budget Document
Page 142
Metropolitan Sewerage District of Buncombe County, North Carolina
Debt Financing (continued) Outstanding Debt as of June 30, 2016 Original Issue Amount
Balance 6/30/2016
Additions
Retirements
Balance 6/30/2017
Enka-Candler Water and Sewer District Bonds liability assumed by Metropolitan Sewerage District of Buncombe County, North Carolina on July 2, 1990 as stated in the sewer consolidated agreement 5.00% serial bonds assumed July 2, 1990 with maturities on each June 1 through 2024 varying from $19,000 to $64,000, interest payable annually.
$1,500,000
$468,000
$
-
$
64,000
$404,000
Total Bonds, Enka Candler Series
$1,500,000
$468,000
$
-
$
64,000
$404,000
Revenue Bonds, Series 2008A issued to refund Series 2005 Revenue Bonds Interest at variable rates in the weekly mode, payable monthly, due serially until 2031.
$33,635,000
$30,630,000
$
-
$825,000
$29,805,000
Total Bond, Series 2008A
$33,635,000
$30,630,000
$
-
$825,000
$29,805,000
2009 North Carolina Water Pollution Control Revolving Fund used to construct certain sewerage projects $672,980 revolving loan issued August 18, 2009 unpaid principal sum is reduced by one-half as "Principal Forgiveness�, interest accrues at 0%, 20 annual installments May 1, 2011 to 2030
$336,490
$235,540
$
-
$16,825
$218,715
Total State Revolving Fund
$336,490
$235,540
$
-
$16,825
$218,715
$495,000
$4,800,000
Revenue Bonds, Series 2009A issued to construct certain sewerage projects 2.0% to 5.00% serial bonds issued October 7, 2009, with maturities on each July 1, 2010 through 2024 varying from $400,000 to $700,000; interest payable semi-annually
$7,920,000
$5,295,000
$
-
5.00% term bonds issued October 7, 2009, at 109.001%, due July 1, 2029; interest payable semi-annually.
$4,065,000
$4,065,000
$
-
$
-
$4,065,000
5.00% term bonds issued October 7, 2009, at 107.240%, due July 1, 2034; interest payable semi-annually.
$5,220,000
$5,220,000
$
-
$
-
$5,220,000
$17,205,000
$14,580,000
$
-
$495,000
$14,085,000
Total Bond, Series 2009A 2017 Budget Document
Page 143
Metropolitan Sewerage District of Buncombe County, North Carolina
Debt Financing (continued) Outstanding Debt as of June 30, 2016 Original Issue Amount
Balance 6/30/2016
Additions
Retirements
Balance 6/30/2017
Revenue Bonds, Series 2009B used to refund portions of Series 1999 2.0% to 5.00% serial bonds issued October 7, 2009, with maturities on each July 1, 2010 through 2019 varying from $595,000 to $3,100,000; interest payable semiannually
$13,360,000
$1,845,000
$
-
$
-
$1,845,000
Total Bond, Series 2009B
$13,360,000
$1,845,000
$
-
$
-
$1,845,000
Revenue Bonds, Series 2013 used to refund Series 2003 and Series 2008B 2.0% to 5.00% serial bonds issued May 1, 2013, with maturities on each July 1, 2014 through 2029 varying from $1,065,000 to $4,255,000; interest payable semi-annually
$30,230,000
$21,895,000
$
-
$3,210,000
$18,685,000
Total Bond, Series 2013
$30,230,000
$21,895,000
$
-
$3,210,000
$18,685,000
$665,000
$20,310,000
Revenue Bonds, Series 2014 issued to construct certain sewerage projects 2.0% to 5.00% serial bonds issued May 21, 2014 with maturities on each July 1, 2015 through 2039 varying from $535,000 to $1,430,000; interest payable semiannually
$21,510,000
$20,975,000
$
-
5.00% term bonds issued May 21, 2014, at 112.950%, due July 1, 2039; interest payable semi-annually.
$4,685,000
$4,685,000
$
-
Total Bond, Series 2014
$26,195,000
$25,660,000
$
Total Bonds–All Series
$96,266,490
$95,313,540
$
2017 Budget Document
$
-
$4,685,000
-
$665,000
$24,995,000
-
$5,275,825
$ 90,037,715
Page 144
Metropolitan Sewerage District of Buncombe County, North Carolina
Aggregate Debt Service Year Ending June 30
Enka-Candler Bonds
Series 2008A Refunding
Series 2009B Refunding
Series 2009A
2017
87,400
1,857,849
1,180,900
73,800
2018
84,200
1,858,620
1,180,700
656,900
2019
81,000
1,859,120
1,179,700
652,700
2020
77,800
1,863,272
1,182,800
647,700
2021
74,600
2,967,245
1,180,000
-
2022
71,400
2,979,356
1,183,150
-
2023
68,200
2,979,445
1,180,200
-
2024
21,000
2,986,599
1,180,875
-
2025
-
2,986,194
1,181,750
-
2026
-
2,987,324
1,180,875
-
2027
-
3,000,803
1,178,250
-
2028
-
3,010,738
1,178,750
-
2029
-
3,017,451
1,182,125
-
2030
-
3,025,226
1,178,375
-
2031
-
1,304,929
1,182,375
-
2032
-
1,306,777
1,179,000
-
2033
-
-
1,178,250
-
2034
-
-
1,179,875
-
2035
-
-
1,178,750
-
2036
-
-
-
-
2037
-
-
-
-
2038
-
-
-
-
2039
-
-
-
-
2040
-
-
-
-
565,600
39,990,947
22,426,700
2,031,100
2017 Budget Document
Page 145
Metropolitan Sewerage District of Buncombe County, North Carolina
Aggregate Debt Service (continued) Year Ending June 30
North Carolina Water Pollution
Series 2013
Control
Refunding
Aggregate Series 2014
Debt Service
Revolving Fund
2017
16,825
4,079,194
1,710,850
9,006,817
2018
16,825
2,368,094
1,707,175
7,872,513
2019
16,825
2,363,094
1,709,175
7,861,613
2020
16,825
2,350,794
1,705,075
7,844,265
2021
16,825
2,322,594
1,701,025
8,262,289
2022
16,825
2,302,844
1,709,625
8,263,199
2023
16,825
2,298,219
1,705,775
8,248,663
2024
16,825
1,377,719
1,706,675
7,289,693
2025
16,825
1,363,469
1,708,025
7,256,262
2026
16,825
1,352,944
1,703,275
7,241,242
2027
16,825
1,341,444
1,695,775
7,233,096
2028
16,825
1,323,644
1,706,625
7,236,581
2029
16,825
1,304,644
1,695,475
7,216,520
2030
16,825
1,294,922
1,697,675
7,213,022
2031
-
-
1,698,175
4,185,479
2032
-
-
1,696,875
4,182,652
2033
-
-
1,698,675
2,876,925
2034
-
-
1,693,575
2,873,450
2035
-
-
1,698,138
2,876,888
2036
-
-
1,697,325
1,697,325
2037
-
-
1,692,850
1,692,850
2038
-
-
1,682,125
1,682,125
2039
-
-
1,681,000
1,681,000
2040
-
-
1,681,000
1,681,000
235,543
27,443,616
40,781,963
133,475,469
2017 Budget Document
Page 146
Metropolitan Sewerage District of Buncombe County, North Carolina
Aggregate Debt Service (continued)
2017 Budget Document
Page 147
Metropolitan Sewerage District of Buncombe County, North Carolina
This page intentionally left blank.
2017 Budget Document
Page 148
Metropolitan Sewerage District of Buncombe County, North Carolina
Net Position by Component Fiscal Year Ended June 30 2006
Net Invested in Capital Assets $
197,656,088
FY2006 to FY2015
Restricted
$
9,446,269
Total Net Position
Unrestricted
$
38,041,095
$
245,143,452
2007
214,808,683
9,447,494
36,699,672
260,955,849
2008
231,678,011
8,886,108
33,968,233
274,532,352
2009
244,875,790
9,493,497
30,570,139
284,939,426
2010
235,471,938
9,248,713
45,195,178
289,915,829
2011
251,754,578
9,294,955
38,170,812
299,220,345
2012
270,297,021
8,117,494
28,687,702
307,102,217
2013
289,369,009
5,472,550
23,332,868
318,174,427
2014
273,702,824
6,238,648
50,388,726
330,330,198
2015
290,329,700
6,930,286
47,164,270
344,424,256
2017 Budget Document
Page 149
Metropolitan Sewerage District of Buncombe County, North Carolina
General Revenues by Source Fiscal Year Ended June 30
Industrial Sewer Charges
Domestic Sewer Charges
FY2006 to FY2015 Facility & Tap Fees
Miscellaneous
Total
2006
2,617,298
20,363,671
2,481,850
2,447,394
27,910,213
2007
2,693,328
22,077,774
3,054,950
3,384,897
31,210,949
2008
1,510,669
23,385,025
3,005,184
2,444,885
30,345,763
2009
1,386,132
22,904,587
2,959,115
1,578,976
28,828,810
2010
1,498,529
23,871,289
1,654,010
1,348,691
28,372,519
2011
1,565,402
25,329,492
2,238,171
1,147,955
30,281,020
2012
1,599,819
26,249,357
2,321,474
1,305,959
31,476,609
2013
1,577,916
26,690,934
2,566,635
1,185,057
32,020,542
2014
1,758,818
28,528,622
4,430,475
972,397
35,690,312
2015
3,725,584
28,978,958
4,311,259
984,097
37,999,898
Note:
Does not include Capital Contributions
2017 Budget Document
Page 150
Metropolitan Sewerage District of Buncombe County, North Carolina
Expenses by Function (Non-GAAP) Fiscal Year Ended June 30
Operating
Expenses
(1)
FY2006 to FY2015
Capital Improvement
Capital Contributions
(2)
(3)
Debt
Service (4)
Total
2006
11,853,663
11,213,052
4,184,135
7,071,308
34,322,158
2007
11,977,241
12,574,902
8,404,343
7,650,737
40,607,223
2008
12,070,195
12,471,794
6,244,304
8,419,405
39,205,698
2009
12,808,349
12,447,791
5,856,798
6,413,405
37,526,343
2010
12,754,727
9,173,231
1,128,684
7,212,980
30,269,622
2011
13,522,468
16,226,145
2,841,859
7,255,856
39,846,328
2012
13,982,269
17,775,391
2,047,550
7,859,771
41,664,981
2013
13,674,518
14,988,922
3,217,846
6,553,956
38,435,242
2014
14,081,697
12,701,810
1,396,385
6,464,583
34,644,475
2015
14,468,184
16,455,653
3,078,520
8,154,350
42,156,707
Note: 1. Includes general operations 2. Excludes depreciation expense 3. This includes collection system infrastructure contributed by developers 4. Includes Bond Principal Expense and Bond Interest Less Capitalized Interest Portion and excludes early retirement of long-term debt
2017 Budget Document
Page 151
Metropolitan Sewerage District of Buncombe County, North Carolina
Wastewater Flow Table
FY2006 to FY2015
Fiscal Year Ended June 30
ADF (A) (mgd)
2006
20.7
11,853,663
2007
18.2
11,977,241
2008
15.8
12,070,195
2009
16.5
12,808,349
2010
21.3
12,754,727
2011
18.5
13,522,468
2012
18.1
13,982,269
2013
21.9
13,674,518
2014
22.9
14,081,697
2015
19.1
14,468,184
Total Operating Expenses (B)
A. ADF=Average Daily Flow B. Includes Collection System Operations and Administrative Expenses in addition to Wastewater Treatment Expenses but excludes depreciation
2017 Budget Document
Page 152
Metropolitan Sewerage District of Buncombe County, North Carolina
Demographic Statistics – Service Area Population Year
Asheville
Biltmore Forest
Black Mountain
Montreat
Weaverville
Woodfin
Buncombe County (B)
1960
60,186
1,004
1,313
(A)
1,041
(A)
130,074
1970
57,681
1,298
3,204
581
1,280
(A)
145,056
1980
54,022
1,499
4,083
741
1,495
3,260
160,897
1990
64,625
1,346
6,537
799
2,056
3,002
174,727
2000
68,555
1,434
7,499
884
2,474
3,169
206,330
2010
74,140
1,522
7,646
774
2,894
3,395
233,932
2017 Budget Document
Page 153
Metropolitan Sewerage District of Buncombe County, North Carolina
Demographic & Economic Statistics
Population Estimates
1
Per Capita Income
2
Median Age
1
FY2006 to FY2015
Civilian Labor Force 3 Unemployment Employed Unemployed Rate
2006
226,524
33,252
40.4
114,609
4,733
4.0%
2007
230,766
34,586
40.5
117,069
4,476
3.7%
2008
233,772
34,846
40.7
117,933
5,664
4.6%
2009
236,349
33,762
40.8
111,852
10,675
8.7%
2010
238,857
33,973
40.7
114,170
10,716
8.6%
2011
243,641
35,106
40.9
115,557
10,299
8.2%
2012
245,319
37,363
41.2
118,283
9,590
7.5%
2013
248,757
37,443
41.4
121,178
8,171
6.3%
2014
251,271
Unavailable
41.6
121,639
5,999
4.7%
2015
254,339
Unavailable
41.8
124,592
6,162
4.7%
Note:
The information above is for Buncombe County, N.C. The District believes that the above information is representative of the entire service area, which extends over approximately 80% of the County.
Sources:
1 2 3
North Carolina Office of State Budget and Management U.S. Department of Commerce, Bureau of Economic Analysis North Carolina Department of Commerce, Division of Employment Security
2017 Budget Document
Page 154
Metropolitan Sewerage District of Buncombe County, North Carolina
Principal Commercial Users
FY2006 to FY2015 2006
Commercial User
Type of Business
Charah
Ash Management Company
Milkco, Inc.
Dairy Products & Juices
Total Charges
$
Rank
2015 Percentage of Total Charges
Total Charges
0.00% $
Rank
Percentage of Total Charges
-
-
1,385,720
1
4.58%
423,150
3
1.91
554,939
2
1.83
Mission Health System
Health & Emergency Services
160,582
5
0.72
306,754
3
1.01
Ridgecrest Baptist Conference Center
Christian Conference Center
290,146
4
1.31
200,680
4
0.66
Sierra Nevada
Micro-Brewery Manufacturer
-
-
-
179,131
5
0.59
Givens Estates
Retirement Community
-
-
-
150,912
6
0.50
BONAR
Chemical Manufacturer
110,286
7
0.50
133,469
7
0.44
-
-
-
127,915
8
0.42
97,547
8
0.44
126,174
9
0.42
10
0.31
- (formerly Colbond) Jacob Holm Industries America
Textile Manufacturing
VA Medical Center
Veterans Hospital
- Asheville Department of Veterans Affairs Blue Ridge Metals
Wire Processing/Cold Formed Facility
-
-
-
93,027
BASF
Textile Manufacturing
535,967
2
2.42
-
-
-
Anvil Kintwear
Textile Manufacturing
752,858
1
3.40
-
-
-
Textile Manufacturing
139,404
6
0.63
-
-
-
- (formerly Asheville Dyeing & Finishing) Spring Global
- (formerly Owen Manufacturing Company, Inc.) Day International
Textile Machine Parts
78,835
9
0.36
-
-
-
The Biltmore Company
Tourist Attraction/Winery/Resort Services
76,527
10
0.35
-
-
-
12.02%
$ 3,258,721
TOTAL
2017 Budget Document
$ 2,665,302
10.76%
Page 155
Metropolitan Sewerage District of Buncombe County, North Carolina
Principal Employers
FY2006 to FY2015 FY 2006
FY 2015
Employees*
Rank
% of Total County Employment
Employees
Rank
% of Total County Employment
Mission Health System & Hospitals
3,000-10,000
1
5.65%
6,994
1
5.75%
Buncombe County Public Schools
3,000-10,000
2
5.65%
4,000
2
3.29%
The Biltmore Company
1,000-3,000
7
1.74%
1,770
3
1.46%
VA Medical Center - Asheville
1,000-3,000
6
1.74%
1,593
4
1.31%
Buncombe County Government
1,000-3,000
4
1.74%
1,369
5
1.13%
Ingles Markets, Inc.
1,000-3,000
3
1.74%
1,137
6
0.93%
Omni Grove Park Inn
750-1,000
9
0.76%
1,100
7
0.90%
Asheville-Buncombe Technicial Community College
750-1,000
10
0.76%
1,019
8
0.84%
1,000-3,000
5
1.74%
1,000
9
0.82%
-
-
-
750
10
0.62%
1,000-3,000
8
1.74%
-
-
-
Employer
City of Asheville Eaton Corporation - Electrical Division Community Care Partners Total for Principal Employers
Note:
13,500-40,000
23.26%
20,732
17.04%
The information above is for Buncombe County, North Carolina. The District believes that the above information is representative of the entire service area, which extends over approximately 80% of the County.
Source: Asheville Area Chamber of Commerce, Economic Development Department North Carolina Employment Security Commission
2017 Budget Document
Page 156
Metropolitan Sewerage District of Buncombe County, North Carolina
Classification of Accounts 51100-Salaries & Wages—This includes salaries & wages for 148 department personnel. Also includes a Cost of Living increase of 3.0%.
51150-Overtime—This includes compensation as necessary for non-exempt personnel. 51200-NC Retirement—The District contributes 7.25% of gross salaries and wages to the North Carolina Local Government Employees' Retirement System. The employees contribute an additional 6.00% through payroll deduction, but the employee portion is not budgeted, as it is not an expense of the District.
51250-Payroll Taxes—The District contributes 6.20% of gross salaries and wages to Social Security and 1.45% for Medicare as the employer share. The employees contribute equal amounts through payroll deduction, but this is not included in the budgeted amount.
51300-Medical, Dental & Life—This includes the employer allocation of the self-funded employee medical and dental program.
51325-Post-Employment Insurance—The District implemented GASB Statement No. 45: Accounting and Financial Reporting by Employers for Postemployment Benefits Other Than Pensions. Included are postretirement benefits other than pension, for example, medical, dental, and vision.
51350-Worker’s Compensation—This includes the allocation of worker's compensation premiums and deductible costs.
51360-State Unemployment Benefits—Beginning FY14, the District is being required to maintain a reserve equaling 1% of unemployment insurance taxable wages. In August of 2014, and every August subsequent, the Division of Employment Security (DES) will calculate the amount that each employer should have in its reserve. Unemployment claims for 2014 will be deducted from the reserve in the fall of that year. Employers will then receive a bill from the DES indicating the amount they must pay to replenish their reserve to the 1% level. This payment will cover both the costs of unemployment claims and increases in the employer’s total number of employees or total taxable wages.
51450-Automobile Allowance—The District has authorized certain management personnel to receive an automobile allowance for the use of their personal vehicle in conducting District business.
2017 Budget Document
Page 157
Metropolitan Sewerage District of Buncombe County, North Carolina
Classification of Accounts (continued) 51500-401(k)—The District contributes up to 5.0% of matching contributions based upon the level of employee participation in the 401(k)-retirement plan. A professional investment institution administers this as contracted with the North Carolina Retirement System.
52010-Advertising—This includes newspaper ads for vacant positions, quarterly informational reports, and mandatory public SSO notices. In addition, the advertising account covers Annual Report and System Performance Annual Report distribution, door hangers and any other miscellaneous communications from the District to the public.
52050-Dues & Subscriptions—This includes memberships to professional organizations and subscriptions to water utility periodicals, local newspapers, etc.
52100-Postage—This includes the charges for mailing of all official correspondence. 52150-Travel, Meetings & Training—This includes attendance at regional, state, and national professional associations and various continuing education requirements including supervisory training, skill-based pay training, operators seminar, etc.
52160-Tuition Assistance—This includes pre-authorized monetary assistance to employees who take educational courses that directly relate to their positions at the District.
52170-Director’s Fees & Expenses—This includes all costs pertaining to the Board of Directors such as stipends, meeting expenses, and travel to national water and wastewater conferences.
52180-Insurance—This represents allocation of general liability insurance premium and deductible costs.
52210-Communications (other than landline telephone)—This includes charges for cellular telephones, mobile radios, and pagers.
52240-Uniforms—This includes charges for the purchase of work shirts, pants, outerwear, safety boots and other related items, as well as the rental and cleaning of certain uniforms.
2017 Budget Document
Page 158
Metropolitan Sewerage District of Buncombe County, North Carolina
Classification of Accounts (continued) 52250-Office Supplies—This includes paper, printing charges, and other miscellaneous officerelated supplies.
52260-Special Departmental Supplies—This includes specialty paper, bindery supplies, and printing services for employee manual, index tabs, ID badges, film, film developing, business cards, and vellum.
52270-Safety Equipment/Supplies—This includes goggles, vests, trench-shoring equipment, gas monitors, and related items to prevent work-related injuries.
52280-Supplies/Small Tools—This includes chainsaw blades, drill bits, gloves, miscellaneous hand tools, axes, shovels, batteries, sewer tape, paint and paint brushes, etc.
52290-Chemicals—This includes all chemicals used in the treatment of wastewater. 52300-Line Cleaning & Supplies—This includes chemicals, rat bait, nozzles, hose, root cutters & replacement rods, root killer, degreaser, etc.
52330-Legal Fees—This includes professional services of the District’s attorney for various matters not related to capital projects.
52340-Debt Administration Fees—This includes trustee fees, liquidity facility fees for variable debt, arbitrage calculation fees, and incidental expenditures incurred by the Bond Trustee.
52350-Professional & Contractual Services—This includes external audit fees, building security, emissions testing, effluent analysis, testing of samples, service contract on pumps, lab instrumentation, emergency line repairs, plumbing repairs, tree service, fence service, software annual support fees, and other outsourced services.
52400-Repairs (Office Equipment)—This includes charges for repairs of various office equipment not under a maintenance agreement.
52410-Maintenance (Bldgs. & Grounds)—This includes janitorial fees, outsourced repairs, mowing services and landscaping supplies, and elevator inspections. 2017 Budget Document
Page 159
Metropolitan Sewerage District of Buncombe County, North Carolina
Classification of Accounts (continued) 52420-Maintenance (Equipment)—This includes maintenance expense on the forklift and pallet jack for the Purchasing/Warehouse Division, maintenance and repair of various equipment items, such as gas detectors, chlorinators, parts and repairs for the camera equipment, cable, pumps, and various other maintenance of non-vehicular equipment.
52430-Landscape Restoration—This includes manholes, rims & lids, blacktop patch and concrete materials, asphalt & concrete work, pipe, couplings, adapters, straw, grass seed, mulch, pine needles and plants required to recover excavated areas, etc.
52440-Pump Maintenance—This includes all parts and supplies necessary to maintain all MSD pumps.
52450-Equipment Rental—This includes the rental of equipment used occasionally like chippers and bulldozers.
52460-Motor Fuel and Lubricants—This includes gasoline, diesel fuel, motor oil, brake fluid, and similar supplies to operate and maintain the District fleet of trucks, vans, and heavy equipment.
52470-Outside Vehicle Maintenance—This includes expenditures paid to factory-authorized dealer service departments or similar enterprises to perform needed repairs to vehicles beyond the capabilities of the District’s in-house fleet maintenance employees.
52500-Rents & Leases—This includes the rental of any equipment for the treatment plant, and operating leases for copiers and other office equipment.
52510-Permits, Fees, & Software Licenses—This includes charges for annual radiation license, stormwater permit, lab certification renewal, state operating permits, air permit, City of Asheville pavement cutting permits, and MSD manholes raised by the City during their paving programs and water usage by preventative maintenance trucks.
52650-Utilities—This includes charges for electricity, gas, water, and trash collection. 52690-Freight—This includes freight charges ONLY for items that are not clearly and easily defined as pertaining to a certain division and/or line item(s).
2017 Budget Document
Page 160
Metropolitan Sewerage District of Buncombe County, North Carolina
Classification of Accounts (continued) 52715-Safety Incentive Program—Rewards to employees for compliance with safety rules and procedures are distributed by the Safety Officer based upon observations during routine and surprise inspections.
52720-Health Fair—This includes costs for physical examinations and lab work, facility rental, refreshments, and supplies for annual employees’ health fair.
52725-Wellness Program—One of the ways the District attempts to manage costs for self-funded health insurance plan is to encourage employees to achieve and maintain healthy lifestyles. Wellness program costs include education, fitness equipment, and auxiliary supplies.
52730-Employee Assistance Program—The District contracts with an agency to provide resources for dealing with employee performance issues to assist management.
52910-Non-Capital Equipment—This includes any item under $1,000 consisting of various tools and assorted information technology components such as computers or monitors.
52915-Copiers, Printers and Faxes—This includes routine supplies and purchase of any machines under $1,000.
52920-Billing & Collections— This represents the billing and collection of sewer charges by the member agencies.
53040-Fleet Equipment Replacement Fund—This includes the proposed annual funding for the future acquisition of vehicles, trucks, and trailers. Current acquisition of replacement vehicles is budgeted in the replacement fund itself.
54010-Capital Equipment (New)—This includes requests for new equipment over $1,000 or more and having a useful life of three years or longer.
54020-Capital Equipment (Software)—This includes license and other nonrecurring software charges of at least $1,000 and having a useful life of three years or longer.
2017 Budget Document
Page 161
Metropolitan Sewerage District of Buncombe County, North Carolina
Classification of Accounts (continued) 54030-Capital Equipment (Replacement)—This includes requests for replacement equipment over $1,000 or more and having a useful life of three years or longer.
59200-Chargebacks to Construction Fund—Direct labor and materials costs incurred to acquire right-of-ways, design, plan, and monitor construction projects budgeted in the Systems Services and Engineering Services departments are transferred to the capital projects fund to be included in the capitalized cost of self-constructed assets.
2017 Budget Document
Page 162
Metropolitan Sewerage District of Buncombe County, North Carolina
Job Classification by Grade Order (effective July 1, 2016) Annual Salary Range - July 1, 2016 Grade 5
Minimum
Mid-Point
Maximum
$
$
$
26,157
33,710
Title
41,263
Construction Worker I
Technical Services Worker I
8
28,168
36,302
44,436
Public Relations Representative
9
28,871
37,209
45,547
Construction Crew Worker II Technical Services Worker II
11
30,789
39,321
47,853
Construction Worker III Technical Services Worker III
12
33,804
41,427
49,050
Construction Operator I Dispatcher II Heavy Equipment Excavator I Office Assistant II Technical Services Operator I
14
35,514
43,524
51,534
Construction Administrative Assistant Construction Operator II Right of Way Administrative Assistant Technical Services Operator II
15
36,403
44,612
52,822
Accounting Technician I Heavy Equipment Excavator II Purchasing Agent I
16
37,314
45,727
54,140
Accounting Technician II Electrician II Mechanic II System Coordinator III Technical Services Operator III
17
38,246
46,870
55,493
Purchasing Agent II
18
39,203
48,043
56,882
Executive Secretary/GM & Board
19
40,183
49,243
58,304
Engineering Technician I Senior Electrician Senior Mechanic Technical Services Data Manager
20
41,187
50,475
59,763
Environmental, Health & Safety Technician Fleet Mechanic III
2017 Budget Document
Page 163
Metropolitan Sewerage District of Buncombe County, North Carolina
Job Classification by Grade Order (effective July 1, 2016) (continued) Annual Salary Range - July 1, 2016 Grade
Minimum
Mid-Point
Maximum
20
41,187
50,475
59,763
WWTP Office Manager WWTP Operator
21
42,216
51,737
61,258
First Responder Industrial Waste Chemist
22
43,271
53,030
62,789
Construction Crew Leader Electrical IV/Specialist Engineering Technician II IT Technician I Lead Operator Mechanical Specialist
23
44,357
54,359
64,361
Budget Analyst I
24
45,463
55,716
65,969
Construction Inspector III GIS Technician II Purchasing Supervisor
25
46,600
57,110
67,619
Construction & Repair Supervisor Electrical Maintenance Crew Leader IT Systems Administrator II Mechanical Maintenance Crew Leader Night Supervisor Payroll/Benefits Manager Pump Station Maintenance Crew Leader Senior Crew Leader SSD Administrator SS Maintenance Supervisor
26
47,767
58,539
69,311
Construction Inspector IV
27
48,961
60,001
71,041
Maintenance Coordinator
28
50,183
61,501
72,819
HR Programs Manager Industrial Pretreatment Coordinator Right of Way Agent
29
51,437
63,038
74,638
Database Analyst Environmental, Health & Safety Manager GIS Analyst SCADA/PLC Technician
2017 Budget Document
Title
Page 164
Metropolitan Sewerage District of Buncombe County, North Carolina
Job Classification by Grade Order (effective July 1, 2016) (continued) Annual Salary Range - July 1, 2016 Grade
Minimum
Mid-Point
Grade
30
52,723
64,615
76,507
Design/Drafting Manager
32
55,394
67,886
80,378
Database/Network Administrator
33
56,778
69,583
82,387
Right of Way Manager
34
58,198
71,322
84,447
Engineer I
35
59,656
73,107
86,558
Manager of SS Construction
36
61,144
74,933
88,721
Accounting Manager Facilities Maintenance Manager Field Operations Manager Fleet Maintenance Manager Maintenance Manager
38
64,243
78,728
93,214
GIS Manager IT Network Manager Planning & Development Manager
40
67,495
82,713
97,930
Engineer III
43
72,683
89,073
105,463
Operations Manager
47
80,230
98,321
116,411
Director of Construction Director of Finance Director of Human Resources Director of Information Technology Director of SS Maintenance
49
84,291
103,297
122,303
Director of Waste Treatment & Maintenance Facility
53
93,039
114,019
135,000
Director of Engineering
contract
34,648
2017 Budget Document
Skill-Based 46,476
Minimum
General Manager
58,304
Facilities Maintenance Technician
Page 165
Metropolitan Sewerage District of Buncombe County, North Carolina
This page intentionally left blank
2017 Budget Document
Page 166
Metropolitan Sewerage District of Buncombe County, North Carolina
Glossary of Terms Accrual Basis of Accounting—Method of accounting where revenues are recognized as soon as they are earned and expenses as soon as the liability is incurred. Used most frequently with business-type governmental funds.
Actuary—A professional trained in mathematics, statistics and economic techniques that allow them to put a financial value on future events. The District retains a consulting actuarial firm to perform the regular annual actuarial valuations of the post retirement plan.
Actuarial Report—A report performed annually by the actuary to examine whether the contributions made to a post-retirement plan is adequate.
Adopted Budget—The budget approved by District Board of Directors and enacted via a budget resolution, on or before June 15 of each year.
Allocate—To divide a lump-sum appropriation into parts, which are designated for expenditure by specific organization units and/or specific purposes, activities, or objects.
AMSA
(American
Metropolitan
established to help improve operations.
Sewerage
Association)—nationwide
organization
Annual Budget—The District's adopted budget for a fiscal year. Appropriation—The authority to spend and obligate a specified amount from a designated fund account for a specific project, purpose, or program.
Asset—An asset is any property with a cash value, such as real estate, equipment, savings, and investments.
Audit—A methodical examination of utilization of resources. It concludes in a written report of its findings. An audit is a test of management’s accounting system to determine the extent to which internal accounting controls are both available and being used.
Basis of Accounting—The criteria governing the timing of the recognition of financial transactions and events. There are three major methods of accounting—cash, accrual, and modified accrual. 2017 Budget Document
Page 167
Metropolitan Sewerage District of Buncombe County, North Carolina
Glossary of Terms (continued) Billing Fee—Charge assessed by member agencies that collect sewer user fees from ratepayers to recover the administrative cost of collection.
BOD (Biochemical Oxygen Demand)—A measure of the amount of oxygen used up in the anaerobic decomposition of organic matter. The BOD test utilizes the oxygen from air dissolved in water and reflects treatability or stage of decomposition. It gives a direct measurement of the strength of wastewater, usually expressed in mg/l (milligrams per liter).
Bond—A written promise to pay a specific sum of money (the principal) at a date or dates in the future (the maturity) together with periodic interest at a specified rate.
Bond Rating—Rating for bonds to be issued that primarily reflects the ability of the issuer to repay the bonds. Better bond ratings result in lower interest rates for the bonds issued. Current bond rates for the District are Aa2 by Moody’s and AA+ by Standard and Poor’s and Fitch Ratings.
Budget—A plan of financial operation comprised of an estimate of proposed expenditures for a fiscal year and the proposed means of financing those expenditures (revenue estimates).
Budget Amendment—Legal means by which an adopted expenditure authorization or limit is increased and could be authorized with a publication, a hearing or a re-certification of the budget.
Budget Calendar—The schedule of key dates or milestones, which the District follows in the preparation and adoption of the budget.
Budget Document—The official written statement prepared by the District's Director of Finance, which presents the proposed and final budgets to the District Board of Directors.
Budget Resolution—The official statement by the District Board of Directors establishing the legal authority for the District Budget administrative staff to obligate and expend funds.
Budget Transmittal—A general discussion of the proposed budget presented to the Board by the General Manager and the Director of Finance as a part of the budget document. The budget message explains principal budget issues against the background of financial experience in recent years and presents recommendations made by the General Manager.
2017 Budget Document
Page 168
Metropolitan Sewerage District of Buncombe County, North Carolina
Glossary of Terms (continued) Capital Budget—The capital budget is responsible for all infrastructure projects in excess of the $15,000 infrastructure capitalization threshold. Projects include replacing and rehabbing structurally defective sewer lines, handling wet-weather flow conditions, improving the performance at the wastewater treatment plant, and preparing the system to handle expected future wastewater flows over the upcoming decade. A capital budget appropriation is limited to the cost of a project and may be expended over a long period until the project is completed.
Capital Expenditure—An amount paid out that creates a benefit in more than one year, usually costs that are incurred in the acquisition or improvement of real or personal property. Capital expenditure includes both the cost of the asset itself as well as expenditures necessary to put it in place. Capital expenditure for equipment, for example, means the net invoice price of the equipment including the cost of any modifications, attachments and accessories or auxiliary apparatus necessary to make it usable for the purposes for which it is acquired. Ancillary charges such as taxes, duty, and protective in transit insurance, freight, and installation are also included in the total purchase price.
Capital Improvement Program (CIP)—Projects established to account for the cost of capital improvements. Typically, the District’s capital projects include a purchase of land and/or the construction or rehabilitation of infrastructure such as major interceptors and pump stations as well as major renovations and additions to the hydroelectric and wastewater treatment plant facilities.
Capital Reserve Fund—The Metropolitan Sewerage District of Buncombe County Capital Reserve Fund, a special fund created by the provisions the District’s Bond Order established to provide funding for unusual and extraordinary expenditures and debt service in the event of insufficient revenues.
Cash Basis of Accounting—Under cash basis, all transactions is recognized when cash is received or expended. This method is not acceptable for use by governmental entities.
Collector Sewers—That portion of the collection and transportation system, which gathers wastewater from individual buildings and transports it through a network of sanitary sewers to interceptor sewers.
Contingency—A budgetary reserve amount established for emergencies or unforeseen expenditures not otherwise known at the time the budget is adopted.
2017 Budget Document
Page 169
Metropolitan Sewerage District of Buncombe County, North Carolina
Glossary of Terms (continued) Coverage Ratio—The excess of current revenues over current expenses divided by required debt service expressed as a ratio. This ratio is used to gauge the adequacy of utility rates to provide cash required for current operations and debt payments.
Current Expenses—The Districts' reasonable and necessary annual expenses of maintenance, repair, and operation of the Sewerage System.
Debt Service—Payment of interest and repayment of principal on bonded indebtedness. Department—A management unit. The District’s Departments include Office of the General Manager, Human Resources, Finance, Information Technology, Engineering, SS Maintenance, and SS Construction. The Departments report directly to the General Manager. The District’s structure at the Department level is presented in the organizational charts.
District—The Metropolitan Sewerage District of Buncombe County, North Carolina, a public body and body politic and corporate in the County of Buncombe, State of North Carolina exercising public and essential governmental functions to provide for the preservation and promotion of the public health and welfare.
District Board—The sewerage district board established under the provisions of the Enabling Act as the governing body of the District.
Division—A term used to describe a cost center with distinct objectives and activities within a Department.
Domestic User—Users whose sewer charges are based upon flow and meter size, predominately residences and small businesses.
Efficiency—A ratio between input (resources) and output (production). High efficiency generally means increased or maximum output in relation to input (cost or hours); or it can mean maintained output at a reduced cost or time period.
Effectiveness—The extent to which the outcome of an action or set of actions produces the desired results or impact.
2017 Budget Document
Page 170
Metropolitan Sewerage District of Buncombe County, North Carolina
Glossary of Terms (continued) Enabling Act—The North Carolina Metropolitan Sewerage Districts Act (Article 5, Chapter 162A, General Statutes of North Carolina, 1982 Replacement Volume, as amended) and, pursuant to the provisions thereof, The State and Local Government Revenue Bond Act (Article 5, Chapter 159, General Statutes of North Carolina, 1982 Replacement)
Encumbrance—Commitment of money to meet an obligation that is expected to be incurred to pay for goods or services received by the District.
Enterprise Fund—A type of proprietary fund set up to account for the financing of services to the general public where all or most of the operating expenses involved are recovered in the form of user charges.
Environmental Protection Agency (EPA)—The federal agency responsible for regulating water quality and the Federal Clean Water Act.
Expansion—Expenditures to enlarge capacity of facilities or extend system to new areas. Expenditures—The cost of goods received or services rendered whether payment for such goods and services has been made or not.
Expenses—Outflows or other using up of assets or incurrences of liabilities (or a combination of both) from delivering or producing goods, rendering services, or carrying out other activities that constitute the entity’s ongoing major or central operations.
Federal Energy Regulatory Commission (FERC)—An independent government agency, officially organized as part of the Department of Energy, and is responsible for regulating the interstate transmission of natural gas, oil, and electricity.
Fiscal Year—The calendar on which the District operates for financial and budget purposes. The District’s fiscal year begins on July 1 and ends on June 30. The current fiscal year, 2016, began on July 1, 2016, and will continue until June 30, 2017.
Fixed Assets—Assets of long–term character, intended to continue to be held or used, such as land, buildings, machinery, and other equipment.
2017 Budget Document
Page 171
Metropolitan Sewerage District of Buncombe County, North Carolina
Glossary of Terms (continued) Flow—Volume of domestic or industrial wastewater. Full-time equivalent (FTE)—A method of calculating employment and enrollment to adjust for part-time or part-year participation. One FTE is equivalent to one full-time employee who works 40 per week for 52 weeks, for a total of 2,080 work hours.
Fund—A fiscal entity with a self-balancing set of accounts used to account for an activity(s) with common objectives.
Fund Equity—The excess of revenues over expenditures accumulated from prior years within a fund that are present in the form of cash at the beginning of the fiscal year.
GAAP (Generally Accepted Accounting Principles)—These are standards for measuring and reporting financial data promulgated by an authoritative body.
GIS (Geographical Information System)—An organized collection of computer hardware, software, geographic data, and personnel designed to efficiently capture, store, update, manipulate, analyze, and display all forms of geographically referenced information.
Goal—The underlying reason(s) for the provision of essential District services. Improvements—Betterments or upgrades to increase value, quality or usefulness. Industrial User—Any user of the Sewerage System who discharges industrial waste (the liquid and waterborne pollutants resulting from processes or operations employed in industrial establishments). Charges based on flow, BOD and TSS.
I/I (Inflow/Infiltration)—Water entering the collection system from rain, water table, streams, and other non-user sources, unnecessarily driving up cost of treatment and likelihood of SSOs.
Influent—The wastewater entering the reclamation facility.
2017 Budget Document
Page 172
Metropolitan Sewerage District of Buncombe County, North Carolina
Glossary of Terms (continued) Infrastructure Rehabilitation System (IRS)—A method of lining existing deteriorating sewer pipes in the ground to save the cost of having to dig them up and replace them. This procedure is performed by in-house staff, at a lower cost than hiring contractors.
Interceptor—A sewer that carries sanitary waste that is built by the District. These are large sewers that collect wastewater from local trunk sewers and convey it to the water reclamation facility.
Laterals—Privately owned building sewer lines and smaller collection system lines (4-6 inch in diameter) which connect to larger public main sewer lines.
Lift Station—A facility in a sewer system consisting of a receiving chamber, pumping equipment, and associated drive and control devices which collect and lift wastewater to a higher elevation when the continuance of the sewer at reasonable slopes would involve excessive trench depths; or that collects and raises wastewater through the use of force mains from areas too low to drain into available sewers.
Line-item Budget—A budget detailing categories of expenditure for goods and services that the District intends to purchase during the fiscal year.
Local Government Budget & Fiscal Control Act—The legal guidelines of the State of North Carolina, which govern budgetary and fiscal affairs of local governments, found in Chapter 159 of the North Carolina General Statutes.
Local Government Commission (LGC)—The nine-member body established as a division of the Department of the State Treasurer to serve the citizens of North Carolina by issuing debt for units of local government and public authorities, monitoring the repayment of their debt, and overseeing the fiscal activities and financial soundness of all local governments and public authorities.
Mission—The mission statement is a brief summary of why a Program exists and what it is trying to achieve. It tells what the Department does, who they do it for, and why. The statement is specific enough to describe the Program’s purpose but general enough to last into the future.
Modified Accrual Basis of Accounting—Under modified accrual, revenue is recognized when earned provided it is collected in time to pay liabilities of the current period. Similarly, liabilities are recognized as expenditures when payment is due because it is only at that time that they normally are liquidated with expendable available financial resources. 2017 Budget Document
Page 173
Metropolitan Sewerage District of Buncombe County, North Carolina
Glossary of Terms (continued) Net Assets—The difference of total assets and total liabilities for any period. Net Revenues—The excess of revenues over current expenses for any period. NPDES (National Pollutant Discharge Elimination System)—permit to operate wastewater treatment issued by the EPA.
Objective—A measurable statement of the actual service(s), which the District expects to achieve. Operations and Maintenance (O&M) Budget—The annual budget for activities related to controlling, operating, managing, and maintaining the sewerage system. Operating costs include such expenses as personal services (salaries and benefits for classified employees and hourly workers), contractual services, materials, and supplies.
Order—The Amended and Restated 1999 Bond Order. To request a copy, contact the Director of Finance at the address on the cover of this document.
OSHA (Occupational Safety and Health Administration)—Federal agency responsible for issuing and monitoring standards to minimize workplace deaths, injuries and illnesses.
PER—Preliminary Engineering Report. Performance Indicators—Specific, observable, and measurable characteristics or changes that show the progress a program or service is making toward achieving a specified goal.
PLC (Programmable Logic Controller)—instrumentation hardware used for automated control of equipment.
Preliminary Budget—Budget that Board approves prior to adoption of final budget. Pretreatment—Any process used by local industries to reduce pollution load before wastewater is introduced into a main sewer system or delivered to a reclamation facility.
2017 Budget Document
Page 174
Metropolitan Sewerage District of Buncombe County, North Carolina
Glossary of Terms (continued) Proprietary Fund—A type of fund that accounts for governmental operations that are financed and operated in a manner similar to private business enterprises. It is financed primarily from charges to users of services provided.
Pumping Station—A relatively large sewage pumping installation designed not only to lift sewage to a higher elevation but also to convey it through force mains to gravity flow points located relatively long distances from the pumping station.
Recommended Budget—The budget proposed by the General Manager and Director of Finance to District Board for adoption.
Rehabilitation—Expenditures for repair due to damage, wear, or decay to restore facilities to normal or optimum condition.
Replacements—Expenditures for components replacing existing units. Revenue (for purposes of Bond Order coverage)—All payments, proceeds, fees, charges, and all other income derived by or for the account of the District from its ownership and operation of the Sewerage System, excluding all acreage, connection, front-footage, tap-on, assessment and similar fees and charges and grants derived by the District in connection with the provision of or payment for capital improvements constituting a part of the Sewerage System and excluding the proceeds of any taxes levied by the District.
Rotating Biological Contactor (RBC)—Large rotating plates housing bacteria, which consume dissolved solids in wastewater.
Satellite System—Any sewer system maintained by another entity without a state-issued discharge permit but which is connected to a MSD line for wastewater treatment and discharge by MSD. The State requires reporting for all satellite systems with a flow over 200,000 gallons per day. MSD has one reportable satellite system.
Sewage—Sewage refers to the wastewater flow from residential, commercial, and industrial establishments, which flows through the pipes to a reclamation facility.
2017 Budget Document
Page 175
Metropolitan Sewerage District of Buncombe County, North Carolina
Glossary of Terms (continued) Sewerage—Sewerage refers to the system of sewers and physical facilities employed to transport, treat, and discharge sewage.
SCADA (Supervisory control and data acquisition)—a computer system for gathering and analyzing real time data. SCADA systems are used to monitor and control a plant or equipment in industries such as telecommunications, water and waste control, energy, oil and gas refining and transportation.
Sludge—The accumulated settled solids deposited from sewage or industrial wastes, raw or treated, in tanks and basins, and containing more or less water forming a semi‐liquid mass.
SS (Suspended Solids)—Solid matter that either floats on the surface of or is suspended in wastewater and which is removable by laboratory filtration.
SSO (Sanitary System Overflow)—Untreated wastewater escapes from the collection system. Treatment System—Wastewater Treatment Plant of the District. User Charge—Fees levied upon residential, commercial, and industrial users of a wastewater treatment system based upon the volume and characteristics of the waste.
Water Reclamation Facility—Wastewater Treatment Plant of the District. WNCRAQA Western North Carolina Regional Air Quality Agency—a self-supporting, local air quality regulatory agency formed by an interlocal agreement between Buncombe County and the City of Asheville.
2017 Budget Document
Page 176