Capital Improvement Program Fiscal Years 2017-2026
Metropolitan Sewerage District of Buncombe County, North Carolina 2028 Riverside Drive W. H. Mull Building Asheville, North Carolina
Phone: (828) 254-9646 Website: www.msdbc.org
Metropolitan Sewerage District of Buncombe County, North Carolina Fiscal Years 2017-2026
Board of Directors Board Member
Representative of
M. Jerry VeHaun, Chairman E. Glenn Kelly, Vice-Chairman Jackie W. Bryson, Secretary/Treasurer Matt Ashley, Jr. Joe Belcher Don Collins Jon E. Creighton Ellen Frost Esther Manheimer Chris Pelly Al P. Root Gwen Wisler
Town of Woodfin Town of Biltmore Forest Town of Woodfin Town of Montreat County of Buncombe Town of Black Mountain County of Buncombe County of Buncombe City of Asheville City of Asheville Town of Weaverville City of Asheville
CIP Committee Members Jon E. Creighton, Chairman Matt Ashley, Jr. Joe Belcher Don Collins Chris Pelly
Selena D. Coffey Gary Jackson Marcus Jones Jonathan Kanipe Joseph Martin Ron Nalley Matt Settlemyer Jason Young
Town of Weaverville City of Asheville Henderson County/Cane Creek Water & Sewer District Town of Biltmore Forest Woodfin Sanitary Water & Sewer District Town of Montreat Town of Black Mountain Town of Woodfin
Thomas E. Hartye, P.E. Ed Bradford, P.E.
General Manager Director of Engineering
Capital Improvement Program Fiscal Years 2017-2026
Overview
NCDENR-DWQ has requested that the following information be provided in this document, in accordance with the Compliance Inspection Report for MSD’s Collection System Permit WQCS00004. Goal Statement The mission of the MSD Capital Improvement Program is to produce, manage, and complete engineering projects for the repair and rehabilitation of the District’s collection system and Water Reclamation Facility (WRF). This shall be undertaken in the most efficient and effective manner necessary to ensure the reliable delivery and treatment of wastewater at an equitable price and in an environmentally sensitive manner.
Description of Existing Facilities
Collection System The MSD service area covers approximately 180 square miles. MSD provides service to areas along the French Broad River Valley and the Swannanoa River Valley as far as Ridgecrest. There are over 1,010 miles of public sanitary sewer line, 31 pump stations within the collection system, and approximately 28,389 manholes system wide. Less than 65 miles are large interceptors with diameters ranging from 24" to 66". One third of the balance is small 6" lines and two-thirds are medium size lines ranging from 8" up to 24". Most of this pipe is between 50 and 100 years old, and is in dire need of rehabilitation or replacement. The District’s 52,000 customers reflect a service population of approximately 125,000 people.
Water Reclamation Facility The Water Reclamation Facility (WRF) is a 40MGD secondary treatment plant serving Buncombe County (specifically Asheville, Biltmore Forest, Black Mountain, Montreat, Weaverville, Woodfin and Buncombe County at large), in addition to portions of Henderson County. Overall, MSD services approximately 52,000 separate sewer customers, a combined customer population of 125,000, and over 30 separately billed industries. The facility treats a current average daily flow of approximately 22 MGD. The WRF is an attached growth design, comprised of 152 rotating biological contactors (RBC’s), which provide full secondary treatment. These RBC’s provide 450-500 acres (3+ acres each unit) of surface area for biological growth. MSD’s facility is believed to be the largest RBC plant in the world. The plant consists of: Preliminary Treatment Components
IDI Barscreens (2 units) w/screenings compactor and shaftless screw conveyer Influent Pumps (3 units) – 35 MGD rated capacity each Aerated Grit Chambers (3 units) w/associated grit and grease removal
Primary Treatment Components Primary Microscreens (7 units) – 250 micron screens Secondary Treatment Components 1st Stage RBC’s (44 units) 2nd Stage RBC’s (72 units) 3rd Stage RBC’s ( 36 units) Intermediate Pumps (3 units) – pump water to clarifier from 3rd RBC stage Intermediate Clarifier (4 cells – total volume 2 MG) Microfiltration via AASI AquaDisk Units (16 units) Disinfection Components Sodium Hypochlorite solution – average feed 1000 gallons/day at 8% solution strength Residuals Handling Components Gravity Thickeners (2 units) – 100 foot-diameter each 2.5 Meter Belt Presses (2 units) Fluidized Bed Incinerator (40DT/day rated) Alkaline Stabilization Facility (40DT/day rated) Energy Management Components
Two separate power circuits for plant, with Automatic Transfer Switch if one fails 4 Megawatt total from three Diesel Generators (emergency backup power for WRF; will maintain full treatment processes during a power outage) 850 Kilowatt Hydro Turbines (3 units) – induction units (French Broad River source)
Automation Components SCADA (Supervisory Control and Data Acquisition) – full automated control of WRF
Sludge Management Plan MSD utilizes its fluidized bed incinerator as its primary residual management option, with alkaline stabilization as a secondary management option – as well as maintains an arrangement with the Buncombe County landfill (lined) for emergencies. Presently the facility is managing 12-15 DT’s per day of residuals. The facilities are designed for 40DT’s per day. Due to the lack of true primary clarifiers, most of the sludge generated at the facility is secondary in nature (i.e. sloughings from the RBC’s). Sludge is thickened in on-site gravity thickeners to a consistency of 4-7% solids at which time it is then pumped to the 2 1/2-meter belt presses. These units dewater the sludge to over 24% solids and then it is pumped to the incinerator. Air emissions from the incinerator are of excellent quality. Recent air emissions testing place removal efficiency of the air scrubbers at 99+% for regulated parameters, and air quality is further enhanced by a new filtration system added in 2016. Incinerator ash is thickened on-site via a gravity ash thickener and then pumped to an on-site lagoon. Groundwater is monitored in
accordance with NCDENR requirements (up & down gradient). When alkaline stabilization operations are activated, a Class A (Eq.) product is produced and distributed to the public. The alkaline add-mixtures utilized in the process are fly ash, cement kiln dust (CKD) and lime kiln dust (LKD). The process incorporates the use of the "N-Viro" process when these alkaline products are utilized in accordance with the patented mix recipe. Due to the fact that the incinerator operations provide much more costeffective management, it is utilized as the primary option. Supplementary fuel is sometimes required due to the 24% solids content - natural gas via PSNC is utilized for this purpose. MSD also maintains an agreement with the local county landfill (lined) to dispose of dewatered sludge during emergency and/or maintenance/breakdown instances; this provides a third residuals management alternative.
Capital Improvement Program Fiscal Years 2017-2026
Program Summary
METROPOLITAN SEWERAGE DISTRICT OF BUNCOMBE COUNTY, NORTH CAROLINA TEN YEAR CAPITAL IMPROVEMENT PROGRAM FY 2016-2017 through 2025-2026 PROJECT NAME
LOCATION OF PROJECT
PROJ. PROJECT MGR. NUMBER
PIPE RATING
PROJECT FOOTAGE
TOTAL ESTIMATED COST
TOTAL EST. EXPENDS THRU FY 16
FY 16-17
BUDGET
FY 17-18
FOOTAGE
BUDGET
FY 18-19
FOOTAGE
BUDGET
FY 19-20
FOOTAGE
BUDGET
FY 20-21
FOOTAGE
BUDGET
FY 21-22
FOOTAGE
BUDGET
FY 22-23
FOOTAGE
BUDGET
FY 23-24
FOOTAGE
BUDGET
FY 24-25
FOOTAGE
BUDGET
FY 25-26
FOOTAGE BUDGET
FOOTAGE
INTERCEPTOR AND WET WEATHER REHABILITATION Christian Creek Int.
Buncombe Co.
HC
2011110
24
5,860
$2,231,579
$44,609
$171,970
$17,000
$1,998,000
$0
$0
$0
$0
$0
$0
$0
Dingle Creek Interceptor
Asheville
RW
2006010
15
7,871
$2,780,592
$71,066
$1,000
$0
$0
$0
$0
$0
$0
$0
$31,326
$2,677,200
Lower Swannanoa Int.
Asheville
EB
2004040
9
6,475
$5,478,400
$14,879
$0
$0
$0
$0
$0
$33,021
$12,500
$5,418,000
$0
$0
South French Broad Int. - Grouting
Biltmore Estate
HC
2011033
8
21,950
$1,912,146
$771,146
$588,000
Beaverdam Creek WW (CDM #10)
Buncombe Co.
EB
2001191
27
5,500
$1,413,000
$0
$0
Biltmore WW (CDM #3)
Biltmore
EB
2001192
12
2,200
$638,000
$0
$0
$0
$0
$0
$0
$0
Four Mile Creek WW (CDM #1)
Biltmore Forest
EB
2001193
8
3,400
$884,000
$0
$0
$0
$0
$0
$0
$0
Haw Creek WW (CDM #6)
Asheville
EB
2001194
8
3,800
$988,000
$0
$0
$0
$0
$0
$0
$0
$0
South Swannanoa WW (CDM #4)
Asheville
EB
2001195
23
8,040
$2,939,600
$0
$0
65,096
19,265,317
$901,700
$760,970
1.0000
1.0000
1.0000
$19,265,317
$901,700
$760,970
SUBTOTAL Inflation per ENR Const. Cost Index
3.02%
SUBTOTAL with inflation
PROJECT NAME
65,096
LOCATION OF PROJECT
PROJ. PROJECT MGR. NUMBER
PIPE RATING
PROJECT FOOTAGE
TOTAL ESTIMATED COST
TOTAL EST. EXPENDS THRU FY 16
7,008
9,600
$0
$0 7,008
7,008
9,600
$587,214
BUDGET
$0
$0
$0
$0
$0
$0
$0
$1,413,000
$0
$1,998,000
5,860
1.0613 9,600
FY 17-18
FOOTAGE
$0 $0
$0
$570,000 1.0302
FY 16-17
BUDGET
$553,000
5,860
FOOTAGE
0
1.0934
$2,120,501
5,860
FY 18-19
BUDGET
$0
$0
$0
BUDGET
0
1.1264 0
FY 19-20
FOOTAGE
$0
$0
$0
BUDGET
0
1.1604 0
FY 20-21
FOOTAGE
$33,021
0
FY 21-22
FOOTAGE
BUDGET
$0
$0
$0
$0
$0
$0
$0
$638,000
$0
$0
$0
$884,000
3,400
$0
$0
$988,000
3,800
$2,939,600
8,040
$0
$4,365,100
13,540
$5,418,000
$5,218,233
13,540
BUDGET
FOOTAGE
6,475
FY 23-24
2,200
$849,200
BUDGET
$4,549,200
15,071
1.3071 2,200
FY 24-25
FOOTAGE
$0
$0
$669,326 1.2687
$6,672,519
BUDGET
2,200
$0 6,475
1.2315
FY 22-23
FOOTAGE
7,871
$0
5,500
1.1954
$38,318
6,475
$5,946,055
15,071
FY 25-26
FOOTAGE BUDGET
FOOTAGE
GENERAL SEWER REHABILITATION Adams Street
Asheville
SA
2012126
46
2,550
$695,400
$12,000
$8,900
Arco Road
E. Asheville
HC
2012082
71
2,022
$592,000
$8,500
$583,500
$64,000
$0
$610,500
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Arlington Street
Asheville
DP
2015008
20
2,600
$747,000
$0
$0
$0
$0
$0
$8,000
$0
$0
$0
$739,000
Asheville Country Club (SS)
Asheville
SA
2012130
47
0
$100,350
$73,850
$26,500
$0
$0
$0
$0
$0
$0
$0
Atkins Street
Arden
HC
2014012
39
1,833
$518,430
$5,480
Beale Road at Copney Lane
Asheville
DP
2009129
47
4,027
$1,157,425
$15,725
$0
$2,250
$28,000
$0
$15,000
$93,700
$0
$1,033,000
2,022
0
2,550
$482,700 4,027
Bear Creek Rd. at School Rd.
W. Asheville
SA
2011117
23
2,062
$572,800
$7,900
$0
$0
$0
$11,300
$86,000
Beaucatcher Rd @ Kenilworth Rd
E. Asheville
SA
2015219
43
1,370
$396,700
$0
$13,000
$1,000
$0
$0
$382,700
Bellevue Road
South Asheville
DP
2015175
49
860
Braddock Way - PRP 20002
Asheville
RW
2006025
8
3,848
$223,000
Broadway St. at Bordeau Place
Asheville
DP
2009034
14
475
Buchanan Ave.
Asheville
SA
2014023
13
1,400
$403,500
$0
$0
$0
Caledonia Road
Asheville
HC
2014153
31
2,491
$755,000
$0
$10,000
$0
$1,435,790 $226,250
860
1,833
$0
1,370
2,600
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$467,600
$0
$0
$0
2,062
$0
$0
$0
$0
$0
$3,000
$5,000
$23,000
$192,000
$0
$0
$0
$0
$0
$0
$18,353
$0
$0
$0
$4,500
$1,000
$29,837
$0
$0
$0
$1,382,100
$13,069
$0
$0
$0
$0
$0
$79,481
$0
$0
$133,700
475
$0
$7,000
$500
$4,500
$39,000
$0
$352,500
1,400
$6,000
$108,000
$0
$631,000
$0
$0
$0
Central Ave. @ I-240
Asheville
SA
2014180
12
990
$282,100
$0
$0
$0
$0
$5,000
$1,600
Chatham Road
Asheville
SA
2015019
35
1,450
$380,100
$0
$13,000
$500
$0
$0
$366,600
Cherokee Road
Asheville
DP
2009132
48
1,960
$605,200
$19,970
$4,230
$75,000
$0
Chestnut Lodge Rd.
Black Mtn.
SA
2014017
61
4,150
$1,002,600
$35,000
$39,000
$74,000
$854,600
$506,000 4,150
1,960
1,450
2,491
$51,000
$0
$0
$224,500
$0
$0
$0
$0
$0 $0
990
$0 $0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Commerce Street
Asheville
SA
2012129
47
530
$184,800
$3,500
$0
$0
$0
$0
$181,300
$0
$0
$0
$0
$0
Craggy Street @ Old US 70
Black Mountain
HC
2015209
2
1,000
$298,750
$0
$4,000
$0
$0
$0
$0
$0
$0
$2,250
$13,000
$279,500
Cumberland Ave.
Asheville
HC
2014014
12
4,587
$1,293,450
$18,250
$0
$0
$0
$0
$0
$0
$0
$0
$1,275,200
436
530
Dellwood Avenue
Asheville
DP
2009131
71
436
$121,850
$30,350
$91,500
$0
$0
$0
$0
$0
East Chestnut Ave @ Five Points
N. Asheville
SA
2015192
31
5,225
$1,606,600
$0
$0
$27,000
$0
$81,800
$54,000
$1,442,000
Elk Mountain Place
Woodfin
HC
2010094
48
4,101
$970,200
$18,000
$22,000
$115,000
$0
$815,200
$0
$0
Elk Park Drive - PRP 35001
Woodfin
SA
2006028
10
2,242
$591,046
$50,046
$0
$0
$0
Elkwood Ave.
Woodfin
HC
2011080
66
4,577
$1,263,450
$11,000
$2,250
$18,000
$1,232,200
Elkwood @ Norman Austin Dr.
Woodfin
DP
2014008
13
600
$178,100
$0
$0
$0
$0
Page 1 of 4
4,577
4,101
5,225
4,587
$0
$0
$0
$0
$1,800
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$541,000
$0
$0
$0
$0
$0
$0
$0
$2,800
$1,500
$8,000
$0
$165,800
3,848
$0
$0
2,242
$0 $0
600
$0
1,000
PROJECT NAME
LOCATION OF PROJECT
PROJ. PROJECT MGR. NUMBER
PIPE RATING
PROJECT FOOTAGE
TOTAL ESTIMATED COST
TOTAL EST. EXPENDS THRU FY 16
FY 16-17
BUDGET
FY 17-18
FOOTAGE
BUDGET
FY 18-19
FOOTAGE
BUDGET
FY 19-20
FOOTAGE
BUDGET
FY 20-21
FOOTAGE
BUDGET
FY 21-22
FOOTAGE
BUDGET
FY 22-23
FOOTAGE
BUDGET
FY 23-24
FOOTAGE
BUDGET
FY 24-25
FOOTAGE
BUDGET
FY 25-26
FOOTAGE BUDGET
FOOTAGE
GENERAL SEWER REHABILITATION continued‌ Fairfax Avenue @ I-240
West Asheville
DP
2015173
74
200
$76,250
$3,900
$3,250
$18,000
$51,100
$0
$0
$0
$0
$0
$0
$0
Fairmont Road
N. Asheville
DP
2015017
31
3,600
$1,094,250
$0
$15,000
$0
$6,750
200
$59,500
$0
$1,013,000
3,600
$0
$0
$0
$0
2,600
Forestdale Drive
S. Asheville
DP
2014002
33
2,600
$843,000
$0
$0
$12,000
$17,500
$104,000
$0
$709,500
$0
$0
$0
Forest Hill Dr. @ Warwick Rd.
Asheville
SA
2014020
14
3,400
$956,100
$0
$0
$0
$17,000
$500
$0
$0
$0
$0
$938,600
3,400
Four Inch Main - College Street
Asheville
SA
2012128
10
1,000
$486,200
$0
$0
$0
$0
$0
$0
$5,500
$203,200
$0
$277,500
1,000
Four Inch Main - Dry Ridge Rd.
Asheville
DP
2012009
58
908
$291,600
$38,100
$0
$0
$0
$253,500
$0
$0
$0
$0
$0
Hazel Mill Rd @ Richland St.
Asheville
SA
2014016
26
3,300
$945,300
$0
$0
$18,000
$0
Hendersonville Rd @ Blake Drive
South Asheville
DP
2015176
71
1,090
$323,200
$0
$6,000
$39,000
$278,200
Hendersonville Rd. @ Peachtree Rd.
S. Asheville
DP
2012135
56
1,100
$220,200
$7,200
$0
$0
Hendersonville Rd. @ Rosscraggon Ph. 2
Arden
RW
2009150
68
4,163
$1,294,450
$155,665
$91,285
$1,038,000
Herron Avenue
W. Asheville
SA
2014186
9
2,060
$595,500
$0
$0
Hill Street
Asheville
SA
2015018
39
1,600
$452,600
$0
$9,000
Horizon Hill Rd. (Hy-Vu Drive)
Asheville
SA
2008084
51
713
$234,410
$10,410
$224,000
Howland Rd. @ Sunset Trail
Asheville
DP
2012134
43
1,033
$376,600
$7,500
$0
713
1,090
908
$9,400
$54,000
$0
$863,900
$0
$0
$0
$0
$0
$213,000
$9,500
$0
$0
$0
$10,300
$2,200
$1,000
$0
$0
$442,600
4,163
1,100
$0
$0
$0
$0
$0
$0
$0
$10,000
$0
$0
$573,000
1,600
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0 $313,600
1,033
$53,000
$0
$554,000
2,360
$0
$0
$0
DP
2014013
37
2,360
$620,700
$4,700
$0
$9,000
2014178
74
3,578
$971,950
$23,450
$73,500
$875,000
3,578
$0 $0
$0
$0
OH
$0 $0
$0
$0
W. Asheville
$0 $0
$0
$51,000
Woodfin
2,135
2,060
$0 $0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Kenilworth @ Springdale Rd.
Asheville
HC
2014010
42
2,135
$597,350
$6,800
$0
$8,250
$41,000
$0
$541,300
$0
$0
$0
$0
Knauth Rd
E. Asheville
SA
2015220
15
400
$127,500
$0
$0
$0
$2,000
$2,200
$12,000
$0
$0
$0
$111,300
Lakeshore Dr. @ Merrimon Ave.
N. Asheville
HC
2014177
25
838
$340,450
$0
$0
$3,000
$0
$6,750
$109,000
$0
$221,700
$0
$0
838
$0 400
Lakeview @ Glen Falls Rd.
N. Asheville
DP
2014007
15
4,200
$1,355,500
$0
$0
$0
$0
$17,000
$15,500
$111,000
$0
$0
$1,212,000
4,200
Asheville
HC
2015016
16
280
$97,200
$0
$0
$0
$0
$1,200
$0
$1,500
$23,000
$0
$71,500
280
Laurel Road - Ph. 2
Arden
HC
2007321
22
1,496
$379,307
$21,307
$0
$0
$0
$0
$0
$0
$0
$358,000
Lincoln Ave.
Asheville
HC
2013103
26
1,415
$397,870
$2,870
$0
Lining Contract No. 8
Various
DP
2015218
NA
11,000
$1,377,000
$0
$1,377,000
$0
$0 $0 $0
$0
$0
$0
$0
$0
$395,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Lionel Place
Leicester
DP
2015009
6
308
$95,700
$0
$0
$0
$0
Long Shoals Rd. @ Allen Ave.
Arden
HC
2010013
59
2,263
$522,525
$11,025
$6,000
$38,000
$467,500
Louisiana Avenue
West Asheville
DP
2015174
12
2,150
$640,000
$0
$0
$0
$0
Louisiana Ave. @ Brucemont Circle
Asheville
DP
2010100
66
2,400
$543,185
$14,765
$8,800
$10,120
$509,500
1,415
1,496
$0 $0
Lakewood Drive @ Dudley
11,000
$0 $0
$0
$0
Johnston Blvd. @ Providence Rd.
$0
$0
$4,500
Jonestown Road
3,300
$0
$0
$0
$0
$1,000
$1,200
$12,000
$81,500
2,263
$0
$0
$0
$0
$0
$0
$0
$0
$0
$8,000
$0
$0
$632,000
2,400
$0
$0
$0
$0
$0
$0
Lower Glendale Ave.
E. Asheville
HC
2012083
15
2,716
$870,200
$8,700
$0
$0
$0
$0
$6,000
$32,000
$0
$0
Lower Melody Lane
E. Asheville
DP
2013027
19
1,180
$352,900
$6,900
$0
$0
$0
$0
$8,000
$65,000
$0
$273,000
Lynn Cove Road
Beaverdam
DP
2015010
31
5,589
$1,547,000
$0
$25,000
$0
$15,000
$91,000
$0
$1,416,000
$0
$0
Manetta Rd. @ Johnson Dr.
N. Asheville
SA
2014022
26
6,500
$1,885,700
$0
$0
$0
$0
$33,000
$7,000
Meadow Road @ Train Yard
Asheville
HC
2015207
37
1,800
$553,000
$0
$9,000
$0
$1,500
$41,000
$501,500
1,800
5,589
$110,000
$1,735,700
$0
$0
6,500
$823,500 1,180
2,150
308
$0 $0
2,716
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Meadowbrook Drive (SS)
Black Mountain
MS
2010076
0
0
$46,850
$12,990
$33,800
$0
$0
$0
$0
$0
$0
$0
$0
$0
Merrimon Ave. at Clearview Terrace
Asheville
RW
2007012
2
500
$324,990
$6,044
$0
$0
$0
$0
$0
$2,500
$0
$81,996
$0
$234,450
500
Merrimon Ave. @ Coleman Ave.
N. Asheville
DP
2014009
9
2,800
$820,000
$0
$0
$0
$0
$0
$0
$10,000
$0
$0
$0
$810,000
2,800
$0
$0
Middle Beaverdam Crk. @ US 19-23
Woodfin
RW
2010002
24
2,930
$1,293,650
$7,430
$0
$7,070
$0
$3,250
$34,000
$0
$1,241,900
Mitchell Avenue
W. Asheville
SA
2014185
17
2,760
$836,200
$0
$0
$0
$0
$14,000
$4,000
$55,000
$0
$763,200
Mountainbrook Rd. @ Chunns Cove Rd.
Asheville
DP
2010112
55
2,800
$592,615
$17,615
$0
$49,000
$0
$526,000
$0
$0
$0
$0
Mountainview Road
E. Asheville
HC
2014011
65
2,120
$623,900
$14,200
$45,500
$564,200
New Haw Creek Rd. @ Dogwood Grove
E. Asheville
SA
2014021
46
1,900
$555,900
$9,500
$7,100
$36,000
New Haw Creek Rd. @ Trinity Chapel Rd.
E. Asheville
HC
2012081
71
838
$252,076
$24,276
$227,800
New Stock Road
Woodfin
DP
2015011
45
9,020
$2,356,500
$0
$36,000
838
2,120
2,800
$0
$0
$0
$0
$0
$503,300
$0
$0
$0
$0
$6,500
$30,000
$0
$2,284,000
2,930
$0 2,760
$0
$0
$0
$0
$0
$0
$0
$0
$0
1,900
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
9,020
$0
$0
$0
$0
$0
North Lexington @ I-240
Asheville
SA
2014182
47
450
$163,700
$2,300
$0
$2,000
$0
$0
$159,400
450
$0
$0
$0
$0
$0
North Market Street
Asheville
SA
2014019
41
1,050
$352,000
$5,300
$1,500
$68,000
$0
$0
$277,200
1,050
$0
$0
$0
$0
$0
Page 2 of 4
PROJECT NAME
LOCATION OF PROJECT
PROJ. PROJECT MGR. NUMBER
PIPE RATING
PROJECT FOOTAGE
TOTAL ESTIMATED COST
TOTAL EST. EXPENDS THRU FY 16
FY 16-17 BUDGET
FY 17-18
FOOTAGE
BUDGET
FY 18-19
FOOTAGE
BUDGET
FY 19-20
FOOTAGE
BUDGET
FY 20-21
FOOTAGE
BUDGET
FY 21-22
FOOTAGE
BUDGET
FY 22-23
FOOTAGE
BUDGET
FY 23-24
FOOTAGE
BUDGET
FY 24-25
FOOTAGE
BUDGET
FY 25-26
FOOTAGE BUDGET
FOOTAGE
GENERAL SEWER REHABILITATION continued‌ Oakland Dr @ Church Street
Black Mountain
DP
2015177
27
575
$171,000
$0
$0
$0
$2,500
$2,500
$29,000
$137,000
Oakwood Street
W. Asheville
HC
2014155
9
976
$305,750
$0
$0
$0
$0
$0
$3,500
$0
Old Haw Creek Rd. @ Greenbriar Rd.
E. Asheville
HC
2012109
56
3,755
$1,058,000
$18,000
$10,500
$98,000
Old West Chapel Rd.
Asheville
DP
2014004
53
14,800
$2,196,000
$36,000
$14,000
$1,379,000
10,090
575
$0
$0
$0
$2,250
$28,000
$272,000
$931,500
3,755
$0
$0
$0
$0
$0
$0
$0
4,680
$0
$0
$0
$0
$0
$0
$0
Point Repair Contract No. 1
Various
SA
2016028
N/A
0
$200,000
$0
$200,000
$0
$0
$0
$0
$0
$0
$0
$0
N. Asheville
SA
2015222
16
700
$220,600
$0
$0
$0
$0
$0
$4,000
$6,800
$28,000
$0
$181,800
Riverside Dr. @ Silverline Plastic
Woodfin
SA
2012007
4
400
$120,920
$1,920
$0
$0
$0
$5,000
$0
$0
$0
$0
Riverview Drive
Asheville
HC
2013104
24
2,302
$649,480
$7,880
$0
$0
$0
$0
$0
$0
$0
$641,600
Royal Pines Drive - PRP 47009
Arden
SA
2007020
35
2,888
W. Asheville
SA
2015223
22
550
$874,500
$15,600
$0
$0
$23,500
$0
$0
$835,400
$165,500
$0
$0
$0
$0
$4,000
$0
$0
2,341
$0
$0
$767,000
Riverside Dr @ Norton Dr
Sand Hill Rd @ Baker Place
$0 976
2,888
$0
$0
$0
$161,500
$0 700
$0
$0
$114,000
2,302
$0
$0
$0
$0
550
$0
$0
Sand Hill Rd. @ Russell/Davenport
W. Asheville
SA
2011093
82
2,341
$686,775
$154,202
$532,573
$0
$0
$0
$0
$0
$0
$0
$0
School Rd. @ Cranford Rd.
W. Asheville
SA
2014184
61
361
$109,000
$500
$0
$108,500
361
$0
$0
$0
$0
$0
$0
$0
$0
325
Sheppard Drive
W. Asheville
OH
2014152
71
325
$89,310
$1,660
$4,000
$83,650
$0
$0
$0
$0
$0
$0
$0
Smokey Park Hwy. @ I-40
Enka
DP
2015012
10
115
$41,750
$0
$0
$0
$0
$0
$0
$1,000
$0
$5,000
$35,750
Springside Rd. @ Overlook Rd.
S. Asheville
SA
2012127
52
4,500
$1,299,200
$21,000
$2,000
$100,200
$0
$1,176,000
$0
$0
$0
$0
$0
Starnes Avenue
Asheville
HC
2014154
22
2,871
$847,100
$0
$0
$0
$11,500
$3,000
$34,000
$0
$0
$798,600
2,871
$0
$0
Stratford Road
N. Asheville
DP
2015013
16
1,770
$495,500
$0
$0
$0
$8,000
$0
$10,000
$82,500
$0
$395,000
1,770
$0
$0
Stratford Rd. @ Oxford Court
Asheville
DP
2012133
75
1,960
$461,310
$60,584
$400,726
Sulphur Springs Rd. @ Covington St.
W. Asheville
DP
2014006
44
1,350
$381,000
$0
$5,500
1,960
4,500
$0
$0
$0
$0
$8,000
$63,000
$0
$304,500
1,350
$0 115
$0 $0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Sutton Avenue
Black Mtn.
DP
2014003
48
3,100
$931,000
$15,000
$0
$5,000
$0
$911,000
3,100
$0
$0
$0
$0
$0
$0
Sweeten Creek @ Buck Shoals
S. Asheville
HC
2014015
51
1,330
$406,170
$4,670
$1,500
$56,000
$0
$344,000
1,330
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Sweeten Creek Rd. @ Busbee View
Asheville
DP
2011095
70
1,048
$307,200
$30,837
$276,363
$0
$0
$0
Sweeten Creek @ Mills Gap
Asheville
SA
2014189
46
2,325
$703,800
$0
$0
$15,500
$80,000
$608,300
Sweeten Creek Rd. @ Weston Rd.
S. Asheville
SA
2014187
30
1,775
$520,200
$0
$0
$9,000
$0
$1,500
$37,000
$472,700
1,775
$0
$0
$0
$0
Upper Grassy Br. Rd. @ Maxwell Rd.
E. Asheville
SA
2010096
35
1,000
$287,710
$5,210
$0
$0
$2,000
$18,000
$0
$262,500
1,000
$0
$0
$0
$0
$20,000
$0
$127,000
$32,500
$0
$0
$1,263,500
$0
$0
$0
$0
$0
$0
$0
US 70 @ Jordan Road
Swannanoa
DP
2015014
21
4,550
$1,443,000
$0
$0
Venable Pump Station Elimination
Asheville
OH
2015172
NA
364
$361,200
$208,700
$152,500
1,048
364
2,325
Walnut Street @ Rankin Ave.
Asheville
SA
2014018
42
2,350
$766,400
$11,500
$0
$0
$1,000
$0
$753,900
Waynesville Ave. @ Brownwood Ave.
W. Asheville
SA
2014183
33
4,100
$1,258,500
$0
$0
$20,500
$500
$63,500
$124,000
Wentworth Ave.
Asheville
SA
2014181
26
1,500
$425,700
$0
$0
$7,500
$0
West Crabapple Lane
W. Asheville
DP
2014005
67
1,720
$503,000
$2,500
$8,000
$37,000
$455,500
Weston Road @ Tampa Blvd.
Skyland
HC
2015208
8
400
$114,150
$0
$0
$0
$0
White Oak Road
Arden
DP
2015193
3
960
$295,250
$0
$0
$0
$0
1,720
2,350
$0 $1,050,000
$417,700 $0
$0
$0
$2,000
$0
$2,250
$18,000
$91,900
400
$0
$0
$0
$4,000
$3,750
$35,000
$252,500
960
$0
$0
2015194
27
430
$124,250
$0
$2,150
$0
$0
$0
$0
$122,100
2014188
22
1,050
$357,100
$0
$0
$0
$0
$5,500
$49,000
$0
SSD Rehab. & Replacement
Various
MS
2002101
N/A
200,000
$41,644,040
$4,017,500
$4,164,404
Surveys for Design
Various
EB
2002060
N/A
N/A
$500,000
$50,000
$50,000
Future Projects - General Rehab.
Various
EB
N/A
N/A
SUBTOTAL Inflation per ENR Const. Cost Index SUBTOTAL with inflation
5,000
$1,125,000
$0
$0
439,470
$108,731,334
$5,427,203
$8,859,631
1.0000
1.0000
1.0000
439,470
$108,731,334
$5,427,203
$8,859,631
3.02%
$50,000
$0 40,722
$9,444,344
40,722
$9,729,563
$10,254,754
40,637
$10,883,494
1.0302
20,000
$12,252,104
44,835
$13,396,005
$4,164,404
20,000
$50,000
$0 44,835
1.0613
Page 3 of 4
$4,164,404 $50,000
$0 40,637
$0 $0
$0
SA
$50,000
$0 $0
$0
HC
20,000
$0 $0
$0
Weaverville
$4,164,404
$0 $0
$0
Asheville
20,000
$0 $0
$0
Wildwood Park
$4,164,404
$0 $0
$500
Wood Ave. @ Parker Rd.
20,000
4,100
4,550
$12,983,604
49,561
$14,624,514
1.0934
20,000
$50,000
$0 49,561
$4,164,404
430
$12,974,722
50,231
$15,055,868
1.1264
$0
$0
$0
$0
$0
$0
$302,600
1,050
$0
$4,164,404
20,000
$4,164,404
$4,164,404
20,000
$50,000
$0 50,273
$9,400,554
50,273
$11,237,837
1.1604
$0 $0
$0
$50,000
$0 50,231
1,500
400
$50,000
$0 36,483
$10,502,450
36,483
$12,934,256
1.1954
$0 20,000
$12,114,054
43,191
$15,369,575
1.2315
20,000
$50,000
$0 43,191
$4,164,404
$1,125,000
5,000
48,291
$8,585,354
35,216
48,291
$11,221,531
1.2687
1.3071 35,216
PROJECT NAME
LOCATION OF PROJECT
PROJ. PROJECT MGR. NUMBER
PIPE RATING
PROJECT FOOTAGE
TOTAL ESTIMATED COST
TOTAL EST. EXPENDS THRU FY 16
FY 16-17
BUDGET
FY 17-18
FOOTAGE
BUDGET
FY 18-19
FOOTAGE
BUDGET
FY 19-20
FOOTAGE
BUDGET
FY 20-21
FOOTAGE
BUDGET
FY 21-22
FOOTAGE
BUDGET
FY 22-23
FOOTAGE
BUDGET
FY 23-24
FOOTAGE
BUDGET
FY 24-25
FOOTAGE
BUDGET
FY 25-26
FOOTAGE BUDGET
FOOTAGE
PRIVATE SEWER REHABILITATION Douglas Place PSR
Asheville
SA
2011116
17
588
$166,312
$8,712
$0
Freno Drive PSR (Lower)
Asheville
HC
2012010
N/A
2,593
$656,532
$28,200
$639,000
Old County Home Rd PSR
W. Asheville
SA
2015221
60
1,400
$373,932
$3,732
$7,000
4,581
$1,196,776
$40,644
$646,000
1.0000
1.0000
1.0000
$1,196,776
$40,644
$646,000
SUBTOTAL Inflation per ENR Const. Cost Index
3.02%
SUBTOTAL with inflation
PROJECT NAME
4,581
LOCATION OF PROJECT
PROJ. PROJECT MGR. NUMBER
PIPE RATING
PROJECT FOOTAGE
TOTAL ESTIMATED COST
TOTAL EST. EXPENDS THRU FY 16
$0
$0
$1,000
$0
$0
$0
$156,600
2,593
$0
$0
$0
$0
$0
$0
$0
2,593
$10,600
$10,600
1.0302 2,593
FY 16-17
BUDGET
$0 0
$10,920
BUDGET
0
1.0613 0
FY 17-18
FOOTAGE
$0
$0
BUDGET
1,400
$0
$353,600
1,400
$0
1.0934 0
FY 18-19
FOOTAGE
$352,600
1.1264
$386,613
1,400
FY 19-20
FOOTAGE
BUDGET
$0 0
$0
BUDGET
0
1.1604 0
FY 20-21
FOOTAGE
$0
$0
0
FY 21-22
FOOTAGE
BUDGET
$0
$0
0
1.1954
$0
$0
0
BUDGET
588
$192,860
BUDGET
$0 $0 $0
$0
0
1.2687 588
FY 23-24
FOOTAGE
$0 $0 $0
$156,600 1.2315
FY 22-23
FOOTAGE
588
$0
0
FY 24-25
FOOTAGE
BUDGET
$0
0
1.3071 $0
0
FY 25-26
FOOTAGE BUDGET
FOOTAGE
TREATMENT PLANT, PUMP STATIONS & GENERAL CAPITAL IMPROVEMENTS Biological Treatment
MSD-Treatment Plant
HC
2016063
N/A
0
$4,000,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,000,000
$3,000,000
Building and Facility Rehabilitation
MSD-Treatment Plant
PW
2002068
N/A
0
$865,000
$135,000
$175,000
$90,000
$89,000
$80,000
$91,000
$68,000
$68,000
$68,000
$68,000
$68,000
Carrier Bridge P.S. Bypass & Improvements
MSD-Treatment Plant
HC
2012140
N/A
0
$2,281,688
$93,788
$250,000
$91,400
$1,709,000
$137,500
$0
$0
$0
$0
$0
$0
Flow Monitoring
MSD-Treatment Plant
SA
2008013
N/A
0
$282,535
$252,535
$30,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
Influent Pump Station Rehabilitation
MSD-Treatment Plant
HC
2012030
N/A
0
$1,639,000
$1,489,000
$150,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
Mountain View P.S. Standby Generator
MSD-Treatment Plant
OH
2015149
N/A
0
$204,210
$45,210
$159,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
Plant Headworks Improvements
MSD-Treatment Plant
HC
2015004
N/A
0
$11,538,575
$696,575
$5,457,000
$5,385,000
$0
$0
$0
$0
$0
$0
$0
$0
Plant High Rate Primary Treatment
MSD-Treatment Plant
HC
2015054
N/A
0
$10,962,000
$0
$960,000
$5,006,000
$4,996,000
$0
$0
$0
$0
$0
$0
$0
RBC Replacement
MSD-Treatment Plant
HC
2007068
N/A
0
$1,536,800
$1,206,800
$330,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
South French Broad Carrier Bridge PER
Buncombe County
HC
2016022
N/A
0
$400,000
$0
$400,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
General Capital Equipment
Varies
EB
2016072
N/A
0
$1,500,000
$0
$150,000
$150,000
$150,000
$150,000
$150,000
$150,000
$150,000
$150,000
$150,000
$150,000
Mull Building Improvements
Mull Building
OH
2016043
N/A
0
$68,000
$0
$68,000
$0
$0
$0
$0
$0
$0
$0
$0
0
$35,277,808
$3,918,908
$8,129,000
1.0000
1.0000
1.0000
$35,277,808
$3,918,908
$8,129,000
SUBTOTAL Inflation per ENR Const. Cost Index
3.02%
SUBTOTAL with inflation
PROJECT NAME
0
LOCATION OF PROJECT
PROJ. PROJECT MGR. NUMBER
PIPE RATING
PROJECT FOOTAGE
TOTAL ESTIMATED COST
TOTAL EST. EXPENDS THRU FY 16
0
0
1.0302 0
FY 16-17
BUDGET
$10,722,400
$11,046,216
BUDGET
0
1.0613 0
FY 17-18
FOOTAGE
$6,944,000
$7,369,751
BUDGET
0
1.0934 0
FY 18-19
FOOTAGE
$367,500
$401,811
BUDGET
0
1.1264 0
FY 19-20
FOOTAGE
$241,000
$271,458
BUDGET
0
1.1604 0
FY 20-21
FOOTAGE
$218,000
$252,967
BUDGET
0
1.1954 0
FY 21-22
FOOTAGE
$218,000
$260,607
BUDGET
0
1.2315 0
FY 22-23
FOOTAGE
$218,000
$268,477
BUDGET
0
1.2687 0
FY 23-24
FOOTAGE
$0
$1,218,000
$1,545,324
BUDGET
0
1.3071 0
FY 24-25
FOOTAGE
$3,218,000
$4,206,103
0
FY 25-26
FOOTAGE BUDGET
FOOTAGE
DESIGN, ROW, & CONSTRUCTION MANAGEMENT EXPENSES Design, ROW, & Const. Mgmt. Exp.
MSD/ENG
EB
N/A
N/A
SUBTOTAL
0
$28,998,216
$2,447,185
$2,546,486
0
$28,998,216
$2,447,185
$2,546,486
$2,658,847 0
$2,727,386
$2,658,847
0
$2,797,917
$2,727,386
0
$2,863,784
$2,797,917
0
$2,931,476
$2,863,784
0
$3,001,123
$2,931,476
0
$3,072,736
$3,001,123
0
$3,146,420
$3,072,736
0
$3,252,040
$3,146,420
0
$3,252,040
0
BUDGET SUMMARY
PROJECT NAME
LOCATION OF PROJECT
PROJ. PROJECT MGR. NUMBER
PIPE RATING
PROJECT FOOTAGE
TOTAL ESTIMATED COST
TOTAL EST. EXPENDS THRU FY 16
SUBTOTAL with Inflation
509,147
$193,469,451
12,735,640
CONTINGENCY REIMBURSEMENT PROJECTS
TOTAL
FY 16-17
BUDGET $20,942,087
FY 17-18
FOOTAGE 50,323
BUDGET $24,032,761
FY 18-19
FOOTAGE 50,237
BUDGET $23,101,132
FY 19-20
FOOTAGE 50,695
BUDGET $16,982,347
FY 20-21
FOOTAGE 50,961
BUDGET $17,759,757
FY 21-22
FOOTAGE 50,231
BUDGET $18,278,629
FY 22-23
FOOTAGE 50,273
BUDGET $19,717,799
FY 23-24
FOOTAGE 50,023
BUDGET $23,140,848
FY 24-25
FOOTAGE 50,254
BUDGET $20,910,520
FY 25-26
FOOTAGE BUDGET 50,491 $24,625,730
FOOTAGE 50,287
$1,000,000 Various
Various
Various
0
$1,000,000
$100,000
$100,000
0
$100,000
0
$100,000
0
$100,000
0
$100,000
0
$100,000
0
$100,000
0
$100,000
0
$100,000
509,147
$194,469,451
$12,835,640
$22,042,087
50,323
$24,132,761
50,237
$23,201,132
50,695
$17,082,347
50,961
$17,859,757
50,231
$18,378,629
50,273
$19,817,799
50,023
$23,240,848
50,254
$21,010,520
Page 4 of 4
$100,000
0
50,491 $24,725,730
0
50,287
Capital Improvement Program Fiscal Years 2017-2026
Project Schedule
CIP PROJECT TIMELINE ID
Project Name
Project #
P. R.
Duration
Start
Finish
Plats
Proj. Mgr. Jul
1
Christian Creek Int.
2011110 24
1126 days
2
Christian Creek Int.
2011110 24
730 days
Fri 7/1/16
Sat 6/30/18
3
Christian Creek Int.
2011110 24
304 days
Sun 7/1/18
Tue 4/30/19
Hunter
4
Dingle Creek Int.
2006010 15
167 days
Mon 1/15/07
Sat 6/30/07
Roger
5
Dingle Creek Int.
2006010 15
581 days
Sun 7/1/07
Sat 1/31/09
6
Dingle Creek Int.
2006010 15
216 days
Tue 7/1/25
Sun 2/1/26
Roger
7
Lower Swannanoa Int.
2004040 9
365 days
Thu 7/1/21
Thu 6/30/22
Hunter
8
Lower Swannanoa Int.
2004040 9
365 days
Fri 7/1/22
Fri 6/30/23
9
Lower Swannanoa Int.
2004040 9
366 days
Sat 7/1/23
Sun 6/30/24
Hunter
10
Reems Creek Master Plan Ext. Ph. 2
2015025 0
123 days
Wed 7/1/15
Sat 10/31/15
Roger
11
Reems Creek Master Plan Ext. Ph. 2
2015025 0
427 days
Sun 11/1/15
Sat 12/31/16
Roger
12
South French Broad Int. - Grouting
2011033 8
213 days
Wed 2/1/12
Fri 8/31/12
Hunter
13
South French Broad Int. - Grouting
2011033 8
946 days
Wed 7/1/15
Wed 1/31/18
Hunter
14
Adams Street
2012126 61
1096 days
Tue 7/1/14
Fri 6/30/17
Shaun
15
Adams Street
2012126 61
365 days
Sat 7/1/17
Sat 6/30/18
16
Adams Street
2012126 61
243 days
Mon 7/1/19
Fri 2/28/20
Shaun
17
Arco Road
2012082 71
699 days
Fri 2/1/13
Wed 12/31/14
Hunter
18
Arco Road
2012082 71
215 days
Fri 7/1/16
Tue 1/31/17
Hunter
19
Arlington Street
2015008 20
731 days
Sun 7/1/18
Tue 6/30/20
Darin
20
Arlington Street
2015008 20
274 days
Sat 7/1/23
Sat 3/30/24
Darin
21
Asheville Country Club
2012130 47
699 days
Thu 8/1/13
Tue 6/30/15
22
Asheville Country Club
2012130 47
365 days
Tue 3/1/16
Tue 2/28/17
23
Asheville Country Club
2012130 47
91 days
Wed 3/1/17
Tue 5/30/17
Shaun
24
Atkins Street
2014012 39
1096 days
Wed 7/1/15
Sat 6/30/18
Hunter
Sat 6/1/13
Thu 6/30/16
Aug
Sep
Oct
Nov
2017 Dec Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
2018 Dec Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
2019 Dec Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
2020 Dec Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
2021 Dec Jan
Feb
Mar
Apr
May
Jun
Hunter 16
Hunter ROW Construction
10
2
Roger
Hunter
Construction
19
Shaun ROW Construction
Construction Design
Shaun 13
Shaun ROW Construction Design
25
Atkins Street
2014012 39
365 days
Sun 7/1/18
Sun 6/30/19
26
Atkins Street
2014012 39
184 days
Wed 7/1/20
Thu 12/31/20
27
Beale Road @ Copney Lane
2009129 47
2557 days
Thu 7/1/10
Fri 6/30/17
3
Hunter ROW
Hunter Construction
Darin Design
28
Beale Road @ Copney Lane
2009129 47
365 days
Sat 7/1/17
Sat 6/30/18
29
Beale Road @ Copney Lane
2009129 47
184 days
Mon 7/1/19
Tue 12/31/19
Darin
30
Bear Creek Rd. @ School Rd.
2011117 10
2922 days
Sun 7/1/12
Tue 6/30/20
Shaun
14
Darin ROW Construction sign
31
Bear Creek Rd. @ School Rd.
2011117 10
365 days
Wed 7/1/20
Wed 6/30/21
32
Bear Creek Rd. @ School Rd.
2011117 10
305 days
Sat 7/1/23
Tue 4/30/24
Shaun
33
Beaucatcher Rd @ Kenilworth Rd
2015219 43
518 days
Mon 8/1/16
Sun 12/31/17
Shaun
34
Beaucatcher Rd @ Kenilworth Rd
2015219 43
153 days
Thu 7/1/21
Tue 11/30/21
Shaun
35
Bellevue Road
2015175 49
365 days
Sat 7/1/17
Sat 6/30/18
36
Bellevue Road
2015175 49
365 days
Sun 7/1/18
Sun 6/30/19
37
Bellevue Road
2015175 49
123 days
Mon 7/1/19
Thu 10/31/19
Darin
38
Braddock Way - PRP 20002
2006025 8
4565 days
Wed 12/31/08
Wed 6/30/21
Roger
18
Shaun ROW
Design
Darin Design
8
Darin ROW Construction Design
39
Braddock Way - PRP 20002
2006025 8
730 days
Thu 7/1/21
Fri 6/30/23
40
Braddock Way - PRP 20002
2006025 8
179 days
Tue 7/1/25
Fri 12/26/25
41
Broadway St. @ Bordeau
2009034 14
1461 days
Fri 1/1/10
Tue 12/31/13
42
Broadway St. @ Bordeau
2009034 14
365 days
Thu 7/1/21
Thu 6/30/22
43
Broadway St. @ Bordeau
2009034 14
184 days
Mon 7/1/24
Tue 12/31/24
Darin
44
Buchanan Ave.
2014023 13
1004 days
Tue 10/1/19
Thu 6/30/22
Shaun
45
Buchanan Ave.
2014023 13
365 days
Fri 7/1/22
Fri 6/30/23
46
Buchanan Ave.
2014023 13
153 days
Mon 7/1/24
Sat 11/30/24
Shaun
47
Caledonia Road
2014153 31
1461 days
Wed 7/1/15
Sun 6/30/19
Hunter
48
Caledonia Road
2014153 31
366 days
Mon 7/1/19
Tue 6/30/20
49
Caledonia Road
2014153 31
215 days
Thu 7/1/21
Mon 1/31/22
50
Central Ave. @ I-240
2014180 50
639 days
Tue 10/1/19
Wed 6/30/21
51
Central Ave. @ I-240
2014180 50
365 days
Thu 7/1/21
Thu 6/30/22
52
Central Ave. @ I-240
2014180 50
123 days
Mon 7/1/24
Thu 10/31/24
Shaun
53
Chatham Road
2015019 35
761 days
Sat 10/1/16
Wed 10/31/18
Shaun
54
Chatham Road
2015019 35
153 days
Wed 7/1/20
Mon 11/30/20
Shaun
55
Cherokee Road
2009132 48
2557 days
Thu 7/1/10
Fri 6/30/17
Darin
5
Roger Roger Darin
2
Darin
Design
9
Shaun
Design
8
Hunter ROW
Hunter Shaun Design
2
Shaun
Design Construction Design 56
Cherokee Road
2009132 48
365 days
Sat 7/1/17
Sat 6/30/18
57
Cherokee Road
2009132 48
184 days
Mon 7/1/19
Tue 12/31/19
Darin
58
Chestnut Lodge Road
2014017 61
611 days
Fri 5/1/15
Sat 12/31/16
Shaun
59
Chestnut Lodge Road
2014017 61
546 days
Sun 1/1/17
Sat 6/30/18
60
Chestnut Lodge Road
2014017 61
335 days
Sun 7/1/18
Fri 5/31/19
Shaun
61
Commerce Street
2012129 47
853 days
Sat 3/1/14
Thu 6/30/16
Shaun
62
Commerce Street
2012129 47
123 days
Wed 7/1/20
Sat 10/31/20
Shaun
63
Craggy St @ Old US 70
2015209 2
3288 days
Wed 7/1/15
Sun 6/30/24
Hunter
10
Darin ROW Construction
19
Shaun ROW Construction
Construction Design 64
Craggy St @ Old US 70
Note: Project durations are based on a 7 day week.
Created by: Cheryl Rice
2015209 2
365 days
Mon 7/1/24
Mon 6/30/25
3
Hunter
Design P.E.R.
Construction
Inactive Milestone
Manual Task
Manual Summary Rollup
Start-only
External Tasks
ROW
External Milestone
Inactive Summary
Duration-only
Manual Summary
Finish-only
External Milestone
1
Deadline
Last Updated: Wed 4/13/16
CIP PROJECT TIMELINE ID
Project Name
Project #
P. R.
Duration
Start
Finish
Plats
Proj. Mgr. Jul
65
Craggy St @ Old US 70
2015209 2
153 days
66
Cumberland Ave.
2014014 12
67
Cumberland Ave.
2014014 12
68
Dellwood Avenue
69
Dellwood Avenue
70
Tue 7/1/25
Sun 11/30/25
Hunter
2556 days
Fri 7/1/16
Fri 6/30/23
Hunter
305 days
Mon 7/1/24
Thu 5/1/25
Hunter
2009131 71
945 days
Sun 7/1/12
Sat 1/31/15
2009131 71
150 days
Sun 2/1/15
Tue 6/30/15
Dellwood Avenue
2009131 71
153 days
Fri 7/1/16
Wed 11/30/16
Darin
71
East Chestnut Ave @ Five Points
2015192 31
1280 days
Sat 7/1/17
Thu 12/31/20
Shaun
72
East Chestnut Ave @ Five Points
2015192 31
547 days
Wed 1/1/20
Wed 6/30/21
73
East Chestnut Ave @ Five Points
2015192 31
365 days
Thu 7/1/21
Thu 6/30/22
74
Elk Mtn. Place
2010094 48
1856 days
Fri 6/1/12
Fri 6/30/17
75
Elk Mtn. Place
2010094 48
365 days
Sat 7/1/17
Sat 6/30/18
76
Elk Mtn. Place
2010094 48
184 days
Mon 7/1/19
Tue 12/31/19
Hunter
77
Elk Park Drive - PRP 35001
2006028 10
487 days
Sat 3/1/08
Tue 6/30/09
Shaun
78
Elk Park Drive - PRP 35001
2006028 10
426 days
Wed 7/1/09
Mon 8/30/10
79
Elk Park Drive - PRP 35001
2006028 10
215 days
Mon 7/1/24
Fri 1/31/25
Shaun
80
Elkwood Avenue
2011080 66
2008 days
Sun 1/1/12
Fri 6/30/17
Hunter
81
Elkwood Avenue
2011080 66
365 days
Sat 7/1/17
Sat 6/30/18
82
Elkwood Avenue
2011080 66
184 days
Sun 7/1/18
Mon 12/31/18
83
Elkwood Ave @ Norman Austin Dr.
2014008 13
1096 days
Mon 7/1/19
Thu 6/30/22
84
Elkwood Ave @ Norman Austin Dr.
2014008 13
365 days
Fri 7/1/22
Fri 6/30/23
85
Elkwood Ave @ Norman Austin Dr.
2014008 13
123 days
Mon 7/1/24
Thu 10/31/24
86
Fairfax Avenue @ I-240
2015173 74
365 days
Mon 1/24/00
Mon 1/22/01
87
Fairfax Avenue @ I-240
2015173 74
365 days
Sat 7/1/17
Sat 6/30/18
88
Fairfax Avenue @ I-240
2015173 74
123 days
Sun 7/1/18
Wed 10/31/18
Darin
89
Fairmont Road
2015017 31
1095 days
Fri 7/1/16
Sun 6/30/19
Darin
Aug
Sep
Oct
Nov
2017 Dec Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
2018 Dec Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
2019 Dec Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
2020 Dec Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
2021 Dec Jan
Feb
Mar
Apr
May
Jun
Design
Darin 2
Darin Construction Design
23
Shaun ROW
Shaun Hunter 30
Hunter ROW Construction
17
3
Shaun
Hunter ROW
Hunter Construction
Darin Design
2
Darin Darin Darin
3
Darin ROW Construction Design
90
Fairmont Road
2015017 31
366 days
Mon 7/1/19
Tue 6/30/20
91
Fairmont Road
2015017 31
184 days
Thu 7/1/21
Fri 12/31/21
92
Forestdale Drive
2014002 33
1095 days
Fri 7/1/16
Sun 6/30/19
93
Forestdale Drive
2014002 33
366 days
Mon 7/1/19
Tue 6/30/20
94
Forestdale Drive
2014002 33
184 days
Thu 7/1/21
Fri 12/31/21
Darin
95
Forest Hill Dr. @ Warwick Rd.
2014020 14
974 days
Sun 7/1/18
Sun 2/28/21
Shaun
96
Forest Hill Dr. @ Warwick Rd.
2014020 14
274 days
Mon 7/1/24
Mon 3/31/25
Shaun
97
Four Inch Main - College Street
2012128 10
731 days
Mon 7/1/19
Wed 6/30/21
98
Four Inch Main - College Street
2012128 10
365 days
Fri 7/1/22
Fri 6/30/23
99
Four Inch Main - College Street
2012128 10
123 days
Mon 7/1/24
Thu 10/31/24
100
Four Inch Main - Dry Ridge Rd.
2012009 58
730 days
Wed 1/1/14
Thu 12/31/15
101
Four Inch Main - Dry Ridge Rd.
2012009 58
365 days
Fri 7/1/16
Fri 6/30/17
102
Four Inch Main - Dry Ridge Rd.
2012009 58
153 days
Mon 7/1/19
Sat 11/30/19
Darin
103
Hazel Mill Rd. @ Richland St.
2014016 26
1157 days
Mon 5/1/17
Tue 6/30/20
Shaun
9
Darin ROW
Darin Darin Design
22
Darin ROW
Design
Shaun Design
2
Shaun Shaun Darin
3
Darin ROW Construction Design
104
Hazel Mill Rd. @ Richland St.
2014016 26
366 days
Wed 7/1/20
Thu 7/1/21
105
Hazel Mill Rd. @ Richland St.
2014016 26
273 days
Fri 7/1/22
Thu 3/30/23
106
Hendersonville Rd. @ Blake Drive
2015176 71
3652 days
Wed 7/1/09
Sun 6/30/19
107
Hendersonville Rd. @ Blake Drive
2015176 71
365 days
Sat 7/1/17
Sat 6/30/18
108
Hendersonville Rd. @ Blake Drive
2015176 71
123 days
Sun 7/1/18
Wed 10/31/18
Darin
109
Hendersonville Rd. @ Mills Gap
2008185 62
1826 days
Wed 7/1/09
Mon 6/30/14
Darin
110
Hendersonville Rd. @ Mills Gap
2008185 62
365 days
Tue 7/1/14
Tue 6/30/15
111
Hendersonville Rd. @ Mills Gap
2008185 62
305 days
Tue 12/1/15
Fri 9/30/16
Darin
112
Hendersonville Rd. @ Peachtree Rd.
2012135 56
731 days
Tue 7/1/14
Thu 6/30/16
Darin
113
Hendersonville Rd. @ Peachtree Rd.
2012135 56
153 days
Mon 7/1/19
Sat 11/30/19
Darin
114
2009150 68
1290 days
Sun 7/1/12
Mon 1/11/16
Roger
2009150 68
536 days
Tue 1/12/16
Fri 6/30/17
2009150 68
182 days
Sat 7/1/17
Fri 12/29/17
Roger
117
Hendersonville Rd. @ Rosscraggon Ph. 2 Hendersonville Rd. @ Rosscraggon Ph. 2 Hendersonville Rd. @ Rosscraggon Ph. 2 Herron Ave.
2014186 9
731 days
Mon 7/1/19
Wed 6/30/21
Shaun
118
Herron Ave.
2014186 9
365 days
Thu 7/1/21
Thu 6/30/22
119
Herron Ave.
2014186 9
215 days
Mon 7/1/24
Fri 1/31/25
Shaun
120
Hill Street
2015018 39
212 days
Fri 12/1/17
Sat 6/30/18
Shaun
121
Hill Street
2015018 39
184 days
Wed 7/1/20
Thu 12/31/20
Shaun
122
Horizon Hill Rd. @ Hy-Vu Dr.
2008084 51
1127 days
Wed 7/1/09
Tue 7/31/12
Shaun
123
Horizon Hill Rd. @ Hy-Vu Dr.
2008084 51
183 days
Wed 8/1/12
Wed 1/30/13
124
Horizon Hill Rd. @ Hy-Vu Dr.
2008084 51
123 days
Fri 7/1/16
Mon 10/31/16
Shaun
125
Howland Rd. @ Sunset Trail
2012134 43
1461 days
Tue 7/1/14
Sat 6/30/18
Darin
14
Shaun ROW
Shaun Darin Design
4
Darin ROW Construction
7
Darin
Construction
115 116
14
Roger ROW Construction Design
2
Shaun
Design Construction
2
Shaun Construction ign
126
Howland Rd. @ Sunset Trail
2012134 43
365 days
Sun 7/1/18
Sun 6/30/19
127
Howland Rd. @ Sunset Trail
2012134 43
153 days
Wed 7/1/20
Mon 11/30/20
Darin
128
Johnston Blvd @ Providence Rd.
2014013 37
2373 days
Sun 1/1/12
Sat 6/30/18
Darin
6
Darin ROW Construction
Note: Project durations are based on a 7 day week.
Created by: Cheryl Rice
Design P.E.R.
Construction
Inactive Milestone
Manual Task
Manual Summary Rollup
Start-only
External Tasks
ROW
External Milestone
Inactive Summary
Duration-only
Manual Summary
Finish-only
External Milestone
2
Deadline
Last Updated: Wed 4/13/16
CIP PROJECT TIMELINE ID
Project Name
Project #
P. R.
Duration
Start
Finish
Plats
Proj. Mgr. Jul
129
Johnston Blvd @ Providence Rd.
2014013 37
365 days
Sun 7/1/18
Sun 6/30/19
12
Aug
Sep
Oct
Nov
2017 Dec Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
2018 Dec Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
2019 Dec Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
2020 Dec Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
2021 Dec Jan
Feb
Mar
Apr
May
Jun
Darin ROW
130
Johnston Blvd @ Providence Rd.
2014013 37
153 days
Wed 7/1/20
Mon 11/30/20
Darin
131
Jonestown Road
2014178 74
731 days
Tue 7/1/14
Thu 6/30/16
Owen
132
Jonestown Road
2014178 74
365 days
Fri 7/1/16
Fri 6/30/17
133
Jonestown Road
2014178 74
184 days
Sat 7/1/17
Sun 12/31/17
Owen
134
Knauth Road
2015220 15
731 days
Sun 7/1/18
Tue 6/30/20
Shaun
135
Knauth Road
2015220 15
365 days
Wed 7/1/20
Wed 6/30/21
136
Knauth Road
2015220 15
92 days
Mon 7/1/24
Mon 9/30/24
137
Kenilworth Rd. @ Springdale
2014010 42
1642 days?
Wed 1/1/14
Sat 6/30/18
138
Kenilworth Rd. @ Springdale
2014010 42
365 days
Sun 7/1/18
Sun 6/30/19
139
Kenilworth Rd. @ Springdale
2014010 42
184 days
Wed 7/1/20
Thu 12/31/20
Hunter
140
Lakeshore Dr. @ Merrimon
2014177 25
1461 days
Fri 7/1/16
Tue 6/30/20
Hunter
Construction
18
Owen ROW Construction Design
2
Shaun ROW
Shaun Hunter 11
Hunter ROW Construction Design
141
Lakeshore Dr. @ Merrimon
2014177 25
365 days
Wed 7/1/20
Wed 6/30/21
142
Lakeshore Dr. @ Merrimon
2014177 25
123 days
Fri 7/1/22
Mon 10/31/22
143
Lakeview Dr. @ Glen Falls
2014007 15
731 days
Mon 7/1/19
Wed 6/30/21
144
Lakeview Dr. @ Glen Falls
2014007 15
365 days
Thu 7/1/21
Thu 6/30/22
145
Lakeview Dr. @ Glen Falls
2014007 15
184 days
Mon 7/1/24
Tue 12/31/24
Darin
146
Lakewood Dr. @ Dudley
2015016 16
1096 days
Mon 7/1/19
Thu 6/30/22
Hunter
147
Lakewood Dr. @ Dudley
2015016 16
731 days
Fri 7/1/22
Sun 6/30/24
148
Lakewood Dr. @ Dudley
2015016 16
123 days
Mon 7/1/24
Thu 10/31/24
149
Laurel Road - Ph 2
2007321 22
425 days
Fri 2/1/08
Tue 3/31/09
150
Laurel Road - Ph 2
2007321 22
162 days
Tue 5/12/09
Tue 10/20/09
151
Laurel Road - Ph 2
2007321 22
153 days
Sat 7/1/23
Thu 11/30/23
Hunter
152
Lincoln Ave.
2013103 26
1643 days
Sun 1/1/12
Thu 6/30/16
Hunter
153
Lincoln Ave.
2013103 26
153 days
Fri 7/1/22
Wed 11/30/22
Hunter
154
Lionel Place
2015009 6
730 days
Fri 7/1/22
Sat 6/29/24
155
Lionel Place
2015009 6
365 days
Mon 7/1/24
Mon 6/30/25
156
Lionel Place
2015009 6
123 days
Tue 7/1/25
Fri 10/31/25
Darin
157
Long Shoals Rd. @ Allen Ave.
2010013 59
1887 days
Tue 5/1/12
Fri 6/30/17
Hunter
158
Long Shoals Rd. @ Allen Ave.
2010013 59
365 days
Sat 7/1/17
Sat 6/30/18
159
Long Shoals Rd. @ Allen Ave.
2010013 59
153 days
Sun 7/1/18
Fri 11/30/18
Hunter
160
Louisiana Ave
2015174 66
365 days
Thu 7/1/21
Thu 6/30/22
Darin
161
Louisiana Ave.
2015174 66
184 days
Mon 7/1/24
Tue 12/31/24
Darin
162
Louisiana Ave. @ Brucemont Circle
2010100 66
335 days
Mon 7/1/13
Sat 5/31/14
163
Louisiana Ave. @ Brucemont Circle
2010100 66
1491 days
Sun 6/1/14
Sat 6/30/18
164
Louisiana Ave. @ Brucemont Circle
2010100 66
153 days
Sun 7/1/18
Fri 11/30/18
Darin
165
Lower Glendale Ave.
2012083 15
3072 days
Fri 2/1/13
Wed 6/30/21
Hunter
9
Hunter ROW
Hunter Darin Design
18
Darin
Design
3
Hunter Hunter Hunter
8
Hunter
Darin 2
8
Darin
Hunter ROW Construction
Darin 4
Darin Construction Design
166
Lower Glendale Ave.
2012083 15
365 days
Thu 7/1/21
Thu 6/30/22
167
Lower Glendale Ave.
2012083 15
184 days
Mon 7/1/24
Tue 12/31/24
168
Lower Melody Lane
2013027 19
2922 days
Mon 7/1/13
Wed 6/30/21
169
Lower Melody Lane
2013027 19
365 days
Thu 7/1/21
Thu 6/30/22
170
Lower Melody Lane
2013027 19
184 days
Sat 7/1/23
Sun 12/31/23
171
Lynn Cove Road
2015010 31
1095 days
Fri 7/1/16
Sun 6/30/19
172
Lynn Cove Road
2015010 31
366 days
Mon 7/1/19
Tue 6/30/20
173
Lynn Cove Road
2015010 31
549 days
Thu 7/1/21
Sat 12/31/22
174
Manetta Rd. @ Johnson Dr.
2014022 26
1552 days
Sat 4/1/17
Wed 6/30/21
175
Manetta Rd. @ Johnson Dr.
2014022 26
365 days
Thu 7/1/21
Thu 6/30/22
176
Manetta Rd. @ Johnson Dr.
2014022 26
365 days
Fri 7/1/22
Fri 6/30/23
Shaun
177
Meadow Rd. @ Train Yard
2015207 37
1461 days
Wed 7/1/15
Sun 6/30/19
Hunter
178
Meadow Rd. @ Train Yard
2015207 37
366 days
Mon 7/1/19
Tue 6/30/20
179
Meadow Rd. @ Train Yard
2015207 37
153 days
Wed 7/1/20
Mon 11/30/20
180
Meadowbrook Drive
2010076 0
1430 days
Mon 11/1/10
Tue 9/30/14
181
Meadowbrook Drive
2010076 0
273 days
Wed 10/1/14
Tue 6/30/15
182
Meadowbrook Drive (SS)
2010076 0
731 days
Wed 7/1/15
Fri 6/30/17
Mike
183
Merrimon Ave. @ Clearview Terrace
2007012 3
541 days
Thu 3/1/12
Fri 8/23/13
Roger
184
Merrimon Ave. @ Clearview Terrace
2007012 3
365 days
Sat 7/1/23
Sat 6/29/24
185
Merrimon Ave. @ Clearview Terrace
2007012 3
336 days
Tue 7/1/25
Mon 6/1/26
Roger
186
Merrimon Ave. @ Coleman
2014009 9
365 days
Thu 7/1/21
Thu 6/30/22
Darin
187
Merrimon Ave. @ Coleman
2014009 9
184 days
Tue 7/1/25
Wed 12/31/25
Darin
188
Middle Beaverdam Crk. @ US 19-23
2010002 24
1096 days
Wed 7/1/15
Sat 6/30/18
Roger
189
Middle Beaverdam Crk. @ US 19-23
2010002 24
1096 days
Sun 7/1/18
Wed 6/30/21
190
Middle Beaverdam Crk. @ US 19-23
2010002 24
215 days
Fri 7/1/22
Tue 1/31/23
191
Mitchell Ave.
2014185 17
731 days
Mon 7/1/19
Wed 6/30/21
192
Mitchell Ave.
2014185 17
365 days
Thu 7/1/21
Thu 6/30/22
8
Hunter Hunter Darin Design
10
Darin Darin Darin Design
20
Darin ROW
Darin Shaun Design
10
Shaun
Design
2
Hunter ROW
Hunter Construction
Mike 6
Mike uction
3
Roger
Design
4
Roger ROW
Roger Shaun Design
Note: Project durations are based on a 7 day week.
Created by: Cheryl Rice
5
Shaun
Design P.E.R.
Construction
Inactive Milestone
Manual Task
Manual Summary Rollup
Start-only
External Tasks
ROW
External Milestone
Inactive Summary
Duration-only
Manual Summary
Finish-only
External Milestone
3
Deadline
Last Updated: Wed 4/13/16
CIP PROJECT TIMELINE ID
Project Name
Project #
P. R.
Duration
Start
Finish
Plats
Proj. Mgr. Jul
193
Mitchell Ave.
2014185 17
243 days
194
Mountainbrook @ Chunns Cove
2010112 55
2192 days
Fri 7/1/11
Fri 6/30/17
195
Mountainbrook @ Chunns Cove
2010112 55
365 days
Sat 7/1/17
Sat 6/30/18
196
Mountainbrook @ Chunns Cove
2010112 55
153 days
Mon 7/1/19
Sat 11/30/19
Darin
197
Mountainview Road
2014011 65
1612 days
Wed 2/1/12
Thu 6/30/16
Hunter
198
Mountainview Road
2014011 65
365 days
Fri 7/1/16
Fri 6/30/17
199
Mountainview Road
2014011 65
184 days
Sat 7/1/17
Sun 12/31/17
Hunter
200
New Haw Creek Rd. @ Dogwood Grove 2014021 46
1096 days
Tue 7/1/14
Fri 6/30/17
Shaun
201
New Haw Creek Rd. @ Dogwood Grove 2014021 46
365 days
Sat 7/1/17
Sat 6/30/18
202
New Haw Creek Rd. @ Dogwood Grove 2014021 46
184 days
Wed 7/1/20
Thu 12/31/20
Shaun
203
New Haw Creek Rd. @ Trinity Chapel
2012081 71
607 days
Fri 2/1/13
Tue 9/30/14
Hunter
204
New Haw Creek Rd. @ Trinity Chapel
2012081 71
582 days
Wed 10/1/14
Wed 5/4/16
205
New Haw Creek Rd. @ Trinity Chapel
2012081 71
153 days
Fri 7/1/16
Wed 11/30/16
206
New Stock Road
2015011 45
730 days
Fri 7/1/16
Sat 6/30/18
207
New Stock Road
2015011 45
365 days
Sun 7/1/18
Sun 6/30/19
208
New Stock Road
2015011 45
305 days
Wed 7/1/20
Sat 5/1/21
Darin
209
North Lexington @ I-240
2014182 47
4689 days
Tue 3/1/05
Sun 12/31/17
Shaun
Sat 7/1/23
Wed 2/28/24
Aug
Sep
Oct
Nov
2017 Dec Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
2018 Dec Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
2019 Dec Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
2020 Dec Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
2021 Dec Jan
Feb
Mar
Apr
May
Jun
Shaun Darin Design
9
Darin ROW Construction
6
Hunter ROW Construction
11
Shaun ROW Construction
2
Hunter Hunter Construction
Darin Design
9
Darin ROW Construction Design
210
North Lexington @ I-240
2014182 47
92 days
Wed 7/1/20
Wed 9/30/20
Shaun
211
North Market Street
2014019 41
792 days
Fri 5/1/15
Fri 6/30/17
Shaun
212
North Market Street
2014019 41
365 days
Sat 7/1/17
Sat 6/30/18
213
North Market Street
2014019 41
153 days
Wed 7/1/20
Mon 11/30/20
Shaun
214
Oakland Dr. @ Church St.
2015177 9
365 days
Sun 7/1/18
Sun 6/30/19
Darin
Construction
1
Shaun ROW Construction Design
215
Oakland Dr. @ Church St.
2015177 9
365 days
Wed 7/1/20
Wed 6/30/21
216
Oakland Dr. @ Church St.
2015177 9
123 days
Thu 7/1/21
Sun 10/31/21
217
Oakwood Street
2014155 9
1095 days
Wed 7/1/20
Fri 6/30/23
218
Oakwood Street
2014155 9
366 days
Sat 7/1/23
Sun 6/30/24
219
Oakwood Street
2014155 9
153 days
Mon 7/1/24
Sat 11/30/24
220
Old Haw Creek Rd. @ Greenbriar Rd.
2012109 56
1611 days
Fri 2/1/13
Fri 6/30/17
221
Old Haw Creek Rd. @ Greenbriar Rd.
2012109 56
365 days
Sat 7/1/17
Sat 6/30/18
222
Old Haw Creek Rd. @ Greenbriar Rd.
2012109 56
184 days
Sun 7/1/18
Mon 12/31/18
223
Old West Chapel Road
2014004 53
1096 days
Tue 7/1/14
Fri 6/30/17
224
Old West Chapel Road
2014004 53
365 days
Sat 7/1/17
Sat 6/30/18
225
Old West Chapel Road
2014004 53
396 days
Sun 7/1/18
Wed 7/31/19
Darin
226
Riverside Dr @ Norton Dr
2015222 16
638 days
Thu 10/1/20
Thu 6/30/22
Shaun
227
Riverside Dr @ Norton Dr
2015222 16
365 days
Fri 7/1/22
Fri 6/30/23
228
Riverside Dr @ Norton Dr
2015222 16
123 days
Mon 7/1/24
Thu 10/31/24
Shaun
229
Riverside Dr. @ Silverline Plastic
2012007 4
3713 days
Wed 5/1/13
Fri 6/30/23
Shaun
230
Riverside Dr. @ Silverline Plastic
2012007 4
92 days
Tue 7/1/25
Tue 9/30/25
Shaun
231
Riverview Drive
2013104 24
1125 days
Fri 6/1/12
Tue 6/30/15
Hunter
232
Riverview Drive
2013104 24
184 days
Sat 7/1/23
Sun 12/31/23
Hunter
233
Royal Pines Dr. - PRP 47009
2007020 35
2376 days
Fri 7/1/11
Sun 12/31/17
234
Royal Pines Dr. - PRP 47009
2007020 35
365 days
Sun 7/1/18
Sun 6/30/19
235
Royal Pines Dr. - PRP 47009
2007020 35
243 days
Thu 7/1/21
Mon 2/28/22
Shaun
236
Sandhill Rd @ Baker Pl
2015223 22
335 days
Thu 8/1/19
Tue 6/30/20
Shaun
237
Sandhill Rd @ Baker Pl
2015223 22
123 days
Sat 7/1/23
Tue 10/31/23
Shaun
238
Sandhill @ Russell/Davenport
2011093 82
1006 days
Tue 5/1/12
Sat 1/31/15
239
Sandhill @ Russell/Davenport
2011093 82
303 days
Sun 2/1/15
Mon 11/30/15
240
Sandhill @ Russell/Davenport
2011093 82
215 days
Fri 7/1/16
Tue 1/31/17
Shaun
241
School Rd. @ Cranford
2014184 61
488 days
Sun 3/1/15
Thu 6/30/16
Shaun
242
School Rd. @ Cranford
2014184 61
92 days
Sat 7/1/17
Sat 9/30/17
Shaun
243
Sheppard Drive
2014152 71
731 days
Tue 7/1/14
Thu 6/30/16
Hunter
244
Sheppard Drive
2014152 71
365 days
Fri 7/1/16
Fri 6/30/17
245
Sheppard Drive
2014152 71
123 days
Sat 7/1/17
Tue 10/31/17
Hunter
246
Smokey Park Hwy. @ I-40
2015012 10
1461 days
Wed 7/1/20
Sun 6/30/24
Darin
247
Smokey Park Hwy. @ I-40
2015012 10
123 days
Mon 7/1/24
Thu 10/31/24
Darin
248
Springside Rd. @ Overlook
2012127 52
853 days
Sun 3/1/15
Fri 6/30/17
Shaun
249
Springside Rd. @ Overlook
2012127 52
365 days
Sat 7/1/17
Sat 6/30/18
250
Springside Rd. @ Overlook
2012127 52
334 days
Mon 7/1/19
Fri 5/29/20
Shaun
251
Starnes Avenue
2014154 22
1096 days
Sat 7/1/17
Tue 6/30/20
Hunter
4
Darin ROW
Darin Hunter 3
Hunter Hunter Hunter
14
Hunter ROW
Hunter Construction
Darin 17
Darin ROW Construction
3
Shaun
Design
Shaun Design
2
Shaun ROW
Design
Shaun 19
Shaun Construction
Construction
1
Hunter ROW Construction
13
Shaun ROW Construction Design
252
Starnes Avenue
2014154 22
365 days
Wed 7/1/20
Wed 6/30/21
253
Starnes Avenue
2014154 22
184 days
Sat 7/1/23
Sun 12/31/23
254
Stratford Road
2015013 16
1096 days
Sun 7/1/18
Wed 6/30/21
255
Stratford Road
2015013 16
365 days
Thu 7/1/21
Thu 6/30/22
256
Stratford Road
2015013 16
366 days
Sat 7/1/23
Sun 6/30/24
4
Hunter ROW
Hunter Darin Design
Note: Project durations are based on a 7 day week.
Created by: Cheryl Rice
16
Darin Darin
Design P.E.R.
Construction
Inactive Milestone
Manual Task
Manual Summary Rollup
Start-only
External Tasks
ROW
External Milestone
Inactive Summary
Duration-only
Manual Summary
Finish-only
External Milestone
4
Deadline
Last Updated: Wed 4/13/16
CIP PROJECT TIMELINE ID
Project Name
Project #
P. R.
Duration
Start
Finish
Plats
Proj. Mgr. Jul
257
Stratford Rd. @ Oxford Court
2012133 75
1217 days
Sun 7/1/12
258
Stratford Rd. @ Oxford Court
2012133 75
244 days
Sat 10/31/15
Thu 6/30/16
259
Stratford Rd. @ Oxford Court
2012133 75
123 days
Fri 7/1/16
Mon 10/31/16
Darin
260
Sulphur Springs Rd @ Covington
2014006 44
1096 days
Wed 7/1/15
Sat 6/30/18
Darin
261
Sulphur Springs Rd @ Covington
2014006 44
365 days
Sun 7/1/18
Sun 6/30/19
262
Sulphur Springs Rd @ Covington
2014006 44
123 days
Wed 7/1/20
Sat 10/31/20
Darin
263
Sutton Avenue
2014003 48
1096 days
Wed 7/1/15
Sat 6/30/18
Darin
Fri 10/30/15
Aug
Sep
Oct
Nov
2017 Dec Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
2018 Dec Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
2019 Dec Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
2020 Dec Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
2021 Dec Jan
Feb
Mar
Apr
May
Jun
Darin 11
Darin Construction Design
13
Darin ROW Construction Design
264
Sutton Avenue
2014003 48
215 days
Mon 7/1/19
Fri 1/31/20
Darin
265
Sweeten Creek @ Buck Shoals
2014015 51
731 days
Wed 7/1/15
Fri 6/30/17
Hunter
Construction ign 266
Sweeten Creek @ Buck Shoals
2012133 51
365 days
Sat 7/1/17
Sat 6/30/18
267
Sweeten Creek @ Buck Shoals
2014015 51
92 days
Mon 7/1/19
Mon 9/30/19
Hunter
268
Sweeten Creek @ Busbee View
2011095 70
1095 days
Sun 7/1/12
Tue 6/30/15
Darin
269
Sweeten Creek @ Busbee View
2012133 75
366 days
Wed 7/1/15
Thu 6/30/16
270
Sweeten Creek @ Busbee View
2011095 70
215 days
Fri 7/1/16
Tue 1/31/17
Darin
271
Sweeten Creek @ Mills Gap
2014189 46
1187 days
Wed 4/1/15
Sat 6/30/18
Shaun
272
Sweeten Creek @ Mills Gap
2014189 46
365 days
Sun 7/1/18
Sun 6/30/19
273
Sweeten Creek @ Mills Gap
2014189 46
215 days
Mon 7/1/19
Fri 1/31/20
Shaun
274
Sweeten Creek @ Weston
2014187 30
1308 days
Thu 12/1/16
Tue 6/30/20
Shaun
2
Hunter ROW Construction
4
Darin Construction Design
5
Shaun ROW Construction Design
275
Sweeten Creek @ Weston
2014187 30
365 days
Wed 7/1/20
Wed 6/30/21
276
Sweeten Creek @ Weston
2014187 30
184 days
Thu 7/1/21
Fri 12/31/21
277
Upper Grassy Branch @ Maxwell Rd.
2010096 35
2556 days
Sun 7/1/12
Sun 6/30/19
278
Upper Grassy Branch @ Maxwell Rd.
2010096 35
366 days
Mon 7/1/19
Tue 6/30/20
279
Upper Grassy Branch @ Maxwell Rd.
2010096 35
123 days
Thu 7/1/21
Sun 10/31/21
280
US 70 @ Jordan Road
2015014 21
365 days
Sat 7/1/17
Sat 6/30/18
281
US 70 @ Jordan Road
2015014 21
731 days
Mon 7/1/19
Wed 6/30/21
282
US 70 @ Jordan Road
2015014 21
184 days
Sat 7/1/23
Sun 12/31/23
283
Venable Pump Station Elim.
2015172 0
191 days
Wed 7/1/15
Thu 1/7/16
284
Venable Pump Station Elim.
2015172 0
84 days
Fri 1/8/16
Thu 3/31/16
285
Venable Pump Station Elim.
2015172 0
275 days
Fri 4/1/16
Sat 12/31/16
Owen
286
Walnut Street @ Rankin
2014018 67
1948 days
Sat 3/1/14
Sun 6/30/19
Shaun
287
Walnut Street @ Rankin
2014018 67
215 days
Wed 7/1/20
Sun 1/31/21
Shaun
288
Waynesville Ave. @ Brownwood
2014183 33
1795 days
Sun 2/1/15
Tue 12/31/19
Shaun
2
Shaun ROW
Shaun Shaun 3
Shaun ROW
Shaun Darin Design
32
Darin ROW
Darin Owen 32
Owen Construction Design Construction Design
289
Waynesville Ave. @ Brownwood
2014183 33
547 days
Wed 1/1/20
Wed 6/30/21
290
Waynesville Ave. @ Brownwood
2014183 33
335 days
Thu 7/1/21
Tue 5/31/22
Shaun
291
Wentworth Avenue
2014181 26
1157 days
Mon 5/1/17
Tue 6/30/20
Shaun
292
Wentworth Avenue
2014181 26
153 days
Fri 7/1/22
Wed 11/30/22
Shaun
293
West Crabapple Lane
2014005 67
731 days
Wed 7/1/15
Fri 6/30/17
294
West Crabapple Lane
2014005 67
365 days
Sat 7/1/17
Sat 6/30/18
295
West Crabapple Lane
2014005 67
153 days
Sun 7/1/18
Fri 11/30/18
Darin
296
Weston Rd. @ Tampa Blvd.
2015208 8
1096 days
Thu 7/1/21
Sun 6/30/24
Hunter
297
Weston Rd. @ Tampa Blvd.
2015208 8
365 days
Mon 7/1/24
Mon 6/30/25
298
Weston Rd. @ Tampa Blvd.
2015208 8
92 days
Tue 7/1/25
Tue 9/30/25
299
White Oak Rd.
2015193 22
366 days
Sat 7/1/23
Sun 6/30/24
300
White Oak Rd.
2015193 22
365 days
Mon 7/1/24
Mon 6/30/25
301
White Oak Rd.
2015193 22
123 days
Tue 7/1/25
Fri 10/31/25
Shaun
302
Wildwood Park
2015194 27
366 days
Wed 7/1/15
Thu 6/30/16
Hunter
303
Wildwood Park
2015194 27
92 days
Thu 7/1/21
Thu 9/30/21
Hunter
304
Wood Ave. @ Parker Rd.
2014188 22
731 days
Sun 7/1/18
Tue 6/30/20
305
Wood Ave. @ Parker Rd.
2014188 22
365 days
Wed 7/1/20
Wed 6/30/21
306
Wood Ave. @ Parker Rd.
2014188 22
153 days
Sat 7/1/23
Thu 11/30/23
307
Douglas Place PSR
2011116 17
2341 days
Fri 2/1/13
Sun 6/30/19
308
Douglas Place PSR
2011116 17
184 days
Mon 7/1/19
Tue 12/31/19
309
Douglas Place PSR
2011116 17
123 days
Sat 7/1/23
Tue 10/31/23
310
Freno Drive - PSR
2012010 0
872 days
Sun 7/1/12
Wed 11/19/14
311
Freno Drive - PSR
2012010 0
589 days
Thu 11/20/14
Thu 6/30/16
312
Freno Drive - PSR
2012010 0
184 days
Fri 7/1/16
Sat 12/31/16
Hunter
313
Old County Home Rd PSR
2015221 60
549 days
Fri 7/1/16
Sun 12/31/17
Shaun
314
Old County Home Rd PSR
2015221 60
546 days
Mon 1/1/18
Sun 6/30/19
315
Old County Home Rd PSR
2015221 60
153 days
Mon 7/1/19
Sat 11/30/19
Shaun
316
Biological Treatment
2016063 0
366 days
Sat 7/1/23
Sun 6/30/24
Hunter
317
Biological Treatment
2016063 0
365 days
Mon 7/1/24
Mon 6/30/25
Hunter
318
Carrier Bridge PS Bypass & Improve.
2012140 0
1642 days
Tue 1/1/13
Fri 6/30/17
319
Carrier Bridge PS Bypass & Improve.
2012140 0
365 days
Sat 7/1/17
Sat 6/30/18
320
Carrier Bridge PS Bypass & Improve.
2012140 0
549 days
Sun 7/1/18
Tue 12/31/19
47
Shaun ROW
Design
Darin ign
12
Darin ROW Construction
12
Hunter Hunter Shaun
9
Shaun
Shaun Design
9
Shaun ROW
Shaun Shaun 1
Shaun ROW
Shaun Hunter 5
Hunter Construction Design
16
Shaun ROW Construction
Hunter 2
Hunter ROW
Hunter Construction
Note: Project durations are based on a 7 day week.
Created by: Cheryl Rice
Design P.E.R.
Construction
Inactive Milestone
Manual Task
Manual Summary Rollup
Start-only
External Tasks
ROW
External Milestone
Inactive Summary
Duration-only
Manual Summary
Finish-only
External Milestone
5
Deadline
Last Updated: Wed 4/13/16
CIP PROJECT TIMELINE ID
Project Name
Project #
P. R.
Duration
Start
Finish
Plats
Proj. Mgr. Jul
321
Flow Monitoring
2008013 0
3287 days
Tue 7/1/08
Fri 6/30/17
Aug
Sep
Oct
Nov
2017 Dec Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
2018 Dec Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
2019 Dec Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
2020 Dec Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
2021 Dec Jan
Feb
Mar
Apr
May
Jun
Shaun Construction
322
Influent Pump Station Rehabilitation
2012030 0
62 days
Tue 7/1/14
Sun 8/31/14
Hunter
323
Influent Pump Station Rehabilitation
2012030 0
1034 days
Mon 9/1/14
Fri 6/30/17
Hunter
324
Mountain View P.S. Standby Generator
2015025 0
215 days
Wed 7/1/15
Sun 1/31/16
325
Mountain View P.S. Standby Generator
2015025 0
121 days
Mon 2/1/16
Tue 5/31/16
326
Mountain View P.S. Standby Generator
2015025 0
92 days
Wed 6/1/16
Wed 8/31/16
Roger
327
Plant Headworks Improvements
2015004 0
366 days
Wed 7/1/15
Thu 6/30/16
Hunter
328
Plant Headworks Improvements
2015004 0
730 days
Fri 7/1/16
Sat 6/30/18
Hunter
329
Plant High Rate Primary Treatment
2015054 0
365 days
Fri 7/1/16
Fri 6/30/17
Hunter
Roger 1
Roger Construction
Construction Design 330
Plant High Rate Primary Treatment
2015054 0
730 days
Sat 7/1/17
Sun 6/30/19
Hunter
331
RBC Replacment
2007068
0
916 days
Mon 6/30/14
Sat 12/31/16
Hunter
332
South French Broad Carrier Bridge PER 2016022
0
365 days
Fri 7/1/16
Fri 6/30/17
Hunter
333
Mull Building Improvements
2016043 0
365 days
Fri 7/1/16
Fri 6/30/17
Owen
Construction
Pre. Eng. Rep.
Construction
Note: Project durations are based on a 7 day week.
Created by: Cheryl Rice
Design P.E.R.
Construction
Inactive Milestone
Manual Task
Manual Summary Rollup
Start-only
External Tasks
ROW
External Milestone
Inactive Summary
Duration-only
Manual Summary
Finish-only
External Milestone
6
Deadline
Last Updated: Wed 4/13/16
Capital Improvement Program Fiscal Years 2017-2026
Interceptor & Wet Weather Projects
DR
U SA
GLEN CABLE RD
NO
RD
EL
E OK
N
D
N
AVERY L
LN
O
RD
PINE
TR E
RD
NOT TO SCALE
DALYA RD
W IL SO N
RD A LE M
RD
NEW S
W
C BU
Y KE
D
AN D
of BUNCOMBE COUNTY, NORTH CAROLINA
Budget Map
R
ALDON DR
L KEN
ER
REGER AVE GREAT LAUREL DR
METROPOLITAN SEWERAGE DISTRICT
GOOSE CREEK RD
BUCKEYE ACCESS RD
RE N
Y 0 HW US 7
E DR W AR
I40 W I40 E SLEEPY HOLLOW LN
R E D BER RY T RL
VE CO
E UP
ING
R ST
R SP
Christian Creek Interceptor Project No. 2011110
D SR IGG R B
TU
N
R RD
/
BO TA NY
O BURLES
MO
SNEAKING CREEK
LN
EN S
STE V
RD MOFFITT NOLL DR E RIV R K
FF I T T BRA NCH
RD
E RD
DR
S COV
E
OR DR
A GE
A
PORTE R
LN TEEM S
RW AY ST E
EASTM O
DIN
D
R CA ID LR
BR WITS END TRL
M JI S H NC
C R EEK R
YOW DR CHRISTIA N
SY LV
ROWLAND RD
N RD
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Christian Creek Int.
LOCATION:
Buncombe Co.
TYPE:
Interceptor
PIPE RATING:
24
PROJECT NO.
2011110
TOTAL LF:
5,860
PROJECT BUDGET:
$2,231,579.00
PROJECT ORIGIN:
SSO's, Work Orders, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$30,079.00
$30,079.00
$5,000.00
$30.00
55330 - DESIGN 55340 - PERMITS
$4,970.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$14,500.00
55370 - LEGAL FEES
$16,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL
$14,500.00 $16,000.00
$16,000.00
$16,000.00
$125,000.00
$125,000.00
$7,000.00
$7,000.00
55410 - CONDEMNATION
$20,000.00
$3,000.00
55420 - CONSTRUCTION
$1,978,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$5,000.00
55450 - SURVEY - ASBUILT
$15,000.00
TOTAL AMOUNT
$2,231,579.00
$30,109.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
Consultant
# PLATS: [ 16
CONTRACTOR:
$14,500.00
$171,970.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$17,000.00
FY 18-19
$1,998,000.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project includes the replacement of approximately 5,860 LF of existing 8-inch and 18-inch sewer pipe. The portions to be replaced are located Southwest of US Hwy 70 at Rowland Rd. FY 23-24 in Swannanoa, and to Porters Cove Rd. at I-40. The lines are undersized and have experienced multiple FY 24-25 SSO's.
$0.00 $0.00
FY 25-26 SPECIAL PROJECT NOTES:
$0.00
System Services will replace approx. 3,050 LF along Sleepy Hollow Lane and approx. 4,185 LF adjacent to Christian Creek, behind Wrights Tool. Total Length to be replaced is approximately 13,095 LF.
SS = 7,235 LF
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Dingle Creek Interceptor
LOCATION:
Asheville
TYPE:
Interceptor
PIPE RATING:
15
PROJECT NO.
2006010
TOTAL LF:
7,871
PROJECT BUDGET:
$2,780,592.00
PROJECT ORIGIN:
SSO's, Work Orders, Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$6,050.00
$6,050.00
$610.00
$610.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES
$3,982.00
$3,982.00
$10,000.00
$7,172.00
$70,000.00
$48,004.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL
$2,750.00
$1,250.00
55410 - CONDEMNATION
$10,000.00
$1,998.00
$2,000.00
$1,000.00
55420 - CONSTRUCTION
$2,650,000.00
$69,066.00
$2,000.00
$1,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$7,500.00
55450 - SURVEY - ASBUILT
$19,700.00
TOTAL AMOUNT
$2,780,592.00
ENGINEER:
MSD
RW
R.O.W. ACQUISITION:
MSD
# PLATS: [ 10 ]
CONTRACTOR:
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located along Dingle Creek between the Blue Ridge Parkway and FY 23-24
$0.00
the Ramble Subdivision. The existing 18-inch vitrified clay pipe main will be replaced with a new 18-inch FY 24-25 ductile iron pipe main. The approximate length of this project is 7,871 LF.
$31,326.00
FY 25-26
$2,677,200.00
SPECIAL PROJECT NOTES:
W IE V ER
/
DR
H DR
Lower Swannanoa Interceptor Project No. 2004040
WINERY RD
MEADOW RD
TE C
DE
NOT TO SCALE
ST U NT CI R
CIR TANS
EA S
TC
OT
E
DR
G LOD
HUNTSMAN PL
E ST
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
P AP
T
RD
LS
CH OA
OW EL
R
MC D
T DU NS SAIN
V RI
AMBOY RD
ST
DE
N LYMA RST DR
VA N
U FERNIH
T RD
R VICTO
R W DO LS
RB ILT
O SH C TM EL
IA RD
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Lower Swannanoa Int.
LOCATION:
Asheville
TYPE:
Interceptor
PIPE RATING:
9
PROJECT NO.
2004040
TOTAL LF:
6,475
PROJECT BUDGET:
$5,478,400.00
PROJECT ORIGIN:
WW SSO's at Splitter box
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$14,879.00
$37,900.00
55330 - DESIGN 55340 - PERMITS
$5,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$3,000.00
55370 - LEGAL FEES
$2,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$10,000.00
55400 - APPRAISAL
$2,500.00
55410 - CONDEMNATION 55420 - CONSTRUCTION
$5,415,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$3,000.00
55450 - SURVEY - ASBUILT TOTAL AMOUNT
$5,478,400.00
$14,879.00
ENGINEER:
MSD
EB
R.O.W. ACQUISITION:
MSD
# PLATS: [ 2 ]
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$0.00
FY 18-19
$0.00 $0.00
CONSTRUCTION ADM:
MSD
FY 19-20
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$33,021.00
FY 22-23
$12,500.00
PROJECT DESCRIPTION: This project is to eliminate problems associated with the splitter box and the FY 23-24
$5,418,000.00
downstream twin 36-inch lines.
SPECIAL PROJECT NOTES:
FY 24-25
$0.00
FY 25-26
$0.00
This project is funded starting in year 11 of the CIP. This portion of line is also included in the SFB/Carrier Bridge PER project.
W
K OA
EW VI
RD
DIS
SO
IR
H I LL
SF AR MR D
RD
DA I
I26
E
RY R D
WINERY RD
RD
South French Broad Interceptor Grouting Project No. 2011033
AK SC
KNO B
JO NE
D
/
DR
LN
RIDGEFIELD BLVD
RD
IE
MORRIS RD
COFFEY CIR
SAR
EF DG E W
LD
PIN E
I40 E
F OL D
I40 W
TERRAINE LN
ME Y
HI LL
DR
I40 W
RD NOT TO SCALE
DEER PARK RD
MI
O LD SH IL H
RD
A
R
FO
R
FF LI
O
DE
RD
L SHI
D
RD
HD
R
LAMBETH DR
T FRI
OH
LONDON RD
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
D
KS I
KR LO C M E H WY E PK RIDG E U BL RUN U SE O H E R
BR O
DR
RD
REED ST WA L ES ST
OO TH W U O S
RD
RD
C
T ES
BUSBE E
D CE
AC H
RD
RO
O
AP P
I40 E
BRAD ST
LE R D
IDL
RA
PO ND
RD
R
DD
DR I TH FA RD CASE
EW OO
NT
MO
RD
FR E
D ER RY R
D SERV ICE R
RD BREV ARD
W RD
RD P FA RM
I26 R TA
K EE
SONVIL
FE
IS AV ALT SHE E
O H ER DC
RD
RD
PL
PL AT
OL
EA U
D YR PO N
TH E
D OL
FA RM
RD GL EN
RD
AY RW I FA
R HENDE
RR Y
OLD OVERLOOK RD
C M
SH TO N I G Y LE
RD
W N LO L VA RD
PA RK
TO
I40
NE PI P
V
D
ST
D OL TO
NA BUE UYVESANT R D HILLT OP RD
W I26
RI E DG
CARIBOU RD
D OL E RE
T DS
HE AM RD ISTA TR RS
RD OLD RIVER
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
South French Broad Int. - Grouting
LOCATION:
Biltmore Estate
TYPE:
Interceptor
PIPE RATING:
8
PROJECT NO.
2011033
TOTAL LF:
21,950
PROJECT BUDGET:
$1,912,146.00
PROJECT ORIGIN:
Line Condition, Inflow & Infiltration
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES
$90.00
$90.00
$1,911,450.00
$203,714.00
$606.00
$606.00
$1,912,146.00
$204,410.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$566,736.00
$588,000.00
$566,736.00
$588,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
7008 ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
N/A
# PLATS: [ 0 ]
CONTRACTOR:
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$553,000.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
PROJECT DESCRIPTION: This project is located within the Biltmore Estate along the French Broad River. FY 22-23
$0.00
The southern terminus of the project is located where the Dingle Creek Int. flows into the South French FY 23-24 Broad Int. The project consists of grouting and lining joints along approx. 22,000 LF of existing 36-inch Reinforced Concrete Pipe. The line is a major source of inflow and infiltration. Construction will be phased FY 24-25 over three years. FY 25-26 SPECIAL PROJECT NOTES:
4,830 LF in FY 15-16 Grouting - 6,845 LF, Lining - 675 LF in FY 16-17
9,600 LF in FY 17-18
$0.00 $0.00 $0.00
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Beaverdam Creek WW (CDM #10)
LOCATION:
Buncombe Co.
TYPE:
Wet Weather Int.
PIPE RATING:
27
PROJECT NO.
2001191
TOTAL LF:
5,500
PROJECT BUDGET:
$1,413,000.00
PROJECT ORIGIN:
CDM Master Plan
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$1,413,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
ENGINEER:
$1,413,000.00
MSD
R.O.W. ACQUISITION:
$0.00
EB # PLATS: [
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$1,413,000.00
PROJECT DESCRIPTION: This was identified as a potential rehabilitation project to improve wet weather flow FY 23-24
$0.00
conveyance, as specified in the Master Plan developed by CDM. It is located in the North French Broad FY 24-25 Interceptor area and is comprised of 5,500 LF of 8-inch through 12-inch diameter pipe. FY 25-26 SPECIAL PROJECT NOTES:
CDM Master Plan Project #10
$0.00 $0.00
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Biltmore WW (CDM #3)
LOCATION:
Biltmore
TYPE:
Wet Weather Int.
PIPE RATING:
12
PROJECT NO.
2001192
TOTAL L.F.:
2,200
PROJECT BUDGET:
$638,000.00
PROJECT ORIGIN:
CDM Master Plan
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$638,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
ENGINEER:
$638,000.00
MSD
R.O.W. ACQUISITION:
$0.00
EB # PLATS: [
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This was identified as a potential rehabilitation project to improve wet weather flow FY 23-24
$0.00
conveyance, as specified in the Master Plan developed by CDM. It is located in the Biltmore area near the FY 24-25 Swannanoa Interceptor, and is comprised of 2,200 LF of 18-inch diameter pipe.
$638,000.00
FY 25-26
$0.00
SPECIAL PROJECT NOTES:
CDM Master Plan Project #3
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Four Mile Creek WW (CDM #1)
LOCATION:
Biltmore Forest
TYPE:
Wet Weather Int.
PIPE RATING:
8
PROJECT NO.
2001193
TOTAL LF:
3,400
PROJECT BUDGET:
$884,000.00
PROJECT ORIGIN:
CDM Master Plan
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$884,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
ENGINEER:
$884,000.00
MSD
R.O.W. ACQUISITION:
$0.00
EB # PLATS: [
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This was identified as a potential rehabilitation project to improve wet weather flow FY 23-24
$0.00
conveyance, as specified in the Master Plan developed by CDM. It is located in the Southeast French FY 24-25 Broad Interceptor area, and is comprised of 3,400 LF of 12-inch diameter pipe. FY 25-26 SPECIAL PROJECT NOTES:
CDM Master Plan Project #1
$0.00 $884,000.00
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Haw Creek WW (CDM #6)
LOCATION:
Asheville
TYPE:
Wet Weather Int.
PIPE RATING:
8
PROJECT NO.
2001194
TOTAL LF:
3,800
PROJECT BUDGET:
$988,000.00
PROJECT ORIGIN:
CDM Master Plan
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$988,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
ENGINEER:
$988,000.00
MSD
R.O.W. ACQUISITION:
$0.00
EB # PLATS: [
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This was identified as a potential rehabilitation project to improve wet weather flow FY 23-24
$0.00
conveyance, as specified in the Master Plan developed by CDM. It is located in the Haw Creek area and is FY 24-25 comprised of 3,800 LF of 12-inch diameter pipe. FY 25-26 SPECIAL PROJECT NOTES:
CDM Master Plan Project #6
$0.00 $988,000.00
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
South Swannanoa WW (CDM #4)
LOCATION:
Asheville
TYPE:
Wet Weather Int.
PIPE RATING:
23
PROJECT NO.
2001195
TOTAL LF:
8,040
PROJECT BUDGET:
$2,939,600.00
PROJECT ORIGIN:
CDM Master Plan
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$2,939,600.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
ENGINEER:
$2,939,600.00
MSD
R.O.W. ACQUISITION:
$0.00
EB # PLATS: [
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$2,939,600.00
PROJECT DESCRIPTION: This was identified as a potential rehabilitation project to improve wet weather flow FY 23-24
$0.00
conveyance, as specified in the Master Plan developed by CDM. It is located in the Biltmore area near FY 24-25 Sweeten Creek, and is comprised of 8,040 LF of 18-inch through 42-inch diameter pipe. FY 25-26 SPECIAL PROJECT NOTES:
CDM Master Plan Project #4
$0.00 $0.00
Capital Improvement Program Fiscal Years 2017-2026
General Sewer Rehabilitation Projects
This Page Intentionally Blank
ORA ST
JOHN ST
NOT TO SCALE
ST
ND AVE OLD ASHE LA S GRE CON
U CH
SS
TON GAS
LS
T
T MYR
HIL RC
LE S
T
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
T
/
CH
BLANTON ST
W TA OC
AVE
Adams Street Project No. 2012126
RALPH ST
ROAD AVE S FRENCH B
T ST BARTLET
PIN E ROV EG
ST
ADAMS ST
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Adams Street
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
46
PROJECT NO.
2012126
TOTAL LF:
2,550
PROJECT BUDGET:
$695,400.00
PROJECT ORIGIN:
Work Orders; Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$12,000.00
$12,000.00
55330 - DESIGN 55340 - PERMITS
$500.00
$500.00
$8,400.00
$8,400.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES
$14,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$50,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$609,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$500.00
TOTAL AMOUNT
$695,400.00
$0.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
Consultant
# PLATS: [ 14 ]
CONTRACTOR:
$12,000.00
$8,900.00
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$64,000.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$610,500.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in downtown Asheville near South French Broad Ave. and FY 23-24
$0.00
is comprised of 2,550 LF of 8-inch ductile iron pipe. The existing line is aging 6-inch vitrified clay pipe, is in FY 24-25 poor condition, and runs under several houses. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
RD
NOT TO SCALE
AVON RD
ER LY RD
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
BE V
T
PLATEAU R D
/
CO
TUNNEL RD
CIR
AR
CR
N EC
Arco Road Project No. 2012082
SHADY
W NE
W HA
RD
TA IN MO UN
RD VI EW
K EE
N LY ON ST
WHITSON RD
CISCO RD
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Arco Road
LOCATION:
E. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
71
PROJECT NO.
2012082
TOTAL LF:
2,022
PROJECT BUDGET:
$592,000.00
PROJECT ORIGIN:
SSO's; Work Orders; Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$6,475.00
$8,500.00
$2,025.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$577,000.00
$577,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
$2,000.00
55450 - SURVEY - ASBUILT
$4,500.00
$4,500.00
TOTAL AMOUNT
$592,000.00
$6,475.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
N/A
# PLATS: [ 0
$2,025.00
$583,500.00
ESTIMATED BUDGETS - FY '18 -'26 ]
CONTRACTOR:
FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
Rd., adjacent to New Haw Creek Rd. It consists of replacing approx. 1,871 LF of 6-inch vitrified clay pipe FY 23-24 and 151 LF of 21-inch reinforced concrete pipe with 8-inch ductile iron pipe and 24-inch ductile iron pipe. FY 24-25 The existing line is in very poor condition with offset joints, roots, and fractures.
$0.00
FY 25-26
$0.00
PROJECT DESCRIPTION: This project is located in the Haw Creek neighborhood of E. Asheville along Arco
SPECIAL PROJECT NOTES:
$0.00
/
TO CH ARL
Arlington Street Project No. 2015008
L TO I240 E
I240 W
HOLLYWOOD ST
WOODFIN P
I240 W
ST
MOU
O TTE
TOW N
RD
NOT TO SCALE
NTAI N
ARLINGTON ST
G SW O
S RON
I240 E
FURMAN CT
OAK PARK RD
T
ARLINGTON ST
U T ST ES W EW VI
FURMAN AVE
FURMAN AVE
E CHESTN
CO
E CAM T
RD
O D R D
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Arlington Street
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
20
PROJECT NO.
2015008
TOTAL LF:
2,600
PROJECT BUDGET:
$747,000.00
PROJECT ORIGIN:
SSO's; Work Orders; Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$8,000.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$730,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$3,000.00
55450 - SURVEY - ASBUILT
$6,000.00
TOTAL AMOUNT
$747,000.00
$0.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [ 0
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$8,000.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project runs along Arlington St. in downtown Asheville. The project begins on FY 23-24
$739,000.00
Furman Ave. and ends at Town Mountain Rd. There are numerous structural problems within the lines FY 24-25 which contribute to I/I issues. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
MIDLAND DR
RD
RIA
D
D O KINGW OD PL
R WEMBLEY D
SUMME R HILL DR
Asheville Country Club Project No. 2012130
VINCENNES CT
WAY
LN
N IA
E DR EDGEDAL DR Y CHANTILL IC HWY TAIN SCEN ELK MOUN
NOT TO SCALE
TIMBER LN
D RDAM R BEAVE TIMBER DR
LL KI
LN
D NR
Q U
A
H
K
S
SK
LW
IE YV
B
R
A
R WD
NC
H
RD
SKYVIEW CIR
RD
Y WA
CARTER COVE RD
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
O
O
SP O
IL
U RO
T
ER
AK
X DE
O ND
ST
/
N SI N GTON
PL
D ORD R
TE WIS
W KE
D
ST JAME S
F STRAT D
W Y
DR OO W E
IDE
EU C
VW
L LOTUS P
L
EK S CRE
PK
LIA KIL
W
D
WY
ING
ID P K
OR R WINDS
CT
A
LI D
AL TA M
GE R LN
E EU CL
ROO K CT BEAV ER B
D RD HOO ROB IN
ON T
RID DRY LE S
MAR
SAIL VER
GH R
O O R T KIF E AT SG
LB O ROU
E DR
O KW D O D
EDGELAWN RD
BR BR O
G RD NT AIN MO U
D OD R OK WO
RIDG
EL K
R MANO
OD RD
C
OR LY
O ROBINH
ND DR RD
A GARL
LD WI
R RY R HE
EVIAN C T
W CRABAPPLE LN
GIBSON
CRABAPPLE LN
C SY RE MO
DR
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Asheville Country Club (SS)
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
47
PROJECT NO.
2012130
TOTAL LF:
0
PROJECT BUDGET:
$100,350.00
PROJECT ORIGIN:
Work orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$25,650.00
$26,350.00
$700.00
55330 - DESIGN 55340 - PERMITS
$1,500.00
$1,500.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES
$8,000.00
$8,000.00
$13,000.00
$8,000.00
$5,000.00
$40,000.00
$30,000.00
$10,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL
$2,500.00
$2,500.00
55410 - CONDEMNATION
$9,000.00
$9,000.00
55420 - CONSTRUCTION 55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
$100,350.00
$25,650.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [ 13
CONTRACTOR:
$48,200.00
$26,500.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
This project is located in North Asheville and is comprised of 7,200 LF of FY 23-24 8-inch ductile iron pipe. The existing line is 8-inch vitrified clay pipe and PVC pipe in poor condition with FY 24-25 repeated maintenance issues and SSO's.
PROJECT DESCRIPTION:
$0.00 $0.00
FY 25-26 SPECIAL PROJECT NOTES:
System Services will construct this project.
$0.00 L.F.
7,200
HOAL
TRADE ST
L MAPLE
NOT TO SCALE
T POND S
N
LANCE LN
T
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
S ATKINS
RD
Atkins Street Project No. 2014012
S RD
LOVER
LE ONVIL
/
S LONG
RS HENDE
S LN
IR MIAMI C
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Atkins Street
LOCATION:
Arden
TYPE:
General Sewer Rehab.
PIPE RATING:
39
PROJECT NO.
2014012
TOTAL LF:
1,833
PROJECT BUDGET:
$518,430.00
PROJECT ORIGIN:
SSO's; Work Orders; Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$5,480.00
$5,480.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$2,250.00
55370 - LEGAL FEES
$3,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$25,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$477,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$3,700.00
TOTAL AMOUNT
$518,430.00
$5,480.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [ 3
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$2,250.00
FY 18-19
$28,000.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$482,700.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in Arden just north of Lake Julian. Approximately 1,833 LF of existing 6-inch vitrified clay pipe will be replaced with new 8-inch ductile iron pipe. The existing sewer FY 23-24 line is in poor condition due to roots, fractures, and sags in the line. The line is undersized and has flooded FY 24-25 houses in the area. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Beale Road at Copney Lane
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
47
PROJECT NO.
2009129
TOTAL LF:
4,027
PROJECT BUDGET:
$1,157,425.00
PROJECT ORIGIN:
SSO's, Access, Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$15,725.00
$15,725.00
55330 - DESIGN 55340 - PERMITS
$1,200.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$15,000.00
55370 - LEGAL FEES
$14,000.00
$15,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$75,000.00
55400 - APPRAISAL
$3,500.00
55410 - CONDEMNATION 55420 - CONSTRUCTION
$1,020,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$3,000.00
55450 - SURVEY - ASBUILT
$10,000.00
TOTAL AMOUNT
$1,157,425.00
$15,725.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [ 14 ]
CONTRACTOR:
$0.00
$15,000.00
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$93,700.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$1,033,000.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project ties into the Lake Julian Ph. 4 project just west of Glen Bridge Road and extends northward to Ducker Road and Lower Glen Bridge Road. It serves several major FY 23-24 manufacturing sites. The lines are in poor condition with broken segments and leaking joints, have resulted FY 24-25 in SSO's, and are difficult to access for maintenance and repairs. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
D
D
RR
MADELINE AVE
RE RC EK RD
Bear Creek Road at School Road Project No. 2011117
R
NOT TO SCALE
HENDRIX ST
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
PL
/
HU
AD
N KL
SCHOOL R
AR T
S MO MI
BEA
R EE
DE MCDA
BEA RC
H RUMBOUG
ST
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Bear Creek Rd. at School Rd.
LOCATION:
W. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
23
PROJECT NO.
2011117
TOTAL LF:
2,062
PROJECT BUDGET:
$572,800.00
PROJECT ORIGIN:
Work Orders; Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$7,900.00
$7,900.00
55330 - DESIGN 55340 - PERMITS
$500.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$10,800.00
55370 - LEGAL FEES
$18,000.00
55380 - ACQUISITION SERVICES
$18,000.00
55390 - COMPENSATION
$50,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$465,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$600.00
TOTAL AMOUNT
$572,800.00
$7,900.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
Consultant
# PLATS: [ 18
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$11,300.00
INSPECTION:
MSD
FY 20-21
$86,000.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in W. Asheville and is comprised of 2,062 LF of 8-inch FY 23-24
$467,600.00
ductile iron pipe. The existing line is aging 8-inch vitrified clay pipe. The line has multiple fractures, sags, FY 24-25 misaligned joints, and root intrusion. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
R RD
HI
E LL
ND E AL RD
RD
DR
Beaucatcher Road at Kenilworth Road Project No. 2015219
TH KENILWOR
AU RA RO NOT TO SCALE
A REST
T CT URAN
H ORT LW I N KE
S KNL
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
L RD
/
TCHE UCA BEA
E TUNN
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Beaucatcher Rd @ Kenilworth Rd
LOCATION:
E. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
43
PROJECT NO.
2015219
TOTAL LF:
1,370
PROJECT BUDGET:
$396,700.00
PROJECT ORIGIN:
Work Orders; line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$13,000.00
$13,000.00
55330 - DESIGN 55340 - PERMITS
$1,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$0.00
55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$380,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$700.00
TOTAL AMOUNT
ENGINEER:
$396,700.00
MSD
R.O.W. ACQUISITION:
$0.00
SA # PLATS: [ 0 ]
CONTRACTOR:
$0.00
$13,000.00
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$1,000.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$382,700.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in East Asheville and is comprised of 1370 LF of 8-inch FY 23-24
$0.00
ductile iron pipe. The existing line is aging 6" orangeburg pipe in poor shape with a large amount of root FY 24-25 intrusion. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
AMHERST RD
/
HEN
RD
VILL E
D ER SO N
Bellevue Road Project No. 2015175
MILL ST ONE DR
MAGNUM WAY
LE AN HURST RD
NOT TO SCALE
E BELLEVU
RD
ROUND TOP RD
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
JAN DR
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Bellevue Road
LOCATION:
South Asheville
TYPE:
General Sewer Rehab
PIPE RATING:
49
PROJECT NO.
2015175
TOTAL LF:
860
PROJECT BUDGET:
$223,000.00
PROJECT ORIGIN:
Work Orders, Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$3,000.00
$3,000.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$5,000.00
55370 - LEGAL FEES
$8,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$15,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$190,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT
$2,000.00
TOTAL AMOUNT
$223,000.00
$0.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [ 8
CONTRACTOR:
$0.00
$3,000.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$5,000.00
FY 18-19
$23,000.00
CONSTRUCTION ADM:
MSD
FY 19-20
$192,000.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in South Asheville along properties on Bellevue Road and FY 23-24
$0.00
is adjacent to Round Top Road. The project will replace 860 LF of 6-inch VCP and PVC. The existing lines FY 24-25 are in bad condition and have too many point repairs. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
A PE
CH
T
E RE
RD
DR
CIR
WAY
CLUBHOUSE CT
T ER C TIMB
BRID GE C T
AS
PE N NOT TO SCALE
STRA W
T
PARK AVE
AN
DR
R
D
O
R
N
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
L LY
D
VE LO
GARDENWOOD LN
A G
W EN
D O
BA L
WA Y
LL BA
E RE DR EE LA N TR
BRADDOC K
CAMPBEL L
GATEHOUSE CT
Braddock Way - PRP 20002 Project No. 2006025
RD
/
C R EEK
EN
TURTLE CREEK DR
CARSO N
ROO LYB HOL
K DR
ET EK CREEKSIDE CT
E SW E CR
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Braddock Way - PRP 20002
LOCATION:
Asheville
TYPE:
Pipe Rated Projects
PIPE RATING:
8
PROJECT NO.
2006025
TOTAL LF:
3,848
PROJECT BUDGET:
$1,435,790.00
PROJECT ORIGIN:
Pipe Rating Program
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$18,190.00
$18,190.00
55330 - DESIGN 55340 - PERMITS
$1,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$4,500.00
55370 - LEGAL FEES
$5,000.00
$163.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$25,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$1,366,800.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$3,500.00
55450 - SURVEY - ASBUILT
$11,800.00
TOTAL AMOUNT
$1,435,790.00
$18,353.00
ENGINEER:
MSD
RW
R.O.W. ACQUISITION:
MSD
# PLATS: [ 5 ]
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$0.00
FY 18-19
$0.00 $4,500.00
CONSTRUCTION ADM.:
MSD
FY 19-20
INSPECTION:
MSD
FY 20-21
$1,000.00
FY 21-22
$29,837.00
FY 22-23
$0.00
Avenue and Braddock Way subdivisions. Problems with these lines include leaking joints, broken pipes and FY 23-24 high inflow and infiltration. In some areas, the existing lines will be relocated from private property to public FY 24-25 rights of way for better access and maintenance.
$0.00
FY 25-26
$1,382,100.00
PROJECT DESCRIPTION: This project will replace, line, and pipe burst several existing sewer mains in Park
SPECIAL PROJECT NOTES:
$0.00
BR S AY W D OA T
IZ EL
ET AB
H
/
NOT TO SCALE
BO
U EA D R
PL
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
T
Broadway Street at Bordeau Place Project No. 2009034
VE SA
ST
CE SS
NE AR ST
A M
L EL W X
R MA U LL
PL
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Broadway St. at Bordeau Place
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
14
PROJECT NO.
2009034
TOTAL LF:
475
PROJECT BUDGET:
$226,250.00
PROJECT ORIGIN:
SSO's; Work Orders; Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$6,250.00
$6,250.00
55330 - DESIGN 55340 - PERMITS
$500.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$1,000.00
$550.00
55370 - LEGAL FEES
$5,000.00
$1,469.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$75,000.00
55400 - APPRAISAL
$4,800.00
$4,800.00
55410 - CONDEMNATION 55420 - CONSTRUCTION
$132,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$500.00
55450 - SURVEY - ASBUILT
$1,200.00
TOTAL AMOUNT
$226,250.00
$13,069.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [ 2
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$0.00 $0.00
CONSTRUCTION ADM:
MSD
FY 19-20
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$79,481.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is on Broadway Ave. just north of I-240. The existing 18-inch sewer FY 23-24
$0.00
will be pipe bursted and replaced with 18-inch high density polyethelyne line. An aerial crossing, which is in FY 24-25 poor condition and ties into the Broadway Ave. main, will also be replaced as part of this project.
$133,700.00
FY 25-26
$0.00
SPECIAL PROJECT NOTES:
Project includes pipe bursting.
OR BILTM E AVE NOT TO SCALE
WHITE FAWN PL
AVE NAN
WILBAR A VE
/
PL NAN
HA BUC
Buchanan Avenue Project No. 2014023
A BUCH
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
N DR FAW E T I WH
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Buchanan Ave.
LOCATION:
Asheville
TYPE:
Pipe Rated Projects
PIPE RATING:
13
PROJECT NO.
2014023
TOTAL LF:
1,400
PROJECT BUDGET:
$403,500.00
PROJECT ORIGIN:
Work orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$7,000.00
55330 - DESIGN 55340 - PERMITS
$500.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$4,500.00
55370 - LEGAL FEES
$9,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$30,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$350,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$500.00
TOTAL AMOUNT
$403,500.00
$0.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [ 9
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$0.00 $7,000.00
CONSTRUCTION ADM.:
MSD
FY 19-20
INSPECTION:
MSD
FY 20-21
$500.00
FY 21-22
$4,500.00
FY 22-23
$39,000.00
PROJECT DESCRIPTION: This project is located in downtown Asheville near Biltmore Ave. and is FY 23-24 comprised of 1,400 LF of 8-inch ductile iron pipe. The existing line is 6-inch clay with heavy root intrusion, FY 24-25 fractures, and one section exposed along a steep grade.
$352,500.00
FY 25-26
$0.00
SPECIAL PROJECT NOTES:
$0.00
N LI
AVE
EB
G
C
IR
R STE
LI N
GS
T
A ALY
RD
KEN ILWO OD
PL
Caledonia Road Project No. 2014153
L UNADIL
CASTLE ST
/
RO
RE BILTMO
CA L
AVE
O
ILLA
G
ED
D UNA
LIN
NI A
W BO RK PA RD NOT TO SCALE
PELH A
D
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
M RD
ST
IA R DON
E LL
E CAL
LOW
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Caledonia Road
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
31
PROJECT NO.
2014153
TOTAL LF:
2,491
PROJECT BUDGET:
$755,000.00
PROJECT ORIGIN:
SSO's; Work orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$10,000.00
$10,000.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$6,000.00
55370 - LEGAL FEES
$8,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$100,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$623,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$3,000.00
55450 - SURVEY - ASBUILT
$5,000.00
TOTAL AMOUNT
$755,000.00
$0.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [ 8
CONTRACTOR:
$0.00
$10,000.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$6,000.00 $108,000.00
CONSTRUCTION ADM.:
MSD
FY 19-20
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$631,000.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located at the Caledonia Rd. entrance to the Kenilworth neighborhood, approx. 0.3 mile south of the Mission Hospital campus. The project includes replacement of FY 23-24 approx. 2,491 LF of 8-inch and 10-inch VCP and Transite pipe with new DIP. The existing pipe has FY 24-25 structural defects which have resulted in multiple SSO's. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
AD WA Y
/
BR O
E
40
O I2
ST T
I240
ERR
IMO N AV E I240 W
ELM ST
ORANGE ST
I240 E
AVE CENTRA L
Central Avenue at I-240 Project No. 2014180
I240E BROADWAY ST TO
WT OM
Y ST
S LIBERT
NOT TO SCALE
ORCHARD ST
I240
W
CHA R
I 240
E TO
TO ST
LOT
TE S
T
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
D HAR ORC
CLAYTON ST
PL ORCHAR D
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Central Ave. @ I-240
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
12
PROJECT NO.
2014180
TOTAL LF:
990
PROJECT BUDGET:
$282,100.00
PROJECT ORIGIN:
SSO's; Work orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$5,000.00
55330 - DESIGN 55340 - PERMITS
$1,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$600.00
55370 - LEGAL FEES
$1,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$50,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$223,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$500.00
TOTAL AMOUNT
$282,100.00
$0.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [ 1
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$0.00 $5,000.00
CONSTRUCTION ADM.:
MSD
FY 19-20
INSPECTION:
MSD
FY 20-21
$1,600.00
FY 21-22
$51,000.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in downtown Asheville near Woodfin St. and is FY 23-24 comprised of 990 LF of 12-inch ductile iron pipe. The existing line is 6, 10, and 12-inch vitrified clay pipe FY 24-25 with a history of SSO's.
$224,500.00
FY 25-26
$0.00
SPECIAL PROJECT NOTES:
$0.00
/
DA YT O
SALEM AVE
N
RD
Chatham Road Project No. 2015019 NOT TO SCALE
TER
LL
RD
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
CHATHAM RD
CLEARVIEW
EDG
NO DK OO W E
ME
R R IMO NA VE
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Chatham Road
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
35
PROJECT NO.
2015019
TOTAL LF:
1,450
PROJECT BUDGET:
$380,100.00
PROJECT ORIGIN:
Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$13,000.00
$13,000.00
55330 - DESIGN 55340 - PERMITS
$500.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$363,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$1,600.00
TOTAL AMOUNT
$380,100.00
$0.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
N/A
# PLATS: [ 0 ]
CONTRACTOR:
$0.00
$13,000.00
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$500.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$366,600.00
FY 21-22
$0.00
FY 22-23
$0.00
This project is located in North Asheville near W.T. Weaver Blvd. and is FY 23-24 comprised of 1,450 LF of 8-inch ductile iron pipe. The existing line is 6-inch vitrified clay pipe in poor FY 24-25 condition with heavy root intrusion.
PROJECT DESCRIPTION:
FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
TR
UD
PL
CE LI A
CLYDE ST
ST
PL
RO KE ER D
Cherokee Road Project No. 2009132
BLAIR S T
CH E
D
/
HILLSIDE ST
LENNOX
EDWIN
BOND ST
OAK
LN
CAN T ERB
D NOT TO SCALE
URY RD N
E NS
TD
R
LA N D RD
SU
WOO D
RD
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
FAIRMON T
PL
TTE S T
CROSS BANBUR Y
E PL
NT RD FAIRM O
E
R
ER G
N CRE SCENT ST
LE R D
E AV ALBEMA R
T DR
CHARLO
OR AR CH ALBEMAR L
K OC RD T
MU
XC
A VON RUCK C
LE
O NN
R R VON RUCK TE
R TE CE
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Cherokee Road
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
48
PROJECT NO.
2009132
TOTAL LF:
1,960
PROJECT BUDGET:
$605,200.00
PROJECT ORIGIN:
SSO's; Access; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$15,200.00
$15,200.00
55330 - DESIGN 55340 - PERMITS
$500.00
$500.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$4,770.00
$8,500.00
55370 - LEGAL FEES
$3,730.00
$10,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$60,000.00
55400 - APPRAISAL
$5,000.00
55410 - CONDEMNATION 55420 - CONSTRUCTION
$500,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$5,000.00
TOTAL AMOUNT
$605,200.00
$19,970.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [ 10
$0.00
$4,230.00
ESTIMATED BUDGETS - FY '18 -'26 ]
CONTRACTOR:
FY 17-18
$75,000.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$506,000.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
Macon Ave. @ Sunset Parkway project to an existing manhole east of Cambridge Road in North Asheville. FY 23-24 The line is old vitrified clay pipe and is in very poor condition. Several segments are under houses, walls or FY 24-25 other physical features which make repairs very difficult.
$0.00
FY 25-26
$0.00
PROJECT DESCRIPTION: This project will replace (or pipe burst) the existing sewer main from the end of the
SPECIAL PROJECT NOTES:
$0.00
/
WOLF CREEK DR
N
ST
WOODBE ND LN
Chestnut Lodge Road Project No. 2014017
W HI TE
RO
HE R
DR PI NE LAUREL LN
DR
BLUE RIDGE ASSE MBLY
DYER DR
FOREST LN
CE
I40 W I40 E
NOT TO SCALE
HIG
OW L N HAD ALPI NE S D
DR
OL
ORY ARM M EN TR
ONY
LO COL
T H TO P
S
RD
E CH U TN E DG RD
K EY D LA
GAP
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
RD
BLUE RIDGE RD
BRIERBROOK RD
S BLUE RIDGE RD
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Chestnut Lodge Rd.
LOCATION:
Black Mtn.
TYPE:
General Sewer Rehab.
PIPE RATING:
61
PROJECT NO.
2014017
TOTAL LF:
4,150
PROJECT BUDGET:
$1,002,600.00
PROJECT ORIGIN:
SSO's; Access; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$22,500.00
$22,500.00
$1,000.00
$1,000.00
55360 - EASEMENT PLATS
$11,500.00
$11,500.00
55370 - LEGAL FEES
$19,000.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES
$15,000.00
55380 - ACQUISITION SERVICES
$19,000.00
$4,000.00
55390 - COMPENSATION
$60,000.00
$20,000.00
55400 - APPRAISAL
$5,000.00
55410 - CONDEMNATION
$10,000.00
55420 - CONSTRUCTION
$850,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$2,600.00
TOTAL AMOUNT
$1,002,600.00
$0.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
Consultant
# PLATS: [ 19
CONTRACTOR:
$35,000.00
$39,000.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$74,000.00
FY 18-19
$854,600.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in Black Mountain near Blue Ridge Road and is comprised of 4,150 LF of 8-inch ductile iron pipe. The existing line is 6-inch and 8-inch clay with root FY 23-24 problems, fractures, and multiple SSO's. FY 24-25 FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
AVE
AVE COXE
ALY
Commerce Street Project No. 2012129
S SEAR
CO
LL
O BUNC ST MBE NOT TO SCALE
ST
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
E MERC COM
ST
/
ON PATT
T
ST
DS
S WALL
E
OO YW A H
EG
H CHURC
T
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Commerce Street
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
47
PROJECT NO.
2012129
TOTAL LF:
530
PROJECT BUDGET:
$184,800.00
PROJECT ORIGIN:
SSO's; Work Orders; Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$2,060.00
$3,000.00
$940.00
55330 - DESIGN 55340 - PERMITS
$500.00
$500.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$180,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$300.00
TOTAL AMOUNT
$184,800.00
$2,060.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
N/A
# PLATS: [ 0
CONTRACTOR:
$1,440.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$181,300.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in downtown Asheville near Church St. and is comprised of 8-inch ductile iron pipe. The exisiting 6-inch line contains both vitrified clay and PVC sections, and has FY 23-24 had excessive maintenance problems due to multiple pipe defects. FY 24-25 FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
/
R
AV E CRAGGY ST
LOCUST ST
Craggy Street at Old US 70 Project No. 2015209
HWY OLD US 70
NOT TO SCALE
WASHINGTON AVE
CENTRAL AVE
ST W COLLEGE
CA RV E
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
T ATE S W ST
GOLDMONT ST
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Craggy Street @ Old US 70
LOCATION:
Black Mountain
TYPE:
General Sewer Rehab
PIPE RATING:
2
PROJECT NO.
2015209
TOTAL LF:
1,000
PROJECT BUDGET:
$298,750.00
PROJECT ORIGIN:
No access for maint./inspection
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$4,000.00
$4,000.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$2,250.00
55370 - LEGAL FEES
$3,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$10,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$275,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$2,500.00
TOTAL AMOUNT
$298,750.00
$0.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [ 3 ]
CONTRACTOR:
$0.00
$4,000.00
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in Black Mountain on Craggy Street, approx. 400 ft. west of FY 23-24
$2,250.00
US 70 Hwy/Old US 70 Hwy intersection. The existing 6" PVC line has multiple bends without manhole FY 24-25 access, making maintenance and inspection difficult. The line will be replaced with new 8" DIP.
$13,000.00
FY 25-26
$279,500.00
SPECIAL PROJECT NOTES:
TA
M CO
SL A
A
R CI
LY
A
E
RT
L
U CA
BL
VE DA AN
T
T ES
I26 W E E DR 6 2 I RSID RIVE
A BE
RD
E
T
VE NA
TN
NOT TO SCALE
BL
ST
ES CH
S UT
LI A NO
BR O
ST
E AV
VIEW
T LA S
G MA
OCA
E AK
W
ST
TH NOR
H NORT
OR SH TS
Cumberland Avenue Project No. 2014014
U CO
T
GAY ST W CHESTNUT ST
R
MORROW S
RICHIE ST
ST
ND
GRAY ST
BIRCH ST
A PE O RS E AV
AD
I ZA EL
T BE
ST
T
H
WA YS
R OD WO
N
OW
U MO
AVE
LA TC
E CH
I24
PL
0W
N 0E
ST
I24
L EL W X
ST
E AV
Y RR
ES RN
A M
N MO
E RO
ST
ELOISE ST
E CHESTNUT
PL
HILLSIDE ST
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
A ST
RE
SPEARS AVE
T
/
AVE
ST PANOL A
L
A WANET
RD FO
A RL
TERY
ROSEWOO D
SARA ST
LN
WATAUGA ST
S WBA CATA
SOCO ST
T ZILLICOA S
HAWTHOR NE
TACOMA ST
E NT R
EP T
CU E MB ND
RIVERSIDE CEME
LI
SA
TACOMA PL
WESTOVER DR
N DA L VIL
L ER E AV
TS
U
ST
N MO
JANE ST
MB CU D AN
IN FL
HO
T EX
ST PL
ST
ST YO G UN A
H
N
T MOUNT CLARE AVE
ES W ST
IZ EL T BE
ST O
T
GD Y TH E
HIGHLAND S
L BU O LD HOLLAND ST
TS TR T EE DR
T AVE
FORS
ND S ON
A DONN
A HOLL MER RIM
S WE VE ON A
FULTON S T
IM MERR
T
Y AL
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Cumberland Ave.
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
12
PROJECT NO.
2014014
TOTAL LF:
4,587
PROJECT BUDGET:
$1,293,450.00
PROJECT ORIGIN:
SSO's; Access; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$18,250.00
$18,250.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$1,261,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$5,000.00
55450 - SURVEY - ASBUILT
$9,200.00
TOTAL AMOUNT
$1,293,450.00
$18,250.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
N/A
# PLATS: [ 0
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in Montford and runs the entire length of Cumberland FY 23-24 Ave. Approximately 4,587 LF of existing 6-inch vitrified clay pipe will be replaced with 8-inch ductile iron FY 24-25 pipe. This line is in very poor condition and has required multiple, frequent point repairs.
$1,275,200.00
FY 25-26
$0.00
SPECIAL PROJECT NOTES:
$0.00
AV E
AZ A
LE A
NN KE
Y ED
DR
H WT HA
O
VE TA
/
VE NA
R NO S WE TH
Dellwood Avenue Project No. 2009131
SO WIL
DE OD WO LL NOT TO SCALE
AVE
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
S T O N EW A LL
VE EA G RID RK A P
E AV
VE EA N R
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Dellwood Avenue
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
71
PROJECT NO.
2009131
TOTAL LF:
436
PROJECT BUDGET:
$121,850.00
PROJECT ORIGIN:
SSO's; Access; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$2,500.00
$2,500.00
55330 - DESIGN 55340 - PERMITS
$250.00
$250.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$3,600.00
$1,015.00
$2,585.00
55370 - LEGAL FEES
$4,000.00
$989.00
$3,011.00
$20,000.00
$10,700.00
$9,300.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$90,000.00
$90,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
$500.00
$500.00
$1,000.00
$1,000.00
$121,850.00
$15,204.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [ 2
CONTRACTOR:
$15,146.00
$91,500.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is for the relocation of an existing sewer main between Dellwood Ave. and Northwest Ave. in Swannanoa (Grovemont) area. The existing 6-inch vitrified clay pipe is in very FY 23-24 poor condition and runs between closely spaced houses making access for maintenance and repairs very FY 24-25 difficult. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
T ES W
OL GN A M
E ST S Y TH
VE IA A
W
ES
ST
AVE OW
BR
UN YO
G YS WA D OA
IZ EL
T
ET AB H PL
E RO N MO
PL
HIGHLAND ST
East Chestnut Avenue at Five Points Project No. 2015192
CH
UT TN
R OD WO HOLLAND ST NOT TO SCALE
ELOISE ST
L
BROAD ST
CLAXTON P
MERRIMON AV E
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
E CHESTNUT ST
ST
/
OC
AL A
ST
ST RE AVE
FOR
MOUNT C LA
W PL DRO O O W
FULTON S T
AND
MAXWELL ST
L HOL
ST
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
East Chestnut Ave @ Five Points
LOCATION:
N. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
31
PROJECT NO.
2015192
TOTAL LF:
5,225
PROJECT BUDGET:
$1,606,600.00
PROJECT ORIGIN:
MH overflows; line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$27,000.00
55330 - DESIGN 55340 - PERMITS
$1,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$13,800.00
55370 - LEGAL FEES
$23,000.00
55380 - ACQUISITION SERVICES
$23,000.00
55390 - COMPENSATION
$75,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$1,440,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$1,800.00
TOTAL AMOUNT
$1,606,600.00
$0.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
Consultant
# PLATS: [ 23 ]
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$27,000.00
FY 18-19
$0.00 $81,800.00
CONSTRUCTION ADM:
MSD
FY 19-20
INSPECTION:
MSD
FY 20-21
$54,000.00
FY 21-22
$1,442,000.00
FY 22-23
$1,800.00
PROJECT DESCRIPTION: This project is located in North Asheville and is comprised of 5,225 LF of 8-inch FY 23-24
$0.00
ductile iron pipe. The existing line is aging 6", 8", and 10" VCP in poor shape with multiple structural defects FY 24-25 per segment. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Elk Mountain Place
LOCATION:
Woodfin
TYPE:
General Sewer Rehab.
PIPE RATING:
48
PROJECT NO.
2010094
TOTAL LF:
4,101
PROJECT BUDGET:
$970,200.00
PROJECT ORIGIN:
SSO's; Access; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$18,000.00
$18,000.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$22,000.00
55370 - LEGAL FEES
$25,000.00
55380 - ACQUISITION SERVICES
$30,000.00
55390 - COMPENSATION
$60,000.00
$22,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$805,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$8,200.00
TOTAL AMOUNT
$970,200.00
$18,000.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
Consultant
# PLATS: [ 30 ]
CONTRACTOR:
$0.00
$22,000.00
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$115,000.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$815,200.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located south of Elk Mountain Rd. between I-26 and the French FY 23-24
$0.00
Broad river. It is comprised of approximately 4,101 LF of 8-inch ductile iron pipe. The existing vitrified clay FY 24-25 pipe sewer line is in poor condition and has experienced SSO's. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
RD
PENLEY AVE
ND
ST
T
DR WALK RIVER RD
NOT TO SCALE
ES
ND LA KY
CIR
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
ELK MOUNTAIN RD
E
D CIR
ND CIR
Elk Park Drive - PRP 35001 Project No. 2006028
K RD
Y LA N
GEORGIA AV
C R EE
W SK
A SKYL
/
SIXTH ST
T
HS
R
N CH
FIF T
ST
MAR T
EL L
N
EX
OU M
COMMUNITY ST
U FO
H RT
T EE THIRD ST
K EL AI NT UR CH NEW ST
O SEC
OLD BEAV ERDA M
E AV WN O BR
ELK PARK DR
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Elk Park Drive - PRP 35001
LOCATION:
Woodfin
TYPE:
Pipe Rated Projects
PIPE RATING:
10
PROJECT NO.
2006028
TOTAL LF:
2,242
PROJECT BUDGET:
$591,046.00
PROJECT ORIGIN:
Pipe Rating Program
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$10,050.00
$10,050.00
$200.00
$200.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES
$9,290.00
$9,290.00
$12,186.00
$12,186.00
$18,320.00
$18,320.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$537,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$2,000.00
TOTAL AMOUNT
$591,046.00
$50,046.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [ 17 ]
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM.:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in Woodfin and is comprised of 2,242 LF of 8-inch ductile FY 23-24
$0.00
iron pipe. The existing line is 6-inch vitrified clay pipe and PVC with numerous sags and root problems, as FY 24-25 well as a PVC creek crossing, which will be replaced during construction of the new line.
$541,000.00
FY 25-26
$0.00
SPECIAL PROJECT NOTES:
Old Beaverdam Creek Road GSR has been incorporated into this project.
E
BROWN A V
ST
ST
RI V ER
ELK MOU N TAIN
SID
RD
ED R
NORT H
Y TA
DR
R LO
RIDGE
E DR
S LAKE
ST
Y LN CHERR
N IO UN ST
DR HORE
CAR JE N AV E
NOT TO SCALE
ALCLARE DR
LAKEVIE W
RD
FOREST VIEW DR
ED G
EW AT
EN
ER
LE
LN
CI R
R
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
D DR
AF
N RD
ELLENWOO
GR E
GLE DEVA
N AVE
RE BLV D
MERRIM O
PINE A C
D TA
Elkwood Avenue Project No. 2011080
E
IS EV
/
CRESCENT ST NORTON DR
E OV
TAG E
GR
CO T
JONES ST
R
SNYDER D
E WASHINGTON AV
G R EE NO A KR T E R RAC D WO EC O T D FI N AVE
O D FIN AVE
I26 E NW O
ELKDA L
ST
HIGH ST
BROOKDALE RD
ST VI EW
I26 W
ROS E
B
T CRE ST C
ST ER RY MU L
ROSECREST ST
I26
WA
ST
N
E VIN
R
TL
E ST
IN TA O DT
L
TR O
N OU KM
T
LN U
ELKWO OD AVE
ST
SAREVA PL
SAREVA PL SUMMER ST
PL E LLE
T VI N
EL
TS
L VA
JA N
LO S CU
HI C
ST PELZER
O RY
E JARNAUL AV
OW
MCPHERSON ST 26 W TO I D R IN NTA MOU K L E LOR N
N
K
Y AL
WI LL
ND CIR
R SHO ST SE E RE
DL RD
SKYLA
IR BA
H
GLENVIEW
O
E AV I BA RD
ES LN
RD
PA
W RK
D O
K LA
RED OAK RD
E AVON PKWY Y W AVON PKW
E OR
GLEN FALLS RD
WESTWOOD RD
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Elkwood Ave.
LOCATION:
Woodfin
TYPE:
General Sewer Rehab.
PIPE RATING:
66
PROJECT NO.
2011080
TOTAL LF:
4,577
PROJECT BUDGET:
$1,263,450.00
PROJECT ORIGIN:
SSO's; Work Orders; Line Condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$11,000.00
$11,000.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$2,250.00
55370 - LEGAL FEES
$3,000.00
$2,250.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$15,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$1,217,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$5,000.00
55450 - SURVEY - ASBUILT
$10,200.00
TOTAL AMOUNT
$1,263,450.00
$11,000.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [ 3
$0.00
$2,250.00
ESTIMATED BUDGETS - FY '18 -'26 ]
CONTRACTOR:
FY 17-18
$18,000.00
FY 18-19
$1,232,200.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
Burnsville Hill Rd. It consists of replacement of approximately 4,577 LF of 8-inch ductile iron pipe. The FY 23-24 existing line has offset joints, fractures, root intrusion, multiple point repairs, and is the source of frequent FY 24-25 problems.
$0.00
FY 25-26
$0.00
PROJECT DESCRIPTION: This project is located in Woodfin, east of I-26 along Elkwood Ave. and Old
SPECIAL PROJECT NOTES:
$0.00
/
EL K
NORMAN DR
NOT TO SCALE
AUSTIN LE HILL RD
OLD BUR NSVIL
N TL WA LN U
Elkwood Avenue at Norman Austin Drive Project No. 2014008
TR O
AV E WO OD
ST JA N
W
ST
ST ORY HICK
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
TA Y
6 I2
E
LO R
6 I2
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Elkwood @ Norman Austin Dr.
LOCATION:
Woodfin
TYPE:
General Sewer Rehab.
PIPE RATING:
13
PROJECT NO.
2014008
TOTAL LF:
600
PROJECT BUDGET:
$178,100.00
PROJECT ORIGIN:
SSO's; Access; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$2,800.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$1,500.00
55370 - LEGAL FEES
$2,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$6,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$163,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$1,800.00
TOTAL AMOUNT
$178,100.00
$0.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [ 2
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$2,800.00
FY 21-22
$1,500.00
FY 22-23
$8,000.00
This project runs through properties along Elkwood Ave., starting at Norman Austin Drive. The existing pipe is 4-inch and 6-inch, is undersized and has misaligned joints. There is a FY 23-24 manhole that is located under a property owner's porch. The proposed 8-inch ductile iron pipe will run FY 24-25 mainly on Elkwood Ave. to move the system in the road for easier maintenance.
PROJECT DESCRIPTION:
FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $165,800.00 $0.00
KW
N
Y
L OAK
TP
/
SE SUN
KW Y
CAN T ER B DN
FAIRMONT RD
Fairmont Road Project No. 2015017
URY R
L
RD LA N D WOO D
ET P
GE RID
P OD WO
NT R D NOT TO SCALE
FAIR MO
S SUN
E AV
DR
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
SU
NS E
T
DR CH
RD KE E ER O
AC M
ON
RD
OW ER
LE MAY FL
E GL A ND
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Fairmont Road
LOCATION:
N. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
31
PROJECT NO.
2015017
TOTAL LF:
3,600
PROJECT BUDGET:
$1,094,250.00
PROJECT ORIGIN:
SSO's; Access; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$15,000.00
$15,000.00
55330 - DESIGN 55340 - PERMITS
$500.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$6,750.00
55370 - LEGAL FEES
$9,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$50,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$1,000,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$3,000.00
55450 - SURVEY - ASBUILT
$10,000.00
TOTAL AMOUNT
$1,094,250.00
$0.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [ 9
CONTRACTOR:
$0.00
$15,000.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$6,750.00 $59,500.00
CONSTRUCTION ADM:
MSD
FY 19-20
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$1,013,000.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in north Asheville approximately 0.25 miles east of FY 23-24
$0.00
Charlotte St. The project will run along roads and properties from Glendale Rd. to Sunset Dr. The 6-inch FY 24-25 clay lines are in poor condition which have caused manhole overflows and SSOs. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
BR
D
DR
EV AR
/
I240
E
0 I24
W
Fairfax Avenue at I-240 Project No. 2015173
FAIRFAX AVE
NOT TO SCALE
24 OI DT
R
DR
B TO
AR EV BR
I24
0W
0E
RD RD A EV
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Fairfax Avenue @ I-240
LOCATION:
West Asheville
TYPE:
General Sewer Rehab
PIPE RATING:
74
PROJECT NO.
2015173
TOTAL LF:
200
PROJECT BUDGET:
$76,250.00
PROJECT ORIGIN:
SSO's; Access, Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$1,000.00
$1,000.00
55360 - EASEMENT PLATS
$2,250.00
$2,250.00
55370 - LEGAL FEES
$3,000.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$15,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$50,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
$5,000.00
$3,900.00
$76,250.00
$3,900.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [ 3
CONTRACTOR:
$0.00
$3,250.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$18,000.00
FY 18-19
$51,100.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in West Asheville off of Fairfax Avenue and adjacent to the FY 23-24
$0.00
I-240 west bound off ramp to Brevard Road. The project consists of replacing 200 LF of 8-inch VCP and a FY 24-25 10-inch DIP. The lines are in poor condition and have root problems that are creating SSOs. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
BU
ER SB E
R BOU
NE L
N
PINE
A BUEN
RD
RD VISTA
O BR
WN
ST
ST
ORE
LE INO SEM
M ARD
D
R FO
Forestdale Drive Project No. 2014002
WN TO
RD
COR
R ST ER
/
LON E
D
E WHIT
E RD
H AM
DR
OU IB
LE
R CA
DA EST
RD
E OR
OO NW DEA
CT
NOT TO SCALE
L RIA
T
M ARD
ST S
T RE S
E IMP
DM O E AR
E FOR
DC
ST
IR
K
V I LL DR OO SW
CI R
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
RO C
D HEN ON ER S
CIR
L
OD NWO DAW M ADA
HI L
L ST N EL
ES DR WHISPERING PIN
D
RD OAK
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Forestdale Drive
LOCATION:
S. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
33
PROJECT NO.
2014002
TOTAL LF:
2,600
PROJECT BUDGET:
$843,000.00
PROJECT ORIGIN:
SSO's; Work orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$12,000.00
55330 - DESIGN 55340 - PERMITS
$500.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$17,000.00
55370 - LEGAL FEES
$22,000.00
55380 - ACQUISITION SERVICES
$22,000.00
55390 - COMPENSATION
$60,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$700,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$3,000.00
55450 - SURVEY - ASBUILT
$6,500.00
TOTAL AMOUNT
$843,000.00
$0.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
Consultant
# PLATS: [ 22 ]
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$12,000.00
FY 18-19
$17,500.00 $104,000.00
CONSTRUCTION ADM:
MSD
FY 19-20
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$709,500.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project begins at Carnell St. and ends at Caribou Rd. The system runs along FY 23-24
$0.00
side roads and properties parallel to Hendersonville Rd. System Services crews have reported numerous FY 24-25 problems including multiple SSO's. The existing pipes will be replaced with 8-inch ductile iron pipe. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
R
RD
MCLAIN ST
Forest Hill Road at Warwick Road Project No. 2014020
LD
DALTON ST
NOT TO SCALE
M CT
LENOIR ST
WARWICK RD
ES
D DR
AVE
WOO
IL CH
LAK E
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
H RD
/
A UN
ST CASTLE LE GDA
AVE
HIL
N SPRI
LA DIL
EST
RICH ARD ST
FOR
RD
ER CALEDONIA
KE
L EB
BUCKINGH A
WYOMING R D
RT ILWO KEN
RD
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Forest Hill Dr. @ Warwick Rd.
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
14
PROJECT NO.
2014020
TOTAL LF:
3,400
PROJECT BUDGET:
$956,100.00
PROJECT ORIGIN:
SSO's; Work orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$17,000.00
55330 - DESIGN 55340 - PERMITS
$500.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$935,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$1,600.00
TOTAL AMOUNT
$956,100.00
$0.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
N/A
# PLATS: [ 0
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$17,000.00
CONSTRUCTION ADM:
MSD
FY 19-20
$500.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is in Asheville in the Kenilworth neighborhood and consists of 3,400 LF of 8-inch ductile iron pipe. The current pipe is undersized 6-inch clay in poor condition, with roots FY 23-24 and fractures. FY 24-25
$938,600.00
FY 25-26
$0.00
SPECIAL PROJECT NOTES:
$0.00
/
L COL
EG E
ST
L COL
EG E
Four Inch Main - College Street Project No. 2012128
RD NTAIN
PL
NOT TO SCALE
H ATC
ER
NEL
RD
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
UC BEA
TU N
I240 E
T WYNNE S
MOU TOWN
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Four Inch Main - College Street
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
10
PROJECT NO.
2012128
TOTAL LF:
1,000
PROJECT BUDGET:
$486,200.00
PROJECT ORIGIN:
Work Orders; Line Condition; Access
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$5,000.00
55330 - DESIGN 55340 - PERMITS
$500.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$1,200.00
55370 - LEGAL FEES
$2,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$200,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$275,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,500.00
55450 - SURVEY - ASBUILT
$1,000.00
TOTAL AMOUNT
$486,200.00
$0.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [ 2
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$0.00 $0.00
CONSTRUCTION ADM:
MSD
FY 19-20
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$5,500.00
FY 22-23
$203,200.00
PROJECT DESCRIPTION: This project is located in downtown Asheville near Beaucatcher Tunnel and is comprised of 8-inch ductile iron pipe. The existing line is 4-inch Orangeburg and 6-inch vitrified clay pipe in FY 23-24 poor condition, with several buildings over the existing line. FY 24-25 FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $277,500.00 $0.00
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Four Inch Main - Dry Ridge Rd.
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
58
PROJECT NO.
2012009
TOTAL LF:
908
PROJECT BUDGET:
$291,600.00
PROJECT ORIGIN:
Problematic Orangeburg Four Inch Sewer
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$3,700.00
$5,100.00
$1,400.00
55330 - DESIGN 55340 - PERMITS
$1,000.00
$1,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$4,000.00
55370 - LEGAL FEES
$3,000.00
$3,000.00
$25,000.00
$25,000.00
$1,725.00
$2,275.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$250,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$2,500.00
TOTAL AMOUNT
$291,600.00
$5,425.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [ 3 ]
CONTRACTOR:
$32,675.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$253,500.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is a 4-inch main and extends from Dry Ridge Rd. to Lucky Lane and FY 23-24
$0.00
Windsor Rd. in Asheville. This project is in the area north of Merrimon Ave. and east of Stratford Rd. The FY 24-25 existing line is a 4-inch Orangeburg pipe which is in poor condition. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
A BR
I24
0E
PA TT O N AV ET O I24 I24 0 E I240 0W W T OP AT T O NA VE W
L VANDA
N NG NI ST
/
MILL B ROO K
R
RD
L HAZE
MILL
WORLE Y
RD
PL
ANNIE ST
Hazel Mill Road at Richland Street Project No. 2014016
AVE TON T A P
RICH LAND ST
L
N AVE PATTO ND
DP
S LA RU
NOT TO SCALE
WE S TW OO
SE RI
DR
TO X
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
N SU
ST AW AY
E PATTON AV
AY AVE RIDGEW
IA AVE
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Hazel Mill Rd @ Richland St.
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
26
PROJECT NO.
2014016
TOTAL LF:
3,300
PROJECT BUDGET:
$945,300.00
PROJECT ORIGIN:
SSO's; Work orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$18,000.00
55330 - DESIGN 55340 - PERMITS
$1,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$8,400.00
55370 - LEGAL FEES
$14,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$40,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$860,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$1,900.00
TOTAL AMOUNT
$945,300.00
$0.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 14
]
FY 17-18
$18,000.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$9,400.00
INSPECTION:
MSD
FY 20-21
$54,000.00
FY 21-22
$0.00
FY 22-23
$863,900.00
PROJECT DESCRIPTION: This project is located in West Asheville, near the Bowen Bridge, and consists of 3,300 LF of 8-inch ductile iron pipe. The current pipe is 6-inch and 8-inch clay and PVC. Lines are FY 23-24 undersized and in poor condition with multiple pipe sags, cracks, and fractures. FY 24-25 FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
N HE DE RS L VIL ON ER DR NOT TO SCALE
K BLA ED
Hendersonville Road at Blake Drive Project No. 2015176
D
BIRCH LANE EXT
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
LN
ST
TR L
AN S
ER M
FI SH
/
AKE N BL
BLAKE CT
H BIRC
EN LIND
R
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Hendersonville Rd @ Blake Drive
LOCATION:
South Asheville
TYPE:
General Sewer Rehab
PIPE RATING:
71
PROJECT NO.
2015176
TOTAL LF:
1,090
PROJECT BUDGET:
$323,200.00
PROJECT ORIGIN:
Work Orders, Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$3,500.00
$3,500.00
55360 - EASEMENT PLATS
$2,500.00
$2,500.00
55370 - LEGAL FEES
$4,000.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$35,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$275,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$500.00
55450 - SURVEY - ASBUILT
$2,700.00
TOTAL AMOUNT
ENGINEER:
$323,200.00
MSD
R.O.W. ACQUISITION:
$0.00
DP # PLATS: [ 4
CONTRACTOR:
$0.00
$6,000.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$39,000.00
FY 18-19
$278,200.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in South Asheville on Blake Drive off of Hendersonville FY 23-24
$0.00
Road. The project will replace 1,090 LF of 6-inch and 8-inch VCP. The existing lines are in bad condition FY 24-25 and have too many point repairs. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
TIMS ON R D
VIL L AG
ED
R
NOT TO SCALE
PEACHTREE RD
Hendersonville Road at Peachtree Road Project No. 2012135
LAMBETH DR
NORWICH DR
LE R D
/
VALLEY SPRINGS RD
PL
SAINT GILES
SONVIL
SHEFFIELD CI R
R HENDE
PEACHTREE RD
WOOD DR
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
NETTL E
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Hendersonville Rd. @ Peachtree Rd.
LOCATION:
S. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
56
PROJECT NO.
2012135
TOTAL LF:
1,100
PROJECT BUDGET:
$220,200.00
PROJECT ORIGIN:
SSO's; Work orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$7,200.00
$2,360.00
$4,840.00
$2,360.00
$4,840.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$210,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$500.00
55450 - SURVEY - ASBUILT
$2,500.00
TOTAL AMOUNT
ENGINEER:
$220,200.00
MSD
R.O.W. ACQUISITION:
DP # PLATS: [
CONTRACTOR:
$0.00
ESTIMATED BUDGETS - FY '18 -'26 0
]
FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$213,000.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project will replace an existing 6-inch vitrified clay line in Hendersonville FY 23-24 Rd. (US 25 South) between Peachtree Rd. and the Racquet Club Village Condo development. The line FY 24-25 condition is very poor. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
BL A
DR
S LEE ST
KE
RO
R C SS BIRCH LANE EXT
RD
RD
R D N O G AG
ON RAGG
D OL
R TU
I NP
RD K RD
CHERRY ST
LN
D
AY NW
R MULBE X URT E RY CO T
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
H BIRC
MOUNTAIN RD
R ABBOTT
AP PI A
NOT TO SCALE
KE
RD ARD ORC H
D WOOD R
CT
/
T
C ROSS
EA
Hendersonville Road at Rosscraggon Drive Phase 2 Project No. 2009150
S ATKINS
N
JU
L MAPLE
POND ST
L AZA
LA KE
RD
RD
TRADE ST N CT
LI AN
SWEETEN CREE
AZ
LE SONVIL
A
GO CRAG ROSS
AL E
R HENDE
T BALSAM C
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Hendersonville Rd. @ Rosscraggon Ph. 2 LOCATION:
Arden
TYPE:
General Sewer Rehab.
PIPE RATING:
68
PROJECT NO.
2009150
TOTAL LF:
4,163
PROJECT BUDGET:
$1,294,450.00
PROJECT ORIGIN:
SSO's, Access, Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$26,450.00
$26,450.00
$55,000.00
$5,106.00
55330 - DESIGN 55340 - PERMITS
$49,894.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$28,000.00
55370 - LEGAL FEES
$22,000.00
$28,000.00 $1,215.00
$10,000.00
$10,785.00
$35,000.00
$70,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$105,000.00
55400 - APPRAISAL
$3,000.00
$3,000.00
55410 - CONDEMNATION
$7,500.00
$7,500.00
55420 - CONSTRUCTION
$1,035,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$3,000.00
55450 - SURVEY - ASBUILT
$9,500.00
TOTAL AMOUNT
$1,294,450.00
$32,771.00
ENGINEER:
MSD
RW
R.O.W. ACQUISITION:
MSD
# PLATS: [ 14 ]
CONTRACTOR:
$122,894.00
$91,285.00
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$1,038,000.00
FY 18-19
$9,500.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project begins at US 25 just south of the railway spur line that goes into the Duke FY 23-24
$0.00
Energy plant and will include lines on Old Furnace Rd. and Azalea Rd. The existing lines are in very poor FY 24-25 condition with high infiltration due to cracks, broken pipes, and bad joints. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
SULPHU R
S ST
S RD
DAL LA
SPRING
RT S
T
SAND HILL RD
HA YW OO
OAKWOOD ST
RD
Herron Avenue Project No. 2014186
D
SALUDA ST
T PRUIT
NOT TO SCALE
ST
N TRYO
ST
W FLO
N D WOO HAY
SL ER
RD
HICKORY TE
R
CROWN ST
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
AVE
BLUE RIDG E AVE
/
LAN VALE AVE
DYS A
E DUNWELL AV
CRAGGY AVE
MILDRED AVE
M
CIR
VE R
AVE
E AV
O N TA VE
LL WE DUN NEVADA AVE
NA ISIA LOU AVE
BRUCEMONT
ES
DORCHESTER
J MA TIC
LN LEITA
JARRETT ST
HERRON AV E
CLOYES ST
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Herron Avenue
LOCATION:
W. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
9
PROJECT NO.
2014186
TOTAL LF:
2060
PROJECT BUDGET:
$595,500.00
PROJECT ORIGIN:
Line Condition; Work Orders
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$10,300.00
55330 - DESIGN 55340 - PERMITS
$1,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$1,200.00
55370 - LEGAL FEES
$2,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$8,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$570,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$1,000.00
TOTAL AMOUNT
$595,500.00
$0.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [ 2
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$0.00 $10,300.00
CONSTRUCTION ADM:
MSD
FY 19-20
INSPECTION:
MSD
FY 20-21
$2,200.00
FY 21-22
$10,000.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in West Asheville near the intersection of Sand Hill Rd. and FY 23-24
$0.00
Haywood Rd. and is comprised of 2,060 LF of 8-inch ductile iron pipe. The existing line is 6-inch vitrified FY 24-25 clay pipe in poor condition, with multiple pipe defects that cannot be adequately repaired by point repairs.
$573,000.00
FY 25-26
$0.00
SPECIAL PROJECT NOTES:
U HO
P ON ST
L
LS
L
N ST
T
R BA F LD IE E AV
Hill Street Project No. 2015018
ST
O YW A H
O M
O
TO
NOT TO SCALE
ST
D OR
D
F NT
E AV
4 I2
0
W
O RO
SE
LT VE
EE GR
NL
EE
E AV
I240
ET
O
ON PATT
AVE
T
ST
DS OO W Y HA
E CH
Y RR
N
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
0W I24 0E I24
T CARTER S
/
AE CH MI
L HI
ST
CL I
SO JA
N
Y BA
NG MA
ST
TO
R
AV E
GU E DG
0E
T E AV
I 24
N MO RD FO BROAD AV E
ST N FRENCH
SH T OR
ST N ANN
ST
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Hill Street
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
39
PROJECT NO.
2015018
TOTAL LF:
1,600
PROJECT BUDGET:
$452,600.00
PROJECT ORIGIN:
SSO's; Access; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$9,000.00
$9,000.00
55330 - DESIGN 55340 - PERMITS
$1,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$440,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$600.00
TOTAL AMOUNT
$452,600.00
$0.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
N/A
# PLATS: [ 0
CONTRACTOR:
$0.00
$9,000.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$1,000.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$442,600.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in Asheville near Montford Ave. and is comprised of 1,600 FY 23-24
$0.00
LF of 8-inch ductile iron pipe. The existing line is 6-inch vitrified clay pipe in poor condition with multiple FY 24-25 severe structural defects. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
E PA TH R
ELL S T
/
STILL W
D
DR HY V U
Horizon Hill Road (Hy-Vu Drive) Project No. 2008084
FENNER A VE
LOOKOUT DR
NOT TO SCALE
NT RD
FEN N
ER
AVE
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
LARCHMO
E D AV
BRID L
RD LA N
N L ROS E
ZO RI O H L HI
SANDON C IR
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Horizon Hill Rd. (Hy-Vu Drive)
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
51
PROJECT NO.
2008084
TOTAL LF:
713
PROJECT BUDGET:
$234,410.00
PROJECT ORIGIN:
SSO's; Work orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$4,900.00
$4,900.00
55360 - EASEMENT PLATS
$1,370.00
$1,370.00
55370 - LEGAL FEES
$1,450.00
$1,450.00
$2,690.00
$2,690.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES
55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$222,000.00
$222,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
$1,000.00
55450 - SURVEY - ASBUILT
$1,000.00
$1,000.00
TOTAL AMOUNT
$234,410.00
$10,410.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [ 2
CONTRACTOR:
$0.00
$224,000.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in Asheville near Merrimon Avenue. It consists of 713 LF FY 23-24
$0.00
of 8-inch ductile iron pipe. The current 8-inch Orangeburg and vitrified clay line has had repeated overflows FY 24-25 due to root intrusion and pipe collapse. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
GE
NT MO
N
ER
D
/
RD
E ST
C MA
GE RID
E AV
WOODLAN D RD
IR FA
O M
NT
RD
Howland Road at Sunset Trail Project No. 2012034
L
ON
P OD O W
D AND R HOWL
O B
NOT TO SCALE
SU
E NS
SU
LA TR
TT
RL
DR T NS E
KEE R D CHER O
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
CHEROKEE RD
ED
E GL
L DA
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Howland Rd. @ Sunset Trail
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
43
PROJECT NO.
2012134
TOTAL LF:
1,033
PROJECT BUDGET:
$376,600.00
PROJECT ORIGIN:
SSO's; Work orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$7,500.00
$4,600.00
$2,900.00
$4,600.00
$2,900.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$4,500.00
55370 - LEGAL FEES
$6,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$45,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$310,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$2,600.00
TOTAL AMOUNT
$376,600.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [
CONTRACTOR:
$0.00
ESTIMATED BUDGETS - FY '18 -'26 6
]
FY 17-18
$4,500.00
FY 18-19
$51,000.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$313,600.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project will replace an existing 8-inch main from 5 Howland Rd. up to the rear FY 23-24
$0.00
of 371 Sunset Dr. System Services recently completed another portion of this system due to SSO's and line FY 24-25 condition. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
Johnston Boulevard at Providence Road Project No. 2014013 NOT TO SCALE
DR
VID
D
O MO
SE
H
L RT EA
N
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
ER
ST
/
HN JO
VD BL
E HIR LS I W
O PR
C EN
ER
ON ST
DEBRA LN
TH LU
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Johnston Blvd. @ Providence Rd.
LOCATION:
W. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
37
PROJECT NO.
2014013
TOTAL LF:
2,360
PROJECT BUDGET:
$620,700.00
PROJECT ORIGIN:
SSO's; Access; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$4,700.00
$4,700.00
55330 - DESIGN 55340 - PERMITS
$5,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$9,000.00
55370 - LEGAL FEES
$12,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$36,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$550,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$500.00
55450 - SURVEY - ASBUILT
$3,500.00
TOTAL AMOUNT
$620,700.00
$0.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [
$4,700.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 12
]
CONTRACTOR:
FY 17-18
$9,000.00
FY 18-19
$53,000.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$554,000.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in West Asheville, approx. 0.6 miles west of New Leicester Hwy. The project consists of replacing 2,360 LF of existing 6-inch vitrified clay and PVC pipe with FY 23-24 new 8-inch ductile iron pipe. The existing line contains many offset joints and bends, and is in poor FY 24-25 structural condition. FY 25-26 SPECIAL PROJECT NOTES:
Providence Road was added to this with additional 1000 LF.
$0.00 $0.00 $0.00
TE
G R
IT
Y
D
R
E RM
T
NIX DR A DR
R
Jonestown Road Project No. 2014178
RY D
VIEW
MA YB ER
CITY
N FOREST LN NOT TO SCALE
ELK MO UNT AIN PL
ELK MOUNTAIN RD
RD
RD AVE
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
ST
/
IN
RIVER WALK DR
E RIV
C AD
D REE
K
REVON D
G IN OO BR
CRESTFIELD
ST
JO NE
R SP
ST OW N
RE E ES E VIN
ST
DR
T NINA S
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Jonestown Road
LOCATION:
Woodfin
TYPE:
General Sewer Rehab.
PIPE RATING:
74
PROJECT NO.
2014178
TOTAL LF:
3,578
PROJECT BUDGET:
$971,950.00
PROJECT ORIGIN:
Work orders; Line condition; Access
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$13,950.00
$13,950.00
55330 - DESIGN 55340 - PERMITS
$1,000.00
$1,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$9,500.00
55370 - LEGAL FEES
$9,500.00
$18,000.00
$18,000.00
$50,000.00
$50,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL
$2,500.00
$2,500.00
55410 - CONDEMNATION
$9,000.00
$2,000.00
55420 - CONSTRUCTION
$859,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$7,000.00
TOTAL AMOUNT
$971,950.00
$13,950.00
ENGINEER:
MSD
OH
R.O.W. ACQUISITION:
MSD
# PLATS: [ 18 ]
CONTRACTOR:
$9,500.00
$73,500.00
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$875,000.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
This project is located in Woodfin between Elk Mountain Rd. and Riverside Dr., specifically along portions of Jonestown Rd. The project consists of replacing approximately 3,578 LF of FY 23-24 existing 6-inch VCP with 8-inch DIP. The line has numerous structural defects and has a history of root FY 24-25 intrusion and SSOs.
PROJECT DESCRIPTION:
FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
NE
LR
D
/
TU N
Knauth Road Project No. 2015220
A
R
D
RD
NOT TO SCALE
TH
P
U
ES
KN
PL MA
CRAIG CIR
S NG RI
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
RI
CE V
LA M
AN CH
AD
R
RD E IL L
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Knauth Rd
LOCATION:
E. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
15
PROJECT NO.
2015220
TOTAL LF:
400
PROJECT BUDGET:
$127,500.00
PROJECT ORIGIN:
Work Orders; line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$2,000.00
55330 - DESIGN 55340 - PERMITS
$1,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$1,200.00
55370 - LEGAL FEES
$2,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$10,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$110,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$300.00
TOTAL AMOUNT
ENGINEER:
$127,500.00
MSD
R.O.W. ACQUISITION:
$0.00
SA # PLATS: [ 2 ]
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$0.00
FY 18-19
$2,000.00
CONSTRUCTION ADM:
MSD
FY 19-20
$2,200.00
INSPECTION:
MSD
FY 20-21
$12,000.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in East Asheville and is comprised of 400 LF of 8-inch FY 23-24
$0.00
ductile iron pipe. The existing line is aging 8-inch VCP in poor condition.
SPECIAL PROJECT NOTES:
FY 24-25
$111,300.00
FY 25-26
$0.00
OO
KIRKM AN RD
BR
K
RD
RD LE
R RA D
Kenilworth Road at Springdale Road Project No. 2014010
O AUR
NOT TO SCALE
LE E AL ND
AR
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
DR
RD
S DELANO
/
CL E
R TH R D
L HI
KENILW O
SPR
O
ING DA
R AU RA
RD
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Kenilworth @ Springdale Rd.
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
42
PROJECT NO.
2014010
TOTAL LF:
2,135
PROJECT BUDGET:
$597,350.00
PROJECT ORIGIN:
Work orders; Line condition; Access
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$6,800.00
$6,800.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$8,250.00
55370 - LEGAL FEES
$11,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$30,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$534,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$3,000.00
55450 - SURVEY - ASBUILT
$4,300.00
TOTAL AMOUNT
$597,350.00
$6,800.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 11
]
FY 17-18
$8,250.00
FY 18-19
$41,000.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$541,300.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in Kenilworth at the intersection of Kenilworth Rd. and Springdale Rd. Approximately 2,135 LF of existing 6-inch vitrified clay pipe will be replaced with 8-inch FY 23-24 ductile iron pipe. The existing line has voids, cracks, roots, and fractures, and has experienced multiple FY 24-25 SSOs. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
/
RE D R
Lakeshore Drive at Merrimon Avenue Project No. 2014177
MOUNT VERNON CIR
SH O
NOT TO SCALE
ME R
LAK E
NA VE RIM O
S MT V
ALY ERNON
AVE
SO
N
DR
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
CLAIRMON T
JO HN
OTTARI RD
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Lakeshore Dr. @ Merrimon Ave.
LOCATION:
N. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
25
PROJECT NO.
2014177
TOTAL LF:
838
PROJECT BUDGET:
$340,450.00
PROJECT ORIGIN:
Work orders; Line condition; Access
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$3,000.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$6,750.00
55370 - LEGAL FEES
$9,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$100,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$218,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$1,700.00
TOTAL AMOUNT
$340,450.00
$0.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [ 9 ]
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$3,000.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$6,750.00
INSPECTION:
MSD
FY 20-21
$109,000.00
FY 21-22
$0.00
FY 22-23
$221,700.00
PROJECT DESCRIPTION: This project is located near the intersection of Lakeshore Dr. and Merrimon Ave. in North Asheville. It consists of replacing approximately 838 LF of 6-inch VCP with 8-inch DIP. FY 23-24 Portions of the line run beneath a collapsed storm drain, and also underneath a house on Lakeshore Dr. FY 24-25 The existing pipe is fractured and generally in poor condition, and will be relocated as part of the project. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
WESTWOOD RD
IR BA DL N NOT TO SCALE
RD OAK RED
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
D
GLEN FALLS RD
Lakeview Road at Glen Falls Road Project No. 2014007
Y AL
LAKESHORE DR
I BA RD
R EW
/
RONSANNE PKWY
EVI LAK
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Lakeview @ Glen Falls Rd.
LOCATION:
N. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
15
PROJECT NO.
2014007
TOTAL LF:
4,200
PROJECT BUDGET:
$1,355,500.00
PROJECT ORIGIN:
Work orders; Line condition; Access
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$17,000.00
55330 - DESIGN 55340 - PERMITS
$500.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$15,000.00
55370 - LEGAL FEES
$18,000.00
55380 - ACQUISITION SERVICES
$18,000.00
55390 - COMPENSATION
$75,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$1,200,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$10,000.00
TOTAL AMOUNT
$1,355,500.00
$0.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
Consultant
# PLATS: [ 18
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$0.00 $17,000.00
CONSTRUCTION ADM:
MSD
FY 19-20
INSPECTION:
MSD
FY 20-21
$15,500.00
FY 21-22
$111,000.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is just south of Beaver Lake on Lakeview Rd., Glen Falls Rd., and FY 23-24
$0.00
through properties on Glen Falls Rd. The existing 6-inch clay pipe will be replaced with 8-inch ductile iron FY 24-25 pipe. System Services has experienced numerous problems with this line.
$1,212,000.00
FY 25-26
$0.00
SPECIAL PROJECT NOTES:
/
LAK E
DUDLEY AVE
Lakewood Drive at Dudley Avenue Project No. 2015016
D DR
NOT TO SCALE
CHILES AVE
E LA K
WY PK
LA K
EW
OO D
DR
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
WO OD
WOO
WAVERLY RD
EW LA K
Y W PK OO D
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Lakewood Drive @ Dudley
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
16
PROJECT NO.
2015016
TOTAL LF:
280
PROJECT BUDGET:
$97,200.00
PROJECT ORIGIN:
SSO's; Access; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$1,200.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$1,500.00
55370 - LEGAL FEES
$3,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$20,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$70,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$500.00
TOTAL AMOUNT
$97,200.00
$0.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [ 3
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$0.00 $1,200.00
CONSTRUCTION ADM:
MSD
FY 19-20
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$1,500.00
FY 22-23
$23,000.00
PROJECT DESCRIPTION: This project is located on Lakewood Dr. in the Kenilworth neighborhood of FY 23-24
$0.00
Asheville. It consists of replacing approx. 280 LF of existing 8-inch VCP with new 8-inch DIP. The existing line runs adjacent to a house foundation and is difficult to maintain. This line has a history of root intrusion. FY 24-25
$71,500.00
FY 25-26
$0.00
SPECIAL PROJECT NOTES:
ER RIPPON CT
Laurel Road Phase 2 Project No. 2007321 NOT TO SCALE
LA U
RE
L
MOUNT ROYAL DR
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
CT
ST
/
SD
DR
L YA RO
E PIN
OR E
RT
LR
AM
N R TE
E OD
LA E UR
SY C
OD RH
R
A PL
M AP
PO
LE
D ON DR
HEMLOCK
D
R
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Laurel Road - Ph. 2
LOCATION:
Arden
TYPE:
General Sewer Rehab.
PIPE RATING:
22
PROJECT NO.
2007321
TOTAL LF:
1,496
PROJECT BUDGET:
$379,307.00
PROJECT ORIGIN:
SSO's; Access; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$8,525.00
$8,525.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$4,000.00
$4,000.00
55370 - LEGAL FEES
$3,482.00
$3,482.00
$5,300.00
$5,300.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$352,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$3,000.00
55450 - SURVEY - ASBUILT
$3,000.00
TOTAL AMOUNT
$379,307.00
$21,307.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [ 8
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
This project is located in Royal Pines in southern Buncombe County. FY 23-24 Approximately 1,496 LF of 8-inch ductile iron pipe will replace existing vitrified clay and Orangeburg pipe FY 24-25 along Laurel Rd. and Laurel Court. The existing lines are in poor condition. PROJECT DESCRIPTION:
FY 25-26 SPECIAL PROJECT NOTES:
System Services constructed earlier portion (Phase 1) during COA water line project. This project re-named to Phase 2.
$0.00 $358,000.00 $0.00 $0.00
ST
R TY
LIB E
/
FR E
LN
M
ED O
PISGAH VIEW AVE
W RALEIGH RD
LINCOLN AVE
SCHOOL RD E
Lincoln Avenue Project No. 2013103
KENMORE ST
NOT TO SCALE
WINSTON AVE
CONCORD PL
BRISTOL PL E BROADVIEW AV
D WI LM IN G TO NR E
EO
RA
BL VD
RALEIGH RD
ON T
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
CLEVELAND AV
COTTAGE COVE LN
E NEWBERN AV
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Lincoln Ave.
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
26
PROJECT NO.
2013103
TOTAL LF:
1,415
PROJECT BUDGET:
$397,870.00
PROJECT ORIGIN:
Work orders; Line condition; Access
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$2,870.00
$2,870.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$389,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$3,000.00
55450 - SURVEY - ASBUILT
$3,000.00
TOTAL AMOUNT
$397,870.00
$2,870.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
N/A
# PLATS: [
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 0
]
FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$395,000.00
PROJECT DESCRIPTION: This project is located in the Oakley neighborhood in southeast Asheville, just FY 23-24 north of I-40. It consists of replacing approximately 1,415 LF of existing 6-inch vitrified clay pipe with 8-inch FY 24-25 ductile iron pipe. The existing line is in very poor structural condition. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
/
Lining Contract No. 8 Project No. 2015218 NOT TO SCALE
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Lining Contract No. 8
LOCATION:
Various
TYPE:
General Sewer Rehab
PIPE RATING:
NA
PROJECT NO.
2015218
TOTAL LF:
11,000
PROJECT BUDGET:
$1,377,000.00
PROJECT ORIGIN:
Access, Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$1,375,000.00
$1,375,000.00
$2,000.00
$2,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
ENGINEER:
$1,377,000.00
MSD
R.O.W. ACQUISITION:
$0.00
DP # PLATS: [ 0 ]
CONTRACTOR:
$0.00
$1,377,000.00
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This is a trenchless technology project that includes lining substandard sewer FY 23-24
$0.00
lines with either CIPP or Fold and Form pipe. Existing manholes will be repaired or replaced as part of this FY 24-25 work. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
CO U
/
OL D
NT
Y
HO M
E
RD
NE W LE IC ER HW Y
Lionel Place Project No. 2015009
ES T
E CT GUINEVE R
LI O L PL
NOT TO SCALE
NE
ST
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
GA W AI N
T LN E LO LANC
KING ARTHUR PL
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Lionel Place
LOCATION:
Leicester
TYPE:
General Sewer Rehab.
PIPE RATING:
6
PROJECT NO.
2015009
TOTAL LF:
308
PROJECT BUDGET:
$95,700.00
PROJECT ORIGIN:
Work orders; Line condition; Access
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$1,000.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$1,200.00
55370 - LEGAL FEES
$2,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$10,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$80,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$500.00
55450 - SURVEY - ASBUILT
$1,000.00
TOTAL AMOUNT
$95,700.00
$0.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 2
]
FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$1,000.00
PROJECT DESCRIPTION: This project runs between two properties from Lionel Place to New Leicester FY 23-24 Hwy. There are multiple bends in the line that make maintenance difficult. FY 24-25
$1,200.00 $12,000.00
FY 25-26
$81,500.00
SPECIAL PROJECT NOTES:
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Long Shoals Rd. @ Allen Ave.
LOCATION:
Arden
TYPE:
General Sewer Rehab.
PIPE RATING:
59
PROJECT NO.
2010013
TOTAL LF:
2,263
PROJECT BUDGET:
$522,525.00
PROJECT ORIGIN:
SSO's; Work orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$11,025.00
$11,025.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$6,000.00
55370 - LEGAL FEES
$8,000.00
$6,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$30,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$462,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$4,500.00
TOTAL AMOUNT
$522,525.00
$11,025.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [ 8
CONTRACTOR:
$0.00
$6,000.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$38,000.00
FY 18-19
$467,500.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located at the west end of Allen Ave., close to the intersection of FY 23-24
$0.00
Hendersonville Rd. and Long Shoals Rd. in Arden. It is comprised of approximately 2,263 LF of 8-inch ductile iron pipe. There are structural problems at various locations, and the line is in poor condition overall. FY 24-25 FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
D
EA I RR
RT S
HA YW O
T
O D
RD
PRUIT
ISI LOU
L DUNWEL
ANA AVE
MA JE
VE LL A AVE
CROWN ST
NOT TO SCALE
S TI CA VE
CIR
Louisiana Avenue Project No. 2015174
N ST TRYO
FLORIDA PL
BRUCEMO
NT PL
AN
TO N
DOWNING ST
AT L AVE
DORCHESTER AVE
OAKWOOD ST
AV E TA
BU R
CLAY ST
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
CLAY ST
ST
IR
SALUDA ST
DR
T ST
TANGLEWOOD
OREGON AV E
IVY ST
T
/
DYS A
CLOYES ST
MAURICET LN
HERRON AVE
AVE FLORIDA
BEL L
CRAGGY AVE
E MILDRED AV
BRUCEMONT
BALM GROVE
WE DUN
KENDALL ST
AVE PINELLAS
LC
MARTIN A VE
MA EL RD
BAKER AVE
TS BRYAN
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Louisiana Avenue
LOCATION:
West Asheville
TYPE:
General Sewer Rehab
PIPE RATING:
12
PROJECT NO.
2015174
TOTAL LF:
2,150
PROJECT BUDGET:
$640,000.00
PROJECT ORIGIN:
Undersized, Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$8,000.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$625,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$5,000.00
TOTAL AMOUNT
ENGINEER:
$640,000.00
MSD
R.O.W. ACQUISITION:
$0.00
DP # PLATS: [ 0 ]
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$0.00
FY 18-19
$0.00 $0.00
CONSTRUCTION ADM:
MSD
FY 19-20
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$8,000.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in West Asheville along Louisiana Avenue. The project will FY 23-24
$0.00
replace 2,150 LF of 6-inch VCP. The existing lines are undersized, in bad condition, and have too many FY 24-25 point repairs.
$632,000.00
FY 25-26
$0.00
SPECIAL PROJECT NOTES:
DR
T ST
AVE
L AVE DUNWEL
Louisiana Avenue at Brucemont Circle Project No. 2010100
T PRUI
IANA
/
TANGLEWOOD
NOT TO SCALE
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
T PL
AVE METROPOLITAN SEWERAGE DISTRICT
BRUCEMO N
AV E
FLORIDA PL
NT CIR BRUCEM O
R AVE DORCHES TE
FL
E AV
ID A
R HE
N RO
BALM GROVE
DU
E LL NW
OR
IS LOU
AVE
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Louisiana Ave. @ Brucemont Circle
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
66
PROJECT NO.
2010100
TOTAL LF:
2,400
PROJECT BUDGET:
$543,185.00
PROJECT ORIGIN:
SSO's; Access; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$2,185.00
$8,185.00
$6,000.00
55330 - DESIGN 55340 - PERMITS
$500.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$5,000.00
$975.00
$2,000.00
55370 - LEGAL FEES
$5,000.00
$1,401.00
$1,800.00
$15,000.00
$4,204.00
$5,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$500,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$7,500.00
TOTAL AMOUNT
$543,185.00
$8,765.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [ 4
CONTRACTOR:
$6,000.00
$8,800.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$10,120.00
FY 18-19
$509,500.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is for the replacement of an existing line from Louisiana Ave. to FY 23-24
$0.00
Brucemont Circle. The present line goes under at least two houses and will be relocated to an existing FY 24-25 alleyway. System Services has had maintenance issues with blockages due to broken joints and pipes. FY 25-26 SPECIAL PROJECT NOTES:
Brucemont Circle added to this with additional 1,650 LF.
$0.00 $0.00
S EA
TS
FAIRVIEW RD
T
/
MP
R
ST
VE RI
N SO
OA
WINDING R D
O TH
A SW
AN NN
FIRST ST
RD
ST S I M PS ON THIRD ST
Lower Glendale Avenue Project No. 2012083 NOT TO SCALE
RD
ALY
UR
IO
DR
ER
E
CH E
FU T
LN
WOOD AVE
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
PL
LY LN LITTLE BIL
N DAWSO
RIVER HILL S
TD N WOOD
IT BR R FOURTH S T
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Lower Glendale Ave.
LOCATION:
E. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
15
PROJECT NO.
2012083
TOTAL LF:
2,716
PROJECT BUDGET:
$870,200.00
PROJECT ORIGIN:
SSO's; Work orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$8,700.00
$6,650.00
$2,050.00
$6,650.00
$2,050.00
55330 - DESIGN 55340 - PERMITS
$4,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$6,000.00
55370 - LEGAL FEES
$8,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$20,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$815,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$3,000.00
55450 - SURVEY - ASBUILT
$5,500.00
TOTAL AMOUNT
$870,200.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [
CONTRACTOR:
$0.00
ESTIMATED BUDGETS - FY '18 -'26 8
]
FY 17-18
$0.00
FY 18-19
$0.00 $0.00
CONSTRUCTION ADM:
MSD
FY 19-20
INSPECTION:
MSD
FY 20-21
$6,000.00
FY 21-22
$32,000.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in S.E. Asheville near the Oakley neighborhood. It consists FY 23-24
$0.00
of replacing approximately 2,716 LF of existing 10-inch and 12-inch vitrified clay pipe along Glendale Ave. FY 24-25 The existing line is subject to inflow and infiltration, is in poor condition, and undersized.
$823,500.00
FY 25-26
$0.00
SPECIAL PROJECT NOTES:
NOT TO SCALE
L ME OD
ST
YL
ER ON RD
/
RD
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
ST
Lower Melody Lane Project No. 2013027
ST
IEW
E
V ER ON
L CO
N
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Lower Melody Lane
LOCATION:
E. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
19
PROJECT NO.
2013027
TOTAL LF:
1,180
PROJECT BUDGET:
$352,900.00
PROJECT ORIGIN:
SSO's; Work orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$6,900.00
$3,500.00
$3,400.00
$3,500.00
$3,400.00
55330 - DESIGN 55340 - PERMITS
$5,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$8,000.00
55370 - LEGAL FEES
$10,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$50,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$270,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT
$3,000.00
TOTAL AMOUNT
$352,900.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [ 10
CONTRACTOR:
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$0.00 $0.00
CONSTRUCTION ADM:
MSD
FY 19-20
INSPECTION:
MSD
FY 20-21
$8,000.00
FY 21-22
$65,000.00
FY 22-23 PROJECT DESCRIPTION: This project is a continuation of Upper Melody Lane.
The system runs through the back of properties on Melody Lane and along the right of way of Norfolk Southern Railroad. The FY 23-24 existing 6-inch Orangeburg pipe will be replaced with 8-inch ductile iron pipe. The existing Orangeburg pipe FY 24-25 is deteriorating and has extensive root problems. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $273,000.00 $0.00 $0.00
RD
N
C
LN
LN
Lynn Cove Road Project No. 2015010
WEBB COVE RD
BEES MOUN TAIN DR
N LY
WT LA E AL RD
TR EC H EE LN
ER D
NOT TO SCALE
GS of BUNCOMBE COUNTY, NORTH CAROLINA
Budget Map
METROPOLITAN SEWERAGE DISTRICT
RD
DG
/
ER AV E B
DR
M DA
ORS ER N V O G
ER
ST ON YR
DG
T GE RID
PO
NOR C IR
R NY STO
DR
R
V GE RID I EW
ND IDE
IDE D
RD
BE
CLU BS
N SU S NY
GOVE R
E OV
BB WE IN SPR
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Lynn Cove Road
LOCATION:
Beaverdam
TYPE:
General Sewer Rehab.
PIPE RATING:
31
PROJECT NO.
2015010
TOTAL LF:
5,589
PROJECT BUDGET:
$1,547,000.00
PROJECT ORIGIN:
SSO's; Work orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$25,000.00
$25,000.00
55330 - DESIGN 55340 - PERMITS
$1,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$15,000.00
55370 - LEGAL FEES
$20,000.00
55380 - ACQUISITION SERVICES
$20,000.00
55390 - COMPENSATION
$50,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$1,400,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$14,000.00
TOTAL AMOUNT
$1,547,000.00
$0.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
Consultant
# PLATS: [ 20
CONTRACTOR:
$0.00
$25,000.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$15,000.00 $91,000.00
CONSTRUCTION ADM:
MSD
FY 19-20
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$1,416,000.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located off of Beaverdam Rd. The project runs through multiple FY 23-24
$0.00
properties along Lynn Cove Rd. from Governor Circle to 225 Lynn Cove Rd. These lines and manholes FY 24-25 have heavy I/I which have created multiple SSOs. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
/
RE D
R
NA VE
ME R
RIM O
AVE
GRACELYN RD
CLAIRMON T
RD
AVE OAKLAWN
SO N DR
KELE H
E RD HOLBOR N
LY
MAYW O
NOT TO SCALE
D
AD RD
OD R
HAMPST E
ER A
Manetta Road at Johnson Drive Project No. 2014022
JO HN
OTTARI R D
WOODVAL E AVE
E AVE LORRAIN
NG FI
C
DR
D
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
IF GR
VD BL
A BL
OO KW
REDWOOD RD
D C LU B R COUNTR Y
IRVING S T
D MANETTA R
SH O
RNE
E MELROSE AV
GRACE AV E PL WARWIC K
ALY STON E
AVE KIMB ERLY
LAK E
OSB O
RD LYN WO OD
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Manetta Rd. @ Johnson Dr.
LOCATION:
N. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
26
PROJECT NO.
2014022
TOTAL LF:
6,500
PROJECT BUDGET:
$1,885,700.00
PROJECT ORIGIN:
SSO's; Work orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$33,000.00
55330 - DESIGN 55340 - PERMITS
$1,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$6,000.00
55370 - LEGAL FEES
$10,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$100,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$1,730,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$3,000.00
55450 - SURVEY - ASBUILT
$2,700.00
TOTAL AMOUNT
$1,885,700.00
$0.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [ 10
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$0.00 $33,000.00
CONSTRUCTION ADM:
MSD
FY 19-20
INSPECTION:
MSD
FY 20-21
$7,000.00
FY 21-22
$110,000.00
FY 22-23
$1,735,700.00
PROJECT DESCRIPTION: This project is located in North Asheville near Merrimon Ave and consists of 6,500 LF of 8-inch ductile iron pipe. The existing clay pipe is undersized and has voids, fractures, and root FY 23-24 intrusions which have contributed to multiple SSO's. FY 24-25 FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
/
SIS
TE
NC
ED
R
IA R TOR C I V
W ADO ME
RD
Meadow Road at Train Yard Project No. 2015207
D
NOT TO SCALE
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
AP P
PE R
RD R O AC H
CIR STUDEN T
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Meadow Road @ Train Yard
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
37
PROJECT NO.
2015207
TOTAL LF:
1,800
PROJECT BUDGET:
$553,000.00
PROJECT ORIGIN:
Line Condition, undersized
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$9,000.00
$9,000.00
55330 - DESIGN 55340 - PERMITS
$4,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$1,500.00
55370 - LEGAL FEES
$7,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$30,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$495,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$4,500.00
TOTAL AMOUNT
$553,000.00
$0.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [ 2 ]
CONTRACTOR:
$0.00
$9,000.00
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$0.00
FY 18-19
$1,500.00
CONSTRUCTION ADM:
MSD
FY 19-20
$41,000.00
INSPECTION:
MSD
FY 20-21
$501,500.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in Asheville on Meadow Rd. between the Biltmore Estate FY 23-24
$0.00
and AB Tech College. It consists of replacing 1,800LF of existing 6" VCP with new 8" DIP. The existing line FY 24-25 is in poor condition, is undersized, and runs underneath various structures. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Meadowbrook Drive (SS)
LOCATION:
TYPE:
General Sewer Rehab.
PIPE RATING:
PROJECT NO.
2010076
TOTAL LF:
0
PROJECT BUDGET:
$46,850.00
PROJECT ORIGIN:
SSO's; Access; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
Black Mountain
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$4,300.00
$4,250.00
$250.00
$240.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$4,500.00
$4,500.00
55370 - LEGAL FEES
$6,000.00
$4,000.00
$2,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$20,000.00
$20,000.00
55400 - APPRAISAL
$2,500.00
$2,500.00
55410 - CONDEMNATION
$7,500.00
$7,500.00
$1,800.00
$1,800.00
55420 - CONSTRUCTION 55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
$46,850.00
$4,490.00
$8,500.00
$33,800.00
ENGINEER:
MSD
MS
ESTIMATED BUDGETS - FY '18 -'26
R.O.W. ACQUISITION:
MSD
# PLATS: [ 6
FY 17-18
$0.00
CONTRACTOR:
MSD (System Services)
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project includes complete replacement of existing 8-inch vitrified clay pipe FY 23-24
$0.00
]
with new 8-inch ductile iron pipe. The vitrified clay lines are in poor condition with cracks and bad joints and FY 24-25 also run under two houses, making the line difficult to maintain.
$0.00
FY 25-26 SPECIAL PROJECT NOTES:
This project will be constructed by System Services.
$0.00 L.F.
1,330
NOL
L RD
M CHATHA
/
R
WESTALL DR
NOT TO SCALE
WOODWARD AV
VINEYARD PL
ED
K OOD G EW
Merrimon Avenue at Clearview Terrace Project No. 2007012
CLEARVIEW TE
MERRIMON AVE
RD
E
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
FARRWOOD AVE
GARDEN TER
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Merrimon Ave. at Clearview Terrace
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
2
PROJECT NO.
2007012
TOTAL LF:
500
PROJECT BUDGET:
$324,990.00
PROJECT ORIGIN:
SSO's; Access; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$5,700.00
$3,200.00
55330 - DESIGN 55340 - PERMITS
$750.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$4,090.00
$1,390.00
55370 - LEGAL FEES
$5,000.00
$1,454.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$75,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$232,450.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$1,000.00
TOTAL AMOUNT
$324,990.00
$6,044.00
ENGINEER:
MSD
RW
R.O.W. ACQUISITION:
MSD
# PLATS: [ 3
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$0.00 $0.00
CONSTRUCTION ADM:
MSD
FY 19-20
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$2,500.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is in two sections along Merrimon Avenue, in the area of Clearview FY 23-24
$81,996.00
Terrace and Farrwood Avenue. The existing line is an old 4-inch main and is in very poor condition. A FY 24-25 roadway bore is proposed under Merrimon Ave. for the lower section of this project. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $234,450.00
TE E ST
VE ON A
AUSTIN A VE
E
ST NOT TO SCALE
SPEARS AV
Merrimon Avenue at Coleman Avenue Project No. 2014009
ES
PL
IM MERR
B RO
EV
E AV
AVE
L DA
VE EA
RLY KIMB E
IN
DE LIN VE NA
NT MOU
C LA R
E AV
N DON
AD
R
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
E
B RO
ANNANDALE AV
E AL
PL
D IN
YN EL
E AV
/
EE
CO N
EST
R MU CK DO
DORTCH AV E
CO N
COLEMAN AVE
IN
HENRIETTA
W ED PL
E
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Merrimon Ave. @ Coleman Ave.
LOCATION:
N. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
9
PROJECT NO.
2014009
TOTAL LF:
2,800
PROJECT BUDGET:
$820,000.00
PROJECT ORIGIN:
Work Orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$10,000.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$800,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$3,000.00
55450 - SURVEY - ASBUILT
$7,000.00
TOTAL AMOUNT
$820,000.00
$0.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
N/A
# PLATS: [ 0
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$0.00 $0.00
CONSTRUCTION ADM:
MSD
FY 19-20
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$10,000.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is on Merrimon Ave., Coleman Ave., and Austin Ave. Existing clay FY 23-24
$0.00
pipe is old and has numerous defects. The 6-inch clay pipe on Coleman and Austin, and the 8-inch clay FY 24-25 pipe on Merrimon will all be replaced with 8-inch ductile iron pipe. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $810,000.00
R PA
KW
D OO
E AV
E
SNYDER DR
E AV
I26 W
I26 E
WASHINGTON AVE
Middle Beaverdam Creek at US 19-23 Project No. 2010002
D
O BR L DA OK
/
CR DA M B E AV ER
OL D
RD
JONES ST
O
N FI
RD NOT TO SCALE
PUF F IN L N
RV IL
ELKDA
RD
LE D R
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
LE
METROPOLITAN SEWERAGE DISTRICT
DEERVIEW LN
EE K
HIGH ST
N
O W
MOORE S T
WE AV E
PELZER ST
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Middle Beaverdam Crk. @ US 19-23
LOCATION:
Woodfin
TYPE:
General Sewer Rehab.
PIPE RATING:
24
PROJECT NO.
2010002
TOTAL LF:
2,930
PROJECT BUDGET:
$1,293,650.00
PROJECT ORIGIN:
SSO's; Work orders; Line condition
2930
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$7,430.00
$10,000.00
55330 - DESIGN 55340 - PERMITS
$3,250.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$4,500.00
55370 - LEGAL FEES
$4,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$30,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$1,230,400.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$4,000.00
55450 - SURVEY - ASBUILT
$7,500.00
TOTAL AMOUNT
$1,293,650.00
$7,430.00
ENGINEER:
MSD
RW
R.O.W. ACQUISITION:
MSD
# PLATS: [ 4
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$7,070.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$3,250.00
INSPECTION:
MSD
FY 20-21
$34,000.00
FY 21-22
$0.00
FY 22-23
$1,241,900.00
PROJECT DESCRIPTION: This project will install 24-inch ductile iron pipe along Beaverdam Creek. It will FY 23-24
$0.00
also replace a 4-inch main at rear of lots on Washington Ave. and along the east side of US 19-23 just north FY 24-25 of the railroad. Lines are in poor condition, and the 4-inch lines are undersized. FY 25-26 SPECIAL PROJECT NOTES:
This project is a combination of Middle Beaverdam Creek Ph. 2, Washington Ave 4" Main, and Woodfin Ave @ US 19-23.
$0.00 $0.00
G R
D
EE
NR
N
B
R
R
D
T PA
N TO
E AV
N UR LB
DR
I W
RE
W
PL
C MA
VE EA
DR
RD
AVE
Mitchell Avenue Project No. 2014185
IR RD
DYS A
NOT TO SCALE
BELLE A
RT S
T
CRAGGY AVE
DR
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
OAKWOOD ST
METROPOLITAN SEWERAGE DISTRICT
E AV
/
RI A
I W
HI LS
ID
BLUE RIDGE AVE
U DR
AVE LA S PIN EL
WI LB UR
D
BELMONT AVE
O YW A H
O BALSAM
E MITCHELL AV
O
CLOYES ST
PA
W RK
OD
W
ST
T A NG LE
R
COVINGTON ST
RD AVE
LU
E TH
R MILDRE D
DE VI
OO D
O PR E NC
R HE ON
RD PACE LN
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Mitchell Avenue
LOCATION:
W. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
17
PROJECT NO.
2014185
TOTAL LF:
2,760
PROJECT BUDGET:
$836,200.00
PROJECT ORIGIN:
Work orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$14,000.00
55330 - DESIGN 55340 - PERMITS
$1,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$3,000.00
55370 - LEGAL FEES
$5,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$50,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$760,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$1,200.00
TOTAL AMOUNT
$836,200.00
$0.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [ 5 ]
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$0.00
FY 18-19
$0.00 $14,000.00
CONSTRUCTION ADM:
MSD
FY 19-20
INSPECTION:
MSD
FY 20-21
$4,000.00
FY 21-22
$55,000.00
FY 22-23
PROJECT DESCRIPTION: This project is located in West Asheville between Patton Ave. and Haywood FY 23-24 Rd. and is comprised of 2,760 LF of 8-inch ductile iron pipe. The existing line is 6-inch vitrified clay pipe in FY 24-25 poor condition, with multiple pipe defects that cannot be adequately repaired by point repairs. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $763,200.00 $0.00 $0.00
Y
DR
/
NE
RD CH
UNN S CO VE
NOT TO SCALE
Mountainbrook Road at Chunns Cove Road Project No. 2010112
R BROOK TE
IEW DR ROLLING V
HO
N CIR CRAFTSM A
DR VIEW CHUN NS
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
MOUNTAINBROOK RD
LN A LL STE G
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Mountainbrook Rd. @ Chunns Cove Rd.
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
55
PROJECT NO.
2010112
TOTAL LF:
2,800
PROJECT BUDGET:
$592,615.00
PROJECT ORIGIN:
SSO's; Access; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$7,615.00
$7,615.00
55330 - DESIGN 55340 - PERMITS
$500.00
$500.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$9,500.00
55370 - LEGAL FEES
$9,000.00
$2,575.00
$6,925.00
$10,190.00
$7,425.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$40,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$520,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$5,000.00
TOTAL AMOUNT
$592,615.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [ 9
CONTRACTOR:
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$49,000.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$526,000.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project will relocate lines from the rear yards of lots fronting on Mountainbrook Rd. (off Chunns Cove Rd.) where access and maintenance is extremely difficult and will move those lines to FY 23-24 public street rights of way. This project will also eliminate one high aerial creek crossing where existing support FY 24-25 piers are failing due to erosion. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
C
HA W
NE W
RD
K
RE E
RD MO UN
TA IN
VI EW NOT TO SCALE
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
D
/
TUNNEL RD
OR
Mountain View Road Project No. 2014011
Y CI R
WHITSON RD
SHA D
C AR
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Mountainview Road
LOCATION:
E. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
65
PROJECT NO.
2014011
TOTAL LF:
2,120
PROJECT BUDGET:
$623,900.00
PROJECT ORIGIN:
Work orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$8,200.00
$8,200.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$6,000.00
55370 - LEGAL FEES
$6,000.00
$6,000.00
$35,000.00
$35,000.00
$6,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL
$2,500.00
$2,500.00
55410 - CONDEMNATION
$9,000.00
$2,000.00
55420 - CONSTRUCTION
$550,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$3,000.00
55450 - SURVEY - ASBUILT
$4,200.00
TOTAL AMOUNT
$623,900.00
$8,200.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [ 6 ]
CONTRACTOR:
$6,000.00
$45,500.00
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$564,200.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in East Asheville between Tunnel Rd. and New Haw Creek Rd. The project consists of replacing approx. 2,120 LF of existing 4, 6 and 8-inch vitrified clay pipe FY 23-24 with 8-inch ductile iron pipe. The existing line has multiple fractures and small holes, and portions of the line FY 24-25 are undersized. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
/
HE SD AR D
NOT TO SCALE
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
LA R K R D
METROPOLITAN SEWERAGE DISTRICT
PE
RD EK OL
D H AW CRE
K RD
DOGWOOD GRV
M M RS I
C R EE NEW HAW
New Haw Creek Road at Dogwood Grove Project No. 2014021
BE T
MEADO W
LN N O
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
New Haw Creek Rd. @ Dogwood Grove
LOCATION:
E. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
46
PROJECT NO.
2014021
TOTAL LF:
1,900
PROJECT BUDGET:
$555,900.00
PROJECT ORIGIN:
SSO's; Work orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$9,500.00
$9,500.00
55330 - DESIGN 55340 - PERMITS
$500.00
$500.00
$6,600.00
$6,600.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES
$11,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$25,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$500,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$1,300.00
TOTAL AMOUNT
$555,900.00
$0.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [ 11
$9,500.00
$7,100.00
ESTIMATED BUDGETS - FY '18 -'26 ]
CONTRACTOR:
FY 17-18
$36,000.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$503,300.00
FY 21-22
$0.00
FY 22-23
$0.00
8-inch ductile iron pipe. Existing 4-inch and 6-inch clay pipe is undersized, with fractures, root intrusion, and FY 23-24 misaligned joints. Existing 8-inch ductile iron pipe has corrosion issues. Existing manholes are in poor FY 24-25 condition.
$0.00
FY 25-26
$0.00
PROJECT DESCRIPTION: This project is in East Asheville near Haw Creek Rd., and consists of 1,900 LF of
SPECIAL PROJECT NOTES:
$0.00
/
RD
TRINITY CHAPEL RD
NOT TO SCALE
New Haw Creek Road at Trinity Chapel Road Project No. 2012081
AR
CO
NEW HAW CREEK RD
MILLER RD E
LY
RD
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
ER
METROPOLITAN SEWERAGE DISTRICT
BE V
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
New Haw Creek Rd. @ Trinity Chapel Rd.
LOCATION:
E. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
71
PROJECT NO.
2012081
TOTAL LF:
838
PROJECT BUDGET:
$252,076.00
PROJECT ORIGIN:
SSO's; Work orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$2,400.00
$4,500.00
$2,100.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$1,350.00
$1,350.00
55370 - LEGAL FEES
$1,037.00
$1,037.25
55390 - COMPENSATION
$9,889.00
$4,389.00
55400 - APPRAISAL
$2,500.00
$2,500.00
55410 - CONDEMNATION
$5,000.00
$5,000.00
55420 - CONSTRUCTION
$224,000.00
55380 - ACQUISITION SERVICES $5,500.00
$224,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
$2,000.00
55450 - SURVEY - ASBUILT
$1,800.00
$1,800.00
TOTAL AMOUNT
$252,076.00
$9,176.25
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [ 2
$15,100.00
$227,800.00
ESTIMATED BUDGETS - FY '18 -'26 ]
CONTRACTOR:
FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
Haw Creek Rd. It consists of replacing approx. 838 LF of existing 6-inch and 8-inch vitrified clay pipe and FY 23-24 21-inch reinforced concrete pipe with new 8-inch ductile iron pipe and 24-inch ductile iron pipe. This line FY 24-25 segment has had multiple point repairs, backups, and overflows.
$0.00
FY 25-26
$0.00
PROJECT DESCRIPTION: This project is located in the Haw Creek neighborhood of East Asheville along New
SPECIAL PROJECT NOTES:
$0.00
D
HILL R
R
D
W O O DY LN
FO
X
C
HA
SE
RD
W FOX C HASE RD
LA N
BIRD
IL SW
D RD
RDG
ER OW D FL RD
New Stock Road Project No. 2015011
EL D R
DR
E BLU
AN ALEX
HAP D ER C
PLEASANT HILL DR
DR
EE K
Y TR L
D WOO
/
WD
R
WR
CR
DIPIT
L
RD
HI
L GO
IE DV
AD
VIE
DWS
RICE M
CHADWICK WADE
FAR ID
GO LD
HIL L
SERE N
O KN
DP
RD NOT TO SCALE
BR U
CT
SH
V EA W
MAR LWO OD
CT
W OO
LL
D
RD
E DR
D
KNOB
RD
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
ER R
STONE Y
GARRISON R
LEM DR A B EM B
LOFTIN ST
E DR LAKESHOR
D
NA VE METROPOLITAN SEWERAGE DISTRICT
RD
AND
E
HIGH L
VI ER
KSID
HEATHER CT
CRE E
RD
CT CRANDON
FIR W
I26 E
N AIKE
OO D
EN R D S HAV
RD OOS T ROB IN R
O WO LL
RD
FOXWOOD DR
W DR
T PA
TI
LN
AC
DR
OR N
I W LE NK
PINE Y
LN
RD
RI PE BRIA RWO OD
E LN RIDG
SHAD O
S RUFU I26 W
S RD
ROSS RD
W NE CK TO E
APPLE C
E
FE RN AD GL DL OO W D AN
S LL
TEA
SI JO Y
MER RIM O
LA E CK LN
B ER R Y LN
COUNTRY OAK DR
LN LOWRY
G
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
New Stock Road
LOCATION:
Woodfin
TYPE:
General Sewer Rehab.
PIPE RATING:
45
PROJECT NO.
2015011
TOTAL LF:
9,020
PROJECT BUDGET:
$2,356,500.00
PROJECT ORIGIN:
SSO's, Undersized pipe
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$36,000.00
$36,000.00
55330 - DESIGN 55340 - PERMITS
$1,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$6,500.00
55370 - LEGAL FEES
$9,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$20,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$2,250,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$10,000.00
55450 - SURVEY - ASBUILT
$24,000.00
TOTAL AMOUNT
$2,356,500.00
$0.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [
CONTRACTOR:
$0.00
$36,000.00
ESTIMATED BUDGETS - FY '18 -'26 9
]
FY 17-18
$6,500.00
FY 18-19
$30,000.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$2,284,000.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project runs along New Stock Rd. in Woodfin. The project begins at Nichols FY 23-24
$0.00
Hill Dr. & New Stock Rd. and runs under I-26 and ends at Weaverville Rd. The existing 8-inch lines have FY 24-25 structural issues that lead to root intrusion and multiple SSOs. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
A ST
ES RN
E CH
Y RR
O BR
N
A
AY DW
ST
I24
D
0W
OO YW A H
TO
PL
IN FL
TS
T
ST
TO
I 24
0E
A SSE HIAW
E ST
North Lexington Avenue at I-240 Project No. 2014182
ST
T
/
E AV
H
0W I24
0E
AVE NOT TO SCALE
I24
BR
A WA YS
IZ EL T BE OA D
A W T T OI 24 0
O BR S AY DW NL N GTO EXIN
T
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
40 O I2 ST T Y A ADW
AVE
METROPOLITAN SEWERAGE DISTRICT
BRO
E I240
ON RRIM O ME
E
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
North Lexington @ I-240
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
47
PROJECT NO.
2014182
TOTAL LF:
450
PROJECT BUDGET:
$163,700.00
PROJECT ORIGIN:
Work orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$2,300.00
$1,680.00
$620.00
$1,680.00
$620.00
55330 - DESIGN 55340 - PERMITS
$2,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$158,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$400.00
TOTAL AMOUNT
$163,700.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
N/A
# PLATS: [
CONTRACTOR:
$0.00
ESTIMATED BUDGETS - FY '18 -'26 0
]
FY 17-18
$2,000.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$159,400.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in downtown Asheville near the I-240 on ramp from FY 23-24 Broadway St. and is comprised of 450 LF of 8-inch ductile iron pipe. The existing line is 4-inch vitrified clay FY 24-25 pipe with a history of stoppages and overflows. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
I24
NL
LY
AVE TON G N I EX
K RAN
LY
T WAY S
LE A TING
LN U T E WA
ST
V IN A
NOT TO SCALE
N SPR S UCE
E
LN
O WO Y HA
D
ST
North Market Street Project No. 2014019
T ST
ST
I240 E
AVE
ELM ST
L CO
TTE ST
G LE
ES
T
40 W
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
I240 E TO CHARLO
ORC
O I2
ST
/
A KEN CHIC LINA
NU WAL
O CAR
T ST
VA
D FI N WOO
40 E
D BROA
L
BRO
O I2 ST T Y A ADW S 240
TP BIL
0W
RKE N MA
ER ND
I24
M ER
IN OI TT
EE ST HIAWASS
A
ST
TO
0W
E TO I240
E
F OD WO
O BR
AY DW
CH
RY ER
N
BR
W T T OI 24 0
WA YS
OA D
TO M ERRIM ON
AVE CENTRA L
ST
N AV RIMO
I240 W
TT DS HAR
K OA
T
E
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
North Market Street
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
41
PROJECT NO.
2014019
TOTAL LF:
1,050
PROJECT BUDGET:
$352,000.00
PROJECT ORIGIN:
Work orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$5,300.00
$3,875.00
$1,425.00
55330 - DESIGN 55340 - PERMITS
$500.00
$500.00
55360 - EASEMENT PLATS
$1,000.00
$1,000.00
55370 - LEGAL FEES
$3,000.00
55350 - SPECIAL STUDIES
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$65,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$275,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,500.00
55450 - SURVEY - ASBUILT
$700.00
TOTAL AMOUNT
$352,000.00
$3,875.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [ 1
CONTRACTOR:
$1,425.00
$1,500.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$68,000.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$277,200.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in downtown Asheville and consists of 1,050 LF of 8-inch ductile iron pipe. The existing 6-inch clay line is undersized, has multiple structural issues, and has FY 23-24 caused flooded structures. FY 24-25 FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
/
PINE ST
CHURCH ST
LN S PA RK
Oakland Drive at Church Street Project No. 2015177
OAKLAND DR
NOT TO SCALE
PINE ST
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
AIN ST MOUNT
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Oakland Dr @ Church Street
LOCATION:
Black Mountain
TYPE:
General Sewer Rehab
PIPE RATING:
27
PROJECT NO.
2015177
TOTAL LF:
575
PROJECT BUDGET:
$171,000.00
PROJECT ORIGIN:
Access, Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$2,500.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$2,500.00
55370 - LEGAL FEES
$4,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$25,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$135,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$500.00
55450 - SURVEY - ASBUILT
$1,500.00
TOTAL AMOUNT
$171,000.00
$0.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [ 4 ]
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$0.00
FY 18-19
$2,500.00 $2,500.00
CONSTRUCTION ADM:
MSD
FY 19-20
INSPECTION:
MSD
FY 20-21
$29,000.00
FY 21-22
$137,000.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in Black Mountain running through properties from Pine St FY 23-24
$0.00
to Oakland Dr. The project will replace 575 LF of 4-inch Orangeburg and 6-inch VCP. The existing lines are FY 24-25 in bad condition and have too many point repairs. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
BLUE RIDG E AVE
/
SULPH U
R SPRIN
LAN VALE AVE
GS RD
T
HA YW O
O
D
R
D
OAKWOOD ST
CLOYES ST
Oakwood Street Project No. 2014155
RT S
NOT TO SCALE
E MILDRED A V
DYS A
W OO
D
AV E
T ST
SALUDA ST
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
EN
IT PRU
METROPOLITAN SEWERAGE DISTRICT
GR E
HERRON AV E
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Oakwood Street
LOCATION:
W. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
9
PROJECT NO.
2014155
TOTAL LF:
976
PROJECT BUDGET:
$305,750.00
PROJECT ORIGIN:
Work orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$3,500.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$2,250.00
55370 - LEGAL FEES
$3,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$25,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$268,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$2,000.00
TOTAL AMOUNT
$305,750.00
$0.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [ 3
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$3,500.00
FY 21-22
$0.00
FY 22-23
PROJECT DESCRIPTION: This project is located in West Asheville on Oakwood St., approximately 0.6 mile east of the the Patton Ave./Haywood Rd. intersection. Approximately 976 LF of existing 6-inch VCP FY 23-24 and Orangeburg pipe will be replaced with 8-inch DIP. The existing line has structural problems and is FY 24-25 undersized for the neighborhood it serves. FY 25-26 SPECIAL PROJECT NOTES:
$2,250.00 $28,000.00 $272,000.00 $0.00
PO
LN
GAR
CIR
CT
D
CT
RD
NOT TO SCALE
TRCE
N T LN
Old Haw Creek Road at Greenbriar Road Project No. 2012109
TRILLIU M
HAW CREEK
RIAR RD GREENB
S
N MELTO
DR
OLD HAW CR EEK RD
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
RD
/
L LN
OR
SPRUCE H IL
CT
C CIS
SPRUCE HILL
AL TRAF
NK WI
L HP
A TENN
ING RSH N PE
RT WO
ROCKING PORCH RDG
C RO
NG KI
H RC
R PE G HIN
ROSE
RD
HEDG E
Y PRESSLE
TRINITY CHAPEL
RD
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Old Haw Creek Rd. @ Greenbriar Rd. LOCATION:
E. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
56
PROJECT NO.
2012109
TOTAL LF:
3,755
PROJECT BUDGET:
$1,058,000.00
PROJECT ORIGIN:
SSO's; Work orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$13,450.00
$18,000.00
$4,550.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$10,500.00
55370 - LEGAL FEES
$14,000.00
55380 - ACQUISITION SERVICES
$14,000.00
55390 - COMPENSATION
$70,000.00
$10,500.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$920,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$4,000.00
55450 - SURVEY - ASBUILT
$7,500.00
TOTAL AMOUNT
$1,058,000.00
$13,450.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
Consultant
# PLATS: [
$4,550.00
$10,500.00
ESTIMATED BUDGETS - FY '18 -'26 14
]
CONTRACTOR:
FY 17-18
$98,000.00
FY 18-19
$931,500.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
Haw Creek Rd. and Greenbriar Rd. It consists of replacing approximately 3,755 LF of existing 6-inch FY 23-24 vitrified clay pipe with 8-inch ductile iron pipe. The existing line is in poor condition and has been subject to FY 24-25 frequent overflows.
$0.00
FY 25-26
$0.00
PROJECT DESCRIPTION: This project is located in the Haw Creek neighborhood of E. Asheville along Old
SPECIAL PROJECT NOTES:
$0.00
T
CR AY TO N
RC
K
NT
WA Y
CH A ST
I40 W SWEETEN CREEK RD TO I40 E
CR EE
ME R
/
STRATUS LN
O LD
ST
T C H AP E L R
SCHOOL RD E
PISGAH VIEW AVE
D
OAKVIEW PARK RD
PINNACLE VIEW RD AVE
LOOMIS AVE
WENTW ORTH A V
LAMAR
FOX DR
DOGW OOD D R
PORTER RD
HARRIS RD
OAKLE Y
W RALEIGH RD
LORA LN
I40 E
ES
E BROADVIEW AV
WINSTON AVE
LINCOLN AVE
Old West Chapel Road Project No. 2014004
W
FR
EE
TE
D
C R AYT ON R
LIB E
RTY
LN DO M
VE S
RD CRAYTON
CO
CT
L
RD IA
E
CLEVELAND AV E
EO RA
G ST
NOT TO SCALE
MEET IN
RALEIGH RD
ON T BL VD
DR
R
E
R TE PO
RR
D
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
ONTEORA OAKS DR
BONDO RD
PORTER R D
D EW
CE
I ADV BRO
JA NI
TO E I24 0
W I40
WILLIAMSBURG PL
R
CHESTNUT TE
ROBERTS RD
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Old West Chapel Rd.
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
53
PROJECT NO.
2014004
TOTAL LF:
14,800
PROJECT BUDGET:
$2,196,000.00
PROJECT ORIGIN:
SSO's; Work orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$31,820.00
$34,000.00
$2,180.00
55330 - DESIGN 55340 - PERMITS
$2,000.00
$2,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$14,000.00
55370 - LEGAL FEES
$17,000.00
55380 - ACQUISITION SERVICES
$17,000.00
55390 - COMPENSATION
$85,000.00
$14,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$2,010,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$15,000.00
TOTAL AMOUNT
$2,196,000.00
$31,820.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
Consultant
# PLATS: [ 17
$4,180.00
$14,000.00
ESTIMATED BUDGETS - FY '18 -'26 ]
CONTRACTOR:
FY 17-18
$1,379,000.00
FY 18-19
$767,000.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
FY 23-24
$0.00
FY 24-25
$0.00
FY 25-26
$0.00
This project is located near the intersection of Sweeten Creek Rd. and I-40. The I-40 crossing will be performed by bore and jack construction. The existing 8-inch clay pipe will be replaced with 8-inch ductile iron pipe. There have been multiple sanitary sewer overflows on this line. This project has been phased for two years, FY 17-18 and FY 18-19. In FY17-18, this phase will consist of lining 10,090 of existing 8-inch and 10-inch pipes. In FY18-19, this phase will consist of replacing 4,680 LF by pipe bursting and dig & replace.
PROJECT DESCRIPTION:
SPECIAL PROJECT NOTES:
/
Point Repair Contract No. 1 Project No. 2016028 NOT TO SCALE
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Point Repair Contract No. 1
LOCATION:
various
TYPE:
General Sewer Rehab
PIPE RATING:
N/A
PROJECT NO.
2016028
TOTAL LF:
0
PROJECT BUDGET:
$200,000.00
PROJECT ORIGIN:
Work Orders
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$200,000.00
$200,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
$200,000.00
$0.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
N/A
# PLATS: [ 0
CONTRACTOR:
$0.00
$200,000.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This construction contract will cover point repairs performed by an outside FY 23-24
$0.00
contractor for Fiscal Year 2016-17. Point repairs covered under this contract are generated through work FY 24-25 orders from the System Services Division. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
/
RIV
D IDE S ER
R
LD A VE
T
NOT TO SCALE
NORTON DR
S CRESCENT
TFIE
Riverside Drive at Norton Drive Project No. 2015222
CRE S
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
VINE ST
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Riverside Dr @ Norton Dr
LOCATION:
N. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
16
PROJECT NO.
2015222
TOTAL LF:
700
PROJECT BUDGET:
$220,600.00
PROJECT ORIGIN:
Work Orders; line condition
DESCRIPTION
ESTIMATED PROJECT COST
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$4,000.00
55330 - DESIGN 55340 - PERMITS
$5,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$1,800.00
55370 - LEGAL FEES
$3,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$25,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$180,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$800.00
TOTAL AMOUNT
$220,600.00
$0.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [ 3
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$4,000.00
FY 21-22
$6,800.00
FY 22-23
$28,000.00
PROJECT DESCRIPTION: This project is located in North Asheville and is comprised of 700 LF of 8-inch FY 23-24
$0.00
ductile iron pipe. The existing line is a problematic 4" sewer line composed of PVC and VCP with many FY 24-25 defects.
$181,800.00
FY 25-26
$0.00
SPECIAL PROJECT NOTES:
E ILL
OO D AVE
Riverside Drive at Silverline Project No. 2012007
DR
/
OL
SV
RD
SIDE
N UR DB
L HIL
ELK W
R RIVE NOT TO SCALE
PO
RD
A PL
R
LN
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
NO
H RT
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Riverside Dr. @ Silverline Plastic
LOCATION:
Woodfin
TYPE:
General Sewer Rehab.
PIPE RATING:
4
PROJECT NO.
2012007
TOTAL LF:
400
PROJECT BUDGET:
$120,920.00
PROJECT ORIGIN:
Problematic Four Inch Sewer Main
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$1,920.00
$1,920.00
55330 - DESIGN 55340 - PERMITS
$5,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$110,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$3,000.00
TOTAL AMOUNT
$120,920.00
$1,920.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
N/A
# PLATS: [
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 0
]
FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$5,000.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in Woodfin and is comprised of 400 LF of 8-inch ductile iron FY 23-24
$0.00
pipe. The existing line is 4-inch, 6-inch, and 8-inch vitrified clay pipe, runs under a building, and is in poor FY 24-25 condition. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $114,000.00
L
DP
SHORT TRE
O BR OD WO
AV E
T
LN
N ST NOT TO SCALE
R BA
T
T LE
STON
DEPOT ST
ST
Y WA
E T AV
E AV
TS
T JOHN ST
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
ST
Riverview Drive Project No. 2013104
RD W
ALY
RLY
WN
ST
DT
N
SUCCESS AVE
AV ON
S WE
R VE I Y R WA D EN
NK LI
LIVING
BEV E
KI EL
AV E WA OL MB
ST
/
MONT ST
K RD
RD WA LD MBO
HOWARD ST
N SU
MILLBRO O
DEAVER S T
WE S TW OO
T
TREMONT S
DR
PL
E RIS
LE A VE
SVI L
WAY NE
RD
EY
S
OA KL
N D OL
G
Y RE IR
LO
NC
AN
GA LO
O
EN
H A YW O
V CRA
ED
D
ID RS
EUCLID BLVD
ES YN A P
RIVERVIEW DR
E RIV R TS
LYMA
E ROB
L RA PH
R OLD LYMAN ST
ST
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Riverview Drive
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
24
PROJECT NO.
2013104
TOTAL LF:
2,302
PROJECT BUDGET:
$649,480.00
PROJECT ORIGIN:
SSO's; Access; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$7,880.00
$7,880.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$633,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$4,000.00
55450 - SURVEY - ASBUILT
$4,600.00
TOTAL AMOUNT
$649,480.00
$7,880.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
N/A
# PLATS: [ 0
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
PROJECT DESCRIPTION: This project is located in Asheville near the Haywood Rd. bridge. The project FY 23-24 consists of replacing approx. 2,302 LF of existing 6-inch vitrified clay pipe with 8-inch ductile iron pipe. The FY 24-25 existing line is in poor condition and has experienced multiple overflows. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $641,600.00 $0.00 $0.00
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Royal Pines Drive - PRP 47009
LOCATION:
Arden
TYPE:
Pipe Rated Projects
PIPE RATING:
35
PROJECT NO.
2007020
TOTAL LF:
2,888
PROJECT BUDGET:
$874,500.00
PROJECT ORIGIN:
Pipe Rating Program
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$15,600.00
$10,100.00
$5,500.00
55330 - DESIGN 55340 - PERMITS
$5,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$1,500.00
55370 - LEGAL FEES
$2,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$15,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$830,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$3,000.00
55450 - SURVEY - ASBUILT
$2,400.00
TOTAL AMOUNT
$874,500.00
$10,100.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [ 2 ]
CONTRACTOR:
$5,500.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$0.00
FY 18-19
$23,500.00 $0.00
CONSTRUCTION ADM.:
MSD
FY 19-20
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$835,400.00
FY 22-23
$0.00
This project is located in South Asheville and is comprised of 2,888 LF of 8-inch FY 23-24 ductile iron pipe. The existing line is 8-inch vitrified clay pipe which has had a history of root problems. FY 24-25
$0.00
FY 25-26
$0.00
PROJECT DESCRIPTION:
SPECIAL PROJECT NOTES:
$0.00
ER PL
N SA
D
LL HI
RD
NOT TO SCALE
NE DR
A M
N A IL ST
R KA
EN
PL
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
D
Sand Hill Road at Baker Place Project No. 2015223
BA K
SHELBU R
ER
/
L
ST CARRIE R
CARRIER P
SALOLA S T
SH URN E LB
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Sand Hill Rd @ Baker Place
LOCATION:
W. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
22
PROJECT NO.
2015223
TOTAL LF:
550
PROJECT BUDGET:
$165,500.00
PROJECT ORIGIN:
Work Orders; line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$3,000.00
55330 - DESIGN 55340 - PERMITS
$1,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$160,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$500.00
TOTAL AMOUNT
ENGINEER:
$165,500.00
MSD
R.O.W. ACQUISITION:
$0.00
SA # PLATS: [ 0 ]
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$4,000.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in West Asheville and is comprised of 550 LF of 8-inch FY 23-24
$161,500.00
ductile iron pipe. The existing line is a 6-inch VCP with mulitple structural defects and access issues due to FY 24-25 being located under several houses. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
WOODGAT E
/
SHELBUR N E DR
E
WA ND A LN
VE R
T
MO NT CT
RU S
NOT TO SCALE
Sand Hill Road at Russell Street and Davenport Road Project No. 2011093
SALOLA S T
RD
SHELBURNE RD
WINNFRED ST
N
LANCE L
D SA N
N DA VE
RD HI LL
L PO RT P
ST
CT S
VE EA
VE R
AVE OK
ES TE
DE L
DUNN
WE S
LS
T
RD TG AT E
SE LL ST
T
RD
EX T
DAVEN PO
RT RD
LN CAIRN
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
REX DR
OL N EY
TS CE N RE S LE C MA P
AVE OOD W E INGL
VE R
ST
EX
AV E MO NT
S
L DE
AR AW
CR E
E
VA NC E
PO L PP
CE NT
CR E VA NC E
ST SC EN T
MEA BRO DOW PL OOD W E PIN
REX DRIVE EXT
AV TON CLIN
MO NT
T ETT S HARN
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Sand Hill Rd. @ Russell/Davenport
LOCATION:
W. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
82
PROJECT NO.
2011093
TOTAL LF:
2,341
PROJECT BUDGET:
$686,775.00
PROJECT ORIGIN:
SSO's; Work orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$18,325.00
$18,325.00
55330 - DESIGN 55340 - PERMITS
$750.00
$750.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$38,900.00
$18,355.00
$20,545.00
55370 - LEGAL FEES
$33,500.00
$16,227.00
$10,000.00
$70,000.00
$62,862.00
$7,138.00
$7,273.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$520,000.00
$520,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$3,000.00
$3,000.00
55450 - SURVEY - ASBUILT
$2,300.00
$2,300.00
TOTAL AMOUNT
$686,775.00
$115,769.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [ 27
CONTRACTOR:
$38,433.00
$532,573.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in West Asheville and is comprised of 2,341 LF of 8-inch FY 23-24
$0.00
ductile iron pipe. The existing line is 8-inch vitrified clay pipe is in poor condition with a history of overflows FY 24-25 at various sites. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
RD
L SCHOO
NOT TO SCALE
D
A CR D OR NF
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
U
TO
PL
R
School Road at Cranford Road Project No. 2014184
RD
HO
H G
N
R N
/
T AR
R HU
A CL D EN O
RD
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
School Rd. @ Cranford Rd.
LOCATION:
W. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
61
PROJECT NO.
2014184
TOTAL LF:
361
PROJECT BUDGET:
$109,000.00
PROJECT ORIGIN:
SSO's; Work orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS
$500.00
$500.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$107,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$500.00
TOTAL AMOUNT
$109,000.00
$0.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
N/A
# PLATS: [ 0
CONTRACTOR:
$500.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$108,500.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in West Asheville between Patton Ave. and Sand Hill Rd. FY 23-24
$0.00
and is comprised of 361 LF of 8-inch ductile iron pipe. The existing line is 6-inch PVC pipe that is full of FY 24-25 roots, bends, and structural defects. Backups in this line have resulted in a flooded house. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
Sheppard Drive Project No. 2014152 NOT TO SCALE
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
ER H W Y
D
/
DR
ICEST
Y NT
RD PPA SHE
NEW LE
D OL U CO R ME HO
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Sheppard Drive
LOCATION:
W. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
71
PROJECT NO.
2014152
TOTAL LF:
325
PROJECT BUDGET:
$89,310.00
PROJECT ORIGIN:
SSO's; Access; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$1,160.00
$1,160.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$500.00
55370 - LEGAL FEES
$500.00
$1,000.00
$1,000.00
$3,000.00
$3,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$82,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$650.00
TOTAL AMOUNT
$89,310.00
$1,160.00
ENGINEER:
MSD
OH
R.O.W. ACQUISITION:
MSD
# PLATS: [ 1
CONTRACTOR:
$500.00
$4,000.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$83,650.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
This project is located at 45 Sheppard Dr. in West Asheville, close to the intersection of Old County Home Rd. and New Leicester Hwy. The project includes replacing approximately FY 23-24 325 LF of existing 6-inch VCP with 8-inch DIP. The existing line has structural defects and has experienced FY 24-25 numerous backups due to root intrusion.
PROJECT DESCRIPTION:
FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
/
SMOKEY PARK
HWY TO I40 E
Smokey Park Highway at I-40 Project No. 2015012
I40 E
NOT TO SCALE
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
I40 W
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Smokey Park Hwy. @ I-40
LOCATION:
Enka
TYPE:
General Sewer Rehab.
PIPE RATING:
10
PROJECT NO.
2015012
TOTAL LF:
115
PROJECT BUDGET:
$41,750.00
PROJECT ORIGIN:
SSO's; Access; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$1,000.00
55330 - DESIGN 55340 - PERMITS
$5,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$35,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT
$750.00
TOTAL AMOUNT
$41,750.00
$0.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
N/A
# PLATS: [ 0
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$0.00 $0.00
CONSTRUCTION ADM:
MSD
FY 19-20
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$1,000.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in Enka near the I-40 on/off ramps, approximately 0.10 mile FY 23-24
$5,000.00
from Smokey Park Hwy. The line crosses under Norfolk Southern railroad. There is a substantial hole along FY 24-25 the bottom of the line that has created problems.
$35,750.00
FY 25-26
$0.00
SPECIAL PROJECT NOTES:
PINC H
R
OVERLOOK RD
MANATEE CT
SPRINGSIDE RD
S LONG
Springside Road at Overlook Road Project No. 2012127
OVERLOOK CT
LIVING SAVIOR WAY
OT D
CT
CIR FO X RED
CON IFER
BRIARCLIFF DR
S RD
NOT TO SCALE
HOAL
MIAMI CIR
/
IR
RED FOX C
IR SPRING FO R EST C
GSID SPRIN K E PAR
AK F
ST
ISH C
IR
DR
W SUMMIT AVE
SCOT T
ALLEN AVE
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
T POND S
OR E
DR
MAUDE A VE
HARRIS S T
SO
BEV LYN
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Springside Rd. @ Overlook Rd.
LOCATION:
S. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
52
PROJECT NO.
2012127
TOTAL LF:
4,500
PROJECT BUDGET:
$1,299,200.00
PROJECT ORIGIN:
SSO's; Work orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$19,500.00
$21,000.00
$1,500.00
55330 - DESIGN 55340 - PERMITS
$2,000.00
$2,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$7,200.00
55370 - LEGAL FEES
$13,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$80,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$1,170,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$3,000.00
55450 - SURVEY - ASBUILT
$3,000.00
TOTAL AMOUNT
$1,299,200.00
$19,500.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [ 13
CONTRACTOR:
$1,500.00
$2,000.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$100,200.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$1,176,000.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in South Asheville near Overlook Rd. and is comprised of 4,500 LF of 8-inch ductile iron pipe. The existing line is 6-inch and 8-inch vitrified clay pipe in poor shape, FY 23-24 with a history of SSO's at various points. FY 24-25 FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
A BE
R
N DE
E AV
B
DP
L
MB CU L ER
N MO
W I240
D AN
T E AV
RD FO
E AV
ON
TF
NOT TO SCALE
N
ON
CH TO
&M
ST
HA IS RR
T YS ER R
E CH
Y RR
I24
0E
E AV
I2
W 40
O YW A H
AY W
OD
TO
ST
TO
I 24
0W
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
BR
D OA
ST
I24
0E
METROPOLITAN SEWERAGE DISTRICT
T
/
SH
T OR
TS
Starnes Avenue Project No. 2014154
M CU
N LA ER
A ST
ES RN
IN FL
ST
ST
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Starnes Avenue
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
22
PROJECT NO.
2014154
TOTAL LF:
2,871
PROJECT BUDGET:
$847,100.00
PROJECT ORIGIN:
SSO's; Work orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$11,500.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$3,000.00
55370 - LEGAL FEES
$4,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$30,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$790,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$3,000.00
55450 - SURVEY - ASBUILT
$5,600.00
TOTAL AMOUNT
$847,100.00
$0.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [ 4 ]
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$0.00
FY 18-19
$11,500.00
CONSTRUCTION ADM:
MSD
FY 19-20
$3,000.00
INSPECTION:
MSD
FY 20-21
$34,000.00
FY 21-22
$0.00
FY 22-23
PROJECT DESCRIPTION: This project is located near downtown Asheville, just north of I-240. Approximately 2,871 LF of existing 6-inch VCP will be replaced with 8-inch DIP along portions of Short St., FY 23-24 Cumberland Ave, Starnes Ave, Harrison St and Flint St. Portions of the existing pipe were installed circa FY 24-25 1900, and have numerous structural defects. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $798,600.00 $0.00 $0.00
LL BE
DA VE
TO N
ER D
RD
AT ST R
Stratford Road Project No. 2015013
LD MAYFIE
NOT TO SCALE
Y PKW
D
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
RR WINDSO
METROPOLITAN SEWERAGE DISTRICT
Y PK W
/
PIN
E AV
EW OO
W RD
R ER D BEAV
PINEV IE
GR AY S
AR D
RD FO RD
D OY NE R
L OOD P ELMW
DR MID
VON WA
LA ND
VO N EA
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Stratford Road
LOCATION:
N. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
16
PROJECT NO.
2015013
TOTAL LF:
1,770
PROJECT BUDGET:
$495,500.00
PROJECT ORIGIN:
SSO's; Work orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$8,000.00
55330 - DESIGN 55340 - PERMITS
$500.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$10,000.00
55370 - LEGAL FEES
$16,000.00
55380 - ACQUISITION SERVICES
$16,000.00
55390 - COMPENSATION
$50,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$390,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$500.00
55450 - SURVEY - ASBUILT
$4,500.00
TOTAL AMOUNT
$495,500.00
$0.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
Consultant
# PLATS: [ 16
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$8,000.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$10,000.00
FY 21-22
$82,500.00
FY 22-23
PROJECT DESCRIPTION: This project is located in N. Asheville along Stratford Road. The project is a FY 23-24 continuation of Stratford @ Oxford Court. The lines run though properties alongside a stream. The existing FY 24-25 6-inch vitrified clay pipe is in poor structural condition which has allowed heavy infiltration. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $395,000.00 $0.00 $0.00
/
RD
EW O PI N
Stratford Road at Oxford Court Project No. 2012133
INE ST
AV E OD
DR
EL K
M
ON T
MERRIMON AVE
WO OD B
EA VE
OX
KS ID
RD RA T FO RD
CT D FO R
PA R
PINE ACRE BLVD NOT TO SCALE
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
DR AND MIDL
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Stratford Rd. @ Oxford Court
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
75
PROJECT NO.
2012133
TOTAL LF:
1,960
PROJECT BUDGET:
$461,310.00
PROJECT ORIGIN:
SSO's; Work orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$6,710.00
$6,710.00
55330 - DESIGN 55340 - PERMITS
$500.00
$500.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES
$9,800.00
$8,750.00
$1,050.00
$10,300.00
$7,074.00
$2,000.00
$1,226.00
$30,000.00
$15,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$45,000.00
55400 - APPRAISAL
$3,500.00
$3,500.00
55410 - CONDEMNATION
$10,000.00
$1,000.00
55420 - CONSTRUCTION
$370,000.00
$9,000.00 $370,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
$500.00
$500.00
$5,000.00
$5,000.00
$461,310.00
$22,534.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [ 11
CONTRACTOR:
$38,050.00
$400,726.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
This project will replace an existing 6-inch main which serves houses along FY 23-24 Oxford Court, near the Merrimon Ave. @ Stratford project. Three SSO's have occurred at manholes on this FY 24-25 line.
PROJECT DESCRIPTION:
FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
PAT T O NA VE
/
PR I N C E TO N DR
ST
BRAMLETT CT
BELMONT AVE
NOT TO SCALE
Sulphur Springs Road at Covington Street Project No. 2014006
HARV A
RD P L
DARTMOUTH
E ND AV ORMO
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
S RD
METROPOLITAN SEWERAGE DISTRICT
SULPHUR SPRING
REDFERN ST
CLINTON AVE
COVINGTON ST
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Sulphur Springs Rd. @ Covington St. LOCATION:
W. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
44
PROJECT NO.
2014006
TOTAL LF:
1,350
PROJECT BUDGET:
$381,000.00
PROJECT ORIGIN:
SSO's; Access; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$5,500.00
$5,500.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$8,000.00
55370 - LEGAL FEES
$13,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$50,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$300,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$3,500.00
TOTAL AMOUNT
$381,000.00
$0.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [
CONTRACTOR:
$0.00
$5,500.00
ESTIMATED BUDGETS - FY '18 -'26 13
]
FY 17-18
$8,000.00
FY 18-19
$63,000.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$304,500.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project begins in the area of the Sulphur Springs Rd. / Delaware Ave. intersection and runs through the back properties along Belmont Ave. The existing 6-inch clay pipe will be FY 23-24 replaced with 8-inch ductile iron pipe. The 6-inch clay line has had numerous problems and runs under a FY 24-25 house. FY 25-26 SPECIAL PROJECT NOTES:
Belmont Ave. added to this with additional 500 LF
$0.00 $0.00 $0.00
U CH
E
ST
ST
S RD
9 NC
O BR
H RC
ST A S AY W D
ER CH S RY Y
Sutton Avenue Project No. 2014003
T HW
/
N HO
T UT YC
T
S HA RIC
SU
VD BL N O
W
E AV ON T T
IDG
ST
SR
ST AT E
MIDLAND AVE
W ES
E
T
R AT E R
S
N MO
ST
E AV AY W E
ER
NOT TO SCALE
NT CE
E AV
AND
TA TE
TL SCO ST
T
D
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Sutton Avenue
LOCATION:
Black Mtn.
TYPE:
General Sewer Rehab.
PIPE RATING:
48
PROJECT NO.
2014003
TOTAL LF:
3,100
PROJECT BUDGET:
$931,000.00
PROJECT ORIGIN:
SSO's; Access; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$15,000.00
$15,000.00
55330 - DESIGN 55340 - PERMITS
$5,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$900,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$3,000.00
55450 - SURVEY - ASBUILT
$8,000.00
TOTAL AMOUNT
$931,000.00
$0.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
N/A
# PLATS: [
$15,000.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 0
]
CONTRACTOR:
FY 17-18
$5,000.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$911,000.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
and Broadway St. The existing 6-inch and 8-inch clay pipe will be replaced with 8-inch ductile iron pipe. FY 23-24 System Services crews report that the pipes are in poor condition, and have caused flooded structures and FY 24-25 sanitary sewer overflows.
$0.00
FY 25-26
$0.00
PROJECT DESCRIPTION: This project is on Sutton Ave. and extends up Ridgeway Ave., Richardson Blvd.,
SPECIAL PROJECT NOTES:
$0.00
KS
H
K RD
N SO L VI L
LD WA ER
EN
D
ARG O LN OOL
C K LN
DR
NOT TO SCALE
Sweeten Creek Road at Buck Shoals Road Project No. 2014015
CH CH TS RIS
/
C BU
D
N HE R DE
SR
SUMTER ST
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
AVE
RD
L OA
R EE
PENSACOLA
LVD TAM PA B
SWE NC E TE HTS
O PEAC
O VE
KEY L
N LN PIGEO PENSAC OLA
DY C WIN
RD
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Sweeten Creek @ Buck Shoals
LOCATION:
S. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
51
PROJECT NO.
2014015
TOTAL LF:
1,330
PROJECT BUDGET:
$406,170.00
PROJECT ORIGIN:
SSO's; Access; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$4,670.00
$4,670.00
55330 - DESIGN 55340 - PERMITS
$4,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$1,500.00
55370 - LEGAL FEES
$2,000.00
$1,500.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$50,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$339,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$3,000.00
TOTAL AMOUNT
$406,170.00
$4,670.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [ 2
CONTRACTOR:
$0.00
$1,500.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$56,000.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$344,000.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in Royal Pines on Buck Shoals Rd. between Hendersonville FY 23-24
$0.00
Rd. (US 25) and Sweeten Creek Rd. (US 25A). Approx. 1,330 LF of existing 6-inch vitrified clay pipe will be FY 24-25 replaced with 8-inch ductile iron pipe. The existing line is in poor condition and is undersized. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
EN C R
EEK R
ONA BERRY LN NOT TO SCALE
Sweeten Creek Road at Busbee View Lane Project No. 2011095
D
IE BUSBEE V
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
W LN
METROPOLITAN SEWERAGE DISTRICT
RD
/
T SWEE
K
BUSBEE VIEW CIR
BUSBEE VIEW RD
C RO
LL HI
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Sweeten Creek Rd. @ Busbee View
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
70
PROJECT NO.
2011095
TOTAL LF:
1,048
PROJECT BUDGET:
$307,200.00
PROJECT ORIGIN:
SSO's; Work orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$13,200.00
$8,040.00
$5,160.00
55330 - DESIGN 55340 - PERMITS
$1,000.00
$1,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$4,800.00
$3,005.00
$1,795.00
55370 - LEGAL FEES
$5,000.00
$1,784.00
$2,000.00
$1,216.00
$20,000.00
$2,053.00
$6,000.00
$11,947.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL
$2,500.00
$2,500.00
55410 - CONDEMNATION
$7,500.00
$7,500.00
55420 - CONSTRUCTION
$250,000.00
$250,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
$500.00
$500.00
$2,700.00
$2,700.00
$307,200.00
$14,882.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [ 4
$15,955.00
$276,363.00
ESTIMATED BUDGETS - FY '18 -'26 ]
CONTRACTOR:
FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
Creek Rd. and extends to Ona Berry Lane (off Busbee Lane). A portion of this line goes under a concrete FY 23-24 loading dock and in some places the pipe cannot be located without extensive work on private property. FY 24-25 There have been several service calls for repairs on this line.
$0.00
FY 25-26
$0.00
PROJECT DESCRIPTION: This project is for the rehabilitation of an existing line which begins at Sweeten
SPECIAL PROJECT NOTES:
$0.00
HENDERSONVILLE RD
/
C EN EE T
ALP I
Sweeten Creek Road at Mills Gap Road Project No. 2014189
SW
D KR RE E
RID
GE
DR
CA NOT TO SCALE
NE
LN EL ST E
AP
RD
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
SG
METROPOLITAN SEWERAGE DISTRICT
MI LL
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Sweeten Creek @ Mills Gap
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
46
PROJECT NO.
2014189
TOTAL LF:
2,325
PROJECT BUDGET:
$703,800.00
PROJECT ORIGIN:
SSO's; Work orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$12,000.00
55330 - DESIGN 55340 - PERMITS
$1,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$2,500.00
55370 - LEGAL FEES
$5,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$75,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$605,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$1,300.00
TOTAL AMOUNT
$703,800.00
$0.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [ 5
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$15,500.00
FY 18-19
$80,000.00
CONSTRUCTION ADM:
MSD
FY 19-20
$608,300.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in South Asheville near Mills Gap Rd. and is comprised of FY 23-24
$0.00
2,325 LF of 8-inch ductile iron pipe. The existing line is 6-inch and 8-inch vitrified clay pipe in poor FY 24-25 condition, with a history of SSO's. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
S WE
TO
IR
AD
RC
O NR
E NN WI
EX
T
D
N HE
DE
R
IL NV O S
N STO WE
Sweeten Creek Road at Weston Road Project No. 2014187
CIR
KR
RD
O PEAC
LE
/
A AV
LO
K AR NP R EE
AY R
C K LN NOT TO SCALE
QU A
CT
IL HO LL OW DR
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
CIR
METROPOLITAN SEWERAGE DISTRICT
D WOO GLEN
LVD TAM PA B
E SWE C TE N N PIGEO LN
RD
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Sweeten Creek Rd. @ Weston Rd.
LOCATION:
S. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
30
PROJECT NO.
2014187
TOTAL LF:
1,775
PROJECT BUDGET:
$520,200.00
PROJECT ORIGIN:
SSO's; Work orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$9,000.00
55330 - DESIGN 55340 - PERMITS
$500.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$1,000.00
55370 - LEGAL FEES
$2,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$35,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$470,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,500.00
55450 - SURVEY - ASBUILT
$1,200.00
TOTAL AMOUNT
$520,200.00
$0.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [ 2
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$9,000.00
FY 18-19
$0.00 $1,500.00
CONSTRUCTION ADM:
MSD
FY 19-20
INSPECTION:
MSD
FY 20-21
$37,000.00
FY 21-22
$472,700.00
FY 22-23
$0.00
This project is located in South Asheville near Weston Rd. and is comprised of FY 23-24 1,775 LF of 8-inch ductile iron pipe. The existing line is 6-inch vitrified clay pipe and 4-inch PVC pipe in poor FY 24-25 condition, with a history of SSO's.
PROJECT DESCRIPTION:
FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
/
ER
SHADY PINES DR
NOT TO SCALE
Upper Grassy Branch Road at Maxwell Road Project No. 2010096
UP P
AS GR
RD NC H BR A SY
D MAXWELL R
CLEAR V IS
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
TA DR
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Upper Grassy Br. Rd. @ Maxwell Rd. LOCATION:
E. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
35
PROJECT NO.
2010096
TOTAL LF:
1,000
PROJECT BUDGET:
$287,710.00
PROJECT ORIGIN:
Access; Line condition; Work orders
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$5,210.00
$5,210.00
55330 - DESIGN 55340 - PERMITS
$500.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$1,500.00
55370 - LEGAL FEES
$3,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$15,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$260,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,500.00
55450 - SURVEY - ASBUILT
$1,000.00
TOTAL AMOUNT
$287,710.00
$5,210.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [ 3
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$2,000.00 $18,000.00
CONSTRUCTION ADM:
MSD
FY 19-20
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$262,500.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in East Asheville and is comprised of 1,000 LF of 8-inch FY 23-24
$0.00
ductile iron pipe. The existing sewer line is 6-inch clay with root and odor problems.
SPECIAL PROJECT NOTES:
FY 24-25
$0.00
FY 25-26
$0.00
YC
LR
D
DEW DROP RD
US 70 at Jordan Road Project No. 2015014
HERSHEL LN
RD RED
/
N GI
H SC
ZANMI RD
E AP
JORDAN RD
LAURA LN
LEE RD
US 70 HWY
RD
MARTIN
ROAD
NOT TO SCALE
EXT
DR
R BU
IR
RA V
ME
D LO P TO ST
RE D
EA
EN
D
TOL S TOY TRL
MARTIN RD
I40 E EYE ACC ESS
I40 W
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
BUC K
AV E
Y HW
RD
70 US
METROPOLITAN SEWERAGE DISTRICT
W RA Y
D OL D DR ER WO O RIV
R N
LN
A FR IN KL
Y N WA
BYA S
YR M
E TL
O SAMS
RD
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
US 70 @ Jordan Road
LOCATION:
Swannanoa
TYPE:
General Sewer Rehab.
PIPE RATING:
21
PROJECT NO.
2015014
TOTAL LF:
4,550
PROJECT BUDGET:
$1,443,000.00
PROJECT ORIGIN:
Access; Line condition; Work orders
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$20,000.00
55330 - DESIGN 55340 - PERMITS
$500.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$20,000.00
55370 - LEGAL FEES
$32,000.00
55380 - ACQUISITION SERVICES
$32,000.00
55390 - COMPENSATION
$75,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$1,250,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,500.00
55450 - SURVEY - ASBUILT
$12,000.00
TOTAL AMOUNT
$1,443,000.00
$0.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
Consultant
# PLATS: [ 32
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$20,000.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$127,000.00
INSPECTION:
MSD
FY 20-21
$32,500.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in Swannanoa along US 70. The project begins at FY 23-24
$1,263,500.00
McBrayer Ave., crosses under US 70 at Martin Rd., and ends at Burgins Chapel Rd. The existing 8-inch FY 24-25 vitrified clay pipe is in poor condition. This is a potential lining project. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
DA
ST
/
PAC O
RD
Venable Pump Station Elimination Project No. 2015172
BRE VAR D
RD BRE VAR D
NOT TO SCALE
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Venable Pump Station Elimination
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
NA
PROJECT NO.
2015172
TOTAL LF:
364
PROJECT BUDGET:
$361,200.00
PROJECT ORIGIN:
New opportunity to eliminate P.S.
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$2,850.00
$2,850.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$1,350.00
$1,350.00
55370 - LEGAL FEES
$1,500.00
$1,500.00
$2,500.00
$2,500.00
$350,000.00
$200,000.00
$150,000.00
55440 - TESTING
$1,500.00
$500.00
$1,000.00
55450 - SURVEY - ASBUILT
$1,500.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION 55430 - CONST. CONTRACT ADM.
TOTAL AMOUNT
$1,500.00
$361,200.00
$0.00
ENGINEER:
MSD
OH
R.O.W. ACQUISITION:
MSD
# PLATS: [
CONTRACTOR:
$208,700.00
$152,500.00
ESTIMATED BUDGETS - FY '18 -'26 1 ]
FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
PROJECT DESCRIPTION: This project is along NC191 (Brevard Road) at the Ingles Market and Asheville FY 22-23
$0.00
Outlets Mall properties in southwest Asheville. This project will eliminate the existing Venable Pump Station FY 23-24 and allow the flow from that pump station to flow into existing sewer lines on the Mall property which have recently become public MSD lines. This project will replace approimately 364 LF of existing 8-inch main and FY 24-25 add approximately 313 LF of new 8-inch main. FY 26-26 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
0W E 0 I24
D
S T VE IN A
E STAG
ST
TT BA Y ER PA RK LN
PAGE
OO YW HA DS
AVE
E RY AV OHEN
S PAC
IS OT
R ILTMO SQ B
S LE X
T
Y AL
INGTO
E AVE
H CHURC
AVE COXE
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
K SQ
T
ST NOT TO SCALE
G E ST
E ALY
ST
ST
Walnut Street at Rankin Avenue Project No. 2014018
AVE
E COLL
L TING
LN U T E WA
ACK WP S C K SQ
ST
N PATTO
T ST
LN
ER C E COMM
K RAN
NU WAL
AVE TON N PA
T
IN FL LY ALY
S WALL
DE
L
BR AY ST OADW
AVE
N VA
P ILT RB
N ING LE X R EN LANG
ARK ERY P BATT
Q
0E A KEN CHIC LINA
LE S BATT
OO YW A H
I 24
S ET
/
I24
O TT
O CAR
S R K ET N MA
RK MA
N AVE
ST
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Walnut Street @ Rankin Ave.
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
42
PROJECT NO.
2014018
TOTAL LF:
2,350
PROJECT BUDGET:
$766,400.00
PROJECT ORIGIN:
Access; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$11,500.00
$9,900.00
$1,600.00
$9,900.00
$1,600.00
55330 - DESIGN 55340 - PERMITS
$500.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$500.00
55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$750,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,500.00
55450 - SURVEY - ASBUILT
$1,400.00
TOTAL AMOUNT
$766,400.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [
$0.00
ESTIMATED BUDGETS - FY '18 -'26 0
]
CONTRACTOR:
FY 17-18
$0.00
FY 18-19
$1,000.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$753,900.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in downtown Asheville and consists of 2,350 LF of 8-inch FY 23-24
$0.00
ductile iron pipe. The current 6-inch clay line is undersized and deteriorated, with many structural problems.
SPECIAL PROJECT NOTES:
FY 24-25
$0.00
FY 25-26
$0.00
DS
T
/
ST
SHORT TRE
ST
MONT ST
N SU
RIS
R ED
BR O
W NW O O
D
AV E
RG I A ST
AV ON
SUCCESS AVE
GE O
NOT TO SCALE
AV E
S WE
T
D EN
V RI
K
Y WA
N LI ER
LN
RIVERVIEW DR
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
DR
RD
Waynesville Avenue at Brownwood Avenue Project No. 2014183
EZELLE
ROO K R WORLEY PL D
ST
G
NN IN
BR A
DE LLW OO
E
SEV
D
MIL LB
TREMONT ST
KS R
NO A
AND
WA YN E
S
VIL LE
AV E AV E
RICH L
OA K
S TW OO DP L
WE
DE AV E
R
ST
PL LE Y
E
G
V IA A
LO
RD
AN
DAL VAN
S
W AM BO
LD NO
H A YW O
DR Y RE IR
LD T
AN NC
O D
GA LO
AL Y
SL RU
LYMA N ST
E AV CR T NS
DE
EUCLID BLVD
V RI SI ER
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Waynesville Ave. @ Brownwood Ave. LOCATION:
W. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
33
PROJECT NO.
2014183
TOTAL LF:
4,100
PROJECT BUDGET:
$1,258,500.00
PROJECT ORIGIN:
Access; Line condition; SSO's.
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$20,500.00
55330 - DESIGN 55340 - PERMITS
$500.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$23,500.00
55370 - LEGAL FEES
$47,000.00
55380 - ACQUISITION SERVICES
$47,000.00
55390 - COMPENSATION
$70,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$1,045,500.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$2,500.00
TOTAL AMOUNT
$1,258,500.00
$0.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
Consultant
# PLATS: [ 47
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
CONTRACTOR:
FY 17-18
$20,500.00
FY 18-19
$500.00 $63,500.00
CONSTRUCTION ADM:
MSD
FY 19-20
INSPECTION:
MSD
FY 20-21
$124,000.00
FY 21-22
$1,050,000.00
FY 22-23
$0.00
and is comprised of 4,100 LF of 8-inch ductile iron pipe. The existing line is 8-inch vitrified clay pipe that is FY 23-24 in poor condition with heavy root intrusion, structural defects, and I&I problems, resulting in a large history of FY 24-25 SSO's.
$0.00
FY 25-26
$0.00
PROJECT DESCRIPTION: This project is located in West Asheville between Haywood Rd. and Craven St.
SPECIAL PROJECT NOTES:
$0.00
RD
E
DAVID SO
RTH AV
AVE
WENTW O
LAMAR
FOX DR
N RD
Wentworth Avenue Project No. 2014181
LOOMIS AVE
OL
/
OAKVIEW PARK RD
PINNACLE VIEW RD
O SCH E
NOT TO SCALE
VID DA
SO
NR
D
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
ONTEORA BLVD
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Wentworth Ave.
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
26
PROJECT NO.
2014181
TOTAL LF:
1,500
PROJECT BUDGET:
$425,700.00
PROJECT ORIGIN:
SSO's; Work orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$7,500.00
55330 - DESIGN 55340 - PERMITS
$500.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$415,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$700.00
TOTAL AMOUNT
$425,700.00
$0.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
N/A
# PLATS: [ 0
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$7,500.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$500.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$417,700.00
This project is located in Asheville near the Oakley neighborhood and is FY 23-24 comprised of 1,500 LF of 8-inch ductile iron pipe. The existing line is 6-inch PVC and 8-inch vitrified clay FY 24-25 pipe that has many offset joints, protruding taps, and pipe defects.
PROJECT DESCRIPTION:
FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
ES
RL
VE R
SA
ILL
ES
LN
R GA
ND LA
LN
CH D
CRABAPPLE LN
West Crabapple Lane Project No. 2014005
DR
LD WI R RY R E
IL O
/
NE T
CT
BAYO N
N CEN VIN CR LE
A
E
A
LN
NOT TO SCALE
AB CR
LE PP
K RD
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
A ND O ROU
LN C R EEK
W P AP AB
U Q H
BEAVER
RD GIBSON
LW
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
West Crabapple Lane
LOCATION:
W. Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
67
PROJECT NO.
2014005
TOTAL LF:
1,720
PROJECT BUDGET:
$503,000.00
PROJECT ORIGIN:
SSO's; Access; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$2,500.00
$2,500.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$8,000.00
55370 - LEGAL FEES
$8,000.00
$12,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$25,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$450,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$4,500.00
TOTAL AMOUNT
$503,000.00
$0.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [
CONTRACTOR:
$2,500.00
$8,000.00
ESTIMATED BUDGETS - FY '18 -'26 12
]
FY 17-18
$37,000.00
FY 18-19
$455,500.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
This project is on West Crabapple Lane which is a private road. The existing FY 23-24 8-inch clay pipe is in bad condition and will be replaced with 8-inch ductile iron pipe. System Services FY 24-25 crews have reported multiple structural defects which are resulting in major infiltration and inflow.
PROJECT DESCRIPTION:
$0.00 $0.00
FY 25-26 SPECIAL PROJECT NOTES:
This project may be constructed by System Services.
$0.00 L.F.
/
A QU
IL H
CA
LO OL
WD
L
E W
O ST
N
RD
Weston Road at Tampa Boulevard Project No. 2015208
R
P ON NGT RRI
TA M PA BLV D
NOT TO SCALE
CI R TA MP A
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Weston Road @ Tampa Blvd.
LOCATION:
Skyland
TYPE:
General Sewer Rehab
PIPE RATING:
8
PROJECT NO.
2015208
TOTAL LF:
400
PROJECT BUDGET:
$114,150.00
PROJECT ORIGIN:
I&I, protruding taps, undersized
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$2,000.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$2,250.00
55370 - LEGAL FEES
$3,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$15,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$90,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$900.00
TOTAL AMOUNT
$114,150.00
$0.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [ 3 ]
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$0.00
FY 18-19
$0.00 $0.00
CONSTRUCTION ADM:
MSD
FY 19-20
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$2,000.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in Skyland, approx. 1/2 mile northeast of the US 25/US 25A FY 23-24
$2,250.00
intersection. It consists of replacing 400LF of existing 6-inch VCP with 8-inch DIP. The existing pipe has FY 24-25 bends and protruding taps in the line, is undersized, and is a source of I&I.
$18,000.00
FY 25-26
$91,900.00
SPECIAL PROJECT NOTES:
E DR
White Oak Road Project No. 2015193
L PINE NEED
OLD SMOKEY TRL WHITE OAK RD NOT TO SCALE
FAIR OAKS RD
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
CIR
/
CRESCENT HILL DR
VILLE RD DOGWOOD RD
RD OAKS
N HENDERSO
N FAIR
PERRY LN
IT WH INE EP
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
White Oak Road
LOCATION:
Arden
TYPE:
General Sewer Rehab
PIPE RATING:
3
PROJECT NO.
2015193
TOTAL LF:
960
PROJECT BUDGET:
$295,250.00
PROJECT ORIGIN:
Access, Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$4,000.00
55330 - DESIGN 55340 - PERMITS
$3,750.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES
$5,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$30,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$250,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$500.00
55450 - SURVEY - ASBUILT
$2,000.00
TOTAL AMOUNT
$295,250.00
$0.00
ENGINEER:
MSD
DP
R.O.W. ACQUISITION:
MSD
# PLATS: [ 5 ]
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$4,000.00
PROJECT DESCRIPTION: This project is located in Arden along White Oak Road, adjacent Hendersonville FY 23-24
$3,750.00
Road. The project will replace 960 LF of 6-inch Orangeburg and VCP. The existing lines are in bad condition FY 24-25 and have too many point repairs.
$35,000.00
FY 25-26
$252,500.00
SPECIAL PROJECT NOTES:
/
WO O
DP AR
KK
NL
Wildwood Park Project No. 2015194
WILDWOO D PARK
N MAIN ST NOT TO SCALE
OAKLAND ST
S
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
CH E
WIL D
ST TN UT
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Wildwood Park
LOCATION:
Weaverville
TYPE:
General Sewer Rehab.
PIPE RATING:
27
PROJECT NO.
2015194
TOTAL LF:
430
PROJECT BUDGET:
$124,250.00
PROJECT ORIGIN:
Pipe fractures, roots, location
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$2,150.00
$2,150.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$119,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$1,100.00
TOTAL AMOUNT
ENGINEER:
$124,250.00
MSD
R.O.W. ACQUISITION:
$0.00
HC # PLATS: [ 0 ]
CONTRACTOR:
$0.00
$2,150.00
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$0.00
FY 18-19
$0.00 $0.00
CONSTRUCTION ADM:
MSD
FY 19-20
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$122,100.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in Weaverville at the corner of N Main St. and Wildwood FY 23-24
$0.00
Park. It consists of replacing 430LF of 8-inch VCP with 8-inch DIP. The existing pipe has multiple fractures, FY 24-25 root problems, and runs underneath multiple structures making maintenance difficult. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
ED
RD
FU R TU
RIVER HILL S
PA ER RK
R
/
E RD NOT TO SCALE
D RIDGE R
Budget Map
METROPOLITAN SEWERAGE DISTRICT of BUNCOMBE COUNTY, NORTH CAROLINA
W
Wood Avenue at Parker Road Project No. 2014188
WOOD ALY N
0
WOOD AVE
4 I2 0
SAYL ES
4 I2
ALY S WOOD
Y BLVD BLEACHER
RD
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Wood Ave. @ Parker Rd.
LOCATION:
Asheville
TYPE:
General Sewer Rehab.
PIPE RATING:
22
PROJECT NO.
2014188
TOTAL LF:
1,050
PROJECT BUDGET:
$357,100.00
PROJECT ORIGIN:
Work orders; Line condition
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$5,500.00
55330 - DESIGN 55340 - PERMITS
$500.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$4,500.00
55370 - LEGAL FEES
$9,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION
$35,000.00
55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$300,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$600.00
TOTAL AMOUNT
$357,100.00
$0.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [ 9
CONTRACTOR:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$5,500.00
INSPECTION:
MSD
FY 20-21
$49,000.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in Asheville between Fairview Rd. and Tunnel Rd. and is FY 23-24
$302,600.00
comprised of 1,050 LF of 8-inch ductile iron pipe. The existing line is 8-inch vitrified clay pipe that has FY 24-25 access issues due to being built over. Backups on this line have resulted in a flooded house. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
SSD Rehab. & Replacement
PROJECT:
LOCATION:
Various
(Annual) TYPE:
General Sewer Rehab.
PIPE RATING:
N/A
PROJECT NO.
2002101
TOTAL LF:
200,000
PROJECT BUDGET:
$41,644,040.00
PROJECT ORIGIN:
In-house Capital Improvements
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$41,644,040.00
$1,555,576.29
$2,461,923.71
$4,164,404.00
$41,644,040.00
$1,555,576.29
$2,461,923.71
$4,164,404.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
20000 ENGINEER:
MSD
MS
R.O.W. ACQUISITION:
MSD
# PLATS: [
ESTIMATED BUDGETS - FY '18 -'26 ]
CONTRACTOR:
FY 17-18
$4,164,404.00
FY 18-19
$4,164,404.00
CONSTRUCTION ADM:
MSD
FY 19-20
$4,164,404.00
INSPECTION:
MSD
FY 20-21
$4,164,404.00
FY 21-22
$4,164,404.00
FY 22-23
$4,164,404.00
crews and materials. This includes new taps, small repairs, lining, as well as larger rehabilitation projects. FY 23-24 Also included is paving when required for these repairs and rehabilitation projects. The total estimated FY 24-25 project cost shown is the total within the ten year window.
$4,164,404.00
PROJECT DESCRIPTION: This line item is for the replacement of capital assets using in-house construction
FY 25-26 SPECIAL PROJECT NOTES:
Capitalized Labor & Misc.
$1,539,404 Materials / Year
Fuel Allocation
Paving Contracts
$1,215,000 Estimated L.F. per year
$100,000
$4,164,404.00 $4,164,404.00 $1,310,000.00 20,000
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Surveys for Design
LOCATION:
Various
TYPE:
General Sewer Rehab.
PIPE RATING:
N/A
PROJECT NO.
2002060
TOTAL LF:
N/A
PROJECT BUDGET:
$500,000.00
PROJECT ORIGIN:
Surveys for future projects
DESCRIPTION
ESTIMATED PROJECT COST
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$500,000.00
$50,000.00
$50,000.00
$50,000.00
$50,000.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION 55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
$500,000.00
$0.00
ENGINEER:
EB
R.O.W. ACQUISITION:
# PLATS: [
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$50,000.00
CONTRACTOR:
FY 18-19
$50,000.00
CONSTRUCTION ADM:
FY 19-20
$50,000.00
INSPECTION:
FY 20-21
$50,000.00
FY 21-22
$50,000.00
FY 22-23
$50,000.00
line item provides for surveying needs for these new projects, in order that preliminary work may begin prior FY 23-24 to being formally incorporated into the next year's CIP. This helps to ensure projects are completed FY 24-25 efficiently.
$50,000.00
FY 25-26
$50,000.00
PROJECT DESCRIPTION: New rehabilitation projects are generated continuously throughout the year. This
SPECIAL PROJECT NOTES:
Funds are transferred out to provide Survey for Design for Future Projects. Total estimated project cost shown is the total within the ten year window.
$50,000.00
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Future Projects - General Rehab.
LOCATION:
Various
TYPE:
General Sewer Rehab.
PIPE RATING:
N/A
PROJECT NO.
N/A
TOTAL LF:
5,000
PROJECT BUDGET:
$1,125,000.00
PROJECT ORIGIN:
TBA
DESCRIPTION
ESTIMATED PROJECT COST
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$1,125,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
$1,125,000.00
$0.00
$0.00
$0.00 0
ENGINEER:
EB
R.O.W. ACQUISITION:
# PLATS: [
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$0.00
CONTRACTOR:
]
FY 18-19
$0.00
CONSTRUCTION ADM:
FY 19-20
$0.00
INSPECTION:
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: Rehabilitation projects are added throughout each fiscal year based upon sanitary FY 23-24
$0.00
sewer overflows, structural condition, maintenance frequency, etc. This line item is a placeholder to budget FY 24-25 for future (unidentified) projects within the ten year window. FY 25-26 SPECIAL PROJECT NOTES:
Estimated cost per L.F. =
$225
$0.00 $1,125,000.00
Capital Improvement Program Fiscal Years 2017-2026
Private Sewer Rehabilitation Projects
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Douglas Place PSR
LOCATION:
Asheville
TYPE:
Private Sewer Rehab.
PIPE RATING:
17
PROJECT NO.
2011116
TOTAL LF:
588
PROJECT BUDGET:
$166,312.00
PROJECT ORIGIN:
Problematic Four Inch Private Sewer Main
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$4,980.00
$4,980.00
55330 - DESIGN 55340 - PERMITS
$500.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$500.00
55370 - LEGAL FEES
$3,732.00
$3,732.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$155,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$1,000.00
55450 - SURVEY - ASBUILT
$600.00
TOTAL AMOUNT
$166,312.00
$4,980.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [ 1
CONTRACTOR:
$3,732.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$1,000.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in West Asheville and is comprised of 1,400 LF of 8-inch FY 23-24
$156,600.00
ductile iron pipe. The existing line is a problematic 4-inch private sewer line composed of PVC and VCP FY 24-25 with many defects. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Freno Drive PSR (Lower)
LOCATION:
Asheville
TYPE:
Private Sewer Rehab.
PIPE RATING:
N/A
PROJECT NO.
2012010
TOTAL LF:
2,593
PROJECT BUDGET:
$656,532.00
PROJECT ORIGIN:
Private Sewer Rehab. Program
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$10,700.00
$8,700.00
$2,000.00
55360 - EASEMENT PLATS
$7,500.00
$4,025.00
$3,475.00
55370 - LEGAL FEES
$3,732.00
$6,268.00
$3,732.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES
55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$630,000.00
$630,000.00
$4,000.00
$4,000.00
$600.00
$5,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
$656,532.00
$18,993.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [ 5
CONTRACTOR:
$9,207.00
$639,000.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM.:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in West Asheville and is comprised of 1,400 LF of 8-inch FY 23-24
$0.00
ductile iron pipe. The existing line is a problematic 4-inch private sewer line composed of PVC and VCP FY 24-25 with many defects. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
PL
SYDNEY LN
Old County Home Road - PSR Project No. 2015221
H ER OM
MAGNOLIA WAY
/
Y SPIVE
C Y NT OU
ST
D OL D NOT TO SCALE
S
S
OD DR
ICE
JO HN
LN
DR
SE
ME LI A
CA
PR IMR O
HEATHER DR
WESTW O
W NE LE R TE Y HW
GRAY CT
E MB
DR
CT
GW OO DL N
DIS
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
A CH
AIN RL
LO N
LA N
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Old County Home Rd PSR
LOCATION:
W. Asheville
TYPE:
Private Sewer Rehab.
PIPE RATING:
60
PROJECT NO.
2015221
TOTAL LF:
1,400
PROJECT BUDGET:
$373,932.00
PROJECT ORIGIN:
Problematic four inch line
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$7,000.00
$7,000.00
55330 - DESIGN 55340 - PERMITS
$1,000.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$9,600.00
55370 - LEGAL FEES
$3,732.00
$3,732.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$350,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING
$2,000.00
55450 - SURVEY - ASBUILT
$600.00
TOTAL AMOUNT
$373,932.00
$0.00
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
MSD
# PLATS: [ 16 ]
CONTRACTOR:
$3,732.00
$7,000.00
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$10,600.00
FY 18-19
$0.00
CONSTRUCTION ADM:
MSD
FY 19-20
$352,600.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is located in West Asheville and is comprised of 1,400 LF of 8-inch FY 23-24
$0.00
ductile iron pipe. The existing line is a problematic 4-inch private sewer line composed of PVC and VCP FY 24-25 with many defects. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
Capital Improvement Program Fiscal Years 2017-2026
Treatment Plant, Pump Stations, & General Capital Improvements
This Page Intentionally Blank
/
V RI
Biological Treatment Project No. 2016063
ED SI D R E R NOT TO SCALE
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Biological Treatment
LOCATION:
MSD-Treatment Plant
TYPE:
Treatment Plant
PIPE RATING:
N/A
PROJECT NO.
2016063
TOTAL LF:
0
PROJECT BUDGET:
$4,000,000.00
PROJECT ORIGIN:
Future Regulatory Requirements
ESTIMATED PROJECT COST
DESCRIPTION
55310 - PRELIM. ENGINEERING
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
EST. BUDGET FY 16-17
$1,000,000.00
55320 - SURVEY - DESIGN 55330 - DESIGN
$3,000,000.00
55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION 55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
ENGINEER:
$4,000,000.00
MSD
R.O.W. ACQUISITION:
$0.00
$0.00
HC # PLATS: [
$0.00
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$0.00
CONTRACTOR:
MSD
0
]
FY 18-19
$0.00
CONSTRUCTION ADM.:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is the final and largest recommendation from the Plant Facilities Plan. FY 23-24
$0.00
It will replace the Rotating Biological Contactors (RBC's) with an alternative biological treatment technology. FY 24-25 This project will be driven by regulatory requirements.
$1,000,000.00
FY 25-26
$3,000,000.00
SPECIAL PROJECT NOTES:
This Page Intentionally Blank
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Building and Facility Rehabilitation
LOCATION:
MSD-Treatment Plant
TYPE:
Treatment Plant - Annual
PIPE RATING:
N/A
PROJECT NO.
2002068
TOTAL LF:
0
PROJECT BUDGET:
$865,000.00
PROJECT ORIGIN:
Miscellaneous building repairs
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
EST. BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$865,000.00
$43,080.00
$865,000.00
$43,080.00
$91,920.00
$175,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
ENGINEER:
MSD
R.O.W. ACQUISITION:
$91,920.00
PW # PLATS: [
$175,000.00
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$90,000.00
CONTRACTOR:
MSD
0
]
FY 18-19
$89,000.00
CONSTRUCTION ADM.:
MSD
FY 19-20
$80,000.00
INSPECTION:
MSD
FY 20-21
$91,000.00
FY 21-22
$68,000.00
FY 22-23
$68,000.00
PROJECT DESCRIPTION: This item is for the replacement of larger capital items such as roofing systems, FY 23-24
$68,000.00
HVAC, and subcontracts on buildings and structures within the MSD campus and treatment plant facility. FY 24-25 Total estimated project cost shown is the total within the ten year window. FY 25-26 SPECIAL PROJECT NOTES: For FY16-17 $100,000 for General Facility maintenance; $75,000 for Incinerator Bldg. 3rd floor repair and coating
$68,000.00 $68,000.00
ST
Y RD
E NOT TO SCALE
Carrier Bridge PS Bypass and Improvements Project No. 2012140
R
/
O AMB
VE ER A
N AV
D
JOYN
AVE
V RI EW VI R E
B LAM
RL
ST
MEADOW R D
TA DESO
TIE T
O CLIFT
I EO S TAHK
N LYMA
SW AY
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
FAC
ILIT IE
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Carrier Bridge P.S. Bypass & Improvements LOCATION:
MSD-Treatment Plant
TYPE:
Treatment Plant
PIPE RATING:
N/A
PROJECT NO.
2012140
TOTAL LF:
0
PROJECT BUDGET:
$2,281,688.00
PROJECT ORIGIN:
McGill Feasibility Study
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
EST. BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$12,250.00
$7,900.00
$4,350.00
55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS
$2,400.00
55370 - LEGAL FEES
$5,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$2,260,038.00
$81,538.00
$250,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT
$2,000.00
TOTAL AMOUNT
$2,281,688.00
$89,438.00
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [ 2 ]
CONTRACTOR:
$4,350.00
$250,000.00
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$91,400.00
FY 18-19
$1,709,000.00
CONSTRUCTION ADM.:
MSD
FY 19-20
$137,500.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: A permanent bypass line will be installed at the Carrier Bridge Pump Station as an emergency backup to the existing 24-inch force main. Once installed, the new bypass line will allow for the pump FY 23-24 station to be bypassed in the event of an emergency, or for major maintenance at the pump station. This project FY 24-25 also includes a phased replacement of the three existing pumps. FY 25-26 SPECIAL PROJECT NOTES:
Ph. 1 - Bypass Line
Ph. 2 - Wetwell repairs
Ongoing - Pump replacement (FY 16-17; FY 17-18; FY 18-19)
$0.00 $0.00 $0.00
This Page Intentionally Blank
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Flow Monitoring
LOCATION:
MSD-Treatment Plant
TYPE:
Treatment Plant
PIPE RATING:
N/A
PROJECT NO.
2008013
TOTAL LF:
0
PROJECT BUDGET:
$282,535.00
PROJECT ORIGIN:
Maintenance of Permanent Flow Monitors
ESTIMATED PROJECT COST
DESCRIPTION
55310 - PRELIM. ENGINEERING
TOTAL EXPENDS THRU 12/31/15
$41,905.00
$41,905.00
$240,630.00
$202,105.00
$282,535.00
$244,010.00
EST. COST JAN - JUNE 2016
EST. BUDGET FY 16-17
55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$8,525.00
$30,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
ENGINEER:
MSD
SA
R.O.W. ACQUISITION:
N/A
# PLATS: [
CONTRACTOR:
$8,525.00
$30,000.00
ESTIMATED BUDGETS - FY '18 -'26 0
]
FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM.:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is for expenses related to the continued operation, maintenance, and FY 23-24
$0.00
improvements of the District's flow monitoring program.
SPECIAL PROJECT NOTES:
FY 11 - 17 - Flow Dar Monitors and installation costs.
FY 24-25
$0.00
FY 25-26
$0.00
Influent Pump Station Rehabilitation Project No. 2012030
DR
/
E RIVERSID NOT TO SCALE
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Influent Pump Station Rehabilitation
LOCATION:
MSD-Treatment Plant
TYPE:
Treatment Plant
PIPE RATING:
N/A
PROJECT NO.
2012030
TOTAL LF:
0
PROJECT BUDGET:
$1,639,000.00
PROJECT ORIGIN:
Aging Equipment
ESTIMATED PROJECT COST
DESCRIPTION
55310 - PRELIM. ENGINEERING
TOTAL EXPENDS THRU 12/31/15
$14,000.00
55320 - SURVEY - DESIGN
EST. COST JAN - JUNE 2016
$14,000.00
EST. BUDGET FY 16-17
$0.00
$1,000.00
$950.00
$50.00
55330 - DESIGN
$75,000.00
$65,000.00
$10,000.00
55340 - PERMITS
$10,000.00
$750.00
$9,250.00
$1,476,500.00
$1,043,175.00
$283,325.00
$57,000.00
$46,779.00
$10,221.00
$5,500.00
$500.00
$5,000.00
$1,639,000.00
$1,171,154.00
55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION 55430 - CONST. CONTRACT ADM. 55440 - TESTING
$150,000.00
55450 - SURVEY - ASBUILT TOTAL AMOUNT
$317,846.00
$150,000.00
ENGINEER:
MSD
HC
ESTIMATED BUDGETS - FY '18 -'26
R.O.W. ACQUISITION:
N/A
# PLATS: [
FY 17-18
$0.00
CONTRACTOR:
TBD
FY 18-19
$0.00
CONSTRUCTION ADM.:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
0
]
PROJECT DESCRIPTION: This project is to rehabilitate the influent pump station at the plant. The existing motor controls have deteriorated over the years and must be replaced. New controls will be installed and FY 23-24 the space will be air conditioned. One influent pump was replaced in FY13-14, and another in FY15-16. The FY 24-25 remaining pump has been re-built multiple times and is approximately 25 years old. FY 25-26 SPECIAL PROJECT NOTES:
Pump replacement work to be subcontracted due to safety and liability concerns.
$0.00 $0.00 $0.00
L
LN
RG MO
AN
VD BL
J
DR
ST
R ST C IR
D WOO
L HO X FO
W LO
CT NOT TO SCALE
E COV
Mountain View Pump Station - Generator Site Project No. 2015149
T IN SA
M SU T MI
NS OH
EH U
T C VI EW IN T PO PI N EEK C T
/
K OA
F EA
Y CR HICKOR CT
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
TREE T OP DR
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Mountain View P.S. Standby Generator
LOCATION:
MSD-Treatment Plant
TYPE:
Treatment Plant
PIPE RATING:
N/A
PROJECT NO.
2015149
TOTAL LF:
0
PROJECT BUDGET:
$204,210.00
PROJECT ORIGIN:
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
EST. BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$3,200.00
$3,200.00
$0.00
55330 - DESIGN
$9,200.00
$8,645.00
$555.00
$810.00
$0.00
55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES
$810.00
$1,000.00
$1,000.00
55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$186,000.00
$0.00
55440 - TESTING
$2,500.00
$0.00
55450 - SURVEY - ASBUILT
$1,500.00
$31,000.00
$155,000.00
55430 - CONST. CONTRACT ADM.
TOTAL AMOUNT
$2,500.00 $1,500.00
$204,210.00
$11,845.00
$33,365.00
$159,000.00
ENGINEER:
MSD
OH
ESTIMATED BUDGETS - FY '18 -'26
R.O.W. ACQUISITION:
MSD
# PLATS: [
FY 17-18
$0.00
CONTRACTOR:
TBD
FY 18-19
$0.00
CONSTRUCTION ADM.:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
1
]
PROJECT DESCRIPTION: This project is to add a permanent back-up generator to the District's Mountain View Pump Station. Gas and electrical lines will be extended down Pinehurst Circle to a new site on the Buncombe FY 23-24 County Board of Education parcel. This project will allow for emergency operation and routine maintenance of FY 24-25 this pump station. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
ED
Plant Headworks Improvements Project No. 2015004
R
/
VE RI ID RS NOT TO SCALE
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Plant Headworks Improvements
LOCATION:
MSD-Treatment Plant
TYPE:
Treatment Plant
PIPE RATING:
N/A
PROJECT NO.
2015004
TOTAL LF:
0
PROJECT BUDGET:
$11,538,575.00
PROJECT ORIGIN:
Facilities Plan Update - HDR
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
EST. BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN
$2,275.00
$2,250.00
$25.00
55330 - DESIGN
$800,000.00
$207,967.00
$478,033.00
55340 - PERMITS
$32,000.00 $7,848.00
$452.00
55350 - SPECIAL STUDIES
$114,000.00 $32,000.00
$8,300.00
55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION 55430 - CONST. CONTRACT ADM.
$10,328,000.00
$5,164,000.00
$368,000.00
$147,000.00
55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
$11,538,575.00
$218,065.00
ENGINEER:
TBD
HC
R.O.W. ACQUISITION:
N/A
# PLATS: [ 0 ]
CONTRACTOR:
$478,510.00
$5,457,000.00
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$5,385,000.00
FY 18-19
$0.00
CONSTRUCTION ADM.:
TBD
FY 19-20
$0.00
INSPECTION:
TBD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is a recommendation from the Facilities Plan Update, a WRF master planning document completed by HDR in April 2015. This project consists of a new influent screening FY 23-24 facility, new grit removal system, fine screening facility, and surge/equalization basins and pumping station at the French Broad River WRF. The upgrades will improve downstream water quality and shave peak FY 24-25 flows into the WRF. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
ED
Plant High Rate Primary Treatment Project No. 2015054
R
/
VE RI ID RS NOT TO SCALE
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Plant High Rate Primary Treatment
LOCATION:
MSD-Treatment Plant
TYPE:
Treatment Plant
PIPE RATING:
N/A
PROJECT NO.
2015054
TOTAL LF:
0
PROJECT BUDGET:
$10,962,000.00
PROJECT ORIGIN:
Facilities Plan Update - HDR
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
EST. BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN
$960,000.00
$960,000.00
55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$9,608,000.00
55430 - CONST. CONTRACT ADM.
$384,000.00
55440 - TESTING
$10,000.00
55450 - SURVEY - ASBUILT TOTAL AMOUNT
$10,962,000.00
$0.00
ENGINEER:
TBD
HC
R.O.W. ACQUISITION:
N/A
# PLATS: [ 0 ]
CONTRACTOR:
$0.00
$960,000.00
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$5,006,000.00
FY 18-19
$4,996,000.00
CONSTRUCTION ADM.:
TBD
FY 19-20
$0.00
INSPECTION:
TBD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is a recommendation from the Facilities Plan Update, a WRF master FY 23-24
$0.00
planning document completed by HDR in April 2015. High rate primary treatment will improve water quality FY 24-25 ahead of the RBC's thereby extending their useful life and improving treatment efficiency. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
RBC Replacement
LOCATION:
MSD-Treatment Plant
TYPE:
Treatment Plant
PIPE RATING:
N/A
PROJECT NO.
2007068
TOTAL LF:
0
PROJECT BUDGET:
$1,536,800.00
PROJECT ORIGIN:
Obsolete / Failing equipment
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
EST. BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$1,536,800.00
$1,032,340.00
$1,536,800.00
$1,032,340.00
$174,460.00
$330,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
ENGINEER:
MSD
HC
R.O.W. ACQUISITION:
MSD
# PLATS: [
CONTRACTOR:
$174,460.00
$330,000.00
ESTIMATED BUDGETS - FY '18 -'26 0
]
FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM.:
MSD
FY 19-20
$0.00
INSPECTION:
MSD
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is for the replacement of the existing Rotating Biological Contactors (RBC's). The existing RBC's were installed in the 1980's, and as time has progressed, units have required FY 23-24 replacement. Twenty RBC's were replaced in FY14-15; ten will be replaced in FY15-16; and ten will be FY 24-25 replaced in FY16-17. FY 25-26 SPECIAL PROJECT NOTES:
MSD has saved significant funds by purchasing used units (in excellent condition) which match the existing units.
$0.00 $0.00 $0.00
/
26
§ ¦ ¨
South French Broad Carrier Bridge PER Project No. 2016022
40
§ ¦ ¨
240
§ ¦ ¨
NOT TO SCALE
40
§ ¦ ¨
Budget Map
of BUNCOMBE COUNTY, NORTH CAROLINA
METROPOLITAN SEWERAGE DISTRICT
240
§ ¦ ¨
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
South French Broad Carrier Bridge PER
LOCATION:
Buncombe County
TYPE:
Treatment Plant
PIPE RATING:
N/A
PROJECT NO.
2016022
TOTAL LF:
0
PROJECT BUDGET:
$400,000.00
PROJECT ORIGIN:
Future Planning
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES
$400,000.00
$400,000.00
55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION 55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
$400,000.00
$0.00
ENGINEER:
TBD
HC
R.O.W. ACQUISITION:
N/A
# PLATS: [ 0 ]
CONTRACTOR:
$0.00
$400,000.00
ESTIMATED BUDGETS - FY '18 -'26 FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
TBD
FY 19-20
$0.00
INSPECTION:
N/A
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This will be a flow modeling evaluation of several large sewer interceptors in the FY 23-24
$0.00
South French Broad, Lower Swannanoa, and Carrier Bridge areas. The study will identify undersized lines FY 24-25 based on current and future flow, and will include phased recommendations for improvements. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
General Capital Equipment
LOCATION:
Varies
TYPE:
General Capital
PIPE RATING:
N/A
PROJECT NO.
2016072
TOTAL LF:
0
PROJECT BUDGET:
$1,500,000.00
PROJECT ORIGIN:
T. Hartye, S. Powell
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
EST. BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$1,500,000.00
$150,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
$1,500,000.00
$0.00
$0.00
$150,000.00
ENGINEER:
MSD
EB
ESTIMATED BUDGETS - FY '18 -'26
R.O.W. ACQUISITION:
N/A
# PLATS: [
FY 17-18
$150,000.00
CONTRACTOR:
N/A
FY 18-19
$150,000.00
CONSTRUCTION ADM.:
MSD
FY 19-20
$150,000.00
INSPECTION:
MSD
FY 20-21
$150,000.00
FY 21-22
$150,000.00
FY 22-23
$150,000.00
PROJECT DESCRIPTION: This is for the purchase of capital equipment in excess of $15,000. Examples FY 23-24
$150,000.00
0
]
include pumps, plant equipment, computer servers, large concrete saws, etc.
SPECIAL PROJECT NOTES:
Total Estimated project cost shown is the total within the ten year window.
FY 24-25
$150,000.00
FY 25-26
$150,000.00
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Mull Building Improvements
LOCATION:
Mull Building
TYPE:
General CIP
PIPE RATING:
N/A
PROJECT NO.
2016043
TOTAL LF:
0
PROJECT BUDGET:
$68,000.00
PROJECT ORIGIN:
T. Hartye, E. Bradford
ESTIMATED PROJECT COST
DESCRIPTION
TOTAL EXPENDS THRU 12/31/15
EST. COST JAN - JUNE 2016
EST. BUDGET FY 16-17
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$68,000.00
$68,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
$68,000.00
$0.00
ENGINEER:
MSD
EB
R.O.W. ACQUISITION:
N/A
# PLATS: [
CONTRACTOR:
$0.00
$68,000.00
ESTIMATED BUDGETS - FY '18 -'26 0
]
FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM.:
N/A
FY 19-20
$0.00
INSPECTION:
N/A
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
PROJECT DESCRIPTION: This project is to improve the efficiency and customer service of the MSD plan review process. It will provide for a paperless plan review system, and is expected to speed review time and FY 23-24 allow for easier communication among parties to the MSD development process. It will also provide for new FY 24-25 carpet, furntiture, and a monitor in the MSD Board Room, which is in need of replacement. FY 25-26 SPECIAL PROJECT NOTES:
$0.00 $0.00 $0.00
Capital Improvement Program Fiscal Years 2017-2026
Design, Right of Way, & Construction Management Expenses
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Design, ROW, & Const. Mgmt. Exp.
LOCATION:
MSD/ENG
FUND:
F01
PIPE RATING:
N/A
ACCOUNT CODE:
N/A
TOTAL LF:
PROJECT BUDGET:
$28,998,216
PROJECT ORIGIN:
ESTIMATED PROJECT COST
DESCRIPTION
SALARIES & BENEFITS
0
TOTAL EXPENDS THRU 12/31/15
CIP Expenses
EST. COST JAN - JUNE 2016
EST. BUDGET FY 16-17
$24,808,314.80
$978,355.00
$1,073,264.00
$2,164,041.87
$1,891,563.25
$76,598.00
$100,410.00
$165,002.02
$171,385.00
$6,400.00
$8,550.00
$14,950.00
$0.00
$275.11
(Includes Proj. Mgmt., ROW, Const. and a portion of GIS and Plan. & Dev.)
SUPPLIES (Includes Proj. Mgmt., ROW, Const. and a portion of GIS and Plan. & Dev.)
FLEET
CAPITAL EQUIPMENT
$3,153.87
DEBT EXPENSE
$2,123,799.00
$92,298.00
$111,310.00
$202,217.00
$28,998,215.92
$1,153,651.00
$1,293,534.00
$2,546,486.00
(Bond Debt Expenses)
TOTAL AMOUNT
ENGINEER:
N/A
EB PLATS: [
ESTIMATED BUDGETS - FY '18 -'26
R.O.W. ACQUISITION:
N/A
FY 17-18
$2,658,847
CONTRACTOR:
N/A
FY 18-19
$2,727,386
CONSTRUCTION ADMINISTRATION:
N/A
FY 19-20
$2,797,917
INSPECTION:
N/A
FY 20-21
$2,863,784
FY 21-22
$2,931,476
FY 22-23
$3,001,123
PROJECT DESCRIPTION: This line item is for expenses related to the District's Capital Improvement Program FY 23-24
$3,072,736
]
(CIP). Included are salaries for the CIP Division, capital equipment, and bond debt expenses related to the FY 24-25 financing of the CIP program. FY 25-26 SPECIAL PROJECT NOTES:
$3,146,420 $3,252,040
Future years assume 3.0% increase per year for all items except Debt Expenses. Estimated Debt Expenses provided by the Finance Department. Total Estimated Project Cost shown is the total within the ten year window.
Capital Improvement Program Fiscal Years 2017-2026
Reimbursement Projects
This Page Intentionally Blank
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Black Mtn. Annex. - Craigmont Rd.
LOCATION:
Black Mountain
TYPE:
Reimbursement
PROJECT NO.
1992173
TOTAL LF:
0
PROJECT BUDGET:
$0.00
PROJECT ORIGIN:
Consolidation Agreements
ESTIMATED
TOTAL EXPENDS
EST. COST
EST. BUDGET
PROJECT COST
THRU 12/31/15
JAN - JUNE 16
FY 16-17
DESCRIPTION
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION 55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
ENGINEER:
$0.00
Administered by Town of Black Mountain
R.O.W. ACQUISITION:
$0.00
$0.00
ESTIMATED BUDGETS - FY '18 -'26
EB # PLATS: [
CONTRACTOR:
$0.00
]
FY 17-18
$0.00
FY 18-19
$0.00
CONSTRUCTION ADM:
Administered by Town of Black Mountain
FY 19-20
$0.00
INSPECTION:
MSD/Black Mountain
FY 20-21
$0.00
FY 21-22
$0.00
FY 22-23
$0.00
Reimbursement project in accordance with Consolidation Agreement. FY 23-24 Estimated project cost was $420,000 in FY 07. FY 24-25
$0.00
FY 25-26
$0.00
PROJECT DESCRIPTION:
SPECIAL PROJECT NOTES:
MSD Share is 35% in accordance with Consolidation Agreement. Project will be budgeted when town decides to construct it.
$0.00
Metropolitan Sewerage District of Buncombe County, North Carolina
CAPITAL IMPROVEMENT PROGRAM BUDGET DATA SHEET - FY 2016 - 2017
PROJECT:
Developer Reimbursements
LOCATION:
Various
TYPE:
Reimbursement - Annual
PROJECT NO.
2004051
TOTAL LF:
0
PROJECT BUDGET:
$1,000,000.00
PROJECT ORIGIN:
Economic Development Policy
ESTIMATED
TOTAL EXPENDS
EST. COST
EST. BUDGET
PROJECT COST
THRU 12/31/15
JAN - JUNE 16
FY 16-17
DESCRIPTION
55310 - PRELIM. ENGINEERING 55320 - SURVEY - DESIGN 55330 - DESIGN 55340 - PERMITS 55350 - SPECIAL STUDIES 55360 - EASEMENT PLATS 55370 - LEGAL FEES 55380 - ACQUISITION SERVICES 55390 - COMPENSATION 55400 - APPRAISAL 55410 - CONDEMNATION 55420 - CONSTRUCTION
$1,000,000.00
$0.00
$1,000,000.00
$0.00
$100,000.00
$100,000.00
55430 - CONST. CONTRACT ADM. 55440 - TESTING 55450 - SURVEY - ASBUILT TOTAL AMOUNT
ENGINEER:
KJ
R.O.W. ACQUISITION:
# PLATS: [
$100,000.00
$100,000.00
ESTIMATED BUDGETS - FY '18 -'26 ]
FY 17-18
$100,000.00
CONTRACTOR:
FY 18-19
$100,000.00
CONSTRUCTION ADM:
FY 19-20
$100,000.00
INSPECTION:
FY 20-21
$100,000.00
FY 21-22
$100,000.00
FY 22-23
$100,000.00
PROJECT DESCRIPTION: This is for reimbursements for extensions that qualify under the District's FY 23-24
$100,000.00
Extension Policy. Refer to the "Policy and Procedures for the Extension of Sewer Service" for further FY 24-25 information. FY 25-26 SPECIAL PROJECT NOTES:
Total Estimated project cost shown is the total within the ten year window. The Board approved up to $200,000 per year for these projects.
$100,000.00 $100,000.00