Skip to main content

Growing in Grace Master Site Plan

Page 1

LEGEND PRIORITY PROJECTS 1. CHAPEL RENOVATION 2. SECURE ENTRY / ADMIN ADDITION 3. SCIENCE, CAREER AND TECHNOLOGY 1. CHAPEL RENOVATION EEDUCATION ADDITION 2. SECURE ENTRY / ADMIN ADDITION 1. TEARDROP CHAPEL RENOVATION 4. REDESIGN 3. SCIENCE, CAREER AND TECHNOLOGY 2. PARKING SECURE ENTRY / ADMIN ADDITION 5. EXPANSION EDUCATION ADDITION 3. SCIENCE, CAREER AND TECHNOLOGY 6. CAFETERIA FLOORING 4. TEARDROP REDESIGN ADDITION 7. EDUCATION 6-LANE TRACK AND FIELD SPORTS 5. PARKING EXPANSION 4. SERVICE TEARDROP REDESIGN 8. DRIVE 6. CAFETERIA RENOVATION 5. ACTIVITY PARKING CENTER EXPANSION 9. 7. 6-LANE TRACK AND FIELD 6. CAFETERIA RENOVATION 8. SERVICE DRIVE 7. 6-LANE TRACK AND FIELD PROJECTS UNDERWAY OR COMPLETED 9. MARCHING BAND FACILITY 8. SERVICE DRIVE 10. CAREER LEARNING CENTER RENOVATION 9. MARCHING BAND FACILITY 11. CLASSROOM FURNITURE AND TECHNOLOGY 10. CAREER LEARNING CENTER RENOVATION 12. MAIN GYM ROOF 11. CLASSROOM FURNITURE AND 13. CHILLER / BOILER REPLACEMENT TECHNOLOGY 12. MAIN GYM ROOF VISIONARY PROJECTS 13. CHILLER / BOILER REPLACEMENT 14. FOOTBALL FIELD RETURF 15. PARKING RESURFACING 16. BASEBALL TOILET FACILITY 17. BASEBALL FIELD TURF

MASTER SITE PLAN Mater Dei High School

SEPTEMBER 2025 Not to Scale


Turn static files into dynamic content formats.

Create a flipbook