CIP Budget FY 2022-2030

Page 1

Capital Improvement Program Fiscal Years 2022—2031 Metropolitan Sewerage District of Buncombe County, North Carolina

2028 Riverside Drive

Phone: (828)-254-9646

W.H. Mull Building

Website: www.msdbc.org

Asheville, North Carolina


Metropolitan Sewerage District of Buncombe County, North Carolina Fiscal Years 2022—2031

Board of Directors Board Member

Representative of

M. Jerry Vehaun, Chairman

Town of Woodfin

E. Glenn Kelly, Vice-Chairman

Town of Biltmore Forest

Jackie W. Bryson, Secretary/Treasurer

Woodfin Sanitary Water & Sewer District

Esther Manheimer

City of Asheville

Chris Pelly

City of Asheville

Gwen Wisler

City of Asheville

Nathan Pennington

County of Buncombe

Robert Pressley

County of Buncombe

Al Whitesides

County of Buncombe

Robert C. Watts

Town of Black Mountain

Matt Ashley, Jr.

Town of Montreat

Earl Valois

Town of Weaverville

Sheila Franklin

Cane Creek Water & Sewer District

William G. Lapsley

Cane Creek Water & Sewer District

CIP Committee Members Robert C. Watts, Chairman Matt Ashley, Jr. William G. Lapsley Chris Pelly Robert Pressley Earl Valois City of Asheville

Debra Campbell

Town of Biltmore Forest

Jonathan Kanipe

Town of Black Mountain

Josh Harrold

Buncombe County

Avril Pinder

Henderson County/Cane Creek Water & Sewer District

Marcus Jones, P.E.

Town of Montreat

Alex Carmichael

Town of Weaverville

Selena D. Coffey

Town of Woodfin

Michael Saunders

Woodfin Sanitary Water & Sewer District

Joseph Martin, Ph.D.

General Manager

Thomas E. Hartye, P.E.

Director of Engineering

Ed Bradford, P.E.


This Page Intentionally Blank


Capital Improvement Program Fiscal Years 2022—2031

Overview


This Page Intentionally Blank


NCDENR-DWQ has requested that the following information be provided in this document, in accordance with the Compliance Inspection Report for MSD’s Collection System Permit WQCS00004.

Goal Statement The mission of the MSD Capital Improvement Program is to produce, manage, and complete engineering projects for the repair and rehabilitation of the District’s collection system and Water Reclamation Facility (WRF). This shall be undertaken in the most efficient and effective manner necessary to ensure the reliable delivery and treatment of wastewater at an equitable price and in an environmentally sensitive manner.

Description of Existing Facilities

Collection System The MSD service area covers approximately 264 square miles. MSD provides service to areas within the French Broad River Valley and the Swannanoa River Valley as far as Ridgecrest. There are over 1,125 miles of public sanitary sewer line, 41 pump stations within the collection system, and approximately 33,221 manholes system-wide. Less than 65 miles are large interceptors with diameters ranging from 24" to 66". One third of the balance is small 6" lines and two-thirds are medium size lines ranging from 8" up to 24". Most of this pipe is between 50 and 100 years old, and is in significant need of rehabilitation or replacement. The District currently serves a population of approximately 172,932 people. Water Reclamation Facility The Water Reclamation Facility (WRF) is a 40MGD secondary treatment plant serving Buncombe County (specifically Asheville, Biltmore Forest, Black Mountain, Montreat, Weaverville, Woodfin and Buncombe County at large), and northern Henderson County (formerly the Cane Creek Water and Sewer District, which merged with MSD on July 1, 2020). Overall, MSD serves a combined customer population of 172,932 and over 30 separately billed industries. The facility treats a current average daily flow of approximately 23 MGD. The WRF is an attached growth design, comprised of 152 rotating biological contactors (RBC’s), which provide full secondary treatment. These RBC’s provide 450-500 acres (3+ acres each unit) of surface area for biological growth. MSD’s facility is believed to be the largest RBC plant in the world. The plant consists of:


Preliminary Treatment Components     

Influent Multirake Barscreens (2 units, ½ inch Bar Spacing, 40 mgd each) with screenings washer/compactor and shaftless screw conveyer Influent Pumps (3 units) - 35 MGD rated capacity each Perforated Plate Fine Screens (3 units, ¼ inch openings, 40 mgd each) with screenings washer/compactor Vortex Grit Removal (2 units @ 50 mgd) - Removal Rate 95% of Grit > 140 Mesh Storm Surge System - Utilizes 3 @ 5mgd pumps and 2 @ 2.1 million gallon tanks to temporarily store storm surge flows over 65 mgd, for temporary peak shaving.

Primary Treatment Components 

Primary Clarification - Chemically Enhanced Kruger ACTIFLO system (Under Construction as of April 2021. Completion expected by Fall 2021)

Secondary Treatment Components      

1st Stage RBC’s (44 units) 2nd Stage RBC’s (72 units) 3rd Stage RBC’s ( 36 units) Intermediate Pumps (3 units) - pump water to clarifier from 3rd RBC stage Intermediate Clarifier (4 cells - total volume 2 MG) Microfiltration via AASI AquaDisk Units (16 units)

Disinfection Components 

Sodium Hypochlorite solution - average feed 1000 gallons/day at 6.5% solution strength

Residuals Handling Components   

Gravity Thickeners (2 units) - 100 foot-diameter each 2.5 Meter Belt Presses (2 units) Fluidized Bed Incinerator (40DT/day rated)

Energy Management Components   

Two separate power circuits from Duke Energy for plant, with Automatic Transfer Switch if one fails 4 Megawatt total from three Diesel Generators (emergency backup power for WRF; will maintain full treatment processes during a power outage) 850 Kilowatt Hydro Turbines (3 units) - induction units (French Broad River source). These generate power using the District’s dam/flume. The power is sold back to Duke energy.


Automation Components 

SCADA (Supervisory Control and Data Acquisition) - full automated control of WRF

Sludge Management Plan 

MSD utilizes its fluidized bed incinerator as its primary residual management option. MSD also maintains an arrangement with the Buncombe County Landfill (lined) for planned maintenance and emergencies. Presently the facility is managing 12-15 DT’s per day of residuals. The facilities are designed for 40 DT’s per day. Due to the lack of true primary clarifiers, most of the sludge generated at the facility is secondary in nature (i.e. sloughings from the RBC’s). Sludge is thickened in on-site gravity thickeners to a consistency of 3-5% solids at which time it is then pumped to the 2 1/2-meter belt presses. These units dewater the sludge to approximately over 24% solids and then it is pumped to the incinerator. Air emissions from the incinerator are of excellent quality. Recent air emissions testing place removal efficiency of the air scrubbers at 99+% for regulated parameters, and air quality is further enhanced by a new filtration system added in 2016. Incinerator ash is thickened on-site via a gravity ash thickener and then pumped to an on-site lagoon. Groundwater is monitored in accordance with NCDEQ requirements (up & down gradient). The incinerator system provides the most cost-effective method for sludge management. Supplementary fuel is sometimes required due to the 24% solids content - natural gas via Dominion Energy is utilized for this purpose. As stated above, MSD maintains an agreement with the local county landfill (lined) to dispose of dewatered sludge during emergency and/or maintenance activities. This provides a second residuals management alternative, when or if needed.


This Page Intentionally Blank


Capital Improvement Program Fiscal Years 2022—2031

Program Summary


This Page Intentionally Blank


METROPOLITAN SEWERAGE DISTRICT OF BUNCOMBE COUNTY, NORTH CAROLINA TEN YEAR CAPITAL IMPROVEMENT PROGRAM FY 2021-2022 through 2030-2031

PROJECT NAME

LOCATION OF PROJECT

PROJ. PROJECT MGR. NUMBER

PIPE RATING

PROJECT TOTAL FOOTAGE ESTIMATED COST

TOTAL EST. EXPENDS THRU FY 21

FY 21-22 BUDGET

FY 22-23

FOOTAGE

BUDGET

FY 23-24

FOOTAGE

BUDGET

FY 24-25

FOOTAGE

BUDGET

FY 25-26

FOOTAGE

BUDGET

FY 26-27

FOOTAGE

BUDGET

FY 27-28

FOOTAGE

BUDGET

FY 28-29

FOOTAGE

BUDGET

FY 29-30

FOOTAGE

BUDGET

FY 30-31

FOOTAGE

BUDGET

FOOTAGE

INTERCEPTOR AND WET WEATHER REHABILITATION AB Tech Equalization Tank

Asheville

HC

2019047

N/A

0

$14,251,500

$0

$0

Christian Creek Interceptor

Buncombe County

HC

2011110

24

12,226

$6,247,462

$382,462

$3,889,000

8,200

French Broad Interceptor @ Amboy Rd.

Asheville

HC/DP

2021036

N/A

2,180

$3,885,000

$0

$3,885,000

2,180

Lower Swannanoa Interceptor

Asheville

EB/HC

2004040

9

6,980

$7,380,217

$203,717

$0

$0

$0

$0

$0

$0

$0

$0

$0

$1,976,000

$0 4,026

$0

$0

$0

$0

$0

$0

$0

$0

$0

0

$0

$0

$0

$0

$38,500

$0

$130,000

$0

$3,495,000

3,490

$2,595,000

6,133

$0

$7,885,000

9,082

$7,885,000

18,705

$11,398,000

Mud Creek Interceptor - Ph. 3

Henderson County

HC

2020010

N/A

9,200

$4,269,265

$14,765

$46,000

$0

$10,500

$315,000

South French Broad Relief Int.

Buncombe County

HC

2017070

N/A

36,330

$32,277,500

$131,300

$32,900

$0

$0

$8,500

Swannanoa Equalization Tank

Swannanoa

HC

2019046

N/A

0

$21,382,013

$11,513

$1,019,000

66,916

$89,692,957

$743,757

$8,871,900

1.0000

1.0000

1.0000

$89,692,957

$743,757

$8,871,900

SUBTOTAL Inflation per ENR Const. Cost Index

2.68%

SUBTOTAL with inflation

PROJECT NAME

66,916

LOCATION OF PROJECT

PROJ. PROJECT MGR. NUMBER

PIPE RATING

PROJECT TOTAL FOOTAGE ESTIMATED COST

TOTAL EST. EXPENDS THRU FY 21

$700,000 10,380

4,026

1.0268 10,380

FY 21-22 BUDGET

$1,401,500

$2,714,500

4,026

FY 22-23

FOOTAGE

BUDGET

0

$1,488,697

BUDGET

0

$10,927,800

0

$10,369,435

BUDGET

$0 3,066

1.1116 0

FY 24-25

FOOTAGE

3,066

$9,125,000

$9,578,500 1.0826

FY 23-24

FOOTAGE

$514,800

$9,125,000

$1,412,000 1.0543

$2,787,249

$1,288,000 0

$12,147,200

3,066

BUDGET

$15,950,750

BUDGET

$0

$0

$0

$0

$0

9,082

$7,885,000

12,572

$7,885,000

$0

18,705

FOOTAGE

$7,935,000

9,082

$7,935,000

12,572

FY 27-28

$9,488,613

BUDGET

$0

9,084

$0

$0

1.2356 9,082

FY 28-29

FOOTAGE

$0 9,084

$0

1.2034

$13,358,073

BUDGET

$0 9,082

$0

1.1720

FY 26-27

FOOTAGE

$0 3,490

$0

$13,975,000 1.1414

FY 25-26

FOOTAGE

$0 $3,513,000

$9,804,689

9,084

FY 29-30

FOOTAGE

BUDGET

0

1.2687 $0

0

FY 30-31

FOOTAGE

BUDGET

FOOTAGE

GENERAL SEWER REHABILITATION Albemarle Commons PS Elimination

Asheville

TH

2018171

N/A

832

$285,130

$3,130

$49,000

$0

$230,000

$3,000

$0

$0

$0

Atkins Street

Arden

HC

2014012

39

1,833

$698,330

$5,480

$0

$0

$0

$0

$2,250

$52,000

$638,600

Aurora Drive

Asheville

DP

2017145

53

2,700

$1,043,500

$37,000

$42,500

$969,000

$0

$0

$0

$0

Avon Ave. @ Haywood Rd

West Asheville

HC

2021003

65

233

$121,750

$0

$1,500

$0

$5,250

$43,000

$72,000

Beale Road at Copney Lane

Asheville

DP

2009129

47

4,027

$1,588,175

$16,925

$19,200

$230,250

$0

$1,323,000

4,027

Bellevue Road

S. Asheville

DP

2015175

49

1,100

$463,100

$9,600

$0

$7,000

$58,000

$388,500

1,100

Bent Tree Road

Asheville

DP

2016102

60

1,654

$862,921

$55,921

$0

$807,000

$0

Braddock Way - PRP 20002

Asheville

TH

2006025

36

3,848

$1,684,940

$18,353

$0

$0

$0

Bryson Street

Biltmore Village

SA

2016167

60

611

$482,750

$40,250

$442,500

$0

$0

$0

$0

$0

$0

$0

$0

Buchanan Ave.

Asheville

SA

2014023

51

2,255

$1,141,900

$35,900

$98,500

$1,007,500

2,255

$0

$0

$0

$0

$0

$0

$0

$0

Caledonia Road

Asheville

HC

2014153

65

2,115

$1,050,350

$367,100

$131,500

$902,750

2,115

$0

$0

$0

$0

$0

$0

$0

$0

Central Ave. @ I-240

Asheville

SA

2014180

35

990

$393,000

$0

$0

$0

$0

$0

$5,000

$16,500

$0

$0

$0

$371,500

Chatham Road

Asheville

SA

2015019

43

1,330

$639,700

$4,800

$3,500

$1,000

$40,000

$0

$590,400

$0

$0

$0

$0

$0

Cherokee Road

Asheville

DP

2009132

48

1,960

$894,680

$25,180

$213,500

$656,000

$0

$0

$0

$0

$0

Cub Road

Asheville

TH

2018027

40

1,204

$457,000

$0

$0

$0

$0

$18,500

$83,000

$0

$355,500

East Chestnut Ave @ Five Points

N. Asheville

SA

2015192

36

5,225

$1,822,050

$54,000

$0

$0

$0

$13,800

$179,250

$0

$0

$1,575,000

Edwards Ave @ US 70 Hwy

Swannanoa

HC

2021004

35

2,400

$871,400

$0

$0

$0

$0

$0

$14,400

$0

$6,000

$39,000

Elk Mountain Place

Woodfin

HC

2010094

48

4,137

$1,532,500

$83,000

$115,000

$155,000

$0

$1,177,250

$0

$0

$0

$0

$0

$0

Fairmont Road

N. Asheville

DP

2015017

31

3,900

$1,704,000

$0

$0

$0

$0

$0

$0

$20,000

$0

$8,500

$162,500

$1,513,000

3,900

Forestdale Drive

S. Asheville

DP

2014002

33

2,600

$1,021,000

$0

$0

$0

$0

$0

$0

$15,000

$0

$246,500

$0

$759,500

2,600

Harmony Lane

Asheville

DP

2016103

35

670

$190,000

$0

$0

$0

$0

$0

670

Hazel Mill Rd @ Richland St.

Asheville

SA

2014016

56

3,300

$1,256,700

$0

$17,000

$9,400

$116,000

$1,114,300

Hill Street @ Cross Place

Asheville

TH

2016249

44

254

$90,500

$1,525

$0

$1,475

$0

$16,000

$71,500

254

$0

$0

$0

$0

$0

Howland Rd. @ Sunset Trail

Asheville

DP

2012134

43

994

$471,600

$7,500

$0

$0

$4,500

$66,000

$393,600

994

$0

$0

$0

$0

$0

Johnston Blvd. @ Providence Rd.

W. Asheville

DP

2014013

37

2,000

$659,150

$8,150

$0

$0

$0

$0

$11,000

$86,000

$554,000

$0

$0

$0

Jonestown Road @ Riverside Drive

Woodfin

TH

2018028

42

N/A - SS

$98,500

$0

$0

$25,500

$15,000

$53,000

$0

$8,000

$0

$0

$0

$0

Joyner Ave @ Amboy Rd

Asheville

SA

2021010

27

241

$97,000

$0

$0

$0

$0

$0

$0

$0

$0

$3,500

$17,000

$76,500

611

2,700

1,654

$0

1,960

Page 1 of 4

832

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$38,500

$162,087

$0

$1,466,000

$0

$0

4,137

3,300

233

1,330

1,833

1,204

3,848

$0

$0

$0

$0

$0

$0

5,225

$0 $812,000

$0 2,400

$0

$0

$0

$0

$2,500

$0

$187,500

$0

$0

$0

$0

$0

$0

2,000

990

241


METROPOLITAN SEWERAGE DISTRICT OF BUNCOMBE COUNTY, NORTH CAROLINA TEN YEAR CAPITAL IMPROVEMENT PROGRAM FY 2021-2022 through 2030-2031

PROJECT NAME

LOCATION OF PROJECT

PROJ. PROJECT MGR. NUMBER

PIPE RATING

PROJECT TOTAL FOOTAGE ESTIMATED COST

TOTAL EST. EXPENDS THRU FY 21

FY 21-22 BUDGET

FY 22-23

FOOTAGE

BUDGET

FY 23-24

FOOTAGE

BUDGET

FY 24-25

FOOTAGE

BUDGET

FY 25-26

FOOTAGE

BUDGET

FY 26-27

FOOTAGE

BUDGET

FY 27-28

FOOTAGE

BUDGET

FY 28-29

FOOTAGE

BUDGET

FY 29-30

FOOTAGE

BUDGET

FY 30-31

FOOTAGE

BUDGET

FOOTAGE

GENERAL SEWER REHABILITATION continued… Kimberly Ave. @ Sedley Avenue

Asheville

TH

2018029

35

3,005

$1,283,000

$0

$0

$0

Le An Hurst Road

Asheville

TH

2019027

77

820

$371,250

$82,000

$32,500

$256,750

Logan Avenue

W. Asheville

SA

2017256

48

2,150

$1,086,500

$11,500

$0

$0

Lynn Cove Road

Beaverdam

DP

2015010

35

5,589

$2,057,000

$0

$0

$0

$0

Manetta Rd. @ Johnson Dr.

N. Asheville

SA

2014022

26

6,500

$2,598,839

$0

$0

$0

$0

Manetta Rd. @ Maywood Rd.

Asheville

TH

2020022

51

605

$275,500

$8,000

$89,000

$0

$178,500

McDowell St @ Lily Carmichael Dr.

Asheville

SA

2021011

42

1,660

$616,000

$0

$0

$0

Meadow Road @ Train Yard

Asheville

HC

2015207

37

2,001

$1,051,000

$7,000

$0

$0

Montford Ave. @ Montford Park

Asheville

HC

2017144

50

1,258

$515,650

$6,300

$0

Mountainbrook Rd. @ Chunns Cove

Asheville

DP

2010112

55

3,204

$1,348,515

$114,015

$1,234,500

New Haw Creek Rd. @ Dogwood Grove

E. Asheville

SA

2014021

31

2,400

$660,900

$9,500

$0

$0

$0

$0

$10,000

New Stock Road

Buncombe County

DP

2015011

45

9,020

$2,741,000

$36,000

$0

$0

$8,000

$163,000

$2,534,000

$235,000

$0

$0

$39,000

$0

$182,000

$0

$1,062,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$131,200

$1,500

$942,300

$0

$0

$0

$0

$25,000

$0

$22,000

$394,000

$0

$1,616,000

$33,000

$0

$7,000

$162,000

$0

$0

$2,385,700

$0

$0

$0

$0

$0

$0

$0

$0

$11,000

$1,000

$0

$604,000

$0

$0

$2,000

$3,000

$80,000

$8,250

$100,000

$401,100

$0

$0

$0

3,204

820

Riverside Dr. @ Riverside Baptist

Asheville

TH

2016251

40

510

Royal Pines Drive - PRP 47009

Arden

SA

2007020

47

2,888

Sand Hill Road @ Baker Place

W. Asheville

SA

2015223

56

1,400

Somerset Rd @ Greene Rd

South Asheville

TH

2021008

70

840

Springside Rd. @ Overlook Rd.

S. Asheville

SA

2012127

52

3,922

Sulphur Springs Rd. @ Covington St.

W. Asheville

DP

2014006

44

1,350

$558,000

$7,500

$0

$0

Sweeten Creek Rd. @ Buck Shoals Rd.

S. Asheville

HC

2014015

51

1,558

$657,670

$12,240

$102,500

$543,900

Sweeten Creek Rd. @ Mills Gap Rd.

Asheville

SA

2014189

16

2,572

$1,278,500

$29,000

$158,500

$0

$1,204,000

Toxaway Street

W. Asheville

SA

2019004

51

722

$309,600

$5,000

$0

$0

$304,600

Walnut St. @ N. Lexington Ave.

Asheville

DP

2017008

42

1,300

$613,040

$40

$0

$0

$0

Waynesville Ave. @ Brownwood Ave.

W. Asheville

SA

2014183

33

3,022

$1,370,750

$0

$0

West Crabapple Lane

W. Asheville

DP

2014005

67

1,774

$580,201

$114,701

$465,500

$6,500 $1,064,500

$623,500

$7,000

$94,000

$522,500

$0

$0

$281,140

$0

$6,040

$6,000

$34,000

$235,100

$1,535,887

$57,487

$1,478,400

$0

$0

3

N/A - SS

$48,000

$3,500

$44,500

N/A

200,000

$46,750,000

$4,600,000

$4,675,000

Surveys for Design

Various

EB

2002060

N/A

N/A

$500,000

$0

$50,000

Future Projects - General Rehab.

Various

EB

N/A

N/A

PROJECT NAME

0

$0

$0

$0

312,483

$92,672,168

$5,894,697

$9,564,140

1.0000

1.0000

1.0000

$92,672,168

$5,894,697

$9,564,140

312,483

LOCATION OF PROJECT

PROJ. PROJECT MGR. NUMBER

PIPE RATING

$0 $0

$0

2015193

SUBTOTAL with inflation

$0 $0

$29,500

2002101

2.68%

$0 $0

$0

DP

PROJECT TOTAL FOOTAGE ESTIMATED COST

TOTAL EST. EXPENDS THRU FY 21

$38,000

$1,000

$0

$0

$602,400

9,020

$0

$0

$0

$0

$0

$0

$28,500

$200,000

$0

$0

2,888

$0

$0

$0

$0

$0 $0

510

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$156,000

$0

$394,500

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

2,572

$0

$0

$0

$0

$0

$0

$0

722

$0

$0

$0

$0

$0

$0

$0

$0

$7,000

$0

$606,000

$0

$0

$0

1,558

840

1,350

1,300

$0

$19,500

$0

$28,000

$103,000

$305,750

$0

$0

$914,500

1,774

$0

$0

$0

$0

$0

$0

$0

$0

$0

20,000

$4,675,000

$0

$0 20,000

$50,000

34,462

34,462

BUDGET

24,731

24,731

BUDGET

34,662

34,662

BUDGET

36,069

36,069

BUDGET

22,150

22,150

BUDGET

27,997

27,997

BUDGET

31,584

FY 28-29

FOOTAGE

BUDGET

30,994

$11,535,600

40,323

1.2687

$10,372,459

BUDGET

20,000

$0

$8,394,500

30,994

FY 29-30

FOOTAGE

3,022

$50,000

1.2356

$11,101,135

2,400

$4,675,000

$0 31,584

1.2034

$10,128,544

20,000

$50,000

$9,225,000

6,500

$0

$4,675,000

$0

$8,642,350

FY 27-28

FOOTAGE

20,000

$50,000

1.1720

$7,076,411

$0

$4,675,000

$0

$6,199,887

FY 26-27

FOOTAGE

20,000

$50,000

1.1414

$11,420,333

$0

$4,675,000

$0

$10,273,900

FY 25-26

FOOTAGE

20,000

$50,000

1.1116

$10,793,533

$0

$4,675,000

$0

$9,970,250

FY 24-25

FOOTAGE

20,000

$50,000

1.0826

$7,589,352

$0

$4,675,000

$0

$7,198,350

FY 23-24

FOOTAGE

20,000

$50,000

1.0543

$11,124,634

$0

$4,675,000

$0

$10,834,275

FY 22-23

FOOTAGE

20,000

$50,000

1.0268 29,511

$0

$4,675,000

$0 29,511

FY 21-22 BUDGET

$0

$0

$0

MS

$0

$0

$0

$0

Arden

$0

$0

$0

Various

2,001

$0

$0

$0

3,922

$0 $959,000

5,589

$0

$0

1,400

1,660

$0

$0

$0

SSD Rehab. & Replacement

Inflation per ENR Const. Cost Index

1,258

$10,100

$1,104,100

White Oak Road

SUBTOTAL

605

2,150

3,005

$14,635,681

40,323

FY 30-31

FOOTAGE

BUDGET

FOOTAGE

PRIVATE SEWER REHABILITATION Homeland Park

Asheville

TH

2016248

48

921

$500,750

$7,250

$145,000

$0

$0

Old County Home Rd PSR

W. Asheville

SA

2015221

67

4,600

$1,840,400

$34,400

$76,500

$25,000

$1,704,500

4,600

5,521

$2,341,150

$41,650

$221,500

$1,704,500

4,600

1.0000

1.0000

1.0000

$2,341,150

$41,650

$221,500

SUBTOTAL Inflation per ENR Const. Cost Index SUBTOTAL with inflation

2.68% 5,521

0

$25,000

0

1.0268 0

$25,670

1.0543 0

$1,797,085

Page 2 of 4

$0

$348,500

$0

$0

$0

0

1.0826 4,600

$0

$348,500

921

921

1.1116 0

$387,388

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

0

1.1414 921

$0

$0

0

1.1720 0

$0

$0

0

1.2034 0

$0

$0

0

1.2356 0

$0

$0

0

1.2687 0

$0

0


a

METROPOLITAN SEWERAGE DISTRICT OF BUNCOMBE COUNTY, NORTH CAROLINA TEN YEAR CAPITAL IMPROVEMENT PROGRAM FY 2021-2022 through 2030-2031

PROJECT NAME

LOCATION OF PROJECT

PROJ. PROJECT MGR. NUMBER

PIPE RATING

PROJECT TOTAL FOOTAGE ESTIMATED COST

TOTAL EST. EXPENDS THRU FY 21

FY 21-22 BUDGET

FY 22-23

FOOTAGE

BUDGET

FY 23-24

FOOTAGE

BUDGET

FY 24-25

FOOTAGE

BUDGET

FY 25-26

FOOTAGE

BUDGET

FY 26-27

FOOTAGE

BUDGET

FY 27-28

FOOTAGE

BUDGET

FY 28-29

FOOTAGE

BUDGET

FY 29-30

FOOTAGE

BUDGET

FY 30-31

FOOTAGE

BUDGET

FOOTAGE

TREATMENT PLANT, PUMP STATIONS & GENERAL CAPITAL IMPROVEMENTS Bar Screen Roof Penetrations

MSD-Treatment Plant

HC

2021021

N/A

0

$100,000

$0

$0

$100,000

$0

$0

$0

$0

$0

$0

$0

$0

Biological Treatment

MSD-Treatment Plant

HC

2016063

N/A

0

$51,210,000

$0

$0

$0

$500,000

$2,410,000

$2,470,000

$10,420,000

$20,836,000

$14,574,000

$0

$0

Building and Facility Rehabilitation

MSD-Treatment Plant

Carrier Bridge PS Replacement

Asheville

HC

2002068

N/A

0

$600,000

$79,000

$60,000

$60,000

HC/DP

2019045

N/A

1,640

$42,529,945

$1,411,424

$638,521

$20,245,000

Collection System Master Plan Update

$60,000

$60,000

$60,000

$60,000

$60,000

$60,000

$60,000

$60,000

$20,235,000

$0

$0

$0

$0

$0

$0

District-Wide

HC

2020011

N/A

0

$200,000

$0

$0

$0

$0

$200,000

$0

$0

$0

$0

$0

$0

Equipment Storage Facility

MSD - Treatment Plant

HC

2020237

N/A

0

$2,729,000

$75,000

$0

$2,654,000

$0

$0

$0

$0

$0

$0

$0

$0

Flow Monitoring

MSD-Treatment Plant

SA

2008013

N/A

0

$500,000

$0

$50,000

$50,000

$50,000

$50,000

$50,000

$50,000

$50,000

$50,000

$50,000

$50,000

$50,000 $10,000

1,640

HVAC Rehabilitation

MSD-Treatment Plant

HC

2020051

N/A

0

$155,000

$52,500

$50,000

$25,000

$10,000

$10,000

$10,000

$10,000

$10,000

$10,000

$10,000

Hydroelectric Power Plant Rehab

MSD-Treatment Plant

HC

2021016

N/A

0

$200,000

$0

$0

$200,000

$0

$0

$0

$0

$0

$0

$0

$0

Incinerator Ash Lagoon Restoration

MSD-Treatment Plant

HC

2021015

N/A

0

$790,000

$0

$720,000

$20,000

$50,000

$0

$0

$0

$0

$0

$0

$0

Incinerator Polymer System Replacement

MSD-Treatment Plant

HC

2019071

N/A

0

$352,000

$0

$352,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

Incinerator Refractory Replacement

MSD-Treatment Plant

HC

2021017

N/A

0

$250,000

$0

$0

$250,000

$0

$0

$0

$0

$0

$0

$0

$0

ITT Pump Station Upgrade

Henderson County

HC

2020061

N/A

0

$1,153,000

$0

$0

$0

$115,000

$1,038,000

$0

$0

$0

$0

$0

$0

Mud Creek PS Replacement

Henderson County

HC

2021073

N/A

0

$500,000

$0

$0

$0

$0

$0

$500,000

$0

$0

$0

$0

$0

Mull Bldg. HVAC Phase III

Asheville

TH

2021045

N/A

0

$584,825

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$30,000

Plant High Rate Primary Treatment

MSD-Treatment Plant

HC

2015054

N/A

0

$17,124,738

$14,917,738

$2,207,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

RBC Slide Gate Replacement

Asheville

SA

2021026

N/A

0

$550,000

$0

$280,000

$270,000

$0

$0

$0

$0

$0

$0

$0

$0

Solids Handling Capacity Improvements

MSD-Treatment Plant

HC

2019087

N/A

0

$2,850,000

$0

$0

$340,000

$2,510,000

$0

$0

$0

$0

$0

$0

$0

Weaverville PS Replacement

Weaverville

SA

2019080

N/A

16,811

$9,548,750

$20,000

$802,500

$383,250

$4,115,000

General Capital Equipment

Varies

EB

2016072

N/A

0

$1,500,000

$235,540

$150,000

$150,000

$150,000

18,451

$133,427,258

$16,841,202

$7,964,021

1.0000

1.0000

1.0000

$133,427,258

$16,841,202

$7,964,021

SUBTOTAL Inflation per ENR Const. Cost Index

2.68%

SUBTOTAL with inflation

PROJECT NAME

18,451

LOCATION OF PROJECT

PROJ. PROJECT MGR. NUMBER

PIPE RATING

PROJECT TOTAL FOOTAGE ESTIMATED COST

TOTAL EST. EXPENDS THRU FY 21

0

1,640

1.0268 0

FY 21-22 BUDGET

$22,093,250

$22,685,349

1,640

BUDGET

$27,995,000

11,000

$29,515,639

BUDGET

5,610

11,000

$7,946,000

5,610

$8,602,133

BUDGET

$3,240,000

0

1.1116 5,610

FY 24-25

FOOTAGE

0 $150,000

1.0826

FY 23-24

FOOTAGE

$4,228,000 $150,000

1.0543

FY 22-23

FOOTAGE

11,000

$3,601,542

BUDGET

$0

$0

$0

$0

$150,000

$150,000

$150,000

$150,000

$10,690,000

0

1.1414 0

FY 25-26

FOOTAGE

$0 $150,000

$12,201,325

BUDGET

0

1.1720 0

FY 26-27

FOOTAGE

$21,106,000

$24,735,523

BUDGET

0

1.2034 0

FY 27-28

FOOTAGE

$14,844,000

$17,862,900

BUDGET

0

1.2356 0

FY 28-29

FOOTAGE

$270,000

$333,619

BUDGET

0

1.2687 0

FY 29-30

FOOTAGE

$300,000

$380,622

0

FY 30-31

FOOTAGE

BUDGET

FOOTAGE

DESIGN, ROW, & CONSTRUCTION MANAGEMENT EXPENSES Design, ROW, & Const. Mgmt. Exp.

MSD/ENG

EB

N/A

N/A

SUBTOTAL

0

$33,125,546

$2,710,185

$2,900,971

0

$33,125,546

$2,710,185

$2,900,971

$2,996,618 0

$3,074,959

$2,996,618

0

$3,155,560

$3,074,959

0

$3,238,537

$3,155,560

0

$3,388,175

$3,238,537

0

$3,467,690

$3,388,175

0

$3,549,494

$3,467,690

0

$3,633,560

$3,549,494

0

$3,719,980

$3,633,560

0

$3,719,980

0

BUDGET SUMMARY

PROJECT NAME

LOCATION OF PROJECT

PROJ. PROJECT MGR. NUMBER

PIPE RATING

SUBTOTAL with Inflation

PROJECT TOTAL FOOTAGE ESTIMATED COST

403,371

$351,259,079

TOTAL EST. EXPENDS THRU FY 21 $26,231,491

TOTAL

BUDGET $29,522,532

FY 22-23

FOOTAGE 39,891

BUDGET $39,619,519

FY 23-24

FOOTAGE 40,128

BUDGET

FY 24-25

FOOTAGE

$43,465,733

40,331

BUDGET $32,920,660

FY 25-26

FOOTAGE

BUDGET

40,272

$30,795,000

FY 26-27

FOOTAGE 40,056

BUDGET $38,616,662

FY 27-28

FOOTAGE 40,855

BUDGET $51,689,830

FY 28-29

FOOTAGE 40,569

BUDGET $42,002,142

FY 29-30

FOOTAGE 40,666

BUDGET $24,144,327

FY 30-31

FOOTAGE 40,078

BUDGET $18,736,283

FOOTAGE 40,323

$1,000,000

CONTINGENCY REIMBURSEMENT PROJECTS

FY 21-22

Various

Various

Various

0

$1,000,000

$437,000

$100,000

0

$100,000

0

$100,000

0

$100,000

0

$100,000

0

$100,000

0

$100,000

0

$100,000

0

$100,000

0

$100,000

0

403,371

$352,259,079

$26,668,491

$30,622,532

39,891

$39,719,519

40,128

$43,565,733

40,331

$33,020,660

40,272

$30,895,000

40,056

$38,716,662

40,855

$51,789,830

40,569

$42,102,142

40,666

$24,244,327

40,078

$18,836,283

40,323

Page 3 of 4


This Page Intentionally Blank

Page 4 of 4


METROPOLITAN SEWERAGE DISTRICT OF BUNCOMBE COUNTY, NORTH CAROLINA TEN YEAR CAPITAL IMPROVEMENT PROGRAM FY 2021-2022 through 2030-2031 MUNICIPAL SUMMARIES PROJECT NAME

LOCATION OF PROJECT

PROJ. PROJECT MGR. NUMBER

PIPE RATING

PROJECT TOTAL FOOTAGE ESTIMATED COST

TOTAL EST. EXPENDS THRU FY 21

FY 21-22 BUDGET

FY 22-23

FOOTAGE

BUDGET

FY 23-24

FOOTAGE

BUDGET

FY 24-25

FOOTAGE

BUDGET

FY 25-26

FOOTAGE

BUDGET

FY 26-27

FOOTAGE

BUDGET

FY 27-28

FOOTAGE

BUDGET

FY 28-29

FOOTAGE

BUDGET

FY 29-30

FOOTAGE

BUDGET

FY 30-31

FOOTAGE

BUDGET

FOOTAGE

BUNCOMBE COUNTY Atkins Street

Arden

HC

2014012

39

1,833

Royal Pines Drive - PRP 47009

Arden

SA

2007020

47

2,888

$698,330 $1,104,100

$5,480

$0

$0

$0

$0

$2,250

$10,100

$0

$0

$0

$29,500

$1,064,500

$52,000

$638,600

$0

$0

2,888

1,833

$0

$0

$0

$0

$0

$0

White Oak Road

Arden

DP

2015193

3

N/A - SS

$48,000

$3,500

$44,500

$0

$0

$0

$0

$0

$0

$0

$0

Lynn Cove Road

Beaverdam

DP

2015010

35

5,589

$2,057,000

$0

$0

$0

$0

$25,000

$0

$22,000

$394,000

$0

$1,616,000

Bryson Street

Biltmore Village

SA

2016167

60

611

$482,750

$40,250

$442,500

611

$0

Christian Creek Interceptor

Buncombe County

HC

2011110

24

12,226

$6,247,462

$382,462

$3,889,000

8,200

$1,976,000

4,026

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

Woodfin

DP

2015011

45

9,020

$2,741,000

$36,000

$0

$0

$8,000

$163,000

South French Broad Relief Int.

Buncombe County

HC

2017070

N/A

36,330

$32,277,500

$131,300

$32,900

$0

$0

$8,500

Edwards Ave @ US 70 Hwy

Swannanoa

HC

2021004

35

2,400

$871,400

$0

$0

$0

$0

$0

$14,400

$0

$6,000

Swannanoa Equalization Tank

Swannanoa

HC

2019046

N/A

0

$21,382,013

$11,513

$1,019,000

$700,000

$1,401,500

$9,125,000

$9,125,000

$0

$0

70,897

$67,909,555

$620,605

$5,427,900

1.0000

1.0000

1.0000

$67,909,555

$620,605

$5,427,900

Inflation per ENR Const. Cost Index

2.68%

SUBTOTAL with inflation

PROJECT NAME

70,897

LOCATION OF PROJECT

PROJ. PROJECT MGR. NUMBER

PIPE RATING

PROJECT TOTAL FOOTAGE ESTIMATED COST

TOTAL EST. EXPENDS THRU FY 21

8,811

4,026

1.0268 8,811

FY 21-22 BUDGET

$2,676,000

4,026

FY 22-23

FOOTAGE

BUDGET

$1,409,500

0

1.0543

$2,747,717

$1,486,062

BUDGET

$2,534,000 0

$9,351,000

0

1.0826 0

FY 23-24

FOOTAGE

$0

$0

New Stock Road

SUBTOTAL

$0 5,589

$10,123,149

0

BUDGET

$13,254,950

11,908

$14,734,029

BUDGET

$0 9,082

$7,959,000

9,082

1.1414 11,908

FY 25-26

FOOTAGE

$0 $7,885,000

1.1116

FY 24-25

FOOTAGE

9,020

$514,800

$9,084,223

BUDGET

9,082

$8,923,600

10,915

1.1720 9,082

FY 26-27

FOOTAGE

$0

$7,885,000

$10,458,159

BUDGET

9,082

10,915

9,084

$0

$39,000

$812,000

2,400

$0

$0

$0 17,073

$0

$7,924,000

9,082

$9,535,544

BUDGET

$0

$10,363,000 1.2356

9,082

FY 28-29

FOOTAGE

$0

$7,935,000

1.2034

FY 27-28

FOOTAGE

$0

$7,885,000

$12,804,788

17,073

FY 29-30

FOOTAGE

BUDGET

0

1.2687

FOOTAGE

$0

0

FY 30-31 BUDGET

FOOTAGE

CITY OF ASHEVILLE AB Tech Equalization Tank

Asheville

HC

2019047

N/A

0

$14,251,500

$0

$0

$0

$0

Albemarle Commons PS Elimination

Asheville

TH

2018171

N/A

832

$285,130

$3,130

$49,000

$0

$230,000

Aurora Drive

Asheville

DP

2017145

53

2,700

$1,043,500

$37,000

$42,500

$969,000

Beale Road at Copney Lane

Asheville

DP

2009129

47

4,027

$1,588,175

$16,925

$19,200

$230,250

Bent Tree Road

Asheville

DP

2016102

60

1,654

$862,921

$55,921

$0

$807,000

Braddock Way - PRP 20002

Asheville

TH

2006025

36

3,848

$1,684,940

$18,353

$0

$0

2,700

1,654

832

$0

$0

$0

$0

$0

$0

$0

$3,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$1,323,000

$0

$0

$0

$0

$0

$0

$0

$0

$38,500

$162,087

$0

$1,466,000

4,027

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

3,848

$0

$0

$0

$0

Buchanan Ave.

Asheville

SA

2014023

51

2,255

$1,141,900

$35,900

$98,500

$1,007,500

2,255

$0

$0

$0

$0

$0

$0

$0

$0

Caledonia Road

Asheville

HC

2014153

65

2,115

$1,050,350

$367,100

$131,500

$902,750

2,115

$0

$0

$0

$0

$0

$0

$0

$0

Carrier Bridge PS Replacement

Asheville

HC/DP

2019045

N/A

1,640

$42,529,945

$1,411,424

$638,521

$20,245,000

1,640

$20,235,000

$0

$0

$0

$0

$0

$0

$0

Central Ave. @ I-240

Asheville

SA

2014180

35

990

$393,000

$0

$0

$0

$0

$0

$5,000

$16,500

$0

$0

$0

$371,500

Chatham Road

Asheville

SA

2015019

43

1,330

$639,700

$4,800

$3,500

$1,000

$40,000

$0

$590,400

$0

$0

$0

$0

$0

Cherokee Road

Asheville

DP

2009132

48

1,960

$894,680

$25,180

$213,500

$656,000

Cub Road

Asheville

TH

2018027

40

1,204

$457,000

$0

$0

$0

French Broad Interceptor @ Amboy Rd.

Asheville

HC/DP

2021036

N/A

2,180

$3,885,000

$0

$3,885,000

Harmony Lane

Asheville

DP

2016103

35

670

$190,000

$0

$0

$0

Hazel Mill Rd @ Richland St.

Asheville

SA

2014016

56

3,300

$1,256,700

$0

$17,000

Hill Street @ Cross Place

Asheville

TH

2016249

44

254

$90,500

$1,525

Homeland Park

Asheville

TH

2016248

48

921

$500,750

$7,250

Howland Rd. @ Sunset Trail

Asheville

DP

2012134

43

994

$471,600

$7,500

Lower Swannanoa Interceptor

Asheville

EB/HC

2004040

9

6,980

$7,380,217

$203,717

$0

$0

$0

$0

$0

$0

$18,500

$83,000

$0

$355,500

$0

$0

$0

$0

$0

$0

$0

$0

$9,400

$116,000

$1,114,300

$0

$0

$1,475

$0

$16,000

$71,500

$145,000

$0

$0

$0

$348,500

$0

$0

$4,500

$66,000

$393,600

$0

$38,500

$0

$130,000

$0

2,180

$0

1,960

1,330

0

Page 1 of 4

3,300

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$2,500

$0

$187,500

$0

$0

$0

$0

$0

254

$0

$0

$0

$0

$0

921

$0

$0

$0

$0

$0

994

$0

$0

$0

$0

$0

$0

$0

$0

$3,495,000

3,490

$3,513,000

1,204

3,490

990

670


METROPOLITAN SEWERAGE DISTRICT OF BUNCOMBE COUNTY, NORTH CAROLINA TEN YEAR CAPITAL IMPROVEMENT PROGRAM FY 2021-2022 through 2030-2031 MUNICIPAL SUMMARIES PROJECT NAME

LOCATION OF PROJECT

PROJ. PROJECT MGR. NUMBER

PIPE RATING

PROJECT TOTAL FOOTAGE ESTIMATED COST

TOTAL EST. EXPENDS THRU FY 21

FY 21-22 BUDGET

FY 22-23

FOOTAGE

BUDGET

FY 23-24

FOOTAGE

BUDGET

FY 24-25

FOOTAGE

BUDGET

FY 25-26

FOOTAGE

BUDGET

FY 26-27

FOOTAGE

BUDGET

FY 27-28

FOOTAGE

BUDGET

FY 28-29

FOOTAGE

BUDGET

FY 29-30

FOOTAGE

BUDGET

FY 30-31

FOOTAGE

BUDGET

FOOTAGE

CITY OF ASHEVILLE continued… Joyner Ave @ Amboy Rd

Asheville

SA

2021010

27

241

$97,000

$0

$0

$0

$0

$0

$0

$0

$0

$3,500

$17,000

Kimberly Ave. @ Sedley Avenue

Asheville

TH

2018029

35

3,005

$1,283,000

$0

$0

$0

$0

$0

$39,000

$0

$182,000

$0

$1,062,000

Le An Hurst Road

Asheville

TH

2019027

77

820

$371,250

$82,000

$32,500

$256,750

Manetta Rd. @ Maywood Rd.

Asheville

TH

2020022

51

605

$275,500

$8,000

$89,000

$0

$178,500

McDowell St @ Lily Carmichael Dr.

Asheville

SA

2021011

42

1,660

$616,000

$0

$0

$0

Meadow Road @ Train Yard

Asheville

HC

2015207

37

2,001

$1,051,000

$7,000

$0

$0

Montford Ave. @ Montford Park

Asheville

HC

2017144

50

1,258

$515,650

$6,300

$0

Mountainbrook Rd. @ Chunns Cove

Asheville

DP

2010112

55

3,204

$1,348,515

$114,015

$1,234,500

3,204

820

$0

$76,500 3,005

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$11,000

$1,000

$0

$604,000

$0

$0

$2,000

$3,000

$80,000

$8,250

$100,000

$401,100

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$6,500

$0

$28,500

$200,000

$0

$0

$0

$0

$0

605

1,258

1,660

$0 $959,000

2,001

$0

$0

$0

$0

Riverside Dr. @ Riverside Baptist

Asheville

TH

2016251

40

510

$235,000

$0

$0

$0

$0

Sweeten Creek Rd. @ Mills Gap Rd.

Asheville

SA

2014189

16

2,572

$1,278,500

$29,000

$158,500

$0

$1,204,000

Walnut St. @ N. Lexington Ave.

Asheville

DP

2017008

42

1,300

$613,040

$40

$0

$0

$0

$0

$7,000

$0

$606,000

$0

$0

$0

New Haw Creek Rd. @ Dogwood Grove

E. Asheville

SA

2014021

31

2,400

$660,900

$9,500

$0

$0

$0

$0

$10,000

$38,000

$1,000

$0

$0

$602,400

East Chestnut Ave @ Five Points

N. Asheville

SA

2015192

36

5,225

$1,822,050

$54,000

$0

$0

$0

$13,800

$179,250

$0

$0

$1,575,000

$0

$0

Fairmont Road

N. Asheville

DP

2015017

31

3,900

$1,704,000

$0

$0

$0

$0

$0

$0

$20,000

$0

$8,500

$162,500

$1,513,000

3,900

Manetta Rd. @ Johnson Dr.

N. Asheville

SA

2014022

26

6,500

$2,598,839

$0

$0

$0

$0

$33,000

$0

$7,000

$162,000

$0

$0

$2,385,700

6,500

Bellevue Road

S. Asheville

DP

2015175

49

1,100

$463,100

$9,600

$0

$7,000

$58,000

$388,500

$0

$0

$0

$0

$0

$0

Forestdale Drive

S. Asheville

DP

2014002

33

2,600

$1,021,000

$0

$0

$0

$0

$0

$0

$15,000

$0

$246,500

$0

$759,500

Somerset Rd @ Greene Rd

S. Asheville

TH

2021008

70

840

$281,140

$0

$6,040

$6,000

$34,000

$235,100

$0

$0

$0

$0

$0

$0

Springside Rd. @ Overlook Rd.

S. Asheville

SA

2012127

52

3,922

$1,535,887

$57,487

$1,478,400

Sweeten Creek Rd. @ Buck Shoals Rd.

S. Asheville

HC

2014015

51

1,558

$657,670

$12,240

$102,500

Avon Ave. @ Haywood Rd

W. Asheville

HC

2021003

65

233

$121,750

$0

$1,500

Johnston Blvd. @ Providence Rd.

W. Asheville

DP

2014013

37

2,000

$659,150

$8,150

$0

3,922

$0

2,572

1,100

840

1,300

510

241

$0

5,225

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$5,250

$43,000

$72,000

$0

$0

$0

$0

$0

$11,000

$86,000

$554,000

$131,200

$1,500

$942,300

$0

$0

$0

$543,900

1,558

Logan Avenue

W. Asheville

SA

2017256

48

2,150

$1,086,500

$11,500

$0

$0

$0

Old County Home Rd PSR

W. Asheville

SA

2015221

67

4,600

$1,840,400

$34,400

$76,500

$25,000

$1,704,500 1,400

4,600

Sand Hill Road @ Baker Place

W. Asheville

SA

2015223

56

1,400

$623,500

$7,000

$94,000

$522,500

$0

$0

$0

Sulphur Springs Rd. @ Covington St.

W. Asheville

DP

2014006

44

1,350

$558,000

$7,500

$0

$0

$156,000

$0

$394,500

1,350

2,150

2,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

Toxaway Street

W. Asheville

SA

2019004

51

722

$309,600

$5,000

$0

$0

$304,600

$0

$0

$0

$0

$0

$0

$0

Waynesville Ave. @ Brownwood Ave.

W. Asheville

SA

2014183

33

3,022

$1,370,750

$0

$0

$0

$19,500

$0

$28,000

$103,000

$305,750

$0

$0

$914,500

West Crabapple Lane

W. Asheville

DP

2014005

67

1,774

$580,201

$114,701

$465,500

1,774

$0

$0

$0

$0

$0

$0

$0

$0

$0

102,326

$106,176,400

$2,773,158

$8,982,161

11,080

$26,237,275

1.0000

1.0000

1.0000

$106,176,400

$2,773,158

$8,982,161

SUBTOTAL Inflation per ENR Const. Cost Index SUBTOTAL with inflation

2.68% 102,326

16,102

1.0268 11,080

$26,940,434

$24,389,850

722

233

9,331

1.0543 16,102

$25,714,664

Page 2 of 4

$3,927,500

10,525

1.0826 9,331

$4,251,809

$2,282,250

5,082

1.1116 10,525

$2,536,919

$4,887,887

5,640

1.1414 5,082

$5,578,924

$6,391,750

9,654

1.1720 5,640

$7,490,916

$4,461,000

11,584

1.2034 9,654

$5,368,256

$1,241,500

3,005

1.2356 11,584

$1,534,029

$6,810,600

2,400

2,600

3,022

20,323

1.2687 3,005

$8,640,883

20,323


METROPOLITAN SEWERAGE DISTRICT OF BUNCOMBE COUNTY, NORTH CAROLINA TEN YEAR CAPITAL IMPROVEMENT PROGRAM FY 2021-2022 through 2030-2031 MUNICIPAL SUMMARIES PROJECT NAME

LOCATION OF PROJECT

PROJ. PROJECT MGR. NUMBER

PIPE RATING

PROJECT TOTAL FOOTAGE ESTIMATED COST

TOTAL EST. EXPENDS THRU FY 21

FY 21-22 BUDGET

FY 22-23

FOOTAGE

BUDGET

FY 23-24

FOOTAGE

BUDGET

FY 24-25

FOOTAGE

BUDGET

FY 25-26

FOOTAGE

BUDGET

FY 26-27

FOOTAGE

BUDGET

FY 27-28

FOOTAGE

BUDGET

FY 28-29

FOOTAGE

BUDGET

FY 29-30

FOOTAGE

BUDGET

FY 30-31

FOOTAGE

BUDGET

FOOTAGE

HENDERSON COUNTY ITT Pump Station Upgrade

Henderson County

HC

2020061

N/A

0

$1,153,000

$0

$0

$0

$115,000

$1,038,000

$0

Mud Creek Interceptor - Ph. 3

Henderson County

HC

2020010

N/A

9,200

$4,269,265

$14,765

$46,000

$0

$10,500

$315,000

$1,288,000

Mud Creek PS Replacement

Henderson County

HC

2021073

N/A

SUBTOTAL Inflation per ENR Const. Cost Index

$500,000

$0

$0

$5,922,265

$14,765

$46,000

1.0000

1.0000

1.0000

$5,922,265

$14,765

$46,000

2.68%

SUBTOTAL with inflation

PROJECT NAME

0 9,200

9,200

LOCATION OF PROJECT

PROJ. PROJECT MGR. NUMBER

PIPE RATING

PROJECT TOTAL FOOTAGE ESTIMATED COST

TOTAL EST. EXPENDS THRU FY 21

$0 0

0

1.0268 0

FY 21-22 BUDGET

$0

$0

$0

BUDGET

0

1.0543 0

FY 22-23

FOOTAGE

$0

$125,500

0

FY 23-24

FOOTAGE

BUDGET

0

$1,464,723

BUDGET

3,066

$2,595,000

0

$1,987,517

3,066

BUDGET

$2,961,875

BUDGET

$0

$0

$0

$0

$0

$0

$0

$0

0

1.1720 6,133

FY 26-27

FOOTAGE

$0 $0 $0 6,133

1.1414

FY 25-26

FOOTAGE

6,133

$0

$1,788,000 1.1116

FY 24-25

FOOTAGE

$2,595,000

$500,000

$1,353,000 1.0826

$132,317

$0 3,066

$0

BUDGET

0

1.2034 0

FY 27-28

FOOTAGE

$0

$0

$0

BUDGET

0

1.2356 0

FY 28-29

FOOTAGE

$0

$0

$0

0

FY 29-30

FOOTAGE

BUDGET

$0

0

1.2687 $0

0

FY 30-31

FOOTAGE

BUDGET

FOOTAGE

TOWN OF WEAVERVILLE Weaverville PS Replacement

Weaverville

SA

2019080

N/A

SUBTOTAL Inflation per ENR Const. Cost Index

$9,548,750

$20,000

$802,500

16,811

$9,548,750

$20,000

$802,500

1.0000

1.0000

1.0000

$9,548,750

$20,000

$802,500

2.68%

SUBTOTAL with inflation

PROJECT NAME

16,811

16,811

LOCATION OF PROJECT

PROJ. PROJECT MGR. NUMBER

PIPE RATING

PROJECT TOTAL FOOTAGE ESTIMATED COST

TOTAL EST. EXPENDS THRU FY 21

$383,250 0

0

1.0268 0

FY 21-22 BUDGET

$383,250

$393,521

BUDGET

11,000

$4,228,000

5,610

$4,115,000

11,000

$4,228,000

5,610

1.0543 0

FY 22-23

FOOTAGE

$4,115,000

1.0826

$4,338,520

11,000

FY 23-24

FOOTAGE

BUDGET

$4,577,123

BUDGET

0

$0

0

$0

1.1116 5,610

FY 24-25

FOOTAGE

$0

1.1414

$0

0

FY 25-26

FOOTAGE

BUDGET

$0 0

$0

BUDGET

0

1.1720 0

FY 26-27

FOOTAGE

$0

$0

$0

BUDGET

0

1.2034 0

FY 27-28

FOOTAGE

$0

$0

$0

BUDGET

0

1.2356 0

FY 28-29

FOOTAGE

$0

$0

$0

0

FY 29-30

FOOTAGE

BUDGET

$0

0

1.2687 $0

0

FY 30-31

FOOTAGE

BUDGET

FOOTAGE

TOWN OF WOODFIN Elk Mountain Place

Woodfin

HC

2010094

48

4,137

$1,532,500

$83,000

$115,000

$155,000

$0

$1,177,250

Jonestown Road @ Riverside Drive

Woodfin

TH

2018028

42

N/A - SS

$98,500

$0

$0

$25,500

$15,000

$53,000

4,137

$1,631,000

$83,000

$115,000

1.0000

1.0000

1.0000

$1,631,000

$83,000

$115,000

SUBTOTAL Inflation per ENR Const. Cost Index SUBTOTAL with inflation

2.68% 4,137

0

$180,500

0

1.0268 0

$185,337

$15,000

0

1.0543 0

$15,815

Page 3 of 4

$1,230,250

4,137

4,137

1.0826 0

$1,331,837

$0

$0

$0

$0

$0

$0

$8,000

$0

$0

$0

$0

0

1.1116 4,137

$0

$8,000

0

1.1414 0

$9,131

$0

0

1.1720 0

$0

$0

0

1.2034 0

$0

$0

$0 $0 0

1.2356 0

$0

$0

0

1.2687 0

$0

0


METROPOLITAN SEWERAGE DISTRICT OF BUNCOMBE COUNTY, NORTH CAROLINA TEN YEAR CAPITAL IMPROVEMENT PROGRAM FY 2021-2022 through 2030-2031 MUNICIPAL SUMMARIES PROJECT NAME

LOCATION OF PROJECT

PROJ. PROJECT MGR. NUMBER

PIPE RATING

PROJECT TOTAL FOOTAGE ESTIMATED COST

TOTAL EST. EXPENDS THRU FY 21

FY 21-22 BUDGET

FY 22-23

FOOTAGE

BUDGET

FY 23-24

FOOTAGE

BUDGET

FY 24-25

FOOTAGE

BUDGET

FY 25-26

FOOTAGE

BUDGET

FY 26-27

FOOTAGE

BUDGET

FY 27-28

FOOTAGE

BUDGET

FY 28-29

FOOTAGE

BUDGET

FY 29-30

FOOTAGE

BUDGET

FY 30-31

FOOTAGE

BUDGET

FOOTAGE

MISCELLANEOUS PROJECTS AND LINE ITEMS Collection System Master Plan Update

District-Wide

HC

2020011

N/A

0

$200,000

$0

$0

$0

$200,000

$0

$0

$0

$0

$0

$0

$0

Bar Screen Roof Penetrations

MSD-Treatment Plant

HC

2021021

N/A

0

$100,000

$0

$0

$100,000

$0

$0

$0

$0

$0

$0

$0

$0

Biological Treatment

MSD-Treatment Plant

HC

2016063

N/A

0

$51,210,000

$0

$0

$0

$500,000

$2,410,000

$2,470,000

$10,420,000

$20,836,000

$14,574,000

$0

$0

Building and Facility Rehabilitation

MSD-Treatment Plant

HC

2002068

N/A

0

$600,000

$79,000

$60,000

$60,000

$60,000

$60,000

$60,000

$60,000

$60,000

$60,000

$60,000

$60,000

Equipment Storage Facility

MSD - Treatment Plant

HC

2020237

N/A

0

$2,729,000

$75,000

$2,654,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

Flow Monitoring

MSD-Treatment Plant

SA

2008013

N/A

0

$500,000

$50,000

$50,000

$50,000

$50,000

$50,000

$50,000

$50,000

$50,000

$50,000

$50,000

$50,000 $10,000

HVAC Rehabilitation

MSD-Treatment Plant

HC

2020051

N/A

0

$155,000

$52,500

$50,000

$25,000

$10,000

$10,000

$10,000

$10,000

$10,000

$10,000

$10,000

Hydroelectric Power Plant Rehab

MSD-Treatment Plant

HC

2021016

N/A

0

$200,000

$0

$0

$200,000

$0

$0

$0

$0

$0

$0

$0

$0

Incinerator Ash Lagoon Restoration

MSD-Treatment Plant

HC

2021015

N/A

0

$790,000

$0

$720,000

$20,000

$50,000

$0

$0

$0

$0

$0

$0

$0

Incinerator Polymer System Replacement

MSD-Treatment Plant

HC

2019071

N/A

0

$352,000

$0

$352,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

Incinerator Refractory Replacement

MSD-Treatment Plant

HC

2021017

N/A

0

$250,000

$0

$0

$250,000

$0

$0

$0

$0

$0

$0

$0

$0

Mull Bldg. HVAC Phase III

MSD - Mull Building

TH

2021045

N/A

0

$584,825

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$30,000

Plant High Rate Primary Treatment

MSD-Treatment Plant

HC

2015054

N/A

0

$17,124,738

$14,917,738

$2,207,000

$0

$0

$0

$0

$0

$0

$0

$0

$0

RBC Slide Gate Replacement

MSD-Treatment Plant

SA

2021026

N/A

0

$550,000

$0

$280,000

$270,000

$0

$0

$0

$0

$0

$0

$0

$0

Solids Handling Capacity Improvements

MSD-Treatment Plant

HC

2019087

N/A

0

$2,850,000

$0

$0

$340,000

$2,510,000

$0

$0

$0

$0

$0

$0

$0

General Capital Equipment

Varies

EB

2016072

N/A

0

$1,500,000

$235,540

$150,000

$150,000

$150,000

$150,000

$150,000

$150,000

$150,000

$150,000

$150,000

$150,000

SSD Rehab. & Replacement

Various

MS

2002101

N/A

200,000

$46,750,000

$4,600,000

$4,675,000

Surveys for Design

Various

EB

2002060

N/A

N/A

$500,000

$0

$50,000

Future Projects - General Rehab.

Various

EB

N/A

N/A

SUBTOTAL Inflation per ENR Const. Cost Index

$0

$0

$0

$126,945,563

$20,009,778

$11,248,000

1.0000

1.0000

1.0000

$126,945,563

$20,009,778

$11,248,000

2.68%

SUBTOTAL with inflation

PROJECT NAME

0 200,000

200,000

LOCATION OF PROJECT

PROJ. PROJECT MGR. NUMBER

PIPE RATING

PROJECT TOTAL FOOTAGE ESTIMATED COST

TOTAL EST. EXPENDS THRU FY 21

20,000

20,000

$50,000

$4,675,000

20,000

$6,355,892

20,000

BUDGET

20,000

20,000

20,000

20,000

20,000

20,000

20,000

20,000

20,000

20,000

20,000

20,000

$0

$4,995,000

20,000

$6,171,950

BUDGET

$5,025,000

20,000

1.2687 20,000

FY 29-30

FOOTAGE

20,000

$50,000

1.2356

$23,548,847

BUDGET

$4,675,000

$0

$19,569,000

FY 28-29

FOOTAGE

20,000

$50,000

1.2034

$30,273,064

BUDGET

$4,675,000

$0

$25,831,000

FY 27-28

FOOTAGE

20,000

$50,000

1.1720

$17,594,334

BUDGET

$4,675,000

$0

$15,415,000

FY 26-27

FOOTAGE

20,000

$50,000

1.1414

$8,297,997

BUDGET

$4,675,000

$0

$7,465,000

FY 25-26

FOOTAGE

20,000

$50,000

1.1116

$8,016,460

BUDGET

$4,675,000

$0

$7,405,000

FY 24-25

FOOTAGE

20,000

$50,000

1.0826

$8,703,397

BUDGET

$4,675,000

$0

$8,255,000

FY 23-24

FOOTAGE

20,000

$50,000

1.0543

FY 22-23

FOOTAGE

$4,675,000

$0

$6,190,000 1.0268

20,000

20,000

$50,000

$0 20,000

FY 21-22 BUDGET

$4,675,000

$6,375,420

20,000

FY 30-31

FOOTAGE

BUDGET

FOOTAGE

DESIGN, ROW, & CONSTRUCTION MANAGEMENT EXPENSES Design, ROW, & Const. Mgmt. Exp.

MSD/ENG

EB

N/A

N/A

SUBTOTAL

0

$33,125,546

$2,710,185

$2,900,971

0

$33,125,546

$2,710,185

$2,900,971

$2,996,618 0

$3,074,959

$2,996,618

0

$3,155,560

$3,074,959

0

$3,238,537

$3,155,560

0

$3,388,175

$3,238,537

0

$3,467,690

$3,388,175

0

$3,549,494

$3,467,690

0

$3,633,560

$3,549,494

0

$3,719,980

$3,633,560

0

$3,719,980

0

BUDGET SUMMARY

PROJECT NAME

LOCATION OF PROJECT

PROJ. PROJECT MGR. NUMBER

PIPE RATING

SUBTOTAL with Inflation

PROJECT TOTAL FOOTAGE ESTIMATED COST

403,371

$351,259,079

TOTAL EST. EXPENDS THRU FY 21 $26,231,491

CONTINGENCY REIMBURSEMENT PROJECTS

TOTAL

FY 21-22 BUDGET $29,522,532

FY 22-23

FOOTAGE 39,891

BUDGET $39,619,519

FY 23-24

FOOTAGE 40,128

BUDGET

FY 24-25

FOOTAGE

$43,465,733

40,331

BUDGET $32,920,660

FY 25-26

FOOTAGE

BUDGET

40,272

$30,795,000

FY 26-27

FOOTAGE 40,056

BUDGET $38,616,662

FY 27-28

FOOTAGE 40,855

BUDGET $51,689,830

FY 28-29

FOOTAGE 40,569

BUDGET $42,002,142

FY 29-30

FOOTAGE 40,666

BUDGET $24,144,327

FY 30-31

FOOTAGE 40,078

BUDGET $18,736,283

FOOTAGE 40,323

1000000.0000 Various

Various

Various

0

$1,000,000

$437,000

$100,000

0

$100,000

0

$100,000

0

$100,000

0

$100,000

0

$100,000

0

$100,000

0

$100,000

0

$100,000

0

$100,000

0

403,371

$352,259,079

$26,668,491

$30,622,532

39,891

$39,719,519

40,128

$43,565,733

40,331

$33,020,660

40,272

$30,895,000

40,056

$38,716,662

40,855

$51,789,830

40,569

$42,102,142

40,666

$24,244,327

40,078

$18,836,283

40,323

Page 4 of 4


Capital Improvement Program Fiscal Years 2022—2031

Project Schedule


This Page Intentionally Blank


ID

Project Name

Project #

P. R.

Duration

Start

Finish

Plats

Proj. Mgr.

1

Christian Creek Int.

2011110 24

1856 days

Sat 6/1/13

Sat 6/30/18

2

Christian Creek Int.

2011110 24

1096 days

Sun 7/1/18

Wed 6/30/21

3

Christian Creek Int.

2011110 24

852 days

Thu 7/1/21

Mon 10/30/23

Hunter

4

French Broad Interceptor @ Amboy

2021036 240

184 days

Thu 7/1/21

Fri 12/31/21

Hunter

5

Lower Swannanoa Int.

2004040 9

1096 days

Fri 7/1/22

Mon 6/30/25

6

Lower Swannanoa Int.

2004040 9

365 days

Tue 7/1/25

Tue 6/30/26

7

Lower Swannanoa Int.

2004040 9

730 days

Wed 7/1/26

Thu 6/29/28

8

Mud Creek Int. Ph. 3

2020010 0

1461 days

Wed 7/1/20

Sun 6/30/24

9

Mud Creek Int. Ph. 3

2020010 0

365 days

Mon 7/1/24

Mon 6/30/25

10

Mud Creek Int. Ph. 3

2020010 0

580 days

Tue 7/1/25

Sun 1/31/27

Hunter

11

South French Broad Relief Int.

2017070 0

2557 days

Sun 7/1/18

Mon 6/30/25

Hunter

12

South French Broad Relief Int.

2017070 0

365 days

Tue 7/1/25

Tue 6/30/26

13

South French Broad Relief Int.

2017070 0

1461 days

Wed 7/1/26

Sun 6/30/30

Hunter

14

Swannanoa EQ Tank

2019046 0

1096 days

Thu 7/1/21

Sun 6/30/24

Hunter

15

Swannanoa EQ Tank

2019046 0

730 days

Mon 7/1/24

Tue 6/30/26

Hunter

16

Ablemarle Commons PS Elimination

2018171 0

62 days

Thu 7/1/21

Tue 8/31/21

Tim

17

Ablemarle Commons PS Elimination

2018171 0

668 days

Wed 9/1/21

Fri 6/30/23

18

Ablemarle Commons PS Elimination

2018171 0

92 days

Sat 7/1/23

Sat 9/30/23

Tim

19

Atkins Street

2014012 39

4018 days

Wed 7/1/15

Tue 6/30/26

Hunter

20

Atkins Street

2014012 39

365 days

Wed 7/1/26

Wed 6/30/27

21

Atkins Street

2014012 39

124 days

Thu 7/1/27

Mon 11/1/27

22

Avon Ave. @ Haywood Road

2021003 65

912 days

Sat 1/1/22

Sun 6/30/24

23

Avon Ave. @ Haywood Road

2021003 65

365 days

Mon 7/1/24

Mon 6/30/25

24

Avon Ave. @ Haywood Road

2021003 65

92 days

Tue 7/1/25

Tue 9/30/25

Hunter

25

Aurora Drive

2017145 53

547 days

Tue 1/1/19

Tue 6/30/20

Darin

26

Aurora Drive

2017145 53

674 days

Wed 8/26/20

Thu 6/30/22

27

Aurora Drive

2017145 53

123 days

Fri 7/1/22

Mon 10/31/22

Darin

28

Beale Road @ Copney Lane

2009129 47

3653 days

Thu 7/1/10

Tue 6/30/20

Darin

29

Beale Road @ Copney Lane

2009129 47

731 days

Fri 7/1/22

Sun 6/30/24

30

Beale Road @ Copney Lane

2009129 47

153 days

Mon 7/1/24

Sat 11/30/24

Darin

31

Bellevue Road

2015175 49

1461 days

Sat 7/1/17

Wed 6/30/21

Darin

32

Bellevue Road

2015175 49

366 days

Sat 7/1/23

Sun 6/30/24

33

Bellevue Road

2015175 49

92 days

Mon 7/1/24

Mon 9/30/24

Darin

34

Bent Tree Road

2016102 60

945 days

Sat 7/1/17

Fri 1/31/20

Darin

35

Bent Tree Road

2016102 60

463 days

Wed 6/12/19

Wed 9/16/20

36

Bent Tree Road

2016102 60

92 days

Fri 7/1/22

Fri 9/30/22

37

Braddock Way PRP 20002

2006025 36

1614 days

Fri 7/1/22

Mon 11/30/26

38

Braddock Way PRP 20002

2006025 36

578 days

Tue 12/1/26

Fri 6/30/28

39

Braddock Way PRP 20002

2006025 36

184 days

Sat 7/1/28

Sun 12/31/28

Tim

40

Bryson Street

2016167 60

152 days

Wed 7/1/20

Sun 11/29/20

Shaun

41

Bryson Street

2016167 60

398 days

Mon 11/30/20

Sat 1/1/22

42

Bryson Street

2016167 60

92 days

Sun 1/2/22

Sun 4/3/22

Shaun

43

Buchanan Ave.

2014023 13

1096 days

Sun 7/1/18

Wed 6/30/21

Shaun

44

Buchanan Ave.

2014023 13

365 days

Thu 7/1/21

Thu 6/30/22

45

Buchanan Ave.

2014023 13

184 days

Fri 7/1/22

Sat 12/31/22

Shaun

46

Caledonia Road

2014153 31

2192 days

Wed 7/1/15

Wed 6/30/21

Hunter

47

Caledonia Road

2014153 31

365 days

Thu 7/1/21

Thu 6/30/22

48

Caledonia Road

2014153 31

123 days

Fri 7/1/22

Mon 10/31/22

Hunter

49

Central Ave. @ I-240

2014180 35

184 days

Wed 7/1/26

Thu 12/31/26

Shaun

50

Central Ave. @ I-240

2014180 35

1277 days

Fri 1/1/27

Sun 6/30/30

51

Central Ave. @ I-240

2014180 35

62 days

Mon 7/1/30

Sat 8/31/30

Note: Project durations are based on a 7 day week. Created by: Cheryl Rice

Hunter 27

1st Quarter Jul Aug Sep

2022 2nd Quarter 3rd Quarter Oct Nov Dec Jan Feb Mar

CIP PROJECT TIMELINE 2023 4th Quarter Apr May Jun

1st Quarter Jul Aug Sep

2nd Quarter Oct Nov Dec

3rd Quarter Jan Feb Mar

4th Quarter Apr May Jun

1st Quarter Jul Aug Sep

2024 2nd Quarter 3rd Quarter Oct Nov Dec Jan Feb Mar

4th Quarter Apr May Jun

1st Quarter Jul Aug Sep

2025 2nd Quarter 3rd Quarter Oct Nov Dec Jan Feb Mar

4th Quarter Apr May Jun

1st Quarter Jul Aug Sep

2026 2nd Quarter 3rd Quarter Oct Nov Dec Jan Feb Mar

4th Quarter Apr May Jun

Jul

Hunter Construction Construction

Ed 0

Design

Ed

ROW

Ed Hunter 14

7

2

3

Design

Hunter

ROW Construction Design

Hunter

ROW

Design

Construc

Design

Tim

ROW Construction Design

Hunter Hunter Hunter

7

6

19

9

5

Design

Hunter

Darin

ROW Construction

ROW Construction

Darin

ROW Construction

Darin

ROW Construction

Darin Darin

Construction

Tim 25

2

3

Design

Tim

Shaun

Shaun

Construction

ROW Construction

Design

2

1

Hunter

ROW Construction

Shaun Shaun

Design P.E.R.

Construction

Inactive Milestone

Manual Task

Manual Summary Rollup

Start-only

External Tasks

ROW

External Milestone

Inactive Summary

Duration-only

Manual Summary

Finish-only

External Milestone

1

Deadline

Last Updated: Thu 4/1/21


ID

Project Name

Project #

P. R.

Duration

Start

Finish

Plats

Proj. Mgr.

52

Chatham Road

2015019 43

2466 days

Wed 3/1/17

Thu 11/30/23

53

Chatham Road

2015019 43

578 days

Fri 12/1/23

Mon 6/30/25

54

Chatham Road

2015019 43

488 days

Tue 7/1/25

Sat 10/31/26

Shaun

55

Cherokee Road

2009132 48

4018 days

Thu 7/1/10

Wed 6/30/21

Darin

56

Cherokee Road

2009132 48

365 days

Thu 7/1/21

Thu 6/30/22

57

Cherokee Road

2009132 48

123 days

Fri 7/1/22

Mon 10/31/22

Darin

58

Cub Road

2018027 40

518 days

Mon 7/1/24

Sun 11/30/25

Tim

59

Cub Road

2018027 40

577 days

Mon 12/1/25

Wed 6/30/27

60

Cub Road

2018027 40

124 days

Thu 7/1/27

Mon 11/1/27

Tim

61

East Chestnut Ave @ Five Points

2015192 36

3075 days

Sat 7/1/17

Sun 11/30/25

Shaun

62

East Chestnut Ave @ Five Points

2015192 36

943 days

Mon 12/1/25

Fri 6/30/28

63

East Chestnut Ave @ Five Points

2015192 36

215 days

Sat 7/1/28

Wed 1/31/29

Shaun

64

Edwards Ave @ US 70 Hwy

2021004 35

1096 days

Tue 7/1/25

Fri 6/30/28

Hunter

65

Edwards Ave @ US 70 Hwy

2021004 35

365 days

Sat 7/1/28

Sat 6/30/29

66

Edwards Ave @ US 70 Hwy

2021004 35

153 days

Sun 7/1/29

Fri 11/30/29

67

Elk Mtn. Place

2010094 48

3136 days

Fri 6/1/12

Thu 12/31/20

68

Elk Mtn. Place

2010094 48

546 days

Mon 1/2/23

Sun 6/30/24

69

Elk Mtn. Place

2010094 48

213 days

Mon 7/1/24

Wed 1/29/25

70

Fairmont Road

2015017 31

2192 days

Sat 7/1/23

Sat 6/30/29

71

Fairmont Road

2015017 31

365 days

Sun 7/1/29

Sun 6/30/30

72

Fairmont Road

2015017 31

153 days

Mon 7/1/30

Sat 11/30/30

73

Forestdale Drive

2014002 33

731 days

Wed 7/1/26

Fri 6/30/28

74

Forestdale Drive

2014002 33

914 days

Sat 7/1/28

Tue 12/31/30

75

Forestdale Drive

2014002 33

123 days

Wed 1/1/31

Sat 5/3/31

Darin

76

Harmony Lane

2016103 35

366 days

Sat 7/1/23

Sun 6/30/24

Darin

77

Harmony Lane

2016103 35

183 days

Tue 7/1/25

Tue 12/30/25

Darin

78

Hazel Mill Rd. @ Richland St.

2014016 26

184 days

Fri 7/1/22

Sat 12/31/22

Shaun

79

Hazel Mill Rd. @ Richland St.

2014016 26

547 days

Sun 1/1/23

Sun 6/30/24

80

Hazel Mill Rd. @ Richland St.

2014016 26

243 days

Mon 7/1/24

Fri 2/28/25

Shaun

81

Hill Street @ Cross Place

2016249 44

1889 days

Mon 7/1/19

Sat 8/31/24

Tim

82

Hill Street @ Cross Place

2016249 44

303 days

Sun 9/1/24

Mon 6/30/25

83

Hill Street @ Cross Place

2016249 44

63 days

Tue 7/1/25

Mon 9/1/25

Tim

84

Howland Rd. @ Sunset Trail

2012134 43

3653 days

Tue 7/1/14

Sun 6/30/24

Darin

85

Howland Rd. @ Sunset Trail

2012134 43

365 days

Mon 7/1/24

Mon 6/30/25

86

Howland Rd. @ Sunset Trail

2012134 43

92 days

Tue 7/1/25

Tue 9/30/25

Darin

87

Johnston Blvd @ Providence Rd.

2014013 37

5295 days

Sun 1/1/12

Tue 6/30/26

Darin

88

Johnston Blvd @ Providence Rd.

2014013 37

365 days

Wed 7/1/26

Wed 6/30/27

89

Johnston Blvd @ Providence Rd.

2014013 37

123 days

Thu 7/1/27

Sun 10/31/27

90

Jonestown Rd. @ Riverside Dr.

2018028 42

884 days

Fri 7/1/22

Sat 11/30/24

91

Jonestown Rd. @ Riverside Dr.

2018028 42

577 days

Sun 12/1/24

Tue 6/30/26

92

Jonestown Rd. @ Riverside Dr.

2018028 42

92 days

Wed 7/1/26

Wed 9/30/26

93

Joyner Road @ Amboy Road

2021010 27

304 days

Sat 7/1/28

Mon 4/30/29

94

Joyner Road @ Amboy Road

2021010 27

426 days

Tue 5/1/29

Sun 6/30/30

95

Joyner Road @ Amboy Road

2021010 27

62 days

Mon 7/1/30

Sat 8/31/30

96

Kimberly Ave. @ Sedley Avenue

2018029 35

1979 days

Fri 7/1/22

Tue 11/30/27

97

Kimberly Ave. @ Sedley Avenue

2018029 35

578 days

Wed 12/1/27

Sat 6/30/29

98

Kimberly Ave. @ Sedley Avenue

2018029 35

123 days

Sun 7/1/29

Wed 10/31/29

99

Le An Hurst Road

2019027 77

55 days

Wed 7/1/20

Mon 8/24/20

100

Le An Hurst Road

2019027 77

675 days

Tue 8/25/20

Thu 6/30/22

101

Le An Hurst Road

2019027 77

62 days

Fri 7/1/22

Wed 8/31/22

Tim

102

Logan Avenue

2017256 48

2376 days

Sun 7/1/18

Tue 12/31/24

Shaun

Note: Project durations are based on a 7 day week. Created by: Cheryl Rice

Shaun 4

1st Quarter Jul Aug Sep

2022 2nd Quarter 3rd Quarter Oct Nov Dec Jan Feb Mar

CIP PROJECT TIMELINE 2023 4th Quarter Apr May Jun

1st Quarter Jul Aug Sep

2nd Quarter Oct Nov Dec

3rd Quarter Jan Feb Mar

4th Quarter Apr May Jun

1st Quarter Jul Aug Sep

2024 2nd Quarter 3rd Quarter Oct Nov Dec Jan Feb Mar

Shaun

4th Quarter Apr May Jun

1st Quarter Jul Aug Sep

2025 2nd Quarter 3rd Quarter Oct Nov Dec Jan Feb Mar

4th Quarter Apr May Jun

1st Quarter Jul Aug Sep

2026 2nd Quarter 3rd Quarter Oct Nov Dec Jan Feb Mar

4th Quarter Apr May Jun

Jul

ROW Construction

Design

10

12

23

8

Darin

ROW Construction Design

Tim

Design

Shaun

Hunter Hunter Hunter

38

Hunter

ROW

Hunter

Construction

Darin 11

Design

Darin Darin Darin

24

14

2

5

14

Darin

Design Construction Design

Shaun

ROW Construction Design

Tim

ROW Construction Design

Darin

ROW Construction Design

Darin Darin Tim

12

Design

Tim

ROW

Tim Shaun 2

Shaun Shaun Tim

13

Design

Tim Tim Tim

13

Tim

ROW Construction

Design

Design P.E.R.

Construction

Inactive Milestone

Manual Task

Manual Summary Rollup

Start-only

External Tasks

ROW

External Milestone

Inactive Summary

Duration-only

Manual Summary

Finish-only

External Milestone

2

Deadline

Last Updated: Thu 4/1/21


ID 103

Project Name

Project #

P. R.

Duration

Start

Finish

Plats

Proj. Mgr.

Logan Avenue

2017256 48

546 days

Wed 1/1/25

Tue 6/30/26

104

Logan Avenue

2017256 48

184 days

Wed 7/1/26

Thu 12/31/26

105

Lynn Cove Road

2015010 31

1095 days

Mon 7/1/24

Wed 6/30/27

106

Lynn Cove Road

2015010 31

731 days

Thu 7/1/27

Sat 6/30/29

107

Lynn Cove Road

2015010 31

215 days

Sun 7/1/29

Thu 1/31/30

Darin

108

Manetta Rd. @ Johnson Dr.

2014022 20

1095 days

Mon 7/1/24

Wed 6/30/27

Shaun

109

Manetta Rd. @ Johnson Dr.

2014022 20

1096 days

Thu 7/1/27

Sun 6/30/30

110

Manetta Rd. @ Johnson Dr.

2014022 20

365 days

Mon 7/1/30

Mon 6/30/31

111

Manetta Rd. @ Maywood

2020022 51

518 days

Wed 7/1/20

Tue 11/30/21

112

Manetta Rd. @ Maywood

2020022 51

577 days

Wed 12/1/21

Fri 6/30/23

113

Manetta Rd. @ Maywood

2020022 51

31 days

Sat 7/1/23

Mon 7/31/23

Owen

114

Meadow Rd. @ Train Yard

2015207 37

4383 days

Wed 7/1/15

Wed 6/30/27

Hunter

115

Meadow Rd. @ Train Yard

2015207 37

366 days

Thu 7/1/27

Fri 6/30/28

116

Meadow Rd. @ Train Yard

2015207 37

154 days

Sat 7/1/28

Fri 12/1/28

Hunter

117

McDowell St. @ Lily Carmichael Dr.

2021011 42

730 days

Mon 7/1/24

Tue 6/30/26

Shaun

118

McDowell St. @ Lily Carmichael Dr.

2021011 42

123 days

Thu 7/1/27

Sun 10/31/27

Shaun

119

Montford Ave. @ Montford Park

2017144 50

1095 days

Wed 7/1/20

Fri 6/30/23

120

Montford Ave. @ Montford Park

2017144 50

366 days

Sat 7/1/23

Sun 6/30/24

121

Montford Ave. @ Montford Park

2017144 50

90 days

Wed 7/3/24

Mon 9/30/24

Hunter

122

Mountainbrook @ Chunns Cove

2010112 55

3288 days

Fri 7/1/11

Tue 6/30/20

Darin

123

Mountainbrook @ Chunns Cove

2010112 55

297 days

Tue 12/8/20

Thu 9/30/21

124

Mountainbrook @ Chunns Cove

2010112 55

123 days

Fri 10/1/21

Mon 1/31/22

Darin

125

New Haw Creek Rd. @ Dogwood Grove

2014021 31

4475 days

Tue 7/1/14

Wed 9/30/26

Shaun

126

New Haw Creek Rd. @ Dogwood Grove

2014021 31

1369 days

Thu 10/1/26

Sun 6/30/30

127

New Haw Creek Rd. @ Dogwood Grove

2014021 31

177 days

Mon 7/1/30

Tue 12/24/30

128

New Stock Road

2015011 45

2922 days

Fri 7/1/16

Sun 6/30/24

129

New Stock Road

2015011 45

365 days

Mon 7/1/24

Mon 6/30/25

130

New Stock Road

2015011 45

304 days

Tue 7/1/25

Thu 4/30/26

Darin

131

Riverside Dr. @ Riverside Baptist

2016251 40

761 days

Tue 7/1/25

Sat 7/31/27

Tim

132

Riverside Dr. @ Riverside Baptist

2016251 40

335 days

Sun 8/1/27

Fri 6/30/28

133

Riverside Dr. @ Riverside Baptist

2016251 40

62 days

Sat 7/1/28

Thu 8/31/28

Tim

134

Royal Pines Dr. - PRP 47009

2007020 35

2284 days

Sun 7/1/18

Mon 9/30/24

Shaun

135

Royal Pines Dr. - PRP 47009

2007020 35

273 days

Tue 10/1/24

Mon 6/30/25

136

Royal Pines Dr. - PRP 47009

2007020 35

236 days

Tue 7/1/25

Sat 2/21/26

Shaun

137

Sandhill Rd @ Baker Pl

2015223 56

700 days

Fri 11/1/19

Thu 9/30/21

Shaun

138

Sandhill Rd @ Baker Pl

2015223 56

365 days

Fri 10/1/21

Fri 9/30/22

139

Sandhill Rd @ Baker Pl

2015223 56

123 days

Sat 10/1/22

Tue 1/31/23

Shaun

140

Somerset Rd. @ Greene Road

2021008 70

730 days

Thu 7/1/21

Fri 6/30/23

Tim

141

Somerset Rd. @ Greene Road

2021008 70

366 days

Sat 7/1/23

Sun 6/30/24

142

Somerset Rd. @ Greene Road

2021008 70

92 days

Mon 7/1/24

Mon 9/30/24

Tim

143

Springside Rd. @ Overlook

2012127 52

1174 days

Sun 3/1/15

Thu 5/17/18

Shaun

144

Springside Rd. @ Overlook

2012127 52

546 days

Fri 5/18/18

Thu 11/14/19

145

Springside Rd. @ Overlook

2012127 52

274 days

Thu 7/1/21

Thu 3/31/22

Shaun

146

Sulphur Springs Rd @ Covington

2014006 44

1095 days

Wed 7/1/20

Fri 6/30/23

Darin

147

Sulphur Springs Rd @ Covington

2014006 44

731 days

Sat 7/1/23

Mon 6/30/25

148

Sulphur Springs Rd @ Covington

2014006 44

123 days

Tue 7/1/25

Fri 10/31/25

Darin

149

Sweeten Creek @ Buck Shoals

2014015 51

2192 days

Wed 7/1/15

Wed 6/30/21

Hunter

150

Sweeten Creek @ Buck Shoals

2014015 51

365 days

Thu 7/1/21

Thu 6/30/22

151

Sweeten Creek @ Buck Shoals

2014015 51

151 days

Fri 7/1/22

Mon 11/28/22

Hunter

152

Sweeten Creek @ Mills Gap

2014189 16

1096 days

Sat 7/1/17

Tue 6/30/20

Shaun

153

Sweeten Creek @ Mills Gap

2014189 16

730 days

Thu 7/1/21

Fri 6/30/23

Note: Project durations are based on a 7 day week. Created by: Cheryl Rice

12

Shaun

1st Quarter Jul Aug Sep

2022 2nd Quarter 3rd Quarter Oct Nov Dec Jan Feb Mar

CIP PROJECT TIMELINE 2023 4th Quarter Apr May Jun

1st Quarter Jul Aug Sep

2nd Quarter Oct Nov Dec

3rd Quarter Jan Feb Mar

4th Quarter Apr May Jun

1st Quarter Jul Aug Sep

2024 2nd Quarter 3rd Quarter Oct Nov Dec Jan Feb Mar

4th Quarter Apr May Jun

1st Quarter Jul Aug Sep

2025 2nd Quarter 3rd Quarter Oct Nov Dec Jan Feb Mar

4th Quarter Apr May Jun

1st Quarter Jul Aug Sep

2026 2nd Quarter 3rd Quarter Oct Nov Dec Jan Feb Mar

4th Quarter Apr May Jun

Jul

ROW

Shaun Darin 28

10

Design

Darin

Design

Shaun Shaun Owen

10

3

Owen

ROW Construction Design

Hunter

Design

Hunter 11

18

15

Design

Hunter

ROW Construction

Darin Construction Design

Shaun Shaun Darin

11

1

2

9

8

8

20

Darin

ROW Construction Design

Tim

Design

Shaun

ROW Construction

Shaun

ROW Construction Design

Tim

ROW Construction

Shaun Construction Design

Darin

ROW Construction

Design

4

5

Hunter

ROW Construction

Shaun

ROW

Design P.E.R.

Construction

Inactive Milestone

Manual Task

Manual Summary Rollup

Start-only

External Tasks

ROW

External Milestone

Inactive Summary

Duration-only

Manual Summary

Finish-only

External Milestone

3

Deadline

Last Updated: Thu 4/1/21


ID 154

Project Name

Project #

P. R.

Duration

Start

Finish

Plats

Proj. Mgr. 1st Quarter Jul Aug Sep

Sweeten Creek @ Mills Gap

2014189 16

214 days

Sat 7/1/23

Tue 1/30/24

Shaun

155

Toxaway Street

2019004 51

731 days

Mon 7/1/19

Wed 6/30/21

Shaun Design

156

Toxaway Street

2019004 51

184 days

Sat 7/1/23

Sun 12/31/23

Shaun

157

Walnut Street @ N. Lexington

2017008 42

365 days

Tue 7/1/25

Tue 6/30/26

Darin

158

Walnut Street @ N. Lexington

2017008 42

309 days

Thu 7/1/27

Thu 5/4/28

Darin

159

Waynesville Ave. @ Brownwood

2014183 33

1553 days

Sat 7/1/23

Thu 9/30/27

160

Waynesville Ave. @ Brownwood

2014183 33

1004 days

Fri 10/1/27

Sun 6/30/30

161

Waynesville Ave. @ Brownwood

2014183 33

244 days

Mon 7/1/30

Sat 3/1/31

162

West Crabapple Lane

2014005 67

1461 days

Wed 7/1/15

Sun 6/30/19

163

West Crabapple Lane

2014005 67

341 days

Fri 9/6/19

Tue 8/11/20

164

West Crabapple Lane

2014005 67

184 days

Thu 7/1/21

Fri 12/31/21

165

White Oak Road

2015193 3

432 days

Fri 1/8/21

Tue 3/15/22

166

Homeland Park

2016248 48

1736 days

Wed 3/1/17

Tue 11/30/21

167

Homeland Park

2016248 48

1308 days

Wed 12/1/21

Mon 6/30/25

168

Homeland Park

2016248 48

62 days

Tue 7/1/25

Sun 8/31/25

Tim

169

Old County Home Rd PSR

2015221 67

1583 days

Wed 3/1/17

Wed 6/30/21

Shaun

170

Old County Home Rd PSR

2015221 67

730 days

Thu 7/1/21

Fri 6/30/23

171

Old County Home Rd PSR

2015221 67

215 days

Sat 7/1/23

Wed 1/31/24

Shaun

172

Bar Screen Roof Penetrations

2021021 0

123 days

Fri 7/1/22

Mon 10/31/22

Hunter

173

Biological Treatment

2016063 0

366 days

Sat 7/1/23

Sun 6/30/24

Hunter

174

Biological Treatment

2016063 0

365 days

Tue 7/1/25

Tue 6/30/26

Hunter

175

Biological Treatment

2016063 0

1096 days

Wed 7/1/26

Sat 6/30/29

Hunter

176

Carrier Bridge PS Replacement

2019045 0

550 days

Mon 7/1/19

Thu 12/31/20

177

Carrier Bridge PS Replacement

2019045 0

365 days

Thu 7/1/21

Thu 6/30/22

178

Carrier Bridge PS Replacement

2019045 0

638 days

Fri 7/1/22

Fri 3/29/24

179

Collection System Master Plan

2020011 0

184 days

Sat 7/1/23

Sun 12/31/23

Hunter

180

Equipment Storage Facility

2020237 0

92 days

Thu 7/1/21

Thu 9/30/21

Hunter

181

Equipment Storage Facility

2020237 0

273 days

Fri 10/1/21

Thu 6/30/22

Hunter

182

Flow Monitoring

2008013 0

4383 days

Tue 7/1/08

Tue 6/30/20

Shaun

183

Incinerator Ash Lagoon Restoration

2021015 0

184 days

Thu 7/1/21

Fri 12/31/21

Hunter

184

Incinerator Ash Lagoon Restoration

2021015 0

912 days

Sat 1/1/22

Sun 6/30/24

Hunter

185

Incinerator Polymer System

2019071 0

365 days

Thu 7/1/21

Thu 6/30/22

Hunter

186

Incinerator Refractory Replacement

2021017 0

184 days

Fri 7/1/22

Sat 12/31/22

Hunter

187

ITT PS Replacement

2020061 0

366 days

Sat 7/1/23

Sun 6/30/24

Hunter

188

ITT PS Replacement

2020061 0

365 days

Mon 7/1/24

Mon 6/30/25

Hunter

189

Mud Creek PS Replacement

2021073 0

274 days

Tue 7/1/25

Tue 3/31/26

Hunter

190

Plant High Rate Primary Treatment

2015054 0

730 days

Fri 7/1/16

Sat 6/30/18

Hunter

191

Plant High Rate Primary Treatment

2015054 0

1461 days

Sun 7/1/18

Thu 6/30/22

Hunter

192

RBS Slide Gate Replacement

2021026 0

365 days

Thu 7/1/21

Thu 6/30/22

Hunter

193

Solids Handling Capacity Improvement

2019087 0

365 days

Fri 7/1/22

Fri 6/30/23

Hunter

194

Solids Handling Capacity Improvement

2019087 0

365 days

Sat 7/1/23

Sat 6/29/24

Hunter

195

Weaverville PS Replacement

2019080 0

730 days

Wed 7/1/20

Thu 6/30/22

Hunter

196

Weaverville PS Replacement

2019080 0

518 days

Fri 7/1/22

Thu 11/30/23

197

Weaverville PS Replacement

2019080 0

731 days

Fri 12/1/23

Sun 11/30/25

Note: Project durations are based on a 7 day week. Created by: Cheryl Rice

2022 2nd Quarter 3rd Quarter Oct Nov Dec Jan Feb Mar

CIP PROJECT TIMELINE 2023 4th Quarter Apr May Jun

1st Quarter Jul Aug Sep

2nd Quarter Oct Nov Dec

3rd Quarter Jan Feb Mar

4th Quarter Apr May Jun

1st Quarter Jul Aug Sep

2024 2nd Quarter 3rd Quarter Oct Nov Dec Jan Feb Mar

4th Quarter Apr May Jun

1st Quarter Jul Aug Sep

2025 2nd Quarter 3rd Quarter Oct Nov Dec Jan Feb Mar

4th Quarter Apr May Jun

2026 2nd Quarter 3rd Quarter Oct Nov Dec Jan Feb Mar

4th Quarter Apr May Jun

Jul

Construction

Construction

Design

Shaun 47

1st Quarter Jul Aug Sep

Design

Shaun Shaun Darin

12

Darin Darin

3

Darin

Construction ROW

Tim 19

16

Tim

ROW Construction

Shaun

ROW Construction Construction Pre. Eng. Rep. Design

Darin 3

Darin

ROW

Darin

21

Construction Design Design

Design Construction Construction Construction

Construction

Construction Design

Construction Design ROW

Hunter

Construction

Hunter

Design P.E.R.

Construction

Inactive Milestone

Manual Task

Manual Summary Rollup

Start-only

External Tasks

ROW

External Milestone

Inactive Summary

Duration-only

Manual Summary

Finish-only

External Milestone

4

Deadline

Last Updated: Thu 4/1/21


Capital Improvement Program Fiscal Years 2022—2030

Interceptor & Wet Weather Projects


This Page Intentionally Blank


A VE

DR

TO CLIF

N AV

E

AB Tech Equalization Tank Project No. 2019047

AMBOY RD

T

/

W RVIE RIVE

JOY N ER

S AN NOT TO SCALE

SW AY

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

FAC ILIT IE

LYM


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

AB Tech Equalization Tank

LOCATION:

Asheville

TYPE:

Treatment Plant

PIPE RATING:

N/A

PROJECT NO.

2019047

TOTAL LF:

0

PROJECT BUDGET:

$14,251,500.00

PROJECT ORIGIN:

CDM Preliminary Engineering Report

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN

$1,250,000.00

55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$1,500.00

55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$12,500,000.00

55430 - CONST. CONTRACT ADM.

$500,000.00

55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT

$14,251,500.00

$0.00

ENGINEER:

CDM

HC

R.O.W. ACQUISITION:

N/A

# PLATS: [ 0 ]

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 23 - 31 FY 22-23

$0.00

FY 23-24

$0.00

CONSTRUCTION ADM.:

TBD

FY 24-25

$0.00

INSPECTION:

TBD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

FY 28-29

$0.00

FY 29-30

$0.00

FY 30-31

$0.00

This project is to implement the recommendations of the French Broad/Carrier Bridge Preliminary Engineering Report. This project will help mitigate wet weather impacts to the French Broad Interceptor by shaving peak wet weather flows. Equalizing flow will help reduce SSOs and prevent inundation and surcharging of downstream infrastructure, including the treatment plant. This is a future project. PROJECT DESCRIPTION:

SPECIAL PROJECT NOTES:


CH R D

BO TA N

YD R

AVERY LN

LN

RD U SA

O NO

RD

EL

KE

N

D

R ST

SP

O

E UP

ER

RD

OV GC N I R

PINE

TR E

D

NOT TO SCALE

DALYA RD

I40 W I40 E SLEEPY HOLLOW LN

WY

W IL S O N RD

W

BU

BUCKEYE ACCESS RD

N

EY CK

AN D

of BUNCOMBE COUNTY, NORTH CAROLINA

Budget Map

R

ALDON DR

L KEN

D ER

REGER AVE GREAT LAUREL DR

METROPOLITAN SEWERAGE DISTRICT

GOOSE CREEK RD

0H US 7

E DR W AR RE RD ALEM NEW S

RD GLEN CABLE

Christian Creek Interceptor Project No. 2011110

S IGG BR

TU

N

R RD

/

MO

SNEAKING CREEK

LN

EN S

STE V

RD MOFFITT NOLL DR E RIV R K

FFIT T BR AN

DR

E RD

A E IDG LR

B

PORTE RS CO V

LN TEEM S

L ER R Y TR

RW AY SY LVE ST E

EASTM OOR D R

DIN RED B

R CA

S

CREEK RD

M JI H NC A R

CHRISTIA N

YOW DR

WITS END TRL

ROWLAND RD

ON RD BURLES


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Christian Creek Interceptor

LOCATION:

Buncombe County

TYPE:

Interceptor

PIPE RATING:

24

PROJECT NO.

2011110

TOTAL LF:

12,226

PROJECT BUDGET:

$6,247,462.00

PROJECT ORIGIN:

SSO's, Line Condition, Undersized

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$30,079.00

$30,079.00

$58,660.00

$17,660.00

55330 - DESIGN 55340 - PERMITS

$41,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$27,115.00

$27,115.00

55370 - LEGAL FEES

$46,038.00

$46,038.00

$150,000.00

$106,885.00

$43,115.00

$10,000.00

$3,000.00

$7,000.00

55410 - CONDEMNATION

$60,000.00

$47,636.00

$12,364.00

55420 - CONSTRUCTION

$5,825,570.00

$570.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL

$3,883,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$9,000.00

55450 - SURVEY - ASBUILT

$6,000.00

$31,000.00

TOTAL AMOUNT

$6,247,462.00

$278,983.00

$103,479.00

$3,889,000.00 8200

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

MSD

# PLATS: [ 27

ESTIMATED BUDGETS - FY 23 - 31 ]

CONTRACTOR:

FY 22-23

$1,976,000.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

of Asheville. The project includes the replacement of approximately 12,226 LF of existing 8-inch VCP FY 28-29

$0.00

sewer pipe with new 8-inch, 12-inch, and 16-inch DIP. The existing lines serve a large collection area and FY 29-30 are undersized. Additionally, they are in poor structural condition and have experienced multiple SSO's.

$0.00

PROJECT DESCRIPTION: This project is located along Christian Creek, between US 70 Hwy and I-40, east

FY 30-31

SPECIAL PROJECT NOTES:

8200 LF in FY 20/21; 4026 LF in FY21/22

$0.00


DR

RIVE RVIE W

DE S

OT AS

T

/

TR E UPS

E

E

AV N ER AM

WAY

U FO

Y ND

ST

B AM

R OY

D

ST MEADOW RD

French Broad Interceptor at Amboy Road Project No. 2021036

JOY

W DR

N AV

A VE

TR L

RIVERV IE

O CLIFT

B LAM

S TI E K I EO TAH

ST

ND

DR

SP I

A GR

W VIE

ST

NOT TO SCALE

WA LT ON

WALTON ST

D

HIBERNIA ST

S WAY

PE R

SIS

TE

H

R

Budget Map

METROPOLITAN SEWERAGE DISTRICT

ED

DR

NC

TE C

VE HIL RNON LW AY

W HAITH DR

of BUNCOMBE COUNTY, NORTH CAROLINA

ITIE FACIL

TAHKIEOSTIE DR

OAKLAND R

WATER ST

FERNIHURST DR

LY N MA

NE T

EN AD LN


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

French Broad Interceptor @ Amboy Rd. LOCATION:

Asheville

TYPE:

Interceptor

PIPE RATING:

N/A

PROJECT NO.

2021036

TOTAL LF:

2,180

PROJECT BUDGET:

$3,885,000.00

PROJECT ORIGIN:

Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS

$10,000.00

$10,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$3,800,000.00

$3,800,000.00

55430 - CONST. CONTRACT ADM.

$60,000.00

$60,000.00

55440 - TESTING

$10,000.00

$10,000.00

$5,000.00

$5,000.00

55450 - SURVEY - ASBUILT TOTAL AMOUNT

ENGINEER:

$3,885,000.00

HDR

R.O.W. ACQUISITION:

$0.00

DP # PLATS: [

CONTRACTOR:

$0.00

$3,885,000.00

ESTIMATED BUDGETS - FY 23- 31 0 ]

FY 22-23

$0.00

FY 23-24

$0.00

CONSTRUCTION ADM.:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

This project is located along Lyman Street between Amboy Rd and Foundy St. The FY 27-28

$0.00

PROJECT DESCRIPTION:

project includes replacement of approximately 2,180 LF of existing 48 and 54-inch RCP with new 60-inch FY 28-29 C900 PVC. The existing lines in this area are in poor condition due to deterioration from hydrogen sulfide . A sink hole occurred in January of 2021 due to the deterioration of the pipe walls. The design budget for this FY 29-30 project is under the associated project 2019045 Carrier Bridge Pump Station Replacement Project. FY 30-31 SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


W IE V ER

/

DR

H DR

Lower Swannanoa Interceptor Project No. 2004040

WINERY RD

MEADOW RD

TE C DE

NOT TO SCALE

ST U NT CI R

CIR TANS

TC

OT

E

DR

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

EA S

G LOD

HUNTSMAN PL

E ST

METROPOLITAN SEWERAGE DISTRICT

P AP

T

RD

LS

CH OA

OW EL

R

MC D

T DU NS SAIN

V RI

AMBOY RD

ST

DE

N LYMA RST DR

VA N

U FERNIH

T

RD

R VICTO

R W DO LS

RB ILT

O SH C TM EL

IA RD


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Lower Swannanoa Interceptor

LOCATION:

Asheville

TYPE:

Interceptor

PIPE RATING:

9

PROJECT NO.

2004040

TOTAL LF:

6,980

PROJECT BUDGET:

$7,380,217.00

PROJECT ORIGIN:

WW SSO's at Splitter box

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$53,379.00

55330 - DESIGN

$50,000.00

55340 - PERMITS

$50,000.00

$14,879.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES

$30,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$7,168,588.00

$188,588.00

$10,250.00

$250.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT

$18,000.00

TOTAL AMOUNT

ENGINEER:

$7,380,217.00

MSD

R.O.W. ACQUISITION:

$203,717.00

EB/HC # PLATS: [

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 23 - 31 ]

FY 22-23

$38,500.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$130,000.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$3,495,000.00

FY 27-28

$3,513,000.00

PROJECT DESCRIPTION: This project is to eliminate problems associated with the splitter box and the FY 28-29

$0.00

downstream twin 36-inch lines.

SPECIAL PROJECT NOTES:

FY 29-30

$0.00

FY 30-31

$0.00

This portion of line is also included in the SFB/Carrier Bridge PER project.


/

Mud Creek Interceptor Phase 3 Project No. 2020010 NOT TO SCALE

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Mud Creek Interceptor - Ph. 3

LOCATION:

Henderson County

TYPE:

Interceptor

PIPE RATING:

N/A

PROJECT NO.

2020010

TOTAL LF:

9,200

PROJECT BUDGET:

$4,269,265.00

PROJECT ORIGIN:

CCWSD FY19 Drainage Basin Study

ESTIMATED PROJECT COST

DESCRIPTION

55310 - PRELIM. ENGINEERING

TOTAL EXPENDS THRU 12/31/20

$9,765.00

55320 - SURVEY - DESIGN

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

$9,765.00

$51,000.00

$5,000.00

$46,000.00

$5,000.00

$46,000.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$10,500.00

55370 - LEGAL FEES

$15,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$300,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$3,850,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$10,000.00

55450 - SURVEY - ASBUILT

$23,000.00

TOTAL AMOUNT

$4,269,265.00

$9,765.00

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

MSD

# PLATS: [ 14 ]

CONTRACTOR:

ESTIMATED BUDGETS - FY 23 - 31 FY 22-23

$0.00

FY 23-24

$10,500.00

CONSTRUCTION ADM:

MSD

FY 24-25

$315,000.00

INSPECTION:

MSD

FY 25-26

$1,288,000.00

FY 26-27

$2,595,000.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project consists of approximately 9,200 LF of 18-inch and 24-inch pipe that will extend gravity sewer along Mud Creek to the Mountain Home Industrial Park. The extension will FY 28-29 allow for the abandonment of Mountain Home pump station and the abandonment of several private pump FY 29-30 stations. FY 30-31

SPECIAL PROJECT NOTES:

1/3 of project linear footage in first year, remaining 2/3 in second year. Assume 18 month construction period.

$0.00 $0.00 $0.00


/

South French Broad Relief Interceptor Project No. 2017070 NOT TO SCALE

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

South French Broad Relief Int.

LOCATION:

Buncombe County

TYPE:

Interceptor

PIPE RATING:

N/A

PROJECT NO.

2017070

TOTAL LF:

36,330

PROJECT BUDGET:

$32,277,500.00

PROJECT ORIGIN:

2001 WW System Master Plan (CDM)

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$98,200.00

$98,200.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES

$65,800.00

55360 - EASEMENT PLATS

$32,900.00

$32,900.00

$32,900.00

$32,900.00

$8,500.00

55370 - LEGAL FEES

$15,000.00

$200.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$500,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$31,500,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$40,000.00

55450 - SURVEY - ASBUILT

$50,000.00

TOTAL AMOUNT

$32,277,500.00

$98,400.00

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

MSD

# PLATS: [ 7 ]

CONTRACTOR:

ESTIMATED BUDGETS - FY 23 - 31 FY 22-23

$0.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$8,500.00

INSPECTION:

MSD

FY 25-26

$514,800.00

FY 26-27

$7,885,000.00

PROJECT DESCRIPTION: This project is to implement the recommendations of the French Broad/Carrier FY 27-28

$7,885,000.00

Bridge Preliminary Engineering Report. This project includes paralleling the existing 36-inch interceptor FY 28-29 from Dingle Creek north to Hominy Creek with a new 36-inch interceptor. It also includes installing a new 60-inch interceptor between Hominy Creek and Carrier Bridge PS. The new interceptor will provide relief to FY 29-30 the existing system during wet weather. FY 30-31 SPECIAL PROJECT NOTES:

This project is currently phased over four years.

$7,885,000.00 $7,935,000.00 $0.00


/

Swannanoa Equalization Tank Project No. 2019046 NOT TO SCALE

AZALE A RD E

LN

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

Y

METROPOLITAN SEWERAGE DISTRICT

R HA

ST DE


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Swannanoa Equalization Tank

LOCATION:

Swannanoa

TYPE:

Wet Weather

PIPE RATING:

N/A

PROJECT NO.

2019046

TOTAL LF:

0

PROJECT BUDGET:

$21,382,013.00

PROJECT ORIGIN:

CDM Preliminary Engineering Report

ESTIMATED PROJECT COST

DESCRIPTION

55310 - PRELIM. ENGINEERING

TOTAL EXPENDS THRU 12/31/20

$513.00

55320 - SURVEY - DESIGN

EST. COST JAN - JUNE 2021

$513.00

$15,000.00

55330 - DESIGN

BUDGET FY 21-22

$15,000.00

$2,100,000.00

55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$1,500.00

55370 - LEGAL FEES

$10,000.00

$500.00

$5,500.00

$4,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$1,000,000.00

55400 - APPRAISAL

$1,000,000.00

$5,000.00

$5,000.00

55410 - CONDEMNATION 55420 - CONSTRUCTION

$17,500,000.00

55430 - CONST. CONTRACT ADM.

$700,000.00

55440 - TESTING

$50,000.00

55450 - SURVEY - ASBUILT TOTAL AMOUNT

$21,382,013.00

$1,013.00

ENGINEER:

TBD

HC

R.O.W. ACQUISITION:

N/A

# PLATS: [ 0 ]

CONTRACTOR:

$10,500.00

$1,019,000.00

ESTIMATED BUDGETS - FY 23 - 31 FY 22-23

$700,000.00

FY 23-24

$1,401,500.00

CONSTRUCTION ADM.:

TBD

FY 24-25

$9,125,000.00

INSPECTION:

TBD

FY 25-26

$9,125,000.00

FY 26-27

$0.00

FY 27-28

$0.00

FY 28-29

$0.00

FY 29-30

$0.00

FY 30-31

$0.00

This project is to implement the recommendations of the French Broad/Carrier Bridge Preliminary Engineering Report. This project will help mitigate wet weather impacts to the Swannanoa Interceptor by shaving peak wet weather flows. Equalizing flow will help reduce SSOs and prevent inundation and surcharging of downstream infrastructure, including the treatment plant. The estimated costs shown are planning level only, and incorporate a new 8.1MG EQ tank, 16MGD pump station and associate piping. PROJECT DESCRIPTION:

SPECIAL PROJECT NOTES:

Tank location was unknown at the time of budget. Project map and compensation are based on siting the tank at COA's Hardesty Ln site (Tank Site Option #6 per CDM Prelim. Eng. Report)


Capital Improvement Program Fiscal Years 2022—2031

General Sewer Rehabilitation Projects


This Page Intentionally Blank


/

WATERS R D

N WI

R SP

T

SPRUCE HIL

LC

L LN

RC ALGA TRAF

PL

IL EH

TH

UC

OR KW

IR

NOT TO SCALE

Albemarle Commons Pump Station Replacement Project No. 2018171

TRAFALGAR CIR

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Albemarle Commons PS Elimination LOCATION:

Asheville

TYPE:

General Capital Improvements

PIPE RATING:

N/A

PROJECT NO.

2018171

TOTAL LF:

832

PROJECT BUDGET:

$285,130.00

PROJECT ORIGIN:

PS Elimination

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$3,130.00

$3,130.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$2,500.00

$2,500.00

55370 - LEGAL FEES

$3,000.00

$3,000.00

$30,000.00

$30,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL

$3,500.00

$3,500.00

55410 - CONDEMNATION

$10,000.00

$10,000.00

55420 - CONSTRUCTION

$230,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT

$3,000.00

TOTAL AMOUNT

$285,130.00

$3,130.00

ENGINEER:

MSD

TH

R.O.W. ACQUISITION:

MSD

# PLATS: [ 2

CONTRACTOR:

$0.00

$49,000.00

ESTIMATED BUDGETS - FY 23 - 31 ]

FY 22-23

$0.00

FY 23-24

$230,000.00

CONSTRUCTION ADM:

MSD

FY 24-25

$3,000.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project is located in East Asheville just off Winkworth Pl. at MSD’s FY 28-29 Albemarle Commons Pump Station. This project will eliminate the existing pump station by installing FY 29-30 approximately 832 LF of 8-inch DIP gravity line. FY 30-31 SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


HOAL

TRADE ST

L MAPLE

NOT TO SCALE

T POND S

N

LANCE LN

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

T

METROPOLITAN SEWERAGE DISTRICT

S ATKINS

RD

Atkins Street Project No. 2014012

S RD

LOVER

LE ONVIL

/

S LONG

RS HENDE

S LN

IR MIAMI C


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Atkins Street

LOCATION:

Arden

TYPE:

General Sewer Rehab.

PIPE RATING:

39

PROJECT NO.

2014012

TOTAL LF:

1,833

PROJECT BUDGET:

$698,330.00

PROJECT ORIGIN:

SSO's, Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$5,480.00

$5,480.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$2,250.00

55370 - LEGAL FEES

$4,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$48,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$632,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$4,600.00

TOTAL AMOUNT

$698,330.00

$5,480.00

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

MSD

# PLATS: [ 3

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 23 - 31 ]

FY 22-23

$0.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$2,250.00

FY 26-27

$52,000.00

FY 27-28

$638,600.00

PROJECT DESCRIPTION: This project is located in Arden just north of Lake Julian. Approximately 1,833 LF of existing 6-inch vitrified clay pipe will be replaced with new 8-inch ductile iron pipe. The FY 28-29 existing sewer line is in poor condition due to roots, fractures, and sags in the line. The line is undersized FY 29-30 and has flooded houses in the area. FY 30-31

SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


RA RO

LL HI D EN E AL RD

Aurora Drive Project No. 2017145 NOT TO SCALE

KE

RTH WO NIL

DR E BOR ALIS

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

S KNL

METROPOLITAN SEWERAGE DISTRICT

L RD

/

DR RD

ALE

A OR

RIN GD

R AU

RTH RD

AU R HE C AT UC

KENILW O

A BE

SP

E TUNN

RD

LN


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Aurora Drive

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

53

PROJECT NO.

2017145

TOTAL LF:

2,700

PROJECT BUDGET:

$1,043,500.00

PROJECT ORIGIN:

Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$10,000.00

$4,640.00

$5,360.00

55360 - EASEMENT PLATS

$4,000.00

$2,450.00

$1,550.00

55370 - LEGAL FEES

$8,000.00

$1,724.00

$6,276.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$40,000.00

55400 - APPRAISAL

$15,000.00

$30,000.00

$2,500.00

$2,500.00

55410 - CONDEMNATION

$10,000.00

$10,000.00

55420 - CONSTRUCTION

$960,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$7,000.00

TOTAL AMOUNT

$1,043,500.00

$8,814.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

MSD

# PLATS: [ 6

CONTRACTOR:

$28,186.00

$42,500.00

ESTIMATED BUDGETS - FY 23 - 31 ]

FY 22-23

$969,000.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project runs along Aurora Drive in the Kenilworth area of Asheville. The project begins on Aurora Drive, runs through several properties, and ends on Springdale Rd. The FY 28-29 existing 6-inch clay pipes have structural defects, heavy root intrusion, and deteriorating manholes. All FY 29-30 of these problems contribute to I/I issues. FY 30-31

SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


E

NOT TO SCALE

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

LV D

/

AV

Y WA

ID B

Avon Avenue at Haywood Road Project No. 2021003

AV ON

S WE

ND TE

CL EU

D

R

H A YW O

O D


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Avon Ave. @ Haywood Rd

LOCATION:

West Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

65

PROJECT NO.

2021003

TOTAL LF:

233

PROJECT BUDGET:

$121,750.00

PROJECT ORIGIN:

Access, Flooded Structure, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$1,500.00

$1,500.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$5,250.00

55370 - LEGAL FEES

$8,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$35,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$70,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$1,000.00

TOTAL AMOUNT

$121,750.00

$0.00

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

MSD

# PLATS: [ 7

CONTRACTOR:

$0.00

$1,500.00

ESTIMATED BUDGETS - FY 23 - 31 ]

FY 22-23

$0.00

FY 23-24

$5,250.00

CONSTRUCTION ADM:

MSD

FY 24-25

$43,000.00

INSPECTION:

MSD

FY 25-26

$72,000.00

FY 26-27

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project is located in West Asheville near Avon Ave, approximately 0.25 mile west of the Haywood Rd. bridge. Approximately 233 LF of existing 6-inch and 8-inch vitrified clay FY 28-29 pipe will be replaced with new 8-inch ductile iron pipe. The existing sewer line is in poor condition due to FY 29-30 roots and cannot be washed or rodded due to lack of access. FY 30-31

SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


D ENE UKE RGY L

C O K D O O W R D N

K

EL

E RE YC L R D TR

I EFF

B

E DG I R

RD

BUS INE PAR SS K CIR

R

RO S T ET

CU

A

E GL

LN

A TS H WD

IE NV

R

WR

Beale Road at Copney Lane Project No. 2009129

LE G

NN

DR

N

CT

FISHERS MILL RD

COP N

C DU

R KER

D

EY L N

FISK

DR

NOT TO SCALE

N GLE

GO MAN DR

GLEN BRIDGE RD

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

RD

METROPOLITAN SEWERAGE DISTRICT

GE RID NB

ION AT RL X T LA RE NCH RA

RD

/

R SD

DO N

W NE ED LL MI

N ICA

A IC

LN

CT

D

S AU AY W

OT DR HAN

N

R OD WO Y E H

RD

SP I R N HILL G CIR

N JO KR

CA

SH LS OA

NV AS

E GRAC

D OL

RD

N

E

BEAL E

SO ER

LL VI

CAT DR

D

R

GLENN WILLOW DR

N HE

ED

ROLLIN S DR

K BLA

D


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Beale Road at Copney Lane

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

47

PROJECT NO.

2009129

TOTAL LF:

4,027

PROJECT BUDGET:

$1,588,175.00

PROJECT ORIGIN:

SSO's, Access, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$15,725.00

$15,725.00

55330 - DESIGN 55340 - PERMITS

$1,200.00

$1,200.00

$1,200.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$18,000.00

55370 - LEGAL FEES

$20,000.00

55380 - ACQUISITION SERVICES

$18,000.00

$42,750.00

55390 - COMPENSATION

$140,000.00

55400 - APPRAISAL

$7,500.00

55410 - CONDEMNATION

$20,000.00

55420 - CONSTRUCTION

$1,310,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$3,000.00

55450 - SURVEY - ASBUILT

$10,000.00

TOTAL AMOUNT

$1,588,175.00

$15,725.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

Consultant

# PLATS: [ 19 ]

CONTRACTOR:

$1,200.00

$19,200.00

ESTIMATED BUDGETS - FY 23 - 31 FY 22-23

$230,250.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$1,323,000.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

It serves several major FY 28-29

$0.00

PROJECT DESCRIPTION: This project ties into the Lake Julian Ph. 4 project just west of Glen Bridge Road

and extends northward to Ducker Road and Lower Glen Bridge Road. manufacturing sites. The lines are in poor condition with broken segments and leaking joints, have FY 29-30 experienced SSO's, and are difficult to access for maintenance and repairs. FY 30-31

SPECIAL PROJECT NOTES:

$0.00 $0.00


HE

AMHERST RD

/

RD

NVIL LE

NDE RSO

RD UN DT OP

MILL STON E

DR

MAGNUM WAY

Bellevue Road Project No. 2015175

RO

LE AN HURST RD

NOT TO SCALE

E BELLEVU

RD

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

JAN DR


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Bellevue Road

LOCATION:

S. Asheville

TYPE:

General Sewer Rehab

PIPE RATING:

49

PROJECT NO.

2015175

TOTAL LF:

1,100

PROJECT BUDGET:

$463,100.00

PROJECT ORIGIN:

Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$9,600.00

$9,600.00

55330 - DESIGN 55340 - PERMITS

$5,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$7,000.00

55370 - LEGAL FEES

$10,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$30,000.00

55400 - APPRAISAL

$3,000.00

55410 - CONDEMNATION

$10,000.00

55420 - CONSTRUCTION

$385,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$500.00

55450 - SURVEY - ASBUILT

$3,000.00

TOTAL AMOUNT

$463,100.00

$9,600.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

MSD

# PLATS: [ 9

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 23 - 31 ]

FY 22-23

$7,000.00

FY 23-24

$58,000.00

CONSTRUCTION ADM:

MSD

FY 24-25

$388,500.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project is located in South Asheville along properties on Bellevue Road, FY 28-29

$0.00

and will replace 1,100 LF of 6-inch VCP and PVC. The existing line is in poor condition and has too many FY 29-30 point repairs. FY 30-31 SPECIAL PROJECT NOTES:

$0.00 $0.00


RD

Bent Tree Road Project No. 2016102 NOT TO SCALE

LN

Budget Map

METROPOLITAN SEWERAGE DISTRICT of BUNCOMBE COUNTY, NORTH CAROLINA

R

/

T DR

RD

SUNS E

OL L OL DT

RD

TR E E

ES

OKE E

S

CR D O O W T

CHE R

RD

RD D TW OO CR E

BENT

ND

BLUE BRIA R

S WE E AV TH


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Bent Tree Road

LOCATION:

Asheville

TYPE:

General Sewer Rehab

PIPE RATING:

60

PROJECT NO.

2016102

TOTAL LF:

1,654

PROJECT BUDGET:

$862,921.00

PROJECT ORIGIN:

SSO's, Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$9,300.00

$9,300.00

55360 - EASEMENT PLATS

$4,500.00

$4,500.00

55370 - LEGAL FEES

$2,656.00

$2,656.00

$39,465.00

$39,465.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES

55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$800,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$5,000.00

TOTAL AMOUNT

$862,921.00

$55,921.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

MSD

# PLATS: [ 5

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 23 - 31 ]

FY 22-23

$807,000.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project runs adjacent to Bent Tree Rd. in Asheville. It begins on Old Toll FY 28-29

$0.00

Rd., crosses Bent Tree Rd., and ends at Crestwood Rd. There are numerous structural problems and FY 29-30 bends within the lines which contribute to I/I issues. FY 30-31 SPECIAL PROJECT NOTES:

$0.00 $0.00


CREEK

DR

CAMPBEL L

GATEHOUSE CT

CIR

Braddock Way - PRP 20002 Project No. 2006025

AY KW

/

CARSO N

E ET

EK

L

NOT TO SCALE

CLUBHOUSE CT

BA

LA

R NT

EE

R

PARK AVE

D

PARK RIDGE CT

E SW

RE NC

GARDENWOOD LN

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

CREEKSIDE CT

A BR OC DD

RD


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Braddock Way - PRP 20002

LOCATION:

Asheville

TYPE:

Pipe Rated Projects

PIPE RATING:

36

PROJECT NO.

2006025

TOTAL LF:

3,848

PROJECT BUDGET:

$1,684,940.00

PROJECT ORIGIN:

Pipe Rating Program

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$18,190.00

$18,190.00

55330 - DESIGN 55340 - PERMITS

$1,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$37,500.00

55370 - LEGAL FEES

$26,000.00

55380 - ACQUISITION SERVICES

$56,250.00

55390 - COMPENSATION

$80,000.00

$163.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$1,450,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$3,500.00

55450 - SURVEY - ASBUILT

$12,500.00

TOTAL AMOUNT

$1,684,940.00

$18,353.00

ENGINEER:

MSD

TH

R.O.W. ACQUISITION:

Consultant

# PLATS: [ 25 ]

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 23 - 31 FY 22-23

$0.00

FY 23-24

$0.00

CONSTRUCTION ADM.:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$38,500.00

FY 26-27

$162,087.00

FY 27-28

$0.00

Park Avenue and Braddock Way subdivisions. Problems with these lines include leaking joints, broken FY 28-29

$1,466,000.00

pipes and high inflow and infiltration. In some areas, the existing lines will be relocated from private FY 29-30 property to public rights of way for better access and maintenance.

$0.00

PROJECT DESCRIPTION: This project will replace, line, and pipe burst several existing sewer mains in

FY 30-31

SPECIAL PROJECT NOTES:

$0.00


A ORE

/

MEADOW RD

M BILT

VE

Bryson Street Project No. 2016167

BR YS ON ST

NOT TO SCALE

NN SWA

VER A RI ANO

RD

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

T

METROPOLITAN SEWERAGE DISTRICT

NS SO MP O TH


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Bryson Street

LOCATION:

Biltmore Village

TYPE:

General Sewer Rehab.

PIPE RATING:

60

PROJECT NO.

2016167

TOTAL LF:

611

PROJECT BUDGET:

$482,750.00

PROJECT ORIGIN:

Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$900.00

$900.00

55360 - EASEMENT PLATS

$1,350.00

$1,350.00

55370 - LEGAL FEES

$3,000.00

$3,000.00

$35,000.00

$35,000.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES

55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL

$5,000.00

$5,000.00

55410 - CONDEMNATION

$20,000.00

$20,000.00

55420 - CONSTRUCTION

$415,000.00

$415,000.00

$1,000.00

$1,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT

$1,500.00

TOTAL AMOUNT

$1,500.00

$482,750.00

$2,250.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

MSD

# PLATS: [ 2

CONTRACTOR:

$38,000.00

$442,500.00

ESTIMATED BUDGETS - FY 23 - 31 ]

FY 22-23

$0.00

FY 23-24

$0.00

CONSTRUCTION ADM.:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project is a high priority project in Biltmore Village, at the intersection of FY 28-29

$0.00

Bryson St and Biltmore Ave. It will replace a failing 4-inch PVC line with sags and reverse grade issues FY 29-30 serving multiple businesses with a 611 LF 8-inch DIP line. FY 30-31 SPECIAL PROJECT NOTES:

$0.00 $0.00


BU

C

H

OR BILTM

PL

AN

A

N

Buchanan Avenue Project No. 2014023

WHITE FAW N

A VE

/

AN HAN BUC

PL

ST NOT TO SCALE

FLORENC E

E WHIT N DR FAW

E A VE

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Buchanan Ave.

LOCATION:

Asheville

TYPE:

Pipe Rated Projects

PIPE RATING:

51

PROJECT NO.

2014023

TOTAL LF:

2,255

PROJECT BUDGET:

$1,141,900.00

PROJECT ORIGIN:

Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$28,000.00

$15,975.00

$12,025.00

55330 - DESIGN 55340 - PERMITS

$1,000.00

$1,000.00

55360 - EASEMENT PLATS

$6,900.00

$6,900.00

55370 - LEGAL FEES

$4,000.00

$4,000.00

$77,000.00

$77,000.00

55350 - SPECIAL STUDIES

55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL

$2,500.00

$2,500.00

55410 - CONDEMNATION

$15,000.00

$15,000.00

55420 - CONSTRUCTION

$1,003,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$2,500.00

TOTAL AMOUNT

$1,141,900.00

$15,975.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

MSD

# PLATS: [ 3

CONTRACTOR:

$19,925.00

$98,500.00

ESTIMATED BUDGETS - FY 23 - 31 ]

FY 22-23

$1,007,500.00

FY 23-24

$0.00

CONSTRUCTION ADM.:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project is located in downtown Asheville near Biltmore Ave. and is FY 28-29 comprised of 2,228 LF of 8-inch ductile iron pipe. The existing line is 6-inch clay with heavy root intrusion, FY 29-30 fractures, and one section exposed along a steep grade. FY 30-31 SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


G

T BIL

RE MO

AV

E

ILW PL OOD

CASTLE ST

Caledonia Road Project No. 2014153

E

RD

NG

PA R

RD

NOT TO SCALE

M RD

K

PELH A

BO W LI

LS

T

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

RD

/

KE N

L CA

A NI O D

EL W LO

E

LIN EB RO CIR

E

AV

UN A

DI L

LA

UNADILLA ALY

RD DON IA CAL E

L CA A NI DO


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Caledonia Road

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

65

PROJECT NO.

2014153

TOTAL LF:

2,115

PROJECT BUDGET:

$1,050,350.00

PROJECT ORIGIN:

SSO's, Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$10,000.00

$9,800.00

$200.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$1,500.00

55370 - LEGAL FEES

$4,000.00

$4,000.00

$100,000.00

$100,000.00

$1,500.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL

$7,500.00

$7,500.00

55410 - CONDEMNATION

$20,000.00

$20,000.00

55420 - CONSTRUCTION

$895,000.00

$351,000.00

$4,000.00

$2,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT

$8,350.00

TOTAL AMOUNT

$2,600.00

$1,050,350.00

$9,800.00

$357,300.00

$131,500.00

1066 ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

MSD

# PLATS: [ 2

CONTRACTOR:

ESTIMATED BUDGETS - FY 23 - 31 ]

FY 22-23

$902,750.00

FY 23-24

$0.00

CONSTRUCTION ADM.:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project is located at the Caledonia Rd. entrance to the Kenilworth neighborhood, approx. 0.3 mile south of the Mission Hospital campus. The project includes replacement FY 28-29 of approx. 2,115 LF of 8-inch VCP pipe with new 8-inch DIP. The existing pipe has structural defects FY 29-30 which have resulted in multiple SSO's. FY 30-31

SPECIAL PROJECT NOTES:

This project overlaps with Biltmore WW (CDM #3, MSD Project# 2001192), which is a Non-Critical project.

$0.00 $0.00 $0.00


E

40

O I2

/

BR O

AD WA Y

ST T

I240

ERR

IMO N AV E

I240 W

ELM ST

ORANGE ST

I240 E

AVE CENTRA L

Central Avenue at I-240 Project No. 2014180

I240E BROADWAY ST TO

WT OM

Y ST

S LIBERT

NOT TO SCALE

ORCHARD ST

E TO

W

CHA R

I 240

LOT

TE S

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

I240

TO ST

T

METROPOLITAN SEWERAGE DISTRICT

D HAR ORC

CLAYTON ST

PL ORCHAR D


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Central Ave. @ I-240

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

35

PROJECT NO.

2014180

TOTAL LF:

990

PROJECT BUDGET:

$393,000.00

PROJECT ORIGIN:

SSO's, Work orders, Line condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$5,000.00

55330 - DESIGN 55340 - PERMITS

$1,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$1,000.00

55370 - LEGAL FEES

$1,500.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$13,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$370,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$500.00

TOTAL AMOUNT

$393,000.00

$0.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

MSD

# PLATS: [ 1

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 23 - 31 ]

FY 22-23

$0.00

FY 23-24

$0.00

CONSTRUCTION ADM.:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$5,000.00

FY 26-27

$16,500.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project is located in downtown Asheville near Woodfin St. and is FY 28-29 comprised of 990 LF of 12-inch ductile iron pipe. The existing line is 6, 10, and 12-inch vitrified clay pipe FY 29-30 with a history of SSO's. FY 30-31 SPECIAL PROJECT NOTES:

$0.00 $0.00 $371,500.00


/

DAYT ON RD

RD AM

Chatham Road Project No. 2015019

CH AT H

SALEM AVE

NOT TO SCALE

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

R

METROPOLITAN SEWERAGE DISTRICT

CLEARVIEW TE

D

CL MER RIM ON

OLL R OOD KN EDGEW

ER WT EA R VIE A VE


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Chatham Road

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

43

PROJECT NO.

2015019

TOTAL LF:

1,330

PROJECT BUDGET:

$639,700.00

PROJECT ORIGIN:

Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$4,800.00

$4,800.00

55330 - DESIGN 55340 - PERMITS

$1,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$4,500.00

55370 - LEGAL FEES

$4,000.00

$3,500.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$35,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$588,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$1,400.00

TOTAL AMOUNT

$639,700.00

$4,800.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

MSD

# PLATS: [ 4 ]

CONTRACTOR:

$0.00

$3,500.00

ESTIMATED BUDGETS - FY 23 - 31 FY 22-23

$1,000.00

FY 23-24

$40,000.00

CONSTRUCTION ADM:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$590,400.00

FY 26-27

$0.00

FY 27-28

$0.00

This project is located in North Asheville near W.T. Weaver Blvd. and is FY 28-29 comprised of 1,450 LF of 8-inch ductile iron pipe. The existing line is 6-inch vitrified clay pipe in poor FY 29-30 condition with heavy root intrusion. PROJECT DESCRIPTION:

FY 30-31 SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


ER G

UD

PL

PL

CE LI A

CLYDE ST

ST

PL

RO KE ER D

Cherokee Road Project No. 2009132

BLAIR S T

CH E

D

/

HILLSIDE ST

LENNOX

EDWIN

BOND ST

OAK

LN

CAN T ERB

NOT TO SCALE

URY RD N

E NS

TD

R

LA N D RD

SU

WOO D RD

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

FAIRMON T

TR

N CRE SCENT ST

TTE S T

CHARLO

E AV LE R D

CROSS BANBUR Y E PL

NT RD FAIRM O

E

T

K OC RD ALBEMA R

T

DR ALBEMAR L

OR AR CH VON RUCK C

MU

XC

A D R

LE

O NN

R R VON RUCK TE

R TE CE


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Cherokee Road

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

48

PROJECT NO.

2009132

TOTAL LF:

1,960

PROJECT BUDGET:

$894,680.00

PROJECT ORIGIN:

SSO's, Access, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$15,680.00

$15,680.00

$9,500.00

$8,250.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES

$1,250.00

$11,000.00

$11,000.00

$175,000.00

$175,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL

$7,500.00

$7,500.00

55410 - CONDEMNATION

$20,000.00

$20,000.00

55420 - CONSTRUCTION

$650,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$5,000.00

TOTAL AMOUNT

$894,680.00

$23,930.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

MSD

# PLATS: [ 10

$1,250.00

$213,500.00

ESTIMATED BUDGETS - FY 23 - 31 ]

CONTRACTOR:

FY 22-23

$656,000.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

the Macon Ave. @ Sunset Parkway project to an existing manhole east of Cambridge Road in North FY 28-29

$0.00

Asheville. The line is old vitrified clay pipe and is in very poor condition. Several segments are under FY 29-30 houses, walls, or other physical features which make repairs very difficult.

$0.00

PROJECT DESCRIPTION: This project will replace (or pipe burst) the existing sewer main from the end of

FY 30-31

SPECIAL PROJECT NOTES:

$0.00


/

VILLAS CT

HILL

LN

TIN Y

RD

Cub Road Project No. 2018027

L

CUB PL

P KIRBY

JO HN BL VD

NOT TO SCALE

ST ON N RIDGE RU N N ER L

DARCUS LN

Budget Map

METROPOLITAN SEWERAGE DISTRICT of BUNCOMBE COUNTY, NORTH CAROLINA

CIR IONA

SO SO WA Y

AR CED

D CUB R


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Cub Road

LOCATION:

Asheville

TYPE:

General Sewer Rehab

PIPE RATING:

40

PROJECT NO.

2018027

TOTAL LF:

1,204

PROJECT BUDGET:

$457,000.00

PROJECT ORIGIN:

CSR's, MH Overflow, Work Orders

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$18,000.00

55330 - DESIGN 55340 - PERMITS

$500.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$15,000.00

55370 - LEGAL FEES

$13,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$55,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$350,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$4,500.00

TOTAL AMOUNT

$457,000.00

$0.00

ENGINEER:

MSD

TH

R.O.W. ACQUISITION:

MSD

# PLATS: [ 12 ]

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 23 - 31 FY 22-23

$0.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$18,500.00

INSPECTION:

MSD

FY 25-26

$83,000.00

FY 26-27

$0.00

FY 27-28

$355,500.00

fronting Cub Rd. This system consists of approximately 1,204 LF of 8-inch VCP to be replaced with 8-inch FY 28-29 DIP. This existing VCP is full of sags, has heavy root intrusion, deteriorating manholes, and bad service FY 29-30 connections.

$0.00

PROJECT DESCRIPTION: This project is located in West Asheville running along the rear of properties

FY 30-31

SPECIAL PROJECT NOTES:

$0.00 $0.00


T ES W

ST

ST

A LIA

VE

BR O

UN YO

G

W

ST

CH

ES

ST

UT TN

AD WA Y

T

ST

BR O AD W AY

IZ EL

ST

ET AB H

WN LA D O E WO AV

T IN FL T S

BE IZA ST L E

TH

VE

E RO N MO

PL

HIGHLAND ST

A VE

East Chestnut Street at Five Points Project No. 2015192

PL

/

O GN MA

FOR

ES S Y TH

A

A OW DR O WO PL

AL OC

UNT MO E PL R CLA ROW

MOUNT CL ARE

D WOO HOLLAND ST

E CHESTNUT

NOT TO SCALE

ST

ST

MAXWELL ST

AND

FULTON S T

L HOL

BROAD ST

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

MERRIMON PL

MERRIMON AVE

METROPOLITAN SEWERAGE DISTRICT

ELOISE ST

CLAXTON PL


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

East Chestnut Ave @ Five Points

LOCATION:

N. Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

36

PROJECT NO.

2015192

TOTAL LF:

5,225

PROJECT BUDGET:

$1,822,050.00

PROJECT ORIGIN:

MH Overflows, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$53,000.00

$19,321.00

$33,679.00

55330 - DESIGN 55340 - PERMITS

$1,000.00

$1,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$16,300.00

55370 - LEGAL FEES

$25,000.00

55380 - ACQUISITION SERVICES

$51,750.00

55390 - COMPENSATION

$100,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$1,570,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$3,000.00

55450 - SURVEY - ASBUILT

$2,000.00

TOTAL AMOUNT

$1,822,050.00

$19,321.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

Consultant

# PLATS: [ 23 ]

CONTRACTOR:

$34,679.00

$0.00

ESTIMATED BUDGETS - FY 23 - 31 FY 22-23

$0.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$13,800.00

INSPECTION:

MSD

FY 25-26

$179,250.00

FY 26-27

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project is located in N. Asheville and is comprised of 5,225 LF of

8-inch FY 28-29 ductile iron pipe. The existing line is aging 6, 8, and 10-inch VCP in poor shape with multiple structural FY 29-30 defects per segment. FY 30-31 SPECIAL PROJECT NOTES:

SSD constructed 607 LF portion of this project in Fulton St in 2020, ahead of COA sidewalks

$1,575,000.00 $0.00 $0.00


S AV E

R BA

EDWARDS AVE

RA KE

OND RICHM

HWY

Edwards Avenue at US 70 Project No. 2021004

VE

/

SHORT ST

ED W AR D

US 7 0

NOT TO SCALE

YOUNG ST

A VE

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

AVERY WOOD DR


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Edwards Ave @ US 70 Hwy

LOCATION:

Swannanoa

TYPE:

General Sewer Rehab.

PIPE RATING:

35

PROJECT NO.

2021004

TOTAL LF:

2,400

PROJECT BUDGET:

$871,400.00

PROJECT ORIGIN:

Line Condition, Flooded Struture

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$14,400.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$6,000.00

55370 - LEGAL FEES

$9,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$30,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$804,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$6,000.00

TOTAL AMOUNT

$871,400.00

$0.00

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

MSD

# PLATS: [ 8

$0.00

$0.00

ESTIMATED BUDGETS - FY 23 - 31 ]

CONTRACTOR:

FY 22-23

$0.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$14,400.00

PROJECT DESCRIPTION: This project is located in Swannanoa, approximately 0.5 mile east of the Patton Cove Rd exit (I-40 exit 59). The project includes pipe replacement on Edwards Ave, Richmond Ave, and Young St. Approximately 2,400 LF of existing 6-inch and 8-inch vitrified clay pipe will be replaced with 8-inch ductile iron pipe. This line was constructed in the 1920s and has numerous structural defects which contributed to one flooded structure. SPECIAL PROJECT NOTES:

FY 26-27

$0.00

FY 27-28

$6,000.00

FY 28-29

$39,000.00

FY 29-30

$812,000.00

FY 30-31

$0.00


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Elk Mountain Place

LOCATION:

Woodfin

TYPE:

General Sewer Rehab.

PIPE RATING:

48

PROJECT NO.

2010094

TOTAL LF:

4,137

PROJECT BUDGET:

$1,532,500.00

PROJECT ORIGIN:

SSO's, Access, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$18,000.00

$18,000.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$30,000.00

$30,000.00

55370 - LEGAL FEES

$40,000.00

$35,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL

$5,000.00

$90,000.00

$50,000.00

$125,000.00

$60,000.00

$10,000.00

55410 - CONDEMNATION

$40,000.00

55420 - CONSTRUCTION

$1,165,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$12,500.00

TOTAL AMOUNT

$1,532,500.00

$18,000.00

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

MSD

# PLATS: [ 38 ]

CONTRACTOR:

$65,000.00

$115,000.00

ESTIMATED BUDGETS - FY 23 - 31 FY 22-23

$155,000.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$1,177,250.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project is located south of Elk Mountain Rd. between I-26 and the French FY 28-29

$0.00

Broad river. It is comprised of approximately 4,101 LF of 8-inch ductile iron pipe. The existing vitrified FY 29-30 clay sewer line is in poor condition and has experienced SSO's. FY 30-31 SPECIAL PROJECT NOTES:

$0.00 $0.00


ON

N

CAN T

AV E

Y PK W

/

L OAK

SU

T N SE

ERB

URY

RD N

RD

Fairmont Road Project No. 2015017 NOT TO SCALE

SU

M AC

KWY

L

D

D NT R FAIR MO

DR NS E

T

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

CH E

LAND WOO D FAIRMONT R

D ER RO KE

ET P

DP

DR OW ER MAY FL

S SUN

OO EW G RID

RD MO U TO WN

RD

NTA IN

E GL

E AL ND


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Fairmont Road

LOCATION:

N. Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

31

PROJECT NO.

2015017

TOTAL LF:

3,900

PROJECT BUDGET:

$1,704,000.00

PROJECT ORIGIN:

SSO's, Access, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$20,000.00

55330 - DESIGN 55340 - PERMITS

$500.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$8,500.00

55370 - LEGAL FEES

$12,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$150,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$1,500,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$3,000.00

55450 - SURVEY - ASBUILT

$10,000.00

TOTAL AMOUNT

$1,704,000.00

$0.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

MSD

# PLATS: [ 11

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 23 - 31 ]

FY 22-23

$0.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$20,000.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project is located in North Asheville approximately 0.25 miles east of FY 28-29

$8,500.00

Charlotte St. The project will run along roads and properties from Glendale Rd. to Sunset Dr. The 6-inch FY 29-30 clay lines are in poor condition which have caused manhole overflows and SSOs.

$162,500.00

FY 30-31

$1,513,000.00

SPECIAL PROJECT NOTES:


BU

ER SB E

R BOU

NE L

N

PINE

RD

RD VISTA

O BR

WN

ST

ST

ORE

LE INO SEM

M ARD

D

R FO

Forestdale Drive Project No. 2014002

WN TO

RD

COR

R ST ER

/

LON E

D

A BUEN

H AM

DR

OU IB

LE

R CA

DA EST

RD

E OR

OO NW DEA

CT

NOT TO SCALE

L RIA

T

M ARD

ST S

T RE S

E IMP

DM O E AR

E FOR

DC

ST

IR

K

E WHIT

E RD

DR OO SW

CI R of BUNCOMBE COUNTY, NORTH CAROLINA

Budget Map

METROPOLITAN SEWERAGE DISTRICT

RO C

V I LL

CIR

L

D HEN ON ER S

OD NWO DAW

M ADA

HI L

L ST N EL

ES DR WHISPERING PIN

D

RD OAK


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Forestdale Drive

LOCATION:

S. Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

33

PROJECT NO.

2014002

TOTAL LF:

2,600

PROJECT BUDGET:

$1,021,000.00

PROJECT ORIGIN:

SSO's, Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$15,000.00

55330 - DESIGN 55340 - PERMITS

$500.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$17,000.00

55370 - LEGAL FEES

$25,000.00

55380 - ACQUISITION SERVICES

$54,000.00

55390 - COMPENSATION

$150,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$750,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$3,000.00

55450 - SURVEY - ASBUILT

$6,500.00

TOTAL AMOUNT

$1,021,000.00

$0.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

Consultant

# PLATS: [ 24 ]

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 23 - 31 FY 22-23

$0.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$15,000.00

FY 27-28

$0.00

along side roads and properties parallel to Hendersonville Rd. System Services crews have reported FY 28-29

$246,500.00

numerous problems including multiple SSO's. The existing pipes will be replaced with 8-inch ductile iron FY 29-30 pipe.

$0.00

PROJECT DESCRIPTION: This project begins at Cornell St. and ends at Caribou Rd. The system runs

FY 30-31

SPECIAL PROJECT NOTES:

$759,500.00


Harmony Lane Project No. 2016103

HARMONY LN

ST

/

R

DR

NT

P CY

ME

HA RC

S ES

NOT TO SCALE

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

W RD

METROPOLITAN SEWERAGE DISTRICT

FAIR VIE

MURPHY ST

ROBIN ST


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Harmony Lane

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

35

PROJECT NO.

2016103

TOTAL LF:

670

PROJECT BUDGET:

$190,000.00

PROJECT ORIGIN:

Undersized, Maintenance Issues

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$2,500.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$185,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$500.00

55450 - SURVEY - ASBUILT

$2,000.00

TOTAL AMOUNT

ENGINEER:

$190,000.00

MSD

R.O.W. ACQUISITION:

$0.00

DP # PLATS: [ 0 ]

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 23 - 31 FY 22-23

$0.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

This project is along Harmony Lane in Asheville's Oakley area. The existing FY 28-29 system has two parallel lines that collect on both side of the street. Problems with the system consist of FY 29-30 root intrusion, poor access for maintenance, and close proximity to houses. PROJECT DESCRIPTION:

FY 30-31 SPECIAL PROJECT NOTES:

$2,500.00 $0.00 $187,500.00


A BR

I24

0E

PA TT O N AV ET O I24 I24 0 E I240 0W W T OP AT T O NA VE W

L VANDA

N NG NI ST

/

MILL B ROO K

R

RD

L HAZE

MILL

WORLE Y

RD

PL

ANNIE ST

Hazel Mill Road at Richland Street Project No. 2014016

AVE TON T A P

RICH LAND ST

L

N AVE PATTO

ND

DP

S LA RU

NOT TO SCALE

WE S TW OO

DR

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

SE RI

TO X METROPOLITAN SEWERAGE DISTRICT

N SU

ST AW AY

E PATTON AV

AY AVE RIDGEW

IA AVE


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Hazel Mill Rd @ Richland St.

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

56

PROJECT NO.

2014016

TOTAL LF:

3,300

PROJECT BUDGET:

$1,256,700.00

PROJECT ORIGIN:

SSO's, Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$17,000.00

$17,000.00

55330 - DESIGN 55340 - PERMITS

$1,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$9,400.00

55370 - LEGAL FEES

$15,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$100,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$1,110,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$2,300.00

TOTAL AMOUNT

$1,256,700.00

$0.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

MSD

# PLATS: [

CONTRACTOR:

$0.00

$17,000.00

ESTIMATED BUDGETS - FY 23 - 31 14

]

FY 22-23

$9,400.00

FY 23-24

$116,000.00

CONSTRUCTION ADM:

MSD

FY 24-25

$1,114,300.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

PROJECT DESCRIPTION: This project is located in West Asheville, near the Bowen Bridge, and consists of 3,300 LF of 8-inch ductile iron pipe. The current pipe is 6-inch and 8-inch clay and PVC. Lines FY 28-29 are undersized and in poor condition with multiple pipe sags, cracks, and fractures. FY 29-30

$0.00

FY 30-31

$0.00

SPECIAL PROJECT NOTES:

$0.00 $0.00


CO AG TT E

TL

NOT TO SCALE

S EA

N

PAT TO

VE EA

CT

4 I2

0

W

TO

I2

6

I24

0E

TO

I26

W

/

PL

E GR LE EN

N AV

ST

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

I 26 W

W

L HIL

METROPOLITAN SEWERAGE DISTRICT

E TO

0 I24

SE ST

Hill Street at Cross Place Project No. 2016249

O CR

SS

O RO LT VE

W


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Hill Street @ Cross Place

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

44

PROJECT NO.

2016249

TOTAL LF:

254

PROJECT BUDGET:

$90,500.00

PROJECT ORIGIN:

Work Orders, Line Location and Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$3,000.00

$1,525.00

55330 - DESIGN 55340 - PERMITS

$500.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$2,500.00

55370 - LEGAL FEES

$3,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$10,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$70,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$500.00

55450 - SURVEY - ASBUILT

$1,000.00

TOTAL AMOUNT

$90,500.00

$1,525.00

ENGINEER:

MSD

TH

R.O.W. ACQUISITION:

MSD

# PLATS: [ 2

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 23 - 31 ]

FY 22-23

$1,475.00

TBD

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$16,000.00

INSPECTION:

MSD

FY 25-26

$71,500.00

FY 26-27

$0.00

FY 27-28

$0.00

& I-26 Interchange. It consists of replacing approximately 635 LF of existing 6-inch VCP with 8-inch DIP. FY 28-29

$0.00

The line has numerous structural issues, experienced frequent stoppages, and flooded structures over the FY 29-30 years.

$0.00

PROJECT DESCRIPTION: This project runs along Hill St. to the intersection of Cross Pl. abutting the I-240

FY 30-31

SPECIAL PROJECT NOTES:

$0.00


G ED

ON EM

E GL

N

LE DA

RD

/

TR

D

MA

N CO

E

E

B

AV

LA TR O

L

Howland Road at Sunset Trail Project No. 2012134

DP OO W GE RID

ST

HO

D R D N W LA RD WOOD LA N D

IR FA

O M

N

R

D

NOT TO SCALE

T

D HOWLAN RD

SU

RL

SU

E NS

T

DR

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

TT

METROPOLITAN SEWERAGE DISTRICT

E NS


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Howland Rd. @ Sunset Trail

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

43

PROJECT NO.

2012134

TOTAL LF:

994

PROJECT BUDGET:

$471,600.00

PROJECT ORIGIN:

SSO's, Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$7,500.00

$4,600.00

$2,900.00

$4,600.00

$2,900.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$4,500.00

55370 - LEGAL FEES

$6,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$60,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$390,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$2,600.00

TOTAL AMOUNT

$471,600.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

MSD

# PLATS: [

CONTRACTOR:

$0.00

ESTIMATED BUDGETS - FY 23 - 31 5

]

FY 22-23

$0.00

FY 23-24

$4,500.00

CONSTRUCTION ADM:

MSD

FY 24-25

$66,000.00

INSPECTION:

MSD

FY 25-26

$393,600.00

FY 26-27

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project will replace an existing 8-inch main from 5 Howland Rd. up to the FY 28-29

$0.00

rear of 371 Sunset Dr. System Services recently completed another portion of this system due to SSO's FY 29-30 and line condition. FY 30-31 SPECIAL PROJECT NOTES:

$0.00 $0.00


/

NOT TO SCALE

H LS WI

DR IRE

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

ST

Johnston Boulevard at Providence Road Project No. 2014013

PR

DEBRA LN

D CE R

ER

O VI D EN

TH LU


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Johnston Blvd. @ Providence Rd.

LOCATION:

W. Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

37

PROJECT NO.

2014013

TOTAL LF:

2,000

PROJECT BUDGET:

$659,150.00

PROJECT ORIGIN:

SSO's, Access, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$8,150.00

55330 - DESIGN

$8,150.00 .

55340 - PERMITS

$5,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$11,000.00

55370 - LEGAL FEES

$15,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$66,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$550,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$500.00

55450 - SURVEY - ASBUILT

$3,500.00

TOTAL AMOUNT

$659,150.00

$8,150.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

MSD

# PLATS: [

$0.00

$0.00

ESTIMATED BUDGETS - FY 23 - 31 14

]

CONTRACTOR:

FY 22-23

$0.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$11,000.00

FY 26-27

$86,000.00

FY 27-28

$554,000.00

PROJECT DESCRIPTION: This project is located in West Asheville, approx. 0.6 miles west of New Leicester Hwy. The project consists of replacing 2,000 LF of existing 6-inch vitrified clay and PVC pipe FY 28-29 with new 8-inch ductile iron pipe. The existing line contains many offset joints and bends, and is in poor FY 29-30 structural condition. FY 30-31

SPECIAL PROJECT NOTES:

Providence Road was added to this with additional 1000 LF.

$0.00 $0.00 $0.00


T DR

NINA ST

A DR

RY D

R

Jonestown Road at Riverside Drive Project No. 2018028

RIVERSID E DR

MA YB ER

R

NOT TO SCALE

VELDA D

G NI

/

IS RIVER M

JONESTOWN RD

NIX DR

REVON D

A ST Y RR HT DR

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

CRESTFIELD AVE


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Jonestown Road @ Riverside Drive

LOCATION:

Woodfin

TYPE:

General Sewer Rehab.

PIPE RATING:

42

PROJECT NO.

2018028

TOTAL LF:

N/A - SS

PROJECT BUDGET:

$98,500.00

PROJECT ORIGIN:

CSR's, Work Orders, I & I issues

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$25,000.00

55330 - DESIGN 55340 - PERMITS

$500.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$15,000.00

55370 - LEGAL FEES

$13,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$40,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION 55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT

$5,000.00

TOTAL AMOUNT

$98,500.00

$0.00

ENGINEER:

MSD

TH

R.O.W. ACQUISITION:

MSD

# PLATS: [ 12 ]

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 23 - 31 FY 22-23

$25,500.00

FY 23-24

$15,000.00

CONSTRUCTION ADM:

MSD

FY 24-25

$53,000.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$8,000.00

FY 27-28

$0.00

This project is located upstream from MSD's WWTP along Riverside Dr. on FY 28-29 Jonestown Rd. It consists of approximately 1,890 LF of existing 6-inch VCP to be replaced with 8-inch FY 29-30 DIP. This system is full of structural defects, has heavy I & I issues, and deteriorating manholes. PROJECT DESCRIPTION:

FY 30-31 SPECIAL PROJECT NOTES:

To be constructed by System Services

$0.00 $0.00 $0.00


/

ER A

VE

Joyner Avenue at Amboy Road Project No. 2021010

D OY R AMB

JOYN

NOT TO SCALE

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

UPSTREAM WAY


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Joyner Ave @ Amboy Rd

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

27

PROJECT NO.

2021010

TOTAL LF:

241

PROJECT BUDGET:

$97,000.00

PROJECT ORIGIN:

Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$2,000.00

55330 - DESIGN 55340 - PERMITS

$500.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$1,000.00

55370 - LEGAL FEES

$2,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$15,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$75,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$500.00

55450 - SURVEY - ASBUILT

$1,000.00

TOTAL AMOUNT

$97,000.00

$0.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

MSD

# PLATS: [ 2

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 23 - 31 ]

FY 22-23

$0.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project is located in West Asheville and is comprised of 241 LF of 8-inch FY 28-29

$3,500.00

ductile iron pipe. The existing line is aging 8" VCP and PVC in poor condition, exposed in a hillside with FY 29-30 erosion issues.

$17,000.00

FY 30-31

$76,500.00

SPECIAL PROJECT NOTES:


MELROSE AVE

LOCKLEY AVE

/

SYRLIN ST

AVE

L

SEDL E

D

Y AVE

LYN R

Kimberly Avenue at Sedley Avenue Project No. 2018029

WOODVA LE AVE

NOT TO SCALE

GR

OD WO OVE

OLL

RD

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

CLU

N BK

METROPOLITAN SEWERAGE DISTRICT

RD

D DR LYN WO O

GRAC E

L

E W OO DR D MA P

WAR WICK P

K RLY O KIMB ERLY KN

XT AD E NOLL RO LL RD KIMB E

KIMB ERLY AVE PL CLU B

CLUB RD COUNTRY

PL SU MN ER

LYNMAR

WILDWOOD AVE


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Kimberly Ave. @ Sedley Avenue

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

35

PROJECT NO.

2018029

TOTAL LF:

3,005

PROJECT BUDGET:

$1,283,000.00

PROJECT ORIGIN:

CSR's, Work Orders, MH Overflows

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$38,000.00

55330 - DESIGN 55340 - PERMITS

$1,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$18,000.00

55370 - LEGAL FEES

$14,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$150,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$1,050,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$10,000.00

TOTAL AMOUNT

$1,283,000.00

$0.00

ENGINEER:

MSD

TH

R.O.W. ACQUISITION:

MSD

# PLATS: [ 13 ]

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 23 - 31 FY 22-23

$0.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$39,000.00

FY 26-27

$0.00

FY 27-28

$182,000.00

This project is located in N. Asheville along Kimberly Ave. The existing 6-inch FY 28-29 VCP will be replaced with 3,005LF of 8-inch HDPE through pipe bursting operations. This 6-inch VCP line FY 29-30 is in poor structural condition, roots present throughout, mis-aligned joints, and problematic spur lines.

$1,062,000.00

FY 30-31

$0.00

PROJECT DESCRIPTION:

SPECIAL PROJECT NOTES:

$0.00


PL

ROCK HILL CIR

ROCK HIL L

Le An Hurst Road Project No. 2019027

R ST R D LE AN HU

ROCK

CADY CT

HILL

RD

NOT TO SCALE

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

OD RD S

/

ROCK HILL CIR

O EDGEW


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Le An Hurst Road

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

77

PROJECT NO.

2019027

TOTAL LF:

820

PROJECT BUDGET:

$371,250.00

PROJECT ORIGIN:

Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$9,000.00

$3,800.00

$5,200.00

55360 - EASEMENT PLATS

$15,000.00

$9,300.00

55370 - LEGAL FEES

$13,000.00

$13,000.00

$45,000.00

$45,000.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES $5,700.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL

$7,500.00

$7,500.00

55410 - CONDEMNATION

$25,000.00

$25,000.00

55420 - CONSTRUCTION

$252,750.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$3,000.00

TOTAL AMOUNT

$371,250.00

$13,100.00

ENGINEER:

MSD

TH

R.O.W. ACQUISITION:

MSD

# PLATS: [ 13 ]

CONTRACTOR:

$68,900.00

$32,500.00

ESTIMATED BUDGETS - FY 23 - 31 FY 22-23

$256,750.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project is located in South Asheville running along the rear of properties FY 28-29 fronting Le An Hurst Rd. It parallels a tributary to Sweeten Creek. The existing 8-inch VCP is in very poor FY 29-30 condition due to heavy root intrusion and has to be routinely rodded. It will be replaced with 8-inch DIP. FY 30-31 SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


LN

HOUNDS EAR DR

HES PER LN US

RG GE O

Logan Avenue Project No. 2017256

AV

E

ST IA

AV ON

V RI

N LI ER

NOT TO SCALE

ST Y WE WA D EN

EU

K

BL

/

SU

VI L

OLD REY N

R

ED

E

AV

RD REY NOL DS

SR D

NR IS

W A YN ES

G

LE

E AV

LU NA

S TRE HOR MO T NT ST

LN

H A YW O

MILLBRO OK RD

ST DEAVE R

RD O D

AN LO

CRAVEN ST

DR

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

RI V

A Y A VE RIDGEW

AN

ER VI EW

G LO CIR ID CL VD


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Logan Avenue

LOCATION:

W. Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

48

PROJECT NO.

2017256

TOTAL LF:

2,150

PROJECT BUDGET:

$1,086,500.00

PROJECT ORIGIN:

Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$13,500.00

$11,500.00

55330 - DESIGN 55340 - PERMITS

$1,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$8,700.00

55370 - LEGAL FEES

$13,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$108,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$940,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$1,300.00

TOTAL AMOUNT

$1,086,500.00

$11,500.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

MSD

# PLATS: [

$0.00

$0.00

ESTIMATED BUDGETS - FY 23 - 31 12 ]

CONTRACTOR:

FY 22-23

$0.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$131,200.00

INSPECTION:

MSD

FY 25-26

$1,500.00

FY 26-27

$942,300.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project is located in West Asheville near Craven St. and consists of FY 28-29

$0.00

2,150 LF of 8-inch DIP. The existing clay pipe is undersized and has a large number of pipe defects.

SPECIAL PROJECT NOTES:

FY 29-30

$0.00

FY 30-31

$0.00


RD

N

C

LN

LN

Lynn Cove Road Project No. 2015010

WEBB COVE RD

BEES MOUN TAIN DR

N LY

WT LA E AL RD

TR EC H EE LN

ER D

NOT TO SCALE

GS of BUNCOMBE COUNTY, NORTH CAROLINA

Budget Map

METROPOLITAN SEWERAGE DISTRICT

RD

DG

/

ER AV E B

DR

M DA

ORS ER N V O G

ER

ST ON YR

DG

T GE RID

PO

NOR C IR

R NY STO

DR

R

V GE RID I EW

ND IDE

IDE D

RD

BE

CLU BS

N SU S NY

GOVE R

E OV

BB WE IN SPR


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Lynn Cove Road

LOCATION:

Beaverdam

TYPE:

General Sewer Rehab.

PIPE RATING:

35

PROJECT NO.

2015010

TOTAL LF:

5,589

PROJECT BUDGET:

$2,057,000.00

PROJECT ORIGIN:

SSO's, Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$25,000.00

55330 - DESIGN 55340 - PERMITS

$1,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$22,000.00

55370 - LEGAL FEES

$30,000.00

55380 - ACQUISITION SERVICES

$63,000.00

55390 - COMPENSATION

$300,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$1,600,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$14,000.00

TOTAL AMOUNT

$2,057,000.00

$0.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

Consultant

# PLATS: [ 28

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 23 - 31 ]

FY 22-23

$0.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$25,000.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$22,000.00

FY 27-28

$394,000.00

PROJECT DESCRIPTION: This project is located off of Beaverdam Rd. The project runs through multiple FY 28-29

$0.00

properties along Lynn Cove Rd. from Governor Circle to 225 Lynn Cove Rd. These lines and manholes FY 29-30 have heavy I/I which have created multiple SSOs.

$1,616,000.00

FY 30-31

$0.00

SPECIAL PROJECT NOTES:


RE D

R

NA VE

/

ME R

RIM O

SH O

RNE

AVE

GRACELYN RD

CLAIRMON T

RD

E

JO HN SO N DR

OTTARI R D

KELE H

E RD

ER A

LY

MAYW O

NOT TO SCALE

D

AD RD

OD R

HAMPST E

HOLBOR N

IRVING S T AVE OAKLAWN WOODVAL E AVE

Manetta Road at Johnson Drive Project No. 2014022

MELROSE AV

GRACE AV E PL

WARWIC K

D MANETTA R

D

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

NG FI

C

DR

METROPOLITAN SEWERAGE DISTRICT

IF GR

VD BL

A BL

OO KW

REDWOOD RD D C LU B R COUNTR Y

E AVE LORRAIN

ALY STON E

AVE KIMB ERLY

LAK E

OSB O

RD LYN WO OD


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Manetta Rd. @ Johnson Dr.

LOCATION:

N. Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

26

PROJECT NO.

2014022

TOTAL LF:

6,500

PROJECT BUDGET:

$2,598,839.00

PROJECT ORIGIN:

SSO's, Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$33,000.00

55330 - DESIGN 55340 - PERMITS

$1,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$7,000.00

55370 - LEGAL FEES

$11,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$150,000.00

55400 - APPRAISAL

$11,139.00

55410 - CONDEMNATION 55420 - CONSTRUCTION

$2,380,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$3,000.00

55450 - SURVEY - ASBUILT

$2,700.00

TOTAL AMOUNT

$2,598,839.00

$0.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

MSD

# PLATS: [ 10

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 23 - 31 ]

FY 22-23

$0.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$33,000.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$7,000.00

FY 27-28

PROJECT DESCRIPTION: This project is located in North Asheville near Merrimon Ave and consists of 6,500 LF of 8-inch ductile iron pipe. The existing clay pipe is undersized and has voids, fractures, and FY 28-29 root intrusions which have contributed to multiple SSO's. FY 29-30

$162,000.00

FY 30-31

$2,385,700.00

SPECIAL PROJECT NOTES:

$0.00 $0.00


/

NT MO R A I VE CL A

ER A LY

MAYW O OD R D

Manetta Road at Maywood Road Project No. 2020022

KELE H

MANETTA RD

AD RD

D

NOT TO SCALE

HAMPST E

OTTARI R

VE R LY A KIMB E

JO HN S DR ON

A LY STON E

RD

D

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

COUNTR Y CLUB R

E HOLBORN


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Manetta Rd. @ Maywood Rd.

LOCATION:

Asheville

TYPE:

General Capital Improvements

PIPE RATING:

51

PROJECT NO.

2020022

TOTAL LF:

605

PROJECT BUDGET:

$275,500.00

PROJECT ORIGIN:

SSO's, Heavy Root Intrusion

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$8,000.00

$3,800.00

$4,200.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$13,000.00

$13,000.00

55370 - LEGAL FEES

$11,000.00

$11,000.00

$50,000.00

$50,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL

$5,000.00

$5,000.00

55410 - CONDEMNATION

$10,000.00

$10,000.00

55420 - CONSTRUCTION

$175,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$2,500.00

TOTAL AMOUNT

$275,500.00

$3,800.00

ENGINEER:

MSD

TH

R.O.W. ACQUISITION:

MSD

# PLATS: [ 10 ]

CONTRACTOR:

$4,200.00

$89,000.00

ESTIMATED BUDGETS - FY 23 - 31 FY 22-23

$0.00

FY 23-24

$178,500.00

CONSTRUCTION ADM:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project is located in North Asheville between Kimberly Ave. and Manetta Rd. at the rear of properties fronting Maywood Rd. The rehabilitation consists of approximately 605 LF of FY 28-29 existing 8-inch VCP to be replaced with 8-inch DIP. The existing 8-inch VCP system is full of structural FY 29-30 defects, has heavy root intrusion and has been a source of SSO’s. FY 30-31

SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


AND R

D

McDowell Street at Lily Carmichael Drive Project No. 2021011

TO

DR NOT TO SCALE

IN GR

D

FD

of BUNCOMBE COUNTY, NORTH CAROLINA

T

Budget Map

METROPOLITAN SEWERAGE DISTRICT

R

DR

GS

AF ST

PICKARD PL

DO

S OR T C

STE IN RL

/

OAK L

C VI

RD

SA

A RI

N U

IR

D

R

IN T

MCDOWELL ST

N

E

EC FIN DR

A

N GE

V VIE

D

D ANNA WOO

EL

R

LILY HA MIC R A C

S

RO AN D APM H C SE

ST

LA A V E UNADIL VE ORE A BILTM


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

McDowell St @ Lily Carmichael Dr.

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

42

PROJECT NO.

2021011

TOTAL LF:

1,660

PROJECT BUDGET:

$616,000.00

PROJECT ORIGIN:

Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$11,000.00

55330 - DESIGN 55340 - PERMITS

$1,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$600,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$3,000.00

TOTAL AMOUNT

$616,000.00

$0.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

MSD

# PLATS: [

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 23 - 31 ]

FY 22-23

$0.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$11,000.00

INSPECTION:

MSD

FY 25-26

$1,000.00

FY 26-27

$0.00

FY 27-28

$604,000.00

PROJECT DESCRIPTION: This project is located in downtown Asheville, along McDowell St near Mission FY 28-29

$0.00

Hospital's main campus. The existing line is 6 and 8-inch vitrified clay pipe, with many structural defects, FY 29-30 requiring extensive maintenance. This line will be replaced with approximately 1,660 LF of 8-inch DIP. FY 30-31 SPECIAL PROJECT NOTES:

$0.00 $0.00


/

PE R

SIS

TE

NC

ED

R

D

OW AD ME

RD

Meadow Road at Train Yard Project No. 2015207

IA R TOR C I V

DE NT

NOT TO SCALE

ST U CI R

C O A PR

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

AP

D R H


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Meadow Road @ Train Yard

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

37

PROJECT NO.

2015207

TOTAL LF:

2,001

PROJECT BUDGET:

$1,051,000.00

PROJECT ORIGIN:

Line Condition, Undersized

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$9,000.00

$7,000.00

55330 - DESIGN 55340 - PERMITS

$10,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$3,000.00

55370 - LEGAL FEES

$30,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$40,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$952,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$5,000.00

TOTAL AMOUNT

$1,051,000.00

$7,000.00

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

MSD

# PLATS: [ 3 ]

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 23 - 31 FY 22-23

$0.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$2,000.00

FY 26-27

$3,000.00

FY 27-28

$80,000.00

PROJECT DESCRIPTION: This project is located in Asheville on Meadow Rd. between the Biltmore Estate FY 28-29

$959,000.00

and AB Tech College. It consists of replacing 2,001 LF of existing 6-inch VCP with new 8-inch DIP. The FY 29-30 existing line is in poor condition, is undersized, and runs underneath various structures. FY 30-31 SPECIAL PROJECT NOTES:

$0.00 $0.00


N DA

L VIL

EP

PEARSON D R

F NT MO D OR

L

AS ET N WA

T

Montford Avenue at Montford Park Project No. 2017144

E AV

/

WATAUGA ST

NOT TO SCALE

LA

ND

AV E

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

BE R

UB CA

S LE

METROPOLITAN SEWERAGE DISTRICT

CU M

SOCO ST

D CIR CUMBERLAN

T


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Montford Ave. @ Montford Park

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

50

PROJECT NO.

2017144

TOTAL LF:

1,258

PROJECT BUDGET:

$515,650.00

PROJECT ORIGIN:

Sags, Structural Defects, Soil Pipe

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$6,300.00

$6,300.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$8,250.00

55370 - LEGAL FEES

$10,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$90,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$396,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$3,100.00

TOTAL AMOUNT

$515,650.00

$0.00

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

MSD

# PLATS: [ 11 ]

CONTRACTOR:

$6,300.00

$0.00

ESTIMATED BUDGETS - FY 23 - 31 FY 22-23

$8,250.00

FY 23-24

$100,000.00

CONSTRUCTION ADM:

MSD

FY 24-25

$401,100.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project is located just south of Montford Park and includes the FY 28-29 replacement of approximately 1,258 LF of existing 8-inch VCP with new 8-inch DIP. The existing pipe has FY 29-30 sags, multiple structural defects, and areas where the pipe is almost non-existent. FY 30-31 SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


Y

DR

/

NE

RD CH

UNN S CO VE

NOT TO SCALE

Mountainbrook Road at Chunns Cove Road Project No. 2010112

R BROOK TE

IEW DR ROLLING V

HO

N CIR CRAFTSM A

DR VIEW CHUN NS

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

MOUNTAINBROOK RD

LN A LL STE G


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Mountainbrook Rd. @ Chunns Cove

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

55

PROJECT NO.

2010112

TOTAL LF:

3,204

PROJECT BUDGET:

$1,348,515.00

PROJECT ORIGIN:

SSO's, Access, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$11,515.00

$11,515.00

$9,500.00

$3,300.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES

$6,200.00

$19,000.00

$13,000.00

$6,000.00

$120,000.00

$80,000.00

$40,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL

$7,500.00

$7,500.00

55410 - CONDEMNATION

$20,000.00

$20,000.00

55420 - CONSTRUCTION

$1,150,000.00

$1,150,000.00

$3,000.00

$3,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT

$8,000.00

TOTAL AMOUNT

$8,000.00

$1,348,515.00

$14,815.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

MSD

# PLATS: [ 18

CONTRACTOR:

$99,200.00

$1,234,500.00

ESTIMATED BUDGETS - FY 23 - 31 ]

FY 22-23

$0.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

This project will relocate lines from the rear yards of lots fronting on Mountainbrook Rd. (off Chunns Cove Rd.) where access and maintenance is extremely difficult and will FY 28-29 move those lines to public street rights of way. This project will also eliminate one high aerial creek FY 29-30 crossing where existing support piers are failing due to erosion. PROJECT DESCRIPTION:

FY 30-31

SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


H

A

/

IM NOT TO SCALE

PE RS

EK R D NEW H AW CR E

New Haw Creek Road at Dogwood Grove Project No. 2014021

LN M O N

OLD HAW CREEK RD

T BE

D ES

RD

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

DOGWO OD GRV


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

New Haw Creek Rd. @ Dogwood Grove

LOCATION:

E. Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

31

PROJECT NO.

2014021

TOTAL LF:

2,400

PROJECT BUDGET:

$660,900.00

PROJECT ORIGIN:

SSO's, Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$9,500.00

$4,925.00

$4,575.00

$4,925.00

$4,575.00

55330 - DESIGN 55340 - PERMITS

$1,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$12,000.00

55370 - LEGAL FEES

$16,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$20,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$600,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$1,400.00

TOTAL AMOUNT

$660,900.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

MSD

# PLATS: [ 15

$0.00

ESTIMATED BUDGETS - FY 23 - 31 ]

CONTRACTOR:

FY 22-23

$0.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$10,000.00

FY 26-27

$38,000.00

FY 27-28

$1,000.00

8-inch ductile iron pipe. Existing 4-inch and 6-inch clay pipe is undersized, with fractures, root intrusion, and FY 28-29

$0.00

misaligned joints. Existing 8-inch ductile iron pipe has corrosion issues. Existing manholes are in poor FY 29-30 condition.

$0.00

PROJECT DESCRIPTION: This project is in East Asheville near Haw Creek Rd., and consists of 2,400 LF of

FY 30-31

SPECIAL PROJECT NOTES:

$602,400.00


D

HILL R

R

D

W O O DY LN FO

X

C

HA

SE

RD

W FOX C HASE RD

LA N

BIRD

IL SW

D RD

RDG

ER OW D FL RD

New Stock Road Project No. 2015011

EL D R

DR

E BLU

AN ALEX

HAP D ER C

PLEASANT HILL DR

DR

EE K

Y TR L

D WOO

/

WD

R

WR

CR

DIPIT

L

RD

HI

L GO

IE DV

AD

VIE

DWS

RICE M

CHADWICK WADE

FAR ID

GO LD

HIL L

SERE N

O KN

DP

RD NOT TO SCALE

BR U

CT

SH

V EA W

MAR LWO OD

CT

W OO

LL

D

RD

E DR

D

KNOB

RD

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

ER R

STONE Y

GARRISON R

LEM DR A B EM B

LOFTIN ST

E DR LAKESHOR

D

NA VE METROPOLITAN SEWERAGE DISTRICT

RD

AND

E

HIGH L

VI ER

KSID

HEATHER CT

CRE E

RD

CT CRANDON

FIR W

I26 E

N AIKE

OO D

EN R D S HAV

RD OOS T ROB IN R

O WO LL

RD

FOXWOOD DR

W DR

T PA

TI

LN

AC

DR

OR N

I W LE NK

PINE Y

LN

RD

RI PE BRIA RWO OD

E LN RIDG SHAD O

S RUFU

I26 W

S RD

ROSS RD

W NE CK TO E

APPLE C

E

FE RN AD GL

DL OO W D AN S LL

TEA

SI JO

Y

MER RIM O

LA E CK LN

B ER R Y LN

COUNTRY OAK DR

LN LOWRY

G


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

New Stock Road

LOCATION:

Buncombe County

TYPE:

General Sewer Rehab.

PIPE RATING:

45

PROJECT NO.

2015011

TOTAL LF:

9,020

PROJECT BUDGET:

$2,741,000.00

PROJECT ORIGIN:

SSO's, Undersized Pipe

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$36,000.00

$17,750.00

$18,250.00

$17,750.00

$18,250.00

55330 - DESIGN 55340 - PERMITS

$1,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$8,000.00

55370 - LEGAL FEES

$12,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$150,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$2,500,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$10,000.00

55450 - SURVEY - ASBUILT

$24,000.00

TOTAL AMOUNT

$2,741,000.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

MSD

# PLATS: [

CONTRACTOR:

$0.00

ESTIMATED BUDGETS - FY 23 - 31 11

]

FY 22-23

$0.00

FY 23-24

$8,000.00

CONSTRUCTION ADM:

MSD

FY 24-25

$163,000.00

INSPECTION:

MSD

FY 25-26

$2,534,000.00

FY 26-27

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project runs along New Stock Rd. The project begins at Nichols Hill Dr. & FY 28-29

$0.00

New Stock Rd., runs under I-26, and ends at Weaverville Rd. The existing 8-inch lines have structural FY 29-30 issues which have led to root intrusion and multiple SSOs. FY 30-31 SPECIAL PROJECT NOTES:

$0.00 $0.00


NOT TO SCALE

Riverside Drive at Riverside Baptist Church Project No. 2016251

IDE DR

/

S RIVER

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Riverside Dr. @ Riverside Baptist

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

40

PROJECT NO.

2016251

TOTAL LF:

510

PROJECT BUDGET:

$235,000.00

PROJECT ORIGIN:

Work Orders, Excessive Infiltration

DESCRIPTION

ESTIMATED PROJECT COST

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$6,500.00

55330 - DESIGN 55340 - PERMITS

$15,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$1,500.00

55370 - LEGAL FEES

$2,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$10,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$195,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$3,000.00

TOTAL AMOUNT

$235,000.00

$0.00

ENGINEER:

MSD

TH

R.O.W. ACQUISITION:

MSD

# PLATS: [ 1

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 23 - 31 ]

FY 22-23

$0.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$6,500.00

FY 26-27

$0.00

FY 27-28

$28,500.00

PROJECT DESCRIPTION: This project is located along Riverside Drive at the Riverside Baptist Church. It FY 28-29

$200,000.00

consists replacing approximately 510 LF of existing 6-inch VCP with 8-inch DIP. The existing 6-inch VCP FY 29-30 segments are structurally unsound and experience heavy I & I. FY 30-31 SPECIAL PROJECT NOTES:

Possible RR Encroachment

$0.00 $0.00


S

VILLE RSON E D N HE

RD

SY

T

ORE CAM

ES DR ROYAL PIN

T

ST

K BLA E DR

RD T TREE S PEACH NOT TO SCALE

MOR E T

DR

O COL

RL

N

R

DEN LIN ST

E

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

CT METROPOLITAN SEWERAGE DISTRICT

R NY D

CED A

E

ND

R TE PL M A

LE

Royal Pines Drive - PRP 47009 Project No. 2007020

TE R

APPIAN WAY

SYC A

OD OD RH

RO ND

RIPPON CT

P MA

/

LN

C RY ER B L EK

D RD

T

S RY RE NC

ES

HEYWOO

ES

EN LIND

E ET

FO R

MY L RT

N ST

BLAKE CT ER CH L RD

E SW LAUR E

MU

L ER

LIND E

P PO T AR


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Royal Pines Drive - PRP 47009

LOCATION:

Arden

TYPE:

Pipe Rated Projects

PIPE RATING:

47

PROJECT NO.

2007020

TOTAL LF:

2,888

PROJECT BUDGET:

$1,104,100.00

PROJECT ORIGIN:

Pipe Rating Program

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$10,100.00

$10,100.00

55330 - DESIGN 55340 - PERMITS

$5,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$1,500.00

55370 - LEGAL FEES

$3,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$20,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$1,060,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$2,500.00

TOTAL AMOUNT

$1,104,100.00

$10,100.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

MSD

# PLATS: [ 2 ]

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 23 - 31 FY 22-23

$0.00

FY 23-24

$0.00

CONSTRUCTION ADM.:

MSD

FY 24-25

$29,500.00

INSPECTION:

MSD

FY 25-26

$1,064,500.00

FY 26-27

$0.00

FY 27-28

$0.00

This project is located in S. Asheville and is comprised of 2,888 LF of 8-inch FY 28-29

$0.00

PROJECT DESCRIPTION:

ductile iron pipe. The existing line is 8-inch vitrified clay pipe which has had a history of root problems.

SPECIAL PROJECT NOTES:

NCDOT resurfacing planned in summer of 2024

FY 29-30

$0.00

FY 30-31

$0.00


IL A

ST

BA K

Sand Hill Road at Baker Place Project No. 2015223

D

NOT TO SCALE

N SA

LL HI

RD

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

RD

/

M AN

PL ER

RNE LB U E H S

T

CARRIER S


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Sand Hill Road @ Baker Place

LOCATION:

W. Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

56

PROJECT NO.

2015223

TOTAL LF:

1,400

PROJECT BUDGET:

$623,500.00

PROJECT ORIGIN:

Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$6,000.00

$5,500.00

$500.00

55330 - DESIGN 55340 - PERMITS

$1,000.00

$1,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$1,500.00

$1,500.00

$10,000.00

$10,000.00

$70,000.00

$70,000.00

$2,500.00

$2,500.00

55410 - CONDEMNATION

$10,000.00

$10,000.00

55420 - CONSTRUCTION

$520,000.00

55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$1,500.00

TOTAL AMOUNT

$623,500.00

$5,500.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

MSD

# PLATS: [ 9 ]

CONTRACTOR:

$1,500.00

$94,000.00

ESTIMATED BUDGETS - FY 23 - 31 FY 22-23

$522,500.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project is located in West Asheville and is comprised of 1,400 LF of 8-inch FY 28-29

$0.00

ductile iron pipe. The existing line is a 6-inch VCP with mulitple structural defects and access issues due FY 29-30 to being located under several houses. FY 30-31 SPECIAL PROJECT NOTES:

$0.00 $0.00


IR FA

K OA

SR

D

L

Somerset Road at Greene Road Project No. 2021008

DR

/

E CH A SE

T

NOT TO SCALE

ER

M E RD RS E

E EN

M

SO

E GR

RD

SO T SE RD

VI N

G TO N O O LD

E

C

Y W A

CO VI NG TO N W AY

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

E

CO OLD V IN E WA GTON Y

METROPOLITAN SEWERAGE DISTRICT

OL D

OL COV DE INGT WAY ON


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Somerset Rd @ Greene Rd

LOCATION:

South Asheville

TYPE:

Pipe Rated Projects

PIPE RATING:

70

PROJECT NO.

2021008

TOTAL LF:

840

PROJECT BUDGET:

$281,140.00

PROJECT ORIGIN:

CSR's, heavy I&I, SSO's/MH Overflow

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$5,040.00

$5,040.00

$1,000.00

$1,000.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$6,000.00

55370 - LEGAL FEES

$9,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$25,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$231,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$2,100.00

TOTAL AMOUNT

$281,140.00

$0.00

ENGINEER:

MSD

TH

R.O.W. ACQUISITION:

MSD

# PLATS: [ 8 ]

CONTRACTOR:

$0.00

$6,040.00

ESTIMATED BUDGETS - FY 23 - 31 FY 22-23

$6,000.00

FY 23-24

$34,000.00

CONSTRUCTION ADM.:

MSD

FY 24-25

$235,100.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project is located in South Asheville off of Somerset Rd. The line cuts FY 28-29

$0.00

behind houses and follows a stream where it lays flat with misaligned joints and erosion has exposed the FY 29-30 pipe causing heavy I&I. The 840 linear feet VCP section needs to be replaced with 8-inch DIP. FY 30-31 SPECIAL PROJECT NOTES:

$0.00 $0.00


WOODVINE RD

R CRANB DR

OOK

/

OVERLOOK CT

LIVING SAVIOR WAY

CEDAR FOREST TRL

E

R HOALS

D

P LOO

Springside Road at Overlook Road Project No. 2012127

S LONG

L ENS

M ADIU Y ST

HA EXC

NOT TO SCALE

Y SK

R ED NG

D SIDE R SPRING

T DR PHEASA N

R

CE FO DA R R TR EST L

BRIARCLIFF DR

ORCHID LN

SPRING FOREST CIR

IR

XC

DF O

OT D R

CT

OVERLOOK ROAD EXT

AK F

HARRIS ST

SO

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

LN

T POND S

R MILLE RD S

METROPOLITAN SEWERAGE DISTRICT

E MAPL

R

W SUMMIT AVE

ALLEN AVE

MAUDE AVE

TD

N DR

OR ES

BEV LY

E DR HOLLY RIDG

RD

ED OAK WIL D MANATE E CT

RE

PINC H

CON IFER

OVERLO OK RD

JULIAN LN

MIAMI CIR

WESTRID GE DR SCOTTIS H CROSSIN G WAY

N

HEN

L LT HO

ILLE

R FAWN D

PA R K

D ER SO N V

GSIDE SPRIN

H IS TT O IR SC C


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Springside Rd. @ Overlook Rd.

LOCATION:

S. Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

52

PROJECT NO.

2012127

TOTAL LF:

3,922

PROJECT BUDGET:

$1,535,887.00

PROJECT ORIGIN:

SSO's, Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$21,500.00

$21,500.00

$2,000.00

$240.00

55330 - DESIGN 55340 - PERMITS

$1,760.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES

$9,250.00

$9,250.00

$10,000.00

$7,248.00

$14,737.00

$14,737.00

$2,752.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$1,473,000.00

$1,473,000.00

$2,000.00

$2,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT

$3,400.00

TOTAL AMOUNT

$3,400.00

$1,535,887.00

$52,975.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

MSD

# PLATS: [ 8

CONTRACTOR:

$4,512.00

$1,478,400.00

ESTIMATED BUDGETS - FY 23 - 31 ]

FY 22-23

$0.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project is located in South Asheville near Overlook Rd. and is comprised of 3,922 LF of 8-inch ductile iron pipe. The existing line is 6-inch and 8-inch vitrified clay pipe in poor FY 28-29 shape, with a history of SSO's at various points. FY 29-30 FY 30-31 SPECIAL PROJECT NOTES:

Project is being coordinated with school's schedule.

$0.00 $0.00 $0.00


PAT T O NA VE

/

PR I N C E TO N DR

ST

BRAMLETT CT

BELMONT AVE

NOT TO SCALE

Sulphur Springs Road at Covington Street Project No. 2014006

HARV A

RD P L

DARTMOUTH

E ND AV ORMO

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

S RD

METROPOLITAN SEWERAGE DISTRICT

SULPHUR SPRING

REDFERN ST

CLINTON AVE

COVINGTON ST


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Sulphur Springs Rd. @ Covington St. LOCATION:

W. Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

44

PROJECT NO.

2014006

TOTAL LF:

1,350

PROJECT BUDGET:

$558,000.00

PROJECT ORIGIN:

SSO's, Access, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$7,500.00

$7,500.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$15,000.00

55370 - LEGAL FEES

$21,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$120,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$390,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$3,500.00

TOTAL AMOUNT

$558,000.00

$7,500.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

MSD

# PLATS: [

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 23 - 31 20

]

FY 22-23

$0.00

FY 23-24

$156,000.00

CONSTRUCTION ADM:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$394,500.00

FY 26-27

$0.00

FY 27-28

$0.00

This project begins in the area of the Sulphur Springs Rd./Delaware Ave. intersection and runs through the back properties along Belmont Ave. The existing 6-inch clay pipe will be FY 28-29 replaced with 8-inch ductile iron pipe. The 6-inch clay line has had numerous problems and runs under a FY 29-30 house. PROJECT DESCRIPTION:

FY 30-31

SPECIAL PROJECT NOTES:

Belmont Ave. added to this with additional 500 LF

$0.00 $0.00 $0.00


N ER

D

EX

T

M RU

AY IW

K LN PEACO C

K RD

IST

EN LD A W

DR NOT TO SCALE

Sweeten Creek Road at Buck Shoals Road Project No. 2014015

KS

D

C BU

SR

N TO

AL HO

S WE

AD RO

RD

ARG O LN

N STO WE

R CH R OL HO C S

/

LE N HE O RS DE L VIL

KEY L

VIL RD E CRE

AC O

D N SO ER N ETE SWE

S

E

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

GLEN COVE DR METROPOLITAN SEWERAGE DISTRICT

SUMTER ST

V COLA A PENSA

D

PE NS

N HE N

HT

L PIGEON

ER

LA

VD TAM PA B L

D WIN OV YC

D


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Sweeten Creek Rd. @ Buck Shoals Rd.

LOCATION:

S. Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

51

PROJECT NO.

2014015

TOTAL LF:

1,558

PROJECT BUDGET:

$657,670.00

PROJECT ORIGIN:

SSO's, Access, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$8,270.00

$4,670.00

$3,600.00

55330 - DESIGN 55340 - PERMITS

$10,000.00

$10,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$3,000.00

55370 - LEGAL FEES

$5,000.00

$5,000.00

$60,000.00

$60,000.00

$3,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL

$7,500.00

$7,500.00

55410 - CONDEMNATION

$20,000.00

$20,000.00

55420 - CONSTRUCTION

$538,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT TOTAL AMOUNT

$3,900.00

$970.00

$657,670.00

$5,640.00

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

MSD

# PLATS: [ 4

CONTRACTOR:

$6,600.00

$102,500.00

ESTIMATED BUDGETS - FY 23 - 31 ]

FY 22-23

$543,900.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

This project is located in Royal Pines on Buck Shoals Rd. between FY 28-29 Hendersonville Rd. and Sweeten Creek Rd. Approx. 1,558 LF of existing 6-inch vitrified clay pipe will be FY 29-30 replaced with 8-inch ductile iron pipe. The existing line is in poor condition and is undersized. PROJECT DESCRIPTION:

FY 30-31 SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


HENDERSONVILLE RD

/

DAVIS GREY DR

D KR N ET E

AP

NOT TO SCALE

DR

RD

ALP INE RIDG E

MI LL SG

Sweeten Creek Road at Mills Gap Road Project No. 2014189

SW E

WALDEN RIDGE DR

CA

CR EE

LN EL ST E

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Sweeten Creek Rd. @ Mills Gap Rd.

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

16

PROJECT NO.

2014189

TOTAL LF:

2,572

PROJECT BUDGET:

$1,278,500.00

PROJECT ORIGIN:

SSO's, Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$24,000.00

$11,300.00

$12,700.00

55330 - DESIGN 55340 - PERMITS

$1,000.00

$1,000.00

55360 - EASEMENT PLATS

$4,000.00

$4,000.00

55370 - LEGAL FEES

$6,000.00

$6,000.00

$125,000.00

$125,000.00

55350 - SPECIAL STUDIES

55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL

$7,500.00

$7,500.00

55410 - CONDEMNATION

$20,000.00

$20,000.00

55420 - CONSTRUCTION

$1,087,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$2,000.00

TOTAL AMOUNT

$1,278,500.00

$11,300.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

MSD

# PLATS: [ 5

CONTRACTOR:

$17,700.00

$158,500.00

ESTIMATED BUDGETS - FY 23 - 31 ]

FY 22-23

$0.00

FY 23-24

$1,204,000.00

CONSTRUCTION ADM:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project is located in South Asheville near Mills Gap Rd. and is comprised of FY 28-29

$0.00

2,572 LF of 8-inch ductile iron pipe. The existing line is 6-inch and 8-inch vitrified clay pipe in poor FY 29-30 condition, with a history of SSO's. FY 30-31 SPECIAL PROJECT NOTES:

NCDOT Sweeten Creek Construction Project slated Fall 2023.

$0.00 $0.00


/

DP OO W T S WE L

CO N

E

RD

CR AV

PR OS

Toxaway Street Project No. 2019004

Z HA

TO R NE C

EY

TR

L

ST TO X A W AY

NOT TO SCALE

T EN S

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

CRA V

EN

I LL LM

EM M RD A


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Toxaway Street

LOCATION:

W. Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

51

PROJECT NO.

2019004

TOTAL LF:

722

PROJECT BUDGET:

$309,600.00

PROJECT ORIGIN:

Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$4,000.00

$2,825.00

$1,175.00

55330 - DESIGN 55340 - PERMITS

$1,000.00

$1,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$303,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$600.00

TOTAL AMOUNT

$309,600.00

$2,825.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

MSD

# PLATS: [ 0

CONTRACTOR:

$2,175.00

$0.00

ESTIMATED BUDGETS - FY 23 - 31 ]

FY 22-23

$0.00

FY 23-24

$304,600.00

CONSTRUCTION ADM:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project is located in West Asheville and is comprised of 722 linear feet of FY 28-29

$0.00

8-inch DIP. The existing sewer line is 6-inch clay with extensive structural problems and roots.

SPECIAL PROJECT NOTES:

FY 29-30

$0.00

FY 30-31

$0.00


N

E AL

Y L REN A LANG

N

NG LE X I

AV TON

GE ST

Y

E COLL

R K ET ST NOT TO SCALE

ER LAWY

A SM

K RAN

E RK

T WAY S BROAD

IN AV

E

TS

K SQ N PAC

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

LK

METROPOLITAN SEWERAGE DISTRICT

S WA

ST

Walnut Street at North Lexington Avenue Project No. 2017008

L TING

T ST

UCE N SPR T

/

INA L

T ST

L CARO

N MA

NU WAL

LN U E WA

UCE S S SPR

T

E


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Walnut St. @ N. Lexington Ave.

LOCATION:

Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

42

PROJECT NO.

2017008

TOTAL LF:

1,300

PROJECT BUDGET:

$613,040.00

PROJECT ORIGIN:

Line Condition, Undersized Pipe

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$7,000.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES

$40.00

$40.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$600,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$4,000.00

TOTAL AMOUNT

$613,040.00

$40.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

MSD

# PLATS: [ 0

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 23 - 31 ]

FY 22-23

$0.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$7,000.00

FY 26-27

$0.00

PROJECT DESCRIPTION: This project runs along Walnut Street in downtown Asheville. The project begins FY 27-28

$606,000.00

at N. Lexington Ave., runs along Walnut Street and down side roads of Market Street, and Lawyers Walk, FY 28-29 and ends near the corner of E. Walnut Street. The existing 6-inch and 8-inch clay pipes have structural issues and yearly maintenance is needed.In 2020 approximately 255 LF was replaced in Langren Alley as FY 29-30 part of agreement with a Developer. FY 30-31 SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


0E

I24

ING

TO NS

T

L

ST

KR D

T

HOWARD S

TREMO N T ST

SHO TREM RT ONT S

OO

T

RE Y NO LD SR

OD WO N OW

IN

LY

K EL

AV

ST

ST

AV ON

SUCCESS AVE

D

TA

AV

E

V RI

NK LI R E

VE

E

RD

Y LE ARG LN

NOT TO SCALE

LN

CRAVEN S T

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

ST

R

Waynesville Avenue at Brownwood Avenue Project No. 2014183

EZELLE

MI LL BR

RG IA

OLD LYMAN

/

T

DS

YP

GE O

D OL

O DOMIN LN

WI LM

LW OO

BR A

DE L

WO RL E

ST

NN ING

WE S

T TREMONT S

L

RICHLAND ST

BR

DA VINCI CT

VE ILLE A

T W OO DP

HO E UN A R DS DR

WAYN ESV

G LO

LU N A HES LN PER LN US SU R

DE AV E

E AV AN

H A YW O

ED NR IS

ST PL

L A WAMBOLDT

MB WA

LE Y

L

OA K

O

EU

N

BL A C K LN WE L

D R

VE

VE SE

S AK

CL ID

IA A

VD

DAL VAN

O D

RD

BL

R AY RIDGEW AVE

S LD NO RI V

ND

Y RE R N CI

DR

A LOG

SP

W

S LA RU

RT RA

ER VIE

RIVERSIDE DR

VE RI LYMAN ST

T S S AY RT E W B S RO NE Y PA


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Waynesville Ave. @ Brownwood Ave. LOCATION:

W. Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

33

PROJECT NO.

2014183

TOTAL LF:

3,022

PROJECT BUDGET:

$1,370,750.00

PROJECT ORIGIN:

Access, Line Condition, SSO's.

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$19,000.00

55330 - DESIGN 55340 - PERMITS

$500.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$31,000.00

55370 - LEGAL FEES

$50,000.00

55380 - ACQUISITION SERVICES

$105,750.00

55390 - COMPENSATION

$250,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$910,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$2,500.00

TOTAL AMOUNT

$1,370,750.00

$0.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

Consultant

# PLATS: [ 47

$0.00

$0.00

ESTIMATED BUDGETS - FY 23 - 31 ]

CONTRACTOR:

FY 22-23

$0.00

FY 23-24

$19,500.00

CONSTRUCTION ADM:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$28,000.00

FY 26-27

$103,000.00

FY 27-28

$305,750.00

and is comprised of 3,022 LF of 8-inch ductile iron pipe. The existing line is 8-inch vitrified clay pipe that is FY 28-29

$0.00

in poor condition with heavy root intrusion, structural defects, and I&I problems, resulting in a long history FY 29-30 of SSO's.

$0.00

PROJECT DESCRIPTION: This project is located in West Asheville between Haywood Rd. and Craven St.

FY 30-31

SPECIAL PROJECT NOTES:

$914,500.00


ES

RL

VE R

SA

ILL

ES

LN

R GA

ND LA

LN

CH D

CRABAPPLE LN

West Crabapple Lane Project No. 2014005

DR

LD WI R RY R E

IL O

/

NE T

CT

BAYO N

N CEN VIN

CR LE

A

E

A

LN

NOT TO SCALE

AB CR

LE PP

K RD

Budget Map

METROPOLITAN SEWERAGE DISTRICT of BUNCOMBE COUNTY, NORTH CAROLINA

A ND O ROU

LN C R EEK

W P AP AB

U Q H

BEAVER

RD GIBSON

LW


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

West Crabapple Lane

LOCATION:

W. Asheville

TYPE:

General Sewer Rehab.

PIPE RATING:

67

PROJECT NO.

2014005

TOTAL LF:

1,774

PROJECT BUDGET:

$580,201.00

PROJECT ORIGIN:

SSO's, Access, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$6,300.00

$6,300.00

55360 - EASEMENT PLATS

$9,000.00

$8,500.00

55370 - LEGAL FEES

$6,526.00

$6,526.00

$67,875.00

$67,875.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES $500.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL

$5,000.00

$5,000.00

55410 - CONDEMNATION

$20,000.00

$20,000.00

55420 - CONSTRUCTION

$460,000.00

$460,000.00

$1,000.00

$1,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT

$4,500.00

TOTAL AMOUNT

$4,500.00

$580,201.00

$89,201.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

MSD

# PLATS: [

CONTRACTOR:

$25,500.00

$465,500.00

ESTIMATED BUDGETS - FY 23 - 31 12 ]

FY 22-23

$0.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

This project is on West Crabapple Lane which is a private road. The FY 28-29 existing 8-inch clay pipe is in poor condition and will be replaced with 8-inch ductile iron pipe. System Services crews have reported multiple structural defects which are resulting in major infiltration and inflow. FY 29-30 PROJECT DESCRIPTION:

FY 30-31 SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


AK RD WHITE O

E RD

White Oak Road Project No. 2015193

RD

OAKS R D

NOT TO SCALE

D

FOX GLEN D

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

EXT

DR

R METROPOLITAN SEWERAGE DISTRICT

WHITE O AK ROAD

SOMERSET RD

HYDE PARK PL

D

/

CT

OLD SMOKEY TRL

ROYAL

D PL

WATSON RD

VILL

LA N

LN PATH WOOD

SO N D ER

CE GRA

K CT S PAR

N PARK

LE D R

CIR

EDNEY LN

CRESCENT HILL DR

PINE NEED

HEN

SR

WOOD PATH LN

IR FA K OA

L

CO

E CH A SE

NW

DOG WOO D

N F A IR OAKS RD

IT WH INE EP

S

LL E

E GR RD

RD

ON E EN

ER R

O O D

ND LY R CI

SO M ET


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

White Oak Road

LOCATION:

Arden

TYPE:

General Sewer Rehab

PIPE RATING:

3

PROJECT NO.

2015193

TOTAL LF:

N/A - SS

PROJECT BUDGET:

$48,000.00

PROJECT ORIGIN:

Access, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$3,500.00

55370 - LEGAL FEES

$4,000.00

$4,000.00

$25,000.00

$25,000.00

$2,500.00

$2,500.00

$10,000.00

$10,000.00

$500.00

$500.00

$3,500.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION 55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT

$2,500.00

TOTAL AMOUNT

$2,500.00

$48,000.00

$0.00

ENGINEER:

MSD

DP

R.O.W. ACQUISITION:

MSD

# PLATS: [ 3 ]

CONTRACTOR:

$3,500.00

$44,500.00

ESTIMATED BUDGETS - FY 23 - 31 FY 22-23

$0.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project is located in Arden along White Oak Road, near Hendersonville FY 28-29

$0.00

Road. The project will replace 960 LF of 6-inch Orangeburg and VCP. The existing lines are in bad condition and have too many point repairs. Construction will be done by System Services In-House crew. FY 29-30 FY 30-31 SPECIAL PROJECT NOTES:

$0.00 $0.00


This Page Intentionally Blank


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

SSD Rehab. & Replacement

PROJECT:

LOCATION:

Various

(Annual) TYPE:

General Sewer Rehab.

PIPE RATING:

N/A

PROJECT NO.

2002101

TOTAL LF:

200,000

PROJECT BUDGET:

$46,750,000.00

PROJECT ORIGIN:

In-house Capital Improvements

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$46,750,000.00

$1,901,386.90

$2,698,613.10

$4,675,000.00

$46,750,000.00

$1,901,386.90

$2,698,613.10

$4,675,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT

20000 ENGINEER:

MSD

MS

R.O.W. ACQUISITION:

MSD

# PLATS: [

CONTRACTOR:

ESTIMATED BUDGETS - FY 23 - 31 ]

FY 22-23

$4,675,000.00

FY 23-24

$4,675,000.00

CONSTRUCTION ADM:

MSD

FY 24-25

$4,675,000.00

INSPECTION:

MSD

FY 25-26

$4,675,000.00

FY 26-27

$4,675,000.00

FY 27-28

$4,675,000.00

This line item is for the replacement of capital assets using in-house construction crews and materials. This includes new taps, small repairs, lining, as well as larger FY 28-29 rehabilitation projects. Also included is paving when required for these repairs and rehabilitation projects. FY 29-30 The total estimated project cost shown is the total within the ten year window. PROJECT DESCRIPTION:

FY 30-31

SPECIAL PROJECT NOTES:

Capitalized Labor & Misc.

$1,628,416 Materials / Year

Fuel Allocation

Paving Contracts

$1,254,155 Estimated L.F. per year

$100,000

$4,675,000.00 $4,675,000.00 $4,675,000.00 $1,417,429.00 20,000


This Page Intentionally Blank


Metropolitan Sewerage District of Buncombe County, North Carolina CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021-2022

PROJECT:

SUMMARY - In-House Projects

ACCOUNT:

GENERAL

DATE OF REPORT:

January 2021

PROJECT BUDGET:

Funded through 2002101 PROJECT NO.

PROJECT LOCATION

WORK ORDER NO.

CONST. YEAR

TOTAL LINEAR FOOTAGE

10 Balsam Road

2020214

Blk Mtn 28711

275803

FY 21-22

410

Briarcliff Drive @ Oakwilde Drive

2019010

Asheville 28803

258768

FY 21-22

860

Briarwood Road @ W. Fox Chase Road

2019248

Asheville 28804

267160

FY 21-22

300

Brookwood Road (4-Inch Main)

2020221

Asheville 28804

275821

FY 21-22

100

Charlotte Street @ N. Ridgeway Ave.

2016237

Blk Mtn 28711

232699

FY 21-22

1,073

Cherokee Road @ Mayflower Drive

2020226

Asheville 28804

275866

FY 21-22

649

48 Clarendon Road

2019009

Asheville 28806

258562

FY 21-22

500

Dayton Road @ No. 35

2020218

Asheville 28804

275887

FY 21-22

375

753 Fairview Road

2020223

Asheville 28803

275813

FY 21-22

100

276 Hi-Alta Avenue

2020081

Asheville 28806

271375

FY 21-22

201

Highland Farms Road

2018018

Blk Mtn 28711

275837

FY 21-22

850

32 Kensington Drive

2020213

Asheville 28805

275805

FY 21-22

644

Lotus Place

2020212

Asheville 28804

275767

FY 21-22

825

Maple Springs Road @ Knauth Road

2015220

Asheville 28805

275867

FY 21-22

890

72 Mimosa Drive

2017230

Asheville 28801

207261

FY 21-22

440

Northwest Avenue @ 215

2018017

Swannanoa 28778

275846

FY 21-22

252

Northwest Avenue @ W. Charleston Ave.

2020225

Swannanoa 28778

275849

FY 21-22

1,000

Norwood Avenue

2020222

Asheville 28804

275810

FY 21-22

270

286 Old Haw Creek Road

2020224

Asheville 28805

275815

FY 21-22

100

Old Asheland Avenue to Phifer Street

2015034

Asheville 28801

258560

FY 21-22

462

Parker Drive @ No. 110

2020219

Swannanoa 28778

275885

FY 21-22

598

11 Shenandoah Road

2020215

Asheville 28805

275804

FY 21-22

1,600

South Main Street @ Reems Creek Road

2017012

Weaverville 28787

275831

FY 21-22

592

Starnes Avenue @ Broadway Street

2020220

Asheville 28801

208325

FY 21-22

922

100 Woodrow Avenue

2020211

Asheville 28801

275765

FY 21-22

300

28 Woodward Avenue

2019021

Asheville 28804

49386

FY 21-22

660

Wynn Street @ Mountain Street

2019139

Asheville 28801

263129

FY 21-22

437

DESCRIPTION

TOTAL FOOTAGE NOTES:

15,410

In addition to the projects identified above, an additional 5,000 linear feet of sewer rehabilitation footage is expected through completion of previously identified projects, emergency repairs, and other activities during FY 2021-2022.


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2021-2022

PROJECT:

10 Balsam Road

LOCATION:

Black Mountain 28711

TYPE:

In House General Sewer Rehab

WORK ORDER:

275803

PROJECT NO.

2020214

TOTAL LF:

410

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

. ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

PROJECT DESCRIPTION: Project consists of replacing approximately 410 LF with 8-inch DIP, by dig and replace.

SPECIAL PROJECT NOTES:

1 ]


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2021-2022

PROJECT:

Briarcliff Dr @ Oakwilde Dr

LOCATION:

Asheville 28803

TYPE:

In House General Sewer Rehab

WORK ORDER:

258768

PROJECT NO.

2019010

TOTAL LF:

860

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

PROJECT DESCRIPTION: Project consists of replacing approximately 860 LF with 8-inch DIP, by dig and replace.

SPECIAL PROJECT NOTES:

0 ]


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2021-2022

PROJECT:

Briarwood Rd @ W. Fox Chase Rd

LOCATION:

Asheville 28804

TYPE:

In House General Sewer Rehab

WORK ORDER:

267160

PROJECT NO.

2019248

TOTAL LF:

300

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

. ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

PROJECT DESCRIPTION: Project consists of replacing approximately 300 LF with 8-inch DIP, by dig and replace.

SPECIAL PROJECT NOTES:

0 ]


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2021-2022

PROJECT:

Brookwood Road (4-Inch Main)

LOCATION:

Asheville 28804

TYPE:

In House General Sewer Rehab

WORK ORDER:

275821

PROJECT NO.

2020221

TOTAL LF:

100

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

. ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [ 1 ]

PROJECT DESCRIPTION: Project consists of replacing approximately 100 LF with 8-inch DIP, by dig and replace.

SPECIAL PROJECT NOTES:


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2021-2022

PROJECT:

Charlotte St @ N. Ridgeway Ave

LOCATION:

Black Mountain 28711

TYPE:

In House General Sewer Rehab

WORK ORDER:

232699

PROJECT NO.

2016237

TOTAL LF:

1,073

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

. ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

PROJECT DESCRIPTION: Project consists of replacing approximately 1,073 LF with 8-inch DIP, by dig and replace.

SPECIAL PROJECT NOTES:

0 ]


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2021-2022

PROJECT:

Cherokee Road @ Mayflower Dr

LOCATION:

Asheville 28804

TYPE:

In House General Sewer Rehab

WORK ORDER:

275866

PROJECT NO.

2020226

TOTAL LF:

649

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

. ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

PROJECT DESCRIPTION: Project consists of replacing approximately 649 LF with 8-inch DIP, by dig and replace.

SPECIAL PROJECT NOTES:

4 ]


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2021-2022

PROJECT:

48 Clarendon Road

LOCATION:

Asheville 28806

TYPE:

In House General Sewer Rehab

WORK ORDER:

258562

PROJECT NO.

2019009

TOTAL LF:

500

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

. ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

PROJECT DESCRIPTION: Project consists of replacing approximately 500 LF with 8-inch DIP, by dig and replace.

SPECIAL PROJECT NOTES:

0 ]


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2021-2022

PROJECT:

Dayton Road @ No. 35

LOCATION:

Asheville 28804

TYPE:

In House General Sewer Rehab

WORK ORDER:

275887

PROJECT NO.

2020218

TOTAL LF:

375

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

PROJECT DESCRIPTION: Project consists of replacing approximately 375 LF with 8-inch DIP, by dig and replace.

SPECIAL PROJECT NOTES:

3 ]


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2021-2022

PROJECT:

753 Fairview Road

LOCATION:

Asheville 28803

TYPE:

In House General Sewer Rehab

WORK ORDER:

275813

PROJECT NO.

2020223

TOTAL LF:

100

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

. ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

PROJECT DESCRIPTION: Project consists of replacing approximately 100 LF with 8-inch DIP, by dig and replace.

SPECIAL PROJECT NOTES:

1 ]


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2021-2022

PROJECT:

276 Hi-Alta Avenue

LOCATION:

Asheville 28806

TYPE:

In House General Sewer Rehab

WORK ORDER:

271375

PROJECT NO.

2020081

TOTAL LF:

201

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [ 3 ]

PROJECT DESCRIPTION: Project consists of replacing approximately 201 LF with 8-inch DIP, by dig and replace.

SPECIAL PROJECT NOTES:


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2021-2022

PROJECT:

Highland Farms Road

LOCATION:

Black Mountain 28711

TYPE:

In House General Sewer Rehab

WORK ORDER:

275837

PROJECT NO.

2018018

TOTAL LF:

850

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

. ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

PROJECT DESCRIPTION: Project consists of replacing approximately 850 LF with 8-inch DIP, by dig and replace.

SPECIAL PROJECT NOTES:

1 ]


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2021-2022

PROJECT:

32 Kensington Drive

LOCATION:

Asheville 28805

TYPE:

In House General Sewer Rehab

WORK ORDER:

275805

PROJECT NO.

2020213

TOTAL LF:

644

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

. ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

PROJECT DESCRIPTION: Project consists of replacing approximately 644 LF with 8-inch DIP, by dig and replace.

SPECIAL PROJECT NOTES:

2 ]


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2021-2022

PROJECT:

Lotus Place

LOCATION:

Asheville 28804

TYPE:

In House General Sewer Rehab

WORK ORDER:

275767

PROJECT NO.

2020212

TOTAL LF:

825

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

. ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

PROJECT DESCRIPTION: Project consists of replacing approximately 825 LF with 8-inch DIP, by dig and replace.

SPECIAL PROJECT NOTES:

1 ]


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2021-2022

PROJECT:

Maple Springs Road @ Knauth Rd

LOCATION:

Asheville 28805

TYPE:

In House General Sewer Rehab

WORK ORDER:

275867

PROJECT NO.

2015220

TOTAL LF:

890

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

PROJECT DESCRIPTION: Project consists of replacing approximately 890 LF with 8-inch DIP, by dig and replace.

SPECIAL PROJECT NOTES:

3 ]


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2021-2022

PROJECT:

72 Mimosa Drive

LOCATION:

Asheville 28801

TYPE:

In House General Sewer Rehab

WORK ORDER:

207261

PROJECT NO.

2017230

TOTAL LF:

440

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

. ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

PROJECT DESCRIPTION: Project consists of replacing approximately 440 LF with 8-inch DIP, by dig and replace.

SPECIAL PROJECT NOTES:

0 ]


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2021-2022

PROJECT:

Northwest Avenue @ 215

LOCATION:

Swannanoa 28778

TYPE:

In House General Sewer Rehab

WORK ORDER:

275846

PROJECT NO.

2018017

TOTAL LF:

252

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

PROJECT DESCRIPTION: Project consists of replacing approximately 252 LF with 8-inch DIP, by dig and replace.

SPECIAL PROJECT NOTES:

3 ]


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2021-2022

PROJECT:

Northwest Ave @ W Charleston Ave

LOCATION:

Swannanoa 28778

TYPE:

In House General Sewer Rehab

WORK ORDER:

275849

PROJECT NO.

2020225

TOTAL LF:

1,000

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

. ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

PROJECT DESCRIPTION: Project consists of replacing approximately 1,000 LF with 8-inch DIP, by dig and replace.

SPECIAL PROJECT NOTES:

0 ]


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2021-2022

PROJECT:

Norwood Avenue

LOCATION:

Asheville 28804

TYPE:

In House General Sewer Rehab

WORK ORDER:

275810

PROJECT NO.

2020222

TOTAL LF:

270

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

. ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

PROJECT DESCRIPTION: Project consists of replacing approximately 270 LF with 8-inch DIP, by dig and replace.

SPECIAL PROJECT NOTES:

0 ]


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2021-2022

PROJECT:

Old Asheland Ave to Phifer Street

LOCATION:

Asheville 28801

TYPE:

In House General Sewer Rehab

WORK ORDER:

258560

PROJECT NO.

2015034

TOTAL LF:

462

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

. ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

PROJECT DESCRIPTION: Project consists of replacing approximately 462 LF with 8-inch DIP, by dig and replace.

SPECIAL PROJECT NOTES:

0 ]


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2021-2022

PROJECT:

286 Old Haw Creek Road

LOCATION:

Asheville 28805

TYPE:

In House General Sewer Rehab

WORK ORDER:

275815

PROJECT NO.

2020224

TOTAL LF:

100

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

PROJECT DESCRIPTION: Project consists of replacing approximately 100 LF with 8-inch DIP, by dig and replace.

SPECIAL PROJECT NOTES:

0 ]


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2021-2022

PROJECT:

Parker Drive @ No. 110

LOCATION:

Swannanoa 28778

TYPE:

In House General Sewer Rehab

WORK ORDER:

275885

PROJECT NO.

2020219

TOTAL LF:

598

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

. ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

PROJECT DESCRIPTION: Project consists of replacing approximately 598 LF with 8-inch DIP, by dig and replace.

SPECIAL PROJECT NOTES:

2 ]


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2021-2022

PROJECT:

11 Shenandoah Road

LOCATION:

Asheville 28805

TYPE:

In House General Sewer Rehab

WORK ORDER:

275804

PROJECT NO.

2020215

TOTAL LF:

1,600

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

. ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

PROJECT DESCRIPTION: Project consists of replacing approximately 1,600 LF with 8-inch DIP, by dig and replace.

SPECIAL PROJECT NOTES:

8 ]


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2021-2022

PROJECT:

S. Main St @ Reems Creek Road

LOCATION:

Weaverville 28787

TYPE:

In House General Sewer Rehab

WORK ORDER:

275831

PROJECT NO.

2017012

TOTAL LF:

592

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

. ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

PROJECT DESCRIPTION: Project consists of replacing approximately 592 LF with 8-inch DIP, by dig and replace.

SPECIAL PROJECT NOTES:

4 ]


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2021-2022

PROJECT:

Starnes Avenue @ Broadway St.

LOCATION:

Asheville 28801

TYPE:

In House General Sewer Rehab

WORK ORDER:

208325

PROJECT NO.

2020220

TOTAL LF:

922

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

. ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

PROJECT DESCRIPTION: Project consists of replacing approximately 922 LF with 8-inch DIP, by dig and replace.

SPECIAL PROJECT NOTES:

0 ]


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2021-2022

PROJECT:

100 Woodrow Avenue

LOCATION:

Asheville 28801

TYPE:

In House General Sewer Rehab

WORK ORDER:

275765

PROJECT NO.

2020211

TOTAL LF:

300

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

PROJECT DESCRIPTION: Project consists of replacing approximately 300 LF with 8-inch DIP, by dig and replace.

SPECIAL PROJECT NOTES:

3 ]


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2021-2022

PROJECT:

28 Woodward Avenue

LOCATION:

Asheville 28804

TYPE:

In House General Sewer Rehab

WORK ORDER:

49386

PROJECT NO.

2019021

TOTAL LF:

660

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

. ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

PROJECT DESCRIPTION: Project consists of replacing approximately 660 LF with 8-inch DIP, by dig and replace.

SPECIAL PROJECT NOTES:

1 ]


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2021-2022

PROJECT:

Wynn Street @ Mountain Street

LOCATION:

Asheville 28801

TYPE:

In House General Sewer Rehab

WORK ORDER:

263129

PROJECT NO.

2019139

TOTAL LF:

437

PROJECT BUDGET:

Funded through Project 2002101

PROJECT ORIGIN:

In-House Capital Improvements

. ENGINEER:

MSD

R.O.W. ACQUISITION:

MSD

CONTRACTOR:

MSD

CONSTRUCTION ADM:

MSD In-House

INSPECTION:

MSD In-House

# PLATS: [

PROJECT DESCRIPTION: Project consists of replacing approximately 437 LF with 8-inch DIP, by dig and replace.

SPECIAL PROJECT NOTES:

4 ]


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Surveys for Design

LOCATION:

Various

TYPE:

General Sewer Rehab.

PIPE RATING:

N/A

PROJECT NO.

2002060

TOTAL LF:

N/A

PROJECT BUDGET:

$500,000.00

PROJECT ORIGIN:

Surveys for future projects

DESCRIPTION

ESTIMATED PROJECT COST

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$500,000.00

$50,000.00

55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION 55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT

$500,000.00

$0.00

ENGINEER:

EB

R.O.W. ACQUISITION:

# PLATS: [

$0.00

$50,000.00

ESTIMATED BUDGETS - FY 23 - 31 ]

FY 22-23

$50,000.00

CONTRACTOR:

FY 23-24

$50,000.00

CONSTRUCTION ADM:

FY 24-25

$50,000.00

INSPECTION:

FY 25-26

$50,000.00

FY 26-27

$50,000.00

FY 27-28

$50,000.00

New rehabilitation projects are generated continuously throughout the year. This line item provides for surveying needs for these new projects, in order that preliminary work may FY 28-29 begin prior to being formally incorporated into the next year's CIP. This helps to ensure projects are FY 29-30 completed efficiently. PROJECT DESCRIPTION:

FY 30-31

SPECIAL PROJECT NOTES:

Funds are transferred out to provide Survey for Design for Future Projects. Total estimated project cost shown is the total within the ten year window.

$50,000.00 $50,000.00 $50,000.00


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022 PROJECT:

Future Projects - Non Critical

LOCATION:

Various

TYPE:

General Sewer Rehab.

PIPE RATING:

N/A

PROJECT NO.

Various

TOTAL LF:

0

PROJECT BUDGET:

Varies

PROJECT ORIGIN:

SSO's, Work Orders, Line condition

Engineer

Project Number

Pipe Rating

Project Footage

Craggy Street @ Old US 70

HC

2015209

2

1,000

$379,150

Lakeshore @ Merrimon

HC

2014177

3

362

$233,600

Riverside Dr. @ Silverline Plastic

SA

2012007

4

400

$158,220

Project

Estimated Budget

Sweeten Creek Road @ Weston Road

SA

2014187

4

1,775

$611,200

Lionel Place

DP

2015009

6

308

$116,500

Tunnel Rd. @ White Pine Drive

OH

2016101

6

170

$69,500

Merrimon Ave. @ Clearview Terrace

OH

2007012

7

500

$307,950

Upper Grassy Branch @ Maxwell Rd.

SA

2010096

7

1,000

$348,510

Four Mile Creek WW (CDM #1)

EB

2001193

8

3,400

$952,000

Haw Creek WW (CDM #6)

EB

2001194

8

3,800

$1,064,000

Weston Road @ Tampa Blvd.

HC

2015208

8

400

$142,150

Herron Avenue

SA

2014186

9

2,060

$804,600

Merrimon Ave. @ Coleman Ave.

DP

2014009

9

2,800

$1,074,000

Oakwood Street

HC

2014115

9

976

$390,250

Asheville Rd. @ Hart Holloway Dr.

TH

2020023

10

292

$97,500

Avena Rd @ Flat Creek Road

TH

2021009

10

1,515

$584,003

Druid Drive

SA

2020006

10

500

$164,400

Elk Park Drive - PRP 35001

SA

2006028

10

2,242

$764,046

Four Inch Main - College Street

SA

2012128

10

1,000

$531,300

Wood Avenue @ Parker Road

SA

2014188

10

1,050

$389,100

Adams Street

SA

2012126

12

2,630

$1,008,900

Battery Park Alley

SA

2016107

12

250

Biltmore WW (CDM #3)

EB

2001192

12

2,200

$660,000

Cumberland Avenue

HC

2014014

12

5,011

$1,917,125

$104,700

Douglas Place PSR

SA

2011116

12

588

$202,980

Louisana Avenue

DP

2015174

12

2,150

$827,000

Weaverville Rd. @ Reynolds Mountain

OH

2018036

12

415

Bear Creek Road

SA

2011117

13

2,800

$166,500 $1,051,800

Edgewood Rd S. @ Sweeten Creek Rd

TH

2021007

13

500

$158,750

Elkwood Ave. @ Norman Austin Drive

DP

2014008

13

600

$225,100

Hemphill Rd @ Charlotte HWY

TH

2021006

13

2,550

$858,675

McDowell St @ Myrtle St

DP

2019257

13

465

$136,000

Oakley Road @ School Road

OH

2018031

13

600

$254,000

Broadway St. @ Bordeau Place

DP

2009034

14

475

$286,750

Forest Hill Drive @ Warwick Road

SA

2014020

14

3,400

Page 1 of 2

$1,301,600


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022 PROJECT:

Future Projects - Non Critical

LOCATION:

Various

TYPE:

General Sewer Rehab.

PIPE RATING:

N/A

PROJECT NO.

Various

TOTAL LF:

0

PROJECT BUDGET:

Varies

PROJECT ORIGIN:

SSO's, Work Orders, Line condition

Engineer

Project Number

Pipe Rating

Project Footage

Town Branch Interceptor Phase III

DP

2017158

14

3,600

$2,501,000

Dingle Creek Interceptor

OH

2006010

15

7,871

$3,121,847

Knauth Road

SA

2015220

15

890

Lower Glendale Avenue

HC

2012083

15

2,716

Riverside Dr. @ Woodfin Avenue

SA

2019005

15

684

$270,600

Chester Place @ Cranford Road

OH

2019026

16

1,025

$396,000

Lakewood Drive @ Dudley Ave.

HC

2015016

16

280

$111,150

Stratford Road

DP

2015013

16

1,820

$694,500

Covewood Trail @ Chunns Cove Road

DP

2021005

17

1,120

$397,000

Mitchell Avenue

SA

2014185

17

3,360

$1,326,500

Tunnel Rd. @ Pleasant Ridge Road

SA

2019006

17

150

Old Toll Rd. @ Blue Briar Road

OH

2018032

19

185

Arlington Street

DP

2015008

20

3,230

$1,119,200

North Market Street

SA

2014019

20

1,064

$377,400

North Street @ Broadway Street

OH

2018030

20

1,067

$451,000

Smokey Park Hwy @ Sand Hill Rd.

OH

2018035

20

590

$287,000

Kenilworth @ Springdale Rd.

HC

2014010

21

1,458

$747,350

US 70 @ Jordan Road

DP

2015014

21

4,550

$1,615,000

Lakeview @ Glen Falls Road

DP

2014007

22

2,750

$1,206,500

Starnes Avenue

HC

2014154

22

2,871

$1,156,000

Middle Beaverdam Crk. @ I-26

OH

2010002

23

2,930

$1,382,430

South Swannanoa WW (CDM #4)

EB

2001195

23

8,040

$3,020,000

Project

Estimated Budget

$170,300 $1,173,450

$53,300 $80,500

Arlington St @ Furman Ave.

TH

2020021

24

310

$130,000

Riverview Drive

HC

2013104

24

2,302

$880,680

Rosewood Ave. @ Riverside Cemetry

HC

2019023

25

180

$79,150

Lincoln Ave

HC

2013103

26

1,415

$540,370 $1,506,000

Beaverdam Creek WW

EB

2001191

27

5,500

Oakland Drive @ Church Street

DP

2015177

27

575

Wildwood Park

HC

2015194

27

582

Lining Contract No. 9

DP

2017031

N/A

TOTAL AMOUNT

than other projects within the Ten Year CIP. All projects are reprioritized each year, and the schedule for the entire program is adjusted based on project criticality.

Page 2 of 2

$223,780 $1,005,000

113,299

PROJECT DESCRIPTION: This is a listing of projects which have low Pipe Ratings and are therefore less critical

$207,000

$44,571,866


Capital Improvement Program Fiscal Years 2022—2031

Private Sewer Rehabilitation Projects


This Page Intentionally Blank


/

RD

R

RD

Homeland Park PSR Project No. 2016248

N AN W S

A O AN

ER IV

RD OD O EW PIN IR AC S MO MI

RHODODENDRON DR

SPRUCE DR A AZALE

UTU S

DR

AR B

RN

VIEW ORS DR NOT TO SCALE

DR

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

PL METROPOLITAN SEWERAGE DISTRICT

PINE CON E

D D PARK R HOMELA N

E GOV

OTEEN PARK

E COTTAG

RD


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Homeland Park

LOCATION:

Asheville

TYPE:

Private Sewer Rehab.

PIPE RATING:

48

PROJECT NO.

2016248

TOTAL LF:

921

PROJECT BUDGET:

$500,750.00

PROJECT ORIGIN:

Work Orders, Line Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$7,250.00

$7,250.00

55330 - DESIGN 55340 - PERMITS

$500.00

$500.00

55360 - EASEMENT PLATS

$24,500.00

$24,500.00

55370 - LEGAL FEES

$20,000.00

$20,000.00

$75,000.00

$75,000.00

55350 - SPECIAL STUDIES

55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL

$5,000.00

$5,000.00

55410 - CONDEMNATION

$20,000.00

$20,000.00

55420 - CONSTRUCTION

$345,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,000.00

55450 - SURVEY - ASBUILT

$2,500.00

TOTAL AMOUNT

$500,750.00

$7,250.00

ENGINEER:

MSD

TH

R.O.W. ACQUISITION:

MSD

# PLATS: [ 19

CONTRACTOR:

$0.00

$145,000.00

ESTIMATED BUDGETS - FY 22 - 30 ]

FY 22-23

$0.00

FY 23-24

$0.00

CONSTRUCTION ADM.:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$348,500.00

FY 26-27

$0.00

FY 27-28

$0.00

This project is located in East Asheville just south of the intersection of Swannanoa River Road and Tunnel Road in Homeland Park. This project consists of 921 LF of existing FY 28-29 4-inch VCP replacing with new 8-inch DIP. The existing 4-inch private sewer is the main line for this FY 29-30 subdivision and is full of roots, which has triggered numerous service calls. PROJECT DESCRIPTION:

FY 30-31

SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


BA

IS H

R

O VE

D

C R D

JOAN WAY

L ROL

ING

H I LL

M CR ILL E LO EK OP

DR

Old County Home Road PSR Project No. 2015221

L W

N

O

IN

N

K

R

M C

T

SPIVEY PL

L RD BARN OW

LIA W AY

DA A N LN AM AIL G

SS

CA M

EL IA

LN G RA CT Y

JO HN

DR

Y NT D

/

BRIARCLIF F TER

LA

MAGN O

WISTERIA CT

R HEATHE

SYDNEY LN

D

LN E NC BA U CO R ME O H

VIFA NIA R

DR W O

O D

WY NOT TO SCALE

LANDIS CT

EL

D

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

ER OM H A IAD

RL

PRIMR OSE DR

CH

DR AI N

W ES T

T

M P

D OL ES H ER

CO

W NE IC LE

DR

A SHAST WALK GE CT

LN

TO N

ID WESTR

AM BE

N LO D OO W G


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Old County Home Rd PSR

LOCATION:

W. Asheville

TYPE:

Private Sewer Rehab.

PIPE RATING:

67

PROJECT NO.

2015221

TOTAL LF:

4,600

PROJECT BUDGET:

$1,840,400.00

PROJECT ORIGIN:

Problematic Four Inch Line

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$20,000.00

$18,800.00

$1,200.00

55330 - DESIGN 55340 - PERMITS

$1,000.00

$1,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$16,900.00

55370 - LEGAL FEES

$17,000.00

$17,000.00

$56,000.00

$56,000.00

$14,400.00

$2,500.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL

$5,000.00

55410 - CONDEMNATION

$20,000.00

55420 - CONSTRUCTION

$1,700,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$2,000.00

55450 - SURVEY - ASBUILT

$2,500.00

TOTAL AMOUNT

$1,840,400.00

$18,800.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

MSD

# PLATS: [ 16 ]

CONTRACTOR:

$15,600.00

$76,500.00

ESTIMATED BUDGETS - FY 23 - 31 FY 22-23

$25,000.00

FY 23-24

$1,704,500.00

CONSTRUCTION ADM:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

This project is located in West Asheville and is comprised of 4,418 LF of 8-inch FY 28-29 ductile iron pipe and 182 LF of 12-inch ductile iron pipe. The existing line is a problematic 4 and 8-inch FY 29-30 sewer line composed of PVC and VCP with many defects. PROJECT DESCRIPTION:

FY 30-31 SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


Capital Improvement Program Fiscal Years 2022—2031

Treatment Plant, Pump Stations, & General Capital Improvements


This Page Intentionally Blank


IDE D

Bar Screen Roof Penetrations Project No. 2021021

R

/

S RIVER NOT TO SCALE

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Bar Screen Roof Penetrations

LOCATION:

MSD-Treatment Plant

TYPE:

Treatment Plant

PIPE RATING:

N/A

PROJECT NO.

2021021

TOTAL LF:

0

PROJECT BUDGET:

$100,000.00

PROJECT ORIGIN:

Equipment Access

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$100,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT

ENGINEER:

$100,000.00

MSD

R.O.W. ACQUISITION:

$0.00

$0.00

HC # PLATS: [

$0.00

ESTIMATED BUDGETS - FY 23- 31 0

]

FY 22-23

$100,000.00

CONTRACTOR:

MSD

FY 23-24

$0.00

CONSTRUCTION ADM.:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

The existing roof panels do not have FY 28-29

$0.00

PROJECT DESCRIPTION: This project includes new precast concrete hollowcore roofing panels with

access penetrations overtop of the influent bar screens. penetrations which makes removal of the bar screens difficult. Removal of the screens is ideal for FY 29-30 maintenance. Roof panel replacement will also require replacement of the membrane roofing system. FY 30-31

SPECIAL PROJECT NOTES:

$0.00 $0.00


/

V RI

Biological Treatment Project No. 2016063

ED SI D R E R NOT TO SCALE

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Biological Treatment

LOCATION:

MSD-Treatment Plant

TYPE:

Treatment Plant

PIPE RATING:

N/A

PROJECT NO.

2016063

TOTAL LF:

0

PROJECT BUDGET:

$51,210,000.00

PROJECT ORIGIN:

Future Regulatory Requirements

ESTIMATED PROJECT COST

DESCRIPTION

55310 - PRELIM. ENGINEERING

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

$500,000.00

55320 - SURVEY - DESIGN

$10,000.00

55330 - DESIGN

$4,800,000.00

55340 - PERMITS

$70,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$44,000,000.00

55430 - CONST. CONTRACT ADM.

$1,750,000.00

55440 - TESTING

$80,000.00

55450 - SURVEY - ASBUILT TOTAL AMOUNT

ENGINEER:

$51,210,000.00

MSD

R.O.W. ACQUISITION:

$0.00

$0.00

HC # PLATS: [

$0.00

ESTIMATED BUDGETS - FY 23- 31 0

]

FY 22-23

$0.00

CONTRACTOR:

MSD

FY 23-24

$500,000.00

CONSTRUCTION ADM.:

MSD

FY 24-25

$2,410,000.00

INSPECTION:

MSD

FY 25-26

$2,470,000.00

FY 26-27

$10,420,000.00

FY 27-28

$20,836,000.00

PROJECT DESCRIPTION: This project is the final and most significant recommendation from the Plant FY 28-29

$14,574,000.00

Facilities Plan. It will replace the Rotating Biological Contactors (RBC's) with an alternative biological FY 29-30 treatment technology. This project will be driven by regulatory requirements. FY 30-31 SPECIAL PROJECT NOTES:

$0.00 $0.00


This Page Intentionally Blank


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Building and Facility Rehabilitation

LOCATION:

MSD-Treatment Plant

TYPE:

Treatment Plant - Annual

PIPE RATING:

N/A

PROJECT NO.

2002068

TOTAL LF:

0

PROJECT BUDGET:

$600,000.00

PROJECT ORIGIN:

Miscellaneous Building Repairs

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$600,000.00

$7,526.00

$71,474.00

$60,000.00

$600,000.00

$7,526.00

$71,474.00

$60,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

MSD

# PLATS: [

CONTRACTOR:

ESTIMATED BUDGETS - FY 23- 31 0

]

FY 22-23

$60,000.00

FY 23-24

$60,000.00

CONSTRUCTION ADM.:

MSD

FY 24-25

$60,000.00

INSPECTION:

MSD

FY 25-26

$60,000.00

FY 26-27

$60,000.00

FY 27-28

$60,000.00

PROJECT DESCRIPTION: This item is for the replacement of larger capital items such as roofing systems, FY 28-29

$60,000.00

HVAC, and subcontracts on buildings and structures within the MSD campus and treatment plant facility. FY 29-30 Total estimated project cost shown is the total within the ten year window. FY 30-31 SPECIAL PROJECT NOTES:

$60,000.00 $60,000.00


R EA

AY MW

RA

VE

YR BO AM

D

NOT TO SCALE

Carrier Bridge Pump Station Replacement Project No. 2019045

T UPS

NE JOY

DR

/

N AV

A VE

O CLIFT

of BUNCOMBE COUNTY, NORTH CAROLINA

Budget Map

METROPOLITAN SEWERAGE DISTRICT

T MEADOW R D

W RIVERVIE

B LAM

S LYMAN

E


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Carrier Bridge PS Replacement

LOCATION:

Asheville

TYPE:

Pump Station Improvements

PIPE RATING:

N/A

PROJECT NO.

2019045

TOTAL LF:

1,640

PROJECT BUDGET:

$42,529,945.00

PROJECT ORIGIN:

CDM Preliminary Engineering Report

ESTIMATED PROJECT COST

DESCRIPTION

55310 - PRELIM. ENGINEERING

TOTAL EXPENDS THRU 12/31/20

$1,025.00

55320 - SURVEY - DESIGN

EST. COST JAN - JUNE 2021

$1,025.00

$10,000.00

55330 - DESIGN

$10,000.00

$1,914,000.00

55340 - PERMITS

BUDGET FY 21-22

$1,248,479.00

$50,000.00

$40,000.00

$615,521.00 $20,000.00

55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS

$3,000.00

55370 - LEGAL FEES

$1,920.00

$1,920.00

$100,000.00

$91,546.00

$8,454.00

$1,342,970.00

$68,454.00

$3,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$38,400,000.00

55430 - CONST. CONTRACT ADM.

$2,000,000.00

55440 - TESTING

$50,000.00

55450 - SURVEY - ASBUILT

$10,000.00

TOTAL AMOUNT

$42,529,945.00

ENGINEER:

HDR

DP

R.O.W. ACQUISITION:

MSD

# PLATS: [

$638,521.00

ESTIMATED BUDGETS - FY 23- 31 3

]

CONTRACTOR:

FY 22-23

$20,245,000.00

FY 23-24

$20,235,000.00

CONSTRUCTION ADM.:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

PROJECT DESCRIPTION: This project will increase the capacity of the Carrier Bridge Pump Station to 40MGD FY 27-28

$0.00

to accommodate future growth in south and west Asheville, as well as CCWSD. This project includes FY 28-29 replacement of the pump station, screening, odor control, electrical building, and an emergency generator. The project also includes two new 36-inch force mains and a 60-inch influent gravity line coming into the FY 29-30 pump station. FY 30-31 SPECIAL PROJECT NOTES: Project includes 740 LF of dual 36-inch force mains and 900 LF of 60-inch gravity line.

$0.00 $0.00 $0.00


/

Collection System Master Plan Update Project No. 2020011 NOT TO SCALE

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Collection System Master Plan Update LOCATION:

District-Wide

TYPE:

General Capital Improvement

PIPE RATING:

N/A

PROJECT NO.

2020011

TOTAL LF:

0

PROJECT BUDGET:

$200,000.00

PROJECT ORIGIN:

Master Plan Update/CCWSD Merger

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES

$200,000.00

55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION 55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT

ENGINEER: R.O.W. ACQUISITION:

$200,000.00

Consultant

$0.00

$0.00

HC # PLATS: [ 0

$0.00

ESTIMATED BUDGETS - FY 23- 31 FY 22-23

$0.00

CONTRACTOR:

]

FY 23-24

$200,000.00

CONSTRUCTION ADM.:

FY 24-25

$0.00

INSPECTION:

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: The District's Collection System Master Plan was completed in 2008 and needs FY 28-29 to be updated. The Master Plan Update will include the merger with Cane Creek Water & Sewer District and FY 29-30 any updates from MSD member agencies. FY 30-31 SPECIAL PROJECT NOTES:

This project is being pushed back to allow for the completion of Buncombe County's updated Zoning Plan.

$0.00 $0.00 $0.00


ED

/

RIV

SID ER

D

EAVE

Equipment Storage Facility Project No. 2020237

MOU ELK NTA IN R

OLD B

RDAM

C R EE

NOT TO SCALE

K RD

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

RA ALTU Y W K P

R


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Equipment Storage Facility

LOCATION:

MSD - Treatment Plant

TYPE:

Treatment Plant

PIPE RATING:

N/A

PROJECT NO.

2020237

TOTAL LF:

PROJECT BUDGET:

Fire Destroyed Old Facility

PROJECT ORIGIN:

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN

$150,000.00

$75,000.00

$75,000.00

55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$2,550,000.00

$2,550,000.00

55430 - CONST. CONTRACT ADM.

$12,000.00

$12,000.00

55440 - TESTING

$10,000.00

$10,000.00

55450 - SURVEY - ASBUILT

$7,000.00

TOTAL AMOUNT

ENGINEER:

$7,000.00

$2,729,000.00

Consultant

R.O.W. ACQUISITION:

$0.00

MCGill # PLATS: [

$75,000.00

$2,654,000.00

ESTIMATED BUDGETS - FY21-FY29 ]

CONTRACTOR:

FY 22-23

$0.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

also known as the “Nutri-Lime Building”, which is located on the main plant property. This facility was FY 28-29

$0.00

utilized for equipment storage. This project is to design and construct a new storage facility at the same FY 29-30 location.

$0.00

PROJECT DESCRIPTION: On November 10, 2020 a fire destroyed MSD’s Alkaline Stabilization Building,

FY 30-31

SPECIAL PROJECT NOTES:

$0.00


This Page Intentionally Blank


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Flow Monitoring

LOCATION:

MSD-Treatment Plant

TYPE:

Treatment Plant

PIPE RATING:

N/A

PROJECT NO.

2008013

TOTAL LF:

0

PROJECT BUDGET:

$500,000.00

PROJECT ORIGIN:

Maintenance of Permanent Flow Monitors

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$500,000.00

$1,170.00

$48,830.00

$50,000.00

$500,000.00

$1,170.00

$48,830.00

$50,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

N/A

# PLATS: [

CONTRACTOR:

ESTIMATED BUDGETS - FY 23- 31 0

]

FY 22-23

$50,000.00

FY 23-24

$50,000.00

CONSTRUCTION ADM.:

MSD

FY 24-25

$50,000.00

INSPECTION:

MSD

FY 25-26

$50,000.00

FY 26-27

$50,000.00

FY 27-28

$50,000.00

PROJECT DESCRIPTION: This project is for expenses related to the continued operation, maintenance, FY 28-29

$50,000.00

and improvements of the District's flow monitoring program.

SPECIAL PROJECT NOTES:

FY 29-30

$50,000.00

FY 30-31

$50,000.00


This Page Intentionally Blank


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

HVAC Rehabilitation

LOCATION:

MSD-Treatment Plant

TYPE:

Treatment Plant - Annual

PIPE RATING:

N/A

PROJECT NO.

2020051

TOTAL LF:

0

PROJECT BUDGET:

$155,000.00

PROJECT ORIGIN:

Misc HVAC Repairs/Replacement

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$155,000.00

$6,036.00

$46,464.00

$50,000.00

$155,000.00

$6,036.00

$46,464.00

$50,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

MSD

# PLATS: [

CONTRACTOR:

ESTIMATED BUDGETS - FY 23- 31 0

]

FY 22-23

$25,000.00

FY 23-24

$10,000.00

CONSTRUCTION ADM.:

MSD

FY 24-25

$10,000.00

INSPECTION:

MSD

FY 25-26

$10,000.00

FY 26-27

$10,000.00

FY 27-28

$10,000.00

This item is for replacement of HVAC systems within the MSD campus, FY 28-29 treatment plant facility, and pump stations. Total estimated project cost shown is the total within the ten FY 29-30 year window. PROJECT DESCRIPTION:

FY 30-31 SPECIAL PROJECT NOTES:

$10,000.00 $10,000.00 $10,000.00


S POUNDER

DR

IDE D

Hydroelectric Power Plant Rehabilitation Project No. 2021016

R

/

S RIVER NOT TO SCALE

RU M AR

AN

RD

GOODMAN RD

B LV D

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

DM

HEIGH TS

METROPOLITAN SEWERAGE DISTRICT

GO O

RD

CT CU TAW AY


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Hydroelectric Power Plant Rehab

LOCATION:

MSD-Treatment Plant

TYPE:

Treatment Plant

PIPE RATING:

N/A

PROJECT NO.

2021016

TOTAL LF:

0

PROJECT BUDGET:

$200,000.00

PROJECT ORIGIN:

Aging Equipment, Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES

$200,000.00

55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION 55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT

$200,000.00

$0.00

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

MSD

# PLATS: [

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 23- 31 0

]

FY 22-23

$200,000.00

FY 23-24

$0.00

CONSTRUCTION ADM.:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project includes an evaluation of the existing hydroelectric plant and its aging FY 28-29

$0.00

infrastructure. The study will consider the cost benefit of replacing various components with more efficient FY 29-30 technology. The project also includes rehabilitation of the influent bar screen structure. FY 30-31 SPECIAL PROJECT NOTES:

$0.00 $0.00


Incinerator Ash Lagoon Restoration Project No. 2021015

R

/

D RIVERSIDE NOT TO SCALE

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Incinerator Ash Lagoon Restoration

LOCATION:

MSD-Treatment Plant

TYPE:

Treatment Plant

PIPE RATING:

N/A

PROJECT NO.

2021015

TOTAL LF:

0

PROJECT BUDGET:

$790,000.00

PROJECT ORIGIN:

Capacity/Condition

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN

$20,000.00

55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$770,000.00

$720,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT

$790,000.00

$0.00

ENGINEER:

TBD

HC

R.O.W. ACQUISITION:

N/A

# PLATS: [

CONTRACTOR:

$0.00

$720,000.00

ESTIMATED BUDGETS - FY 23- 31 0

]

FY 22-23

$20,000.00

FY 23-24

$50,000.00

CONSTRUCTION ADM.:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project is for the restoration of the existing incinerator ash lagoon. The lagoon FY 28-29

$0.00

has approximately 9 acres of surface area and is overgrown with vegetation. The vegetation will be removed to FY 29-30 increase lagoon capacity. Once complete, the overflow structure will be rehabilitated. FY 30-31 SPECIAL PROJECT NOTES:

$0.00 $0.00


IDE D

Incinerator Polymer System Replacement Project No. 2019071

R

/

S RIVER NOT TO SCALE

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Incinerator Polymer System Replacement LOCATION:

MSD-Treatment Plant

TYPE:

Treatment Plant

PIPE RATING:

N/A

PROJECT NO.

2019071

TOTAL LF:

0

PROJECT BUDGET:

$352,000.00

PROJECT ORIGIN:

Aging/Obsolete Equipment

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$352,000.00

$352,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT

$352,000.00

$0.00

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

MSD

# PLATS: [

$0.00

$352,000.00

ESTIMATED BUDGETS - FY 23- 31 0

]

CONTRACTOR:

FY 22-23

$0.00

FY 23-24

$0.00

CONSTRUCTION ADM.:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

Polymer is added to thickened sludge to improve its dewatering characteristics prior to the belt filter presses. FY 28-29 The polymer system consists of a feed hopper, aging tanks, mixers and dosing pumps. The existing system FY 29-30 was installed when the incinerator was placed online and is now approximately 29 years old.

$0.00

PROJECT DESCRIPTION: This project is for the replacement of the polymer system at the Incinerator Building.

FY 30-31

SPECIAL PROJECT NOTES:

$0.00 $0.00


IDE D

Incinerator Refactory Replacement Project No. 2021017

R

/

S RIVER NOT TO SCALE

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Incinerator Refractory Replacement

LOCATION:

MSD-Treatment Plant

TYPE:

Treatment Plant

PIPE RATING:

N/A

PROJECT NO.

2021017

TOTAL LF:

0

PROJECT BUDGET:

$250,000.00

PROJECT ORIGIN:

Aging Equipment, IFCO Recommendation

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$250,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT

$250,000.00

$0.00

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

N/A

# PLATS: [

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 23- 31 0

]

FY 22-23

$250,000.00

FY 23-24

$0.00

CONSTRUCTION ADM.:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project is for the replacement of the high temperature refractory lining inside the FY 28-29

$0.00

fluidizing bed incinerator. The refractory was last replaced in 2004 and is showing wear. The refractory FY 29-30 protects the steel shell of the incinerator from high temps and corrosive gases. FY 30-31 SPECIAL PROJECT NOTES:

$0.00 $0.00


NC KD R

NOT TO SCALE

R FE AR FP LIF

/

D TR

DR

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT

OR

AR

ITT Pump Station Upgrade Project No. 2020061

W NE

P AIR

C TAL REN

RD W E

ST F EL DT


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

ITT Pump Station Upgrade

LOCATION:

Henderson County

TYPE:

Pump Station Improvement

PIPE RATING:

N/A

PROJECT NO.

2020061

TOTAL LF:

0

PROJECT BUDGET:

$1,153,000.00

PROJECT ORIGIN:

Aging Infrastructure

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN

$15,000.00

55330 - DESIGN

$100,000.00

55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$988,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING

$50,000.00

55450 - SURVEY - ASBUILT TOTAL AMOUNT

$1,153,000.00

$0.00

ENGINEER:

MSD

HC

R.O.W. ACQUISITION:

MSD

# PLATS: [

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 23- 31 0

]

FY 22-23

$0.00

FY 23-24

$115,000.00

CONSTRUCTION ADM.:

MSD

FY 24-25

$1,038,000.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

PROJECT DESCRIPTION: The ITT pump station is located in the Broadpointe Industrial Park in south FY 27-28

$0.00

Asheville. The station is generally in fair to poor condition. Additional wet well capacity and pumping FY 28-29 capacity will be necessary in the future. The existing access to the pump station is located in a flood plain area and is unaccessable with a flusher truck. The project should involve the negotiation of a new access FY 29-30 route through the Broadpointe Ind. Park in addition to the PS upgrade. FY 30-31 SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


BRIDGE RD

ASSEE W HIAW

NOT TO SCALE

DR

BAD

IN D

R

EBONY DR

YADKIN RD

Budget Map

METROPOLITAN SEWERAGE DISTRICT of BUNCOMBE COUNTY, NORTH CAROLINA

E SWIFT CREEK RD

E HIAWASSEE RD

NEW RIVER DR

ALLIGATOR DR TAR R RD RIVE

AN OW

RD

CH

O RD PAMLIC

W SWIFT CREEK RD

LUMBER RIV ER R D

BLACK RIVER RD

Mud Creek Pump Station Replacement Project No. 2021073

D

/

BUTLER

ER

D

OK AN KR

RO

RD R EE

W HA ER RIV MU DC

N TRENT L


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Mud Creek PS Replacement

LOCATION:

Henderson County

TYPE:

Pump Station Improvement

PIPE RATING:

N/A

PROJECT NO.

2021073

TOTAL LF:

0

PROJECT BUDGET:

$500,000.00

PROJECT ORIGIN:

Capacity Improvements

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$500,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT

$500,000.00

ENGINEER:

TBD

HC

R.O.W. ACQUISITION:

N/A

# PLATS: [ 0 ]

CONTRACTOR:

ESTIMATED BUDGETS - FY 23- 31 FY 22-23

$0.00

FY 23-24

$0.00

CONSTRUCTION ADM.:

TBD

FY 24-25

$0.00

INSPECTION:

TBD

FY 25-26

$500,000.00

FY 26-27

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project is to increase firm capacity of the Mud Creek Pumping System and FY 28-29

$0.00

to consolidate the two existing pump stations into a single station. The replacement project will also FY 29-30 include upgrades to pump controls and emergency backup power supply. FY 30-31 SPECIAL PROJECT NOTES: This project was identified late in the budgetary process and $500,000 has been added to construction as a place holder.

$0.00 $0.00


E RIVERSID DR NOT TO SCALE

M OU

/

K EL N AI NT

Mull Building HVAC Phase III Project No. 2021045

DAM C EAVER OLD B

R EEK

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

RD

METROPOLITAN SEWERAGE DISTRICT

TH T U R EX O F ET RE ST

RD


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Mull Bldg. HVAC Phase III

LOCATION:

Asheville

TYPE:

General Capital Improvements

PIPE RATING:

N/A

PROJECT NO.

2021045

TOTAL LF:

0

PROJECT BUDGET:

$584,825.00

PROJECT ORIGIN:

Condition and Performance Problems

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS

$25.00

55350 - SPECIAL STUDIES

$32,600.00

55360 - EASEMENT PLATS 55370 - LEGAL FEES

$200.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$527,000.00

55430 - CONST. CONTRACT ADM.

$25,000.00

55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT

$584,825.00

$0.00

ENGINEER:

McGill Associates

TH

R.O.W. ACQUISITION:

MSD

# PLATS: [ 0 ]

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 23- 31 FY 22-23

$0.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$0.00

INSPECTION:

MSD/McGill

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: Phases I and II are complete, which include the replacement of the air handlers, FY 28-29 cooling tower (with two air cooled chillers), pumps, and electrical components. Phase III is replacement of the FY 29-30 boilers, which will be done at the end of their service life. FY 30-31 SPECIAL PROJECT NOTES:

$0.00 $0.00 $30,000.00


ED

Plant High Rate Primary Treatment Project No. 2015054

R

/

VE RI ID RS NOT TO SCALE

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Plant High Rate Primary Treatment

LOCATION:

MSD-Treatment Plant

TYPE:

Treatment Plant

PIPE RATING:

N/A

PROJECT NO.

2015054

TOTAL LF:

0

PROJECT BUDGET:

$17,124,738.00

PROJECT ORIGIN:

Facilities Plan Update - HDR

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN

$3,000.00

$3,000.00

$1,077,194.00

$1,077,194.00

$9,069.00

$9,069.00

$1,800.00

$1,800.00

$15,276,186.00

$11,329,186.00

$720,000.00 $37,489.00

$17,124,738.00

55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION 55430 - CONST. CONTRACT ADM. 55440 - TESTING

$1,880,000.00

$2,067,000.00

$495,000.00

$90,000.00

$135,000.00

$22,489.00

$10,000.00

$5,000.00

$12,937,738.00

$1,980,000.00

$2,207,000.00

55450 - SURVEY - ASBUILT TOTAL AMOUNT

ENGINEER:

CDM

HC

R.O.W. ACQUISITION:

N/A

# PLATS: [ 0 ]

CONTRACTOR:

ESTIMATED BUDGETS - FY 23- 31 FY 22-23

$0.00

FY 23-24

$0.00

CONSTRUCTION ADM.:

TBD

FY 24-25

$0.00

INSPECTION:

TBD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project is a recommendation from the Facilities Plan Update, a WRF FY 28-29

$0.00

master planning document completed by HDR in April 2015. High rate primary treatment will improve FY 29-30 water quality ahead of the RBC's thereby extending their useful life and improving treatment efficiency. FY 30-31 SPECIAL PROJECT NOTES:

$0.00 $0.00


IDE D

RBC Slide Gate Replacement Project No. 2021026

R

/

S RIVER NOT TO SCALE

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

RBC Slide Gate Replacement

LOCATION:

Asheville

TYPE:

Water Reclamation Facility

PIPE RATING:

N/A

PROJECT NO.

2021026

TOTAL LF:

0

PROJECT BUDGET:

$550,000.00

PROJECT ORIGIN:

Failing Equip,ent

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$550,000.00

$280,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT

$550,000.00

$0.00

ENGINEER:

MSD

SA

R.O.W. ACQUISITION:

MSD

# PLATS: [

CONTRACTOR:

$0.00

$280,000.00

ESTIMATED BUDGETS - FY 23 - 31 0

]

FY 22-23

$270,000.00

FY 23-24

$0.00

CONSTRUCTION ADM:

MSD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

FY 27-28

$0.00

PROJECT DESCRIPTION: This project will replace failing slide gates in the RBC Basins 2 and 3 at the FY 28-29

$0.00

Water Reclamation Facility.

SPECIAL PROJECT NOTES:

FY 29-30

$0.00

FY 30-31

$0.00


IDE D

Solids Handling Capacity Improvements Project No. 2019087

R

/

S RIVER NOT TO SCALE

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Solids Handling Capacity Improvements LOCATION:

MSD-Treatment Plant

TYPE:

Treatment Plant

PIPE RATING:

N/A

PROJECT NO.

2019087

TOTAL LF:

0

PROJECT BUDGET:

$2,850,000.00

PROJECT ORIGIN:

Capacity Improvements

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN

$340,000.00

55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$2,400,000.00

55430 - CONST. CONTRACT ADM.

$100,000.00

55440 - TESTING

$10,000.00

55450 - SURVEY - ASBUILT TOTAL AMOUNT

$2,850,000.00

$0.00

ENGINEER:

TBD

HC

R.O.W. ACQUISITION:

MSD

# PLATS: [

CONTRACTOR:

$0.00

$0.00

ESTIMATED BUDGETS - FY 23- 31 0

]

FY 22-23

$340,000.00

FY 23-24

$2,510,000.00

CONSTRUCTION ADM.:

TBD

FY 24-25

$0.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

PROJECT DESCRIPTION: This project will increase the capacity of the solids handling and dewatering FY 27-28

$0.00

processes at the treatment plant. Additional capacity will be needed to accomodate future flow rates as well as FY 28-29 increased sludge generation from the High Rate Primary Treatment process. Further testing will confirm exact timing of this capital investment. The project will include a third belt filter press, third cake pump, new piping FY 29-30 between the Thickener Bldg. and Incinerator Bldg., and new polymer system. FY 30-31 SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


/

Weaverville Pump Station Replacement Project No. 2019080 NOT TO SCALE

MSD WRF

MSD Hydroelectric Plant

Weaverville Pump Station No. 2

Weaverville Pump Station No. 1

Budget Map

of BUNCOMBE COUNTY, NORTH CAROLINA

METROPOLITAN SEWERAGE DISTRICT


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Weaverville PS Replacement

LOCATION:

Weaverville

TYPE:

Pump Station Improvements

PIPE RATING:

N/A

PROJECT NO.

2019080

TOTAL LF:

16,811

PROJECT BUDGET:

$9,548,750.00

PROJECT ORIGIN:

Capacity Improvements

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN

$90,000.00

$90,000.00

$950,000.00

$712,500.00

55340 - PERMITS

$15,000.00

55350 - SPECIAL STUDIES

$20,000.00

55360 - EASEMENT PLATS

$15,750.00

55370 - LEGAL FEES

$25,000.00

$10,000.00

$10,000.00

$10,000.00

$10,000.00

55380 - ACQUISITION SERVICES 55390 - COMPENSATION

$90,000.00

55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$7,960,000.00

55430 - CONST. CONTRACT ADM.

$325,000.00

55440 - TESTING

$20,000.00

55450 - SURVEY - ASBUILT

$38,000.00

TOTAL AMOUNT

$9,548,750.00

ENGINEER:

Consultant

SA

R.O.W. ACQUISITION:

MSD

# PLATS: [

CONTRACTOR:

$802,500.00

ESTIMATED BUDGETS - FY 23- 31 21

]

FY 22-23

$383,250.00

FY 23-24

$4,115,000.00

CONSTRUCTION ADM.:

Consultant

FY 24-25

$4,228,000.00

INSPECTION:

MSD

FY 25-26

$0.00

FY 26-27

$0.00

PROJECT DESCRIPTION: This project is for the replacement of Weaverville Pump Stations No. 1 & No. 2. FY 27-28

$0.00

Heavy growth has led to an increased demand for sewer allocations in Weaverville and as a result both FY 28-29 stations are low on available capacity. This project includes replacing PS No. 1, replacing the existing 12inch force main with 18-inch, and converting PS No. 2 into a smaller residential station. Pump Station No. FY 29-30 1 will be designed to pump directly to the WRF. FY 30-31 SPECIAL PROJECT NOTES:

$0.00 $0.00 $0.00


This Page Intentionally Blank


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

General Capital Equipment

LOCATION:

Varies

TYPE:

General Capital

PIPE RATING:

N/A

PROJECT NO.

2016072

TOTAL LF:

0

PROJECT BUDGET:

$1,500,000.00

PROJECT ORIGIN:

General Manager

ESTIMATED PROJECT COST

DESCRIPTION

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$1,500,000.00

$217,748.00

$17,792.00

$150,000.00

$1,500,000.00

$217,748.00

$17,792.00

$150,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT

ENGINEER:

MSD

EB

R.O.W. ACQUISITION:

N/A

# PLATS: [

CONTRACTOR:

ESTIMATED BUDGETS - FY 23- 31 FY 22-23

$150,000.00

N/A

FY 23-24

$150,000.00

CONSTRUCTION ADM.:

MSD

FY 24-25

$150,000.00

INSPECTION:

MSD

FY 25-26

$150,000.00

FY 26-27

$150,000.00

FY 27-28

$150,000.00

This is for the purchase of capital equipment in excess of $15,000.00. FY 28-29

$150,000.00

PROJECT DESCRIPTION:

Examples include pumps, plant equipment, computer servers, large concrete saws, etc.

SPECIAL PROJECT NOTES:

0

]

FY 29-30

$150,000.00

FY 30-31

$150,000.00

Total Estimated project cost shown is the total within the ten year window.


Capital Improvement Program Fiscal Years 2022—2031

Design, Right of Way, & Construction Management Expenses


This Page Intentionally Blank


This Page Intentionally Blank


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Design, ROW, & Const. Mgmt. Exp.

LOCATION:

MSD/ENG

FUND:

F01

PIPE RATING:

N/A

ACCOUNT CODE:

N/A

TOTAL LF:

0

PROJECT BUDGET:

$33,125,545.80

PROJECT ORIGIN:

CIP Expenses

ESTIMATED PROJECT COST

DESCRIPTION

SALARIES & BENEFITS

TOTAL EXPENDS THRU 12/31/20

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

$29,316,717

$1,095,869.00

$1,271,847.00

$2,557,312.00

$1,990,106

$52,813.00

$104,724.00

$173,598.00

$168,072

$8,126.00

$8,126.00

$14,661.00

$1,650,651

$60,605.00

$108,075.00

$155,400.00

$33,125,546

$1,217,413.00

$1,492,772.00

$2,900,971.00

(Includes Proj. Mgmt., ROW, Const. and a portion of GIS and Plan. & Dev.)

SUPPLIES (Includes Proj. Mgmt., ROW, Const. and a portion of GIS and Plan. & Dev.)

FLEET

CAPITAL EQUIPMENT

$0

DEBT EXPENSE (Bond Debt Expenses)

TOTAL AMOUNT

ENGINEER:

N/A

EB

R.O.W. ACQUISITION:

N/A

PLATS: [

FY 22-23

$2,996,618.17

CONTRACTOR:

N/A

FY 23-24

$3,074,959.32

CONSTRUCTION ADMINISTRATION:

N/A

FY 24-25

$3,155,559.60

INSPECTION:

N/A

FY 25-26

$3,238,537.39

FY 26-27

$3,388,175.32

FY 27-28

$3,467,690.40

PROJECT DESCRIPTION: This line item is for expenses related to the District's Capital Improvement Program FY 28-29

$3,549,494.07

ESTIMATED BUDGETS - FY 22 - 30 ]

(CIP). Included are salaries for the CIP Division, capital equipment, and bond debt expenses related to the FY 29-30 financing of the CIP program. FY 30-31 SPECIAL PROJECT NOTES:

$3,633,560.25 $3,719,980.47

Future years assume 3.0% increase per year for all items except Debt Expenses. Estimated Debt Expenses provided by the Finance Department. Total Estimated Project Cost shown is the total within the ten year window.


Capital Improvement Program Fiscal Years 2022—2031

Reimbursement Projects


This Page Intentionally Blank


This Page Intentionally Blank


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2021 - 2022

PROJECT:

Developer Reimbursements

TYPE:

Reimbursement - Annual

PROJECT NO.

PROJECT BUDGET:

DESCRIPTION

LOCATION:

Various

2004051

TOTAL LF:

0

$1,000,000.00

PROJECT ORIGIN:

Economic Development Policy

ESTIMATED

TOTAL EXPENDS THRU 12/31/20

PROJECT COST

EST. COST JAN - JUNE 2021

BUDGET FY 21-22

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION

$1,000,000.00

$0.00

$1,000,000.00

$0.00

$437,000.00

$100,000.00

55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT

ENGINEER:

KJ

R.O.W. ACQUISITION:

# PLATS: [

$437,000.00

$100,000.00

ESTIMATED BUDGETS - FY 23 - 31 FY 22-23

$100,000.00

CONTRACTOR:

]

FY 23-24

$100,000.00

CONSTRUCTION ADM:

FY 24-25

$100,000.00

INSPECTION:

FY 25-26

$100,000.00

FY 26-27

$100,000.00

FY 27-28

$100,000.00

PROJECT DESCRIPTION: This is for reimbursements for extensions that qualify under the District's FY 28-29

$100,000.00

Extension Policy. Refer to the "Policy and Procedures for the Extension of Sewer Service" for further FY 29-30 information. FY 30-31 SPECIAL PROJECT NOTES:

Total estimated project cost shown is the total within the ten year window. $200,000 per year is approved.

$100,000.00 $100,000.00


Metropolitan Sewerage District of Buncombe County, North Carolina

CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021

PROJECT:

Black Mtn. Annex. - Craigmont Rd.

TYPE:

Reimbursement

PROJECT NO.

PROJECT BUDGET:

DESCRIPTION

LOCATION:

Black Mountain

1992173

TOTAL LF:

0

$0.00

PROJECT ORIGIN:

Consolidation Agreements

ESTIMATED

TOTAL EXPENDS THRU 12/31/19

PROJECT COST

EST. COST JAN - JUNE 2020

BUDGET FY 20-21

55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION 55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT

ENGINEER:

$0.00

Administered by Town of Black Mountain

R.O.W. ACQUISITION:

$0.00

$0.00

ESTIMATED BUDGETS - FY 22 - 30

EB # PLATS: [

CONTRACTOR:

$0.00

]

FY 21-22

$0.00

FY 22-23

$0.00

CONSTRUCTION ADM:

Administered by Town of Black Mountain

FY 23-24

$0.00

INSPECTION:

MSD/Black Mountain

FY 24-25

$0.00

FY 25-26

$0.00

FY 26-27

$0.00

Reimbursement project in accordance with Consolidation Agreement. FY 27-28 Estimated project cost was $420,000 in FY07. FY 28-29

$0.00

FY 29-30

$0.00

PROJECT DESCRIPTION:

SPECIAL PROJECT NOTES:

MSD Share is 35% in accordance with Consolidation Agreement. Project will be budgeted when town decides to construct it.

$0.00