A New Approach to Pharmacy Delivery MMA has developed a new approach to pharmacy delivery: a permanent, fully finished CVS pharmacy designed and pre-manufactured as a modular FF&E system, then assembled within the host retail environment in days rather than weeks. The fundamental difference is simple: Rather than relying on conventional field construction using metal studs, gypsum board and multiple sequential trades, the pharmacy is transformed into a precision-manufactured, pre-engineered kit of parts.
We are not building the pharmacy in the store.
WE ARE ASSEMBLING IT IN THE STORE.
The structural framework, modular wall panels, electrical infrastructure, security ceiling, doors, valance and other components are manufactured and coordinated before arriving at the project site. Once delivered, these components are assembled, connected, equipped and commissioned within the host store.
MASSA MULTIMEDIA ARCHITECTURE
The
concept
applies
assembly-line
manufacturing principles to pharmacy delivery. Fabrication is moved away from the retail environment and into controlled
manufacturing
facilities
where dimensions, finishes, electrical infrastructure and individual components can be coordinated before they ever reach the store. For CVS, the pharmacy becomes less like a conventional construction project and more like a manufactured product.
PRE-MANUFACTURE. DELIVER. ASSEMBLE. CONNECT. OPEN. This is the foundation of speed to market.
3297 Route 66, Neptune, NJ 07753 – (732) 898-7882
CVS Modular Pharmacy
MASSA MULTIMEDIA ARCHITECTURE
3297 Route 66, Neptune, NJ 07753 – (732) 898-7882
CVS Modular Pharmacy
Designed around the CVS Prototype The proposed modular pharmacy has been developed
The objective is not to redesign the CVS prototype. It is to demonstrate how the prototype can be translated into a pre-manufactured, repeatable modular system. The platform is inherently adaptable. Depending upon
directly around the CVS pharmacy prototype.
CVS’s program requirements and the available host-
The fundamental layout and functionality remain
reduced or reconfigured while maintaining the same
substantially consistent with that prototype. Only minor dimensional adjustments have been introduced where necessary to coordinate the CVS layout with the modular structural column grid and manufactured panel system.
MASSA MULTIMEDIA ARCHITECTURE
store environment, the pharmacy can be expanded, basic modular methodology. The result is not a one-size-fits-all box. It is a repeatable platform capable of adapting to different pharmacy sizes and configurations.
Visualize It
Engineer It
Pre-Manufacture It
From Visualization to Fabrication In addition to the conceptual renderings contained throughout this presentation, MMA has developed a
series
of
preliminary
fabrication
drawings
demonstrating how the modular pharmacy can actually be manufactured and assembled. While these drawings remain conceptual and will continue to be developed and coordinated with CVS, they contain sufficient information to communicate the structural grid, modular wall system, mesh security ceiling, lighting, perimeter valance, openings and other major components of the proposed assembly.
Assemble It
Repeat It
The adjustments required to accommodate the modular column grid and manufactured panel system are extremely minor. The fundamental layout, functionality and operational intent of the CVS prototype remain intact. The renderings demonstrate what the finished pharmacy can become. The fabrication drawings demonstrate how we intend to manufacture and assemble it. Together, they move the concept beyond visualization and begin to establish a practical system capable of progressing from prototype to fabrication to deployment.
3297 Route 66, Neptune, NJ 07753 – (732) 898-7882
CVS Modular Pharmacy
Floor Plan
MASSA MULTIMEDIA ARCHITECTURE
Elevations
3297 Route 66, Neptune, NJ 07753 – (732) 898-7882
CVS Modular Pharmacy
The Pre-Manufactured System The pharmacy utilizes a 3¾-inch post-and-beam superstructure integrated with 3½-inch modular wall panels to create a durable, highly finished permanent enclosure. The wall system extends approximately 10 feet above the finished floor, coordinated with the upper post-and-beam structure. Above the pharmacy, a prefabricated white-finished open-mesh security ceiling is mechanically secured to the modular superstructure. The mesh provides the required secure enclosure while maintaining an open relationship with the surrounding big-box environment. Its open configuration allows conditioned air and ambient light from the host building to penetrate the pharmacy. Supplemental surface-mounted lighting below the mesh provides the lighting levels required for pharmacy operations. Because the pharmacy is effectively a box within the larger conditioned box, the intent is to utilize the host building’s conditioned environment through the open-mesh ceiling rather than introduce a separate conventional ducted HVAC system within the modular pharmacy, subject to final engineering and site-specific conditions. A custom perimeter valance, fascia and signage system completes the enclosure, screens the upper portion of the modular assembly and provides a finished architectural framework for CVS-approved graphics and signage. MASSA MULTIMEDIA ARCHITECTURE
3297 Route 66, Neptune, NJ 07753 – (732) 898-7882
CVS Modular Pharmacy
Doors, Security & Access Control
data and access-control systems, allowing CVS’s specialty contractors to install their respective systems through infrastructure already incorporated into the manufactured assembly. The
Pharmacy entrances incorporate solid wood doors within aluminum frames with glazed transoms, coordinated to match the CVS prototype. Door hardware will similarly match the applicable CVS prototype requirements. The
modular
system
superstructure
also
provides
coordinated
mounting and support conditions for the overhead rollup security doors, which will be installed by the CVS contractor. Security and access-control requirements are therefore considered during manufacturing rather than becoming field modifications to a completed enclosure.
incorporates
the
required
conduits, electrical boxes and pathways for security,
MASSA MULTIMEDIA ARCHITECTURE
Lighting
Plug-And-Play
Electrical & Technology
Surface-mounted pharmacy lighting is installed on the modular mesh ceiling by the CVS electrical contractor and connected to the system’s electrical infrastructure,
Electrical infrastructure is integrated into the premanufactured wall system, with UL-listed receptacles, boxes, conduits and modular wiring components coordinated with CVS requirements before the system arrives on site.
using either conventional switching or wireless/ Bluetooth controls. Based on experience with similar projects, MMA recommends evaluating wireless lighting controls for this application. With this approach, power is provided directly to the
Once the pharmacy is assembled, the CVS electrical contractor installs the required electrical panel and makes the necessary connections to the modular wiring
fixtures while switching, dimming and lighting control can be accomplished wirelessly, eliminating much of the dedicated control wiring and associated conduit
harness and designated junction points.
typically required for conventional wall-mounted
From those connections, the modular pharmacy’s
connected and controlled through another simplified
lighting controls. The fixtures are then powered,
electrical distribution operates as a plug-and-play
plug-and-play approach to field assembly.
system, reducing field wiring, labor and coordination. CVS’s
technology
contractor
can
install
data,
communications and access-control cabling through pre-installed conduit pathways, resolving much of the coordination before the pharmacy reaches the store.
3297 Route 66, Neptune, NJ 07753 – (732) 898-7882
CVS Modular Pharmacy
Millwork, Gondolas, Shelving & Casework The current modular pharmacy pricing includes the millwork, casework, gondolas and shelving required for the pharmacy. However, the system is intentionally designed to give CVS flexibility in procuring these components. If CVS has existing preferred manufacturers, national purchasing agreements or more advantageous pricing for casework, gondolas, shelving or related fixtures, those manufacturers can be utilized and their products coordinated with the modular platform.
THE MODULAR ENCLOSURE IS THE PLATFORM. The fixture package can be supplied through MMA’s proposed manufacturers or through CVS’s preferred vendors. Wherever
practical,
MMA
recommends
utilizing
freestanding gondolas, shelving, casework and fixtures rather than attaching these components permanently to the modular wall panels.
MASSA MULTIMEDIA ARCHITECTURE
The modular superstructure is capable of providing
leaving unnecessary penetrations or damage to the
attachment and support where required. However,
modular panels.
unnecessary penetrations are intentionally avoided. This protects the finished wall panels and becomes particularly
important
if
the
pharmacy
is
later
reconfigured or relocated, as freestanding fixtures can simply be removed, repositioned and reused without
DESIGN EVERY COMPONENT WITH ITS NEXT USE IN MIND. That philosophy helps preserve the pharmacy as a reusable asset rather than a one-time installation.
3297 Route 66, Neptune, NJ 07753 – (732) 898-7882
CVS Modular Pharmacy
FF&E — A Different Entitlement Strategy
The entitlement effort can be focused principally
A fundamental distinction of this approach is that the
Exact requirements remain subject to the applicable
modular pharmacy is designed and delivered primarily as FF&E — a manufactured furniture and equipment system rather than conventionally constructed interior walls. The walls are not being framed, boarded and finished in place as traditional architectural partitions. They arrive
on the building and life-safety components that remain applicable, including such items as egress, fire alarm, electrical connections, accessibility and other jurisdictionally required life-safety provisions.
Authority Having Jurisdiction and project-specific conditions, but the FF&E delivery model substantially reduces
the
conventional
field-construction
component of the pharmacy.
THIS IS AN IMPORTANT PART OF SPEED TO MARKET.
as manufactured components and are assembled within the host environment.
The goal is not simply to assemble the pharmacy faster. The goal is to compress the entire delivery process —
That distinction can significantly streamline the
entitlement, fabrication, site preparation, assembly and
entitlement and permitting process.
opening.
MASSA MULTIMEDIA ARCHITECTURE
Cost Segregation & Accelerated Depreciation
Assembled Not Built The fundamental advantage of pre-manufacturing is that the activity occurring inside the retail environment
The FF&E strategy also creates the potential for meaningful
cost-segregation
and
accelerated-
depreciation benefits.
of manufactured, demountable FF&E components than
conventional
permanent
building
construction, qualifying components may be eligible for shorter depreciable lives through an appropriate cost-segregation analysis. Final tax treatment and asset classification will remain subject to CVS’s accounting and tax review. However, the potential financial benefit reinforces why the modular pharmacy should be evaluated based upon its total lifecycle value, rather than simply comparing initial cost with conventional construction. That lifecycle value includes speed to market, reduced field construction, entitlement efficiencies, potential accelerated depreciation and the ability to reuse and redeploy the asset.
Traditional construction requires raw materials and multiple trades to arrive at the site and progressively
Because substantial portions of the pharmacy consist rather
changes from construction to assembly.
create the finished pharmacy. The modular approach reverses that process. The components arrive already manufactured, finished, coordinated and ready for assembly. This substantially reduces cutting, framing, finishing and field fabrication. It reduces the number of trades simultaneously working within the store and minimizes dust, debris and disruption to the surrounding retail operation. Most importantly, it dramatically compresses the field schedule. We Don’t Build the Pharmacy On-Site. We Pre-Manufacture It Off-Site and Assemble It OnSite. That is what creates speed to market.
3297 Route 66, Neptune, NJ 07753 – (732) 898-7882
CVS Modular Pharmacy
Scalable by Design
More
importantly,
multiple
pharmacies
can
be
manufactured in parallel. They can then be packaged, shipped to multiple
The opportunity becomes considerably larger when the system is viewed not as a solution for one pharmacy, but as a scalable CVS deployment platform.
pharmacy packages can move through production concurrently.
assembled
by
multiple
teams
simultaneously.
Conventional construction generally requires each location to progress through its own field-construction sequence.
Based upon the current manufacturing strategy, pharmacy
and
This changes the equation entirely.
Once the modular configuration is approved, multiple
individual
locations
packages
can
be
pre-
manufactured within an anticipated 8-to-12-week production cycle, subject to final scope, material availability and production capacity.
Pre-manufacturing allows CVS to create a production pipeline.
MANUFACTURE IN PARALLEL. DEPLOY SIMULTANEOUSLY. Five pharmacies do not necessarily have to mean five sequential construction projects. Ten pharmacies do not necessarily have to mean ten independent construction schedules. The modular platform provides the opportunity to manufacture multiple pharmacy packages concurrently and assemble them at multiple locations at the same time. This transforms speed to market from a single-project benefit into a portfolio-wide strategy.
MASSA MULTIMEDIA ARCHITECTURE
Rack. Stack. Deploy. The system also creates the opportunity to manufacture ahead of immediate demand. Standardized pharmacy components — or complete pharmacy packages — can be manufactured, packaged, staged and held until CVS is ready for deployment. Rather than beginning fabrication after each location is released, CVS can maintain a pipeline of modular
As opportunities are identified, the package can be released, shipped and assembled.
PRE-MANUFACTURE AHEAD OF DEMAND. RACK AND STAGE. SHIP WHEN REQUIRED. ASSEMBLE IN DAYS. This creates a level of deployment flexibility that conventional field construction simply cannot provide.
components ready for shipment.
3297 Route 66, Neptune, NJ 07753 – (732) 898-7882
CVS Modular Pharmacy
MASSA MULTIMEDIA ARCHITECTURE
Permanent Installation. Portable Asset. Perhaps the most significant long-term advantage of the modular system is that permanent does not have to mean permanently fixed to one location. The pharmacy is designed to provide the durability, security, appearance and functionality expected of a permanent CVS pharmacy while remaining demountable, reconfigurable, transportable and reusable. This fundamentally changes the lifecycle economics of the pharmacy. With conventional construction, a future store remodel or relocation can require the existing pharmacy to be demolished and much of the original investment discarded. With modular delivery, CVS has another option. If the host store is remodeled and the pharmacy needs to move, the modular pharmacy can be demounted and reassembled in another location within the same facility. If CVS ultimately needs the pharmacy somewhere else, it can be demounted, packaged, transported and reassembled at another location. The pharmacy is therefore not necessarily an investment permanently tied to the real estate in which it was originally assembled. It Becomes a Portable Asset.
3297 Route 66, Neptune, NJ 07753 – (732) 898-7882
CVS Modular Pharmacy
Demount. Relocate. Reassemble. Reuse. Demounting the modular pharmacy is essentially the reverse of the original assembly process. The post-and-beam superstructure, modular wall panels, mesh security ceiling, valance and integrated systems are coordinated components that can be disconnected and disassembled rather than demolished, allowing the same methodology that supports rapid assembly to also enable demounting within a compressed timeframe. During a future remodel, CVS could temporarily shut down the pharmacy, demount the modular system and reassemble it in a new permanent position within the same store. Where maintaining pharmacy operations is critical, CVS could also consider utilizing a floater modular pharmacy. A floater could be assembled and commissioned in advance, allowing pharmacy operations to transition while the existing unit is relocated or surrounding renovations proceed; once the permanent pharmacy is operational, the floater can be demounted, packaged and moved to the next project. This creates the potential for CVS to maintain a portfolio of reusable pharmacy assets rather than repeatedly constructing and demolishing pharmacies as stores evolve. The original capital investment does not necessarily disappear simply because the real estate changes.
MASSA MULTIMEDIA ARCHITECTURE
Built To Last. Designed To Move. Demountability should never be confused with temporary construction. This is intended to be a permanent, durable and highly finished pharmacy environment. Its modularity simply gives CVS something conventional construction generally cannot: the ability to move the asset without destroying it. The pharmacy may remain in its original location for its entire useful life, be modified as CVS’s needs evolve, move within the same store during a future remodel, or be demounted, shipped and reassembled somewhere else.
PERMANENT INSTALLATION. PORTABLE ASSET.
3297 Route 66, Neptune, NJ 07753 – (732) 898-7882
CVS Modular Pharmacy
Visualization & Design Intent
Similarly, the preliminary fabrication drawings included within this presentation remain conceptual. They have been developed to provide CVS with a meaningful understanding of how MMA envisions the system being manufactured and assembled and how closely the proposed modular configuration follows the CVS
The imagery contained within this booklet is intended to demonstrate the architectural quality, flexibility and potential of the modular pharmacy system. The renderings are conceptual visualizations and are not intended to establish, redesign or modify CVS’s architectural, interior-design or branding standards. Colors, finishes, graphics, signage, millwork and other visual elements shown are illustrative and intended to demonstrate how refined and permanent a premanufactured modular pharmacy can appear. Final selections will be coordinated with CVS and the applicable CVS prototype requirements.
MASSA MULTIMEDIA ARCHITECTURE
prototype. These studies contain enough information to establish the fundamental assembly methodology while allowing the system to continue to evolve through coordination with CVS and the individual manufacturers. The renderings communicate the vision. The fabrication drawings communicate the method. Together, they demonstrate that modular does not have to look temporary and that the concept is capable of progressing into a practical, repeatable manufactured solution.
From One Pharmacy to a Deployment Platform
The Modular Advantage Permanent Installation. Portable Asset. Pre-Manufactured Off-Site. Assembled On-Site.
The larger opportunity is not simply to deliver one pharmacy faster.
Speed to Market.
It is to establish a repeatable CVS pharmacy platform that can be pre-manufactured, staged, shipped, assembled,
expanded,
Assembled in Days — Not Built Over Weeks.
reduced,
reconfigured,
Scalable Across Multiple Locations. Manufacture in Parallel. Deploy
demounted and redeployed as CVS’s needs evolve.
Simultaneously.
A pharmacy can be manufactured for one specific
Rack. Stack. Ship. Assemble.
location.
FF&E. Streamlined Entitlement.
Multiple pharmacies can be produced simultaneously
Potential Cost-Segregation & Accelerated-
for a coordinated rollout.
Depreciation Benefits.
Components can be manufactured ahead of demand
Minimal Dust. Minimal Disruption.
and staged until required.
Plug-and-Play Electrical & Technology.
CVS can utilize MMA’s proposed casework and fixture
Integrated Security & Access Control.
manufacturers or integrate its own preferred national
Flexible Fixture & Casework Procurement.
vendors. And when the real estate changes, the pharmacy itself does not necessarily become obsolete.
IT CAN MOVE.
Durable. Demountable. Reconfigurable. Relocatable. Transportable. Reusable. An Investment Designed to Be Reused Not Demolished.
3297 Route 66, Neptune, NJ 07753 – (732) 898-7882
CVS Modular Pharmacy
The idea is Simple Visualize it Repeat it
Engineer it Deliver it
Pre-manufacture it Assemble it
Open it
And when CVS’s needs change:
Demount it. Relocate it. Reassemble it. Reuse it. The result is more than a faster way to deliver a pharmacy.
It is a different way to think about the pharmacy itself:
A permanent CVS pharmacy transformed from a conventional construction project into a premanufactured, scalable and portable asset.
MASSA MULTIMEDIA ARCHITECTURE
3297 Route 66, Neptune, NJ 07753 – (732) 898-7882
MASSA MULTIMEDIA ARCHITECTURE www.mma-architects.com
Gabriel J. Massa RA, AIA, NCARB PRINCIPAL-IN-CHARGE 732.310.5630 gmassa@mma-architects.com
Jaime Capron RA, AIA, NCARB PRINCIPAL 732.557.1866 jcapron@mma-architects.com
Studio B - 3297 Route 66 - Neptune, NJ 07753