MBS Helps Create Another San Antonio Landmark things can become rather com plicated, so we are lucky to have Supervisor Ron Atnip di recting our crews. Ron is being assisted by foremen Ismael Herrera and Robert Mons, who are both good coordina tors and experts on drywall work. Together these men are helping achieve outstanding rates of production.
Standing high up in the Alamodome, Ron Atnip shows Bruce Marek where the next sequence of the project will start
Our offices around Texas and in Atlanta are establishing quite a reputation for an ability to build out large, complex sta diums. Now our work on the Alamodome is proving again that our crews have what it takes to build these large, com plex projects by demonstrating how they can work to tight schedules while maintaining exceptional quality.
I
The new Alamodome, which will seat an audience of 65,000, and will include two ice arenas, will be used for sports events and conventions. MBS is in stalling all the metal stud and sheetrock, building walls, ceil ings, furrdowns and press boxes. After working on the project for several months, MBS is now installing over 6,000 lin-
ear feet of furrdowns, 10,000 feet of partitioning and furred CMU, as well as almost 100,000 sq. ft. of drywall ceil ings. MBS is working on most of the six floors including fin ishing out the meeting rooms, installing furrdowns on the first floor, building out walls, and offices on the mezzanine level, finishing out the press boxes on the club level and in stalling smoke baffles through out the press boxes. One of the most tricky parts of the project has been the mechanical rooms on the sixth floor where we have installed framing around the entire top of the building. Since this is a very large con struction project, the work has been divided into packages and distributed among 23 prime contractors. MBS is currently
working with one of these con tractors, Salazar Construction. With so many different con tractors working at the site.
A major challenge of the job has been handling materials. Restocking with new materials and equipment and hauling off trash has not been easy since none of the elevators goes all the way to the top of the struc ture. Despite these challenges our teams are both on schedule and on budget, thanks to the great crew which includes Luis Aguilar, Joe Cantu, Rudy Carbajal, Jose Elizondo, Mauro Fernandez, Jesse Flo res, Cliff Frandsen, David Herrera, Miguel Morales, and Angel Puga.
Interior of this enormous new dome with all its extensive activity. The appearance of the equipment on the ground gives an idea of the enormous size of this dome
Page 1
MBC Landscaping
Lunch In The Sun
MBC Landscaping paused during their Christmas Party celebration for a group photograph
Lt. to rt.: Juan Zepeda, Anastacio Olalde, Francisco Zepeda, Hipotito Tapia, Luis Flores, Isaias Acevado and Abraham Tapia enjoying tacos at a Christmas celebration
MBS Dallas Office personnel and foremen joined forces this Christmas to cheer on the Bloodthirsty Red Knights at the Medieval Times Dinner and Tournament. Even though the Red Knight was not the victor at the evening’s fes tivities, the Christmas party it self was a winner. Speaking of winners, the Christmas party was a battle ground of sorts as Marek em ployees competed for prizes in a number of games. These in cluded a football throwing con test, won by Gary Mullins; a golf putting competition which Craig Holmes won; darts, won by Chet Hodges; a casting competition for the fishermen in the group, won by Mike Webb; and a basketball com petition which was won by Mike Glass. (Maybe Mike could give some help to the Dallas Mavericks.) These winners won recognition from their peers for their skills, and some fantastic prizes. And, of course, there was great food and fun that has become a Christmas tradition in the Dal las office.
Springs Party Barn for their Christmas Party and to play horseshoes and volleyball. Ceremonies included a draw ing for door prizes and a pres entation of the service awards.
Congratuiations to all Landscaping's service award winners which included: Back: Antonio Acosta, Luis Velasquez, Victor Moiina, Arturo Leon, Orlando Sierra and Marilyn Burke. Front: Florentin Hernandez, Gerber Lopez, Homer Gomez, Lorenzo Cortez and Juan Turcios-Romero
Marty Hall receives a 10-year service award ring from Paul Marek
Austin carpenter, Hal Pollard, receiving his 5-year service award
MBS Austin On December 18, MBS’s field crews got together at Shady
Hall, who was recognized for his ten years of service and Carpenter Hal Pollard who celebrated five years with MBS.
Floyd Zahn and John Anderson celebrating at Austin’s Xmas Party
Congratulations to Danny Holland who won the MVP award in volleyball and was also recognized for his five years of service. Congratuations also to Foreman Marty
Page 2
Austin Foreman Danny Holland receiving his five year award from Paul Marek
«
The Atlanta office came out in force to celebrate at the Christmas party
MIS Atlanta The Atlanta Field party at Christmas was a big family af fair with employees, their spouses and children attend ing. Bruce Marek was the guest of honor and Santa put in
MIS Atlanta made its party a family affair with children, clowns and, of course, Santa
an appearance, thanks to Elva Lay. A drawing was also held with everyone receiving gifts ranging from a flash light to a television set. A number of employees were presented with three, five and fifteen-year service awards.
MBS San Antonio Reported to be the best Field Christmas Party ever, field per sonnel in San Antonio got to gether on December 19 at the Knights of Columbus Hall for
dinner, dancing, door prizes and service awards.
MBS Houston MBS Houston had plenty to celebrate at their party. See the back cover for all the details.
Marek Company Employees Honored At Annual Awards Celebration
4
MBC, Oak Forest Lumber Supply and Stanley Construc tion presented gold rings with rubies or diamonds to 13 em ployees for "length of service” at the annual Awards Presenta tion ceremonies and Christmas Party on Wednesday, Decem ber 23, 1992. Approximately 175 partici pants attended the ceremony which included a BBQ dinner with all the trimmings. Ralph Marek, Paul Marek, Pat Trojanowsky, and Lloyd White expressed their grati tude and appreciation to those rece iving awards as well as acknowledging six men who have retired - Sonny Fox, John Bobby Grabarkwitz, Johnson, Leonard Meinke, Martin Pivonka, and George Simicek. The Mareks attribute their SL1Ccess to the fine people working for them and special tribute was made to these valued employees who have already retired from die company.
Honored with awards for twenty years’ service were Raymond Groll and Jorge Rodriguez.
Fifteen years awards went to Robert James, Hilario Romaro, and Victor Hernan dez. Ten year award recipients were Thomas Benjamin,
Page 3
Martin Cerna-Bravo, Gracie Cooper, Juan Diosdado, Michael Hein, Mario Hernandez, Jose Robles and Joseph Weatherly.
I»J7n7STS7/1VrS1BHIT| l 1 lilLVirriivnirnrjn u fl 'KM1
this turned out to be just an other job. And they managed to complete the work under budget and way under sched ule, despite some very exten sive framing work using 14GA track which was delivered in 24-foot lengths. With such an extensive area to cover, the fi nal floor assembly totaled al most 2 miles of wall!
Foreman Bob Winder and his crew are on schedule and beat ing the budget on the Student Enlisted Housing project for Browning Construction where we are installing exterior 18GA framing and sheathing, interior framing and sheetrock, hollow metal door frames and acousti cal ceilings. Working to a March 1 turnover, our crews at the Kelly Air Force Base Gas Turbine En gine Facility worksite are de veloping good heads for heights with virtually all exte rior and interior framing, inte rior sheetrock and acoustical
Jorge Huezo and Juan Turcios-Romero are just two of a great crew working on the McLendon Towne Crossing project which includes landscaping and irrigation installation. Other key members of the team include Fred Bruman, Lorenzo Cortez, Florentin Hernandez, Victor Molina-Urbina and Pauline Velasquez
A
Roberto Rivere (Ift.), Jaime Ramirez (cntr.) and Francisco Ostorga (rt.) laying sod as part of the irrigation and landscaping project for All Star R V Resort
MBS Austin Working within the legal sys tem took on new meaning at the Travis County Courthouse where MBS recently com pleted a 100,000-sq. ft. acousti cal renovation job. Because the courts had to function as nor mal during the day, Foreman Gary Danish, right-hand man William Floyd and their crews were only able to work at night. The job involved renovating
the entire five-story building, installing 12 x 12 concealed spline, 12x12 glue up and 2 x 2 reveal edge ceilings, and matching the renovations to the original building design and finishes. Because it was "work as usual" in the courthouse dur ing the day, Purchasing Man ager Lloyd Meredith had to arrange for materials to be brought in at night. Then, at the end of each work session, our crews had to clean up the work area leaving it neat and tidy for the next day. Despite these challenges our crews completed the work on schedule and within budget.
Gilbert Hewitt (front) and Foreman Larry Acosta discuss the best ways to install furrdowns at Kelly Air Force Base in San Antonio
Congratulations to a great crew of men that included Foremen Israel Ochoa and Gary Schultz, Mike DeLaGarza, Robert Dillion, Fred Enderle, George Guerrero, James Lesdema, Tom Ochoa, Darryl Takahata and Refugio Villegas, for a fantas tic job!
ceilings installation being con ducted 10 to 30 feet off the ground. Foreman Larry Acosta and Acoustical Fore man Gary Gonzales, assisted by Larry Hemphill and Martin Martinez are helping Continued on page 5
MBS San Antonio Framing a new floor in two weeks means working to a fairly demanding schedule. If the floor covers an area of 22,000 sq. ft. and is sloped to accommodate theater seating, the pace is likely to be nothing less than hectic. But, for our crews at the Ingram Park Mall,
EliMlZllt^'f^^^les, Pablo Valverde. TonyPuga. on m Stnden, Enlisted HoZg ZSinZZcnT'^
Page 4
continued from page 4 bring the job in on schedule and budget.
MBS Dallas Our crews have become well known at the Dallas/Fort Worth Airport for the extensive amount of work they have un dertaken there. Keeping up the tradition of quality work at the airport. Job Supervisor Ed Kuta and his crews are now starting to install drywall and acoustical and linear pan ceil ings for the Delta Airlines ticket counter.
Jobsite Supervisor Robert Braze! and his crews are mak ing good progress working on the three-story, 140,000 sq. ft. Frito-Lay building in Plano. In addition to installing the exterior and interior framing, sheathing and insulation , we are also installing interior drywall partitioning, furrdowns, Magna Grid ceilings and exte rior and interior plaster soffits. Work is progressing well on a three-story medical oitice building which will be part of the Trinity Medical Center. MBS is installing 6 inch by 18
Lt. to rt. Isreal Ochoa, Tom Ochoa, Fred Enderle, James Lesdema and George Guerro working on the Ingram Park Mall in San Antonio
Jobsite Supervisor Kyle Pottholf and Acoustical Fore man Wayne Stravvser are in stalling high design drywall and acoustical finishes as part of IBM’s high-tech renova tions. MBS will buildout train ing rooms, classrooms, support offices and a new computer center. At Central and Southwest, MBS is working on the core and tenant buildout for a new nine-story building, as well as renovating the existing sevenstory building. In addition to installing conventional drywall partitions, Acoustical Foreman Randy Agnew will be installing gypsum board light coves throughout. An interesting and unusual feature of the job is the eight-story atrium. MBS will be installing the fascia and furrdowns at the skylights above.
gauge exterior framing for backup as well as drywall for the shell and core areas, and acoustical ceilings. Jobsite Su pervisor Bryant Hand and his crews will also be constructing 30-foot high columns with horizontal beams in the elegant three-story atrium connecting the new and existing buildings.
MBS Houston MBS has returned to Sage Plaza where we have been awarded the drywall, acousti cal ceilings and paint contracts for a two-phase remodeling of 20 floors for Halliburton. MBS has twice previously remodeled this building - for Sohio and for British Petroleum. David Dry wall Foreman Gordon, Acoustical Foreman Danny Garish and Paint Fore man Tony Cuellar expect to be
The McDonald Douglas facility includes 78,000 square feet of exposed structural steel
working in the building until well into the summer. Our crews are no strangers to high profile jobs which de mand extra quality, so when it came to building George Bush’s new 10,000 feet of ex ecutive offices, MBS was the obvious choice. Drywall Fore man Russell Bellew and Acoustical Foreman Ira Lefevre kept their crews work ing to a fast turnaround sched ule, despite a number of design changes. Foreman Frank Zerrath and his men are back at the Texas Children’s Hospital remodel ing six wings. The work in cludes removing old vinyl walls and putting up new Acryvyn wall coverings in all the rooms and corridors, as well as a considerable amount of painting. Nearby, in the Medi cal Center, we are doing a simi lar remodeling job for St. Lukes; painting, removing vi nyl wall coverings and install-
Fred Robinstein cutting sheetrock at the Halliburton buildout
Page 5
ing 15,000 yards of fabric. Since the facility is open for business during the daytime, all the work is being carried out at night.
Chris Garish putting up sheetrock at Halliburton
Elsewhere in town we are in stalling drywall and acoustical ceilings at the three-story Dur ham Medical Clinic. The recently completed Space Museum at NASA is drawing record numbers of visitors. MBS is now back in the area working on a major paint con tract for General Contractor E.E. Reed, painting the McDonald Douglas Lunar Module Facility. The facility includes 78,000 sq. ft. of ex posed structural steel under roof which adds up to a great deal of painting! Our acoustical division is working on the remodeling of two new schools. Cullen Mid dle School and the High School for the Health Professionals, where our crews will be install ing a total of 250,000 sq. ft. of acoustical tiles.
pendable and a valued em ployee. Congratulations to service award winners Antonio Acosta, Marilyn Burke, Lorenzo Cortez, Homer Garza, Florentin Hernandez, Artura Leon. Gerber Lopez, Victor Molino, Orlando Sierra and Luis Velasquez.
MBC Houston
Like father, like son. Foreman Juan Ochoa and Juan Ochoa Jr. working at the North East Baptist Hospital in San Antonio. Juan is currently running six floors of tenant buildout. All the floors have a 40 day "sell" to owner competition date which is keeping Juan and his crew really busy.
MBS San Antonio Outstanding Employees of the Year recognition goes to Drywall Mechanic Gustavo Moreno, Drywall Trainee Julio Portela and Acoustical Mechanic Russell Tanksley. Congratulations to these fine men for their hard work, dedi cation to the company and good attitudes. Welcome back to Dennis Yanowski who is returning to San Antonio from Houston. Best wishes and good luck to Mark Keith, drywall estima tor. who is transferring to MBS in Houston.
MBC Landscaping Outstanding Employee Recog nition to Manuel Perla for his hard work and dedication. Manuel works on a crew each day and then works in the me chanics shop helping out with equipment. He is extremely de-
Arturo Anderson wins Out standing Employee recogni tion. Arturo joined the company seven years ago as a trainee on Tim Morena’s sanding crew. With his good work ethic, pleasant personal ity and excellent attitude, he was soon one of the top Sand ers. Last summer he became a trainee with Miguel Ro driguez’s finishing crew working on some of Houston’s finest homes and is quickly be coming a top finisher. Veteran crew leader John Grabarkwitz retired on Janu ary 1, ending a 36-year career with MBC. For many years John was the head drywall crew leader under John Marek, working on Murray Construction Company’s homes. In later years he devel oped a custom house crew working on some of the city’s most prestigious mansions in River Oaks. Most recently he has been a specialty crew leader responsible for handling metal work, ceiling tile and other unusual jobs. John should feel proud of his long and distinguished career. Crewleader Luis Rodriquez and right-hand man Jose Lerma have been doing a great job on the Town View Apart-
ment job in Fishkill, New York where they are installing insu lation, dry wall and splatter texture for 288 apartments. Weather conditions, however, leave much to be desired. "Up state New York is very beauti ful in the spring and summer, but there isn’t much to see dur ing the winter other than snow and icy roads," reports Luis. Hang in there Luis and Jose and keep up the good work. We extend our sincere condolenses to the family and friends of NickArriazola who, after a lengthy illness, passed away on December 26, 1992. Nick had been an employee of MBC for more than 30 years. He will certainly be missed by the Marek Family and his fel low employees who worked with him for so many years.
MBS Dallas
different ways. He creates an atmosphere that everyone enjoys; he has coached the softball team, he includes the production group on customer- Jk' related outings and he is a keen hunter. His recent involvement with EDS World Headquarters has earned him our recognition. As "On-Site" project manager, he coordinated all changes, schedules and materi als deliveries, while maintain ing good customer relations. Doug is bright, fast and fair which are characteristics that customers enjoy. In fact, he doesn’t just make good cus tomers, he turns customers into friends.
MBS Houston Special Employee Recognition goes to John Tant who runs the warehouse and tool room in Houston. John is responsible for all incoming and outgoing tools, inventory and purchas ing, as well as supervising a staff of assistants. John, who # has been with the company for 25 years, understands how im portant costs and overheads are in a business. He is a stickler for detail and a price hound who is always looking for ways to save the company money or buy equipment at a lower price. Welcome to Larry Frattalone who has joined Drywall as an Estimator.
MIS Atlanta
Doug Laird - Dallas’s outstanding employee
Key employee Doug Laird, an estimator/project manager, started with the company in Houston’s drywall division. He subsequently moved to Dallas in June 1989, and he and his wife Sue Ellen have added Shelby and Travis to their family. Doug has helped the Dallas team in a great many
Page 6
Estimator and Project Manager Mike Feather is to be con gratulated for yet again con tributing to a banner year for our Atlanta office. Mike, a five year veteran of the company, typically starts work in the of fice before 7:00 a.m., estimat ing jobs, writing letters and calling on customers. Some of the projects he has been most proud to have worked on in clude the Nation’s Bank Tenant buildout, drywall and acousti cal ceilings on 21 floors with
MIS Atlanta continued from page 6 conti actor Beers Interiors, a sixteen-floor drywall and acoustical ceilings project for IBM at Riveredge, and an eight-floor project for Long, Aldridge & Norman. One of the reasons for Mike’s success is his ability to work with everyone. He is greatly respected by his colleagues and is a credit to the company.
ourth quarter was a successful and busy period for Atlanta with President Steve Shockley, assisted by David Salyers, Oeg Stine, Mike Feather! J.D. Nickolson and Jeff Burns selling so much work that Pro duction Manager Fred Lay and Mike O’Brien had to in-' crease the work force adding carpenters, finishers and acoustical mechanics. Every one hopes that this is a positive trend that will continue.
MBC’s Single Family Division Attracts New Builders. Gateway Homes, which was incorporated by Tom Walker, and several outside investors is now working with MBC. Mr. Walker has had a distinguished career in the Houston real es tate industry over the past twenty years including serving as president of the Greater Houston Builders Association and Tom Walker Custom Homes. Gateway Homes was founded in 1991 primarily to
take advantage of the supply of foreclosed lots in the Houston area and to provide affordable housing for the first- time buyer. The company has grown considerably and expects to close around 250 homes in 1993. Gateway’s staff includes Project Manager Alan Blackshear and Lead Supervisors Bob Thompsen and Bob Scott, with help from Brian Clark and Marc Harris.
rmisasmsanWi MBS Dallas In March, our crews will start work remodeling and building the "metal deburring" facility for LTV, one of Dallas’s major companies. An interesting feature of the work will be a 40foot tall free-standing partition consisting ot 8-inch 12-gauge studs.
MBS Houston
«r
MBS has several new jobs which will start this spring. These include a contract with Sugar Creek Baptist Church which will start in March and will include the installation of 30,000 sq. ft. of drywall and acoustical ceilings and a drywall contract with Texas A&M
kT
2
MBC Helps With Tornado Cleanup
MBC’s residential department has been doing a substantial amount of work as a result of the tornadoes that hit the Hous ton area on November 21. In Channelview alone, 200 homes were destroyed and 600 dam aged. Following the torna does, MBC soon started receiving calls to perform jobs ranging from installing a cou ple of sheets of drywall to com plete home insulation, sheetrocking and texturing. It is not easy restoring a badly damaged home to top notch condition, but thanks to our quality and professionalism,
our crews have been doing an excellent job. Much of the work has been performed by Jose Arcentales, Armando Arredondo, Jesus Cervantes, John Edwards, Arbino Garcia, Alfredo Garcia, John Lazaro Grabarkwitz, Lagunas, Gerardo Prieto, Hilario Romero, Tom Sloan and Paul Valadez. These men have received many compliments from builders and homeowners on their neatness and the quality of their work, and we would like to recognize them for a job well done.
United Way Campaign, 1992
to buildout their new four-story Business Administration Building in College Station.
MBC Landscaping Work is about to start at the Exxon Chemical Building where MBC Landscaping will be installing a rooftop garden. Congratulations to everyone involved in landing this pres tigious job.
Giving a Chance To Someone In Need Some 375 employees of Marek Brothers companies in Hous ton made pledges to the United Way, totaling an impressive $42,871.80. Considering the hard economic times which have hit just about everyone in the industry, it is very com-
,A very sincere thank you to everyone who participated in the fund raising drive. Special thanks to Remizer Seals, the Campaign Advisor and Loan Executive Larry Solodyne.
Births and Weddings
MBS San Antonio
MBS Houston
In March MBS will start in stalling acoustical ceilings at the S.W. High School.
Best wishes to Mike and Susan Holland whose baby daughter April Susanne was bom on October 29. Congratulations to Chris Conner who finally tied the knot in November when he
Starting in April will be the Mall Del Norte Expansion in Laredo. Then, in July, our crews will begin on the new 1,000-bed prison in Cuero.
mendable that so many of our employees can still dig deeper into their pockets to contribute to those who are less fortunate.
Page 7
married his new bride Barbara.
MBS Austin Jeff and Kari Bradley had plenty to celebrate on New Years Eve with the birth of their daughter, Kelsey Dawn who weighed in at 61b. 2oz.
mmmm
How We Are Meeting The Challenges Of The Past - And The Future Although we are already well into 1993, it’s a good time to look back at 1992 and also see what 1993 holds for us. We’ve got a lot of information that we feel is important for you to know. Even though it’s early, it looks as if we’ve put together our third profitable year. It’s not like the profits of the eight ies, but it will be enough to give selective raises, repay bank debts, pay our fair share to Un cle Sam and, hopefully, have a little left over to replenish the war chest that was drastically depleted during the second half of the last decade. It will be another month or so before we have the final tally, but as far as individual branches are concerned, it looks something like this: Austin and MBC residential in Houston will have a loss; Atlanta and San Antonio will be slightly in the black and Dallas and MBS Houston both had a strong year.
I
I know that many of you worked extremely hard in 1992 and, in some cases, your branch will not show a profit for the year. Try as we might, we have never had a year in which all branches were profit able. It’s still a risky business. All we can do in 1993 is do our best again and hope that the market will allow us to make a profit. In addition to making a modest profit overall, we did have some- major accomplishments in 1992.
Safety lt was one of the safest years in the history of the company,
with the fewest lost-time acci dents since the 1970’s. It’s a real credit to each of you. The result is that we avoided a lot of the personal grief that goes with injuries and have lowered our workman’s compensation modifier which will result in decreased insurance cost. We will have a safety contest this year that can result in added money in your pocket.(See back page of the newsletter.) Full details will be published later.
Increased Productivity Productivity on the job starts with the personal production of each team member. Our suc cess in 1992 was due to our ability to be the low cost pro ducer in our markets. I know it’s hard, repetitious work, but that’s what it takes to make it happen. We’ve got to keep it up to stay on top.
Steady Work 1992 showed an improvement in the number of people who had steady work throughout the year and many enjoyed overtime wages. We do every thing we can to eliminate man power fluctuations so that you can have a dependable paycheck from week to week, but unfortunately, it doesn’t al ways work out that way.
Major Residential Acquisition One of the largest residential contractors in Dallas was ac quired and consolidated as part of Marek Brothers Company, Residential. We will continue to look for opportunities for
growth wherever they present themselves.
Quick Bid This is the year we finally found a computer estimating system that works for every one. The Quick Bid System has increased our ability to put out more bids and service our customers better, which should generate more work. Today, it’s be fast or be last.
Prestige Projects We have never had a year in which we were involved in so many world class, high profile projects. They were as fol lows: Austin Convention Center State Capitol expansion Dallas EDS ./. C. Penney executive floors Ross Perot’s offices San Antonio Fiesta Texas Alamodome
Houston, MBC Gerald Hines residence Trammell Crow apartments
tributed a total of $544,811 to the plan and the company matched this with $ 160,900 tor a total of $705,711. It you are not in the plan, be sure to get in when you have the opportunity on July 1. It’s a no-lose situ ation and will make a differ ence when you need it most.
Now Let’s Look at 1993 Outlook We can be encouraged that the national estimates for con struction activity published by the F. W. Dodge Corporation predicts for the South Central Region of the U.S., an increase of 12% fornon-residential con struction and a 15% increase for residential for the coming year. On the other hand, our backlog is at its lowest point in several years. The good news is that we’re not carrying large, bad jobs into the new year. But, we’re also not carrying any major projects in Houston or Atlanta into this year. Thus, we need to really put on sales hats and get some new work. The markets seem to be picking up and our managers are confident we can do it.
Houston, MBS
Budget
NASA Space Center Greyhound Day Track You can be proud of your part in these projects, for we were able to turn them out on time, and in each case, have a satis fied customer.
Our budget for 1993 is not much different from 1992. We haven’t had any major over head changes. We’re off to a much slower start and the first quarter of last year is when we really had our growth. If any thing, this year will start slow and pick up during the second and third quarters. We’ll see a lot of jobs bidding that will be
401K Last year, 75% of you enrolled in the 40IK program and con-
pan of the 1994 backlog. The big jobs that we have grown to depend on will happen in the second half of the year and in 1994.
Goals Let’s take a moment to look at our overall company goals. I know it gets repetitious, but any way you shake it. our com pany goals continue to revolve around three areas: ® Making the hudgetlprofitability • Making this a better place to work • Customer satisfaction If we can take care of those, everything else falls into place.
Making a Profit Now that we’ve had three con tinuous years of profitability, we don’t want to go back wards. And, to do it again is going to take a lot of work. We can't stop doing the things that we have been doing. If any thing, we've got to do them better, because the competition and the market are going to put obstacles in our way. Making money in every profit center is going to be the key to making a profit in 1993.
Making This a Better Place to Work We want to continue in our ef forts to make this a better place to work. Employee morale is so important. It’s the key to better productivity and keep ing a safe working environ ment. And, if we succeed there, we will make a profit.
Increase Customer Satisfaction Finally, one of the most impor tant goals for the year - in crease customer satisfaction. The customer is still the king and we can’t forget it. We’re customer driven and every thing we do in the office or on the jobsite affects that rela tionship with our customers.
And, many times, it’s the little things that make the difference - like keeping the jobsite clean or returning phone calls.
New Ideas TQM - Decentralization Empowerment: One thing about 1993, there will be more changes. Man agement philosophy is in a constant state of change and we at the Marek Companies have to be sure we’re keeping up with the times. Three phrases you'll all be hearing more about in the future are: • Total, quality management • Decentralization of control • Empowerment of the people
TQM A major movement in Ameri can business is called Total Quality Management, orTQM. It can better be described as a continuous improvement pro gram. That is, businesses look at every process they are en gaged in. and see how it can be improved, especially by looked at the needs of the cus tomer or whoever is the end user of the product. It means that we have to continually look at the way we do our jobs and look for improvements, and give better service to the customer in the process.
Decentralization of Control A second major movement is the decentralizing of control. We feel like we have achieved a great deal of decentralized control because each branch has the ability to adapt itself to its particular market and has a great deal of latitude in achiev ing its goals. They only get a nominal amount of supervision and general support from the corporate office.
Empowerment Empowerment is a main part of the TQM process. We must be gin to put the power to make improvements on the jobsite, instead of in the office. Em powerment of the worker will be the buzz word of the ’90s. The continuous improvement process starts with each of you. Management can only provide the vision of what can happen.
Summary These are unusual times. Mighty businesses, like IBM and General Motors, are being brought to their knees and do ing whatever they must to sur vive. Yet, as we study the latest trends in business manage ment, we feel that we are doing the things that are necessary to survive and thrive in the ’90s. However, we do have big con cerns about 1993. If I had to choose the three biggest con cerns, they would be as fol lows: • Tight margins and tough markets • Unethical competition • Escalating healthcare costs It’s going to take a lot of hard work and planning to over come these obstacles, but we have a lot going for us. On the plus side, we have the following: ° We have a skilled, trained labor force that is the envy of the industry ° We are the only interior contractor that offers a reasonably steady stream of work; it's not always perfect, but it's ahead of the rest ° We have a seasoned and aggressive management team ° We are a dominant player in all of our markets
• Our customers prefer us to the competition • There is still plenty of room to grow and improve • We are financially sound We will need the best from each of you in 1993. We have goals to accomplish, and that will take teamwork. In addi tion to our company goals, I urge each of you to consider personal goals. It’s going to be another year of your life and change begins within each of us. Choose three things to change your life and do it. Put it in writing and stay with it. In summary, in regard to 1992, we've got a lot to be thankful for and proud of. One thing you should take credit for is your part in making 1992 a suc cess. You were part of an exciting team that met the challenge and won. As a team, we made it happen in a difficult market. 1993 presents new challenges that will test us all. But, we have the tools to do our job and all that remains is for us to con tinue doing things right. If I could pick three words that summarize where we are and where we want to stay, it would be ...
• ■. A Step Ahead Remember these three words. They stand for what we are and what we want to be. We want to continue being the best in our industry and we do that by staying a step ahead of the competition. Those three words summarize our goals and give us a mission statement that we can take with us and easily remember. On behalf of my partners, Bruce and Paul and myself, our best wishes for a happy, pros perous 1993.
Stan Marek
Safety Jackpot Brings A Christmas Bonus To Over 100 Lucky Winners! additional funds will be added until the next quarter.
Jackpot winners had plenty to smite about. Lt to rt: Gerald Cocran, Dave Gordon, James Chambers, James Underwood, Bubba Campbell, Henry Coinley and Doug Bollom
In Houston, working safely has been paying dividends all round, with the MBS Safety Jackpot. Starting on July 17 last year, the company contributed money to the fund for every work day that passed without a lost-time accident. By Christ mas we had had a record breaking 108 days without an accident resulting in lost work time, and $ 10,800 in the pot! In the past, the longest period that the company has gone without an accident was 82 days.
The Marek Family of Companies ATLANTA, GEORGIA Marek Interior Systems, Inc. (MISI) AUSTIN, TEXAS Marek Brothers Systems, Inc. (MBS)
To celebrate this new record, the money from the pot was given away at a drawing at the Christmas Party on December 23. Over 500 employees at tended the party which was held at the SPJST Hall, and 108 lucky employees each won a $ 100 bill. The company is con tinuing with the program and a new pot was started on January 4. Funds from the pot will be distributed in July and Decem ber. If there are no accidents, the fund could again be quite sizable, but if an accident does occur the pot will "freeze" until the end of the quarter and no
Everyone knows the impor tance of safety, but when you are in hurry it is easy to forget the basic rules. That is when accidents happen.Working safely means working smart. It means abiding by the safety rules, being aware of potential hazards and exercising cau tion. Our field crews at MBS have proved that they can do this, and they deserve to be congratulated. Based on the success of the Jack Pot, other
Doug Eckerman proudly displays the new jacket he won
branches will also be partici pating in similar programs in 1993. MBS Houston went a record breaking 210 days without lost-time due to an accident!
"One for Two" Big Success The Marek Brothers Compa nies concluded the first year of 401 matching and em ployee response was excep tional, with 75% of Marek employees taking advantage of the matching by contribut ing $544,811 through payroll deductions. In turn, the com pany matched this with an other $160,900, creating a total 1992 40IK contribution of $705,711. "We are very pleased that Marek employees saw the tremendous benefit in our 401K matching program," remarked Marek President, Stan Marek. "Planning for retirement is so critical, and it's never too early to get started. And, with the 507c company matching, there's no better return anywhere."
I
Insights 3539 Oak Forest Drive Suite 200 Houston, Texas 77018
DALLAS, TEXAS Marek Brothers Systems, Inc. (MBS) Marek Brothers Company, Inc. (MBC) HOUSTON,TEXAS Magnolia Gardens Marek Brothers Systems (MBS) Marek Brothers Company (MBC) Marek Brothers Landscaping Oak Forest Lumber & Supply Company Stanley Construction SAN ANTONIO,TEXAS Marek Brothers Systems, Inc.(MBS)