Capital Improvement Program Fiscal Years 2021—2030 Metropolitan Sewerage District of Buncombe County, North Carolina
-
-
Metropolitan Sewerage District
of Buncombe County, North Carolina Fiscal Years 2021—2030
Board -
CIP Committee Members
—
Overview
NCDENR-DWQ has requested that the following information be provided in this document, in accordance with the Compliance Inspection Report for MSD’s Collection System Permit WQCS00004. Goal Statement The mission of the MSD Capital Improvement Program is to produce, manage, and complete engineering projects for the repair and rehabilitation of the District’s collection system and Water Reclamation Facility (WRF). This shall be undertaken in the most efficient and effective manner necessary to ensure the reliable delivery and treatment of wastewater at an equitable price and in an environmentally sensitive manner.
Description of Existing Facilities
Collection System The MSD service area covers approximately 180 square miles. MSD provides service to areas along the French Broad River Valley and the Swannanoa River Valley as far as Ridgecrest. There are over 1,044 miles of public sanitary sewer line, 30 pump stations within the collection system, and approximately 31,174 manholes system-wide. Less than 65 miles are large interceptors with diameters ranging from 24" to 66". One third of the balance is small 6" lines and two-thirds are medium size lines ranging from 8" up to 24". Most of this pipe is between 50 and 100 years old, and is in significant need of rehabilitation or replacement. The District currently serves a population of approximately 161,747 people. As of the printing date of this budget (April 2020), MSD is in the process of merging with the Cane Creek Water and Sewer District (CCWSD) in Northern Henderson County. This merger is currently expected to become effective on July 1, 2020 and will add approximately 9,889 customers, 83 miles of sewer lines, 1,738 manholes, and 9 pump stations to MSD’s current system. MSD already treats the wastewater from CCWSD under a contractual agreement. Water Reclamation Facility The Water Reclamation Facility (WRF) is a 40MGD secondary treatment plant serving Buncombe County (specifically Asheville, Biltmore Forest, Black Mountain, Montreat, Weaverville, Woodfin and Buncombe County at large), in addition to the Cane Creek Water and Sewer District. Overall, MSD serves a combined customer population of 171,636, and over 30 separately billed industries. The facility treats a current average daily flow of approximately 22 MGD. The WRF is an attached growth design, comprised of 152 rotating biological contactors (RBC’s), which provide full secondary treatment. These RBC’s provide 450-500 acres (3+ acres each unit) of surface area for biological growth. MSD’s facility is believed to be the largest RBC plant in the world. The plant consists of:
Preliminary Treatment Components
Influent Multirake Barscreens (2 units, ½ inch Bar Spacing, 40 mgd each) with screenings washer/compactor and shaftless screw conveyer Influent Pumps (3 units) - 35 MGD rated capacity each Perforated Plate Fine Screens (3 units, ¼ inch openings, 40 mgd each) with screenings washer/compactor Vortex Grit Removal (2 units @ 50 mgd) - Removal Rate 95% of Grit > 140 Mesh Storm Surge System - Utilizes 3 @ 5mgd pumps and 2 @ 2.1 million gallon tanks to temporarily store storm surge flows over 65 mgd, for temporary peak shaving.
Primary Treatment Components
Primary Clarification - Chemically Enhanced Kruger ACTIFLO system (Under Construction as of April 2020. Completion expected by Spring 2021)
Secondary Treatment Components
1st Stage RBC’s (44 units) 2nd Stage RBC’s (72 units) 3rd Stage RBC’s ( 36 units) Intermediate Pumps (3 units) - pump water to clarifier from 3rd RBC stage Intermediate Clarifier (4 cells - total volume 2 MG) Microfiltration via AASI AquaDisk Units (16 units)
Disinfection Components
Sodium Hypochlorite solution - average feed 1000 gallons/day at 6.5% solution strength
Residuals Handling Components
Gravity Thickeners (2 units) - 100 foot-diameter each 2.5 Meter Belt Presses (2 units) Fluidized Bed Incinerator (40DT/day rated)
Energy Management Components
Two separate power circuits from Duke Energy for plant, with Automatic Transfer Switch if one fails 4 Megawatt total from three Diesel Generators (emergency backup power for WRF; will maintain full treatment processes during a power outage) 850 Kilowatt Hydro Turbines (3 units) - induction units (French Broad River source). These generate power using the District’s dam/flume. The power is sold back to Duke energy.
Automation Components
SCADA (Supervisory Control and Data Acquisition) - full automated control of WRF
Sludge Management Plan
MSD utilizes its fluidized bed incinerator as its primary residual management option. MSD also maintains an arrangement with the Buncombe County Landfill (lined) for emergencies. Presently the facility is managing 12-15 DT’s per day of residuals. The facilities are designed for 40 DT’s per day. Due to the lack of true primary clarifiers, most of the sludge generated at the facility is secondary in nature (i.e. sloughings from the RBC’s). Sludge is thickened in on-site gravity thickeners to a consistency of 3-5% solids at which time it is then pumped to the 2 1/2-meter belt presses. These units dewater the sludge to over 24% solids and then it is pumped to the incinerator. Air emissions from the incinerator are of excellent quality. Recent air emissions testing place removal efficiency of the air scrubbers at 99+% for regulated parameters, and air quality is further enhanced by a new filtration system added in 2016. Incinerator ash is thickened on-site via a gravity ash thickener and then pumped to an on-site lagoon. Groundwater is monitored in accordance with NCDEQ requirements (up & down gradient). The incinerator system provides the most cost-effective method for sludge management. Supplementary fuel is sometimes required due to the 24% solids content - natural gas via Dominion Energy (formerly PSNC Energy) is utilized for this purpose. MSD also maintains an agreement with the local county landfill (lined) to dispose of dewatered sludge during emergency and/or maintenance activities. This provides a second residuals management alternative, when or if needed.
—
Program Summary
METROPOLITAN SEWERAGE DISTRICT OF BUNCOMBE COUNTY, NORTH CAROLINA TEN YEAR CAPITAL IMPROVEMENT PROGRAM FY 2020-2021 through 2029-2030
PROJECT NAME
LOCATION OF PROJECT
PROJ. PROJECT MGR. NUMBER
PIPE RATING
PROJECT TOTAL FOOTAGE ESTIMATED COST
TOTAL EST. EXPENDS THRU FY 20
FY 20-21 BUDGET
FY 21-22
FOOTAGE
BUDGET
FY 22-23
FOOTAGE
BUDGET
FY 23-24
FOOTAGE
BUDGET
FY 24-25
FOOTAGE
BUDGET
FY 25-26
FOOTAGE
BUDGET
FY 26-27
FOOTAGE
BUDGET
FY 27-28
FOOTAGE
BUDGET
FY 28-29
FOOTAGE
BUDGET
FY 29-30
FOOTAGE
BUDGET
FOOTAGE
INTERCEPTOR AND WET WEATHER REHABILITATION AB Tech Equalization Tank
Asheville
HC
2019047
N/A
0
$14,250,000
$0
$0
Christian Creek Interceptor
Buncombe County
HC
2011110
24
12,226
$5,869,424
$235,710
$3,792,303
$0 8,200
$1,842,000
4,026
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
9,084
$0
$0
9,084
$0
Lower Swannanoa Interceptor
Asheville
EB/HC
2004040
9
6,500
$6,822,717
$203,717
$0
$32,500
$0
$33,000
$27,500
0
$3,255,000
Mud Creek Interceptor - Ph. 3
Henderson County
HC
2020010
NA
9,200
$4,254,500
$0
$46,000
$0
$10,500
$315,000
$3,883,000
9,200
$0
South French Broad Relief Int.
Buncombe County
HC
2017070
N/A
36,330
$31,258,500
$95,000
$50,000
$0
$8,500
$515,000
0
$7,635,000
9,082
$7,635,000
Swannanoa Equalization Tank
Swannanoa
HC
2019046
N/A
0
$22,556,500
$0
$27,500
64,256
85,011,641
$534,427
$3,915,803
0
$20,758,000
18,282
$20,102,500
1.0000
1.0000
1.0000
$85,011,641
$534,427
$3,915,803
SUBTOTAL Inflation per ENR Const. Cost Index
2.79%
SUBTOTAL with inflation
PROJECT NAME
64,256
LOCATION OF PROJECT
PROJ. PROJECT MGR. NUMBER
PIPE RATING
PROJECT TOTAL FOOTAGE ESTIMATED COST
TOTAL EST. EXPENDS THRU FY 20
$2,004,000 8,200
4,026
1.0279 8,200
FY 20-21 BUDGET
$700,000
$3,878,500
$3,986,710
BUDGET
0
1.0566 4,026
FY 21-22
FOOTAGE
$1,400,000
$719,000
1.0861
$759,680
0
FY 22-23
FOOTAGE
BUDGET
$9,212,500
$2,263,000
0
FY 23-24
FOOTAGE
BUDGET
$23,173,358
18,282
BUDGET
FOOTAGE
9,082
$7,635,000
12,332
$10,906,250
9,082
$7,685,000
12,332
$7,685,000
$0
$0
1.1795
$23,067,706
12,332
FY 25-26 BUDGET
3,250
$0
1.1475
FY 24-25
FOOTAGE
$3,271,250
$9,212,500
1.1164
$2,457,747
3,250
FOOTAGE
1.2124
$12,864,137
12,332
FY 26-27 BUDGET
$0
1.2463
$9,317,511
9,084
FY 27-28
FOOTAGE
BUDGET
$0 0
$0
BUDGET
0
1.2810 0
FY 28-29
FOOTAGE
$0
$0
0
FY 29-30
FOOTAGE
BUDGET
FOOTAGE
GENERAL SEWER REHABILITATION Albemarle Commons PS Elimination
Asheville
OH
2018171
N/A
832
$274,130
$3,130
$0
$38,000
$0
$233,000
$0
$0
$0
$0
$0
$0
Arlington St. @ Furman Ave.
Asheville
OH
2020021
24
310
$130,000
$0
$0
$0
$0
$0
$0
$0
$5,000
$0
$12,500
$112,500
Atkins Street
Arden
HC
2014012
39
1,833
$698,330
$5,480
$0
$0
$0
$0
$0
$2,250
$52,000
$638,600
$0
$0
Aurora Drive
Asheville
DP
2017145
53
2,605
$1,183,000
$14,000
$60,500
$1,108,500
Beale Road at Copney Lane
Asheville
DP
2009129
47
4,027
$1,572,925
$31,925
$125,000
$93,000
Bellevue Road
S. Asheville
DP
2015175
49
1,100
$503,600
$9,600
$7,000
$58,000
Bent Tree Road
Asheville
DP
2016102
60
1,654
$855,500
$17,500
$92,000
$746,000
Braddock Way - PRP 20002
Asheville
OH
2006025
36
3,848
$1,680,940
$18,353
$0
Bryson Street
Biltmore Village
SA
2016167
N/A
210
$203,300
$0
$203,300
Buchanan Ave.
Asheville
SA
2014023
51
2,255
$1,122,900
$34,400
Caledonia Road
Asheville
HC
2014153
65
1,225
$1,302,850
Central Ave. @ I-240
Asheville
SA
2014180
35
990
$429,500
Chatham Road
Asheville
SA
2015019
43
1,330
$648,700
Cherokee Road
Asheville
DP
2009132
48
1,960
$867,680
$24,680
$1,000
Chestnut Lodge Rd.
Black Mountain
SA
2014017
61
4,560
$1,928,700
$146,700
$1,782,000
Cub Road
Asheville
OH
2018027
40
1,204
$457,000
$0
East Chestnut Ave @ Five Points
N. Asheville
SA
2015192
36
5,225
$1,822,050
Elk Mountain Place
Woodfin
HC
2010094
48
4,101
$1,448,750
2,605
$0
$0
$0
$1,323,000
$429,000 1,654
1,100
$0
832
1,833
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
4,027
$0
$0
$0
$0
$38,500
$158,087
$0
$1,466,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$87,000
$0
$1,001,500
2,255
$0
$0
$0
$0
$0
$0
$0
$365,600
$1,500
$69,000
$866,750
1,225
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$5,000
$3,000
$50,000
$371,500
$4,800
$0
$0
$0
$0
$1,000
$52,500
$590,400
$0
$0
$0
$186,000
$656,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$18,500
$83,000
$0
$355,500
$0
$0
$0
$54,000
$0
$0
$0
$0
$13,800
$179,250
$0
$1,575,000
$0
$0
$18,000
$55,000
$236,500
$1,139,250
$0
$0
$0
$0
$0
$0
$0
210
4,560
Page 1 of 4
1,960
4,101
1,330
1,204
5,225
3,848
310
$0
990
METROPOLITAN SEWERAGE DISTRICT OF BUNCOMBE COUNTY, NORTH CAROLINA TEN YEAR CAPITAL IMPROVEMENT PROGRAM FY 2020-2021 through 2029-2030 PROJECT NAME
LOCATION OF PROJECT
PROJ. PROJECT MGR. NUMBER
PIPE RATING
PROJECT TOTAL FOOTAGE ESTIMATED COST
TOTAL EST. EXPENDS THRU FY 20
FY 20-21 BUDGET
FY 21-22
FOOTAGE
BUDGET
FY 22-23
FOOTAGE
BUDGET
FY 23-24
FOOTAGE
BUDGET
FY 24-25
FOOTAGE
BUDGET
FOOTAGE
FY 25-26 BUDGET
FY 26-27
FOOTAGE
BUDGET
FY 27-28
FOOTAGE
BUDGET
FY 28-29
FOOTAGE
BUDGET
FY 29-30
FOOTAGE
BUDGET
FOOTAGE
GENERAL SEWER REHABILITATION continued… Fairmont Road
N. Asheville
DP
2015017
31
3,900
$1,654,000
$0
$0
$0
$0
$0
$0
$20,000
$0
$8,500
$112,500
Forestdale Drive
S. Asheville
DP
2014002
33
2,600
$931,000
$0
$0
$0
$0
$0
$15,000
$0
$17,500
$100,000
$798,500
Four Inch Main - Patton Hill Rd.
Swannanoa
OH
2016100
27
618
$296,910
$2,910
$294,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
Harmony Lane
Asheville
DP
2016103
35
670
$190,000
$0
$0
$0
$0
$0
$0
$0
$0
$2,500
$0
$187,500
670
Hazel Mill Rd @ Richland St.
Asheville
SA
2014016
26
3,300
$1,236,700
$0
$0
$0
$0
$0
$0
$17,000
$1,000
$20,400
$84,000
$1,114,300
3,300
$0
$0
$0
$0
$0
$0
$0
$0
618
Highland Farms Road
Black Mountain
HC
2018018
70
820
$285,000
$6,450
$32,500
$246,050
$0
$0
$0
$0
Hill Street @ Cross Place
Asheville
OH
2016249
44
254
$90,500
$1,525
$0
$0
$1,475
$0
$16,000
$71,500
$0
$0
$0
$0
$0
$0
$0
$0
$0
$4,500
$66,000
$393,600
Horizon Hill Rd. (Hy-Vu Drive)
Asheville
SA
2008084
51
713
$285,444
$10,444
$275,000
Howland Rd. @ Sunset Trail
Asheville
DP
2012134
43
994
$471,600
$7,500
$0
Jarnaul Avenue
N. Asheville
HC
2016104
75
4,684
$1,909,250
$238,163
$1,671,212
Johnston Blvd. @ Providence Rd.
W. Asheville
DP
2014013
37
2,000
$629,150
$8,150
$0
Jonestown Road @ Riverside Drive
Woodfin
OH
2018028
42
1,890
$620,500
$0
Kimberly Ave. @ Sedley Avenue
Asheville
OH
2018029
35
3,005
$1,233,000
$0
Le An Hurst Road
Asheville
OH
2019027
77
820
$346,000
$9,000
Lincoln Avenue
Asheville
HC
2013103
26
1,415
$540,370
$2,870
Logan Avenue
W. Asheville
SA
2017256
48
1,884
$758,500
$11,500
Lynn Cove Road
Beaverdam
DP
2015010
35
5,589
$1,851,000
Manetta Rd. @ Johnson Dr.
N. Asheville
SA
2014022
26
6,500
$2,537,700
Manetta Rd. @ Maywood Rd.
Asheville
OH
2020022
51
605
$255,500
$0
713
4,684
820
254
994
$1,513,000 2,600
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$11,000
$56,000
$554,000
$0
$0
$25,500
$15,000
$23,000
$30,000
$530,000
$0
$0
$0
$0
$0
$0
$39,000
$0
$72,000
$60,000
$1,062,000
$98,000
$0
$239,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$537,500
$0
$8,200
$76,500
$662,300
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$25,000
$0
$22,000
$158,000
$30,000
$1,616,000
$0
$0
$0
$0
$0
$33,000
$0
$7,000
$112,000
$0
$2,385,700
$8,000
$69,000
$0
$178,500
605
$0
$0
$0
$0
$0
$0
$0
$3,000
$65,000
$959,000
$0
$0
1,258
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$18,000
$72,000
$1,000
$602,400
$0
$0
$0
$0
$0
$0
$0
$0
820
1,884
Meadow Road @ Train Yard
Asheville
HC
2015207
37
2,001
$1,036,000
$9,000
$0
$0
$0
$0
Montford Ave. @ Montford Park
Asheville
HC
2017144
50
1,258
$514,150
$0
$6,300
$6,750
$100,000
$401,100
Mountainbrook Rd. @ Chunns Cove
Asheville
DP
2010112
55
2,984
$1,053,015
$21,015
$175,000
$857,000
$0
$0
New Haw Creek Rd. @ Dogwood Grove
E. Asheville
SA
2014021
31
1,900
$702,900
$9,500
$0
$0
$0
$0
$0
$0
New Stock Road
Woodfin
DP
2015011
45
9,020
$2,661,000
$36,000
$0
$0
$0
$8,000
$83,000
$2,534,000
Northwest Ave. @ No. 215
Swannanoa
HC
2018017
84
252
$121,550
$6,350
$30,500
$84,700
$0
$0
$0
$0
2,984
252
Page 2 of 4
9,020
1,890
2,000
2,001
3,900
$0
$0
$0
$0
$0 $0 3,005
5,589
$0
1,415
$0 6,500
1,900
METROPOLITAN SEWERAGE DISTRICT OF BUNCOMBE COUNTY, NORTH CAROLINA TEN YEAR CAPITAL IMPROVEMENT PROGRAM FY 2020-2021 through 2029-2030 PROJECT NAME
LOCATION OF PROJECT
PROJ. PROJECT MGR. NUMBER
PIPE RATING
PROJECT TOTAL FOOTAGE ESTIMATED COST
TOTAL EST. EXPENDS THRU FY 20
FY 20-21 BUDGET
FY 21-22
FOOTAGE
BUDGET
FY 22-23
FOOTAGE
BUDGET
FY 23-24
FOOTAGE
BUDGET
FY 24-25
FOOTAGE
BUDGET
FY 25-26
FOOTAGE
BUDGET
FY 26-27
FOOTAGE
BUDGET
FY 27-28
FOOTAGE
BUDGET
FY 28-29
FOOTAGE
BUDGET
FY 29-30
FOOTAGE
BUDGET
FOOTAGE
GENERAL SEWER REHABILITATION continued… Oakland Drive @ Church Street
Black Mountain
DP
2015177
27
575
$207,000
$0
$0
$0
$0
$0
$0
$0
$2,500
$2,500
Riverside Dr. @ Riverside Baptist
Asheville
OH
2016251
40
510
$232,500
$0
$0
$0
$0
$0
$6,500
$0
$26,000
$200,000
Rosewood Ave. @ Riverside Cemetery
Montford
HC
2019023
25
180
Royal Pines Drive - PRP 47009
Arden
SA
2007020
35
2,888
$79,150 $1,099,100
$30,000
$172,000
$0
$0
510
$0
$0
$0
$0
$0
$0
$1,800
$0
$2,250
$24,000
$10,100
$0
$0
$0
$0
$0
$0
$0
$24,500
$1,064,500
W. Asheville
SA
2015223
56
1,100
$390,700
$7,000
$1,500
$30,500
$0
$0
$0
$0
$0
$0
Weaverville
HC
2017012
51
565
$241,050
$6,550
$52,000
$182,500
565
$0
$0
$0
$0
$0
$0
$0
$0
Springside Rd. @ Overlook Rd.
S. Asheville
SA
2012127
65
3,922
$1,437,887
$77,487
$0
$1,360,400
3,922
$0
$0
$0
$0
$0
$0
$0
$0
Sulphur Springs Rd. @ Covington St.
W. Asheville
DP
2014006
44
1,350
$528,000
$7,500
$0
$0
$0
$0
$15,000
$111,000
$394,500
$0
$0
$0
Sweeten Creek Rd. @ Buck Shoals Rd.
S. Asheville
HC
2014015
51
1,558
$628,170
$5,640
$6,600
$73,000
$543,900
1,558
$0
$0
$0
$0
$0
$0
$0
Sweeten Creek Rd. @ Mills Gap Rd.
Asheville
SA
2014189
16
2,572
$1,253,500
$28,000
$134,500
$0
$1,091,000
2,572
$0
$0
$0
$0
$0
$0
$0
Toxaway Street
W. Asheville
SA
2019004
51
722
$286,600
$4,000
$1,000
$281,600
$0
$0
$0
$0
$0
$0
$0
$0
Walnut St. @ N. Lexington Ave.
Asheville
DP
2017008
42
1,550
$663,500
$0
$0
$0
$0
$0
$7,000
$0
$656,500
$0
$0
$0
Walnut Street @ Rankin Ave.
Asheville
SA
2014018
54
500
$1,760,300
$1,357,300
$403,000
$0
$0
$0
$0
$0
$0
$0
$0
Waynesville Ave. @ Brownwood Ave.
W. Asheville
SA
2014183
33
3,022
$1,370,750
$0
$0
$0
$0
$19,500
$0
$28,000
$203,000
$205,750
$914,500
West Crabapple Lane
W. Asheville
DP
2014005
67
1,774
$644,800
$110,300
$69,000
White Oak Road
Arden
DP
2015193
3
N/A
$48,000
$0
$48,000
Wildwood Park
Weaverville
HC
2015194
27
582
$223,780
$2,380
$0
SSD Rehab. & Replacement
Various
MS
2002101
N/A
200,000
$46,000,000
$4,600,000
$4,675,000
Surveys for Design
Various
EB
2002060
N/A
N/A
$500,000
$0
$50,000
$50,000
$50,000
$50,000
$50,000
$50,000
$50,000
$50,000
$50,000
Future Projects - Non Critical
Various
EB
Varies
Varies
Varies
Varies
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
322,315
$96,935,381
$7,344,802
$10,445,412
1.0000
1.0000
1.0000
$96,935,381
$7,344,802
$10,445,412
SUBTOTAL Inflation per ENR Const. Cost Index
2.79%
SUBTOTAL with inflation
PROJECT NAME
322,315
LOCATION OF PROJECT
PROJ. PROJECT MGR. NUMBER
PIPE RATING
PROJECT TOTAL FOOTAGE ESTIMATED COST
TOTAL EST. EXPENDS THRU FY 20
$465,500 N/A
20,000
31,285
31,285
$0 3,022
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$221,400
582
$4,675,000
20,000
$4,675,000
20,000
$10,925,200
35,298
$11,230,013
BUDGET
$4,675,000
20,000
$11,246,575
36,691
1.0566 35,298
FY 21-22
FOOTAGE
1,550
$0
$0
1.0279
FY 20-21 BUDGET
1,774
1,350
180
$0
S. Main St. @ Reems Creek Rd.
722
1,100
$51,100 2,888
Sand Hill Road @ Baker Place
500
$351,700
575
$11,882,888
BUDGET
20,000
$7,608,900
28,606
1.0861 36,691
FY 22-23
FOOTAGE
$4,675,000
$8,263,699
BUDGET
20,000
$5,064,800
20,000
1.1164 28,606
FY 23-24
FOOTAGE
$4,675,000
$5,654,130
BUDGET
20,000
$7,912,800
29,274
1.1475 20,000
FY 24-25
FOOTAGE
$4,675,000
$9,079,972
BUDGET
20,000
$8,491,587
28,318
1.1795 29,274
FY 25-26
FOOTAGE
$4,675,000
$10,015,994
BUDGET
20,000
$9,295,000
31,569
1.2124 28,318
FY 26-27
FOOTAGE
$4,675,000
$11,269,521
BUDGET
$4,675,000
20,000
$50,000 $0
$11,960,500
40,952
1.2463 31,569
FY 27-28
FOOTAGE
$0
$14,905,833
BUDGET
40,322
1.2810 40,952
FY 28-29
FOOTAGE
$11,993,900
$15,364,492
40,322
FY 29-30
FOOTAGE
BUDGET
FOOTAGE
PRIVATE SEWER REHABILITATION Homeland Park
Asheville
OH
2016248
48
921
$478,750
$7,250
$0
$123,000
$0
Old County Home Rd PSR
W. Asheville
SA
2015221
67
4,600
$1,815,400
$20,000
$14,400
$76,500
$1,704,500
4,600
$0
5,521
$2,294,150
$27,250
$14,400
$1,704,500
4,600
$348,500
1.0000
1.0000
1.0000
$2,294,150
$27,250
$14,400
SUBTOTAL Inflation per ENR Const. Cost Index SUBTOTAL with inflation
2.79% 5,521
0
$199,500
0
1.0279 0
$205,066
$348,500
1.0566 0
$1,800,938
Page 3 of 4
921
921
1.0861 4,600
$378,491
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
0
1.1164 921
$0
$0
0
1.1475 0
$0
$0
0
1.1795 0
$0
$0
0
1.2124 0
$0
$0
0
1.2463 0
$0
$0
0
1.2810 0
$0
0
METROPOLITAN SEWERAGE DISTRICT OF BUNCOMBE COUNTY, NORTH CAROLINA TEN YEAR CAPITAL IMPROVEMENT PROGRAM FY 2020-2021 through 2029-2030 PROJECT NAME
LOCATION OF PROJECT
PROJ. PROJECT MGR. NUMBER
PIPE RATING
PROJECT TOTAL FOOTAGE ESTIMATED COST
TOTAL EST. EXPENDS THRU FY 20
FY 20-21 BUDGET
FY 21-22
FOOTAGE
BUDGET
FY 22-23
FOOTAGE
BUDGET
FY 23-24
FOOTAGE
BUDGET
FY 24-25
FOOTAGE
BUDGET
FY 25-26
FOOTAGE
BUDGET
FY 26-27
FOOTAGE
BUDGET
FY 27-28
FOOTAGE
BUDGET
FY 28-29
FOOTAGE
BUDGET
FY 29-30
FOOTAGE
BUDGET
FOOTAGE
TREATMENT PLANT, PUMP STATIONS & GENERAL CAPITAL IMPROVEMENTS Biological Treatment
MSD-Treatment Plant
HC
2016063
N/A
0
$45,640,000
$0
$0
$0
$0
$500,000
$2,010,000
$2,000,000
$10,320,000
$18,486,000
$12,324,000
$0
Building and Facility Rehabilitation
MSD-Treatment Plant
HC
2002068
N/A
0
$509,500
$101,000
$79,000
$51,000
$42,000
$40,000
$47,500
$50,000
$50,000
$50,000
$50,000
$50,000 $0
Carrier Bridge PS Replacement
Asheville
HC/DP
2019045
N/A
770
$28,099,375
$451,375
$1,703,000
$12,970,000
$12,970,000
$5,000
$0
$0
$0
$0
$0
Collection System Master Plan Update
District-Wide
HC
2020011
N/A
0
$200,000
$0
$0
$200,000
770
$0
$0
$0
$0
$0
$0
$0
$0
Flow Monitoring
MSD-Treatment Plant
SA
2008013
N/A
0
$541,905
$425,156
$50,000
$50,000
$50,000
$50,000
$50,000
$50,000
$50,000
$50,000
$50,000
$50,000
HVAC Rehabilitation
MSD-Treatment Plant
HC
2020051
N/A
0
$519,000
$0
$52,500
$54,000
$55,500
$57,000
$50,000
$50,000
$50,000
$50,000
$50,000
$50,000
Incinerator Polymer System Replacement
MSD-Treatment Plant
HC
2019071
N/A
0
$200,000
$0
$200,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
ITT Pump Station Upgrade
Henderson County
HC
2020061
N/A
0
$988,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Mull Bldg. HVAC
Asheville
OH
2018186
N/A
0
$584,725
$267,725
$317,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
Plant High Rate Primary Treatment
MSD-Treatment Plant
HC
2015054
N/A
0
$16,834,138
$9,957,138
$6,877,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
Solids Handling Capacity Improvements
MSD-Treatment Plant
HC
2019087
N/A
0
$2,052,000
$0
$0
$180,000
$1,872,000
$0
$0
$0
$0
$0
$0
$0
Weaverville PS Replacement
Weaverville
HC
2019080
N/A
16,610
$7,828,750
$0
$20,000
$770,000
$130,750
$3,435,000
5,610
$0
$0
$0
$0
$0
General Capital Equipment
Varies
EB
2016072
N/A
5,610
$2,300,000
SUBTOTAL Inflation per ENR Const. Cost Index
$1,500,000
$150,000
$150,000
$105,497,393
$11,352,394
$9,448,500
1.0000
1.0000
1.0000
$105,497,393
$11,352,394
$9,448,500
2.79%
SUBTOTAL with inflation
PROJECT NAME
0 17,380
17,380
LOCATION OF PROJECT
PROJ. PROJECT MGR. NUMBER
PIPE RATING
PROJECT TOTAL FOOTAGE ESTIMATED COST
TOTAL EST. EXPENDS THRU FY 20
$150,000 0
770
1.0279 0
FY 20-21 BUDGET
$150,000
$14,425,000
770
FY 21-22
FOOTAGE
BUDGET
0
$16,134,216
BUDGET
11,000
$5,780,500
$150,000
$4,237,000 1.0861
0
FY 22-23
FOOTAGE
$3,473,000
$150,000
$15,270,250 1.0566
$14,827,458
11,000
1.1164
$4,601,623
11,000
FY 23-24
FOOTAGE
BUDGET
$150,000
1.1475
$6,453,107
5,610
FY 24-25
FOOTAGE
BUDGET
$150,000 0
$2,639,260
BUDGET
0
1.1795 0
FY 25-26
FOOTAGE
$150,000
$10,620,000
$12,526,499
BUDGET
0
1.2124 0
FY 26-27
FOOTAGE
$150,000
$18,786,000
$22,776,678
BUDGET
0
1.2463 0
FY 27-28
FOOTAGE
$150,000
$12,624,000
$15,732,724
BUDGET
0
1.2810 0
FY 28-29
FOOTAGE
$300,000
$384,308
0
FY 29-30
FOOTAGE
BUDGET
FOOTAGE
DESIGN, ROW, & CONSTRUCTION MANAGEMENT EXPENSES Design, ROW, & Const. Mgmt. Exp.
MSD/ENG
EB
N/A
N/A
SUBTOTAL
0
$32,623,347
$2,722,685
$2,870,201
0
$32,623,347
$2,722,685
$2,870,201
$2,950,214 0
$3,027,163
$2,950,214
0
$3,106,329
$3,027,163
0
$3,187,830
$3,106,329
0
$3,335,947
$3,187,830
0
$3,413,895
$3,335,947
0
$3,494,085
$3,413,895
0
$3,576,488
$3,494,085
0
$3,661,197
$3,576,488
0
$3,661,197
0
BUDGET SUMMARY
PROJECT NAME
LOCATION OF PROJECT
PROJ. PROJECT MGR. NUMBER
PIPE RATING
SUBTOTAL with Inflation
PROJECT TOTAL FOOTAGE ESTIMATED COST
409,472
$322,361,912
TOTAL EST. EXPENDS THRU FY 20 $21,981,558
TOTAL
BUDGET $26,694,316
FY 21-22
FOOTAGE 39,485
BUDGET $33,199,460
FY 22-23
FOOTAGE 40,094
BUDGET
FY 23-24
FOOTAGE
$33,604,885
41,291
BUDGET $18,807,889
FY 24-25
FOOTAGE
BUDGET
40,527
$38,468,425
FY 25-26
FOOTAGE 43,892
BUDGET $38,122,884
FY 26-27
FOOTAGE 41,606
BUDGET $38,820,525
FY 27-28
FOOTAGE 40,650
BUDGET $46,857,795
FY 28-29
FOOTAGE 40,653
BUDGET $34,215,046
FY 29-30
FOOTAGE 40,952
BUDGET $19,409,997
FOOTAGE 40,322
$1,000,000
CONTINGENCY REIMBURSEMENT PROJECTS
FY 20-21
Various
Various
Various
0
$1,337,000
$12,307
$437,000
0
$100,000
0
$100,000
0
$100,000
0
$100,000
0
$100,000
0
$100,000
0
$100,000
0
$100,000
0
$100,000
0
409,472
$323,698,912
$21,993,865
$28,131,316
39,485
$33,299,460
40,094
$33,704,885
41,291
$18,907,889
40,527
$38,568,425
43,892
$38,222,884
41,606
$38,920,525
40,650
$46,957,795
40,653
$34,315,046
40,952
$19,509,997
40,322
Page 4 of 4
METROPOLITAN SEWERAGE DISTRICT OF BUNCOMBE COUNTY, NORTH CAROLINA TEN YEAR CAPITAL IMPROVEMENT PROGRAM FY 2020-2021 through 2029-2030 MUNICIPAL SUMMARIES PROJECT NAME
LOCATION OF PROJECT
PROJ. PROJECT MGR. NUMBER
PIPE RATING
PROJECT TOTAL FOOTAGE ESTIMATED COST
TOTAL EST. EXPENDS THRU FY 20
FY 20-21 BUDGET
FY 21-22
FOOTAGE
BUDGET
FY 22-23
FOOTAGE
BUDGET
FY 23-24
FOOTAGE
BUDGET
FY 24-25
FOOTAGE
BUDGET
FY 25-26
FOOTAGE
BUDGET
FY 26-27
FOOTAGE
BUDGET
FY 27-28
FOOTAGE
BUDGET
FY 28-29
FOOTAGE
BUDGET
FY 29-30
FOOTAGE
BUDGET
FOOTAGE
BUNCOMBE COUNTY Atkins Street
Arden
HC
2014012
39
1,833
Royal Pines Drive - PRP 47009
Arden
SA
2007020
35
2,888
$698,330 $1,099,100
$5,480
$0
$0
$0
$0
$0
$2,250
$52,000
$638,600
$10,100
$0
$0
$0
$0
$0
$0
$0
$24,500
White Oak Road
Arden
DP
2015193
3
N/A
$48,000
$0
$48,000
Lynn Cove Road
Beaverdam
DP
2015010
35
5,589
$1,851,000
$0
$0
N/A
$0
$0
$0
$0
$0
$0
$0
$0
$0
$25,000
$0
$22,000
$158,000
$30,000
$1,616,000
Biltmore Village
SA
2016167
N/A
210
$203,300
$0
$203,300
210
$0
Christian Creek Interceptor
Buncombe County
HC
2011110
24
12,226
$5,869,424
$235,710
$3,792,303
8,200
$1,842,000
South French Broad Relief Int.
Buncombe County
HC
2017070
N/A
36,330
$31,258,500
$95,000
$50,000
$0
$8,500
$515,000
Swannanoa Equalization Tank
Swannanoa
HC
2019046
N/A
0
$22,556,500
$0
$27,500
$2,004,000
$700,000
$1,400,000
$9,212,500
$9,212,500
$0
$0
Four Inch Main - Patton Hill Rd.
Swannanoa
OH
2016100
27
618
$296,910
$2,910
$294,000
$0
$0
$0
$0
$0
$0
Northwest Ave. @ No. 215
Swannanoa
HC
2018017
84
252
$121,550
$6,350
$30,500
$0
$0
$0
$0
59,946
$64,002,614
$355,550
$4,445,603
1.0000
1.0000
1.0000
$64,002,614
$355,550
$4,445,603
SUBTOTAL Inflation per ENR Const. Cost Index
2.79%
SUBTOTAL with inflation
PROJECT NAME
59,946
LOCATION OF PROJECT
PROJ. PROJECT MGR. NUMBER
PIPE RATING
PROJECT TOTAL FOOTAGE ESTIMATED COST
TOTAL EST. EXPENDS THRU FY 20
9,028
FY 20-21 BUDGET
4,026
FOOTAGE
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$708,500
0
1.0566 $748,586
BUDGET
0
$1,940,000
0
1.0861 0
FY 22-23
FOOTAGE
$0
$0
4,278
BUDGET
$0
$0
$3,930,700
FY 21-22
5,589
$0
$0
4,278
$0
$0
252
$4,040,367
$0 2,888
$0
$84,700
1.0279 9,028
$0 $1,064,500
$0
Bryson Street
618
1,833
$2,106,950
BUDGET
9,082
$16,847,500
9,082
1.1164 0
FY 23-24
FOOTAGE
$7,635,000
$18,807,840
BUDGET
9,082
$16,871,750
9,082
1.1475 9,082
FY 24-25
FOOTAGE
$7,635,000
$19,360,406
BUDGET
9,082
$7,845,000
9,082
1.1795 9,082
FY 25-26
FOOTAGE
$7,635,000
$9,253,332
BUDGET
9,084
$8,378,100
10,917
1.2124 9,082
FY 26-27
FOOTAGE
$7,685,000
$10,157,845
BUDGET
8,477
1.2463 10,917
FY 27-28
FOOTAGE
$0
$2,680,500
$3,340,587
BUDGET
0
1.2810 8,477
FY 28-29
FOOTAGE
$0
$0
0
FY 29-30
FOOTAGE
BUDGET
FOOTAGE
CITY OF ASHEVILLE AB Tech Equalization Tank
Asheville
HC
2019047
N/A
0
$14,250,000
$0
$0
$0
$0
$0
$0
Lower Swannanoa Interceptor
Asheville
EB/HC
2004040
9
6,500
$6,822,717
$203,717
$0
$32,500
$0
$33,000
$27,500
Albemarle Commons PS Elimination
Asheville
OH
2018171
N/A
832
$274,130
$3,130
$0
$38,000
$0
$233,000
$0
$0
$0
$0
$0
$0
Arlington St. @ Furman Ave.
Asheville
OH
2020021
24
310
$130,000
$0
$0
$0
$0
$0
$0
$0
$5,000
$0
$12,500
$112,500
Aurora Drive
Asheville
DP
2017145
53
2,605
$1,183,000
$14,000
$60,500
$1,108,500
$0
$0
$0
$0
$0
$0
$0
$0
Beale Road at Copney Lane
Asheville
DP
2009129
47
4,027
$1,572,925
$31,925
$125,000
$93,000
$0
$1,323,000
$0
$0
$0
$0
$0
$0
Bent Tree Road
Asheville
DP
2016102
60
1,654
$855,500
$17,500
$92,000
$746,000
$0
$0
$0
$0
$0
$0
$0
Braddock Way - PRP 20002
Asheville
OH
2006025
36
3,848
$1,680,940
$18,353
$0
$0
$0
$0
$0
$38,500
$158,087
$0
$1,466,000
2,605
1,654
832
4,027
$0 0
$3,255,000
$0 3,250
$3,271,250
3,250
$0
$0
$0
$0
$0
$0
310
$0 3,848
$0
Buchanan Ave.
Asheville
SA
2014023
51
2,255
$1,122,900
$34,400
$87,000
$0
$1,001,500
2,255
$0
$0
$0
$0
$0
$0
$0
Caledonia Road
Asheville
HC
2014153
65
1,225
$1,302,850
$365,600
$1,500
$69,000
$866,750
1,225
$0
$0
$0
$0
$0
$0
$0
Central Ave. @ I-240
Asheville
SA
2014180
35
990
$429,500
$0
$0
$0
$0
$0
$0
$0
$5,000
$3,000
$50,000
$371,500
Chatham Road
Asheville
SA
2015019
43
1,330
$648,700
$4,800
$0
$0
$0
$0
$1,000
$52,500
$590,400
$0
$0
$0
Cherokee Road
Asheville
DP
2009132
48
1,960
$867,680
$24,680
$1,000
$186,000
$656,000
$0
$0
$0
$0
$0
$0
$0
Cub Road
Asheville
OH
2018027
40
1,204
$457,000
$0
$0
$0
$0
$18,500
$83,000
$0
$355,500
$0
$0
$0
Harmony Lane
Asheville
DP
2016103
35
670
$190,000
$0
$0
$0
$0
$0
$0
$0
$0
$2,500
$0
$187,500
670
Hazel Mill Rd @ Richland St.
Asheville
SA
2014016
26
3,300
$1,236,700
$0
$0
$0
$0
$0
$0
$17,000
$1,000
$20,400
$84,000
$1,114,300
3,300
Hill Street @ Cross Place
Asheville
OH
2016249
44
254
$90,500
$1,525
$0
$0
Horizon Hill Rd. (Hy-Vu Drive)
Asheville
SA
2008084
51
713
$285,444
$10,444
$275,000
Howland Rd. @ Sunset Trail
Asheville
DP
2012134
43
994
$471,600
$7,500
Kimberly Ave. @ Sedley Avenue
Asheville
OH
2018029
35
3,005
$1,233,000
Le An Hurst Road
Asheville
OH
2019027
77
820
$346,000
Lincoln Avenue
Asheville
HC
2013103
26
1,415
$540,370
Manetta Rd. @ Maywood Rd.
Asheville
OH
2020022
51
605
1,960
1,204
$0
$1,475
$0
$16,000
$71,500
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$4,500
$66,000
$393,600
$0
$0
$0
$0
$0
$0
$0
$0
$39,000
$0
$72,000
$60,000
$1,062,000
$9,000
$98,000
$0
$239,000
$0
$0
$0
$0
$0
$0
$0
$2,870
$0
$0
$0
$0
$0
$0
$0
$0
$0
$537,500
$255,500
$0
$8,000
$69,000
$0
$178,500
605
$0
$0
$0
$0
$0
$0
$0
$3,000
$65,000
$959,000
$0
$0
1,258
$0
$0
$0
$0
$0
$0
713
820
Meadow Road @ Train Yard
Asheville
HC
2015207
37
2,001
$1,036,000
$9,000
$0
$0
$0
$0
Montford Ave. @ Montford Park
Asheville
HC
2017144
50
1,258
$514,150
$0
$6,300
$6,750
$100,000
$401,100
Page 1 of 4
254
1,330
994
2,001
3,005
990
$0
1,415
METROPOLITAN SEWERAGE DISTRICT OF BUNCOMBE COUNTY, NORTH CAROLINA TEN YEAR CAPITAL IMPROVEMENT PROGRAM FY 2020-2021 through 2029-2030 MUNICIPAL SUMMARIES PROJECT NAME
LOCATION OF PROJECT
PROJ. PROJECT MGR. NUMBER
PIPE RATING
PROJECT TOTAL FOOTAGE ESTIMATED COST
TOTAL EST. EXPENDS THRU FY 20
FY 20-21 BUDGET
FY 21-22
FOOTAGE
BUDGET
FY 22-23
FOOTAGE
BUDGET
FY 23-24
FOOTAGE
BUDGET
FY 24-25
FOOTAGE
BUDGET
FY 25-26
FOOTAGE
BUDGET
FY 26-27
FOOTAGE
BUDGET
FY 27-28
FOOTAGE
BUDGET
FY 28-29
FOOTAGE
BUDGET
FY 29-30
FOOTAGE
BUDGET
FOOTAGE
CITY OF ASHEVILLE continued… Mountainbrook Rd. @ Chunns Cove
Asheville
DP
2010112
55
2,984
$1,053,015
$21,015
$175,000
$857,000
Sweeten Creek Rd. @ Mills Gap Rd.
Asheville
SA
2014189
16
2,572
$1,253,500
$28,000
$134,500
$0
$1,091,000
Walnut St. @ N. Lexington Ave.
Asheville
DP
2017008
42
1,550
$663,500
$0
$0
$0
Walnut Street @ Rankin Ave.
Asheville
SA
2014018
54
500
$1,760,300
$1,357,300
$403,000
$0
500
2,984
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$7,000
$0
$656,500
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$348,500
$0
$0
$0
$0
$0
$0
$12,970,000
$5,000
$0
$0
$0
$0
$0
$0
2,572
Homeland Park
Asheville
OH
2016248
48
921
$478,750
$7,250
$0
$123,000
Carrier Bridge PS Replacement
Asheville
HC/DP
2019045
N/A
770
$28,099,375
$451,375
$1,703,000
$12,970,000
Riverside Dr. @ Riverside Baptist
Asheville
OH
2016251
40
510
$232,500
$0
$0
$0
$0
$0
$6,500
$0
$26,000
$200,000
New Haw Creek Rd. @ Dogwood Grove
E. Asheville
SA
2014021
31
1,900
$702,900
$9,500
$0
$0
$0
$0
$0
$0
$18,000
$72,000
East Chestnut Ave @ Five Points
N. Asheville
SA
2015192
36
5,225
$1,822,050
$54,000
$0
$0
$0
$0
$13,800
$179,250
$0
$1,575,000
Fairmont Road
N. Asheville
DP
2015017
31
3,900
$1,654,000
$0
$0
Jarnaul Avenue
N. Asheville
HC
2016104
75
4,684
$1,909,250
$238,163
$1,671,212
4,684
770
$0
$0
$20,000
$0
$8,500
$112,500
$1,513,000
$0
$0
$0
$0
$0
$0
SA
2014022
26
6,500
$2,537,700
$0
$0
$0
$0
2015175
49
1,100
$503,600
$9,600
$7,000
$58,000
$429,000
Forestdale Drive
S. Asheville
DP
2014002
33
2,600
$931,000
$0
$0
$0
Springside Rd. @ Overlook Rd.
S. Asheville
SA
2012127
65
3,922
$1,437,887
$77,487
$0
$1,360,400
Sweeten Creek Rd. @ Buck Shoals Rd.
S. Asheville
HC
2014015
51
1,558
$628,170
$5,640
$6,600
$73,000
Johnston Blvd. @ Providence Rd.
W. Asheville
DP
2014013
37
2,000
$629,150
$8,150
$0
$0
$0
$0
Logan Avenue
W. Asheville
SA
2017256
48
1,884
$758,500
$11,500
$0
$8,200
$76,500
$662,300
Sand Hill Road @ Baker Place
W. Asheville
SA
2015223
56
1,100
$390,700
$7,000
$1,500
$30,500
$351,700
Sulphur Springs Rd. @ Covington St.
W. Asheville
DP
2014006
44
1,350
$528,000
$7,500
$0
$0
Toxaway Street
W. Asheville
SA
2019004
51
722
$286,600
$4,000
$1,000
$281,600
Waynesville Ave. @ Brownwood Ave.
W. Asheville
SA
2014183
33
3,022
$1,370,750
$0
$0
$0
West Crabapple Lane
W. Asheville
DP
2014005
67
1,774
$644,800
$110,300
$69,000
$465,500
Old County Home Rd PSR
W. Asheville
SA
2015221
67
4,600
$1,815,400
$20,000
$14,400
$76,500
Rosewood Ave. @ Riverside Cemetery
Montford
HC
2019023
25
Inflation per ENR Const. Cost Index
$0 $4,940,512
1.0000
1.0000
1.0000
101,603
$89,967,653
$3,186,224
$4,940,512
2.79%
SUBTOTAL with inflation
PROJECT NAME
$0 $3,186,224
LOCATION OF PROJECT
PROJ. PROJECT MGR. NUMBER
PIPE RATING
PROJECT TOTAL FOOTAGE ESTIMATED COST
TOTAL EST. EXPENDS THRU FY 20
BUDGET
3,922
$18,652,450
5,897
$19,172,853
722
1,774
$0
$7,000
$112,000
$0
$2,385,700
$0
$0
$0
$0
$0
$0
$0
$0
$15,000
$0
$17,500
$100,000
$798,500
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
1,558
$11,000
$56,000
$554,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$15,000
$111,000
$394,500
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$19,500
$0
$28,000
$203,000
$205,750
$914,500
1,100
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
17,190
$3,222,400
14,431
$21,164,666
17,190
$3,499,710
1.0566
BUDGET
$261,300
9,527
$291,704
1.0861
FY 22-23
FOOTAGE
$0 9,527
BUDGET
$3,854,550
0
$4,423,113
1.1164
FY 23-24
FOOTAGE
$1,800 0
BUDGET
$6,295,337
3,504
$7,425,474
1.1475
FY 24-25
FOOTAGE
$0 3,504
BUDGET
$3,874,400
9,678
$4,697,432
1.1795
FY 25-26
FOOTAGE
$2,250 9,678
BUDGET
$4,525,000
9,736
$5,639,304
1.2124
FY 26-27
FOOTAGE
$24,000 9,736
FOOTAGE
BUDGET
$51,100
180
12,475
$6,875,500
19,165
12,475
$8,807,691
1.2463
FY 27-28
1.2810
FY 28-29
FOOTAGE
BUDGET
6,500
$0
$0 $0
3,900
$0 3,022
4,600
$0 $20,031,325
1,350
1,900
$0
$0 1,884
2,000
2,600
$0
14,431
FY 21-22 BUDGET
$33,000
$1,704,500
1.0279
FOOTAGE
$0 $0
1,100
$543,900
$0 5,897
FY 20-21
$0
$0
DP
$79,150
$0
5,225
$0
N. Asheville
$89,967,653
$0 $602,400
$0
S. Asheville
180
$0 $1,000
$0
Bellevue Road
101,603
510
$0
Manetta Rd. @ Johnson Dr.
SUBTOTAL
921
1,550
19,165
FY 29-30
FOOTAGE
BUDGET
FOOTAGE
HENDERSON COUNTY ITT Pump Station Upgrade
Henderson County
HC
2020061
N/A
0
$988,000
$0
$0
$0
$0
$0
$0
Mud Creek Interceptor - Ph. 3
Henderson County
HC
2020010
NA
9,200
$4,254,500
$0
$46,000
$0
$10,500
$315,000
$3,883,000
9,200
9,200
$5,242,500
$0
$46,000
$3,883,000
9,200
1.0000
1.0000
1.0000
$5,242,500
$0
$46,000
SUBTOTAL Inflation per ENR Const. Cost Index SUBTOTAL with inflation
2.79% 9,200
0
$0
0
1.0279 0
$0
$10,500
0
1.0566 0
$11,094
Page 2 of 4
$315,000
0
1.0861 0
$342,108
1.1164 0
$4,334,818
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
0
1.1475 9,200
$0
$0
0
1.1795 0
$0
$0
0
1.2124 0
$0
$0
0
1.2463 0
$0
$0
0
1.2810 0
$0
0
METROPOLITAN SEWERAGE DISTRICT OF BUNCOMBE COUNTY, NORTH CAROLINA TEN YEAR CAPITAL IMPROVEMENT PROGRAM FY 2020-2021 through 2029-2030 MUNICIPAL SUMMARIES PROJECT NAME
LOCATION OF PROJECT
PROJ. PROJECT MGR. NUMBER
PIPE RATING
PROJECT TOTAL FOOTAGE ESTIMATED COST
TOTAL EST. EXPENDS THRU FY 20
FY 20-21 BUDGET
FY 21-22
FOOTAGE
BUDGET
FY 22-23
FOOTAGE
BUDGET
FY 23-24
FOOTAGE
BUDGET
FY 24-25
FOOTAGE
BUDGET
FY 25-26
FOOTAGE
BUDGET
FY 26-27
FOOTAGE
BUDGET
FY 27-28
FOOTAGE
BUDGET
FY 28-29
FOOTAGE
BUDGET
FY 29-30
FOOTAGE
BUDGET
FOOTAGE
TOWN OF BLACK MOUNTAIN Chestnut Lodge Rd.
Black Mountain
SA
2014017
61
4,560
$1,928,700
$146,700
$1,782,000
Highland Farms Road
Black Mountain
HC
2018018
70
820
$285,000
$6,450
$32,500
$246,050
Oakland Drive @ Church Street
Black Mountain
DP
2015177
27
575
$207,000
$0
$0
$0
5,955
$2,420,700
$153,150
$1,814,500
1.0000
1.0000
1.0000
$2,420,700
$153,150
$1,814,500
SUBTOTAL Inflation per ENR Const. Cost Index
2.79%
SUBTOTAL with inflation
PROJECT NAME
5,955
LOCATION OF PROJECT
PROJ. PROJECT MGR. NUMBER
PIPE RATING
PROJECT TOTAL FOOTAGE ESTIMATED COST
TOTAL EST. EXPENDS THRU FY 20
4,560
4,560
820
$246,050
820
1.0279 4,560
FY 20-21 BUDGET
$0
$252,915
BUDGET
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$2,500
$2,500
$30,000
$172,000
575
$172,000
575
$0
0
1.0566 820
FY 21-22
FOOTAGE
$0
$0
BUDGET
0
1.0861 0
FY 22-23
FOOTAGE
$0
$0
BUDGET
0
1.1164 0
FY 23-24
FOOTAGE
$0
$0
BUDGET
0
1.1475 0
FY 24-25
FOOTAGE
$0
$0
BUDGET
0
1.1795 0
FY 25-26
FOOTAGE
$2,500
$2,949
BUDGET
0
1.2124 0
FY 26-27
FOOTAGE
$2,500
$3,031
BUDGET
$30,000
0
1.2463 0
FY 27-28
FOOTAGE
$0
1.2810
$37,388
0
FY 28-29
FOOTAGE
BUDGET
$220,336
575
FY 29-30
FOOTAGE
BUDGET
FOOTAGE
TOWN OF WEAVERVILLE S. Main St. @ Reems Creek Rd.
Weaverville
HC
2017012
51
565
$241,050
$6,550
$52,000
$182,500
Weaverville PS Replacement
Weaverville
HC
2019080
N/A
16,610
$7,828,750
$0
$20,000
$770,000
Wildwood Park
Weaverville
HC
2015194
27
SUBTOTAL Inflation per ENR Const. Cost Index
$223,780
$2,380
$0
$8,293,580
$8,930
$72,000
1.0000
1.0000
1.0000
17,757
$8,293,580
$8,930
$72,000
2.79%
SUBTOTAL with inflation
PROJECT NAME
582 17,757
LOCATION OF PROJECT
PROJ. PROJECT MGR. NUMBER
PIPE RATING
PROJECT TOTAL FOOTAGE ESTIMATED COST
TOTAL EST. EXPENDS THRU FY 20
$0
$0
$130,750
$3,435,000
$0 0
$952,500
0
$979,075
$0 565
$130,750
565
$138,148
1.0279
FY 20-21 BUDGET
565
FOOTAGE
BUDGET
$3,435,000
0
$3,730,606
BUDGET
11,000
$3,473,000
11,000
$3,877,111
BUDGET
$0
$0
$0
$0
$0
$0
$0
$0
$0
5,610
$0
$0
1.1164
FY 23-24
FOOTAGE
$0 5,610
$0
1.0861
FY 22-23
FOOTAGE
$3,473,000
$0 0
1.0566
FY 21-22
$0 11,000
1.1475 5,610
FY 24-25
FOOTAGE
BUDGET
$0 0
BUDGET
0
1.1795
$0
0
FY 25-26
FOOTAGE
$0
$0
BUDGET
0
1.2124
$0
0
FY 26-27
FOOTAGE
$0
$0
BUDGET
$221,400
582
0
$221,400
582
0
$283,619
1.2463
$0
0
FY 27-28
FOOTAGE
$0
1.2810
$0
FY 28-29
FOOTAGE
BUDGET
582
FY 29-30
FOOTAGE
BUDGET
FOOTAGE
TOWN OF WOODFIN Elk Mountain Place
Woodfin
HC
2010094
48
4,101
$1,448,750
$18,000
$55,000
$236,500
$1,139,250
Jonestown Road @ Riverside Drive
Woodfin
OH
2018028
42
1,890
$620,500
$0
$0
$0
$25,500
New Stock Road
Woodfin
DP
2015011
45
9,020
$2,661,000
$36,000
$0
15,011
$4,730,250
$54,000
$55,000
1.0000
1.0000
1.0000
$4,730,250
$54,000
$55,000
SUBTOTAL Inflation per ENR Const. Cost Index SUBTOTAL with inflation
2.79% 15,011
$0 0
$236,500
$0 0
1.0279 0
$243,098
4,101
$1,164,750
$1,230,650
Page 3 of 4
$0
$0
$0
$23,000
$30,000
$530,000
$8,000 4,101
1.0566 0
$0 $15,000
$23,000
$83,000 0
1.0861 4,101
$24,979
$106,000
0
1.1164 0
$118,334
$2,534,000
9,020
$0
$2,564,000
9,020
$530,000
1.1475 0
$2,942,201
1,890
$625,145
$0
$0
$0
$0
$0 1,890
1.1795 9,020
$0 $0
$0
$0 0
1.2124 1,890
$0
$0
$0 0
1.2463 0
$0
$0
0
1.2810 0
$0
0
METROPOLITAN SEWERAGE DISTRICT OF BUNCOMBE COUNTY, NORTH CAROLINA TEN YEAR CAPITAL IMPROVEMENT PROGRAM FY 2020-2021 through 2029-2030 MUNICIPAL SUMMARIES PROJECT NAME
LOCATION OF PROJECT
PROJ. PROJECT MGR. NUMBER
PIPE RATING
PROJECT TOTAL FOOTAGE ESTIMATED COST
TOTAL EST. EXPENDS THRU FY 20
FY 20-21 BUDGET
FY 21-22
FOOTAGE
BUDGET
FY 22-23
FOOTAGE
BUDGET
FY 23-24
FOOTAGE
BUDGET
FY 24-25
FOOTAGE
BUDGET
FY 25-26
FOOTAGE
BUDGET
FY 26-27
FOOTAGE
BUDGET
FY 27-28
FOOTAGE
BUDGET
FY 28-29
FOOTAGE
BUDGET
FY 29-30
FOOTAGE
BUDGET
FOOTAGE
MISCELLANEOUS PROJECTS AND LINE ITEMS Collection System Master Plan Update
District-Wide
HC
2020011
N/A
0
$200,000
$0
$0
$200,000
$0
$0
$0
$0
$0
$0
$0
Mull Bldg. HVAC
MSD - Admin
OH
2018186
N/A
0
$584,725
$267,725
$317,000
$0
$0
$0
$0
$0
$0
$0
$0
$0 $0
Biological Treatment
MSD-Treatment Plant
HC
2016063
N/A
0
$45,640,000
$0
$0
$0
$0
$500,000
$2,010,000
$2,000,000
$10,320,000
$18,486,000
$12,324,000
$0
Building and Facility Rehabilitation
MSD-Treatment Plant
HC
2002068
N/A
0
$509,500
$101,000
$79,000
$51,000
$42,000
$40,000
$47,500
$50,000
$50,000
$50,000
$50,000
$50,000
Flow Monitoring
MSD-Treatment Plant
SA
2008013
N/A
0
$541,905
$425,156
$50,000
$50,000
$50,000
$50,000
$50,000
$50,000
$50,000
$50,000
$50,000
$50,000
HVAC Rehabilitation
MSD-Treatment Plant
HC
2020051
N/A
0
$519,000
$0
$52,500
$54,000
$55,500
$57,000
$50,000
$50,000
$50,000
$50,000
$50,000
$50,000
Incinerator Polymer System Replacement
MSD-Treatment Plant
HC
2019071
N/A
0
$200,000
$0
$200,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
Plant High Rate Primary Treatment
MSD-Treatment Plant
HC
2015054
N/A
0
$16,834,138
$9,957,138
$6,877,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
Solids Handling Capacity Improvements
MSD-Treatment Plant
HC
2019087
N/A
0
$2,052,000
$0
$0
$180,000
$1,872,000
$0
$0
$0
$0
$0
$0
$0
General Capital Equipment
Various
EB
2016072
N/A
0
$1,500,000
$150,000
$150,000
$150,000
$150,000
$150,000
$150,000
$150,000
$150,000
$150,000
$150,000
$150,000
Future Projects - Non Critical
Various
EB
Varies
Varies
Varies
Varies
$0
$0
SSD Rehab. & Replacement
Various
MS
2002101
N/A
200,000
$46,000,000
$4,600,000
$4,675,000
Surveys for Design
Various
EB
2002060
N/A N/A
$500,000
$0
$50,000
$115,081,268
$15,501,019
$12,450,500
1.0000
1.0000
1.0000
$115,081,268
$15,501,019
$12,450,500
SUBTOTAL
200,000
Inflation per ENR Const. Cost Index
2.79%
SUBTOTAL with inflation
PROJECT NAME
200,000
LOCATION OF PROJECT
PROJ. PROJECT MGR. NUMBER
PIPE RATING
PROJECT TOTAL FOOTAGE ESTIMATED COST
TOTAL EST. EXPENDS THRU FY 20
$0 20,000
20,000
$50,000 20,000
20,000
$5,410,000
20,000
$5,560,939
BUDGET
20,000
20,000
$6,894,500
20,000
$7,284,580
BUDGET
20,000
20,000
$5,522,000
20,000
$5,997,206
BUDGET
20,000
20,000
$7,032,500
20,000
$7,850,787
BUDGET
20,000
20,000
$7,025,000
20,000
$8,061,218
BUDGET
20,000
20,000
$15,345,000
20,000
$18,099,730
BUDGET
20,000
20,000
$23,511,000
20,000
$28,505,402
BUDGET
20,000
20,000
$17,349,000
20,000
$21,621,279
BUDGET
20,000
$5,025,000
20,000
1.2810 20,000
FY 28-29
FOOTAGE
$4,675,000 $50,000
1.2463
FY 27-28
FOOTAGE
$0
$4,675,000 $50,000
1.2124
FY 26-27
FOOTAGE
$0
$4,675,000 $50,000
1.1795
FY 25-26
FOOTAGE
$0
$4,675,000 $50,000
1.1475
FY 24-25
FOOTAGE
$0
$4,675,000 $50,000
1.1164
FY 23-24
FOOTAGE
$0
$4,675,000 $50,000
1.0861
FY 22-23
FOOTAGE
$0
$4,675,000 $50,000
1.0566
FY 21-22
FOOTAGE
$0
$4,675,000 $50,000
1.0279
FY 20-21 BUDGET
$0
$4,675,000
$6,437,153
20,000
FY 29-30
FOOTAGE
BUDGET
FOOTAGE
DESIGN, ROW, & CONSTRUCTION MANAGEMENT EXPENSES Design, ROW, & Const. Mgmt. Exp.
MSD/ENG
EB
N/A
N/A
SUBTOTAL
0
$32,623,347
$2,722,685
$2,870,201
0
$32,623,347
$2,722,685
$2,870,201
$2,950,214 0
$3,027,163
$2,950,214
0
$3,106,329
$3,027,163
0
$3,187,830
$3,106,329
0
$3,335,947
$3,187,830
0
$3,413,895
$3,335,947
0
$3,494,085
$3,413,895
0
$3,576,488
$3,494,085
0
$3,661,197
$3,576,488
0
$3,661,197
0
BUDGET SUMMARY
PROJECT NAME
LOCATION OF PROJECT
PROJ. PROJECT MGR. NUMBER
PIPE RATING
SUBTOTAL with Inflation
PROJECT TOTAL FOOTAGE ESTIMATED COST
409,472
$322,361,912
TOTAL EST. EXPENDS THRU FY 20 $21,981,558
TOTAL
BUDGET $26,694,316
FY 21-22
FOOTAGE 39,485
BUDGET $33,199,460
FY 22-23
FOOTAGE 40,094
BUDGET
FY 23-24
FOOTAGE
$33,604,885
41,291
BUDGET $18,807,889
FY 24-25
FOOTAGE
BUDGET
40,527
$38,468,425
FY 25-26
FOOTAGE 43,892
BUDGET $38,122,884
FY 26-27
FOOTAGE 41,606
BUDGET $38,820,525
FY 27-28
FOOTAGE 40,650
BUDGET $46,857,795
FY 28-29
FOOTAGE 40,653
BUDGET $34,215,046
FY 29-30
FOOTAGE 40,952
BUDGET $19,409,997
FOOTAGE 40,322
$1,000,000
CONTINGENCY REIMBURSEMENT PROJECTS
FY 20-21
Various
Various
Various
0
$1,337,000
$12,307
$437,000
0
$100,000
0
$100,000
0
$100,000
0
$100,000
0
$100,000
0
$100,000
0
$100,000
0
$100,000
0
$100,000
0
409,472
$323,698,912
$21,993,865
$28,131,316
39,485
$33,299,460
40,094
$33,704,885
41,291
$18,907,889
40,527
$38,568,425
43,892
$38,222,884
41,606
$38,920,525
40,650
$46,957,795
40,653
$34,315,046
40,952
$19,509,997
40,322
Page 4 of 4
—
Project Schedule
CIP PROJECT TIMELINE ID 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53
Project Name
Christian Creek Int. Christian Creek Int. Christian Creek Int. Lower Swannanoa Int. Lower Swannanoa Int. Lower Swannanoa Int. Mud Creek Int. Ph. 3 Mud Creek Int. Ph. 3 Mud Creek Int. Ph. 3 South French Broad Relief Int. South French Broad Relief Int. South French Broad Relief Int. Swannanoa EQ Tank Swannanoa EQ Tank Ablemarle Commons PS Elimination Ablemarle Commons PS Elimination Ablemarle Commons PS Elimination Arlington St. @ Furman Ave. Arlington St. @ Furman Ave. Arlington St. @ Furman Ave. Atkins Street Atkins Street Atkins Street Aurora Drive Aurora Drive Aurora Drive Beale Road @ Copney Lane Beale Road @ Copney Lane Beale Road @ Copney Lane Bellevue Road Bellevue Road Bellevue Road Bent Tree Road Bent Tree Road Bent Tree Road Braddock Way PRP 20002 Braddock Way PRP 20002 Braddock Way PRP 20002 Bryson Street Buchanan Ave. Buchanan Ave. Buchanan Ave. Caledonia Road Caledonia Road Caledonia Road Central Ave. @ I-240 Central Ave. @ I-240 Central Ave. @ I-240 Chatham Road Chatham Road Chatham Road Cherokee Road Cherokee Road
Note: Project durations are based on a 7 day week. Created by: Cheryl Rice
Project #
2011110 2011110 2011110 2004040 2004040 2004040 2020010 2020010 2020010 2017070 2017070 2017070 2019046 2019046 2018171 2018171 2018171 2020021 2020021 2020021 2014012 2014012 2014012 2017145 2017145 2017145 2009129 2009129 2009129 2015175 2015175 2015175 2016102 2016102 2016102 2006025 2006025 2006025 2016167 2014023 2014023 2014023 2014153 2014153 2014153 2014180 2014180 2014180 2015019 2015019 2015019 2009132 2009132
P. R.
24 24 24 9 9 9 0 0 0 0 0 0 0 0 0 0 0 24 24 24 39 39 39 53 53 53 47 47 47 49 49 49 60 60 60 36 36 36 500
13 13 13 31 31 31 35 35 35 43 43 43 48 48
Duration
Start
Finish
1856 days 731 days 852 days 731 days 365 days 730 days 1095 days 366 days 365 days 1826 days 366 days 1461 days 1096 days 730 days 62 days 668 days 92 days 762 days 334 days 31 days 4018 days 365 days 124 days 547 days 365 days 123 days 3653 days 911 days 153 days 1461 days 365 days 92 days 945 days 516 days 92 days 1614 days 943 days 184 days 184 days 731 days 730 days 184 days 2192 days 365 days 123 days 549 days 547 days 62 days 3044 days 365 days 123 days 4018 days 365 days
Sat 6/1/13 Sun 7/1/18 Thu 7/2/20 Fri 7/1/22 Mon 7/1/24 Tue 7/1/25 Wed 7/1/20 Sat 7/1/23 Mon 7/1/24 Sun 7/1/18 Sat 7/1/23 Mon 7/1/24 Thu 7/1/21 Mon 7/1/24 Thu 7/1/21 Wed 9/1/21 Sat 7/1/23 Wed 7/1/26 Tue 8/1/28 Sun 7/1/29 Wed 7/1/15 Wed 7/1/26 Thu 7/1/27 Tue 1/1/19 Wed 7/1/20 Thu 7/1/21 Thu 7/1/10 Fri 1/1/21 Sat 7/1/23 Sat 7/1/17 Thu 7/1/21 Fri 7/1/22 Sat 7/1/17 Sat 2/1/20 Thu 7/1/21 Fri 7/1/22 Mon 12/1/25 Sat 7/1/28 Wed 7/1/20 Sun 7/1/18 Wed 7/1/20 Fri 7/1/22 Wed 7/1/15 Thu 7/1/21 Fri 7/1/22 Wed 7/1/26 Sat 1/1/28 Sun 7/1/29 Wed 3/1/17 Tue 7/1/25 Wed 7/1/26 Thu 7/1/10 Thu 7/1/21
Sat 6/30/18 Tue 6/30/20 Mon 10/31/22 Sun 6/30/24 Mon 6/30/25 Wed 6/30/27 Fri 6/30/23 Sun 6/30/24 Mon 6/30/25 Fri 6/30/23 Sun 6/30/24 Fri 6/30/28 Sun 6/30/24 Tue 6/30/26 Tue 8/31/21 Fri 6/30/23 Sat 9/30/23 Mon 7/31/28 Sat 6/30/29 Tue 7/31/29 Tue 6/30/26 Wed 6/30/27 Mon 11/1/27 Tue 6/30/20 Wed 6/30/21 Sun 10/31/21 Tue 6/30/20 Fri 6/30/23 Thu 11/30/23 Wed 6/30/21 Thu 6/30/22 Fri 9/30/22 Fri 1/31/20 Wed 6/30/21 Thu 9/30/21 Mon 11/30/26 Fri 6/30/28 Sun 12/31/28 Thu 12/31/20 Tue 6/30/20 Thu 6/30/22 Sat 12/31/22 Wed 6/30/21 Thu 6/30/22 Mon 10/31/22 Fri 12/31/27 Sat 6/30/29 Fri 8/31/29 Mon 6/30/25 Tue 6/30/26 Sat 10/31/26 Wed 6/30/21 Thu 6/30/22
Plats
27
2
14
8
2
1
3
7
16
9
5
25
3
2
1
4
10
Proj. Mgr.
2021 2022 2023 2024 2025 Jul AugSepOctNovDecJanFebMarAprMayJun Jul AugSepOctNovDecJanFebMarAprMayJun Jul AugSepOctNovDecJanFebMarAprMayJun Jul AugSepOctNovDecJanFebMarAprMayJun Jul AugSepOctNovDecJanFebMarAprMayJun
Hunter Hunter Hunter Ed Ed Ed Hunter Hunter Hunter Hunter Design Hunter Hunter Hunter Hunter Owen Owen Owen Owen Owen Owen Hunter Hunter Hunter Darin Darin ROW Darin Darin Design Darin Darin Darin Darin Darin Darin Darin ROW Darin Owen Owen Owen Shaun Construction Shaun Shaun Shaun Hunter Design Hunter Hunter Shaun Shaun Shaun Shaun Shaun Shaun Darin Design Darin
Construction Design ROW Design ROW Construction ROW Design
Design ROW Construction
Design
Construction ROW Construction ROW Construction
Construction Design
ROW Construction ROW Construction
Design
ROW
Design P.E.R.
External Milestone
Manual Task
Manual Summary
External Tasks
ROW
Inactive Milestone
Duration-only
Start-only
External Milestone
Construction
Inactive Summary
Manual Summary Rollup
Finish-only
Deadline
1
Last Updated: Mon 4/6/20
CIP PROJECT TIMELINE ID 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106
Project Name
Cherokee Road Chestnut Lodge Road Chestnut Lodge Road Chestnut Lodge Road Cub Road Cub Road Cub Road East Chestnut Ave @ Five Points East Chestnut Ave @ Five Points East Chestnut Ave @ Five Points Elk Mtn. Place Elk Mtn. Place Elk Mtn. Place Fairmont Road Fairmont Road Fairmont Road Forestdale Drive Forestdale Drive Forestdale Drive Four Inch Main - Patton Hill Road Four Inch Main - Patton Hill Road Harmony Lane Harmony Lane Hazel Mill Rd. @ Richland St. Hazel Mill Rd. @ Richland St. Hazel Mill Rd. @ Richland St. Highland Farms Road Highland Farms Road Highland Farms Road Hill Street @ Cross Place Hill Street @ Cross Place Hill Street @ Cross Place Horizon Hill Rd. @ Hy-Vu Dr. Horizon Hill Rd. @ Hy-Vu Dr. Horizon Hill Rd. @ Hy-Vu Dr. Howland Rd. @ Sunset Trail Howland Rd. @ Sunset Trail Howland Rd. @ Sunset Trail Jarnaul Avenue Jarnaul Avenue Jarnaul Avenue Johnston Blvd @ Providence Rd. Johnston Blvd @ Providence Rd. Johnston Blvd @ Providence Rd. Jonestown Rd. @ Riverside Dr. Jonestown Rd. @ Riverside Dr. Jonestown Rd. @ Riverside Dr. Kimberly Ave. @ Sedley Avenue Kimberly Ave. @ Sedley Avenue Kimberly Ave. @ Sedley Avenue Le An Hurst Road Le An Hurst Road Le An Hurst Road
Note: Project durations are based on a 7 day week. Created by: Cheryl Rice
Project #
2009132 2014017 2014017 2014017 2018027 2018027 2018027 2015192 2015192 2015192 2010094 2010094 2010094 2015017 2015017 2015017 2014002 2014002 2014002 2016100 2016100 2016103 2016103 2014016 2014016 2014016 2018018 2018018 2018018 2016249 2016249 2016249 2008084 2008084 2008084 2012134 2012134 2012134 2016104 2016104 2016104 2014013 2014013 2014013 2018028 2018028 2018028 2018029 2018029 2018029 2019027 2019027 2019027
P. R.
48 61 61 61 40 40 40 36 36 36 48 48 48 31 31 31 33 33 33 27 27 35 35 26 26 26 65 65 65 44 44 44 51 51 51 43 43 43 75 75 75 37 37 37 42 42 42 35 35 35 77 77 77
Duration
Start
Finish
123 days 976 days 457 days 304 days 731 days 577 days 124 days 3045 days 607 days 305 days 3136 days 546 days 213 days 1827 days 365 days 153 days 1461 days 550 days 123 days 182 days 273 days 366 days 183 days 914 days 547 days 261 days 366 days 365 days 93 days 1889 days 303 days 63 days 1127 days 183 days 105 days 4018 days 365 days 92 days 614 days 482 days 184 days 5295 days 365 days 123 days 884 days 577 days 92 days 1614 days 578 days 123 days 153 days 577 days 62 days
Fri 7/1/22 Fri 7/29/16 Mon 4/1/19 Wed 7/1/20 Sat 7/1/23 Sun 12/1/24 Wed 7/1/26 Sat 7/1/17 Sat 11/1/25 Thu 7/1/27 Fri 6/1/12 Fri 1/1/21 Fri 7/1/22 Sat 7/1/23 Sat 7/1/28 Sun 7/1/29 Sat 7/1/23 Thu 7/1/27 Mon 1/1/29 Mon 12/31/18 Thu 10/1/20 Thu 7/1/27 Sun 7/1/29 Tue 7/1/25 Sat 1/1/28 Sun 7/1/29 Mon 7/1/19 Wed 7/1/20 Thu 7/1/21 Mon 7/1/19 Sun 9/1/24 Tue 7/1/25 Wed 7/1/09 Wed 8/1/12 Wed 7/1/20 Tue 7/1/14 Tue 7/1/25 Wed 7/1/26 Sat 7/1/17 Thu 3/7/19 Wed 7/1/20 Sun 1/1/12 Wed 7/1/26 Thu 7/1/27 Fri 7/1/22 Sun 12/1/24 Wed 7/1/26 Fri 7/1/22 Tue 12/1/26 Sat 7/1/28 Wed 7/1/20 Tue 12/1/20 Fri 7/1/22
Mon 10/31/22 Sun 3/31/19 Tue 6/30/20 Fri 4/30/21 Mon 6/30/25 Tue 6/30/26 Sun 11/1/26 Fri 10/31/25 Wed 6/30/27 Sun 4/30/28 Thu 12/31/20 Thu 6/30/22 Sun 1/29/23 Fri 6/30/28 Sat 6/30/29 Fri 11/30/29 Wed 6/30/27 Sun 12/31/28 Thu 5/3/29 Sun 6/30/19 Wed 6/30/21 Fri 6/30/28 Sun 12/30/29 Fri 12/31/27 Sat 6/30/29 Mon 3/18/30 Tue 6/30/20 Wed 6/30/21 Fri 10/1/21 Sat 8/31/24 Mon 6/30/25 Mon 9/1/25 Tue 7/31/12 Wed 1/30/13 Tue 10/13/20 Mon 6/30/25 Tue 6/30/26 Wed 9/30/26 Wed 3/6/19 Tue 6/30/20 Thu 12/31/20 Tue 6/30/26 Wed 6/30/27 Sun 10/31/27 Sat 11/30/24 Tue 6/30/26 Wed 9/30/26 Mon 11/30/26 Fri 6/30/28 Tue 10/31/28 Mon 11/30/20 Thu 6/30/22 Wed 8/31/22
Plats
21
12
23
34
11
24
14
3
2
2
5
38
14
12
13
12
Proj. Mgr.
2021 2022 2023 2024 2025 Jul AugSepOctNovDecJanFebMarAprMayJun Jul AugSepOctNovDecJanFebMarAprMayJun Jul AugSepOctNovDecJanFebMarAprMayJun Jul AugSepOctNovDecJanFebMarAprMayJun Jul AugSepOctNovDecJanFebMarAprMayJun
Darin Shaun Shaun Shaun Construction Owen Owen Owen Shaun Shaun Shaun Hunter Design Hunter Hunter Darin Darin Darin Darin Darin Darin Owen Owen Construction Darin Darin Shaun Shaun Shaun Hunter Hunter ROW Hunter Owen Owen Owen Shaun Shaun Shaun Construction Darin Darin Darin Hunter Hunter Hunter Construction Darin Darin Darin Owen Owen Owen Owen Owen Owen Design Owen Owen Owen
Construction
Design
Design
ROW Construction
Design
Construction
Design ROW
Construc
Design
Design
Design
Design
ROW
Construction
Design P.E.R.
External Milestone
Manual Task
Manual Summary
External Tasks
ROW
Inactive Milestone
Duration-only
Start-only
External Milestone
Construction
Inactive Summary
Manual Summary Rollup
Finish-only
Deadline
2
Last Updated: Mon 4/6/20
CIP PROJECT TIMELINE ID 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159
Project Name
Lincoln Ave. Lincoln Ave. Logan Avenue Logan Avenue Logan Avenue Lynn Cove Road Lynn Cove Road Lynn Cove Road Manetta Rd. @ Johnson Dr. Manetta Rd. @ Johnson Dr. Manetta Rd. @ Johnson Dr. Manetta Rd. @ Maywood Manetta Rd. @ Maywood Manetta Rd. @ Maywood Meadow Rd. @ Train Yard Meadow Rd. @ Train Yard Meadow Rd. @ Train Yard Montford Ave. @ Montford Park Montford Ave. @ Montford Park Montford Ave. @ Montford Park Mountainbrook @ Chunns Cove Mountainbrook @ Chunns Cove Mountainbrook @ Chunns Cove New Haw Creek Rd. @ Dogwood Grove New Haw Creek Rd. @ Dogwood Grove New Haw Creek Rd. @ Dogwood Grove New Stock Road New Stock Road New Stock Road Northwest Ave. @ No. 215 Northwest Ave. @ No. 215 Northwest Ave. @ No. 215 Oakland Dr. @ Church St. Oakland Dr. @ Church St. Oakland Dr. @ Church St. Riverside Dr. @ Riverside Baptist Riverside Dr. @ Riverside Baptist Riverside Dr. @ Riverside Baptist Rosewood Ave. @ Riverside Cemetery Rosewood Ave. @ Riverside Cemetery Rosewood Ave. @ Riverside Cemetery Royal Pines Dr. - PRP 47009 Royal Pines Dr. - PRP 47009 Royal Pines Dr. - PRP 47009 Sandhill Rd @ Baker Pl Sandhill Rd @ Baker Pl Sandhill Rd @ Baker Pl South Main St. @ Reems Creek Rd. South Main St. @ Reems Creek Rd. South Main St. @ Reems Creek Rd. Springside Rd. @ Overlook Springside Rd. @ Overlook Springside Rd. @ Overlook
Note: Project durations are based on a 7 day week. Created by: Cheryl Rice
Project #
2013103 2013103 2017256 2017256 2017256 2015010 2015010 2015010 2014022 2014022 2014022 2020022 2020022 2020022 2015207 2015207 2015207 2017144 2017144 2017144 2010112 2010112 2010112 2014021 2014021 2014021 2015011 2015011 2015011 2018017 2018017 2018017 2015177 2015177 2015177 2016251 2016251 2016251 2019023 2019023 2019023 2007020 2007020 2007020 2015223 2015223 2015223 2017012 2017012 2017012 2012127 2012127 2012127
P. R.
26 26 48 48 48 31 31 31 20 20 20 51 51 51 37 37 37 50 50 50 55 55 55 31 31 31 45 45 45 84 84 84 27 27 27 40 40 40 25 25 25 35 35 35 56 56 56 51 51 51 52 52 52
Duration
Start
Finish
1643 days 90 days 1461 days 365 days 176 days 1826 days 731 days 215 days 1095 days 731 days 365 days 518 days 577 days 31 days 4018 days 365 days 154 days 730 days 365 days 90 days 3288 days 365 days 123 days 4567 days 912 days 177 days 2922 days 365 days 304 days 365 days 365 days 90 days 731 days 365 days 92 days 761 days 334 days 92 days 1827 days 365 days 93 days 3471 days 305 days 236 days 608 days 365 days 129 days 366 days 365 days 93 days 1218 days 731 days 216 days
Sun 1/1/12 Sun 7/1/29 Sun 7/1/18 Fri 7/1/22 Sat 7/1/23 Thu 7/1/21 Wed 7/1/26 Sat 7/1/28 Mon 7/1/24 Thu 7/1/27 Sun 7/1/29 Wed 7/1/20 Wed 12/1/21 Sat 7/1/23 Wed 7/1/15 Wed 7/1/26 Thu 7/1/27 Wed 7/1/20 Fri 7/1/22 Tue 7/4/23 Fri 7/1/11 Wed 7/1/20 Thu 7/1/21 Tue 7/1/14 Fri 1/1/27 Sun 7/1/29 Fri 7/1/16 Mon 7/1/24 Tue 7/1/25 Tue 7/2/19 Wed 7/1/20 Sun 7/4/21 Wed 7/1/26 Sat 7/1/28 Sun 7/1/29 Mon 7/1/24 Sat 8/1/26 Thu 7/1/27 Sat 7/1/23 Sat 7/1/28 Sun 7/1/29 Sun 7/1/18 Sat 1/1/28 Wed 11/1/28 Fri 11/1/19 Thu 7/1/21 Fri 7/1/22 Mon 7/1/19 Wed 7/1/20 Thu 7/1/21 Sun 3/1/15 Sun 7/1/18 Thu 7/1/21
Thu 6/30/16 Fri 9/28/29 Thu 6/30/22 Fri 6/30/23 Sat 12/23/23 Tue 6/30/26 Fri 6/30/28 Wed 1/31/29 Wed 6/30/27 Sat 6/30/29 Sun 6/30/30 Tue 11/30/21 Fri 6/30/23 Mon 7/31/23 Tue 6/30/26 Wed 6/30/27 Wed 12/1/27 Thu 6/30/22 Fri 6/30/23 Sun 10/1/23 Tue 6/30/20 Wed 6/30/21 Sun 10/31/21 Thu 12/31/26 Sat 6/30/29 Mon 12/24/29 Sun 6/30/24 Mon 6/30/25 Thu 4/30/26 Tue 6/30/20 Wed 6/30/21 Fri 10/1/21 Fri 6/30/28 Sat 6/30/29 Sun 9/30/29 Fri 7/31/26 Wed 6/30/27 Thu 9/30/27 Fri 6/30/28 Sat 6/30/29 Mon 10/1/29 Fri 12/31/27 Tue 10/31/28 Sun 6/24/29 Wed 6/30/21 Thu 6/30/22 Sun 11/6/22 Tue 6/30/20 Wed 6/30/21 Fri 10/1/21 Sat 6/30/18 Tue 6/30/20 Tue 2/1/22
Plats
12
28
10
10
4
9
18
11
11
2
4
1
3
2
2
5
8
Proj. Mgr.
2021 2022 2023 2024 2025 Jul AugSepOctNovDecJanFebMarAprMayJun Jul AugSepOctNovDecJanFebMar AprMayJun Jul AugSepOctNovDecJanFebMarAprMayJun Jul AugSepOctNovDecJanFebMar AprMayJun Jul AugSepOctNovDecJanFebMarAprMayJun
Hunter Hunter Shaun Design Shaun Shaun Darin Darin Darin Shaun Shaun Shaun Owen Owen Owen Hunter Hunter Hunter Hunter Hunter Hunter Darin Design Darin Darin Shaun Shaun Shaun Darin Design Darin Darin Hunter Hunter Hunter Darin Darin Darin Owen Owen Owen Hunter Hunter Hunter Shaun Shaun Shaun Shaun Design Shaun Shaun Hunter Hunter Hunter Shaun Shaun Shaun
ROW Construction Design
Design ROW Construction Design
Design ROW Construction ROW Construction Design
ROW
ROW Construction
Design
Design
ROW Construction ROW Construction
Construction
Design P.E.R.
External Milestone
Manual Task
Manual Summary
External Tasks
ROW
Inactive Milestone
Duration-only
Start-only
External Milestone
Construction
Inactive Summary
Manual Summary Rollup
Finish-only
Deadline
3
Last Updated: Mon 4/6/20
CIP PROJECT TIMELINE ID 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207
Project Name
Sulphur Springs Rd @ Covington Sulphur Springs Rd @ Covington Sulphur Springs Rd @ Covington Sweeten Creek @ Buck Shoals Sweeten Creek @ Buck Shoals Sweeten Creek @ Buck Shoals Sweeten Creek @ Mills Gap Sweeten Creek @ Mills Gap Sweeten Creek @ Mills Gap Toxaway Street Toxaway Street Walnut Street @ N. Lexington Walnut Street @ N. Lexington Walnut Street @ Rankin Walnut Street @ Rankin Waynesville Ave. @ Brownwood Waynesville Ave. @ Brownwood Waynesville Ave. @ Brownwood West Crabapple Lane West Crabapple Lane West Crabapple Lane White Oak Road Wildwood Park Wildwood Park Homeland Park Homeland Park Homeland Park Old County Home Rd PSR Old County Home Rd PSR Old County Home Rd PSR Biological Treatment Biological Treatment Biological Treatment Carrier Bridge PS Replacement Carrier Bridge PS Replacement Carrier Bridge PS Replacement Collection System Master Plan Update Flow Monitoring Incinerator Polymer Sys. Replacement Mull Building HVAC Mull Building HVAC Plant High Rate Primary Treatment Plant High Rate Primary Treatment Solids Handling Capacity Improvement Solids Handling Capacity Improvement Weaverville PS Replacement Weaverville PS Replacement Weaverville PS Replacement
Note: Project durations are based on a 7 day week. Created by: Cheryl Rice
Project #
2014006 2014006 2014006 2014015 2014015 2014015 2014189 2014189 2014189 2019004 2019004 2017008 2017008 2014018 2014018 2014183 2014183 2014183 2014005 2014005 2014005 2015193 2015194 2015194 2016248 2016248 2016248 2015221 2015221 2015221 2016063 2016063 2016063 2019045 2019045 2019045 2020011 2008013 2019071 2018186 2018186 2015054 2015054 2019087 2019087 2019080 2019080 2019080
P. R.
44 44 44 51 51 51 16 16 16 51 51 42 42 42 42 33 33 33 67 67 67 3 27 27 48 48 48 67 67 67 0 0 0 0 0 0 500
0 0 0 0 0 0 0 0 0 0 0
Duration
Start
Finish
1826 days 365 days 123 days 2192 days 365 days 151 days 1096 days 730 days 214 days 366 days 184 days 365 days 309 days 1643 days 204 days 1188 days 639 days 244 days 1461 days 731 days 184 days 273 days 366 days 92 days 1736 days 577 days 62 days 1583 days 730 days 215 days 366 days 730 days 1096 days 550 days 546 days 638 days 365 days 4748 days 365 days 181 days 365 days 730 days 1096 days 365 days 365 days 730 days 550 days 731 days
Wed 7/1/20 Tue 7/1/25 Wed 7/1/26 Wed 7/1/15 Thu 7/1/21 Fri 7/1/22 Sat 7/1/17 Wed 7/1/20 Fri 7/1/22 Mon 7/1/19 Thu 7/1/21 Mon 7/1/24 Wed 7/1/26 Fri 1/1/16 Wed 7/1/20 Sat 7/1/23 Thu 10/1/26 Sat 7/1/28 Wed 7/1/15 Mon 7/1/19 Thu 7/1/21 Thu 10/1/20 Wed 7/1/15 Sun 7/1/29 Wed 3/1/17 Wed 12/1/21 Sat 7/1/23 Wed 3/1/17 Thu 7/1/21 Fri 7/1/22 Sat 7/1/23 Mon 7/1/24 Wed 7/1/26 Mon 7/1/19 Fri 1/1/21 Fri 7/1/22 Thu 7/1/21 Tue 7/1/08 Wed 7/1/20 Tue 1/1/19 Wed 7/1/20 Fri 7/1/16 Sun 7/1/18 Thu 7/1/21 Fri 7/1/22 Wed 7/1/20 Fri 7/1/22 Sat 7/1/23
Mon 6/30/25 Tue 6/30/26 Sat 10/31/26 Wed 6/30/21 Thu 6/30/22 Mon 11/28/22 Tue 6/30/20 Thu 6/30/22 Mon 1/30/23 Tue 6/30/20 Fri 12/31/21 Mon 6/30/25 Wed 5/5/27 Tue 6/30/20 Wed 1/20/21 Wed 9/30/26 Fri 6/30/28 Thu 3/1/29 Sun 6/30/19 Wed 6/30/21 Fri 12/31/21 Wed 6/30/21 Thu 6/30/16 Sun 9/30/29 Tue 11/30/21 Fri 6/30/23 Thu 8/31/23 Wed 6/30/21 Fri 6/30/23 Tue 1/31/23 Sun 6/30/24 Tue 6/30/26 Sat 6/30/29 Thu 12/31/20 Thu 6/30/22 Fri 3/29/24 Thu 6/30/22 Wed 6/30/21 Wed 6/30/21 Sun 6/30/19 Wed 6/30/21 Sat 6/30/18 Wed 6/30/21 Thu 6/30/22 Fri 6/30/23 Thu 6/30/22 Mon 1/1/24 Mon 6/30/25
Plats
20
4
5
47
12 3
19
16
1
21
Proj. Mgr.
2021 2022 2023 2024 2025 Jul AugSepOctNovDecJanFebMar AprMayJun Jul AugSepOctNovDecJanFebMarAprMayJun Jul AugSepOctNovDecJanFebMarAprMayJun Jul AugSepOctNovDecJanFebMarAprMayJun Jul AugSepOctNovDecJanFebMarAprMayJun
Darin Darin Darin Hunter Design Hunter Hunter Shaun Shaun Shaun Shaun Design Shaun Darin Darin Shaun Shaun Construction Shaun Shaun Shaun Darin Darin ROW Darin Darin ROW Hunter Hunter Owen Owen Owen Shaun Shaun Shaun Hunter Hunter Hunter Darin Darin Darin Hunter Shaun Construction Hunter Construction Owen Owen Construction Hunter Hunter Hunter Hunter Hunter Hunter Hunter
Design
ROW Construction ROW Construction Construction Design
Design
Construction
ROW Construction ROW Construction
Pre. Eng. Rep.
ROW Construction Design
Design Design
Construction ROW
Design P.E.R.
External Milestone
Manual Task
Manual Summary
External Tasks
ROW
Inactive Milestone
Duration-only
Start-only
External Milestone
Construction
Inactive Summary
Manual Summary Rollup
Finish-only
Deadline
4
Last Updated: Mon 4/6/20
—
Interceptor & Wet Weather Projects
A VE
DR
TO CLIF
N AV
E
AB Tech Equalization Tank Project No. 2019047
AMBOY RD
T
/
W RVIE RIVE
JOY N ER
S AN NOT TO SCALE
SW AY
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
FAC ILIT IE
LYM
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
AB Tech Equalization Tank
LOCATION:
Asheville
TYPE:
Treatment Plant
PIPE RATING:
N/A
PROJECT NO.
2019047
TOTAL LF:
0
PROJECT BUDGET:
$14,250,000.00
PROJECT ORIGIN:
CDM Preliminary Engineering Report
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN
$1,250,000.00
55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$12,500,000.00
55430 - CONST. CONTRACT ADM.
$500,000.00
55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
$14,250,000.00
$0.00
ENGINEER:
CDM
HC
R.O.W. ACQUISITION:
N/A
# PLATS: [ 0 ]
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY 22 - 30 FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM.:
TBD
FY 23-24
$0.00
INSPECTION:
TBD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
FY 27-28
$0.00
FY 28-29
$0.00
FY 29-30
$0.00
This project is to implement the recommendations of the French Broad/Carrier Bridge Preliminary Engineering Report. This project will help mitigate wet weather impacts to the French Broad Interceptor by shaving peak wet weather flows. Equalizing flow will help reduce SSOs and prevent inundation and surcharging of downstream infrastructure, including the treatment plant. This is a future project. PROJECT DESCRIPTION:
SPECIAL PROJECT NOTES:
CH R D
BO TA N
YD R
AVERY LN
LN
RD U SA
O NO
RD
EL
KE
N
D
R ST
SP
O
E UP
ER
RD
OV GC N I R
PINE
TR E
D
NOT TO SCALE
DALYA RD
I40 W I40 E SLEEPY HOLLOW LN
WY
W IL S O N RD
W
BU
BUCKEYE ACCESS RD
N
EY CK
AN D
of BUNCOMBE COUNTY, NORTH CAROLINA
Budget Map
R
ALDON DR
L KEN
D ER
REGER AVE GREAT LAUREL DR
METROPOLITAN SEWERAGE DISTRICT
GOOSE CREEK RD
0H US 7
E DR W AR RE RD ALEM NEW S
RD GLEN CABLE
Christian Creek Interceptor Project No. 2011110
S IGG BR
TU
N
R RD
/
MO
SNEAKING CREEK
LN
EN S
STE V
RD MOFFITT NOLL DR E RIV R K
FFIT T BR AN
DR
E RD
A E IDG LR
B
PORTE RS CO V
LN TEEM S
L ER R Y TR
RW AY SY LVE ST E
EASTM OOR D R
DIN RED B
R CA
S
CREEK RD
M JI H NC A R
CHRISTIA N
YOW DR
WITS END TRL
ROWLAND RD
ON RD BURLES
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Christian Creek Interceptor
LOCATION:
Buncombe County
TYPE:
Interceptor
PIPE RATING:
24
PROJECT NO.
2011110
TOTAL LF:
12,226
PROJECT BUDGET:
$5,869,424.00
PROJECT ORIGIN:
SSO's, Line Condition, Undersized
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$30,079.00
$30,079.00
$41,660.00
$17,660.00
55330 - DESIGN 55340 - PERMITS
$24,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$27,115.00
$27,115.00
55370 - LEGAL FEES
$55,000.00
$44,411.00
$200,000.00
$85,427.00
$10,000.00
$3,000.00
55410 - CONDEMNATION
$40,000.00
$859.00
$39,141.00
55420 - CONSTRUCTION
$5,425,570.00
$570.00
$3,617,000.00
$589.00
$10,589.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL
$114,573.00 $2,000.00
$5,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$9,000.00
55450 - SURVEY - ASBUILT
$6,000.00
$31,000.00
TOTAL AMOUNT
$5,869,424.00
$209,121.00
$26,589.00
$3,792,303.00 8200
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [ 27
ESTIMATED BUDGETS - FY 22 - 30 ]
CONTRACTOR:
FY 21-22
$1,842,000.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
of Asheville. The project includes the replacement of approximately 12,226 LF of existing 8-inch VCP FY 27-28
$0.00
sewer pipe with new 8-inch, 12-inch, and 16-inch DIP. The existing lines serve a large collection area and FY 28-29 are undersized. Additionally, they are in poor structural condition and have experienced multiple SSO's.
$0.00
PROJECT DESCRIPTION: This project is located along Christian Creek, between US 70 Hwy and I-40, east
FY 29-30
SPECIAL PROJECT NOTES:
8200 LF in FY 20/21; 4026 LF in FY21/22
$0.00
W IE V ER
/
DR
H DR
Lower Swannanoa Interceptor Project No. 2004040
WINERY RD
MEADOW RD
TE C DE
NOT TO SCALE
ST U NT CI R
CIR TANS
TC
OT
E
DR
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
EA S
G LOD
HUNTSMAN PL
E ST
METROPOLITAN SEWERAGE DISTRICT
P AP
T
RD
LS
CH OA
OW EL
R
MC D
T DU NS SAIN
V RI
AMBOY RD
ST
DE
N LYMA RST DR
VA N
U FERNIH
T
RD
R VICTO
R W DO LS
RB ILT
O SH C TM EL
IA RD
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Lower Swannanoa Interceptor
LOCATION:
Asheville
TYPE:
Interceptor
PIPE RATING:
9
PROJECT NO.
2004040
TOTAL LF:
6,500
PROJECT BUDGET:
$6,822,717.00
PROJECT ORIGIN:
WW SSO's at Splitter box
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$47,379.00
55330 - DESIGN
$20,000.00
55340 - PERMITS
$10,000.00
$14,879.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$3,000.00
55370 - LEGAL FEES
$5,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$20,000.00
55400 - APPRAISAL
$2,500.00
55410 - CONDEMNATION 55420 - CONSTRUCTION
$6,688,588.00
$188,588.00
$10,000.00
$250.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT
$16,250.00
TOTAL AMOUNT
$6,822,717.00
$203,717.00
ENGINEER:
MSD
EB/HC
R.O.W. ACQUISITION:
MSD
# PLATS: [ 2 ]
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY 22 - 30 FY 21-22
$32,500.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$33,000.00
INSPECTION:
MSD
FY 24-25
$27,500.00
FY 25-26
$3,255,000.00
FY 26-27
$3,271,250.00
PROJECT DESCRIPTION: This project is to eliminate problems associated with the splitter box and the FY 27-28
$0.00
downstream twin 36-inch lines.
SPECIAL PROJECT NOTES:
FY 28-29
$0.00
FY 29-30
$0.00
This portion of line is also included in the SFB/Carrier Bridge PER project.
/
Mud Creek Interceptor Phase 3 Project No. 2020010 NOT TO SCALE
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Mud Creek Interceptor - Ph. 3
LOCATION:
Henderson County
TYPE:
Interceptor
PIPE RATING:
NA
PROJECT NO.
2020010
TOTAL LF:
9,200
PROJECT BUDGET:
$4,254,500.00
PROJECT ORIGIN:
CCWSD FY19 Drainage Basin Study
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$46,000.00
$46,000.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$10,500.00
55370 - LEGAL FEES
$15,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$300,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$3,850,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$10,000.00
55450 - SURVEY - ASBUILT
$23,000.00
TOTAL AMOUNT
$4,254,500.00
$0.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [ 14 ]
CONTRACTOR:
$0.00
$46,000.00
ESTIMATED BUDGETS - FY 22 - 30 FY 21-22
$0.00
FY 22-23
$10,500.00
CONSTRUCTION ADM:
MSD
FY 23-24
$315,000.00
INSPECTION:
MSD
FY 24-25
$3,883,000.00
FY 25-26
$0.00
FY 26-27
$0.00
PROJECT DESCRIPTION: This project consists of approximately 9,200 LF of 18-inch and 24-inch pipe that will extend gravity sewer along Mud Creek to the Mountain Home Industrial Park. The extension will FY 27-28 allow for the abandonment of an existing CCWSD pump station that connects to the City of Hendersonville FY 28-29 system and the abandonment of several private pump stations. FY 29-30
SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
/
South French Broad Relief Interceptor Project No. 2017070 NOT TO SCALE
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
South French Broad Relief Int.
LOCATION:
Buncombe County
TYPE:
Interceptor
PIPE RATING:
N/A
PROJECT NO.
2017070
TOTAL LF:
36,330
PROJECT BUDGET:
$31,258,500.00
PROJECT ORIGIN:
2001 WW System Master Plan (CDM)
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$94,300.00
$95,000.00
$700.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES
$50,000.00
55360 - EASEMENT PLATS
$50,000.00
$8,500.00
55370 - LEGAL FEES
$15,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$500,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$30,500,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$40,000.00
55450 - SURVEY - ASBUILT
$50,000.00
TOTAL AMOUNT
$31,258,500.00
$94,300.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [ 8 ]
CONTRACTOR:
$700.00
$50,000.00
ESTIMATED BUDGETS - FY 22 - 30 FY 21-22
$0.00
FY 22-23
$8,500.00
CONSTRUCTION ADM:
MSD
FY 23-24
$515,000.00
INSPECTION:
MSD
FY 24-25
$7,635,000.00
FY 25-26
$7,635,000.00
PROJECT DESCRIPTION: This project is to implement the recommendations of the French Broad/Carrier FY 26-27
$7,635,000.00
Bridge Preliminary Engineering Report. This project includes paralleling the existing 36-inch interceptor FY 27-28 from Dingle Creek north to Hominy Creek with a new 36-inch interceptor. It also includes installing a new 60-inch interceptor between Hominy Creek and Carrier Bridge PS. The new interceptor will provide relief to FY 28-29 the existing system during wet weather. FY 29-30 SPECIAL PROJECT NOTES:
This project is currently phased over four years.
$7,685,000.00 $0.00 $0.00
RY R
D
/
WI NE
RD
Swannanoa Equalization Tank Project No. 2019046
ME
AD OW
NOT TO SCALE
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Swannanoa Equalization Tank
LOCATION:
Swannanoa
TYPE:
Wet Weather
PIPE RATING:
N/A
PROJECT NO.
2019046
TOTAL LF:
0
PROJECT BUDGET:
$22,556,500.00
PROJECT ORIGIN:
CDM Preliminary Engineering Report
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$15,000.00
55330 - DESIGN
$15,000.00
$2,100,000.00
55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES
$1,500.00
$1,500.00
$10,000.00
$6,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$2,000,000.00
55400 - APPRAISAL
$5,000.00
$5,000.00
55410 - CONDEMNATION 55420 - CONSTRUCTION
$17,500,000.00
55430 - CONST. CONTRACT ADM.
$875,000.00
55440 - TESTING
$50,000.00
55450 - SURVEY - ASBUILT TOTAL AMOUNT
$22,556,500.00
$0.00
ENGINEER:
TBD
HC
R.O.W. ACQUISITION:
N/A
# PLATS: [ 0 ]
CONTRACTOR:
$0.00
$27,500.00
ESTIMATED BUDGETS - FY 22 - 30 FY 21-22
$2,004,000.00
FY 22-23
$700,000.00
CONSTRUCTION ADM.:
TBD
FY 23-24
$1,400,000.00
INSPECTION:
TBD
FY 24-25
$9,212,500.00
FY 25-26
$9,212,500.00
FY 26-27
$0.00
FY 27-28
$0.00
FY 28-29
$0.00
FY 29-30
$0.00
This project is to implement the recommendations of the French Broad/Carrier Bridge Preliminary Engineering Report. This project will help mitigate wet weather impacts to the Swannanoa Interceptor by shaving peak wet weather flows. Equalizing flow will help reduce SSOs and prevent inundation and surcharging of downstream infrastructure, including the treatment plant. The estimated costs shown are planning level only, and incorporate a new 8.1MG EQ tank, 16MGD pump station and associate piping. PROJECT DESCRIPTION:
SPECIAL PROJECT NOTES:
Proposed tank location is off of Meadow Rd. at the old Norfolk Southern roundhouse.
—
General Sewer Rehabilitation Projects
/
WATERS R D
N WI
R SP
T
L LN
C LGAR
SPRUCE HIL
LC
A TRAF
PL
IL EH
TH
UC
OR KW
IR
NOT TO SCALE
Albemarle Commons Pump Staion Elimination Project No. 2018171
R TRAFALGAR CI
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Albemarle Commons PS Elimination
LOCATION:
Asheville
TYPE:
General Capital Improvements
PIPE RATING:
N/A
PROJECT NO.
2018171
TOTAL LF:
832
PROJECT BUDGET:
$274,130.00
PROJECT ORIGIN:
PS Elimination
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$3,130.00
$3,130.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$2,500.00
55370 - LEGAL FEES
$3,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$20,000.00
55400 - APPRAISAL
$2,500.00
55410 - CONDEMNATION
$10,000.00
55420 - CONSTRUCTION
$230,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT
$3,000.00
TOTAL AMOUNT
$274,130.00
$3,130.00
ENGINEER:
MSD
OH
R.O.W. ACQUISITION:
MSD
# PLATS: [ 2
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY 22 - 30 ]
FY 21-22
$38,000.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$233,000.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
PROJECT DESCRIPTION: This project is located in East Asheville just off Winkworth Pl. at MSD’s Albemarle FY 27-28 Commons Pump Station. This project will eliminate the existing pump station by installing approximately 832 FY 28-29 LF of 8-inch DIP gravity line. FY 29-30 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
CLAYTON ST
ST
/
CHARLOTTE
I240 W
TO CHA RLOTT
E ST
Arlington Street at Furman Avenue Project No. 2020021
I240 E
I240 W
ARLINGTON ST
NOT TO SCALE
FURMAN AVE FURMAN CT
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
FURMAN CT
ARLINGTON ST
OAK PARK RD
METROPOLITAN SEWERAGE DISTRICT
FURMAN AVE
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Arlington St. @ Furman Ave.
LOCATION:
Asheville
TYPE:
General Capital Improvements
PIPE RATING:
24
PROJECT NO.
2020021
TOTAL LF:
310
PROJECT BUDGET:
$130,000.00
PROJECT ORIGIN:
CSR's, Location, Root Intrusion
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$5,000.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$1,500.00
55370 - LEGAL FEES
$2,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$9,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$110,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$1,500.00
TOTAL AMOUNT
$130,000.00
$0.00
ENGINEER:
MSD
OH
R.O.W. ACQUISITION:
MSD
# PLATS: [ 1 ]
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY 22 - 30 FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$5,000.00
This project consists of approximately 240 LF of existing 8-inch VCP to be re-aligned and replaced with 310 LF of 8-inch FY 27-28 DIP. The existing 8-inch VCP system is having frequent service calls and is located directly underneath dwellings which FY 28-29 would prohibit future rehab or emergency repairs. FY 29-30
$0.00
PROJECT DESCRIPTION: This project is located in Asheville crossing beneath several houses fronting Arlington St.
SPECIAL PROJECT NOTES:
$12,500.00 $112,500.00
HOAL
TRADE ST
L MAPLE
NOT TO SCALE
T POND S
N
LANCE LN
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
T
METROPOLITAN SEWERAGE DISTRICT
S ATKINS
RD
Atkins Street Project No. 2014012
S RD
LOVER
LE ONVIL
/
S LONG
RS HENDE
S LN
IR MIAMI C
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Atkins Street
LOCATION:
Arden
TYPE:
General Sewer Rehab.
PIPE RATING:
39
PROJECT NO.
2014012
TOTAL LF:
1,833
PROJECT BUDGET:
$698,330.00
PROJECT ORIGIN:
SSO's, Work Orders, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$5,480.00
$5,480.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$2,250.00
55370 - LEGAL FEES
$4,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$48,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$632,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$4,600.00
TOTAL AMOUNT
$698,330.00
$5,480.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [ 3
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY 22 - 30 ]
FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$2,250.00
FY 26-27
$52,000.00
PROJECT DESCRIPTION: This project is located in Arden just north of Lake Julian. Approximately 1,833 LF of existing 6-inch vitrified clay pipe will be replaced with new 8-inch ductile iron pipe. The FY 27-28 existing sewer line is in poor condition due to roots, fractures, and sags in the line. The line is undersized FY 28-29 and has flooded houses in the area. FY 29-30
SPECIAL PROJECT NOTES:
$638,600.00 $0.00 $0.00
RA RO
LL HI D EN E AL RD
Aurora Drive Project No. 2017145 NOT TO SCALE
KE
RTH WO NIL
DR E BOR ALIS
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
S KNL
METROPOLITAN SEWERAGE DISTRICT
L RD
/
DR RD
ALE
A OR
RIN GD
R AU
RTH RD
AU R HE C AT UC
KENILW O
A BE
SP
E TUNN
RD
LN
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Aurora Drive
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
53
PROJECT NO.
2017145
TOTAL LF:
2,605
PROJECT BUDGET:
$1,183,000.00
PROJECT ORIGIN:
Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$10,000.00
$4,640.00
$5,360.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$4,000.00
55370 - LEGAL FEES
$8,000.00
$8,000.00
$40,000.00
$40,000.00
$4,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL
$2,500.00
$2,500.00
55410 - CONDEMNATION
$10,000.00
$10,000.00
55420 - CONSTRUCTION
$1,100,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$6,500.00
TOTAL AMOUNT
$1,183,000.00
$4,640.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [ 7
CONTRACTOR:
$9,360.00
$60,500.00
ESTIMATED BUDGETS - FY 22 - 30 ]
FY 21-22
$1,108,500.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
PROJECT DESCRIPTION: This project runs along Aurora Drive in the Kenilworth area of Asheville. The project begins on Aurora Drive, runs through several properties, and ends on Springdale Rd. The FY 27-28 existing 6-inch clay pipes have structural defects, heavy root intrusion, and deteriorating manholes. All FY 28-29 of these problems contribute to I/I issues. FY 29-30
SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
W NE
C RO
D OO W K
RD
RO
S
T ET
A
CU
TS H
AW
DR
W
C A NV AS
CT
SS NE CIR I S BU ARK P
Beale Road at Copney Lane Project No. 2009129
BUS INE PAR SS K CIR
ED MILLS DR
VIE EN GL PL
DR
D
GLENN BRIDGE RD
R ER
EY L N
NOT TO SCALE
ROLL INS DR
Budget Map
METROPOLITAN SEWERAGE DISTRICT of BUNCOMBE COUNTY, NORTH CAROLINA
RD
/
Y DR EK E CR RL T
EFF
N IE L
N ICA
AN IC T C
CK DU
COP N AY W
R
E RD
KR S AU
BEA L
N JO
SH
GLENN WILLOW D
D OL LS OA
LN
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Beale Road at Copney Lane
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
47
PROJECT NO.
2009129
TOTAL LF:
4,027
PROJECT BUDGET:
$1,572,925.00
PROJECT ORIGIN:
SSO's, Access, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$15,725.00
$15,725.00
55330 - DESIGN 55340 - PERMITS
$1,200.00
$1,200.00
55360 - EASEMENT PLATS
$15,000.00
$15,000.00
55370 - LEGAL FEES
$17,000.00
55350 - SPECIAL STUDIES
55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL
$15,000.00
$36,000.00
$20,000.00
$140,000.00
$90,000.00
$5,000.00
55410 - CONDEMNATION
$20,000.00
55420 - CONSTRUCTION
$1,310,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$3,000.00
55450 - SURVEY - ASBUILT
$10,000.00
TOTAL AMOUNT
$1,572,925.00
$15,725.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
Consultant
# PLATS: [ 16 ]
CONTRACTOR:
$16,200.00
$125,000.00
ESTIMATED BUDGETS - FY 22 - 30 FY 21-22
$93,000.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$1,323,000.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
It serves several major FY 27-28
$0.00
PROJECT DESCRIPTION: This project ties into the Lake Julian Ph. 4 project just west of Glen Bridge Road
and extends northward to Ducker Road and Lower Glen Bridge Road. manufacturing sites. The lines are in poor condition with broken segments and leaking joints, have FY 28-29 experienced SSO's, and are difficult to access for maintenance and repairs. FY 29-30
SPECIAL PROJECT NOTES:
$0.00 $0.00
HE
AMHERST RD
/
RD
NVIL LE
NDE RSO
RD UN DT OP
MILL STON E
DR
MAGNUM WAY
Bellevue Road Project No. 2015175
RO
LE AN HURST RD
NOT TO SCALE
E BELLEVU
RD
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
JAN DR
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Bellevue Road
LOCATION:
S. Asheville
TYPE:
General Sewer Rehab
PIPE RATING:
49
PROJECT NO.
2015175
TOTAL LF:
1,100
PROJECT BUDGET:
$503,600.00
PROJECT ORIGIN:
Work Orders, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$9,600.00
$9,600.00
55330 - DESIGN 55340 - PERMITS
$5,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$7,000.00
55370 - LEGAL FEES
$7,000.00
$10,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$30,000.00
55400 - APPRAISAL
$3,000.00
55410 - CONDEMNATION
$10,000.00
55420 - CONSTRUCTION
$425,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$3,000.00
TOTAL AMOUNT
$503,600.00
$9,600.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [ 9
CONTRACTOR:
$0.00
$7,000.00
ESTIMATED BUDGETS - FY 22 - 30 ]
FY 21-22
$58,000.00
FY 22-23
$429,000.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
PROJECT DESCRIPTION: This project is located in South Asheville along properties on Bellevue Road, FY 27-28
$0.00
and will replace 1,100 LF of 6-inch VCP and PVC. The existing line is in poor condition and has too many FY 28-29 point repairs. FY 29-30 SPECIAL PROJECT NOTES:
$0.00 $0.00
RD
Bent Tree Road Project No. 2016102 NOT TO SCALE
LN
Budget Map
METROPOLITAN SEWERAGE DISTRICT of BUNCOMBE COUNTY, NORTH CAROLINA
R
/
T DR
RD
SUNS E
OL L OL DT
RD
TR E E
ES
OKE E
S
CR D O O W T
CHE R
RD
RD D TW OO CR E
BENT
ND
BLUE BRIA R
S WE E AV TH
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Bent Tree Road
LOCATION:
Asheville
TYPE:
General Sewer Rehab
PIPE RATING:
60
PROJECT NO.
2016102
TOTAL LF:
1,654
PROJECT BUDGET:
$855,500.00
PROJECT ORIGIN:
SSO's, Work Orders, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$8,000.00
$8,000.00
55360 - EASEMENT PLATS
$4,500.00
$4,500.00
55370 - LEGAL FEES
$7,000.00
$1,107.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES
$3,893.00
$2,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$65,000.00
$65,000.00
$5,000.00
$5,000.00
55410 - CONDEMNATION
$20,000.00
$20,000.00
55420 - CONSTRUCTION
$740,000.00
55400 - APPRAISAL
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$5,000.00
TOTAL AMOUNT
$855,500.00
$13,607.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [ 5
CONTRACTOR:
$3,893.00
$92,000.00
ESTIMATED BUDGETS - FY 22 - 30 ]
FY 21-22
$746,000.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
PROJECT DESCRIPTION: This project runs adjacent to Bent Tree Rd. in Asheville. It begins on Old Toll FY 27-28
$0.00
Rd., crosses Bent Tree Rd., and ends at Crestwood Rd. There are numerous structural problems and FY 28-29 bends within the lines which contribute to I/I issues. FY 29-30 SPECIAL PROJECT NOTES:
$0.00 $0.00
CREEK
DR
CAMPBEL L
GATEHOUSE CT
CIR
Braddock Way - PRP 20002 Project No. 2006025
AY KW
/
CARSO N
E ET
EK
L
NOT TO SCALE
CLUBHOUSE CT
BA
LA
R NT
EE
R
PARK AVE
D
PARK RIDGE CT
E SW
RE NC
GARDENWOOD LN
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
CREEKSIDE CT
A BR OC DD
RD
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Braddock Way - PRP 20002
LOCATION:
Asheville
TYPE:
Pipe Rated Projects
PIPE RATING:
36
PROJECT NO.
2006025
TOTAL LF:
3,848
PROJECT BUDGET:
$1,680,940.00
PROJECT ORIGIN:
Pipe Rating Program
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$18,190.00
$18,190.00
55330 - DESIGN 55340 - PERMITS
$1,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$37,500.00
55370 - LEGAL FEES
$26,000.00
55380 - ACQUISITION SERVICES
$56,250.00
55390 - COMPENSATION
$76,000.00
$163.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$1,450,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$3,500.00
55450 - SURVEY - ASBUILT
$12,500.00
TOTAL AMOUNT
$1,680,940.00
$18,353.00
ENGINEER:
MSD
OH
R.O.W. ACQUISITION:
MSD
# PLATS: [ 25 ]
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY 22 - 30 FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM.:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
PROJECT DESCRIPTION: This project will replace, line, and pipe burst several existing sewer mains in
FY 25-26
$38,500.00
FY 26-27
$158,087.00
Park Avenue and Braddock Way subdivisions. Problems with these lines include leaking joints, broken FY 27-28 pipes and high inflow and infiltration. In some areas, the existing lines will be relocated from private FY 28-29 property to public rights of way for better access and maintenance. FY 29-30
SPECIAL PROJECT NOTES:
$0.00 $1,466,000.00 $0.00
Bryson Street Project No. 2016167
VE
/
A ORE
MEADOW RD
BILTM NOT TO SCALE
BR YS ON
ST
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Bryson Street
LOCATION:
Biltmore Village
TYPE:
General Sewer Rehab.
PIPE RATING:
N/A
PROJECT NO.
2016167
TOTAL LF:
210
PROJECT BUDGET:
$203,300.00
PROJECT ORIGIN:
Work Orders, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$202,000.00
$202,000.00
$1,000.00
$1,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT
$300.00
TOTAL AMOUNT
ENGINEER:
$300.00
$203,300.00
MSD
R.O.W. ACQUISITION:
$0.00
SA # PLATS: [ 0
CONTRACTOR:
$0.00
$203,300.00
ESTIMATED BUDGETS - FY 22 - 30 ]
FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM.:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
PROJECT DESCRIPTION: This project is a high priority project in Biltmore Village, at the intersection of FY 27-28
$0.00
Bryson St and Biltmore Ave. It will replace a failing 4-inch PVC line serving multiple businesses with a 210 FY 28-29 LF 8-inch DIP line. FY 29-30 SPECIAL PROJECT NOTES:
$0.00 $0.00
BU
C
H
OR BILTM
PL
AN
A
N
Buchanan Avenue Project No. 2014023
WHITE FAW N
A VE
/
AN HAN BUC
PL
ST NOT TO SCALE
FLORENC E
E WHIT N DR FAW
E A VE
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Buchanan Ave.
LOCATION:
Asheville
TYPE:
Pipe Rated Projects
PIPE RATING:
51
PROJECT NO.
2014023
TOTAL LF:
2,255
PROJECT BUDGET:
$1,122,900.00
PROJECT ORIGIN:
Work Orders, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$28,000.00
$15,975.00
$12,025.00
55330 - DESIGN 55340 - PERMITS
$1,000.00
$1,000.00
55360 - EASEMENT PLATS
$5,900.00
$5,400.00
55370 - LEGAL FEES
$4,000.00
$4,000.00
$70,000.00
$70,000.00
55350 - SPECIAL STUDIES $500.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL
$2,500.00
$2,500.00
55410 - CONDEMNATION
$10,000.00
$10,000.00
55420 - CONSTRUCTION
$997,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$2,500.00
TOTAL AMOUNT
$1,122,900.00
$15,975.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [ 3
CONTRACTOR:
$18,425.00
$87,000.00
ESTIMATED BUDGETS - FY 22 - 30 ]
FY 21-22
$0.00
FY 22-23
$1,001,500.00
CONSTRUCTION ADM.:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
PROJECT DESCRIPTION: This project is located in downtown Asheville near Biltmore Ave. and is FY 27-28 comprised of 2,228 LF of 8-inch ductile iron pipe. The existing line is 6-inch clay with heavy root intrusion, FY 28-29 fractures, and one section exposed along a steep grade. FY 29-30 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
G
T BIL
RE MO
AV
E
ILW PL OOD
CASTLE ST
Caledonia Road Project No. 2014153
E
RD
NG
PA R
RD
NOT TO SCALE
M RD
K
PELH A
BO W LI
LS
T
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
RD
/
KE N
L CA
A NI O D
EL W LO
E
LIN EB RO CIR
E
AV
UN A
DI L
LA
UNADILLA ALY
RD DON IA CAL E
L CA A NI DO
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Caledonia Road
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
65
PROJECT NO.
2014153
TOTAL LF:
1,225
PROJECT BUDGET:
$1,302,850.00
PROJECT ORIGIN:
SSO's, Work Orders, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$10,000.00
$9,800.00
$200.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$1,500.00
55370 - LEGAL FEES
$4,000.00
$1,500.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$65,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$1,210,000.00
$351,000.00
$4,000.00
$2,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT
$8,350.00
TOTAL AMOUNT
$2,600.00
$1,302,850.00
$9,800.00
$355,800.00
$1,500.00
1066 ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [ 2
CONTRACTOR:
ESTIMATED BUDGETS - FY 22 - 30 ]
FY 21-22
$69,000.00
FY 22-23
$866,750.00
CONSTRUCTION ADM.:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
PROJECT DESCRIPTION: This project is located at the Caledonia Rd. entrance to the Kenilworth neighborhood, approx. 0.3 mile south of the Mission Hospital campus. The project includes replacement FY 27-28 of approx. 2,291 LF of 8-inch VCP pipe with new 8-inch DIP. The existing pipe has structural defects FY 28-29 which have resulted in multiple SSO's. FY 29-30
SPECIAL PROJECT NOTES:
This project overlaps with Biltmore WW (CDM #3, MSD Project# 2001192), which is a Non-Critical project.
$0.00 $0.00 $0.00
E
40
O I2
/
BR O
AD WA Y
ST T
I240
ERR
IMO N AV E
I240 W
ELM ST
ORANGE ST
I240 E
AVE CENTRA L
Central Avenue at I-240 Project No. 2014180
I240E BROADWAY ST TO
WT OM
Y ST
S LIBERT
NOT TO SCALE
ORCHARD ST
E TO
W
CHA R
I 240
LOT
TE S
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
I240
TO ST
T
METROPOLITAN SEWERAGE DISTRICT
D HAR ORC
CLAYTON ST
PL ORCHAR D
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Central Ave. @ I-240
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
35
PROJECT NO.
2014180
TOTAL LF:
990
PROJECT BUDGET:
$429,500.00
PROJECT ORIGIN:
SSO's, Work orders, Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$5,000.00
55330 - DESIGN 55340 - PERMITS
$1,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$1,000.00
55370 - LEGAL FEES
$1,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$50,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$370,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$500.00
TOTAL AMOUNT
$429,500.00
$0.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [ 1
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY 22 - 30 ]
FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM.:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$5,000.00
PROJECT DESCRIPTION: This project is located in downtown Asheville near Woodfin St. and is FY 27-28 comprised of 990 LF of 12-inch ductile iron pipe. The existing line is 6, 10, and 12-inch vitrified clay pipe FY 28-29 with a history of SSO's.
$50,000.00
FY 29-30
$371,500.00
SPECIAL PROJECT NOTES:
$3,000.00
/
DAYT ON RD
RD AM
Chatham Road Project No. 2015019
CH AT H
SALEM AVE
NOT TO SCALE
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
R
METROPOLITAN SEWERAGE DISTRICT
CLEARVIEW TE
D
CL MER RIM ON
OLL R OOD KN EDGEW
ER WT EA R VIE A VE
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Chatham Road
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
43
PROJECT NO.
2015019
TOTAL LF:
1,330
PROJECT BUDGET:
$648,700.00
PROJECT ORIGIN:
Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$4,800.00
$4,800.00
55330 - DESIGN 55340 - PERMITS
$1,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$3,500.00
55370 - LEGAL FEES
$4,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$45,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$588,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$1,400.00
TOTAL AMOUNT
$648,700.00
$4,800.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [ 4 ]
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY 22 - 30 FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$1,000.00
FY 25-26
$52,500.00
FY 26-27
$590,400.00
This project is located in North Asheville near W.T. Weaver Blvd. and is FY 27-28 comprised of 1,450 LF of 8-inch ductile iron pipe. The existing line is 6-inch vitrified clay pipe in poor FY 28-29 condition with heavy root intrusion. PROJECT DESCRIPTION:
FY 29-30 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
ER G
UD
PL
PL
CE LI A
CLYDE ST
ST
PL
RO KE ER D
Cherokee Road Project No. 2009132
BLAIR S T
CH E
D
/
HILLSIDE ST
LENNOX
EDWIN
BOND ST
OAK
LN
CAN T ERB
NOT TO SCALE
URY RD N
E NS
TD
R
LA N D RD
SU
WOO D RD
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
FAIRMON T
TR
N CRE SCENT ST
TTE S T
CHARLO
E AV LE R D
CROSS BANBUR Y E PL
NT RD FAIRM O
E
T
K OC RD ALBEMA R
T
DR ALBEMAR L
OR AR CH VON RUCK C
MU
XC
A D R
LE
O NN
R R VON RUCK TE
R TE CE
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Cherokee Road
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
48
PROJECT NO.
2009132
TOTAL LF:
1,960
PROJECT BUDGET:
$867,680.00
PROJECT ORIGIN:
SSO's, Access, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$15,680.00
$15,680.00
55330 - DESIGN 55340 - PERMITS
$500.00
$500.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$9,500.00
55370 - LEGAL FEES
$8,250.00
$250.00
$1,000.00
$23,930.00
$750.00
$1,000.00
$10,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$150,000.00
55400 - APPRAISAL
$6,000.00
55410 - CONDEMNATION
$20,000.00
55420 - CONSTRUCTION
$650,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$5,000.00
TOTAL AMOUNT
$867,680.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [ 10
ESTIMATED BUDGETS - FY 22 - 30 ]
CONTRACTOR:
FY 21-22
$186,000.00
FY 22-23
$656,000.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
the Macon Ave. @ Sunset Parkway project to an existing manhole east of Cambridge Road in North FY 27-28
$0.00
Asheville. The line is old vitrified clay pipe and is in very poor condition. Several segments are under FY 28-29 houses, walls, or other physical features which make repairs very difficult.
$0.00
PROJECT DESCRIPTION: This project will replace (or pipe burst) the existing sewer main from the end of
FY 29-30
SPECIAL PROJECT NOTES:
$0.00
BROOK H A VEN DR
MBLY DR
LN
D LN
Chestnut Lodge Road Project No. 2014016
FORES T
B EN
LA
KE
YG AP
NOT TO SCALE
OL D
RD
CEME NT RD
LN
ST
HE R
RO N
DR
WOO D
DYER DR
ALPI NE S H ADO W LN
R
of BUNCOMBE COUNTY, NORTH CAROLINA
Budget Map
METROPOLITAN SEWERAGE DISTRICT
MAG N CRE OLIA EK L N
OR YD AR M
WH I T EP INE LAUREL
BLUE R IDGE R D
D
/
BLUE RIDGE ASSE
T NU
HIG H C O LON TOP YR D
CH T ES ER DG O L
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Chestnut Lodge Rd.
LOCATION:
Black Mountain
TYPE:
General Sewer Rehab.
PIPE RATING:
61
PROJECT NO.
2014017
TOTAL LF:
4,560
PROJECT BUDGET:
$1,928,700.00
PROJECT ORIGIN:
SSO's, Access, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$24,400.00
$24,400.00
55330 - DESIGN 55340 - PERMITS
$1,000.00
$1,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$17,300.00
$17,300.00
55370 - LEGAL FEES
$19,000.00
$4,604.00
$14,396.00
$100,000.00
$18,551.00
$66,449.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL
$15,000.00
$5,000.00
$5,000.00
55410 - CONDEMNATION
$20,000.00
$20,000.00
55420 - CONSTRUCTION
$1,736,000.00
$1,736,000.00
$2,000.00
$2,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT
$4,000.00
TOTAL AMOUNT
$4,000.00
$1,928,700.00
$64,855.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [ 21
CONTRACTOR:
$81,845.00
$1,782,000.00
ESTIMATED BUDGETS - FY 22 - 30 ]
FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
PROJECT DESCRIPTION: This project is located in Black Mountain near Blue Ridge Road and is comprised of 4,560 LF of 8-inch ductile iron pipe. The existing line is 6-inch and 8-inch clay with root FY 27-28 problems, fractures, and multiple SSO's. FY 28-29 FY 29-30 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
/
VILLAS CT
HILL
LN
TIN Y
RD
Cub Road Project No. 2018027
L
CUB PL
P KIRBY
JO HN BL VD
NOT TO SCALE
ST ON N RIDGE RU N N ER L
DARCUS LN
Budget Map
METROPOLITAN SEWERAGE DISTRICT of BUNCOMBE COUNTY, NORTH CAROLINA
CIR IONA
SO SO WA Y
AR CED
D CUB R
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Cub Road
LOCATION:
Asheville
TYPE:
General Sewer Rehab
PIPE RATING:
40
PROJECT NO.
2018027
TOTAL LF:
1,204
PROJECT BUDGET:
$457,000.00
PROJECT ORIGIN:
CSR's, MH Overflow, Work Orders
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$18,000.00
55330 - DESIGN 55340 - PERMITS
$500.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$15,000.00
55370 - LEGAL FEES
$13,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$55,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$350,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$4,500.00
TOTAL AMOUNT
$457,000.00
$0.00
ENGINEER:
MSD
OH
R.O.W. ACQUISITION:
MSD
# PLATS: [ 12 ]
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY 22 - 30 FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$18,500.00
INSPECTION:
MSD
FY 24-25
$83,000.00
FY 25-26
$0.00
FY 26-27
$355,500.00
fronting Cub Rd. This system consists of approximately 1,204 LF of 8-inch VCP to be replaced with 8-inch FY 27-28 DIP. This existing VCP is full of sags, has heavy root intrusion, deteriorating manholes, and bad service FY 28-29 connections.
$0.00
PROJECT DESCRIPTION: This project is located in West Asheville running along the rear of properties
FY 29-30
SPECIAL PROJECT NOTES:
$0.00 $0.00
T ES W
ST
ST
A LIA
VE
BR O
UN YO
G
W
ST
CH
ES
ST
UT TN
AD WA Y
T
ST
BR O AD W AY
IZ EL
ST
ET AB H
WN LA D O E WO AV
T IN FL T S
BE IZA ST L E
TH
VE
E RO N MO
PL
HIGHLAND ST
AVE
East Chestnut Street at Five Points Project No. 2015192
PL
/
O GN MA
FOR
ES S Y TH
A
A OW DR O WO PL
AL OC
UNT MO E PL R CLA ROW
MOUNT CLAR E
D WOO HOLLAND ST
E CHESTNUT
NOT TO SCALE
ST
ST
MAXWELL ST
AND
FULTON S T
L HOL
BROAD ST
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
MERRIMON PL
MERRIMON AVE
METROPOLITAN SEWERAGE DISTRICT
ELOISE ST
CLAXTON PL
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
East Chestnut Ave @ Five Points
LOCATION:
N. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
36
PROJECT NO.
2015192
TOTAL LF:
5,225
PROJECT BUDGET:
$1,822,050.00
PROJECT ORIGIN:
MH Overflows, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$53,000.00
$19,321.00
$33,679.00
55330 - DESIGN 55340 - PERMITS
$1,000.00
$1,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$16,300.00
55370 - LEGAL FEES
$25,000.00
55380 - ACQUISITION SERVICES
$51,750.00
55390 - COMPENSATION
$100,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$1,570,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$3,000.00
55450 - SURVEY - ASBUILT
$2,000.00
TOTAL AMOUNT
$1,822,050.00
$19,321.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
Consultant
# PLATS: [ 23 ]
CONTRACTOR:
$34,679.00
$0.00
ESTIMATED BUDGETS - FY 22 - 30 FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$13,800.00
FY 25-26
$179,250.00
FY 26-27
$0.00
PROJECT DESCRIPTION: This project is located in N. Asheville and is comprised of 5,225 LF of
8-inch FY 27-28 ductile iron pipe. The existing line is aging 6, 8, and 10-inch VCP in poor shape with multiple structural FY 28-29 defects per segment. FY 29-30 SPECIAL PROJECT NOTES:
SSD to construct a 607 LF portion of this project in Fulton St in 2020, ahead of COA sidewalks
$1,575,000.00 $0.00 $0.00
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Elk Mountain Place
LOCATION:
Woodfin
TYPE:
General Sewer Rehab.
PIPE RATING:
48
PROJECT NO.
2010094
TOTAL LF:
4,101
PROJECT BUDGET:
$1,448,750.00
PROJECT ORIGIN:
SSO's, Access, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$18,000.00
$18,000.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$30,000.00
$30,000.00
55370 - LEGAL FEES
$35,000.00
$25,000.00
55380 - ACQUISITION SERVICES
$76,500.00
55390 - COMPENSATION
$100,000.00
55400 - APPRAISAL
$10,000.00
55410 - CONDEMNATION
$40,000.00
55420 - CONSTRUCTION
$1,127,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$10,250.00
TOTAL AMOUNT
$1,448,750.00
$18,000.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
Consultant
# PLATS: [ 34 ]
CONTRACTOR:
$0.00
$55,000.00
ESTIMATED BUDGETS - FY 22 - 30 FY 21-22
$236,500.00
FY 22-23
$1,139,250.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
PROJECT DESCRIPTION: This project is located south of Elk Mountain Rd. between I-26 and the French FY 27-28
$0.00
Broad river. It is comprised of approximately 4,101 LF of 8-inch ductile iron pipe. The existing vitrified FY 28-29 clay sewer line is in poor condition and has experienced SSO's. FY 29-30 SPECIAL PROJECT NOTES:
$0.00 $0.00
ON
N
CAN T
AV E
Y PK W
/
L OAK
SU
T N SE
ERB
URY
RD N
RD
Fairmont Road Project No. 2015017 NOT TO SCALE
SU
M AC
KWY
L
D
D NT R FAIR MO
DR NS E
T
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
CH E
LAND WOO D FAIRMONT R
D ER RO KE
ET P
DP
DR OW ER MAY FL
S SUN
OO EW G RID
RD MO U TO WN
RD
NTA IN
E GL
E AL ND
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Fairmont Road
LOCATION:
N. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
31
PROJECT NO.
2015017
TOTAL LF:
3,900
PROJECT BUDGET:
$1,654,000.00
PROJECT ORIGIN:
SSO's, Access, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$20,000.00
55330 - DESIGN 55340 - PERMITS
$500.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$8,500.00
55370 - LEGAL FEES
$12,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$100,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$1,500,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$3,000.00
55450 - SURVEY - ASBUILT
$10,000.00
TOTAL AMOUNT
$1,654,000.00
$0.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [ 11
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY 22 - 30 ]
FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$20,000.00
FY 26-27
$0.00
PROJECT DESCRIPTION: This project is located in North Asheville approximately 0.25 miles east of FY 27-28
$8,500.00
Charlotte St. The project will run along roads and properties from Glendale Rd. to Sunset Dr. The 6-inch FY 28-29 clay lines are in poor condition which have caused manhole overflows and SSOs.
$112,500.00
FY 29-30
$1,513,000.00
SPECIAL PROJECT NOTES:
BU
ER SB E
R BOU
NE L
N
PINE
RD
RD VISTA
O BR
WN
ST
ST
ORE
LE INO SEM
M ARD
D
R FO
Forestdale Drive Project No. 2014002
WN TO
RD
COR
R ST ER
/
LON E
D
A BUEN
H AM
DR
OU IB
LE
R CA
DA EST
RD
E OR
OO NW DEA
CT
NOT TO SCALE
L RIA
T
M ARD
ST S
T RE S
E IMP
DM O E AR
E FOR
DC
ST
IR
K
E WHIT
E RD
DR OO SW
CI R of BUNCOMBE COUNTY, NORTH CAROLINA
Budget Map
METROPOLITAN SEWERAGE DISTRICT
RO C
V I LL
CIR
L
D HEN ON ER S
OD NWO DAW
M ADA
HI L
L ST N EL
ES DR WHISPERING PIN
D
RD OAK
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Forestdale Drive
LOCATION:
S. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
33
PROJECT NO.
2014002
TOTAL LF:
2,600
PROJECT BUDGET:
$931,000.00
PROJECT ORIGIN:
SSO's, Work Orders, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$15,000.00
55330 - DESIGN 55340 - PERMITS
$500.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$17,000.00
55370 - LEGAL FEES
$25,000.00
55380 - ACQUISITION SERVICES
$54,000.00
55390 - COMPENSATION
$60,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$750,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$3,000.00
55450 - SURVEY - ASBUILT
$6,500.00
TOTAL AMOUNT
$931,000.00
$0.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
Consultant
# PLATS: [ 24 ]
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY 22 - 30 FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$15,000.00
FY 25-26
$0.00
FY 26-27
$17,500.00
along side roads and properties parallel to Hendersonville Rd. System Services crews have reported FY 27-28 numerous problems including multiple SSO's. The existing pipes will be replaced with 8-inch ductile iron FY 28-29 pipe.
$100,000.00
PROJECT DESCRIPTION: This project begins at Carnell St. and ends at Caribou Rd. The system runs
FY 29-30
SPECIAL PROJECT NOTES:
$798,500.00 $0.00
NH
ILL
RD
S 70
HWY
Four Inch Main - Patton Hill Road Project No. 2016100
U OLD VE ON A
/
PAT TO
S WHIT
0H
WY
NOT TO SCALE
7 US
AV E
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
E D WA RD S
OLD L RD PATTON HIL
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Four Inch Main - Patton Hill Rd.
LOCATION:
Swannanoa
TYPE:
Four Inch Main
PIPE RATING:
27
PROJECT NO.
2016100
TOTAL LF:
618
PROJECT BUDGET:
$296,910.00
PROJECT ORIGIN:
Problematic Orangeburg Four Inch Sewer
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$2,500.00
$2,500.00
$200.00
$200.00
$210.00
$210.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$290,000.00
$290,000.00
$2,500.00
$2,500.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT
$1,500.00
TOTAL AMOUNT
$1,500.00
$296,910.00
$2,910.00
ENGINEER:
MSD
OH
R.O.W. ACQUISITION:
N/A
# PLATS: [ 0 ]
CONTRACTOR:
$0.00
$294,000.00
ESTIMATED BUDGETS - FY 22 - 30 FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
PROJECT DESCRIPTION: This Four Inch Main project is located in Swannanoa at the intersection of Old FY 27-28
$0.00
US-70 Hwy. and Patton Hill Rd. It consists of replacing approximately 618 LF of undersized 4-inch FY 28-29 Orangeburg pipe with 8-inch DIP. FY 29-30 SPECIAL PROJECT NOTES:
$0.00 $0.00
Harmony Lane Project No. 2016103
HARMONY LN
ST
/
R
DR
NT
P CY
ME
HA RC
S ES
NOT TO SCALE
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
W RD
METROPOLITAN SEWERAGE DISTRICT
FAIR VIE
MURPHY ST
ROBIN ST
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Harmony Lane
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
35
PROJECT NO.
2016103
TOTAL LF:
670
PROJECT BUDGET:
$190,000.00
PROJECT ORIGIN:
Undersized, Maintenance Issues
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$2,500.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$185,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$500.00
55450 - SURVEY - ASBUILT
$2,000.00
TOTAL AMOUNT
ENGINEER:
$190,000.00
MSD
R.O.W. ACQUISITION:
$0.00
DP # PLATS: [ 0 ]
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY 22 - 30 FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
This project is along Harmony Lane in Asheville's Oakley area. The existing FY 27-28 system has two parallel lines that collect on both side of the street. Problems with the system consist of FY 28-29 root intrusion, poor access for maintenance, and close proximity to houses. PROJECT DESCRIPTION:
FY 29-30 SPECIAL PROJECT NOTES:
$2,500.00 $0.00 $187,500.00
A BR
I24
0E
PA TT O N AV ET O I24 I24 0 E I240 0W W T OP AT T O NA VE W
L VANDA
N NG NI ST
/
MILL B ROO K
R
RD
L HAZE
MILL
WORLE Y
RD
PL
ANNIE ST
Hazel Mill Road at Richland Street Project No. 2014016
AVE TON T A P
RICH LAND ST
L
N AVE PATTO
ND
DP
S LA RU
NOT TO SCALE
WE S TW OO
DR
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
SE RI
TO X METROPOLITAN SEWERAGE DISTRICT
N SU
ST AW AY
E PATTON AV
AY AVE RIDGEW
IA AVE
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Hazel Mill Rd @ Richland St.
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
26
PROJECT NO.
2014016
TOTAL LF:
3,300
PROJECT BUDGET:
$1,236,700.00
PROJECT ORIGIN:
SSO's, Work Orders, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$17,000.00
55330 - DESIGN 55340 - PERMITS
$1,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$9,400.00
55370 - LEGAL FEES
$15,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$80,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$1,110,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$2,300.00
TOTAL AMOUNT
$1,236,700.00
$0.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY 22 - 30 14
]
FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$17,000.00
FY 26-27
$1,000.00
PROJECT DESCRIPTION: This project is located in West Asheville, near the Bowen Bridge, and consists of 3,300 LF of 8-inch ductile iron pipe. The current pipe is 6-inch and 8-inch clay and PVC. Lines FY 27-28 are undersized and in poor condition with multiple pipe sags, cracks, and fractures. FY 28-29
$20,400.00
FY 29-30
$1,114,300.00
SPECIAL PROJECT NOTES:
$84,000.00
/
OAKEN HILL PL
Highland Farms Road Project No. 2018018
HIGHLAND FARMS RD
PERIDOT PT
NOT TO SCALE
LE
TR
L
AVENA S T
Budget Map
METROPOLITAN SEWERAGE DISTRICT of BUNCOMBE COUNTY, NORTH CAROLINA
N GO WA
T PE RID OT P
R BE TA C NA RD
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Highland Farms Road
LOCATION:
Black Mountain
TYPE:
General Sewer Rehab.
PIPE RATING:
70
PROJECT NO.
2018018
TOTAL LF:
820
PROJECT BUDGET:
$285,000.00
PROJECT ORIGIN:
Work Orders, Line Size and Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$5,700.00
$5,300.00
$400.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$1,750.00
55370 - LEGAL FEES
$4,000.00
$4,000.00
$15,000.00
$15,000.00
$750.00
$1,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL
$2,500.00
$2,500.00
55410 - CONDEMNATION
$10,000.00
$10,000.00
55420 - CONSTRUCTION
$242,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$2,050.00
TOTAL AMOUNT
$285,000.00
$5,300.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [ 3
CONTRACTOR:
$1,150.00
$32,500.00
ESTIMATED BUDGETS - FY 22 - 30 ]
FY 21-22
$246,050.00
TBD
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
of the Old US70 @ Pine Circle project, completed in 2016. Approx. 820 LF of existing 8-inch VCP will be FY 27-28
$0.00
replaced with new 8-inch DIP. The existing sewer has multiple sags that catch rags and debris, and has FY 28-29 also experienced many SSOs.
$0.00
PROJECT DESCRIPTION: This project is located adjacent to the WNC Veterans Cemetary, just upstream
FY 29-30
SPECIAL PROJECT NOTES:
$0.00
CO AG TT E
TL
NOT TO SCALE
S EA
N
PAT TO
VE EA
CT
4 I2
0
W
TO
I2
6
I24
0E
TO
I26
W
/
PL
E GR LE EN
N AV
ST
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
I 26 W
W
L HIL
METROPOLITAN SEWERAGE DISTRICT
E TO
0 I24
SE ST
Hill Street at Cross Place Project No. 2016249
O CR
SS
O RO LT VE
W
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Hill Street @ Cross Place
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
44
PROJECT NO.
2016249
TOTAL LF:
254
PROJECT BUDGET:
$90,500.00
PROJECT ORIGIN:
Work Orders, Line Location and Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$3,000.00
$1,525.00
55330 - DESIGN 55340 - PERMITS
$500.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$2,500.00
55370 - LEGAL FEES
$3,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$10,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$70,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$500.00
55450 - SURVEY - ASBUILT
$1,000.00
TOTAL AMOUNT
$90,500.00
$1,525.00
ENGINEER:
MSD
OH
R.O.W. ACQUISITION:
MSD
# PLATS: [ 2
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY 22 - 30 ]
FY 21-22
$0.00
TBD
FY 22-23
$1,475.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$16,000.00
FY 25-26
$71,500.00
FY 26-27
$0.00
& I-26 Interchange. It consists of replacing approximately 635 LF of existing 6-inch VCP with 8-inch DIP. FY 27-28
$0.00
The line has numerous structural issues, experienced frequent stoppages, and flooded structures over the FY 28-29 years.
$0.00
PROJECT DESCRIPTION: This project runs along Hill St. to the intersection of Cross Pl. abutting the I-240
FY 29-30
SPECIAL PROJECT NOTES:
$0.00
E PA TH R
ELL S T
/
STILL W
D
DR HY V U
Horizon Hill Road (Hy-Vu Drive) Project No. 2008084
FENNER A VE
LOOKOUT DR
SANDON C IR NOT TO SCALE
FEN N
ER
AVE
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
NT RD
METROPOLITAN SEWERAGE DISTRICT
LARCHMO
E D AV
BRID L
RD LA N
N L ROS E
ZO RI O H L HI
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Horizon Hill Rd. (Hy-Vu Drive)
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
51
PROJECT NO.
2008084
TOTAL LF:
713
PROJECT BUDGET:
$285,444.00
PROJECT ORIGIN:
SSO's, Work Orders, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$4,900.00
$4,900.00
55360 - EASEMENT PLATS
$1,370.00
$1,370.00
55370 - LEGAL FEES
$1,450.00
$1,450.00
$2,690.00
$2,690.00
$273,034.00
$34.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES
55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$273,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$1,000.00
$1,000.00
TOTAL AMOUNT
$1,000.00
$285,444.00
$10,444.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [ 1
CONTRACTOR:
$0.00
$275,000.00
ESTIMATED BUDGETS - FY 22 - 30 ]
FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
PROJECT DESCRIPTION: This project is located in Asheville near Merrimon Avenue. It consists of 713 LF FY 27-28
$0.00
of 8-inch ductile iron pipe. The current 8-inch Orangeburg and vitrified clay line has had repeated FY 28-29 overflows due to root intrusion and pipe collapse. FY 29-30 SPECIAL PROJECT NOTES:
$0.00 $0.00
N
ER
D
/
RD
O B
E ST
C MA
GE RID
E AV
WOODLAN D RD
IR FA
O M
NT
RD
Howland Road at Sunset Trail Project No. 2012034
L
ON
P OD O W
D AND R HOWL
LA TR
NOT TO SCALE
SU
E NS
SU
ED
NT MO
TT
RL
DR T NS E
Budget Map
METROPOLITAN SEWERAGE DISTRICT of BUNCOMBE COUNTY, NORTH CAROLINA
KEE R D CHER O CHEROKEE RD
GE
E GL
L DA
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Howland Rd. @ Sunset Trail
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
43
PROJECT NO.
2012134
TOTAL LF:
994
PROJECT BUDGET:
$471,600.00
PROJECT ORIGIN:
SSO's, Work Orders, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$7,500.00
$4,600.00
$2,900.00
$4,600.00
$2,900.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$4,500.00
55370 - LEGAL FEES
$6,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$60,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$390,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$2,600.00
TOTAL AMOUNT
$471,600.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [
CONTRACTOR:
$0.00
ESTIMATED BUDGETS - FY 22 - 30 5
]
FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$4,500.00
FY 25-26
$66,000.00
FY 26-27
$393,600.00
PROJECT DESCRIPTION: This project will replace an existing 8-inch main from 5 Howland Rd. up to the FY 27-28
$0.00
rear of 371 Sunset Dr. System Services recently completed another portion of this system due to SSO's FY 28-29 and line condition. FY 29-30 SPECIAL PROJECT NOTES:
$0.00 $0.00
RK R
D
VALLEY PA
RK RD
DR
N ALLESAR
OA
PINE MEADOW DR
JARNAUL AVE
M
N KK
W
L OL
DR
RD
Jarnaul Avenue Project No. 2016104
RD
E PIN DO EA
/
EASTWAY ST
Y PA
RIDGE
D A VE
ELKWO O
ST
VALL E
NORT H
IR
PELZER
LC
ARE
CT
WESTWOOD RD
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
IE LAKEV RD
W
METROPOLITAN SEWERAGE DISTRICT
R
FA GL L E L S N R D
D ORE ESH LAK
RONSANNE PKWY RONSANNE PKWY
E DR ALCLA R
NOT TO SCALE
L ALC
MORANCE AVE
D
GI NE L
A LLS R GLEN F
SAREVA PL
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Jarnaul Avenue
LOCATION:
N. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
75
PROJECT NO.
2016104
TOTAL LF:
4,684
PROJECT BUDGET:
$1,909,250.00
PROJECT ORIGIN:
SSO's, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$18,500.00
$18,500.00
55360 - EASEMENT PLATS
$29,250.00
$26,185.00
$3,190.00
55370 - LEGAL FEES
$25,000.00
$10,909.00
$4,091.00
$85,500.00
$56,250.00
$18,000.00
$11,250.00
$200,000.00
$66,038.00
$30,000.00
$103,962.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$10,000.00
55400 - APPRAISAL
$10,000.00
55410 - CONDEMNATION
$30,000.00
$30,000.00
55420 - CONSTRUCTION
$1,497,000.00
$1,497,000.00
$2,000.00
$2,000.00
$5,000.00
$5,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT
$12,000.00
TOTAL AMOUNT
$12,000.00
$1,909,250.00
$177,882.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
Consultant
# PLATS: [
CONTRACTOR:
$60,281.00
$1,671,212.00
ESTIMATED BUDGETS - FY 22 - 30 38
]
FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
PROJECT DESCRIPTION: This project is located in North Asheville, between Elkwood Ave. and Beaver Lake. The project consists of replacing approx. 4,684 LF of existing 4 and 6-inch VCP with new 8-inch FY 27-28 DIP. The existing lines and manholes are in poor structural condition and have experienced multiple FY 28-29 SSOs and manhole overflows. FY 29-30
SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
/
NOT TO SCALE
H LS WI
DR IRE
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
ST
Johnston Boulevard at Providence Road Project No. 2014013
PR
DEBRA LN
D CE R
ER
O VI D EN
TH LU
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Johnston Blvd. @ Providence Rd.
LOCATION:
W. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
37
PROJECT NO.
2014013
TOTAL LF:
2,000
PROJECT BUDGET:
$629,150.00
PROJECT ORIGIN:
SSO's, Access, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$8,150.00
55330 - DESIGN
$8,150.00 .
55340 - PERMITS
$5,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$11,000.00
55370 - LEGAL FEES
$15,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$36,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$550,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$500.00
55450 - SURVEY - ASBUILT
$3,500.00
TOTAL AMOUNT
$629,150.00
$8,150.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [
$0.00
$0.00
ESTIMATED BUDGETS - FY 22 - 30 14
]
CONTRACTOR:
FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$11,000.00
FY 26-27
$56,000.00
PROJECT DESCRIPTION: This project is located in West Asheville, approx. 0.6 miles west of New Leicester Hwy. The project consists of replacing 2,000 LF of existing 6-inch vitrified clay and PVC pipe FY 27-28 with new 8-inch ductile iron pipe. The existing line contains many offset joints and bends, and is in poor FY 28-29 structural condition. FY 29-30
SPECIAL PROJECT NOTES:
Providence Road was added to this with additional 1000 LF.
$554,000.00 $0.00 $0.00
T DR
NINA ST
A DR
RY D
R
Jonestown Road at Riverside Drive Project No. 2018028
RIVERSID E DR
MA YB ER
R
NOT TO SCALE
VELDA D
G NI
/
IS RIVER M
JONESTOWN RD
NIX DR
REVON D
A ST Y RR HT DR
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
CRESTFIELD AVE
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Jonestown Road @ Riverside Drive
LOCATION:
Woodfin
TYPE:
General Sewer Rehab.
PIPE RATING:
42
PROJECT NO.
2018028
TOTAL LF:
1,890
PROJECT BUDGET:
$620,500.00
PROJECT ORIGIN:
CSR's, Work Orders, I & I issues
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$25,000.00
55330 - DESIGN 55340 - PERMITS
$500.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$15,000.00
55370 - LEGAL FEES
$13,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$40,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$520,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$5,000.00
TOTAL AMOUNT
$620,500.00
$0.00
ENGINEER:
MSD
OH
R.O.W. ACQUISITION:
MSD
# PLATS: [ 12 ]
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY 22 - 30 FY 21-22
$0.00
FY 22-23
$25,500.00
CONSTRUCTION ADM:
MSD
FY 23-24
$15,000.00
INSPECTION:
MSD
FY 24-25
$23,000.00
FY 25-26
$30,000.00
FY 26-27
$530,000.00
This project is located upstream from MSD's WWTP along Riverside Dr. on FY 27-28 Jonestown Rd. It consists of approximately 1,890 LF of existing 6-inch VCP to be replaced with 8-inch FY 28-29 DIP. This system is full of structural defects, has heavy I & I issues, and deteriorating manholes. PROJECT DESCRIPTION:
FY 29-30 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
MELROSE AVE
LOCKLEY AVE
/
SYRLIN ST
AVE
L
SEDL E
D
Y AVE
LYN R
Kimberly Avenue at Sedley Avenue Project No. 2018029
WOODVA LE AVE
NOT TO SCALE
GR
OD WO OVE
OLL
RD
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
CLU
N BK
METROPOLITAN SEWERAGE DISTRICT
RD
D DR LYN WO O
GRAC E
L
E W OO DR D MA P
WAR WICK P
K RLY O KIMB ERLY KN
XT AD E NOLL RO LL RD KIMB E
KIMB ERLY AVE PL CLU B
CLUB RD COUNTRY
PL SU MN ER
LYNMAR
WILDWOOD AVE
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Kimberly Ave. @ Sedley Avenue
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
35
PROJECT NO.
2018029
TOTAL LF:
3,005
PROJECT BUDGET:
$1,233,000.00
PROJECT ORIGIN:
CSR's, Work Orders, MH Overflows
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$38,000.00
55330 - DESIGN 55340 - PERMITS
$1,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$18,000.00
55370 - LEGAL FEES
$14,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$100,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$1,050,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$10,000.00
TOTAL AMOUNT
$1,233,000.00
$0.00
ENGINEER:
MSD
OH
R.O.W. ACQUISITION:
MSD
# PLATS: [ 13 ]
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY 22 - 30 FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$39,000.00
FY 25-26
$0.00
FY 26-27
$72,000.00
This project is located in N. Asheville along Kimberly Ave. The existing 6-inch FY 27-28 VCP will be replaced with 3,005LF of 8-inch HDPE through pipe bursting operations. This 6-inch VCP line FY 28-29 is in poor structural condition, roots present throughout, mis-aligned joints, and problematic spur lines.
$1,062,000.00
FY 29-30
$0.00
PROJECT DESCRIPTION:
SPECIAL PROJECT NOTES:
$60,000.00
PL
ROCK HILL CIR
ROCK HIL L
Le An Hurst Road Project No. 2018027
ST R D LE AN HUR
ROCK
CADY CT
HILL
RD
NOT TO SCALE
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
OD RD S
/
ROCK HILL CIR
O EDGEW
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Le An Hurst Road
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
77
PROJECT NO.
2019027
TOTAL LF:
820
PROJECT BUDGET:
$346,000.00
PROJECT ORIGIN:
Work Orders, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$9,000.00
$3,800.00
$5,200.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$15,000.00
$15,000.00
55370 - LEGAL FEES
$13,000.00
$13,000.00
$45,000.00
$45,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL
$5,000.00
$5,000.00
55410 - CONDEMNATION
$20,000.00
$20,000.00
55420 - CONSTRUCTION
$235,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$3,000.00
TOTAL AMOUNT
$346,000.00
$3,800.00
ENGINEER:
MSD
OH
R.O.W. ACQUISITION:
MSD
# PLATS: [ 12 ]
CONTRACTOR:
$5,200.00
$98,000.00
ESTIMATED BUDGETS - FY 22 - 30 FY 21-22
$0.00
FY 22-23
$239,000.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
PROJECT DESCRIPTION: This project is located in South Asheville running along the rear of properties FY 27-28 fronting Le An Hurst Rd. It parallels a tributary to Sweeten Creek. The existing 8-inch VCP is in very poor FY 28-29 condition due to heavy root intrusion and has to be routinely rodded. It will be replaced with 8-inch DIP. FY 29-30 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
/
FR E
ST
R TY
LIB E
LN
M
ED O
PISGAH VIEW AVE
W RALEIGH RD
LINCOLN AVE
SCHOOL RD E
Lincoln Avenue Project No. 2013103
KENMORE ST
NOT TO SCALE
WINSTON AVE
CONCORD PL
BRISTOL PL E BROADVIEW AV
D WI LM IN G TO NR E
EO
RA
BL VD
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
RALEIGH RD
ON T
METROPOLITAN SEWERAGE DISTRICT
CLEVELAND AV
COTTAGE COVE LN
E NEWBERN AV
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Lincoln Avenue
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
26
PROJECT NO.
2013103
TOTAL LF:
1,415
PROJECT BUDGET:
$540,370.00
PROJECT ORIGIN:
Work Orders, Line Condition, Access
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$2,870.00
$2,870.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$531,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$3,000.00
55450 - SURVEY - ASBUILT
$3,500.00
TOTAL AMOUNT
$540,370.00
$2,870.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
N/A
# PLATS: [
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY 22 - 30 0
]
FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
PROJECT DESCRIPTION: This project is located in the Oakley neighborhood in southeast Asheville, FY 27-28 just north of I-40. It consists of replacing approximately 1,415 LF of existing 6-inch vitrified clay pipe with FY 28-29 8-inch ductile iron pipe. The existing line is in very poor structural condition. FY 29-30 SPECIAL PROJECT NOTES:
$0.00 $0.00 $537,500.00
LN
HOUNDS EAR DR
HES PER LN US
RG GE O
Logan Avenue Project No. 2017256
AV
E
ST IA
AV ON
V RI
N LI ER
NOT TO SCALE
ST Y WE WA D EN
EU
K
BL
/
SU
VI L
OLD REY N
R
ED
E
AV
RD REY NOL DS
SR D
NR IS
W A YN ES
G
LE
E AV
LU NA
S TRE HOR MO T NT ST
LN
H A YW O
MILLBRO OK RD
ST DEAVE R
RD O D
AN LO
CRAVEN ST
DR
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
RI V
A Y A VE RIDGEW
AN
ER VI EW
G LO CIR ID CL VD
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Logan Avenue
LOCATION:
W. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
48
PROJECT NO.
2017256
TOTAL LF:
1,884
PROJECT BUDGET:
$758,500.00
PROJECT ORIGIN:
Work Orders, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$11,500.00
$11,500.00
55330 - DESIGN 55340 - PERMITS
$1,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$8,700.00
55370 - LEGAL FEES
$13,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$62,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$660,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$1,300.00
TOTAL AMOUNT
$758,500.00
$11,500.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [
$0.00
$0.00
ESTIMATED BUDGETS - FY 22 - 30 12 ]
CONTRACTOR:
FY 21-22
$8,200.00
FY 22-23
$76,500.00
CONSTRUCTION ADM:
MSD
FY 23-24
$662,300.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
PROJECT DESCRIPTION: This project is located in West Asheville near Craven St. and consists of FY 27-28
$0.00
1,884 LF of 8-inch DIP. The existing clay pipe is undersized and has a large number of pipe defects.
SPECIAL PROJECT NOTES:
FY 28-29
$0.00
FY 29-30
$0.00
RD
N
C
LN
LN
Lynn Cove Road Project No. 2015010
WEBB COVE RD
BEES MOUN TAIN DR
N LY
WT LA E AL RD
TR EC H EE LN
ER D
NOT TO SCALE
GS of BUNCOMBE COUNTY, NORTH CAROLINA
Budget Map
METROPOLITAN SEWERAGE DISTRICT
RD
DG
/
ER AV E B
DR
M DA
ORS ER N V O G
ER
ST ON YR
DG
T GE RID
PO
NOR C IR
R NY STO
DR
R
V GE RID I EW
ND IDE
IDE D
RD
BE
CLU BS
N SU S NY
GOVE R
E OV
BB WE IN SPR
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Lynn Cove Road
LOCATION:
Beaverdam
TYPE:
General Sewer Rehab.
PIPE RATING:
35
PROJECT NO.
2015010
TOTAL LF:
5,589
PROJECT BUDGET:
$1,851,000.00
PROJECT ORIGIN:
SSO's, Work Orders, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$25,000.00
55330 - DESIGN 55340 - PERMITS
$1,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$22,000.00
55370 - LEGAL FEES
$29,000.00
55380 - ACQUISITION SERVICES
$63,000.00
55390 - COMPENSATION
$95,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$1,600,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$14,000.00
TOTAL AMOUNT
$1,851,000.00
$0.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
Consultant
# PLATS: [ 28
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY 22 - 30 ]
FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$25,000.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$22,000.00
FY 26-27
$158,000.00
PROJECT DESCRIPTION: This project is located off of Beaverdam Rd. The project runs through multiple FY 27-28
$30,000.00
properties along Lynn Cove Rd. from Governor Circle to 225 Lynn Cove Rd. These lines and manholes FY 28-29 have heavy I/I which have created multiple SSOs.
$1,616,000.00
FY 29-30
$0.00
SPECIAL PROJECT NOTES:
RE D
R
NA VE
/
ME R
RIM O
SH O
RNE
AVE
GRACELYN RD
CLAIRMON T
RD
E
JO HN SO N DR
OTTARI R D
KELE H
E RD
ER A
LY
MAYW O
NOT TO SCALE
D
AD RD
OD R
HAMPST E
HOLBOR N
IRVING S T AVE OAKLAWN WOODVAL E AVE
Manetta Road at Johnson Drive Project No. 2014022
MELROSE AV
GRACE AV E PL
WARWIC K
D MANETTA R
D
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
NG FI
C
DR
METROPOLITAN SEWERAGE DISTRICT
IF GR
VD BL
A BL
OO KW
REDWOOD RD D C LU B R COUNTR Y
E AVE LORRAIN
ALY STON E
AVE KIMB ERLY
LAK E
OSB O
RD LYN WO OD
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Manetta Rd. @ Johnson Dr.
LOCATION:
N. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
26
PROJECT NO.
2014022
TOTAL LF:
6,500
PROJECT BUDGET:
$2,537,700.00
PROJECT ORIGIN:
SSO's, Work Orders, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$33,000.00
55330 - DESIGN 55340 - PERMITS
$1,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$7,000.00
55370 - LEGAL FEES
$11,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$100,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$2,380,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$3,000.00
55450 - SURVEY - ASBUILT
$2,700.00
TOTAL AMOUNT
$2,537,700.00
$0.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [ 10
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY 22 - 30 ]
FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$33,000.00
FY 25-26
$0.00
FY 26-27
$7,000.00
PROJECT DESCRIPTION: This project is located in North Asheville near Merrimon Ave and consists of 6,500 LF of 8-inch ductile iron pipe. The existing clay pipe is undersized and has voids, fractures, and FY 27-28 root intrusions which have contributed to multiple SSO's. FY 28-29
$112,000.00
FY 29-30
$2,385,700.00
SPECIAL PROJECT NOTES:
$0.00
/
NT MO R A I VE CL A
ER A LY
MAYW O OD R D
Manetta Road at Maywood Road Project No. 2020022
KELE H
MANETTA RD
AD RD
D
NOT TO SCALE
HAMPST E
OTTARI R
VE R LY A KIMB E
JO HN S DR ON
A LY STON E
RD
D
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
COUNTR Y CLUB R
E HOLBORN
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Manetta Rd. @ Maywood Rd.
LOCATION:
Asheville
TYPE:
General Capital Improvements
PIPE RATING:
51
PROJECT NO.
2020022
TOTAL LF:
605
PROJECT BUDGET:
$255,500.00
PROJECT ORIGIN:
SSO's, Heavy Root Intrusion
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$8,000.00
$8,000.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$13,000.00
55370 - LEGAL FEES
$11,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$45,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$175,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$2,500.00
TOTAL AMOUNT
$255,500.00
$0.00
ENGINEER:
MSD
OH
R.O.W. ACQUISITION:
MSD
# PLATS: [ 10 ]
CONTRACTOR:
$0.00
$8,000.00
ESTIMATED BUDGETS - FY 22 - 30 FY 21-22
$69,000.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$178,500.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
PROJECT DESCRIPTION: This project is located in North Asheville between Kimberly Ave. and Manetta Rd. at the rear of properties fronting Maywood Rd. The rehabilitation consists of approximately 605 LF of existing FY 27-28 8-inch VCP to be replaced with 8-inch DIP. The existing 8-inch VCP system is full of structural defects, has FY 28-29 heavy root intrusion and has been a source of SSO’s. FY 29-30
SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
/
PE R
SIS
TE
NC
ED
R
D
OW AD ME
RD
Meadow Road at Train Yard Project No. 2015207
IA R TOR C I V
DE NT
NOT TO SCALE
ST U CI R
C O A PR
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
AP
D R H
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Meadow Road @ Train Yard
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
37
PROJECT NO.
2015207
TOTAL LF:
2,001
PROJECT BUDGET:
$1,036,000.00
PROJECT ORIGIN:
Line Condition, Undersized
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$9,000.00
$7,000.00
$2,000.00
$7,000.00
$2,000.00
55330 - DESIGN 55340 - PERMITS
$10,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$3,000.00
55370 - LEGAL FEES
$15,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$40,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$952,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$5,000.00
TOTAL AMOUNT
$1,036,000.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [ 4 ]
CONTRACTOR:
$0.00
ESTIMATED BUDGETS - FY 22 - 30 FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$3,000.00
FY 26-27
$65,000.00
PROJECT DESCRIPTION: This project is located in Asheville on Meadow Rd. between the Biltmore Estate FY 27-28
$959,000.00
and AB Tech College. It consists of replacing 2,001 LF of existing 6-inch VCP with new 8-inch DIP. The FY 28-29 existing line is in poor condition, is undersized, and runs underneath various structures. FY 29-30 SPECIAL PROJECT NOTES:
$0.00 $0.00
N DA
L VIL
EP
PEARSON D R
F NT MO D OR
L
AS ET N WA
T
Montford Avenue at Montford Park Project No. 2017144
E AV
/
WATAUGA ST
NOT TO SCALE
LA
ND
AV E
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
BE R
UB CA
S LE
METROPOLITAN SEWERAGE DISTRICT
CU M
SOCO ST
D CIR CUMBERLAN
T
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Montford Ave. @ Montford Park
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
50
PROJECT NO.
2017144
TOTAL LF:
1,258
PROJECT BUDGET:
$514,150.00
PROJECT ORIGIN:
Sags, Structural Defects, Soil Pipe
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$6,300.00
$6,300.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$6,750.00
55370 - LEGAL FEES
$10,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$90,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$396,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$3,100.00
TOTAL AMOUNT
$514,150.00
$0.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [ 9 ]
CONTRACTOR:
$0.00
$6,300.00
ESTIMATED BUDGETS - FY 22 - 30 FY 21-22
$6,750.00
FY 22-23
$100,000.00
CONSTRUCTION ADM:
MSD
FY 23-24
$401,100.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
PROJECT DESCRIPTION: This project is located just south of Montford Park and includes the FY 27-28 replacement of approximately 1,258 LF of existing 8-inch VCP with new 8-inch DIP. The existing pipe has FY 28-29 sags, multiple structural defects, and areas where the pipe is almost non-existent. FY 29-30 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
Y
DR
/
NE
RD CH
UNN S CO VE
NOT TO SCALE
Mountainbrook Road at Chunns Cove Road Project No. 2010112
R BROOK TE
IEW DR ROLLING V
HO
N CIR CRAFTSM A
DR VIEW CHUN NS
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
MOUNTAINBROOK RD
LN A LL STE G
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Mountainbrook Rd. @ Chunns Cove
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
55
PROJECT NO.
2010112
TOTAL LF:
2,984
PROJECT BUDGET:
$1,053,015.00
PROJECT ORIGIN:
SSO's, Access, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$11,515.00
$11,515.00
$9,500.00
$3,300.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES
$6,200.00
$19,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL
$19,000.00
$21,000.00
$21,000.00
$110,000.00
$110,000.00
$5,000.00
$5,000.00
55410 - CONDEMNATION
$20,000.00
$20,000.00
55420 - CONSTRUCTION
$850,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$5,000.00
TOTAL AMOUNT
$1,053,015.00
$14,815.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [ 18
CONTRACTOR:
$6,200.00
$175,000.00
ESTIMATED BUDGETS - FY 22 - 30 ]
FY 21-22
$857,000.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
This project will relocate lines from the rear yards of lots fronting on Mountainbrook Rd. (off Chunns Cove Rd.) where access and maintenance is extremely difficult and will FY 27-28 move those lines to public street rights of way. This project will also eliminate one high aerial creek FY 28-29 crossing where existing support piers are failing due to erosion. PROJECT DESCRIPTION:
FY 29-30
SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
/
HE SD AR D
NOT TO SCALE
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
LA R K R D
METROPOLITAN SEWERAGE DISTRICT
PE
RD EK OL
D H AW CRE
K RD
DOGWOOD GRV
M M RS I
C R EE NEW HAW
New Haw Creek Road at Dogwood Grove Project No. 2014021
BE T
MEADO W
LN N O
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
New Haw Creek Rd. @ Dogwood Grove LOCATION:
E. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
31
PROJECT NO.
2014021
TOTAL LF:
1,900
PROJECT BUDGET:
$702,900.00
PROJECT ORIGIN:
SSO's, Work Orders, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$9,500.00
$4,925.00
$4,575.00
$4,925.00
$4,575.00
55330 - DESIGN 55340 - PERMITS
$1,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$8,000.00
55370 - LEGAL FEES
$12,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$60,000.00
55400 - APPRAISAL
$2,500.00
55410 - CONDEMNATION
$7,500.00
55420 - CONSTRUCTION
$600,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$1,400.00
TOTAL AMOUNT
$702,900.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [ 11
$0.00
ESTIMATED BUDGETS - FY 22 - 30 ]
CONTRACTOR:
FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$18,000.00
8-inch ductile iron pipe. Existing 4-inch and 6-inch clay pipe is undersized, with fractures, root intrusion, and FY 27-28 misaligned joints. Existing 8-inch ductile iron pipe has corrosion issues. Existing manholes are in poor FY 28-29 condition.
$72,000.00
PROJECT DESCRIPTION: This project is in East Asheville near Haw Creek Rd., and consists of 1,900 LF of
FY 29-30
SPECIAL PROJECT NOTES:
$1,000.00 $602,400.00
D
HILL R
R
D
W O O DY LN FO
X
C
HA
SE
RD
W FOX C HASE RD
LA N
BIRD
IL SW
D RD
RDG
ER OW D FL RD
New Stock Road Project No. 2015011
EL D R
DR
E BLU
AN ALEX
HAP D ER C
PLEASANT HILL DR
DR
EE K
Y TR L
D WOO
/
WD
R
WR
CR
DIPIT
L
RD
HI
L GO
IE DV
AD
VIE
DWS
RICE M
CHADWICK WADE
FAR ID
GO LD
HIL L
SERE N
O KN
DP
RD NOT TO SCALE
BR U
CT
SH
V EA W
MAR LWO OD
CT
W OO
LL
D
RD
E DR
D
KNOB
RD
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
ER R
STONE Y
GARRISON R
LEM DR A B EM B
LOFTIN ST
E DR LAKESHOR
D
NA VE METROPOLITAN SEWERAGE DISTRICT
RD
AND
E
HIGH L
VI ER
KSID
HEATHER CT
CRE E
RD
CT CRANDON
FIR W
I26 E
N AIKE
OO D
EN R D S HAV
RD OOS T ROB IN R
O WO LL
RD
FOXWOOD DR
W DR
T PA
TI
LN
AC
DR
OR N
I W LE NK
PINE Y
LN
RD
RI PE BRIA RWO OD
E LN RIDG SHAD O
S RUFU
I26 W
S RD
ROSS RD
W NE CK TO E
APPLE C
E
FE RN AD GL
DL OO W D AN S LL
TEA
SI JO
Y
MER RIM O
LA E CK LN
B ER R Y LN
COUNTRY OAK DR
LN LOWRY
G
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
New Stock Road
LOCATION:
Woodfin
TYPE:
General Sewer Rehab.
PIPE RATING:
45
PROJECT NO.
2015011
TOTAL LF:
9,020
PROJECT BUDGET:
$2,661,000.00
PROJECT ORIGIN:
SSO's, Undersized Pipe
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$36,000.00
$17,750.00
$18,250.00
$17,750.00
$18,250.00
55330 - DESIGN 55340 - PERMITS
$1,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$8,000.00
55370 - LEGAL FEES
$12,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$70,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$2,500,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$10,000.00
55450 - SURVEY - ASBUILT
$24,000.00
TOTAL AMOUNT
$2,661,000.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [
CONTRACTOR:
$0.00
ESTIMATED BUDGETS - FY 22 - 30 11
]
FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$8,000.00
INSPECTION:
MSD
FY 24-25
$83,000.00
FY 25-26
$2,534,000.00
FY 26-27
$0.00
PROJECT DESCRIPTION: This project runs along New Stock Rd. in Woodfin. The project begins at Nichols FY 27-28
$0.00
Hill Dr. & New Stock Rd., runs under I-26, and ends at Weaverville Rd. The existing 8-inch lines have FY 28-29 structural issues which have led to root intrusion and multiple SSOs. FY 29-30 SPECIAL PROJECT NOTES:
$0.00 $0.00
EST
ON A
VE
R NO
H WT HA
W TH
O E RN AV NOT TO SCALE
T ES AV
E
/
HAR L
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
VE
Northwest Avenue at No. 215 Project No. 2018017
WC
EN D AV LV HE D B UN BO
L DE A OD O LW
E
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Northwest Ave. @ No. 215
LOCATION:
Swannanoa
TYPE:
General Sewer Rehab.
PIPE RATING:
84
PROJECT NO.
2018017
TOTAL LF:
252
PROJECT BUDGET:
$121,550.00
PROJECT ORIGIN:
Structural Condition, SSOs
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$4,850.00
$4,850.00
55360 - EASEMENT PLATS
$1,500.00
$1,500.00
55370 - LEGAL FEES
$3,000.00
$3,000.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$20,000.00
$20,000.00
55400 - APPRAISAL
$2,500.00
$2,500.00
55410 - CONDEMNATION
$5,000.00
$5,000.00
55420 - CONSTRUCTION
$82,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$700.00
TOTAL AMOUNT
$121,550.00
$0.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [ 2
CONTRACTOR:
$6,350.00
$30,500.00
ESTIMATED BUDGETS - FY 22 - 30 ]
FY 21-22
$84,700.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
PROJECT DESCRIPTION: This project is in the Grovemont community of Swannanoa and includes the replacement of approx. 252 LF of existing 6-inch VCP and CIP with new 8-inch DIP. The existing lines are FY 27-28 in poor structural condition; one of which is highly corroded CIP. The lower portion of the project runs FY 28-29 parallel with a creek and has overflowed on multiple occasions and is a confirmed source of I&I. FY 29-30
SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
/
PINE ST
CHURCH ST
LN S PA RK
Oakland Drive at Church Street Project No. 2015177
OAKLAND DR
NOT TO SCALE
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
PINE ST
METROPOLITAN SEWERAGE DISTRICT
AIN ST MOUNT
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Oakland Drive @ Church Street
LOCATION:
Black Mountain
TYPE:
General Sewer Rehab
PIPE RATING:
27
PROJECT NO.
2015177
TOTAL LF:
575
PROJECT BUDGET:
$207,000.00
PROJECT ORIGIN:
Access, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$2,500.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$2,500.00
55370 - LEGAL FEES
$5,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$25,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$170,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$500.00
55450 - SURVEY - ASBUILT
$1,500.00
TOTAL AMOUNT
$207,000.00
$0.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [ 4 ]
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY 22 - 30 FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$2,500.00
PROJECT DESCRIPTION: This project is located in Black Mountain running through properties from Pine FY 27-28
$2,500.00
St to Oakland Dr. The project will replace 575 LF of 4-inch Orangeburg and 6-inch VCP. The existing lines FY 28-29 are in poor condition and have too many point repairs.
$30,000.00
FY 29-30
$172,000.00
SPECIAL PROJECT NOTES:
NOT TO SCALE
Riverside Drive at Riverside Baptist Church Project No. 2016251
IDE DR
/
S RIVER
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Riverside Dr. @ Riverside Baptist
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
40
PROJECT NO.
2016251
TOTAL LF:
510
PROJECT BUDGET:
$232,500.00
PROJECT ORIGIN:
Work Orders, Excessive Infiltration
DESCRIPTION
ESTIMATED PROJECT COST
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$6,500.00
55330 - DESIGN 55340 - PERMITS
$15,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$1,500.00
55370 - LEGAL FEES
$2,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$7,500.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$195,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$3,000.00
TOTAL AMOUNT
$232,500.00
$0.00
ENGINEER:
MSD
OH
R.O.W. ACQUISITION:
MSD
# PLATS: [ 1
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY 22 - 30 ]
FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$6,500.00
FY 25-26
$0.00
FY 26-27
$26,000.00
PROJECT DESCRIPTION: This project is located along Riverside Drive at the Riverside Baptist Church. It FY 27-28
$200,000.00
consists replacing approximately 510 LF of existing 6-inch VCP with 8-inch DIP. The existing 6-inch VCP FY 28-29 segments are structurally unsound and experience heavy I & I. FY 29-30 SPECIAL PROJECT NOTES:
Possible RR Encroachment
$0.00 $0.00
R VE
/
E W
O ST
S LL HI
LN
WESTOVER DR
Rosewood Avenue at Riverside Cemetery Project No. 2019023 NOT TO SCALE
Y
RIVER S ID CEMET E ER Y
CEMETER
VE
RIVERSID E
ROSEW OOD A
HAWTHORN E LN
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
RIV C ERSI E M E TE D E RY
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Rosewood Ave. @ Riverside Cemetery LOCATION:
Montford
TYPE:
General Sewer Rehab.
PIPE RATING:
25
PROJECT NO.
2019023
TOTAL LF:
180
PROJECT BUDGET:
$79,150.00
PROJECT ORIGIN:
Line condition, Access
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$1,800.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$2,250.00
55370 - LEGAL FEES
$4,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$20,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$50,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$500.00
55450 - SURVEY - ASBUILT
$600.00
TOTAL AMOUNT
$79,150.00
$0.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [ 3
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY 22 - 30 ]
FY 21-22
$0.00
FY 22-23
$0.00 $0.00
CONSTRUCTION ADM:
MSD
FY 23-24
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$1,800.00
FY 26-27
PROJECT DESCRIPTION: This project is located off of Rosewood Avenue in Montford, adjacent to Riverside Cemetery. This project includes the replacement of approximately 180 LF of 6-inch VCP pipe with FY 27-28 new 8-inch DIP. The existing line is in poor structural condition and is located next to a broken storm drain, FY 28-29 causing heavy I&I. FY 29-30
SPECIAL PROJECT NOTES:
$0.00 $2,250.00 $24,000.00 $51,100.00
S
VILLE RSON E D N HE
RD
SY
T
ORE CAM
ES DR ROYAL PIN
T
ST
K BLA E DR
RD T TREE S PEACH NOT TO SCALE
MOR E T
DR
O COL
RL
N
R
DEN LIN ST
E
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
CT METROPOLITAN SEWERAGE DISTRICT
R NY D
CED A
E
ND
R TE PL M A
LE
Royal Pines Drive - PRP 47009 Project No. 2007020
TE R
APPIAN WAY
SYC A
OD OD RH
RO ND
RIPPON CT
P MA
/
LN
C RY ER B L EK
D RD
T
S RY RE NC
ES
HEYWOO
ES
EN LIND
E ET
FO R
MY L RT
N ST
BLAKE CT ER CH L RD
E SW LAUR E
MU
L ER
LIND E
P PO T AR
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Royal Pines Drive - PRP 47009
LOCATION:
Arden
TYPE:
Pipe Rated Projects
PIPE RATING:
35
PROJECT NO.
2007020
TOTAL LF:
2,888
PROJECT BUDGET:
$1,099,100.00
PROJECT ORIGIN:
Pipe Rating Program
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$10,100.00
$10,100.00
55330 - DESIGN 55340 - PERMITS
$5,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$1,500.00
55370 - LEGAL FEES
$3,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$15,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$1,060,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$2,500.00
TOTAL AMOUNT
$1,099,100.00
$10,100.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [ 2 ]
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY 22 - 30 FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM.:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
PROJECT DESCRIPTION:
This project is located in S. Asheville and is comprised of 2,888 LF of 8-inch FY 27-28
ductile iron pipe. The existing line is 8-inch vitrified clay pipe which has had a history of root problems.
SPECIAL PROJECT NOTES:
NCDOT resurfacing planned in summer of 2023
$24,500.00
FY 28-29
$1,064,500.00
FY 29-30
$0.00
IL A
ST
L
ST
H UG BO L M P RU
PL
Sand Hill Road at Baker Place Project No. 2015223
ER
CARRIER
BA K
N SA
RD
NOT TO SCALE
D
LL HI
SHELBUR N
ER
R KA
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
E DR
EN
PL
METROPOLITAN SEWERAGE DISTRICT
D
/
M AN
CARRIER P
SALOLA S T
SH URN E LB
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Sand Hill Road @ Baker Place
LOCATION:
W. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
56
PROJECT NO.
2015223
TOTAL LF:
1,100
PROJECT BUDGET:
$390,700.00
PROJECT ORIGIN:
Work Orders, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$6,000.00
$6,000.00
$1,000.00
$1,000.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$1,500.00
55370 - LEGAL FEES
$3,000.00
$1,500.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$15,000.00
55400 - APPRAISAL
$2,500.00
55410 - CONDEMNATION
$10,000.00
55420 - CONSTRUCTION
$350,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$700.00
TOTAL AMOUNT
$390,700.00
$0.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [ 2 ]
CONTRACTOR:
$7,000.00
$1,500.00
ESTIMATED BUDGETS - FY 22 - 30 FY 21-22
$30,500.00
FY 22-23
$351,700.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
PROJECT DESCRIPTION: This project is located in West Asheville and is comprised of 1100 LF of 8-inch FY 27-28
$0.00
ductile iron pipe. The existing line is a 6-inch VCP with mulitple structural defects and access issues due FY 28-29 to being located under several houses. FY 29-30 SPECIAL PROJECT NOTES:
$0.00 $0.00
/
South Main Street at Reems Creek Road Project No. 2017012
N
ST
NOT TO SCALE
RE EM
S
C
S
I MA
RD
LN
RE EK
K EL
K
W AY
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
CR AN
METROPOLITAN SEWERAGE DISTRICT
BA L
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
S. Main St. @ Reems Creek Rd.
LOCATION:
Weaverville
TYPE:
General Sewer Rehab.
PIPE RATING:
51
PROJECT NO.
2017012
TOTAL LF:
565
PROJECT BUDGET:
$241,050.00
PROJECT ORIGIN:
Line condition, Access
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$2,800.00
$2,800.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$3,750.00
55370 - LEGAL FEES
$6,000.00
$6,000.00
$3,750.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$35,000.00
$35,000.00
55400 - APPRAISAL
$3,500.00
$3,500.00
55410 - CONDEMNATION
$7,500.00
$7,500.00
55420 - CONSTRUCTION
$179,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$1,500.00
TOTAL AMOUNT
$241,050.00
$2,800.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [ 5
$3,750.00
$52,000.00
ESTIMATED BUDGETS - FY 22 - 30 ]
CONTRACTOR:
FY 21-22
$182,500.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
FY 27-28
$0.00
FY 28-29
$0.00
FY 29-30
$0.00
PROJECT DESCRIPTION: This project is located on South Main Street in Weaverville, adjacent to the intersection with Reems Creek Road. The project consists of replacing approx. 513 LF of existing 6 and 8-inch VCP with 565 LF of new 8-inch DIP. The existing lines routinely cause stoppages in flow and require frequent maintenance. Maintenance is made difficult by several structures located over the existing lines. SPECIAL PROJECT NOTES:
WOODVINE RD
R CRANB DR
OOK
/
OVERLOOK CT
LIVING SAVIOR WAY
CEDAR FOREST TRL
E
R HOALS
D
P LOO
Springside Road at Overlook Road Project No. 2012127
S LONG
L ENS
M ADIU Y ST
HA EXC
NOT TO SCALE
Y SK
R ED NG
D SIDE R SPRING
T DR PHEASA N
R
CE FO DA R R TR EST L
BRIARCLIFF DR
ORCHID LN
SPRING FOREST CIR
IR
XC
DF O
OT D R
CT
OVERLOOK ROAD EXT
AK F
HARRIS ST
SO
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
LN
T POND S
R MILLE RD S
METROPOLITAN SEWERAGE DISTRICT
E MAPL
R
W SUMMIT AVE
ALLEN AVE
MAUDE AVE
TD
N DR
OR ES
BEV LY
E DR HOLLY RIDG
RD
ED OAK WIL D MANATE E CT
RE
PINC H
CON IFER
OVERLO OK RD
JULIAN LN
MIAMI CIR
WESTRID GE DR SCOTTIS H CROSSIN G WAY
N
HEN
L LT HO
ILLE
R FAWN D
PA R K
D ER SO N V
GSIDE SPRIN
H IS TT O IR SC C
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Springside Rd. @ Overlook Rd.
LOCATION:
S. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
65
PROJECT NO.
2012127
TOTAL LF:
3,922
PROJECT BUDGET:
$1,437,887.00
PROJECT ORIGIN:
SSO's, Work Orders, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$21,500.00
$21,500.00
55330 - DESIGN 55340 - PERMITS
$2,000.00
$2,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES
$9,250.00
$9,250.00
$10,000.00
$6,972.00
$14,737.00
$14,737.00
$3,028.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL
$5,000.00
$5,000.00
55410 - CONDEMNATION
$15,000.00
$15,000.00
55420 - CONSTRUCTION
$1,355,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$3,400.00
TOTAL AMOUNT
$1,437,887.00
$52,459.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [ 8
CONTRACTOR:
$25,028.00
$0.00
ESTIMATED BUDGETS - FY 22 - 30 ]
FY 21-22
$1,360,400.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
PROJECT DESCRIPTION: This project is located in South Asheville near Overlook Rd. and is comprised of 3,922 LF of 8-inch ductile iron pipe. The existing line is 6-inch and 8-inch vitrified clay pipe in poor FY 27-28 shape, with a history of SSO's at various points. FY 28-29 FY 29-30 SPECIAL PROJECT NOTES:
This project will need to begin as soon as school lets out for the summer. NTP will be a firm June 1, project will be advertised in March.
$0.00 $0.00 $0.00
PAT T O NA VE
/
PR I N C E TO N DR
ST
BRAMLETT CT
BELMONT AVE
NOT TO SCALE
Sulphur Springs Road at Covington Street Project No. 2014006
HARV A
RD P L
DARTMOUTH
E ND AV ORMO
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
S RD
METROPOLITAN SEWERAGE DISTRICT
SULPHUR SPRING
REDFERN ST
CLINTON AVE
COVINGTON ST
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Sulphur Springs Rd. @ Covington St. LOCATION:
W. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
44
PROJECT NO.
2014006
TOTAL LF:
1,350
PROJECT BUDGET:
$528,000.00
PROJECT ORIGIN:
SSO's, Access, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$7,500.00
$7,500.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$15,000.00
55370 - LEGAL FEES
$21,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$90,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$390,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$3,500.00
TOTAL AMOUNT
$528,000.00
$7,500.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY 22 - 30 20
]
FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$15,000.00
FY 25-26
$111,000.00
FY 26-27
$394,500.00
This project begins in the area of the Sulphur Springs Rd./Delaware Ave. intersection and runs through the back properties along Belmont Ave. The existing 6-inch clay pipe will be FY 27-28 replaced with 8-inch ductile iron pipe. The 6-inch clay line has had numerous problems and runs under a FY 28-29 house. PROJECT DESCRIPTION:
FY 29-30
SPECIAL PROJECT NOTES:
Belmont Ave. added to this with additional 500 LF
$0.00 $0.00 $0.00
LE
KS
SR
D
N TO
AL HO
S WE
AD RO
EX
T
M RU
AY IW
IST O HO SC LR
K LN PEACO C
K RD
EN LD A W
DR NOT TO SCALE
RGO LN
RD
S
N STO WE
R CH
Sweeten Creek Road at Buck Shoals Road Project No. 2014015
C BU
RD
E
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
GLEN COVE DR METROPOLITAN SEWERAGE DISTRICT
SUMTER ST
V COLA A PENSA
D
/
O RS IL NV
KEY LA
HE E ND E CRE
PE N
N ETE SWE
ER
S
N
HT
L PIGEON
AC OL A
VD TAM PA B L
D WIN OV YC
D
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Sweeten Creek Rd. @ Buck Shoals Rd.
LOCATION:
S. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
51
PROJECT NO.
2014015
TOTAL LF:
1,558
PROJECT BUDGET:
$628,170.00
PROJECT ORIGIN:
SSO's, Access, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$8,270.00
$4,670.00
$3,600.00
55330 - DESIGN 55340 - PERMITS
$10,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$3,000.00
55370 - LEGAL FEES
$5,000.00
$3,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$47,000.00
55400 - APPRAISAL
$3,500.00
55410 - CONDEMNATION
$7,500.00
55420 - CONSTRUCTION
$538,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT TOTAL AMOUNT
$3,900.00
$970.00
$628,170.00
$5,640.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [ 4
CONTRACTOR:
$0.00
$6,600.00
ESTIMATED BUDGETS - FY 22 - 30 ]
FY 21-22
$73,000.00
FY 22-23
$543,900.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
This project is located in Royal Pines on Buck Shoals Rd. between FY 27-28 Hendersonville Rd. and Sweeten Creek Rd. Approx. 1,558 LF of existing 6-inch vitrified clay pipe will be FY 28-29 replaced with 8-inch ductile iron pipe. The existing line is in poor condition and is undersized. PROJECT DESCRIPTION:
FY 29-30 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
HENDERSONVILLE RD
/
DAVIS GREY DR
D KR N ET E
AP
NOT TO SCALE
DR
RD
ALP INE RIDG E
MI LL SG
Sweeten Creek Road at Mills Gap Road Project No. 2014189
SW E
WALDEN RIDGE DR
CA
CR EE
LN EL ST E
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Sweeten Creek Rd. @ Mills Gap Rd.
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
16
PROJECT NO.
2014189
TOTAL LF:
2,572
PROJECT BUDGET:
$1,253,500.00
PROJECT ORIGIN:
SSO's, Work Orders, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$24,000.00
$11,300.00
$12,700.00
55330 - DESIGN 55340 - PERMITS
$1,000.00
$1,000.00
55360 - EASEMENT PLATS
$4,000.00
$3,000.00
55370 - LEGAL FEES
$6,000.00
$6,000.00
$100,000.00
$100,000.00
55350 - SPECIAL STUDIES $1,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL
$7,500.00
$7,500.00
55410 - CONDEMNATION
$20,000.00
$20,000.00
55420 - CONSTRUCTION
$1,087,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$2,000.00
TOTAL AMOUNT
$1,253,500.00
$11,300.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [ 5
$16,700.00
$134,500.00
ESTIMATED BUDGETS - FY 22 - 30 ]
CONTRACTOR:
FY 21-22
$0.00
FY 22-23
$1,091,000.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
PROJECT DESCRIPTION: This project is located in South Asheville near Mills Gap Rd. and is comprised of FY 27-28
$0.00
2,572 LF of 8-inch ductile iron pipe. The existing line is 6-inch and 8-inch vitrified clay pipe in poor FY 28-29 condition, with a history of SSO's. FY 29-30 SPECIAL PROJECT NOTES:
NCDOT Sweeten Creek Construction Project slated Fall 2022 currently, but preliminary engineering has been suspended at this time
$0.00 $0.00
/
DP OO W T S WE L
E PR
YT
RL
Toxaway Street Project No. 2019004
OS
E
RD
CO N EN CR AV
Z HA
TO R NE C ST TO X A W AY
NOT TO SCALE
T EN S CRA V
I LL LM
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
EM M RD A
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Toxaway Street
LOCATION:
W. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
51
PROJECT NO.
2019004
TOTAL LF:
722
PROJECT BUDGET:
$286,600.00
PROJECT ORIGIN:
Work Orders, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$4,000.00
$4,000.00
55330 - DESIGN 55340 - PERMITS
$1,000.00
$1,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$280,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$600.00
TOTAL AMOUNT
$286,600.00
$0.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [ 0
CONTRACTOR:
$4,000.00
$1,000.00
ESTIMATED BUDGETS - FY 22 - 30 ]
FY 21-22
$281,600.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
PROJECT DESCRIPTION: This project is located in West Asheville and is comprised of 722 linear feet of FY 27-28
$0.00
8-inch DIP. The existing sewer line is 6-inch clay with extensive structural problems and roots.
SPECIAL PROJECT NOTES:
FY 28-29
$0.00
FY 29-30
$0.00
N
INGT LE X
VE ON A NOT TO SCALE
ER LAWY
K AR M S
BROAD T WAY S
K RAN
IN AV
ET
LN
E
LY REN A LANG
N PAC K SQ
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
K
METROPOLITAN SEWERAGE DISTRICT
S WAL
T
Walnut Street at North Lexington Avenue Project No. 2017008
R K ET
GE ST
LY
ST
N MA
E COLL
LE A TING
LN U T
UCE S N SPR T
/
T ST
A OLIN CAR
NU WAL
E WA
UCE S S SPR
ST
ST
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Walnut St. @ N. Lexington Ave.
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
42
PROJECT NO.
2017008
TOTAL LF:
1,550
PROJECT BUDGET:
$663,500.00
PROJECT ORIGIN:
Line Condition, Undersized Pipe
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$7,000.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$650,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,500.00
55450 - SURVEY - ASBUILT
$5,000.00
TOTAL AMOUNT
$663,500.00
$0.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [ 0
$0.00
$0.00
ESTIMATED BUDGETS - FY 22 - 30 ]
CONTRACTOR:
FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$7,000.00
FY 25-26
$0.00
FY 26-27
$656,500.00
at N. Lexington Ave., runs along Walnut Street and down side roads of Langren Alley, Market Street, and FY 27-28 Lawyers Walk, and ends near the corner of E. Walnut Street. The existing 6-inch and 8-inch clay pipes FY 28-29 have structural issues and yearly maintenance is needed.
$0.00
PROJECT DESCRIPTION: This project runs along Walnut Street in downtown Asheville. The project begins
FY 29-30
SPECIAL PROJECT NOTES:
$0.00 $0.00
0W E 0 I24
D OO W Y HA
TS K RAN
T E STAG LN
PAGE AVE
E RY AV OHEN
IS OT
VE IN A
DS OO W Y HA T
RK ALY BATTERY PA
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
KS S PAC
K SQ
NOT TO SCALE
N PAC METROPOLITAN SEWERAGE DISTRICT
GE ST
Y E AL
E COLL
L TING
T ST LY REN A LANG
Walnut Street at Rankin Avenue Project No. 2014018
AVE
AVE
T
LN U E WA
Q
T
N PATTO
N ON INGT LE X
S NUT WAL
ALY
ST WALL
L
K EN CHIC LN
K AVE Y PAR R E T BAT
ND VA
TP BIL ER
A OLIN CAR
T WAY S
Q TLE S
TO
D BROA
BAT
ST
0E IN FL
ET S
/
I24
I24
RK N MA
ST
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Walnut Street @ Rankin Ave.
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
54
PROJECT NO.
2014018
TOTAL LF:
500
PROJECT BUDGET:
$1,760,300.00
PROJECT ORIGIN:
Access, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$18,500.00
$9,900.00
$8,600.00
55330 - DESIGN 55340 - PERMITS
$500.00
$500.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES
$300.00
$300.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION 55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT
$1,710,000.00
$1,310,000.00
$27,000.00
$27,000.00
$1,000.00
$1,000.00
$3,000.00
TOTAL AMOUNT
$400,000.00
$3,000.00
$1,760,300.00
$10,200.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [
$1,347,100.00
$403,000.00
ESTIMATED BUDGETS - FY 22 - 30 0
]
CONTRACTOR:
FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
ductile iron pipe. The current 6-inch clay line is undersized and deteriorated, with many structural FY 27-28
$0.00
PROJECT DESCRIPTION: This project is located in downtown Asheville and consists of 2,495 LF of 8-inch
problems.
SPECIAL PROJECT NOTES:
This project is being coordinated with a larger City of Asheville project in the downtown area.
FY 28-29
$0.00
FY 29-30
$0.00
0E
I24
ING
TO NS
T
L
ST
KR D
T
HOWARD S
TREMO N T ST
SHO TREM RT ONT S
OO
T
RE Y NO LD SR
OD WO N OW
IN
LY
K EL
AV
ST
ST
AV ON
SUCCESS AVE
D
TA
AV
E
V RI
NK LI R E
VE
E
RD
Y LE ARG LN
NOT TO SCALE
LN
CRAVEN S T
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
ST
R
Waynesville Avenue at Brownwood Avenue Project No. 2014183
EZELLE
MI LL BR
RG IA
OLD LYMAN
/
T
DS
YP
GE O
D OL
O DOMIN LN
WI LM
LW OO
BR A
DE L
WO RL E
ST
NN ING
WE S
T TREMONT S
L
RICHLAND ST
BR
DA VINCI CT
VE ILLE A
T W OO DP
HO E UN A R DS DR
WAYN ESV
G LO
LU N A HES LN PER LN US SU R
DE AV E
E AV AN
H A YW O
ED NR IS
ST PL
L A WAMBOLDT
MB WA
LE Y
L
OA K
O
EU
N
BL A C K LN WE L
D R
VE
VE SE
S AK
CL ID
IA A
VD
DAL VAN
O D
RD
BL
R AY RIDGEW AVE
S LD NO RI V
ND
Y RE R N CI
DR
A LOG
SP
W
S LA RU
RT RA
ER VIE
RIVERSIDE DR
VE RI LYMAN ST
T S S AY RT E W B S RO NE Y PA
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Waynesville Ave. @ Brownwood Ave. LOCATION:
W. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
33
PROJECT NO.
2014183
TOTAL LF:
3,022
PROJECT BUDGET:
$1,370,750.00
PROJECT ORIGIN:
Access, Line Condition, SSO's.
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$19,000.00
55330 - DESIGN 55340 - PERMITS
$500.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$31,000.00
55370 - LEGAL FEES
$50,000.00
55380 - ACQUISITION SERVICES
$105,750.00
55390 - COMPENSATION
$250,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$910,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$2,500.00
TOTAL AMOUNT
$1,370,750.00
$0.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
Consultant
# PLATS: [ 47
$0.00
$0.00
ESTIMATED BUDGETS - FY 22 - 30 ]
CONTRACTOR:
FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$19,500.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$28,000.00
FY 26-27
$203,000.00
and is comprised of 3,022 LF of 8-inch ductile iron pipe. The existing line is 8-inch vitrified clay pipe that is FY 27-28 in poor condition with heavy root intrusion, structural defects, and I&I problems, resulting in a long history FY 28-29 of SSO's.
$205,750.00
PROJECT DESCRIPTION: This project is located in West Asheville between Haywood Rd. and Craven St.
FY 29-30
SPECIAL PROJECT NOTES:
$914,500.00 $0.00
ES
RL
VE R
SA
ILL
ES
LN
R GA
ND LA
LN
CH D
CRABAPPLE LN
West Crabapple Lane Project No. 2014005
DR
LD WI R RY R E
IL O
/
NE T
CT
BAYO N
N CEN VIN
CR LE
A
E
A
LN
NOT TO SCALE
AB CR
LE PP
K RD
Budget Map
METROPOLITAN SEWERAGE DISTRICT of BUNCOMBE COUNTY, NORTH CAROLINA
A ND O ROU
LN C R EEK
W P AP AB
U Q H
BEAVER
RD GIBSON
LW
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
West Crabapple Lane
LOCATION:
W. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
67
PROJECT NO.
2014005
TOTAL LF:
1,774
PROJECT BUDGET:
$644,800.00
PROJECT ORIGIN:
SSO's, Access, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$6,300.00
$6,300.00
$9,000.00
$8,500.00
$500.00
$14,000.00
$4,521.00
$5,479.00
$4,000.00
$85,000.00
$40,000.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$125,000.00
55400 - APPRAISAL
$5,000.00
$5,000.00
55410 - CONDEMNATION
$20,000.00
$20,000.00
55420 - CONSTRUCTION
$460,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$4,500.00
TOTAL AMOUNT
$644,800.00
$19,321.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [
CONTRACTOR:
$90,979.00
$69,000.00
ESTIMATED BUDGETS - FY 22 - 30 12 ]
FY 21-22
$465,500.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
This project is on West Crabapple Lane which is a private road. The FY 27-28 existing 8-inch clay pipe is in poor condition and will be replaced with 8-inch ductile iron pipe. System Services crews have reported multiple structural defects which are resulting in major infiltration and inflow. FY 28-29 PROJECT DESCRIPTION:
FY 29-30 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
AK RD WHITE O
E RD
White Oak Road Project No. 2015193
RD
OAKS R D
NOT TO SCALE
D
FOX GLEN D
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
EXT
DR
R METROPOLITAN SEWERAGE DISTRICT
WHITE O AK ROAD
SOMERSET RD
HYDE PARK PL
D
/
CT
OLD SMOKEY TRL
ROYAL
D PL
WATSON RD
VILL
LA N
LN PATH WOOD
SO N D ER
CE GRA
K CT S PAR
N PARK
LE D R
CIR
EDNEY LN
CRESCENT HILL DR
PINE NEED
HEN
SR
WOOD PATH LN
IR FA K OA
L
CO
E CH A SE
NW
DOG WOO D
N F A IR OAKS RD
IT WH INE EP
S
LL E
E GR RD
RD
ON E EN
ER R
O O D
ND LY R CI
SO M ET
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
White Oak Road
LOCATION:
Arden
TYPE:
General Sewer Rehab
PIPE RATING:
3
PROJECT NO.
2015193
TOTAL LF:
N/A
PROJECT BUDGET:
$48,000.00
PROJECT ORIGIN:
Access, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$3,500.00
$3,500.00
55370 - LEGAL FEES
$4,000.00
$4,000.00
$25,000.00
$25,000.00
$2,500.00
$2,500.00
$10,000.00
$10,000.00
$500.00
$500.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION 55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT
$2,500.00
TOTAL AMOUNT
$2,500.00
$48,000.00
$0.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [ 3 ]
CONTRACTOR:
$0.00
$48,000.00
ESTIMATED BUDGETS - FY 22 - 30 FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
PROJECT DESCRIPTION: This project is located in Arden along White Oak Road, near Hendersonville FY 27-28
$0.00
Road. The project will replace 960 LF of 6-inch Orangeburg and VCP. The existing lines are in bad condition and have too many point repairs. Construction will be done by System Services In-House crew. FY 28-29 FY 29-30 SPECIAL PROJECT NOTES:
$0.00 $0.00
/
WO O
DP AR
KK
NL
Wildwood Park Project No. 2015194
WILDWOO D PARK
N MAIN ST NOT TO SCALE
OAKLAND ST
S
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
CH E
WIL D
ST TN UT
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Wildwood Park
LOCATION:
Weaverville
TYPE:
General Sewer Rehab.
PIPE RATING:
27
PROJECT NO.
2015194
TOTAL LF:
582
PROJECT BUDGET:
$223,780.00
PROJECT ORIGIN:
Pipe Fractures, Roots, Location
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$2,380.00
$2,380.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$218,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$1,400.00
TOTAL AMOUNT
ENGINEER:
$223,780.00
MSD
R.O.W. ACQUISITION:
$2,380.00
HC # PLATS: [ 0 ]
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY 22 - 30 FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
PROJECT DESCRIPTION: This project is located in Weaverville at the corner of N Main St. and Wildwood FY 27-28
$0.00
FY 29-30
$221,400.00
Park. It consists of installing 582 LF of 8-inch DIP to replace existing 8-inch VCP. The existing pipe has FY 28-29 multiple fractures, root problems, and runs underneath multiple structures making maintenance difficult. SPECIAL PROJECT NOTES:
$0.00
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
SSD Rehab. & Replacement
PROJECT:
LOCATION:
Various
(Annual) TYPE:
General Sewer Rehab.
PIPE RATING:
N/A
PROJECT NO.
2002101
TOTAL LF:
200,000
PROJECT BUDGET:
$46,000,000.00
PROJECT ORIGIN:
In-house Capital Improvements
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$46,000,000.00
$1,901,386.90
$2,698,613.10
$4,675,000.00
$46,000,000.00
$1,901,386.90
$2,698,613.10
$4,675,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
20000 ENGINEER:
MSD
MS
R.O.W. ACQUISITION:
MSD
# PLATS: [
CONTRACTOR:
ESTIMATED BUDGETS - FY 22 - 30 ]
FY 21-22
$4,675,000.00
FY 22-23
$4,675,000.00
CONSTRUCTION ADM:
MSD
FY 23-24
$4,675,000.00
INSPECTION:
MSD
FY 24-25
$4,675,000.00
FY 25-26
$4,675,000.00
FY 26-27
$4,675,000.00
This line item is for the replacement of capital assets using in-house construction crews and materials. This includes new taps, small repairs, lining, as well as larger FY 27-28 rehabilitation projects. Also included is paving when required for these repairs and rehabilitation projects. FY 28-29 The total estimated project cost shown is the total within the ten year window. PROJECT DESCRIPTION:
FY 29-30
SPECIAL PROJECT NOTES:
Capitalized Labor & Misc.
$1,628,416 Materials / Year
Fuel Allocation
Paving Contracts
$1,254,155 Estimated L.F. per year
$100,000
$4,675,000.00 $4,675,000.00 $4,675,000.00 $1,417,429.00 20,000
Metropolitan Sewerage District of Buncombe County, North Carolina CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020-2021 PROJECT:
SUMMARY - In-House Projects
ACCOUNT:
GENERAL
DATE OF REPORT:
February 2020
PROJECT BUDGET:
Funded through 2002101 PROJECT NO.
PROJECT LOCATION
WORK ORDER NO.
CONST. YEAR
TOTAL LINEAR FOOTAGE
2017244
Asheville 28805
248044
FY 20-21
1,002
Briarwood Road @ W. Fox Chase
2019248
Asheville 28804
267160
FY 20-21
300
Brucemont Circle Phase 2
2018232
Asheville 28806
256883
FY 20-21
913
Caledonia Road @ Springdale Road
2019268
Asheville 28803
268194
FY 20-21
629
169 Charlotte Street
2019264
Asheville 28801
244586/244585
FY 20-21
70
Charlotte Street @ N. Ridgeway Ave.
2016237
Blk Mtn 28711
232699
FY 20-21
1,073
Coleman Avenue @ Conestee Place
2016208
Asheville 28801
233875
FY 20-21
1,517
Dogwood Road @ White Pine Road
2014132
Arden 28704
265656
FY 20-21
565
E. Chestnut Avenue @ Five Points Line A
2015192
Asheville 28801
268188
FY 20-21
580
Forest Hill Drive @ Kenilworth Road
2019267
Asheville 28803
268193
FY 20-21
353
Heywood Road @ Grace Lane
2019186
Arden 28704
264967
FY 20-21
959
Kenilworth Road @ Rosefield Drive
2019265
Asheville 28803
268191
FY 20-21
100
Kenilworth Road @ Warwick Road
2019266
Asheville 28803
268182
FY 20-21
573
Lakewood Drive @ Waverly Road
2019012
Asheville 28803
258770
FY 20-21
1,350
Lapsley Lane @ Brevard Road
2016197
Arden 28704
237319
FY 20-21
576
Merrimon Place @ South Liberty St.
2019178
Asheville 28801
264618
FY 20-21
212
Mountain View Road @ Maxwell Road
2019197
Asheville 28805
265289
FY 20-21
521
Old Asheland Avenue to Phifer Street
2015034
Asheville 28801
258560
FY 20-21
462
139 Old County Home Road
2019063
Asheville 28806
260128
FY 20-21
352
Old County Home Rd @ Johnston School
2019194
Asheville 28806
236281
FY 20-21
150
154 Overbrook Road
2019161
Montreat 28757
264010
FY 20-21
470
Owenby Lane @ US Hwy. 70
2018033
Blk Mtn 28711
268180
FY 20-21
900
Reddick Road
2018034
Asheville 28805
267501
FY 20-21
635
23 Spears Avenue
2019140
Asheville 28801
263130
FY 20-21
130
75 White Oak Road
2015193
Arden 28704
264966
FY 20-21
275
WRF Ash Pump Line Replacement
2019247
Asheville 28804
267391
FY 20-21
1,000
Wynne Street @ Main Street
2019139
Asheville 28801
263129
FY 20-21
437
DESCRIPTION Bell Road @ New Haw Creek Road
TOTAL FOOTAGE
16,104
NOTES: In addition to the projects identified above, an additional 5,000 linear feet of sewer rehabilitation footage is expected through completion of previously identified projects, emergency repairs, and other activities during FY 2020-2021.
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2020-2021
PROJECT:
Bell Road @ New Haw Creek Road
LOCATION:
Asheville 28805
TYPE:
In House General Sewer Rehab
WORK ORDER:
248044
PROJECT NO.
2017244
TOTAL LF:
1,002
PROJECT BUDGET:
Funded through Project 2002101
PROJECT ORIGIN:
In-House Capital Improvements
ENGINEER:
MSD
R.O.W. ACQUISITION:
MSD
CONTRACTOR:
MSD
CONSTRUCTION ADM:
MSD In-House
INSPECTION:
MSD In-House
# PLATS: [
PROJECT DESCRIPTION: Project consists of replacing approximately 1,002 LF with 8-inch DIP, by dig and replace.
SPECIAL PROJECT NOTES:
0 ]
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2020-2021
PROJECT:
Briarwood Road @ W. Fox Chase
LOCATION:
Asheville 28804
TYPE:
In House General Sewer Rehab
WORK ORDER:
267160
PROJECT NO.
2019248
TOTAL LF:
300
PROJECT BUDGET:
Funded through Project 2002101
PROJECT ORIGIN:
In-House Capital Improvements
ENGINEER:
MSD
R.O.W. ACQUISITION:
MSD
CONTRACTOR:
MSD
CONSTRUCTION ADM:
MSD In-House
INSPECTION:
MSD In-House
# PLATS: [
PROJECT DESCRIPTION: Project consists of replacing approximately 300 LF with 8-inch DIP, by dig and replace.
SPECIAL PROJECT NOTES:
0 ]
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2020-2021
PROJECT:
Brucemont Circle Phase 2
LOCATION:
Asheville 28806
TYPE:
In House General Sewer Rehab
WORK ORDER:
256883
PROJECT NO.
2018232
TOTAL LF:
913
PROJECT BUDGET:
Funded through Project 2002101
PROJECT ORIGIN:
In-House Capital Improvements
ENGINEER:
MSD
R.O.W. ACQUISITION:
MSD
CONTRACTOR:
MSD
CONSTRUCTION ADM:
MSD In-House
INSPECTION:
MSD In-House
# PLATS: [
12 ]
PROJECT DESCRIPTION: Project consists of replacing approximately 913 LF with 8-inch DIP/HDPE by dig and replace and pipebursting.
SPECIAL PROJECT NOTES:
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2020-2021
PROJECT:
Caledonia Road @ Springdale Road
LOCATION:
Asheville 28803
TYPE:
In House General Sewer Rehab
WORK ORDER:
268194
PROJECT NO.
2019268
TOTAL LF:
629
PROJECT BUDGET:
Funded through Project 2002101
PROJECT ORIGIN:
In-House Capital Improvements
ENGINEER:
MSD
R.O.W. ACQUISITION:
MSD
CONTRACTOR:
MSD
CONSTRUCTION ADM:
MSD In-House
INSPECTION:
MSD In-House
# PLATS: [
0 ]
PROJECT DESCRIPTION: Project consists of replacing approximately 629 LF with 8-inch DIP, by dig and replace. This is a joint project with COA storm-water.
SPECIAL PROJECT NOTES:
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2020-2021
PROJECT:
169 Charlotte Street
LOCATION:
Asheville 28801
TYPE:
In House General Sewer Rehab
WORK ORDER:
244586 / 244585
PROJECT NO.
2019264
TOTAL LF:
70
PROJECT BUDGET:
Funded through Project 2002101
PROJECT ORIGIN:
In-House Capital Improvements
ENGINEER:
MSD
R.O.W. ACQUISITION:
MSD
CONTRACTOR:
MSD
CONSTRUCTION ADM:
MSD In-House
INSPECTION:
MSD In-House
# PLATS: [
0 ]
PROJECT DESCRIPTION: Project consists of replacing approximately 70 LF with 8-inch DIP, by dig and replace, prior to COA repairing subject roadway.
SPECIAL PROJECT NOTES:
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2020-2021
PROJECT:
Charlotte Street @ N. Ridgeway Ave. LOCATION:
Black Mountain 28711
TYPE:
In House General Sewer Rehab
WORK ORDER:
232699
PROJECT NO.
2016237
TOTAL LF:
1,073
PROJECT BUDGET:
Funded through Project 2002101
PROJECT ORIGIN:
In-House Capital Improvements
ENGINEER:
MSD
R.O.W. ACQUISITION:
MSD
CONTRACTOR:
MSD
CONSTRUCTION ADM:
MSD In-House
INSPECTION:
MSD In-House
# PLATS: [
0 ]
PROJECT DESCRIPTION: Project consists of replacing approximately 1,073 LF with 8-inch DIP, by dig and replace. Work to be coordinated with school
schedule.
SPECIAL PROJECT NOTES:
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2020-2021
PROJECT:
Coleman Avenue @ Conestee Pl
LOCATION:
Asheville 28801
TYPE:
In House General Sewer Rehab
WORK ORDER:
233875
PROJECT NO.
2016208
TOTAL LF:
1,517
PROJECT BUDGET:
Funded through Project 2002101
PROJECT ORIGIN:
In-House Capital Improvements
ENGINEER:
MSD
R.O.W. ACQUISITION:
MSD
CONTRACTOR:
MSD
CONSTRUCTION ADM:
MSD In-House
INSPECTION:
MSD In-House
# PLATS: [
PROJECT DESCRIPTION: Project consists of replacing approximately 1,517 LF with 8-inch DIP, by dig and replace.
SPECIAL PROJECT NOTES:
3 ]
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2020-2021
PROJECT:
Dogwood Road @ White Pine Road
LOCATION:
Arden 28704
TYPE:
In House General Sewer Rehab
WORK ORDER:
265656
PROJECT NO.
2014132
TOTAL LF:
565
PROJECT BUDGET:
Funded through Project 2002101
PROJECT ORIGIN:
In-House Capital Improvements
ENGINEER:
MSD
R.O.W. ACQUISITION:
MSD
CONTRACTOR:
MSD
CONSTRUCTION ADM:
MSD In-House
INSPECTION:
MSD In-House
# PLATS: [ 8 ]
PROJECT DESCRIPTION: Project consists of replacing approximately 565 LF with 8-inch DIP, by dig and replace.
SPECIAL PROJECT NOTES:
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2020-2021
PROJECT:
E. Chestnut Ave @ Five Points Line A
LOCATION:
Asheville 28801
TYPE:
In House General Sewer Rehab
WORK ORDER:
268188
PROJECT NO.
2015192
TOTAL LF:
580
PROJECT BUDGET:
Funded through Project 2002101
PROJECT ORIGIN:
In-House Capital Improvements
ENGINEER:
MSD
R.O.W. ACQUISITION:
MSD
CONTRACTOR:
MSD
CONSTRUCTION ADM:
MSD In-House
INSPECTION:
MSD In-House
# PLATS: [
0 ]
PROJECT DESCRIPTION: Project consists of replacing approximately 580 LF with 8-inch DIP, by dig and replace. Work activities to be coordinated with COA
sidewalk improvement project.
SPECIAL PROJECT NOTES:
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2020-2021
PROJECT:
Forest Hill Drive @ Kenilworth
LOCATION:
Asheville 28803
TYPE:
In House General Sewer Rehab
WORK ORDER:
268193
PROJECT NO.
2019267
TOTAL LF:
353
PROJECT BUDGET:
Funded through Project 2002101
PROJECT ORIGIN:
In-House Capital Improvements
ENGINEER:
MSD
R.O.W. ACQUISITION:
MSD
CONTRACTOR:
MSD
CONSTRUCTION ADM:
MSD In-House
INSPECTION:
MSD In-House
# PLATS: [
0 ]
PROJECT DESCRIPTION: Project consists of replacing approximately 353 LF with 8-inch DIP, by dig and replace. Work activities to be coordinated with COA
storm-water project.
SPECIAL PROJECT NOTES:
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2020-2021
PROJECT:
Heywood Road @ Grace Lane
LOCATION:
Arden 28704
TYPE:
In House General Sewer Rehab
WORK ORDER:
264967
PROJECT NO.
2019186
TOTAL LF:
959
PROJECT BUDGET:
Funded through Project 2002101
PROJECT ORIGIN:
In-House Capital Improvements
ENGINEER:
MSD
R.O.W. ACQUISITION:
MSD
CONTRACTOR:
MSD
CONSTRUCTION ADM:
MSD In-House
INSPECTION:
MSD In-House
# PLATS: [
PROJECT DESCRIPTION: Project consists of replacing approximately 959 LF with 8-inch DIP, by dig and replace.
SPECIAL PROJECT NOTES:
3 ]
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2020-2021
PROJECT:
Kenilworth Road @ Rosefield Dr.
LOCATION:
Asheville 28803
TYPE:
In House General Sewer Rehab
WORK ORDER:
268191
PROJECT NO.
2019265
TOTAL LF:
100
PROJECT BUDGET:
Funded through Project 2002101
PROJECT ORIGIN:
In-House Capital Improvements
ENGINEER:
MSD
R.O.W. ACQUISITION:
MSD
CONTRACTOR:
MSD
CONSTRUCTION ADM:
MSD In-House
INSPECTION:
MSD In-House
# PLATS: [
0 ]
PROJECT DESCRIPTION: Project consists of replacing approximately 100 LF with 8-inch DIP, by dig and replace. Work activities to be coordinated with COA
storm-water project.
SPECIAL PROJECT NOTES:
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2020-2021
PROJECT:
Kenilworth Road @ Warwick
LOCATION:
Asheville 28803
TYPE:
In House General Sewer Rehab
WORK ORDER:
268182
PROJECT NO.
2019266
TOTAL LF:
573
PROJECT BUDGET:
Funded through Project 2002101
PROJECT ORIGIN:
In-House Capital Improvements
ENGINEER:
MSD
R.O.W. ACQUISITION:
MSD
CONTRACTOR:
MSD
CONSTRUCTION ADM:
MSD In-House
INSPECTION:
MSD In-House
# PLATS: [
0 ]
PROJECT DESCRIPTION: Project consists of replacing approximately 573 LF with 8-inch DIP, by dig and replace. Work activities to be coordinated with COA
paving project.
SPECIAL PROJECT NOTES:
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2020-2021
PROJECT:
Lakewood Drive @ Waverly Road
LOCATION:
Asheville 28803
TYPE:
In House General Sewer Rehab
WORK ORDER:
258770
PROJECT NO.
2019012
TOTAL LF:
1,350
PROJECT BUDGET:
Funded through Project 2002101
PROJECT ORIGIN:
In-House Capital Improvements
ENGINEER:
MSD
R.O.W. ACQUISITION:
MSD
CONTRACTOR:
MSD
CONSTRUCTION ADM:
MSD In-House
INSPECTION:
MSD In-House
# PLATS: [
PROJECT DESCRIPTION: Project consists of replacing approximately 1,350 LF with 8-inch DIP, by dig and replace.
SPECIAL PROJECT NOTES:
0 ]
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2020-2021
PROJECT:
Lapsley Lane @ Brevard Road
LOCATION:
Avery's Creek 28704
TYPE:
In House General Sewer Rehab
WORK ORDER:
237319
PROJECT NO.
2016197
TOTAL LF:
576
PROJECT BUDGET:
Funded through Project 2002101
PROJECT ORIGIN:
In-House Capital Improvements
ENGINEER:
MSD
R.O.W. ACQUISITION:
MSD
CONTRACTOR:
MSD
CONSTRUCTION ADM:
MSD In-House
INSPECTION:
MSD In-House
# PLATS: [
PROJECT DESCRIPTION: Project consists of replacing approximately 576 LF with 8-inch DIP, by dig and replace.
SPECIAL PROJECT NOTES:
3 ]
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2020-2021
PROJECT:
Merrimon Place @ South Liberty
LOCATION:
Asheville 28801
TYPE:
In House General Sewer Rehab
WORK ORDER:
264618
PROJECT NO.
2019178
TOTAL LF:
212
PROJECT BUDGET:
Funded through Project 2002101
PROJECT ORIGIN:
In-House Capital Improvements
ENGINEER:
MSD
R.O.W. ACQUISITION:
MSD
CONTRACTOR:
MSD
CONSTRUCTION ADM:
MSD In-House
INSPECTION:
MSD In-House
# PLATS: [
PROJECT DESCRIPTION: Project consists of replacing approximately 212 LF with 8-inch DIP, by dig and replace.
SPECIAL PROJECT NOTES:
0 ]
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2020-2021
PROJECT:
Mountain View Road @ Maxwell Rd.
LOCATION:
Asheville 28805
TYPE:
In House General Sewer Rehab
WORK ORDER:
265289
PROJECT NO.
2019197
TOTAL LF:
521
PROJECT BUDGET:
Funded through Project 2002101
PROJECT ORIGIN:
In-House Capital Improvements
ENGINEER:
MSD
R.O.W. ACQUISITION:
MSD
CONTRACTOR:
MSD
CONSTRUCTION ADM:
MSD In-House
INSPECTION:
MSD In-House
# PLATS: [
PROJECT DESCRIPTION: Project consists of replacing approximately 521 LF with 8-inch DIP, by dig and replace.
SPECIAL PROJECT NOTES:
8 ]
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2020-2021
PROJECT:
Old Asheland Ave. to Phifer St.
LOCATION:
Asheville 28801
TYPE:
In House General Sewer Rehab
WORK ORDER:
258560
PROJECT NO.
2015034
TOTAL LF:
462
PROJECT BUDGET:
Funded through Project 2002101
PROJECT ORIGIN:
In-House Capital Improvements
ENGINEER:
MSD
R.O.W. ACQUISITION:
MSD
CONTRACTOR:
MSD
CONSTRUCTION ADM:
MSD In-House
INSPECTION:
MSD In-House
# PLATS: [
PROJECT DESCRIPTION: Project consists of replacing approximately 462 LF with 8-inch DIP, by dig and replace.
SPECIAL PROJECT NOTES:
0 ]
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2020-2021
PROJECT:
139 Old County Home Road
LOCATION:
Asheville 28806
TYPE:
In House General Sewer Rehab
WORK ORDER:
260128
PROJECT NO.
2019063
TOTAL LF:
352
PROJECT BUDGET:
Funded through Project 2002101
PROJECT ORIGIN:
In-House Capital Improvements
ENGINEER:
MSD
R.O.W. ACQUISITION:
MSD
CONTRACTOR:
MSD
CONSTRUCTION ADM:
MSD In-House
INSPECTION:
MSD In-House
# PLATS: [
PROJECT DESCRIPTION: Project consists of replacing approximately 352 LF with 8-inch DIP, by dig and replace.
SPECIAL PROJECT NOTES:
0 ]
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2020-2021
PROJECT:
Old County Home @ Johnston School
LOCATION:
Asheville 28806
TYPE:
In House General Sewer Rehab
WORK ORDER:
236281
PROJECT NO.
2019194
TOTAL LF:
150
PROJECT BUDGET:
Funded through Project 2002101
PROJECT ORIGIN:
In-House Capital Improvements
ENGINEER:
MSD
R.O.W. ACQUISITION:
MSD
CONTRACTOR:
MSD
CONSTRUCTION ADM:
MSD In-House
INSPECTION:
MSD In-House
# PLATS: [
PROJECT DESCRIPTION: Project consists of replacing approximately 150 LF with 8-inch DIP, by dig and replace.
SPECIAL PROJECT NOTES:
2 ]
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2020-2021
PROJECT:
154 Overbrook Road
LOCATION:
Montreat 28757
TYPE:
In House General Sewer Rehab
WORK ORDER:
264010
PROJECT NO.
2019161
TOTAL LF:
470
PROJECT BUDGET:
Funded through Project 2002101
PROJECT ORIGIN:
In-House Capital Improvements
ENGINEER:
MSD
R.O.W. ACQUISITION:
MSD
CONTRACTOR:
MSD
CONSTRUCTION ADM:
MSD In-House
INSPECTION:
MSD In-House
# PLATS: [
PROJECT DESCRIPTION: Project consists of replacing approximately 470 LF with 8-inch DIP, by dig and replace.
SPECIAL PROJECT NOTES:
0 ]
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2020-2021
PROJECT:
Owenby Lane @ US Hwy. 70
LOCATION:
Black Mountain 28711
TYPE:
In House General Sewer Rehab
WORK ORDER:
268180
PROJECT NO.
2018033
TOTAL LF:
900
PROJECT BUDGET:
Funded through Project 2002101
PROJECT ORIGIN:
In-House Capital Improvements
ENGINEER:
MSD
R.O.W. ACQUISITION:
MSD
CONTRACTOR:
MSD
CONSTRUCTION ADM:
MSD In-House
INSPECTION:
MSD In-House
# PLATS: [
PROJECT DESCRIPTION: Project consists of replacing approximately 900 LF with 8-inch DIP, by dig and replace.
SPECIAL PROJECT NOTES:
4 ]
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2020-2021
PROJECT:
Reddick Road
LOCATION:
Asheville 28805
TYPE:
In House General Sewer Rehab
WORK ORDER:
267501
PROJECT NO.
2018034
TOTAL LF:
635
PROJECT BUDGET:
Funded through Project 2002101
PROJECT ORIGIN:
In-House Capital Improvements
ENGINEER:
MSD
R.O.W. ACQUISITION:
MSD
CONTRACTOR:
MSD
CONSTRUCTION ADM:
MSD In-House
INSPECTION:
MSD In-House
# PLATS: [
PROJECT DESCRIPTION: Project consists of replacing approximately 635 LF with 8-inch DIP, by dig and replace.
SPECIAL PROJECT NOTES:
0 ]
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2020-2021
PROJECT:
23 Spears Avenue
LOCATION:
Asheville 28801
TYPE:
In House General Sewer Rehab
WORK ORDER:
263130
PROJECT NO.
2019140
TOTAL LF:
130
PROJECT BUDGET:
Funded through Project 2002101
PROJECT ORIGIN:
In-House Capital Improvements
ENGINEER:
MSD
R.O.W. ACQUISITION:
MSD
CONTRACTOR:
MSD
CONSTRUCTION ADM:
MSD In-House
INSPECTION:
MSD In-House
# PLATS: [
PROJECT DESCRIPTION: Project consists of replacing approximately 130 LF with 8-inch DIP, by dig and replace.
SPECIAL PROJECT NOTES:
0 ]
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2020-2021
PROJECT:
75 White Oak Road
LOCATION:
Arden 28704
TYPE:
In House General Sewer Rehab
WORK ORDER:
264966
PROJECT NO.
2015193
TOTAL LF:
275
PROJECT BUDGET:
Funded through Project 2002101
PROJECT ORIGIN:
In-House Capital Improvements
ENGINEER:
MSD
R.O.W. ACQUISITION:
MSD
CONTRACTOR:
MSD
CONSTRUCTION ADM:
MSD In-House
INSPECTION:
MSD In-House
# PLATS: [
PROJECT DESCRIPTION: Project consists of replacing approximately 275 LF with 8-inch DIP, by dig and replace.
SPECIAL PROJECT NOTES:
0 ]
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2020-2021
PROJECT:
WRF Ash Pump Line Replacement
LOCATION:
Woodfin 28804
TYPE:
In House General Sewer Rehab
WORK ORDER:
267391
PROJECT NO.
2019247
TOTAL LF:
1,000
PROJECT BUDGET:
Funded through Project 2002101
PROJECT ORIGIN:
In-House Capital Improvements
ENGINEER:
MSD
R.O.W. ACQUISITION:
MSD
CONTRACTOR:
MSD
CONSTRUCTION ADM:
MSD In-House
INSPECTION:
MSD In-House
# PLATS: [
PROJECT DESCRIPTION: Project consists of replacing approximately 1,000 LF with 6-inch CPVC, by dig and replace.
SPECIAL PROJECT NOTES:
0 ]
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM SSD REHABILITATION AND REPLACEMENT BUDGET DATA SHEET - FY 2020-2021
PROJECT:
Wynne Street @ Mountain Street
LOCATION:
Asheville 28801
TYPE:
In House General Sewer Rehab
WORK ORDER:
263129
PROJECT NO.
2019139
TOTAL LF:
437
PROJECT BUDGET:
Funded through Project 2002101
PROJECT ORIGIN:
In-House Capital Improvements
ENGINEER:
MSD
R.O.W. ACQUISITION:
MSD
CONTRACTOR:
MSD
CONSTRUCTION ADM:
MSD In-House
INSPECTION:
MSD In-House
# PLATS: [
PROJECT DESCRIPTION: Project consists of replacing approximately 437 with 8-inch DIP, by dig and replace.
SPECIAL PROJECT NOTES:
3 ]
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Surveys for Design
LOCATION:
Various
TYPE:
General Sewer Rehab.
PIPE RATING:
N/A
PROJECT NO.
2002060
TOTAL LF:
N/A
PROJECT BUDGET:
$500,000.00
PROJECT ORIGIN:
Surveys for future projects
DESCRIPTION
ESTIMATED PROJECT COST
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$500,000.00
$50,000.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION 55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
$500,000.00
$0.00
ENGINEER:
EB
R.O.W. ACQUISITION:
# PLATS: [
$0.00
$50,000.00
ESTIMATED BUDGETS - FY 22 - 30 ]
FY 21-22
$50,000.00
CONTRACTOR:
FY 22-23
$50,000.00
CONSTRUCTION ADM:
FY 23-24
$50,000.00
INSPECTION:
FY 24-25
$50,000.00
FY 25-26
$50,000.00
FY 26-27
$50,000.00
New rehabilitation projects are generated continuously throughout the year. This line item provides for surveying needs for these new projects, in order that preliminary work may FY 27-28 begin prior to being formally incorporated into the next year's CIP. This helps to ensure projects are FY 28-29 completed efficiently. PROJECT DESCRIPTION:
FY 29-30
SPECIAL PROJECT NOTES:
Funds are transferred out to provide Survey for Design for Future Projects. Total estimated project cost shown is the total within the ten year window.
$50,000.00 $50,000.00 $50,000.00
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Future Projects - Non Critical
LOCATION:
Various
TYPE:
General Sewer Rehab.
PIPE RATING:
N/A
PROJECT NO.
Various
TOTAL LF:
0
PROJECT BUDGET:
Varies
PROJECT ORIGIN:
SSO's, Work orders, Line condition
Engineer
Project Number
Pipe Rating
Project Footage
Craggy Street @ Old US 70
HC
2015209
2
1,000
$379,150
Lakeshore @ Merrimon
HC
2014177
3
362
$233,600
Tunnel Rd. @ Pleasant Ridge Road
SA
2019006
3
150
$53,300
Riverside Dr. @ Silverline Plastic
SA
2012007
4
400
$158,220
Sweeten Creek Road @ Weston Road
SA
2014187
4
1,775
$611,200
Lionel Place
DP
2015009
6
308
$116,500
Tunnel Rd. @ White Pine Drive
OH
2016101
6
170
$69,500
Merrimon Ave. @ Clearview Terrace
OH
2007012
7
500
$307,950
Upper Grassy Branch @ Maxwell Rd.
SA
2010096
7
1,000
$348,510
Four Mile Creek WW (CDM #1)
EB
2001193
8
3,400
$952,000 $1,064,000
Project
Haw Creek WW (CDM #6)
EB
2001194
8
3,800
Weston Road @ Tampa Blvd.
HC
2015208
8
400
Estimated Budget
$142,150
Herron Avenue
SA
2014186
9
2,060
$804,600
Merrimon Ave. @ Coleman Ave.
DP
2014009
9
2,800
$1,074,000
Oakwood Street
HC
2014115
9
976
Asheville Rd. @ Hart Holloway Dr.
OH
2020023
10
292
$97,500
Druid Drive
SA
2020006
10
500
$162,900
Elk Park Drive - PRP 35001
SA
2006028
10
2,242
$764,046
Four Inch Main - College Street
SA
2012128
10
1,000
$531,300
Wood Avenue @ Parker Road
SA
2014188
10
1,050
$389,100
Adams Street
SA
2012126
12
2,630
$1,007,400
Battery Park Alley
SA
2016107
12
250
$104,700
Biltmore WW (CDM #3)
EB
2001192
12
2,200
$660,000
Cumberland Avenue
HC
2014014
12
5,011
$1,917,125
Douglas Place PSR
SA
2011116
12
588
$202,480
Louisana Avenue
DP
2015174
12
2,150
$827,000
Weaverville Rd. @ Reynolds Mountain
OH
2018036
12
415
Bear Creek Road
SA
2011117
13
2,800
Elkwood Ave. @ Norman Austin Drive
DP
2014008
13
600
$225,100
McDowell St @ Myrtle St
DP
2019257
13
465
$136,000
Oakley Road @ School Road
OH
2018031
13
600
$254,000
Broadway St. @ Bordeau Place
DP
2009034
14
475
$286,750
Page 1 of 2
$390,250
$166,500 $1,050,300
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Future Projects - Non Critical
LOCATION:
Various
TYPE:
General Sewer Rehab.
PIPE RATING:
N/A
PROJECT NO.
Various
TOTAL LF:
0
PROJECT BUDGET:
Varies
PROJECT ORIGIN:
SSO's, Work orders, Line condition
Project
Forest Hill Drive @ Warwick Road
Engineer
Project Number
Pipe Rating
Project Footage
Estimated Budget
SA
2014020
14
3,400
$1,301,600
Town Branch Interceptor Phase III
DP
2017158
14
3,600
$2,501,000
Dingle Creek Interceptor
OH
2006010
15
7,871
$3,121,847
Knauth Road
SA
2015220
15
400
Lakeview @ Glen Falls Road
DP
2014007
15
4,200
$1,706,500
Lower Glendale Avenue
HC
2012083
15
2,716
$1,173,450
Riverside Dr. @ Woodfin Avenue
SA
2019005
15
684
$270,600
Chester Place @ Cranford Road
OH
2019026
16
1,025
$396,000
Lakewood Drive @ Dudley Ave.
HC
2015016
16
280
$111,150
Stratford Road
DP
2015013
16
1,820
$694,500 $1,325,000
$170,300
Mitchell Avenue
SA
2014185
17
3,360
Old Toll Rd. @ Blue Briar Road
OH
2018032
19
185
$80,500
Arlington Street
DP
2015008
20
2,600
$993,000
North Street @ Broadway Street
OH
2018030
20
1,067
$451,000
North Market Street
SA
2014019
20
1,064
$377,400
Smokey Park Hwy @ Sand Hill Rd.
OH
2018035
20
590
$287,000
Kenilworth @ Springdale Rd.
HC
2014010
21
2,524
$747,350
US 70 @ Jordan Road
DP
2015014
21
4,550
$1,615,000
Starnes Avenue
HC
2014154
22
2,871
$1,156,000
Middle Beaverdam Crk. @ I-26
OH
2010002
23
2,930
$1,382,430
South Swannanoa WW (CDM #4)
EB
2001195
23
8,040
$3,020,000
Riverview Drive
HC
2013104
24
2,302
$880,680
Beaverdam Creek WW
EB
2001191
27
5,500
$1,506,000
Lining Contract No. 9
DP
2017031
N/A 105,948
$41,760,438
TOTAL AMOUNT
PROJECT DESCRIPTION: This is a listing of projects which have low Pipe Ratings and are therefore less critical than
other projects within the Ten Year CIP. All projects are reprioritized each year, and the schedule for the entire program is adjusted based on project criticality. SPECIAL PROJECT NOTES:
Page 2 of 2
$1,005,000
—
Private Sewer Rehabilitation Projects
/
RD
R
RD
Homeland Park PSR Project No. 2016248
N AN W S
A O AN
ER IV
RD OD O EW PIN IR AC S MO MI
RHODODENDRON DR
SPRUCE DR A AZALE
UTU S
DR
AR B
RN
VIEW ORS DR NOT TO SCALE
DR
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
PL METROPOLITAN SEWERAGE DISTRICT
PINE CON E
D D PARK R HOMELA N
E GOV
OTEEN PARK
E COTTAG
RD
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Homeland Park
LOCATION:
Asheville
TYPE:
Private Sewer Rehab.
PIPE RATING:
48
PROJECT NO.
2016248
TOTAL LF:
921
PROJECT BUDGET:
$478,750.00
PROJECT ORIGIN:
Work Orders, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$7,250.00
$7,250.00
55330 - DESIGN 55340 - PERMITS
$500.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$24,500.00
55370 - LEGAL FEES
$20,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$53,000.00
55400 - APPRAISAL
$5,000.00
55410 - CONDEMNATION
$20,000.00
55420 - CONSTRUCTION
$345,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$2,500.00
TOTAL AMOUNT
$478,750.00
$7,250.00
ENGINEER:
MSD
OH
R.O.W. ACQUISITION:
MSD
# PLATS: [ 19
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY 22 - 30 ]
FY 21-22
$123,000.00
FY 22-23
$0.00
CONSTRUCTION ADM.:
MSD
FY 23-24
$348,500.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
This project is located in East Asheville just south of the intersection of Swannanoa River Road and Tunnel Road in Homeland Park. This project consists of 921 LF of existing FY 27-28 4-inch VCP replacing with new 8-inch DIP. The existing 4-inch private sewer is the main line for this FY 28-29 subdivision and is full of roots, which has triggered numerous service calls. PROJECT DESCRIPTION:
FY 29-30
SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
BA
IS H
R
O VE
D
C R D
JOAN WAY
L ROL
ING
H I LL
M CR ILL E LO EK OP
DR
Old County Home Road PSR Project No. 2015221
L W
N
O
IN
N
K
R
M C
T
SPIVEY PL
L RD BARN OW
LIA W AY
DA A N LN AM AIL G
SS
CA M
EL IA
LN G RA CT Y
JO HN
DR
Y NT D
/
BRIARCLIF F TER
LA
MAGN O
WISTERIA CT
R HEATHE
SYDNEY LN
D
LN E NC BA U CO R ME O H
VIFA NIA R
DR W O
O D
WY NOT TO SCALE
LANDIS CT
EL
D
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
ER OM H A IAD
RL
PRIMR OSE DR
CH
DR AI N
W ES T
T
M P
D OL ES H ER
CO
W NE IC LE
DR
A SHAST WALK GE CT
LN
TO N
ID WESTR
AM BE
N LO D OO W G
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Old County Home Rd PSR
LOCATION:
W. Asheville
TYPE:
Private Sewer Rehab.
PIPE RATING:
67
PROJECT NO.
2015221
TOTAL LF:
4,600
PROJECT BUDGET:
$1,815,400.00
PROJECT ORIGIN:
Problematic Four Inch Line
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$20,000.00
$18,800.00
$1,200.00
55330 - DESIGN 55340 - PERMITS
$1,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$16,900.00
55370 - LEGAL FEES
$17,000.00
$14,400.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$56,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$1,700,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$2,500.00
TOTAL AMOUNT
$1,815,400.00
$18,800.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [ 16 ]
CONTRACTOR:
$1,200.00
$14,400.00
ESTIMATED BUDGETS - FY 22 - 30 FY 21-22
$76,500.00
FY 22-23
$1,704,500.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
This project is located in West Asheville and is comprised of 4,600 LF of 8-inch FY 27-28 ductile iron pipe and 182 LF of 12-inch ductile iron pipe. The existing line is a problematic 4 and 8-inch FY 28-29 sewer line composed of PVC and VCP with many defects. PROJECT DESCRIPTION:
FY 29-30 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
—
Treatment Plant, Pump Stations, & General Capital Improvements
/
V RI
Biological Treatment Project No. 2016063
ED SI D R E R NOT TO SCALE
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Biological Treatment
LOCATION:
MSD-Treatment Plant
TYPE:
Treatment Plant
PIPE RATING:
N/A
PROJECT NO.
2016063
TOTAL LF:
0
PROJECT BUDGET:
$45,640,000.00
PROJECT ORIGIN:
Future Regulatory Requirements
ESTIMATED PROJECT COST
DESCRIPTION
55310 - PRELIM. ENGINEERING
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
$500,000.00
55320 - SURVEY - DESIGN
$10,000.00
55330 - DESIGN
$4,000,000.00
55340 - PERMITS
$50,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$40,000,000.00
55430 - CONST. CONTRACT ADM.
$1,000,000.00
55440 - TESTING
$80,000.00
55450 - SURVEY - ASBUILT TOTAL AMOUNT
ENGINEER:
$45,640,000.00
MSD
R.O.W. ACQUISITION:
$0.00
$0.00
HC # PLATS: [
$0.00
ESTIMATED BUDGETS - FY 22- 30 0
]
FY 21-22
$0.00 $0.00
CONTRACTOR:
MSD
FY 22-23
CONSTRUCTION ADM.:
MSD
FY 23-24
$500,000.00
INSPECTION:
MSD
FY 24-25
$2,010,000.00
FY 25-26
$2,000,000.00
FY 26-27
$10,320,000.00
PROJECT DESCRIPTION: This project is the final and most significant recommendation from the Plant FY 27-28
$18,486,000.00
Facilities Plan. It will replace the Rotating Biological Contactors (RBC's) with an alternative biological FY 28-29 treatment technology. This project will be driven by regulatory requirements. FY 29-30 SPECIAL PROJECT NOTES:
$12,324,000.00 $0.00
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Building and Facility Rehabilitation
LOCATION:
MSD-Treatment Plant
TYPE:
Treatment Plant - Annual
PIPE RATING:
N/A
PROJECT NO.
2002068
TOTAL LF:
0
PROJECT BUDGET:
$509,500.00
PROJECT ORIGIN:
Miscellaneous building repairs
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$509,500.00
$15,190.00
$85,810.00
$79,000.00
$509,500.00
$15,190.00
$85,810.00
$79,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [
CONTRACTOR:
ESTIMATED BUDGETS - FY 22- 30 0
]
FY 21-22
$51,000.00
FY 22-23
$42,000.00
CONSTRUCTION ADM.:
MSD
FY 23-24
$40,000.00
INSPECTION:
MSD
FY 24-25
$47,500.00
FY 25-26
$50,000.00
FY 26-27
$50,000.00
PROJECT DESCRIPTION: This item is for the replacement of larger capital items such as roofing systems, FY 27-28
$50,000.00
HVAC, and subcontracts on buildings and structures within the MSD campus and treatment plant facility. FY 28-29 Total estimated project cost shown is the total within the ten year window. FY 29-30 SPECIAL PROJECT NOTES:
$50,000.00 $50,000.00
IE OST
B LAM
TR L
R AV
TR UPS
NE JOY
EA M
E
W DR
VE
D OY R AMB
WAY
NOT TO SCALE
Carrier Bridge Pump Station Replacement Project No. 2019045
A VE
ON A CLIFT
/
KIE TAH
TA ST DESO MEADOW RD
IE RIVERV
N ST LYMA
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Carrier Bridge PS Replacement
LOCATION:
Asheville
TYPE:
Pump Station Improvements
PIPE RATING:
N/A
PROJECT NO.
2019045
TOTAL LF:
770
PROJECT BUDGET:
$28,099,375.00
PROJECT ORIGIN:
CDM Preliminary Engineering Report
ESTIMATED PROJECT COST
DESCRIPTION
55310 - PRELIM. ENGINEERING
TOTAL EXPENDS THRU 12/31/19
$1,025.00
55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
$1,025.00
$10,000.00
$4,500.00
$5,500.00
$2,040,000.00
$63,721.00
$376,279.00
$1,600,000.00
$40,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$3,000.00
55370 - LEGAL FEES
$3,000.00
$350.00
$350.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$100,000.00
$100,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$25,000,000.00
55430 - CONST. CONTRACT ADM.
$850,000.00
55440 - TESTING
$50,000.00
55450 - SURVEY - ASBUILT
$5,000.00
TOTAL AMOUNT
$28,099,375.00
$69,596.00
ENGINEER:
HDR
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [
CONTRACTOR:
$381,779.00
$1,703,000.00
ESTIMATED BUDGETS - FY 22- 30 3
]
FY 21-22
$12,970,000.00
FY 22-23
$12,970,000.00
CONSTRUCTION ADM.:
MSD
FY 23-24
$5,000.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
PROJECT DESCRIPTION: This project is to implement the recommendations of the French Broad/Carrier FY 26-27
$0.00
Bridge Preliminary Engineering Report. This project will increase the capacity of the Carrier Bridge Pump FY 27-28 Station to 34MGD to accommodate future growth in south and west Asheville, as well as CCWSD. The estimated costs shown are planning level only, and incorporate a new pump station with screening, odor FY 28-29 control, electrical building, and emergency generator. The project also includes a new 36-inch force main. FY 29-30 SPECIAL PROJECT NOTES:
CDM - PER
This project will include the replacement of the existing 24-inch DIP 770 LF forcemain.
$0.00 $0.00 $0.00
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Collection System Master Plan Update LOCATION:
District-Wide
TYPE:
General Capital Improvement
PIPE RATING:
N/A
PROJECT NO.
2020011
TOTAL LF:
0
PROJECT BUDGET:
$200,000.00
PROJECT ORIGIN:
Master Plan Update/CCWSD Merger
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES
$200,000.00
55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION 55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
ENGINEER: R.O.W. ACQUISITION:
$200,000.00
Consultant
$0.00
HC # PLATS: [ 0
$0.00
$0.00
ESTIMATED BUDGETS - FY 22 - 30 FY 21-22
$200,000.00
CONTRACTOR:
]
FY 22-23
$0.00
CONSTRUCTION ADM.:
FY 23-24
$0.00
INSPECTION:
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
PROJECT DESCRIPTION: The District's Collection System Master Plan was completed in 2008 and needs FY 27-28 to be updated. The Master Plan Update will include the merger with Cane Creek Water & Sewer District and FY 28-29 any updates from MSD member agencies. FY 29-30 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Flow Monitoring
LOCATION:
MSD-Treatment Plant
TYPE:
Treatment Plant
PIPE RATING:
N/A
PROJECT NO.
2008013
TOTAL LF:
0
PROJECT BUDGET:
$541,905.00
PROJECT ORIGIN:
Maintenance of Permanent Flow Monitors
ESTIMATED PROJECT COST
DESCRIPTION
55310 - PRELIM. ENGINEERING
TOTAL EXPENDS THRU 12/31/19
$41,905.00
$41,905.00
$500,000.00
$383,251.00
$541,905.00
$425,156.00
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$50,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
N/A
# PLATS: [
CONTRACTOR:
$0.00
$50,000.00
ESTIMATED BUDGETS - FY 22- 30 0
]
FY 21-22
$50,000.00
FY 22-23
$50,000.00
CONSTRUCTION ADM.:
MSD
FY 23-24
$50,000.00
INSPECTION:
MSD
FY 24-25
$50,000.00
FY 25-26
$50,000.00
FY 26-27
$50,000.00
PROJECT DESCRIPTION: This project is for expenses related to the continued operation, maintenance, FY 27-28
$50,000.00
and improvements of the District's flow monitoring program.
SPECIAL PROJECT NOTES:
FY 28-29
$50,000.00
FY 29-30
$50,000.00
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
HVAC Rehabilitation
LOCATION:
MSD-Treatment Plant
TYPE:
Treatment Plant - Annual
PIPE RATING:
N/A
PROJECT NO.
2020051
TOTAL LF:
0
PROJECT BUDGET:
$519,000.00
PROJECT ORIGIN:
Misc HVAC repairs/replacement
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$519,000.00
$52,500.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
$519,000.00
$0.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [
CONTRACTOR:
$0.00
$52,500.00
ESTIMATED BUDGETS - FY 22- 30 0
]
FY 21-22
$54,000.00
FY 22-23
$55,500.00
CONSTRUCTION ADM.:
MSD
FY 23-24
$57,000.00
INSPECTION:
MSD
FY 24-25
$50,000.00
FY 25-26
$50,000.00
FY 26-27
$50,000.00
This item is for replacement of HVAC systems within the MSD campus, FY 27-28 treatment plant facility, and pump stations. Total estimated project cost shown is the total within the ten FY 28-29 year window. PROJECT DESCRIPTION:
FY 29-30 SPECIAL PROJECT NOTES:
$50,000.00 $50,000.00 $50,000.00
IDE D
Incinerator Polymer System Replacement Project No. 2019071
R
/
S RIVER NOT TO SCALE
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Incinerator Polymer System Replacement LOCATION:
MSD-Treatment Plant
TYPE:
Treatment Plant
PIPE RATING:
N/A
PROJECT NO.
2019071
TOTAL LF:
0
PROJECT BUDGET:
$200,000.00
PROJECT ORIGIN:
Aging/Obsolete equipment
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION 55430 - CONST. CONTRACT ADM.
$200,000.00
$200,000.00
55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
$200,000.00
$0.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [
$0.00
$200,000.00
ESTIMATED BUDGETS - FY 22- 30 0
]
CONTRACTOR:
FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM.:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
Polymer is added to thickened sludge to improve its dewatering characteristics prior to the belt filter presses. FY 27-28 The polymer system consists of a feed hopper, aging tanks, mixers and dosing pumps. The existing system FY 28-29 was installed when the incinerator was placed online and is now approximately 28 years old.
$0.00
PROJECT DESCRIPTION: This project is for the replacement of the polymer system at the Incinerator Building.
FY 29-30
SPECIAL PROJECT NOTES:
$0.00 $0.00
NC KD R
NOT TO SCALE
R FE AR FP LIF
/
D TR
DR
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
OR
AR
ITT Pump Station Upgrade Project No. 2020061
W NE
P AIR
C TAL REN
RD W E
ST F EL DT
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
ITT Pump Station Upgrade
LOCATION:
Henderson County
TYPE:
Pump Station Improvement
PIPE RATING:
N/A
PROJECT NO.
2020061
TOTAL LF:
0
PROJECT BUDGET:
$988,000.00
PROJECT ORIGIN:
Aging Infrastructure
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$988,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
$988,000.00
$0.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY 22- 30 0
]
FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM.:
MSD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
PROJECT DESCRIPTION: The ITT pump station is located in the Broadpointe Industrial Park in south FY 26-27
$0.00
Asheville. The station is generally in fair to poor condition. Additional wet well capacity and pumping FY 27-28 capacity will be necessary in the future. The existing access to the pump station is located in a flood plain area and is unaccessable with a flusher truck. The project should involve the negotiation of a new access FY 28-29 route through the Broadpointe Ind. Park in addition to the PS upgrade. FY 29-30 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
NOT TO SCALE
M OU
/
DAM C EAVER OLD B
K EL N AI NT
Mull Building HVAC Study Project No. 2018186
E RIVERSID
R EEK
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
RD
METROPOLITAN SEWERAGE DISTRICT
TH T U R EX O F ET RE ST
RD
DR
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Mull Bldg. HVAC
LOCATION:
Asheville
TYPE:
General Capital Improvements
PIPE RATING:
N/A
PROJECT NO.
2018186
TOTAL LF:
0
PROJECT BUDGET:
$584,725.00
PROJECT ORIGIN:
Condition and Performance Problems
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES
$25.00
$25.00
$32,600.00
$23,600.00
$100.00
$100.00
$527,000.00
$25,854.00
$9,000.00
55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION 55430 - CONST. CONTRACT ADM.
$25,000.00
$199,146.00
$302,000.00
$10,000.00
$15,000.00
$218,146.00
$317,000.00
55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
$584,725.00
$49,579.00
ENGINEER:
McGill Associates
OH
R.O.W. ACQUISITION:
MSD
# PLATS: [ 0 ]
CONTRACTOR:
ESTIMATED BUDGETS - FY 22- 30 FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM:
MSD
FY 23-24
$0.00
INSPECTION:
MSD/McGill
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
PROJECT DESCRIPTION: MSD’s Mull building experiences hot/cold zones and frequent service calls. The system is approaching 20 years of service life. As suggested per McGill Associates HVAC study completed in 2019, MSD FY 27-28 will be performing a complete overhaul on these aging core components. This will include the replacement of the FY 28-29 air handlers, cooling tower (with two air cooled chillers), pumps, and electrical components. FY 29-30 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
ED
Plant High Rate Primary Treatment Project No. 2015054
R
/
VE RI ID RS NOT TO SCALE
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Plant High Rate Primary Treatment
LOCATION:
MSD-Treatment Plant
TYPE:
Treatment Plant
PIPE RATING:
N/A
PROJECT NO.
2015054
TOTAL LF:
0
PROJECT BUDGET:
$16,834,138.00
PROJECT ORIGIN:
Facilities Plan Update - HDR
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN
$3,000.00
$3,000.00
$1,077,194.00
$1,077,194.00
$9,069.00
$9,069.00
$1,800.00
$1,800.00
$15,071,000.00
$4,007,034.00
$4,358,966.00
$6,705,000.00
$625,000.00
$305,000.00
$160,000.00
$160,000.00
$47,075.00
$5,972.00
$29,103.00
$12,000.00
$16,834,138.00
$5,409,069.00
$4,548,069.00
$6,877,000.00
55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION 55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
ENGINEER:
CDM
HC
R.O.W. ACQUISITION:
N/A
# PLATS: [ 0 ]
CONTRACTOR:
ESTIMATED BUDGETS - FY 22- 30 FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM.:
TBD
FY 23-24
$0.00
INSPECTION:
TBD
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
PROJECT DESCRIPTION: This project is a recommendation from the Facilities Plan Update, a WRF FY 27-28
$0.00
master planning document completed by HDR in April 2015. High rate primary treatment will improve FY 28-29 water quality ahead of the RBC's thereby extending their useful life and improving treatment efficiency. FY 29-30 SPECIAL PROJECT NOTES:
$0.00 $0.00
IDE D
Solids Handling Capacity Improvements Project No. 2019087
R
/
S RIVER NOT TO SCALE
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Solids Handling Capacity Improvements LOCATION:
MSD-Treatment Plant
TYPE:
Treatment Plant
PIPE RATING:
N/A
PROJECT NO.
2019087
TOTAL LF:
0
PROJECT BUDGET:
$2,052,000.00
PROJECT ORIGIN:
Capacity Improvements
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN
$180,000.00
55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$1,800,000.00
55430 - CONST. CONTRACT ADM.
$70,000.00
55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT TOTAL AMOUNT
$2,052,000.00
ENGINEER:
TBD
R.O.W. ACQUISITION:
MSD
CONTRACTOR:
$0.00
$0.00
$0.00
ESTIMATED BUDGETS - FY 22- 30 # PLATS: [
0
]
FY 21-22
$180,000.00
FY 22-23
$1,872,000.00
CONSTRUCTION ADM.:
TBD
FY 23-24
$0.00
INSPECTION:
MSD
FY 24-25
$0.00
FY 25-26
$0.00
PROJECT DESCRIPTION: This project will increase the capacity of the solids handling and dewatering FY 26-27
$0.00
processes at the treatment plant. Additional capacity will be needed to accomodate future flow rates as well as FY 27-28 increased sludge generation from the High Rate Primary Treatment process. Further testing will confirm exact timing of this capital investment. The project will include a third belt filter press, third cake pump, and new FY 28-29 piping between the Thickener Bldg. and Incinerator Bldg. FY 29-30 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
LU D ER R
D
HA R OL D SL UD
ER RD
JIMM SLUD Y ER R
OLIVIA CIR
WALT DR
KUY K BRA ENDA NCH LL RD
SW FE EE PK RN T W Y
D KE R OO CR EK D E R C
RD
L GOSNEL RD
ER S D R POUND
TT VE E RD
FA RI
N
DA DR
IS BANN
T FO
Y LN
GO O
I TH
RD
DM A
NE IAN STO GE LA C H D A P D P A RI GE R BA VD VILLA RE BL HI BR LL S IDG DR E
O
S LL
I R R E T DR R D ER
O D
Weaverville Pump Station No. 2
W O
W FOX CHASE RD
MSD WRF
D
WOOD HILL DR
D LS R MIL NOT TO SCALE
D
AI N
SE AVA
LN
R TO A N
WHITETAIL DR
S EM R D RE EK E CR
GAR RISO N
S KING G D R S D OL IN Y N N TA E R O U VD M BL
MSD Hydroelectric Plant NR
RRY R
LA ND R ER LE D IS UR E M OU NT
HIG H
Weaverville Pump Station No. 1
SA N T PLEA DR L HIL
IL
Weaverville Pump Station Replacement Project No. 2019080
NI A
D
T ISH AT SPAN DR P OAK
GOLDVIEW RD
QU A
RD S TO NE
RD
RE
Y
RD
RS VE
TD
R
WIND SOR R D
GE RD
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
ID DRY R
AN
STA RL PAS ING S
D
METROPOLITAN SEWERAGE DISTRICT
S
NO BR
KA RID TIES GE DR
BAIR D COVE RD
LD NO
YK
LON CHA GS PEL RD
K OD RD ROO ROBINHO B ER AV RD E B
/
SPLIT DR RD RAIL LIS GIL
M AC ED O
OLIV E D NIA R CROS TTE O D E C SI A M PKW NG OLD Y D R FIELD R E V O CH E CL PIN DR EN A D Y R F RO WA PS TO B R VE RI
OK CO Y RD L R LE L VA
DE A V NNA DR
I26 W KNOLL RIDGE DR
WE LC DR H
OLD NC 20 HWY
O U
N I N SO OL JOH D R
C
LS HO R C I N LL D HI
S PL MILL
M ID
R
D
RH
VAL
JENK INS
RD
YM ER
WILEY ACRE S DR
TELMA LN
LE Y R D
MAG S
H RIC D R HILL
T
ME R LO O SE D Y LN
R LE B RD EM O2 N
MAY A P P BRIDG LE E RD
R D W IL EY F RID OX GE RD
TUPELO TRL
R JO O BE HN R NY T S RD
RL RD CA TS R BE RO
R
FES T IV A LN I26 E
STIL L RUN
LO
RUFUS RIDGE LN R
H LN
ER RT A N CH GL
RIVERSIDE D
BRUS
PIT T LO MAN OP
AINT IAN P
BA LOW RT E R O N RD
IND
ALS RDG
RD
DR
NE WB R PK IDGE WY
SANDST ME ONE RR DR IM AVE ON
ST
S ST MA R I EX EE N T T SM AIN CO
NEW STOCK RD
D AIKEN R
E I LL ERV V A WE D RE LN F O RO
RI Y N S N LE SU NAP D R
E DG POINTS WEST DR
LS RD
BAIRD COVE RD VW
D AN L HI R ERT D MOST WHISPERING BREEZE KNL
NT
E VM Y WA HWY LL HA RS DS BOY L RD E P CHA
LN DRY RIDGE RD
O W L OD
LAND O RIDGE N RD
RD
MA
VE
TIN LOF ST INDIAN
V NO ILLA VA DR
D OL
F UF D BL E R V CO
VONNIE DR
RICE COVE R D
E HY L RH
ON RR HE E RD V CO
AL T AM O
ST PHIPPS
ST
EAST ST
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Weaverville PS Replacement
LOCATION:
Weaverville
TYPE:
Pump Station Improvements
PIPE RATING:
N/A
PROJECT NO.
2019080
TOTAL LF:
16,610
PROJECT BUDGET:
$7,828,750.00
PROJECT ORIGIN:
Capacity Improvements
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$90,000.00
55330 - DESIGN
$665,000.00
55340 - PERMITS
$15,000.00
55350 - SPECIAL STUDIES
$20,000.00
55360 - EASEMENT PLATS
$15,750.00
55370 - LEGAL FEES
$25,000.00
$20,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$90,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$6,650,000.00
55430 - CONST. CONTRACT ADM.
$200,000.00
55440 - TESTING
$20,000.00
55450 - SURVEY - ASBUILT
$38,000.00
TOTAL AMOUNT
$7,828,750.00
ENGINEER:
Consultant
R.O.W. ACQUISITION:
MSD
CONTRACTOR:
$0.00
$0.00
$20,000.00
ESTIMATED BUDGETS - FY 22- 30 # PLATS: [
21
]
FY 21-22
$770,000.00
FY 22-23
$130,750.00
CONSTRUCTION ADM.:
Consultant
FY 23-24
$3,435,000.00
INSPECTION:
MSD
FY 24-25
$3,473,000.00
FY 25-26
$0.00
PROJECT DESCRIPTION: This project is for the replacement of Weaverville Pump Stations No. 1 & No. 2. FY 26-27
$0.00
Heavy growth has led to an increased demand for sewer allocations in Weaverville and as a result both FY 27-28 stations are low on available capacity. This project includes replacing PS No. 1, replacing the existing 12" force main with 18", and converting PS No. 2 into a smaller residential station. Pump Station No. 1 will be FY 28-29 designed to pump directly to the WRF. FY 29-30 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
General Capital Equipment
LOCATION:
Varies
TYPE:
General Capital
PIPE RATING:
N/A
PROJECT NO.
2016072
TOTAL LF:
0
PROJECT BUDGET:
$1,500,000.00
PROJECT ORIGIN:
General Manager
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$1,500,000.00
$122,095.00
$27,905.00
$150,000.00
$1,500,000.00
$122,095.00
$27,905.00
$150,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
ENGINEER:
MSD
EB
R.O.W. ACQUISITION:
N/A
# PLATS: [
CONTRACTOR:
ESTIMATED BUDGETS - FY 22- 30 FY 21-22
$150,000.00
N/A
FY 22-23
$150,000.00
CONSTRUCTION ADM.:
MSD
FY 23-24
$150,000.00
INSPECTION:
MSD
FY 24-25
$150,000.00
FY 25-26
$150,000.00
FY 26-27
$150,000.00
This is for the purchase of capital equipment in excess of $15,000.00. FY 27-28
$150,000.00
PROJECT DESCRIPTION:
Examples include pumps, plant equipment, computer servers, large concrete saws, etc.
SPECIAL PROJECT NOTES:
0
]
FY 28-29
$150,000.00
FY 29-30
$150,000.00
Total Estimated project cost shown is the total within the ten year window.
—
Design, Right of Way, & Construction Management Expenses
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Design, ROW, & Const. Mgmt. Exp.
LOCATION:
MSD/ENG
FUND:
F01
PIPE RATING:
N/A
ACCOUNT CODE:
N/A
TOTAL LF:
0
PROJECT BUDGET:
$32,623,346.65
PROJECT ORIGIN:
CIP Expenses
ESTIMATED PROJECT COST
DESCRIPTION
SALARIES & BENEFITS
TOTAL EXPENDS THRU 12/31/19
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
$28,742,915
$1,095,869.00
$1,271,847.00
$2,507,259.00
$2,029,187
$52,813.00
$104,724.00
$177,007.00
$186,311
$8,126.00
$8,126.00
$16,252.00
$12,500.00
$7,500.00
(Includes Proj. Mgmt., ROW, Const. and a portion of GIS and Plan. & Dev.)
SUPPLIES (Includes Proj. Mgmt., ROW, Const. and a portion of GIS and Plan. & Dev.)
FLEET
CAPITAL EQUIPMENT
$7,500
DEBT EXPENSE
$1,657,434
$60,605.00
$108,075.00
$162,183.00
$32,623,347
$1,217,413.00
$1,505,272.00
$2,870,201.00
(Bond Debt Expenses)
TOTAL AMOUNT
ENGINEER:
N/A
EB
R.O.W. ACQUISITION:
N/A
PLATS: [
FY 21-22
$2,950,213.58
CONTRACTOR:
N/A
FY 22-23
$3,027,162.59
CONSTRUCTION ADMINISTRATION:
N/A
FY 23-24
$3,106,328.98
INSPECTION:
N/A
FY 24-25
$3,187,829.84
FY 25-26
$3,335,946.55
FY 26-27
$3,413,894.77
PROJECT DESCRIPTION: This line item is for expenses related to the District's Capital Improvement Program FY 27-28
$3,494,084.56
ESTIMATED BUDGETS - FY 22 - 30 ]
(CIP). Included are salaries for the CIP Division, capital equipment, and bond debt expenses related to the FY 28-29 financing of the CIP program. FY 29-30 SPECIAL PROJECT NOTES:
$3,576,488.46 $3,661,196.52
Future years assume 3.0% increase per year for all items except Debt Expenses. Estimated Debt Expenses provided by the Finance Department. Total Estimated Project Cost shown is the total within the ten year window.
—
Reimbursement Projects
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Developer Reimbursements
TYPE:
Reimbursement - Annual
PROJECT NO.
PROJECT BUDGET:
DESCRIPTION
LOCATION:
Various
2004051
TOTAL LF:
0
$1,337,000.00
PROJECT ORIGIN:
Economic Development Policy
ESTIMATED
TOTAL EXPENDS THRU 12/31/19
PROJECT COST
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$1,337,000.00
$12,307.00
$1,337,000.00
$12,307.00
$0.00
$437,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
ENGINEER:
KJ
R.O.W. ACQUISITION:
# PLATS: [
$0.00
$437,000.00
ESTIMATED BUDGETS - FY 22 - 30 FY 21-22
$100,000.00
CONTRACTOR:
]
FY 22-23
$100,000.00
CONSTRUCTION ADM:
FY 23-24
$100,000.00
INSPECTION:
FY 24-25
$100,000.00
FY 25-26
$100,000.00
FY 26-27
$100,000.00
Extension Policy. Refer to the "Policy and Procedures for the Extension of Sewer Service" for further FY 27-28 information. For FY20-21 there are two reimbursement agreements: 1) Olivette Master Plan FY 28-29 Interceptor $350,000; 2) 17 North Market Street $87,000.
$100,000.00
PROJECT DESCRIPTION: This is for reimbursements for extensions that qualify under the District's
FY 29-30
SPECIAL PROJECT NOTES:
Total estimated project cost shown is the total within the ten year window. $200,000 per year is approved.
$100,000.00 $100,000.00
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2020 - 2021
PROJECT:
Black Mtn. Annex. - Craigmont Rd.
TYPE:
Reimbursement
PROJECT NO.
PROJECT BUDGET:
DESCRIPTION
LOCATION:
Black Mountain
1992173
TOTAL LF:
0
$0.00
PROJECT ORIGIN:
Consolidation Agreements
ESTIMATED
TOTAL EXPENDS THRU 12/31/19
PROJECT COST
EST. COST JAN - JUNE 2020
BUDGET FY 20-21
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION 55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
ENGINEER:
$0.00
Administered by Town of Black Mountain
R.O.W. ACQUISITION:
$0.00
$0.00
ESTIMATED BUDGETS - FY 22 - 30
EB # PLATS: [
CONTRACTOR:
$0.00
]
FY 21-22
$0.00
FY 22-23
$0.00
CONSTRUCTION ADM:
Administered by Town of Black Mountain
FY 23-24
$0.00
INSPECTION:
MSD/Black Mountain
FY 24-25
$0.00
FY 25-26
$0.00
FY 26-27
$0.00
Reimbursement project in accordance with Consolidation Agreement. FY 27-28 Estimated project cost was $420,000 in FY07. FY 28-29
$0.00
FY 29-30
$0.00
PROJECT DESCRIPTION:
SPECIAL PROJECT NOTES:
MSD Share is 35% in accordance with Consolidation Agreement. Project will be budgeted when town decides to construct it.
$0.00