P O R POR T F O T F O L I O L I O Marsha Ferguson Marsha Ferguson Architecture Portfolio Architecture Portfolio
MARSHA FERGUSON PROFILE INFO Produced day-to-day construction documents and graphic design representations while engaging with clients and consultants across project phases, currently pursuing architectural licensure.
WORK EXPERIENCE Architectural Designer II
2023 - Present
Newground International Supported client and consultant communications across all project phases, serving as the primary point of contact on select projects while coordinating with architects, designers, and MEP/Structural/Civil engineering consultants Produced construction documents for retail clients, conducting site surveys, code and zoning research, and due diligence reports ensuring regulatory compliance
CONTACT INFO Phone 312-765-3137
Email renee41085@gmail.com
Location Chicago, IL.
CONTENTS
Collaborated with senior leadership on scheduling, staffing,
01 - MOVING ARTS CENTER
and timeline management across multiple concurrent retail projects Project Coordinator Holabird and Root
02 - WOLF POINT TOWERS 2019 - 2023
03 - POLK STREET RESIDENCE
Prepared drawings for contract phases from schematic design through bid/permit, including details, sections, elevations, and schedules. Produced amendments, addenda's, and bulletins as well as provided Construction Administration assistance.
04 - MATIAS SOTO STREET DINING ROOM 05 - PROFESSIONAL WORKS
Performed code reviews and calculations according to
MY SKILLS ADVANCED Autodesk - AutoCAD, Revit Sketch-Up Bluebeam Revu Microsoft - Teams, Word, Excel, PowerPoint, Outlook PROFICIENT Adobe Creative Suite InDesign, Photoshop, Illustrator Enscape
specified standards and code reviews. CAD Designer
06 - ADDITIONAL WORKS 2017 - 2019
Weaver Consultants Group Created groundwater elevation contour maps from survey data. Conducted research on site boundary's and contextual history. Produced site location and layout maps specifying boundary and conditions. Survey Drafter
2018 - 2018
Associated Surveying Group, LLC Produced plat of surveys for residential projects. Reviewed legal description and subdivision plats to ensure the correct easements and setbacks. Compared Surveyor measurements with archived site measurements.
FAMILIAR WITH ProCore 3DS Max Rhino Grasshopper
EDUCATION HISTORY Prof. Bachelor Of Architecture
2014 - 2019
Illinois Institute of Technology Major: Architecture Harold Washington College
2003 - 2014
HOLABIRD & ROOT Position - Project Coordinator I SEASONS RETIREMENT COMMUNITIES SENIOR HOUSING DEVELOPMENT During my time at Holabird & Root, I worked on various projects related to healthcare, CHA housing, senior housing, and education at both the K-12 and college levels. Notably, I contributed to the new Senior Retirement Development in St. Catharines, Ontario, Canada. This is a multi-phased project and includes the development of a six-story building with 143 units. Numerous spaces within the development were designed to cultivate a sense of community amongst residents. These spaces include dining facilities, a large kitchen, theater, games/activity room, exercise room, party room, social gathering areas, outdoor patio, and more. The project is situated on a 10-acre site and will include a total of 560 retirement units spread throughout the development. My main focus was the construction document phase, where I honed my Revit skills and adapted to the workflows of a large-scale team. I worked under tight deadlines, helped package drawings to meet milestones, and gained a deeper understanding of effective coordination within complex projects.
Softwares: Revit / Enscape / Photoshop
Location // St. Catharines, Ontario, Canada Type // Senior Housing Development Size // 143 units
CURATED MATERIAL COLORS FOR THE EXTERIOR FACADE: After selecting James Hardie board as the building's exterior material, I was responsible for choosing a color palette to share with the client for review. The initial color options included shades typical of the client’s previous developments, while also introducing a few slightly cooler tones.
Palette Option #2
Designer Cream
Spun Silk
Artic White Artic White
LightLight MistMist
Praline
Baby Chick
Artic White
Light Mist
Gold Rush
Good Fortune
Artic White
Cobble CobbleStone Stone
Golden Harvest
Spun Silk
Gray Slate
Palette Option #3
Options:
Design Manufacturer:
Design Manufacturer:
Design Product:
Design Product:
Palette Option #4
Dream Collection James Hardie Plank Lap Siding – Smooth Finish James Hardie Reveal Panel System – Smooth Finish
Palette Option #1
Palette Option #5
Sugar Maple
Spun Silk
Artic Artic White White Artic Artic White White
Cobble Stone Cobble Stone Cobble Stone Cobble Stone Cobble Stone Cobble Stone
Cobble Cobble StoneStone
SEASONS ST. CATHARINES
/
COLOR COMPARISONS M. FERGUSON
/
09/25/20 Comm. No.
15726.1A
COLOR COMPARISON EXERCISE:
STONE ROX - MOUNTAIN LEDGE LOYALIST GREY: STONE ROX - MOUNTAIN LEDGE LOYALIST GREY:
During the later stages of the project, the exterior building material was changed from James Hardie board to EIFS. Since the owner had already approved the colors to be used, I was tasked with conducting a color comparison between the two materials to ensure that the new material matched the previously approved colors. BENJAMIN MOORE COLORS: BENJAMIN MOORE COLORS:
NORTH ELEVATION RENDERING
EIFS-4 EIFS-3
1" = 60'-0" EIFS-4 EIFS-3 EIFS-4 EIFS-2
EIFS-3 EIFS-1
EIFS-2
EIFS-1
EIFS-2
EIFS-1
JAMES HARDIE COLORS: JAMES HARDIE COLORS:
SOUTH ELEVATION RENDERING 1" = 60'-0" COLOR CODES COMPARISONS: MATERIAL CODE: APPROVED JAMES HARDIE COLORS: COLOR CODES COMPARISONS:
BENJAMIN MOORE COLOR CODES:
FC-1 to EIFS-1 MATERIAL CODE:
COBBLE STONE APPROVED JAMES HARDIE COLORS:
REVERE PEWTER BENJAMIN MOOREHC-172 COLOR CODES:
FC-1 FC-2 to to EIFS-1 EIFS-2
COBBLE STONE AGED PEWTER
REVERE HC-172 CHELSEAPEWTER GRAY HC-168
FC-2 FC-3 to EIFS-2 EIFS-3
AGED ARCTICPEWTER WHITE
CHELSEA GRAY HC-168 HORIZON 1478
FC-3 to to EIFS-4 EIFS-3 FC-4
ARCTIC WHITE PEARL GRAY
HORIZON 1478 1460 SILVER DOLLAR
FC-4 to EIFS-4
PEARL GRAY
SILVER DOLLAR 1460
STONE ROX - MOUNTAIN LEDGE SANDSTONE BEACH:
BENJAMIN MOORE COLORS:
EAST ELEVATION RENDERING 1" = 60'-0"
BENJAMIN MOORE COLORS: BENJAMIN MOORE COLORS: JAMES HARDIE COLORS: JAMES HARDIE COLORS:
JAMES HARDIE COLORS:
EIFS-2
EIFS-3
EIFS-4
EIFS-1
EIFS-2
EIFS-3
EIFS-4
EIFS-1
WEST ELEVATION RENDERING 1" = 60'-0"
22
EIFS AS SCHEDULED WRB TO WRAP OVER COVER BOARD AT CANOPY ROOF DRIP MATAL FLASHING AT TRANSITION FROM EIFS TO ROOF ROOF MEMBRANE OVER INSUL. AND CANT STRIP AT TRANSITION ROOF MEMBRANE 1/2" COVERBOARD
REFER TO ROOF PLAN FOR CANOPY DRAIN LOCATIONS
1-1/2" METAL DECK
OPEN AIR CAVITY DRAIN TO BE CONNECTED TO CATCH BASIN PIPE AT EXTERIOR
STRUCTURAL THERMAL BREAK IN LINE WITH INSULATION
HSS BEAM, SEE STRUCT. EIFS AS SCHEDULED LINEAR PLANK CEILING BASIS OF DESIGN: ARMSTRONG METALWORKS LINEAR, 8" PLANKS, EFFECTS CHERRY EXTERIOR, M1 UNPERFORATED, W/ 2" EFFECTS WOOD LOOKS TRIM AT FULL PERIMETER. INSTALL USING MANF. STANDARD CEILING STRUCTURE FIELD CUR PER MANF. FOR RECESSED FIXTURES AND PROVIDE BLACK ESCUTCHEONS. FIBER CEMENT TRIM BACKER ROD & SEALANT JT BOTH SIDES AT ALL (4) SIDES OF ALUM FRAME, TYP. ALUM. STOREFRONT SYSTEM, SHIM AS REQ'D CEILING AS SCHEDULED
4 DETAIL AT EAST CANOPY/BUILDING INTERFACE A9-3
1 1/2" = 1'-0"
12
13
14
1' - 0 1/2" 318 mm WINDOW SYSTEM - SHIM AS REQUIRED
0' - 4 1/2" 0' - 4 1/2" 0' - 3 1/2" 111 mm 114 mm 92 mm
CONTINOUS SEALANT AND BACKER ROD
1 LAYER 5/8" GYPSUM BOARD SHEATHING ON 7/8" HAT CHANNEL FURRING OR 2 1/2" METAL STUD @ 24" O.C., MAXIMUM
2' - 0 1/2" 622 mm
CONCRETE SHEAR WALL. SEE STRUCTURAL DWGS.
0' - 3" 0' - 4"
102 mm 79 mm
0' - 8"
203 mm
0' - 4" 98 mm
1' - 2" 352 mm
D
22
0' - 3"
79 mm
EIFS, REFER TO ELEVATION
METAL STUD HEADER OVER R.O., TYP.
ST-1 STONE VENEER BATT INSULATION 1 LAYER 5/8" GYPSUM BOARD SHEATHING ON 6" METAL STUDS 24" O.C.
FIBER CEMENT TRIM BACKER ROD & SEALANT JT BOTH SIDES AT ALL (4) SIDES OF ALUM FRAME, TYP.
EIFS
ALUM STOREFRONT SYSTEM, SHIM AS REQ'D
G2 - SPANDREL, SEE A4-1
WOOD BLOCKING - AS REQUIRED, TYP.
FIBER CEMENT TRIM BACKER ROD AND SEALANT EACH SIDEOF SHIM
1 PLAN DETAIL - EXT. CORNER AT SHEAR WALL - DINING HALL A5-9
9 SECTION DETAIL - SPANDREL GLASS @ TOP OF WINDOW A5-11 1 1/2" = 1'-0"
1 1/2" = 1'-0"
?
PLAN NORTH
N 3' - 2" TYP. UNO
M
6"
L
2' - 6 3/4"
152 mm
781 mm 1' - 6 5/8" 472 mm
6 1/4"
6' - 10 3/8"
157 mm
2094 mm
9
VAPOR RETARDER MEMBRANE (6 MIL MIN.)
2' - 0"
2" 51 mm 6"
330 mm TERMINATION BAR W/ CONT. BEAD OF SEALANT ALONG TOP OF FLASHING, TYP.
CONCEALED CLIPS, TYP. AS REQ'D BY MANF.
DRIP METAL FLASHING AT TRANSITION FROM EIFS TO ROOF
UNDERLAYMENT PER MANF. OVER PLYWOOD DECK, SLOPED 1" PER 12". REFER TO SHEET A2-5 FOR ROOF PLAN LAYOUT. PROVIDE CONTINUOUS SNOW GUARD (DOUBLE RAIL TYPE) AT LOW ENDS OF SLOPES, CLIPPED TO SEAMS PER MANF. TYP.
EXTENT OF FIELD APPLIED STUCCO BY EIFS MANF.
5/8" SHEATHING
12" TYP. OR PER MANF.
12
LIGHT-GUAGE METAL FRAMING BY EIFS MANF.
1 METAL COPING W/ DRIP EDGE.
6"
6 3/8"
5/8" 3"
"Z" CLOSURE
2' - 10"
9" 2 1/4"
B / ROOF 21.26m +69' - 9"
PROVIDE BLOCKING AS REQUIRED TO ACHIEVE SLOPE AND PREVENT DEFLECTION.
2X6 METAL FRAMING @ 24" O.C.
56 mm
AIR SPACE
STANDING SEAM METAL ROOF, MS2 2" DEEP MECHANICALLY SEAMED, PROVIDE "DOUBLE FOLD" TYPE SEAMS BY WESTERN STATES METAL ROOFING MANF., WITH MIN. 40 YEAR WARRANTY; INSTALL AS PER MANF. REFER TO SECTION 074113.13. PROVIDE BUTYL TAPE AT LAPS BETWEEN METAL PANELS. CONC ROOF SLAB. REFER TO STRUCT. DWG'S
229 mm
EIFS-3
1' - 1"
152 mm
CONTINUOUS 4" SOFFIT VENT WITH INSECT SCREEN
1" AIR BARRIER - WRAP CONTINUOUS INSIDE OF OPENING
3/4" EXTERIOR GRADE PLYWOOD SHEATHING
25 mm EQ
LOOSE FILL INSUL. AT BALC. CEILINGS, TYP.
SST FLASHING 1" REVEAL AT EIFS FIBER CEMENT TRIM
ALUM. STOREFRONT.
1 TYPICAL SECTION DETAIL - PARAPET AND BALCONY CANOPY A5-13 1 1/2" = 1'-0"
1"
25 mm
TERMINATION BAR W/ CONT. BEAD OF SEALANT ALONG TOP OF FLASHING, TYP.
610 mm
8"
MIN. WOOL INSULATION W/ INTEGRATED COVER; R-40 (10" AVG. THICKNESS) 1/4" : 12" MIN. SLOPE TO ROOF DRAIN, TYP.
203 mm
CANT STRIP OR LARGE DIA. BACKER ROD.
864 mm
3"
77 mm
11"
279 mm
WRAP MEMBRANES SO COPING AND FLASHING OVERLAPS MEMBRANES, TYP.
EIFS-4 ON 2" RAILS.
EQ
1" REVEAL EA. SIDE. ALIGN OUTSIDE EDGES TO FINISH FACES OF WALL AS SHOWN.
162 mm 16 mm 77 mm
TAPERED INSUL.
151 mm
METAL COPING WITH DRIP EDGES BOTH SIDES
1
2
35' - 10" 10922 mm
3
22' - 2" 6756 mm
4
16' - 10" 5131 mm
5
24' - 0" 7315 mm
9' - 4" 2845 mm
6
7
8' - 2" 2489 mm
8
15' - 2" 4623 mm
9
9' - 0" 2743 mm
14' - 4" 4369 mm
10
5' - 3" 1600 mm
11
12
7' - 3" 2210 mm
10' - 10" 3302 mm
13
14
15
16
2' - 7" 3' - 8" 7' - 8" 787 mm 1118 mm 2337 mm
17
18
19 20
7' - 4" 2' - 1" 2235 mm 635 mm
13' - 8" 4166 mm
2' - 1" 635 mm
21
2' - 11" 889 mm
12' - 0"
13' - 4" 4064 mm
22 11' - 2" 3404 mm
12' - 0"
TECHINCAL SKILLS / DESIGN / SPATIAL PLANNING / COORDINATION:
23 13' - 1" 3988 mm
12' - 0"
A STAIR C ST-C
3404 mm
11' - 2"
A 12' - 0"
B
1' - 4 1/2" 425 mm
3 A6-8 D MED CL. 126A
11' - 0"
12' - 0"
ACTIVITY OFFICE 110
DEMO KITCHEN 125
10' - 0"
10' - 0"
STOR. 113
5 A9-2
3' - 0"
12' - 0"
8' - 0"
8' - 0"
12' - 0"
TOILET 179
TOILET 178
CSM OFFICE 171
MED ADMIN 168
9' - 0"
9' - 0"
9' - 0"
9' - 0"
SERVICE 131
10' - 0"
MED FILES 167
10' - 6"
10' - 0"
L
10' - 0"
UNISEX TOILET 129
M
9 1/4" 237 mm
10' - 0"
10' - 0"
12' - 0"
5994 mm
12' - 0"
ELEV. #1 E-1
LOUNGE 121
10' - 6" MICRO MARKET 125A
10' - 6"
10' - 0"
2 A6-13
ELEV. #2 E-2
12' - 0"
10' - 0"
ELEV. #3 E-3
VESTIBULE 133
10' - 0"
Q
13
10' - 6"
7' - 0"
EQ
9' - 0" TRASH 165 N.C.
10.08
13 10' - 0" N.C.
MC UNIT 156
10' - 0"
10' - 0"
MC UNIT 153
1' - 5" 436 mm
10.08
9' - 0"
1' - 2" 358 mm
13' - 0"
3962 mm
A9-1B 1" = 1'-0"
10' - 0"
10' - 0"
13 X
ROOF HATCH
8 GA. HANGER WIRE 24" O.C.
CORRIDOR 141
Y 13
6" STEEL C TRACK 25 GA.
10' - 0"
10.08
10.08
10.08
10.08
10.08
10.08
10.08
MC UNIT 142
10.08
1" LINEAR PANEL SHAFT LINER
10' - 0"
10' - 0"
2" X 6" MINERAL WOOL
10.08
10.08
AA 3200 mm
5 A6-20
BB
AA 4" CT STUDS 20 GA. 24" O.C. MAX.
BB 4 A6-20
1 100 LEVEL REFLECTED CEILING PLAN
PLAN NORTH
0
MC UNIT 151
MC UNIT 150
10' - 0"
10' - 0"
MC UNIT 149
10' - 0"
3/32" = 1'-0"
1
2
3
LIGHT FIXTURE AS SCHEDULED. SEE RCP FOR LOCATION AND REFER TO ELECT. DWG'S FOR SPEC.
Z
MC UNIT 152
A3-2
12 SOFFIT TRANSITION @ SALON
MC UNIT 140
3' - 0" 914 mm
10.08
10' - 6"
W
MC UNIT 139
CL
2' - 4" 706 mm
10.08
10' - 0"
10' - 0"
Z
13
JC 163 N.C.
2' - 3 1/2" 694 mm
7' - 3"
2210 mm
7' - 4"
LOUNGE 159
COURTYARD 165D
10.08
MC UNIT 154
Y
V
10' - 0"
10.08
10' - 0"
10' - 0"
U
MC UNIT 138
STOR. 172
MC UNIT 155
X
GPDW SOFFIT ON LIGHT GAUGE METAL FRAME
10' - 0" READING / WRITING LOUNGE 160
LIGHT FIXTURES AS SCHEDULED
3' - 0 1/2" 930 mm
MC UNIT 137
N.C.
5969 mm
19' - 7"
13
10.08
914 mm
20' - 7"
6274 mm 1880 mm
6' - 2" 7' - 3"
2210 mm
W
FILES 162
10.08
8' - 0"
CEILINGS AS SCHEDULED. REFER TO RCP FOR HEIGHTS
10' - 0"
9' - 0"
2 A6-15
12' - 0"
EXAM 173
T
MC UNIT 136
10.08
10' - 0"
10' - 6"
10.08
10' - 0"
2235 mm
12' - 0"
12' - 0"
10' - 0" CORRIDOR 157
10' - 6"
12' - 0"
MC UNIT 158
2x6 METAL BLOCKING @ 24" O.C. TO DECK BRACE AS NEEDED
9' - 0"
1' - 6" 455 mm
10' - 0"
9' - 0"
V
TOILET 164
10' - 0" 9' - 0"
QUIET ROOM 176
S
10' - 0"
3' - 8" 1114 mm
T
STOR 177 9'-6"
EXERCISE 180
1' - 1" 326 mm
12' - 3"
3733 mm
10.08
10.08 STAIR A ST-A
UNDERSIDE OF DECK
MC UNIT 135
10' - 0" MAIL 181
8' - 0"
10.08
12' - 0"
10' - 0"
R 2 A9-3
STOR. 170
2 A6-14
8' - 0"
Q
13
13
10' - 0"
EQ
10' - 0"
2 A6-11
U
13
MEDS 169 N.C.
EQ
14' - 6"
4420 mm
10' - 6"
SALON 182
N.C.
MC UNIT 134
13 13
S
N.C.
BAS CLOSET 165C N.C.
3' - 0"
13' - 1"
3988 mm
10' - 0"
10' - 6"
A9-1B 1" = 1'-0"
LAUNDRY 166
10' - 0" 10' - 6"
13 BULKHEAD TRANSITION @ MC NURSE STATION
10' - 0" EQ
EQ
7' - 0"
EQ
10' - 6" 10' - 0"
P
CORRIDOR 122
STAIR B ST-B
10' - 6"
13
10' - 0"
LIGHT FIXTURES AS SCHEDULED
O
DATA CLOSET #2 132
CORRIDOR 122
PUB/GAMES 120
9' - 0"
GPDW SOFFIT WRAP VERTICAL SUPPORTS
STAFF ROOM 130
12' - 0"
12' - 0"
1251 mm
N
12' - 0"
10' - 0"
12' - 0"
4' - 0"
9' - 0"
* BALCONY ABOVE
7' - 0"
ALIGN SOFFIT TO COLUMN
13
1' - 2 7/8" 378 mm
12' - 0" 13
K
9' - 0"
9' - 0"
2 A6-12 13
10' - 0"
2 A6-16
914 mm
13
CEILINGS AS SCHEDULED. REFER TO RCP FOR HEIGHTS
STORAGE 184
8' - 6" 7' - 0"
2x6 METAL BLOCKING @ 24" O.C. TO DECK BRACE AS NEEDED
J
9' - 0"
TOILET 123
MAIN DATA ROOM 115
I
MANAGER OFFICE 183
8' - 6"
9' - 0"
9' - 0"
CLOSING ROOM 102
10' - 0"
TOILET 124
CACF 119
OFFICE 104
10' - 0"
* BALCONY ABOVE
12' - 0"
10' - 6"
H
12' - 0" 30" x 40" LOUVER SOFFITS AS PER TYPICAL SPECIFICATION, REFER TO MECHANICAL SHEETS.
8' - 0"
BUSINESS MANAGER OFFICE 103
G KITCHEN 127
9' - 0"
9' - 0"
10' - 0"
F
12' - 0" 12' - 0"
1' - 0" 305 mm
12' - 0"
12' - 0"
10' - 0"
JAN. CL. 127D
12' - 0"
OFFICE 111
WORK ROOM 114
3150 mm 1' - 8" 508 mm
10' - 4" 5' - 5"
10' - 0"
N.C.
12' - 0"
1' - 4" 10' - 4"
LEASING MANAGER OFFICE 105
CANOPY, SEE ENLARGED PLANS FOR FURTHER DETAIL
19' - 8"
11' - 0"
E
13
R
12' - 0"
10' - 6"
12' - 0"
9' - 0"
1981 mm 1651 mm
6' - 6" 10' - 1"
P
9' - 0"
12' - 0"
12' - 0"
STOR. 112
3073 mm
O
10' - 0"
THEATER/ CHAPEL 109
10' - 6"
10' - 0"
L
N
TOILET 108
8' - 10" 2688 mm
10' - 0"
M
SPA 107
12' - 0"
K
CL
13
12' - 0"
10' - 10"
3302 mm
1' - 9"
3150 mm 406 mm 3048 mm 533 mm
10' - 0"
J
1' - 8"
I
10' - 0"
508 mm
H
11' - 4"
G
JC 117 N.C.
2 A6-10
CORRIDOR 118
3454 mm
F
11' - 0" 10' - 6"
CRAFTS 106
D
1 A6-9B C
DINING 126
10' - 0"
1' - 6" 458 mm
11' - 8"
3556 mm
12' - 6"
3810 mm
12' - 0" 10' - 6"
C
E
B
11' - 0"
While learning to create construction documents for the first time on my initial project, I was responsible for developing a clear and legible reflected ceiling plan. My task involved identifying the optimal locations for the surrounding lights in relation to the placement of the coffered ceilings. I also needed to coordinate with both the Mechanical and Electrical engineers to determine the best placement for the diffusers. This project posed challenges due to the limited space available for ductwork, which often required us to adjust our lighting arrangements while ensuring adequate illumination for each area and maintaining aesthetics.
6" UNO
0
4
5
6
7
8
1' - 6" 455 mm MC UNIT 148
6 A6-19
10' - 0"
MC UNIT 147
1' - 6" 453 mm MC UNIT 146
MC UNIT 145
10' - 0"
10' - 0"
10' - 0"
1' - 6" 455 mm MC UNIT 144
10' - 0"
MC UNIT 143
ALIGN SAW-CUT OPENING TO UNDERSIDE OF LANDING @ 10'-0" A.F.F. (VIF) & ALIGN VESTIBULE CEILING.
3 LAYERS 5/8" TYPE X GYPSUM WALL BOARD 2- HOUR FIRE RATED GYPSUM CEILING ASSEMBLY; UL DESIGN G586 STAIR
VESTIBULE
FIRE SEALANT FULL PERIMETER @ ALL JOINTS
10' - 0"
11 CEILING TRANSITION @ VEST. 133 AND STAIR B 9
10
11
12
13 14
15
16
17
18
19 20
21
22
23
A9-1B 1 1/2" = 1'-0"
4" CT STUDS 20 GA. 24" O.C. MAX.
9
10
W26
CONC. BEAM PER STRUCT. DWGS
4" 102 mm TYP.
MOUNT LINEAR COVE LIGHT FIXTURE TO INSIDE OF COVE, FULL PERIMETER SO THAT IT ILLUMINATES THE EDGES OF THE SOFFITS.
4" 102 mm TYP.
6" 152 mm UNO
4" 102 mm TYP.
ALIGN SOFFIT TO EDGE OF WALL.
6" 152 mm UNO.
4" 102 mm TYP.
WRAP GPDW ALL SIDES OF COVE AROUND FULL PERIMETER.
VARIES REFER TO PLANS
FIREPLACE; REFER TO INTERIOR DWG FOR DETAILS.
CEILINGS AS SCHEDULED, SEE RCP.
33
SOFFIT TRANSITION @ MICROMARKET SOFFIT TRANSITION @ MICROMARKET A9-1D 1 1/2" = 1'-0"
A9-1D 1 1/2" = 1'-0"
0' - 2" 48 mm
BATHROOM POD DOOR OPENING FINISHED BY MANF.
STUDS ANCHORED TO SHEAR WALL AND FRAMING OF BATHROOM POD DOOR AS SCHEDULED
CONTRACTOR TO INSTALL 5/8" GPDW AND PAINT AS SCHEDULED.
BATHROOM POD WALL BY MANF.
CONC. SHEAR WALL. SEE STRUCT. DWGS
JAMBDETAIL DETAILATAT BATHROOM POD DOOR ADJACENT SHEAR JAMB BATHROOM POD DOOR WITHWITH ADJACENT SHEAR
WALL 7 WALL
A9-1C A9-1C 111/2" 1/2"= =1'-0" 1'-0"
STEEL BEAM REFER TO STRUCT. DWG'S.
2x6 METAL BLOCKING @ 24" O.C. TO DECK BRACE AS NEEDED
6" UNO
ALIGN SOFFIT TO COLUMN
CEILINGS AS SCHEDULED. REFER TO RCP FOR HEIGHTS ALIGN GPDW SOFFIT TO MULLION
3 SOFFIT TRANSITION @ THEATER/ CHAPEL A9-1C 1" = 1'-0"
NEWGROUND INTERNATIONAL Position - Architectural Designer II PANDA EXPRESS - RETAIL PROTOTYPE WASHINGTON, PA - GROUND-UP At Newground International, I gained hands-on experience with both ground-up construction and renovation projects for retail prototypes. As an Architectural Designer II, I was responsible for coordinating between various consultants, including our MEP and structural teams as well as the owner’s consultants for civil, landscape, and signage. Working on retail prototypical projects such as Panda Express provided me with valuable insights into disciplines beyond architecture. For the Washington, PA project, my role involved producing site test fit options to assist the client in determining which prototype could be applied to the site. I evaluated the maximum amount of parking that could be provided according to code regulations, the best access from the road based on said regulations, and the maximum number of cars that could fit in the drive-through, also in compliance with code regulations.
Softwares: AutoCAD / SketchUp / Powerpoint
Location // Washington, PA Type // Retail Prototype / Ground-up Construction Size // 2,400 sf
HOBBY LOBBY FIVE BELOW
FUTURE MENARDS AND DICK’S ANCHOR
40 36 29 31 39
30
32 35
27
TACO BELL
30
30
43
7
CHICK FIL A
7
WALNUT GRILL WASHINGTON
31
34
37 33
27
OLIVE GARDEN
28
28 24 20
10
19 11
18 9 12
7
15 14
13 45
45
CONSIDERATIONS: • 2400 PANDA HOME COMPACT (FACING AWAY FROM ROAD) • PARKING REQ MET • DT 2-2-1 • ACCESS POINT TO OLD MILL BLVD • CROSS-ACCESS POINT TO ADJACENT PROPERTY
13
46
7
VERSION: PARKING: DT STACK:
R2 39 (-12) 21 (+5)
CONSIDERATIONS: • 2400 PANDA HOME COMPACT (FACING AWAY FROM ROAD) • WILL REQUIRE PARKING VARIANCE • DT 2-2-1 w/ MOD ESCAPE LANE • ACCESS POINT TO OLD MILL BLVD • ACCESS POINT TO SECONDARY ROAD • NO CROSS-ACCESS POINT TO ADJACENT PROPERTY
46
15
17
12 14
9
16
1
16
17
1
R1 59 (+8) 10 (-6)
2
2
18
APPENDIX – PH 2700 FLOOR PLAN
PREFERRED FLOOR PLAN (COMPACT) VERSION: PARKING: DT STACK:
3
3 11
6
CONSIDERATIONS: • 2400 PANDA HOME COMPACT (FACING AWAY FROM ROAD) • PARKING REQ MET • DT 2-2-1 w/ MOD ESCAPE LANE • ACCESS POINT TO OLD MILL BLVD • ACCESS POINT TO SECONDARY ROAD • CROSS-ACCESS POINT TO ADJACENT PROPERTY
21 4
19
9
6
4
22
10
8
20
5
7
9
5
8
21
44
22
PREFERRED 51 16
44
25 30
23
7
31 25
23
26
26 24
GABE’S DISCOUNT STORE
9
9
VERSION: PARKING: DT STACK:
33
ZOUP! CHIPOTLE LONG HORN STEAKHOUSE
ASAHI ALL YOU CAN EAT
32
FIVE GUYS ITALIAN VILLAGE PLAZA
38
VALLEY POOL & SPA
43
38
39 31 35 37
EXISTING CLEAN EXPRESS AUTO WASH
41
BUFFALO WILD WINGS ANYTIME FITNESS
42
SPORTSMAN’S WAREHOUSE
VERSION: PARKING: DT STACK:
R3 30 (-21) 21 (+5)
CONSIDERATIONS: • 2700 PANDA HOME (FACING AWAY FROM ROAD) • WILL REQUIRE PARKING VARIANCE • DT 2-2-2 • ACCESS POINT TO OLD MILL BLVD • ACCESS POINT TO SECONDARY ROAD • NO CROSS-ACCESS POINT TO ADJACENT PROPERTY
NEWGROUND INTERNATIONAL Position - Architectural Designer II PANDA EXPRESS - RETAIL PROTOTYPE HARWOOD HEIGHTS, IL - GROUND-UP At Newground International, I gained hands-on experience with both ground-up construction and renovation projects for retail prototypes. As an Architectural Designer II, I was responsible for coordinating between various consultants, including our MEP and structural teams as well as the owner’s consultants for civil, landscape, and signage. Working on retail prototypical projects such as Panda Express provided me with valuable insights into disciplines beyond architecture. For the Harwood Heights, IL project, my role involved creating the construction drawing set based on the approved building prototype for the site. Panda Express provided a standard drawing set that served as a template, which I modified to accommodate the specific conditions and materials for this project. Additional changes to the drawing set included addressing health or permit-related comments, implementing design updates from the client, incorporating COMcheck results from our engineers, and ensuring compliance with code regulations.
Softwares: AutoCAD / SketchUp
Location // Harwood Heights, IL Type // Retail Prototype / Ground-up Construction Size // 2,693 sf
TECHINCAL SKILLS / COORDINATION:
CANOPY BY SIGNAGE VENDOR DASHED SHOWN FOR CLARITY
CL
10'-1"
10 A-400.1
11'-3"
T.O. CANOPY 11'-7"
5° 68. T CU
2" SPACING TYP.
3'-2"
B.O. CANOPY 10'-7" FURRING STRIPS BY GC
CANOPY BY SIGNAGE VENDOR
GUTTER DOWNSPOUT BY SIGNAGE VENDOR
SINGLE PLY PARAPET MEMBRANE
ST-1S
STONE CAP BY GC ST-1
COMPOSITE DECKING OVER 1 X PVC VERTICAL SLEEPERS/BATTENS @ 16" O.C. (PAINTED FLAT BLACK) (PAINTED FLAT BLACK) OVER RMAX ECOBASE-CI INSULATION (MIN R9.8) W/ LIQUID APPLIED WEATHER BARRIER OVER 1/2" EXTERIOR PLYWOOD SHEATHING. REFER SPECS & SHEET A-201 FOR INSTALLATION SEQUENCE.
STONE FINISH BY GC COLUMN FOOTINGS BY GC
22'-9"
PATIO CANOPY ELEVATION Scale= 1/4" = 1'-0"
09 A-400.1
CL
9 1/4"
4'-2 1/4"
OC5 OC6
CANOPY BY SIGNAGE VENDOR DASHED SHOWN FOR CLARITY
B.O. CANOPY 10'-7"
4"X4"X1/4" COLUMN BY SIGNAGE VENDOR
B.O. WOOD BULKHEAD FRAMING 10'-1"
8"X8"X1/2" BASE PLATE BY SIGNAGE VENDOR
B.O. WOOD HEADER & FINISH 10'-0"
11'-3"
3'-0"
OC6
TRIM BY GC
ACOUSTICAL CEILING TILE ON T-BAR. REFER SPECS & FINISH SCHEDULE ON SHEET A-105
CL
OC6
4"X4"X3/16" TUBE BY SIGNAGE VENDOR
CL
OTC2
OT12
COMPOSITE DECKING BY GC
EXPAND-O-FLASH PVC BELLOWS ND FLASHING FLAP BY GC
04 A-405
4"
OC5
GUTTER EXTRUSION BY SIGNAGE VENDOR
TRIM BY GC
BLOCKING. REF. STRUCTURAL
12'-9" 12'-0 1/2"
TRIM BY GC
SINGLE PLY ROOF MEMBRANE OVER POLY-ISO INSULATION OVER PLYWOOD DECKING (REFER SPECS FOR R-VALUE)
1 1/2"
1 1/2"
For this project, at the request of the approving jurisdiction, we were required to include a patio seating area with shade coverage. Since Panda Express does not always include patios in their developments, no standard prototypical drawings were created for the canopy itself. Initially, we were unsure about the design of the canopy, and it took multiple discussions with the client to gain clearer insight into the overall vision.
L-ANGLE BY GC
CD-1
23'-0"
4"
CL
COMPOSITE DECKING BY GC
4 A-306
PANEL SEAM
BRAKE METAL FLASHING
OC6
GUTTER DOWNSPOUT BY SIGNAGE VENDOR T.O. STONE CAP 3'-2"
SLOPE
4"X4"X3/16" TUBE BY SIGNAGE VENDOR
OC6
CL
1'-4"
7'-0"
OC6
4 A-405 OC5
OC5
OC5
1 A-302
05 A-400
KNEE WALL REF. STRUCTURAL
OC5
CONCRETE FLOOR SLAB REFER STRUCTURAL. FINISH AS SCHEDULED
ADHERED STONE AS SCHEDULED OVER METAL LATH OVER RMAX ECOBASE-CI INSULATION (MIN R9.8) W/ LIQUID APPLIED WEATHER BARRIER
FOUNDATION WEEP SCREED SELF LEVELING SEALANT CONC. FOUND. REF. STRUCTURAL
8 X 8 X .75 BASE PLATE, STEEL A36; REF STRUCTURAL FINISHED FLOOR 0'-0"
SLOPE
EXPANSION JOINT
FINISHED FLOOR 0'-0"
FOUNDATION - REFER STRUCTURAL EXTEND INSULATION 24" BELOW FINISHED FLOOR (MIN. R-15)
REF. STRUCT.
1'-0"
9'-0 1/2"
FLOOR FINISH. REFER TO FLOOR FINISH PLAN FOR MORE INFORMATION.
CL
OC5
2X WOOD FRAMING REF. STRUCTURAL
10 3/4"
OT12
ADHERED STONE OVER METAL LATH OVER VAPOR BARRIER; ADHERED STONE TO TURN AT EXPOSED CORNER; BY GC ST-1
CUT STONE CAP BY GC ST1S
WINDOW SILL 3'-2"
1'-4 1/2"
OC15 OC5
DOUBLE 2X WOOD STUDS @ 16" O.C. AT SIDE WALLS (DECK BEARING) ONLY REFER STRUCTURAL
10'-1"
2 A-302
1 1/2"
4" MIN.
OC6
T.O. CONCRETE 2'-11"
4 A-306 23'-0"
3'-0"
OC6
PLAN VIEW
VERIFY WITH MANF. SHOP DWGS
CL
21'-4"
STANDING SEAM ROOFING BY SIGNAGE VENDOR
VERIFY WITH MANF. SHOP DWGS
CL
PRE-MANUFACTURED ALUM. SWOOP ELEMENT PROVIDED BY PANDA VENDOR AND INSTALLED BY PANDA VENDOR. TOP/BOTTOM VARIES, RE: ELEVATIONS T.O. SWOOP VARIES
FOUNDATION - REFER STRUCTURAL
PANDA SCULPTURE. REFER TO CIVIL DRAWINGS.
CL
ENLARGED PATIO FURNITURE PLAN 02 Scale= 1/4" = 1'-0" A-405
WALL SECTION 02 Scale= 3/4" = 1'-0" A-302
WALL SECTION 04 Scale= 1 1/2" = 1'-0" A-306
Our office usually does not design canopies, but since this project was my responsibility, I collaborated closely with the canopy vendor to create detailed plans and elevations. This was essential to provide the vendor with a workable reference. I also coordinated between the canopy vendor and our structural team to ensure the concrete footings for the canopy were properly sized. This task proved to be a challenging lesson in defining the responsibilities surrounding the canopy's design scope. I had to communicate back and forth between the client and the consultants until all details were finalized and ready to be included in the overall construction set.
TECHINCAL SKILLS / COORDINATION / CODE RESEARCH: In developing the construction set for the Harwood Heights Panda Express project, I coordinated the approved floor plan with applicable life-safety requirements. I developed the architectural drawings and verified occupant loads, exit access travel distances, circulation paths, and emergency egress provisions to ensure compliance with applicable building and fire codes. D5
DOOR D5 EXIT FOR EMPLOYEES ONLY 42"/0.2 = 210 MAX.OCCUPANTS
3
1
3 L86 L97
L86 L97
1
Particular attention was given to maintaining functional circulation throughout the kitchen and dining areas while meeting life-safety requirements.
210
3
8
D
OCCUPANT LOAD TABLE FROM IBC CHAPTER 1004.5
L4HO
2
106
105A
B
12
4A-40BC
9
WALK-IN FREEZER
14
7
WOMEN'S ROOM
108
7
L97
100
1" '-0 2
UM IM
3'-0" CLEAR
L NA
TOTAL INTERIOR OCCUPANT LOAD =
73 OCCUPANTS
OUTDOOR PATIO 250 SF GROSS / 15 SF PER OCCUPANT = OCCUPANTS
20
TOTAL EXTERIOR OCCUPANT LOAD =
18 OCCUPANTS
9
3
6 100
3'-0" CLEAR
DINING ROOM
3'-0" CLEAR
10
12 3'-0" CLEAR
11
3'-0" CLEAR
52'-0" PATH OF TRAVEL
28'-9 1 "
10
2
102 2
L4HO
6
111 ENTRY VESTIBULE
9
L4HO
NOTE: DIMENSIONS ARE FROM INTERIOR WALL D1B
DOOR D1B 36"/0.2 = 180 MAX.OCCUPANTS
3
2
2
L4HO
9
L4HO
FIRE EXTINGUISHERS LOCATIONS: FIRE EXTINGUISHERS TO BE PLACED IN ACCORDANCE WITH LOCAL FIRE AUTHORITY REQUIREMENTS AND SECTION 906, IFC.
4
111 4
8
9
EGRESS
ENTRY VESTIBULE
SYMBOL LEGEND EXIT CAPACITY
L97
L86
1
4
12
-FIXTURE TYPES L1EM, L19W-EM, L19B-EM ARE INTERIOR EMERGENCY LIGHTS. -FIXTURE TYPE L4HO IS INTERIOR EXIT SIGN. -FIXTURE TYPES L86 & L97 ARE EXTERIOR EGRESS LIGHTS.
11
2
DRIVE-THRU STATION
L4HO
6
12
3'-0" CLEAR
4 EXIT SE PARAT
ION
EMERGENCY AND EGRESS LIGHTING: EMERGENCY AND EGRESS LIGHTING IS SHOWN ON SHEET A-105, REFLECTED CEILING PLAN.
102
DOOR D8 EXIT FOR EMPLOYEES ONLY 42"/0.2 = 210 MAX.OCCUPANTS
22
KITCHEN
DRIVE-THRU STATION
FINAL CORE DRILL LOCATIONS FOR FURNITURE / EQUIPMENT SHALL BE VERIFIED WITH PANDA EXPRESS DESIGN MANAGER PRIOR TO DRILLING.
4
1
103
D8
44
CORRIDORS / VESTIBULE NOT INCLUDED IN NET AREA 8
5
A DI
1
L4HO
3
KITCHEN
REFER TO VENDOR PACKET FOR ADDITIONAL FURNITURE INFORMATION.
2 6
4
1
103
C
L86
FEC-1
B
STORAGE / MECH 161 SF GROSS / 300 SF PER OCCUPANT = OCCUPANT
L97
5
X MA
DINING ROOM
4
3'-0" CLEAR
6
INDOOR DINING - FIXED SEATING 523 LINEAR INCHES/ 24 LINEAR INCHES PER OCCUPANT = OCCUPANTS
RESTROOM VESTIBULE
K
29
")
GO
4
3'-0" CLEAR
44'-3" PATH OF TRAVEL
71
108
210
'-6
0
9
14
DOOR D2 42"/0.2 = 210 MAX.OCCUPANTS
L86
L4HO
'(75
13
KITCHEN PREP
D2
2
7 =3 "/2
104
12 0" 3'- AR E CL
RESTROOM VESTIBULE
3'-0" CLEAR
KITCHEN PREP
WOMEN'S ROOM
12
KITCHEN 1027 SF GROSS / 200 SF PER OCCUPANT = OCCUPANTS
INDOOR DINING - UNCONCENTRATED (TABLES/CHAIRS) 647 SF NET / 15 SF PER OCCUPANT = OCCUPANTS
107 12
3 CL '-0" EA R
107
28'-8" PATH OF TRAVEL
104
A
3
1 A-503
13
105
D
L97 L86
MEN'S ROOM
4
3'-0" CLEAR
WALK-IN COOLER
2
106 12
16
1 A-503
C
1
2
105A
L4HO
105 WALK-IN COOLER
L4HO
15
MEN'S ROOM
25'-4" PATH OF TRAVEL
WALK-IN FREEZER
A
NOTE: DIMENSIONS ARE FROM INTERIOR WALL
L97 L86
1 D1
1
3
3 8
DOOR D1 84"/0.2 = 420 MAX.OCCUPANTS
REFER TO VENDOR PACKET FOR ADDITIONAL FURNITURE INFORMATION.
L97
L86
1
1
3 8
120
ALLOWABLE
17.8
ACTUAL
3
FINAL CORE DRILL LOCATIONS FOR FURNITURE / EQUIPMENT SHALL BE VERIFIED WITH PANDA EXPRESS DESIGN MANAGER PRIOR TO DRILLING.
420 37
XX'-X" L4HO
210 4
L97
OF HATCH ACCESS
N
EGRESS PLAN 01 Scale= 1/4" = 1'-0" G-006
L86
MAXIMUM TRAVEL DISTANCE FROM FARTHEST POINT UNIVERSAL MOUNT EXIT SIGN, LED LIGHTED, 120/277V WITH BATTERY PACK 2 FACE, GREEN LETTERS EMERGENCY AND SECURITY LIGHTING TO BE INSTALLED JUST BELOW THE CANOPY
N
ACCESSIBILITY PLAN 01 Scale= 1/4" = 1'-0" G-006
EGRESS PATH DISTANCES: A 52'-0" B 28'-8" C 44'-3" D 25'-4" COMMON PATH OF TRAVEL TABLE FROM IBC CHAPTER 1006.2.1 75 FEET MAX. EXIT ACCESS TRAVEL DIST. TABLE FROM IBC CHAPTER 1017.2 200 FEET MAX.
NEWGROUND INTERNATIONAL Position - Architectural Designer II STARBUCKS - RETAIL SHELL PROJECT COLORADO SPRINGS, CO - GROUND-UP For this Starbucks project, I was responsible for developing the architectural model in Revit and producing the Schematic Design (SD), Design Development (DD), and Construction Document (CD) sets in accordance with Starbucks’ design standards and project-specific criteria. My responsibilities included selecting exterior materials based on Starbucks’ established design parameters and translating the design intent into coordinated architectural drawings. Softwares: Revit / Enscape
Location // Colorado Springs, CO Type // Retail Shell Building / Ground-up Construction Size // 2,457 sf
TECHINCAL SKILLS / COORDINATION / MATERIAL SELECTIONS:
RS BL V
PROPERTY LINE
POWE
SITE LEGEND
D
AEROP L
AZA DR .
ZIA CERAMIC TILE SEQUOIA - 2” X 8” - MATTE FINISH EXTERIOR GRADE / EPOXY GROUT COLOR: MAPEI 5039 IVORY
THIN BRICK RUNNING BOND - CHALKDUST - TUNDRABRICK SPECMIX MORTAR - SM750 - SILVERSTONE
Particular attention was given to coordinating site utilities and the trash enclosure. I worked closely with the civil consultant to accommodate changes resulting from the jurisdiction’s review of the civil plans while maintaining alignment with Starbucks’ design standards and local requirements. This project strengthened my experience in multidisciplinary coordination, Revit modeling, and architectural documentation, while reinforcing the importance of clear communication and flexibility in delivering a coordinated design within a demanding schedule.
CONCRETE SURFACE DRYVIT EIFS SANDPEBBLE FINE MATCH TO RAL7044 - SILK GREY Y D
LANDSCAPE AREA
Y
D
H
H
REINFORCED CONCRETE PAVING N
5' PUBLIC IMPROVEMENT EASEMENT
1
0
2000
4000
8000
7' DRAINAGE AND UTILITY EASEMENT (PLAT)
Scale: 1:100
10' LANDSCAPE SETBACK
25' BUILDING SETBACK
20' PUBLIC TRAIL EASEMENT (PLAT)
5' UTILITY EASEMENT
25' BUILDING SETBACK
25
AEROP LAZA D RIV
E
KEY PLAN 1" = 100'-0"
30' LANDSCAPE EASEMENT 6 A101 25
38 384' - 0
28
7
13
28
1
15
1/2"
30 TYP.
40 14
30
TYP.
1
19 TYP.
18' - 6"
43
26
14
38 TYP.
4
29
TYP.
S 005
37
15 21
9
32
PROPOSED STARBUCKS BUILDING FOOTPRINT 2,457 SQFT
17
T/ FINISH FLOOR EL = 0'-0" (ARCH.)
29 1
29 30
1 A105
27 34
1
42 9' - 0"
38
60' - 2 3/4"
18' - 0" Y D
23 22
38
19
18
7 A106
20
38
9
42 31
16
12' - 0"
30
3 42
45' - 3 1/4"
12 TYP.
H
25' BUILDING SETBACK
25 27
24
5' UTILITY EASEMENT
38 6 A101 D
TYP.
29
1 1 A104
H
4
Y
41
1 A106
32 2
35
15
1
25
POWER S
17
BLVD.
33
36
3 A102 41
6
11
8
28
10
28
13
5
28
4 A104
PROPOSED PATIO SPACE 479 SQFT
N
2 1
2
ARCHITECTURAL SITE PLAN 1" = 20'-0" 3
0
500
1000
Scale: 1:20
4
5
1
2 3 A400
C
T.O. SCREEN 23' - 5"
3 1
7
Q MT-01
15
10
11
Q EF-01
Q BR-01
A401
TYP.
TECHINCAL SKILLS / COORDINATION:
2 A401
B
A
Q MT-01
Q EF-01
T.O. PARAPET 19' - 4"
EQ
EQ
8' - 2 1/2"
12' - 0 1/4"
Throughout the project, I coordinated closely with the mechanical, plumbing, structural, and civil consultants, as well as the client, to obtain necessary project information and resolve design-related questions. Due to the tight project timeline, maintaining alignment between the architectural, civil, and MEP drawings was essential. I worked closely with the consultants to identify discrepancies, coordinate design changes, and ensure consistency across the various drawing sets.
7' - 11 1/2"
7
3
A510
A510
10
6 A500
B.O CANOPY 11' - 0" 10 A500
A.F.F
9' - 0"
9' - 0"
A.F.F.
CL
T.O. GLAZING 10' - 0"
B.O. OPENING 3' - 0"
A
T.O. FINISHED FLOOR 0"
1
4 4 A510
Scale:
3
20
6
16
5
4
14
L-03
13
6
Q TL-01
19
8
Q TL-01
6
C
D-01 1
1/4" = 1'-0"
A
T.O. SCREEN 23' - 5"
T.O. PARAPET 19' - 4"
L-02 TYP.
EAST ELEVATION
B
Q MT-01
2
Q BR-01
A400
7
Q EF-01
C
TYP.
4 A510 11 T.O. PARAPET 19' - 4"
T.O. PARAPET 19' - 4"
EXTERIOR WALL LEGEND
Q EF-01 15' - 2 1/4"
20' - 5"
9' - 5"
B.O CANOPY 11' - 0"
ROOF CONSTRUCTION, REFER TO 2/A511
2 A500
T.O. GLAZING 10' - 0"
6 A510
SIGNAGE SHOWN DASHED FOR CLARITY, REFER TO EXTERIOR ELEVATIONS FOR MORE INFORMATION
2
XXXX
5' - 0"
BR-01 THIN BRICK RUNNING BOND - CHALK DUST - TUNDRABRICK
ROOF CONSTRUCTION, REFER TO 2/A511
10
10
EIFS WALL CONSTRUCTION, REFER TO EXTERIOR ELEVATIONS FOR FINISH
14
1
9
A500
A500
A500
EF-01 EIFS, DRYVIT RAL7044 SILK GREY - SANDPEBBLE FINE
EIFS WALL CONSTRUCTION, REFER TO EXTERIOR ELEVATIONS FOR FINISH 6 A510
B.O. TRUSSES 14' - 0"
T.O. FINISHED FLOOR 0"
12
1 8
Q TL-01
WEST ELEVATION Scale:
12
Q TL-01
6
D-02
18
Q MT-02
Q MT-02
Q MT-02
6
Q MT-02
B.O. TRUSSES 14' - 0"
6
1/4" = 1'-0"
4' - 0"
SIM
12
13 A510
SIM
8
13 A510
B.O CANOPY 11' - 0"
PREMANUFACTURED CANOPY
THIN BRICK WALL CONSTRUCTION
T.O. GLAZING 10' - 0"
B.O CANOPY 11' - 0"
14 A510
EIFS WALL CONSTRUCTION
T.O. GLAZING 10' - 0"
REVEAL
BLOCKING, REFER TO STRUCTURAL DRAWINGS
WOOD SHIM
BLOCKING, REFER TO STRUCTURAL
CONTINUOUS SEALANT
BACKER ROD & SEALANT JOINT, TYP. BOTH SIDES
PREMANUFACTURED CANOPY BEYOND
CERAMIC WALL TILE CONSTRUCTION BEYOND, REFER TO EXTERIOR ELEVATION FOR FINISH
CONTINUOUS PREFINISHED FLASHING TO MATCH STOREFRONT FINISH
PREFINISHED CONTINUOUS FLASHING TO MATCH COLOR SW 7004 SNOWBOUND
STOREFRONT SYSTEM, REFER TO EXTERIOR ELEVATIONS AND DOOR/WINDOW SCHEDULE FOR ADDITIONAL INFORMATION
EXTERIOR
THIN BRICK WALL CONSTRUCTION, REFER TO EXTERIOR ELEVATIONS FOR FINISH
THIN BRICK WALL CONSTRUCTION
INTERIOR ALUMINUM STOREFRONT SYSTEM, REFER TO DOOR AND WINDOW SCHEDULE SHEET.
AIR CURTAIN, REFER TO MECHANICAL FOR MORE INFORMATION.
ALUMINUM STOREFRONT SYSTEM, REFER TO DOOR AND WINDOW SCHEDULE SHEET.
12 A510
14
THIN BRICK WALL @ STOREFRONT WINDOW Scale:
7
1 1/2" = 1'-0"
EIFS, THIN BRICK TRANSITION Scale:
1 1/2" = 1'-0" SIDEWALK SLOPE AWAY FROM BUILDING
B.O. OPENING 3' - 0" 2 A510
EIFS WALL CONSTRUCTION PREFINISHED FLASHING TO MATCH EIFS WALL FINISH
CERAMIC WALL TILE CONSTRUCTION, REFER TO EXTERIOR ELEVATION FOR FINISH
1 A510
T.O. FINISHED FLOOR 0"
BLOCKING, REFER TO STRUCTURAL
STAINLESS STEEL SILL W/ HEMMED EDGES
B.O. CANOPY
PREFINISHED .040 ALUMINUM BRAKE METAL ON P.T. 2X BLOCKING
CONCRETE FOOTING AND SLAB, REFER TO STRUCTURAL SHEETS
PREFINISHED FLASHING TO MATCH STOREFRONT
EXTERIOR
3
WALL SECTION Scale:
3/4" = 1'-0"
13
CANOPY DETAIL Scale:
1 1/2" = 1'-0"
T.O. FINISHED FLOOR 0"
SHIM AS REQUIRED
10"
1/2" SEALANT & BACKER ROD JOINT, TYP. BOTH SIDES DRIVE-THRU SHELF, REFER TO 4/A101 FOR MORE INFORMATION
1' - 0"
PREMANUFACTURED CANOPY
CONTINUOUS INSULATION FOR UNHEATED SLAB
9 A510
STOREFRONT SYSTEM AT DRIVE-THRU, REFER TO EXTERIOR ELEVATIONS AND DOOR/WINDOW SCHEDULE FOR ADDITIONAL INFORMATION
CONTINUOUS INSULATION FOR UNHEATED SLAB
GALVANIZED METAL FLASHING
BACKER ROD & SEALANT JOINT, TYP. BOTH SIDES
CONCRETE FOOTING AND SLAB, REFER TO STRUCTURAL SHEETS
CERAMIC WALL TILE CONSTRUCTION
INTERIOR
12
DRIVE - THRU WINDOW Scale:
1 1/2" = 1'-0"
2
WALL SECTION Scale:
3/4" = 1'-0"
TL-01 CERAMIC TILE ZIA CERAMICS - SEQUOIA
EXTERIOR GRADE SCHLUTER STRIP AT CORNER; FINISH TO MATCH COLOR SW 6180 OAKMOSS
BACKER ROD & SEALANT JOINT PREFINISHED FLASHING TO MATCH STOREFRONT
1
2
3
1
4
2
3
42' - 7 1/4"
16' - 1"
4
12' - 7 1/4"
7 A500
15
1
3 A401
5
2
WOOD SHIM
INTERIOR
15
B
10
11 A500
2' - 1"
6' - 8 1/4"
W-07
20
W-08
4' - 7"
A
" 1/4 E : OT OP O SL ER F 7 P
15
BACKER ROD & SEALANT JOINT, TYP. BOTH SIDES
3 20
A
CERAMIC WALL TILE CONSTRUCTION
STOREFRONT SYSTEM, REFER TO EXTERIOR ELEVATIONS AND DOOR/WINDOW SCHEDULE FOR ADDITIONAL INFORMATION
13' - 11"
A300
EXTERIOR
1/2"
A200
10' - 10 1/4" 8 1/2"
4
2
14
4 10
STOREFRONT - WINDOW JAMB AT CERAMIC WALL TILE Scale:
B
1 1/2" = 1'-0"
17' - 8"
14
2
3 A500
5
A401
16' - 1"
11' - 7 1/4"
HOLD
HOLD
13' - 11"
12' - 3 1/2"
TYP.
15
9
INTERIOR 41' - 7 1/4"
6
1
1 7
4
CERAMIC WALL TILE CONSTRUCTION BACKER ROD & SEALANT JOINT
9
17
23' - 7 3/4"
A200
11
EXTERIOR
THIN BRICK WALL CONSTRUCTION
8
W-06 6' - 2"
15 7
1 A107
15
7 1/4" PE: SLO FOOT PER
18
14 13 21 16
53' - 11 3/4"
2 A300
7
1 A401
STARBUCKS 05 2323.36 SF
6
D-01
CL
15
8' - 10"
SLOPE: 1/4" PER FOOT 15
CL 6' - 2"
61' - 8"
45' - 9"
1
54' - 11 3/4"
3
4
SLO P PER E: 1/4" FOO T
41' - 9"
COND.
D-02
12
11
3
CERAMIC TILE, THIN BRICK - CORNER Scale:
1 1/2" = 1'-0"
GROSS AREA: 2,457SF LEASABLE FLOOR AREA: 2,313SF
9
6 12
7
4
BACKER ROD & SEALANT JOINT, TYP. BOTH SIDES 1
WOOD SHIM
GFI
7
19 11' - 8"
W-05
A200
STOREFRONT SYSTEM, REFER TO EXTERIOR ELEVATIONS AND DOOR/WINDOW SCHEDULE FOR ADDITIONAL INFORMATION
10
1
5
13
4
30' - 4"
10
A400
TYP.
4
2
CERAMIC WALL TILE CONSTRUCTION
EXTERIOR GRADE SCHLUTER STRIP AT CORNER; FINISH TO MATCH COLOR SW 6180 OAKMOSS
4"
7
2
8 1/4" PE: SLO FOOT PER
6 3/4" 7' - 11"
A400
CL 1' - 8"
4' - 8"
16' - 6 1/2"
2' - 0"
8' - 2 3/4"
COLUMN, REFER TO STRUCTURAL DRAWINGS
W-04 W-01
4
C
3
A400
8' - 0"
S 001 15
EXTERIOR
9 3/4"
3' - 8"
1
INTERIOR
C
D-03 W-03
GFI
W-02
15
19
4
18
7 3
15
CERAMIC WALL TILE - CORNER Scale:
1 1/2" = 1'-0"
A200 N
N
1
ARCHITECTURAL ROOF PLAN 1/4" = 1'-0"
0
2' Scale: 1/4" = 1'-0"
4'
8'
1
ARCHITECTURAL FLOOR PLAN 1/4" = 1'-0"
0
2'
4'
8'
ROOF LEGEND
Scale: 1/4" = 1'-0"
INDICATES SERVICE WALKWAY THREAD
INDICATES AREA OF TAPERED INSULATION, INSTALL TO PROVIDE SLOPE TO DRAIN
NEWGROUND INTERNATIONAL Position - Architectural Designer II CREDIT UNION HOUSE - FINANCIAL WASHINGTON, DC - RENOVATION OF TWO HISTORICAL BUILDINGS For the Credit Union House project in Washington, DC, I assisted the project architect with the renovation of two historic buildings. My responsibilities included developing architectural plans, elevations, sections, and details based on a Revit model provided by a third-party agency, as well as identifying drawing discrepancies and assisting with design coordination.
Softwares: Revit
Location // Washington, DC Type // Financial / Renovation of two historical buildings Size // Bldg 1: 2,000 sf / Bldg 2: 2,500 sf
A
B
C
D
E
4 5/8" 15' - 2 3/4"
10' - 1 3/8"
ALIGN
1' - 1 3/8"
1' - 1 3/8" 6' - 8 7/8" 10 3/4"
15' - 0" 10 3/4"
3108C B.O. CEILING - VARIES SEE CLNG PLN
6"
6
6
6
4' - 1 1/8"
WOMENS RESTROOM 3108
B.O. SOFFIT - VARIES SEE CLNG PLN
6
1
W
3107
ALIGN
09-65
UP
6
4' - 1 1/8" 6
6
13' - 10 3/4"
9' - 7 5/8"
ALIGN
09-64
7
6
PASSAGE 3105
6
7' - 10 3/4"
1 1/2" = 1'-0"
SOUTH STAIR 3103 E
S.1
A016_B-2
SOFFIT AT WINDOW AND SUSPENDED CEILING
3103A
16' - 1 7/8" VIF
3103B
6
EXTEND MTL STUDS TO UNDERSIDE OF STRUCTURE ABOVE
8 1/2"
11 5/8"
U
5
1' - 10 1/4" 6
5
EXISTING WINDOW
3106
6 ALIGN
4' - 1 3/4"
1' - 5 1/8" 4' - 9 1/2"
WINDOW TRIM
3108A
6D
6
5' - 3 5/8" VIF 1 A007_B-2
1 A022_B-2
ALL-GENDER RESTROOM 3107
11 7/8"
2
E
MTL CORNER BEAD
EVENT SPACE 3104
10 3/4"
A016_B-2
7
CATERING 3106
10' - 4 1/4" VIF
3
A016_B-2
8
8' - 6 1/2"
ELEVATOR 3102
4' - 4 5/8"
1 A020_B-2
NORTH STAIR 3101
ENTRY 3001
(1) LAYER 5/8" GYP BD ON 3 5/8" MTL STUDS
3108B
10 3/4"
+/- 8 7/8" CLEAR STRUCT PLATE
+/- 8 7/8" CLEAR STRUCT PLATE
4.1 PLAN NORTH
N
1
CEILING - AS SCHEDULED
B.O. SOFFIT - VARIES SEE CLNG PLN
6"
1 5/8"
A significant challenge of this project was balancing updated interior requirements with the constraints of the existing historic buildings. Restrictions on exterior modifications limited the ability to alter existing window openings, resulting in discrepancies between window heights and the proposed ceiling heights. I assisted in developing architectural details to illustrate ceiling transitions and clarify their relationship to the existing windows. This project strengthened my experience in architectural detailing, consultant coordination, and problem-solving within the constraints of historic building renovations.
EXTEND MTL STUDS TO UNDERSIDE OF STRUCTURE ABOVE
09-65
9' - 4 1/8"
22' - 7 3/4"
6
1' - 10 1/4" 11 7/8"
4
8 3/8"
MECHANICAL EQUIPMENT, SEE MECH DRAWINGS
21 A014_B-2
+/- 6' - 4 1/8" VIF
18' - 6 3/4" VIF
6
4
17' - 3 1/4"
11 1/8" 4' - 9 7/8"
6
UP
3001
3.2
4' - 4 5/8"
CEILING - AS SCHEDULED
1 A006_B-2
2
3
18' - 2 3/8"
B.O. SOFFIT - VARIES SEE CLNG PLN
1' - 2 3/8"
1.8
TECHINCAL SKILLS / COORDINATION:
G 8' - 5 1/4"
7' - 7 5/8"
1 A008_B-2
0.9 1
F
72' - 5 3/8"
B.O. CEILING - VARIES SEE CLNG PLN
ARCHITECTURAL FIRST FLOOR PLAN
CEILING TRIM
1/4" = 1'-0"
B.O. SOFFIT - VARIES SEE CLNG PLN (1) LAYER 5/8" GYP BD ON 3 5/8" MTL STUDS MTL CORNER BEAD
A
B
C
D
E
GYP. 10' - 0" PT-4 GYP. 10' - 0" PT-4
GYP. SLOPED PT-4
GYP. 10' - 0" PT-4
GYP. 10' - 0" PT-4
ACT-3 9' - 6 1/2"
GYP. 9' - 4" PT-4
7 A019_B-2
1' - 2"
0.9
F
G
SIM 7 A019_B-2
WINDOW TRIM
GYP. 10' - 8" PT-4
GYP. 9' - 0" PT-4
EXISTING WINDOW 9 A019_B-2
2' - 7 3/4"
SOFFIT AT WINDOW AND SUSPENDED CEILING
8
1 1/2" = 1'-0"
1 1 A006_B-2
GYP. 9' - 0" PT-4
5 A019_B-2
26-03
10 A019_B-2
26-03
EQ
3
1' - 2"
26-02
4' - 3 3/4"
28-01
4
6"
B.O. BULKHEAD - VARIES SEE CLNG PLN MTL CORNER BEAD
PASSAGE 3105
4 A019_B-2
MECHANICAL EQUIPMENT, SEE MECH DRAWINGS
LIGHT FIXTURE, SEE RCP AND ELECTRICAL DRAWINGS
ACT-3 9' - 0"
EXTEND MTL STUDS TO UNDERSIDE OF STRUCTURE ABOVE
CEILING TRIM B.O. BULKHEAD SEE CLNG PLN (1) LAYER 5/8" GYP BD ON 3 5/8" MTL STUDS
GYP. 9' - 6" PT-9
CEILING - AS SCHEDULED
BULKHEAD AT SUSPENDED ACT
6
1/4" = 1'-0"
BULKHEAD AT SUSPENDED ACT
4
1 1/2" = 1'-0"
11"
1' - 9"
A004_A-2
4
6 5
1101B
1' - 0" CLEAR
09-01
VIF
E
1100
STORAGE 1106
1105
EXG. TIN 10' - 8" PT-6
06-13
09-43
12-09
ACT-3 9' - 2"
09-39
26-02 02-104
02-102 02-103
E
12-06
02-102
12-07
26-02 2 A006_A-2
02-104
02-90
02-104
02-105
02-104
1/4" = 1'-0"
N
PLAN NORTH
ARCHITECTURAL FIRST FLOOR PLAN
WOMENS RESTROOM 1109
2
FIRST FLOOR REFLECTED CEILING PLAN 1/4" = 1'-0"
GYP. 9' - 2" WC-1
EQ
GYP. 9' - 2" WC-1
26-02 02-104
02-105 26-02
1
09-40 1
02-90
02-104
09-40
02-90
02-90 02-104
GYP. 10' - 8"
PLAN NORTH
ACT-3 9' - 2"
09-40 02-90
PRIVATE OFFICE 1110
02-90
1
ACT-3 10' - 2"
EXG. TIN 10' - 8" PT-6
14 A007_A-2
1 A006_A-2
EQ
1' - 6" EQ
1 A008_A-2
1109C
STORAGE 1106
26-03 09-44
GYP. 9' - 2" WC-1
ALL-GENDER RESTROOM 1108
EQ
02-105
09-45
EQ
EQ 3 A006_A-2
02-103 2 A008_A-2
EQ
11-11
ACT-2 9' - 2 1/2"
09-40
1
EQ GYP. 9' - 2" WC-1
26-02 ENTRY 1100
+/- 17' - 11"
1110A 1' - 0" CLEAR
4 A006_A-2
EQ
BREAKROOM 2' - 0" 1107
26-03
2
1106
09-01 E
A005_A-2
WOMENS RESTROOM 1109
5' - 10 3/4"
5 1 A008_A-2
+/- 3' - 0 1/8"
ENTRY 1100
10 A002_A-2
1
VIF 6
EVENT SPACE 1101 02-104
1109B
5
9' - 0 5/8"
09-39
2' - 5 3/4"
09-40
BREAKROOM 1107
+/- 12' - 8 1/2" VIF
2 A008_A-2
PRIVATE OFFICE 1110
3
5
1 A007_A-2
9
26-02
ALL-GENDER RESTROOM 1108
STAGE 1103
EQ
STAGE 1103
3
5
A002_A-2
02-105
EQ
E
A005_A-2
1 A003_A-2
26-02
1
2' - 0"
EQ
EVENT SPACE 1101
1 26-02
PASSAGE 1104 ACT-2 9' - 6"
2' - 0"
1A
09-43
1109A
1107 11' - 2 5/8"
5
5A
ACT-2 9' - 2 1/2"
EQ
1108
6 6
W
3 A006_A-2
J
5
05-10 UP
6
U
TENANT ENTRY 1102
EQ
VIF
+/- 5' - 0 5/8"
2
ACT-2 9' - 2 1/2"
1110B
6"
VIF
PASSAGE 1104
1' - 8 1/4"
+/- 8' - 3 1/8"
VIF
A004_A-2
1 1/2" = 1'-0"
1' - 6 1/2"
3 A008_A-2
8 3/4"
+/- 15' - 1 1/8"
4
VIF
3 A008_A-2
X1101A TENANT ENTRY 1102
+/- 4' - 1 7/8"
J
GYP. BD TRANSITION AT SUSPENDED CEILING
4
1 1/2" = 1'-0"
2' - 0"
FIRST FLOOR REFLECTED CEILING PLAN
1102
(1) LAYER 5/8" GYP BD ON 3 5/8" MTL STUDS
CEILING - AS SCHEDULED
MTL CORNER BEAD
EQ
N
2
ACT-3 9' - 6 1/2"
GYP. 9' - 4" PT-4
EQ
GYP. 9' - 6" PT-9
EQ
EQ
3' - 0"
EQ
EQ
GYP. SLOPED PT-4 PLAN NORTH
1' - 4 7/8"
4.1
N
SEE FLOOR PLAN FOR PARTITION TYPE.
B.O. CEILING SEE CLNG PLN
(1) LAYER 5/8" GYP BD ON 3 5/8" MTL STUDS
1' - 2 3/4"
1 A007_B-2
SOUTH STAIR 3103
EQ
01-06
5 3/8"
3.2
CEILING - AS SCHEDULED
EQ
GYP. 9' - 0" PT-4 ALL-GENDER RESTROOM 3107
ACT-4
EVENT SPACE 3104
EXTEND MTL STUDS TO UNDERSIDE OF STRUCTURE ABOVE
6"
1 A022_B-2
CEILING - AS SCHEDULED
26-02
EQ
EQ
ELEVATOR 3102
ACT-4
6"
GYP. 9' - 4" PT-2
10' - 0"
ENTRY 3001
EXTEND MTL STUDS TO UNDERSIDE OF STRUCTURE ABOVE
WOMENS RESTROOM 3108
6"
2
GYP. 9' - 0" PT-4
EQ
ACT-1 9' - 0"
5' - 1 3/8"
4' - 1 1/2"
6"
CATERING 3106
6 A019_B-2
3' - 10"
2' - 7 3/4"
EQ
10 1/4" 4' - 3 3/4"
3 A019_B-2
1' - 2"
1.8
EQ
26-02
5 3/8"
NORTH STAIR 3101
EQ
EQ
02-90
11
G 1' - 4"
13' - 7 3/8"
9 A019_B-2
10 1/4"
1 3' - 0 5/8"
5"
RESTROOM / SHOWER 3006
01-08
22-15
10 1/2"
PT-3
10-43
5
3' - 2 1/8"
01-13 2
1
01-02
7
+/- 5' - 10 1/4" VIF
10-14
26-02
6' - 4 1/4" VIF
10-34
5A A013_B-2
A013_B-2
4
6
10-27
6
5
3006
01-09
6A
3' - 6"
18"
MIN
7 5A 01-02
18"
MIN
01-13 A013_B-2
14
12
15 A020_B-2
5' - 0 5/8"
01-09
09-20
11 5A
01-11
7
8
11' - 1 1/2"
22-04
7
ALL-GENDER RESTROOM 3007
22-15
4" TRIMMED TILE BASE, T-2
22-15
10-02
RESTROOM - SOUTH ELEVATION
14
12-14
WELLNESS SUITE 3005
A013_B-2
3/8" = 1'-0"
10
4
01-13 9
3' - 6 1/4"
5A
01-13
12 A020_B-2
22-15 01-10
4 5/8"
VIF
5A
E
F
22-15
G
11 A019_B-2
2' - 2"
SS COUNTERTOP & BACKSPLASH, SS-1
11-01
11-09
6
3108C
3' - 3 3/4"
1' - 8 1/4" 17
A014_B-2
19
6
5A
11-07 2' - 7"
01-02
6
22-15
1.8
6
A014_B-2
11 A020_B-2 3' - 0"
TOE KICK, RM-8
2' - 9"
3" BEVELED WOOD MOULDING ATTACHED TO WOOD BLOCKING GLASS HOLDER CLIPS
3/8" = 1'-0"
BEVELED WOOD MOULDING
8
22-04
1"
3' - 0"
CATERING KITCHEN - SOUTH ELEVATION
4
8' - 4 5/8"
7
5' - 5 1/4"
5' - 6 1/4"
1" = 1'-0"
11' - 7"
5A
7
5
01-10
GLASS SHELVING
MIRROR SPACERS
ADHERE GLASS SHELF TO MIRROR BACKING
22-04
3.2
5A
01-02
8' - 5 1/2"
7
4' - 2"
5A
5' - 4 1/4" VIF
EVENT SPACE 1101 568.66 SF
01-10
5 1/2"
3 1/8"
2' - 10"
01-06
CLEAR
5A
PLAN NORTH
21
3106
6
22-15
1' - 6" 4 1/2"
4
7
7
2' - 5"
1' - 5 3/8" 1"
3
1' - 4"
A007_A-2
5' - 3 5/8"
3' - 1 5/8"
2' - 6 5/8"
3108A
3107
1' - 6"
A007_A-2
3' - 6"
1' - 6"
4"
WC-2
A007_A-2
13 A007_A-2
3
11 A007_A-2
TEMPERED GLASS SHELVES
WP-1
PLAM SHELF, PL-1
12-07
PLAM SHELVING, PL-1 3D WOOD PANELING, WP-1
3/4" COUNTERTOP - SEE ELEV. FOR FINISH 1 X 3 SUB-TOP FRAMING
GLASS MIRROR, GL-1 PLAM SURROUND, PL-1 TEMPERED GLASS SHELVES RECESSED LED STRIP UPLIGHT
1' - 1" 1' - 0"
01-13
11 3/8" 5' - 4 7/8"
2 1/2" 9
1' - 0 3/4" 1' - 0 1/4"
01-13
12-11
5
12
01-09
22-04 7
ANTIQUE GLASS MIRROR
RECESSED LED STRIPPING, OFFSET BOTTOM LED STRIP TO NOT INTERFERE WITH 3D PANELING
7' - 1"
26-06
ALL-GENDER RESTROOM 3107
8 A007_A-2
3' - 5"
1
A007_A-2
1 1/2" 1' - 2"
A014_B-2
8' - 7" 7 A007_A-2
PLAM ON 3/4" SUBSTRATE HINGED DOOR
1' - 2"
MELAMINE ON 3/4" SUBSTRATE (ALL SIDES) 1/2" MELAMINE BACK PANEL
QUARTZ COUNTERTOP, QZ-1 CABINET PULLS, ACC-2
TOE KICK
PLAM CABINETS, PL-1
5A
3' - 7"
3' - 7"
2 1/2"
TOE KICK, RM-8
NOTE: WHEN CAB'TS ARE 3'-4" H., PROVIDE 2 ADJ. SHELVES
7' - 2"
ENLARGED CATERING KITCHEN AND RESTROOM FLOOR PLANS 1/2" = 1'-0"
1
ENLARGED FLOOR PLAN - FRONT AND BACK BAR 1/2" = 1'-0"
SEE SPECS. FOR HARDWARE
RECESSED LED STRIP DOWNLIGHT
2
3' - 4 1/2"
10
5A
1' - 6"
9' - 10"
11
4
6' - 0 1/4"
CATERING 3106
5A
CLEAR
A014_B-2
18"
2
7
MIN
3
11 A007_A-2
6
5' - 6 1/8" VIF
MIN
3108B
6D 5A
10 1/4" WOMENS RESTROOM 3108 01-13
13' - 9 3/4"
16' - 7 1/8"
18"
01-09
N
14
13
20
5A
2
A014_B-2
15
22-04
7
6' - 8 1/2"
6
WALL TRANSITION DETAIL AT WINDOW - PLAN
01-10
3' - 2 1/4"
2' - 11 1/2"
11
WALL BASE, RM-1
16
18
10"
10"
6A
METAL STUD WALL
EXISTING WINDOW TRIM TO BE PARTIALLY REMOVED AS NEEDED FOR THE PLACEMENT OF NEW WALL TILE AND GYPSUM BOARD.
PLAM CABINETS, PL-1
2' - 10"
0.9
2' - 8"
11-10
NEW WALL TILE, SEE ELEVATION RESTROOM DOOR
SEE ELEVATIONS
N
CABINET PULLS, ACC-1
11-04
1/2" = 1'-0"
1
PLYWOOD
EXISTING WALL
7' - 11 5/8" VIF
ENLARGED RESTROOM FLOOR PLAN
15
NEW BREAK METAL END WALL GUARD.
PT-1
CATERING 3106
13 A020_B-2
5A
7' - 11"
NEW BREAK METAL
+/- 9 5/8"
3005
3.2 PLAN NORTH
EXISTING WINDOW
PT-1
4 5/8"
3007
12 A019_B-2
PLAM CABINETS, PL-1
3' - 0"
3
10 IN006_B-2
13 IN006_B-2
13
SEE ELEVATIONS
2
I would coordinate with the MEP consultants when discrepancies were identified within our shared cloud revit model, bringing these issues to the project architect’s attention and assisting with their resolution. I also worked closely with the in-house interior designer to coordinate the placement of display monitors in event spaces and conference rooms, as well as bathroom accessories throughout the restrooms. Due to the limited space within several restrooms, I helped explore alternative accessory layouts to maintain functionality while meeting required clearance dimensions.
5"
1' - 10 1/2" 1' - 2 1/2"
T-4
7 3
1.8
1' - 2 1/2" 1' - 10 3/4"
01-10
22-04
A013_B-2
WOMENS RESTROOM 3108
8' - 0"
1 A006_B-2
TECHINCAL SKILLS / COORDINATION:
3/8" = 1'-0"
2
BACK BAR - ELEVATION 3/8" = 1'-0"
11
BACK BAR - SECTION 1" = 1'-0"
1
4"
0.9
12
3/8" = 1'-0"
P O R POR T F O T F O L I O L I O Marsha Ferguson Marsha Ferguson Architecture Portfolio Architecture Portfolio