Insights
^ publication of the Marek Family of Companies
Spring, 1997
Fine Craftsmanship Goes Into the Finest Homes in Dallas tom home builders. The builders of the area’s finest and most prestigious homes are naturally very selective. They rely on word-of-mouth advertising and want to see examples of a contractor’s work. Quality and service are often more im portant than pricing and scheduling. By listening to home builders and giving them what they want, MBC Dallas has successfully established a reputation as the premier drywall contractor in Metroplex.
The Jim Sexton Model Home in Tour 18 resembles a medieval castle, complete with gargoyles. A primary goal of our Dallas resi dential team has always been to establish the Marek name and reputation among Dallas area cus-
Finisher Jonathan Celis puts the finishing touches on the new Thayer residence.
This April, our crews completed work on one of the most unusual and challenging houses we’ve ever done. Located in the Highland Shores community, the house overlooks Lake Lewisville. The builder, Jim Thayer of Creative Concepts, is also the owner. The three-story house fea tures an array of interesting architectural features, including ultramodern styling, numerous reveals, projections, niches, light coves, radius walls and ceilings, Continued on page 4
Snake Charmers - A New Attraction at the Atlanta Zoo?
tv _
The "Snake Charmers" pause for a picture.
The new structure taking shape at the Atlanta Zoo. One usually associates zoos with unusual animals, not unusual architecture - but all this is changing with construction of the new Conservation Resource Center at the downtown Atlanta Zoo. The new build ing is designed to look like a coiled snake, resting in the grass!
the reptile. To create the desired effects, the roof includes 33 elevation points combined with various degrees of roof pitch. This concrete roof will then be covered in dirt and landscaped to make it resemble a sleeping serpent.
Spearheading the work is foreman John Files who is framing the metal stud roof trusses which will become the “body” on
Inside the building, the effect will be en hanced with canted walls, sloped gypsum board ceilings and soffits. The exhibit is
next to the llama enclosure and beside the miniature train tracks that take tourists around the park. Over the last few weeks, John and his lead carpenter Arvin Ma lone have noticed that the llamas have been looking none to happy. It seems that the tourists are more interested in watch ing the MIS crew of “snake charmers” than they are in live animals.♦
0
From Olympic Games to Baseball, MIS is Still On the Winning Team The Olympic Games may be over, but that doesn’t mean that work on the sta dium is finished. Our crews are now back on the site converting the stadium to be come the new “Turner Field” where the Atlanta Braves pro-baseball club will play. A great deal of work is involved, which has meant ten-hour days, sevendays a week for foremen Geoff George, Tim Althius, Jeff Gehan,, Bill Pallino and Miller Vinyard, with lead carpen
ters John Boeh, Thomas Edwards, Mike Fordem and Dough Springsteen. These men have been key in getting the public areas completed for a pre-season exhibition game with the current world series cham pion, the New York Yan_______ B kees. Under the scope of the The replica of the baseball that broke Babe Ruth's record. conversion, the locker room areas are being completely
reconfigured and new office space constructed for man agement personnel. We have also built out the origi nal concession areas in the courtyard entrance and our crews have installed numerous firewalls, heavy gauge framing and acoustical ceil ings.
The new Turner Stadium will become home to the Atlanta Braves. i l
An interesting new addition to the stadium is the mu seum area, which will disPage 2
play memorabilia. These include an old passenger car from a train that has been tied into the structure and finished out to allow patrons to experience how the early baseball players traveled. A giant billboard in the courtyard area depicts the baseball Hank Aaron hit to break Babe Ruth s 714l home run record. The work has involved a great mam changes, which have kept foreman # Geoff George on his toes as our crews continue to work during the season com pleting the work and attending to the fi nal details.♦
drywall partitions, gypsum board lay-in ceilings and FRP. Before starting on this job, Terry worked on an Aladdin office/warehouse buildout for General Contractors, installing un dergrid partitions, shaftwalls, acoustical ceilings, doors and hardware.
Ramsey Ruiz (It.) and David Villalobos (rt.) preparing sheetrock at the Pearsall school.
MBS San Antonio Foreman Darwin Macat is getting valu able assistance from Edward Rendon and David Villalobos at the Pearsall Senior High School where we are remodeling the current facility and building an addition. This is a fast-paced job which needs to be completed in time for the new school year starting this summer. Its “baptism by fire” for new employee/foreman Harry Krueger who is working with Joe Cantu on the six-story Red Roof Inn construction for Lyda. With no time to waste, our men are in stalling heavy gauge exterior and interior framing and hanging sheetrock before the roof is in place. We are keeping our fingers crossed that it doesn’t start rain ing.
»
Angel Puga is running two three-story remodels at the Lackland A.F.B. with the help of leadmen George Puga and Rigoberto Fernandez, who are each in charge of one of the buildings. With around 20 employees on the job, the work includes installing 120,000 sq. ft. of drywall ceilings. Some of the key men on the job include Sergeo Alvarado, Robert Caseas, Jose Canto, Rudy Cortez, Luis Lopez, William Muelimier, Jesus Paz, Ramiro Puga and Steve Valencia. Bob Winder is wrapping up work on the first phase of the UTSA Downtown project where we have been installing barrel ceilings in the restrooms, radius furr-
Working around inclement weather at the new Pearsall School. downs, heavy gauge exterior framing and Densglass. Helping Bob on the site have been Rudy Carbajal, Juan Chapa, Jesse Flores, Ted Rodriguez and Jose Silva
MBS Austin We are currently working on two sepa rate contracts for Constructors and Asso ciates. Foreman Hal Pollard is building out one and half floors of lease space for Brigham Oil and Gas. Our crews are con currently renovating an existing 120,000- square foot retail space for Saks Fifth Avenue where we are installing ex terior walls. Joe Knight and his crew are installing a new floor it the prenatal department of the Seton Hospital working with General Contractor White Constmction.
Exterior of the new U.T. building in downtown San Antonio.
MBS Dallas Foremen Terry Evans, Joe Rodriguez and Wayne Strawser are getting under way with a five-story 125,000-square foot tenant improvement for Ernst and Young. This is a high-end buildout with a great many fancy details to accommo date. David Guilbault and his crew are start ing work on a remodel of Corgan Archi tects’ 50,000-square foot offices. Again, our crews can expect lots of interesting features. Perhaps nothing beats the smell of fresh bagels, but unfortunately, there hasn’t been much baking going on at Benny’s Bagels at Plaza of the Americas while Terry Higgs has been demolishing exist ing walls and ceilings and installing new Page 3
!
Work on the Coppel Professional Plaza has progressed well under Richard Bur gess’s direction, with our crews install ing some fancy features, including radius-furrdown from eight-foot AFF to a 15-foot deck. We also installed exterior wall framing with gypsum sheathing on the outside, 5/8 inch drywall on the inte rior, acoustical ceilings with undergrid partitions, doors and hardware.
MBS Houston Working around shoppers can be quite tricky, particularly in a high traffic area like the Galleria. So, foremen Ron Fisch, Nick Nunez and Danny Smith have gotten around the problem by building two tunnels connecting the old Marshall Fields store to the rest of the Galleria for the general public to use. Our men are then free to work on the conversion of Marshall Fields into a new Saks Fifth Avenue. With work scheduled for com pletion in August, we have around 50 men on site, installing elaborate GRG, furrdowns, drywall and acoustical ceil ings. We are currently working on two fastpaced lease buildouts. Foremen Ray Masey and David McMillan are build ing out eight stories in the new Coastal Bank building, installing drywall, acousContinued on page 4
tical ceilings and fancy Compasso Magnagrid ceilings in this elegant new facility. Meanwhile, foreman Ray Moore and his men are hard at work fin ishing off drywall, acoustical ceilings and paint at the Kerr McGee facility for Bellows Construction. This job has taken careful planning and scheduling since we have had to wait for the last two tenants to move out before we could move onto the two final floors. California-based general contractors Gordon & Williams chose Marek Broth ers to install drywall, acoustical ceilings and paint in the new KRIV Television Production Studios. Since sound insula tion is key to this project, foreman How ard Boren and his crew have been paying special attention to ensuring that the walls and ceilings are carefully iso lated in order to make each room sound proof. In our industry, it is not usual to travel to sites out of town or even out of state, and we are fortunate to have employees who are willing to get up and go on short no tice. Working with Satterfield & Pontikes, foremen Darryl Hunter and James Owen, along with a crew of twelve men, are converting eight theaters in Orlando, Florida to the stadium-style seating. In addition to drywall and acous tical work, MBS is constructing the tiered seating using metal stud framing. Bobby Sandel is currently working on MBS Houston’s biggest EIFS project ever at the new AmeriSuites hotel where we are also handling the drywall and acoustical ceilings contracts and apply ing Duroplex paint finishes.
MIS Atlanta We currently have a number of different jobs around town keeping our crews working to fast-paced schedules. We have four jobs currently in progress for G A Pacific; a four-story core renova tion and one-story lease buildout for G.B.A. and a two-story tenant buildout for Alston & Bird where foremen James Hallmark, Nick Pallino and Mike Perry are currently adding the finishing touches. Ceilings foreman James Powell is work ing to a fast-paced July 1 finish at the
IBM Sales Call Center where we are in stalling 140,000 sq. ft. of 2 x 4 ceilings, 18 feet above the ground. All the work is being done from massive 20-foot by 20foot rolling tower scaffold. Kyle McGrady has begun work on the Sunbridge Assisted Living Residence, where we are installing three-story loadbearing walls. If foreman Bill Cummings and lead car penter Charles Winn sometimes feel a bit at sea working on the new Informa tion America project in downtown At lanta, it is to be expected. Information America, the world’s largest information gathering company, will occupy four floors of the Marriott Marquis building, with one of the most unusual office spaces ever designed. When finished, the
MBC Custom Homes Continued from page 1 and just about every other challenging feature possible in wood frame con struction. The stairway has a 30-foot high radius wall of glass block and drywall. In the 35-foot high main living area, the speakers for the stereo system are built into the walls and covered with a paper that matches the adjoining drywall. With a magician’s touch, our fin ishers made the edges go away, and after prime and texture, the speakers are per fectly camouflaged into the wall. MBC superintendent Shawn Borem and salesman Charles Barnett had the highest praises for the workmanship and the long hours that our crews dedi cated to this project.
interior will resemble a series of ships at sea, complete with wave and cloud efNumerous angled interior partitions are combined with a variety of other unusual features. Each elevator lobby is being framed to resemble the hull of a ship, with the “boats” extending into the corn puter floor section. Many of the partitions separating offices have major elevation changes in order to accommo date an ocean wave effect which is being created using smoked glass installed above the offices. The ceiling will be painted rather than tiled, incorporating a parachute and cloud motif suspended from the grid. Full-sized galvanized street lamps and wall sconces will pro vide permanent lighting throughout the office space.♦ remarkable homes is the Jim Sexton model. We are also proud to be the contractor of choice for New Haven Custom Homes, who builds in Tour 18, Highland Shores and other communities.
I
These and other builders of the area’s most exclusive homes are beginning to discover that Marek Brothers is synony mous with excellence when it comes to drywall. Whether it’s domed ceilings or rounded bullnose comers; slick walls or hand-troweled texture, they know they can count on Marek craftsmen, like patchman Jorge Terrazas. Jorge and his coworkers are getting the opportu nity to work in some of the finest custom homes around, and we look forward to more of this type of work in the future.o
We also recently completed fBg*> the drywall work on Mr. Thayer’s last residence for builder Jim Sexton Custom i;\ Homes. This beautiful home, also on the lake in Highland Shores, was later purchased by former NBA star Roy Tarpley. Jim Sexton Custom Homes is one of the select builders in the new Tour 18 development in Flower Mound where one of the most The first Thayer residence. Page 4
0
fects.
'
4~
■|a|
I
have him on our team. ” Keep up the good work, Mike! Welcome to two new employees. Audi Paz started working for us as a temporary last September, and then, in January, joined us as a full-time employee looking after payroll and insurance duties. Rob ert Ayala has joined our Rio Grande Val ley office to oversee safety and to assist Robert Martinez with his various re sponsibilities. Congratulations to ten-year employee Gary Gonzales who was recently pro moted from acoustical foreman into a newly created position overseeing safety, hiring and supervising the acous tical ceilings department.
MBS Houston ruur-ume winner or village builders' Out standing Service Award, Mike Castellano (rt.)
Welcome to Priscilla Salazar, a new member of the MBC Residential Team.
MBC Houston
A warm welcome to Priscilla Salazar who recently joined the MBC Residen tial team as a receptionist/secretary. Priscilla’s talents include bilingual skills which are very valuable to the drywall construction business. Priscilla is also the daughter-in-law of longtime MBC employee Martin Salazar. In Priscilla’s time away from the office, she enjoys her two-year old daughter, Sarah.
MBC Residential’s Mike Castellano has won the “Outstanding Service Award” from Village Builders for the fourth con secutive year. Mike was presented the Service Award on Friday, March 7, at Village Builder’s Annual Contractors BBQ Dinner. Each year, Village Builders selects indi viduals that have impressed them with their ability to consistently provide the type of service Village requires in order to maintain a high level of customer sat isfaction. When you consider how many trades are involved in building a house, and the number of people that the customer service department deals with, it becomes quite obvious that this award is a real honor for Mike and MBC. Through the years, Mike has combined his skills with his great personality to consistently service the needs of our customers. Mike has been with MBC for 26 years and as a highly skilled drywall crafts^J man, he handles himself and his job as a
A warm welcome to Greg Cable who has joined our Acoustical and Floor Cov erings division as a project manager/esti mator. Greg brings with him several years of experience working for a com petitor. Watch your Insights for news about the Annual General Contractors Fair on May 17 - a fun-filled day for the whole family.
MBC Dallas
MBS San Antonio When asked to think of an all-purpose foreman who can also please the cus tomer, Mike Cole’s name is at the top of the list. Mike, a 13-year veteran of the company, has founded a home at S.W. Bell’s Corporate Headquarters in downtown San Antonio. He has spent most of his waking moments there for the last three years attending to the many diverse needs that are generated by a major corporation. Mike’s duties range from lig t duty remodeling to full blown emo tion and rework of certain areas. Ron Gilmore, Director of Corporate Architecture for SBC Asset Management, Inc., had this to say about Mike: “When Mike ^ cjwrg6 0faproject that has a short
professional.
yz/.ve, / can COunt on him to bring the job
Congratulations, Mike, for your fourth consecutive Village award and thank you for your many years of dedicated service.
in on time. His coor dination great asset‘0^ ™ Zy fortunate to well as to SRC. Page 5
Jeff Wicker working on a new set of plans at MBC Dallas. Jeff Wicker is the latest addition to our residential staff, and people around here haven’t been this excited about a new team member since the Cowboys signed Continued on page 6
Deion. Jeff comes to Marek Brothers with extensive drywall experience, having previously worked for a competi tor in Austin and San Antonio. Jeff and his wife Cathy were planning to move to Dallas. Luckily, he was familiar with Marek’s reputation as a good place to work, so he applied for a job. He didn’t have to look any further. He started out with us on the ground floor, working as a patch man in the field. After several months, we decided we could make bet ter use of his talents and experience by moving him into the office. Since the first of the year, Jeff has been spending most of his time estimating plans. His duties also include selling, and project management - and he is also a pretty fair hand with his tools. Jeff isn’t bashful about calling on some new builders. Along with rounding up new plans to bid, he has managed to bring in some new customers. It is this type of initiative, coupled with his conta gious enthusiasm, that makes Jeff a pleasure to work with. Please join us in welcoming him.
A Chance for our Houston Employees to Become Homeowners The City of Houston, in cooperation with Majestic Homes, has announced a program that will allow low income families to become homeowners. This program will feature homes to be built in Briar Villa off South Post Oak. Mastermark Homes has a similar program in Spring Branch Villas near N. Gessner and Clay Road. To qualified home buyers the city will provide up to $9,500. in down payment assistance. Families will move into a new threebedroom, two-bath, two-car garage house priced at approximately $60,000 with a total down payment of around $1,800. They will pay about $600 per
music department of Emery University Campus.
month, which would include taxes and insurance. After five years, if the family has stayed in the home and kept its mortgage payments current, the entire $9,500 assistance will be forgiven. Since the program is designed for lower income families, the maximum income for a family of four is $36,400. This program represents a good oppor tunity for employees of the Marek Family of Companies. If you are inter ested and have approximately $2,000 in savings and fairly good credit, call Ann De La Rosa at the MBS office at 713/681 -2626 and she will assist you in filling out the application>
his work is very refreshing, and when something challenging comes along, we always know that, if Doug is on the job, the work will get done - and done right! A j Darral Quebedeaux has been selected as our safety director - a vital responsibil ity in our industry when mistakes can cost lives. Darral will also be responsible for supervising acoustical ceiling work. His experience in both safety and ceiling installations will be a great asset to our team>
MIS Atlanta Bill “Tiny” Lumus gets Outstanding Employee Recognition for all the effort he put forth on the Burlington Road building, a three-story remodel of a church which will be used as part of the
i
Condolences
t
We offer our condolences to long time MBC Houston field supervisor, Jorge Rodriguez and wife Suzie in the loss of his mother-in-law, Mercedes Trivino, who passed away in March, 1997.
Bud Hudson, at MIS, received a personal letter of thanks from Holder Construction on completion of the Emery School of Business. The company complemented Bill Lumus and his crew on their great attitude and commitment to getting the job done. A warm welcome to Angel Chapman who will be taking care of Accounts Pay able for us.
MBS Austin Bill "Tiny” Lumus gets Outstanding Employee Recognition from Atlanta and from Holder Con struction.
L
This issue we would like to recognize foreman Doug Prew as someone we can always rely on. Doug’s attitude towards Page 6
<0
MBS San Antonio is sad to report the death of George Drenes on April 7. George retired from the company in 1988, but kept in touch with us, keeping us all informed about how manyfish he had caught. Our thoughts are with the Campbell family on the death of Sharon Camp bell Koeblen on April 8. Sharon was Ray and Pat Campbell’s daughter and Bubba Campbell’s sister. ♦
MBS Houston
MBS Dallas Our crews are getting ready to start work on the Lowes of North Dallas project where we will be installing acoustical ceilings, interior drywall partitions and EIFS at the entry canopies. On the exte rior, we will be installing heavy gauge metal framing around the exterior entry canopies and towers and then 1/2-inch Densglass over the framing. Finally, we will install light gauge corrugated metal decking with sloped canopies. Just when the weather starts to really heat up in June or July, we will start work on the Brinks Home Security facility where we will be finishing out two floors with 80,000 sq. ft. of acoustical ceiling, deck high and undergrid drywall partitions, plaster soffit at the exterior entries and EIFS over Densglass which will be ap plied to heavy gauge framed roof screen walls. We will also be installing door frames, doors and hardware. Home Depot is opening a new facility close to Love Field where we will be in stalling 24-foot high partitions with 1/2 inch plywood to 20 feet, interior drywall partitions, sheetrock and acoustical ceil ings. Home Depot is particularly security conscious, so we will also be installing security mesh between metal studs and drywall, and bullet resistant fiberreinforced gypsum panels. We will com plete thejob by installing doors and hard ware. 1 I
i :
MBS San Antonio We are currently enjoying a strong mar ket with bids pending on a number of jobs and a backlog of work. Work will start in August on the second phase of the UTS A Downtown Campus. After completing the first phase of the project for Spaw Glass, we have been contracted to return to the site to install metal framing, exterior Densglass and Durock, interior framing, drywall ther-
Watch your Insights for coverage of the new 21-story Court House project which we will be starting later this year, install ing 21 -stories of dry wall for Manhattan Construction. mal installation and acoustical ceilings in this 168,000 sq. ft. mixed use facility. In September, we will be beginning work on two major projects. The first involves the Valley Regional Medical Center, a new hospital in Brownsville where our crews will be handling both the exterior and interior of the new 3-story, 300,000 sq. ft. facility. The second project is the construction of the new Barbara Bush Middle School, a 170,000 sq. ft. project where we will be installing exterior framing, sheathing, insulation, drywall, acoustical ceilings andH-I impact board.
MIS Atlanta Following on a tradition for building out high profile downtown facilities in At lanta, we will be beginning work on a four-story core and buildout FDA Annex project in July for Beers Construction.
MBS Austin We have a busy summer ahead with sev eral large jobs due to start up. Work will begin in July on a major 3,000seat auditorium which will keep our crews busy for the remainder of the year. Joe Knight will be supervising the work with help from Ernest Canales, Reese Crowther, Bob Fritz and Lonnie Gar ner. Then, in August, foreman Floyd Zahn will be starting work on a five-story of fice building for White Construction. Floyd, assisted by Joe Pete Gonzales, Hal Pollard, Dale Robinson and Jeff Scott, will be constructing the base . building and handling the interior buildout, including installing acoustical ceilings. Looking ahead to 1998, around the mid dle of the year we will be working on a joint venture project with MBS Houston and MBS San Antonio installing acousti cal ceilings at the new Austin-Bergstrom International Airport.
Page 7
Our drywall and acoustical crews will also be starting soon on the new Herman Pavilion Hospital in Houston’s ever ex panding medical center. ♦
MBC Houston Congratulations to Ronnie and Tina Marek on the arrival of their new baby boy, Kyle Thomas, bom on April 7, 1997. Kyle, who has two older brothers, weighed in at 71bs. 8oz., and was 19 inches long.
MIS Atlanta Best wishes to finishing foreman Sal Tollis who is getting married in May and project manager Mike Feather and his wife Lisa who are expecting a baby in September.
MBS Austin Congratulations to Domitilo Casti llo and his wife Elena on the birth of the son, Jose, born March 12, who weighed in at 81bs. 3 oz..
MBS Houston Lisa and Roger Walla are celebrat ing the arrival of their baby son, Brandon Scott, who was bom in the middle of March and weighed a good lOlbs. 4 oz. Best wishes to Frank Messina and his wife who are expecting a baby later this year> Best wishes to Randy Miller and his wife Bethanie who are expecting their second child in September.
lution for the biggest problem facing the construction industry: a lack of skilled workers. Interesting things are happening in construction. First, the State Drywall Association is trying to improve the image of our in dustry. That effort has moved to the Texas legislature and has resulted in a proposed bill to register drywall contractors in the State of Texas. The bill is being vigorously opposed by the Home builders and Apartment Association and may not survive. These organiza tions feel that their best interests lie in preserving the present system which promotes the use of small independent subcontractors who will work for wages only. This is discouraging but this effort is a start and people in Austin are more aware of the situation than before. Another movement is underway, and its outlook is more favorable. It is known as the “Construction Workforce Coali tion” and is composed of several con struction associations in the Houston area, including ABC (Associated Builders and Contractors), AGC (Asso ciated General Contractors), IEC (Inde pendent Electrical Contractors) and D1SCA (Drywall and Interior Systems Contractors Association). Representatives of these associations and contractor members have been meeting since last October to find a so-
The Marek Family of Companies ATLANTA, GEORGIA Marek Interior Systems, Inc. (MISI) AUSTIN, TEXAS Marek Brothers Systems, Inc. (MBS) DALLAS, TEXAS Marek Brothers Systems, Inc. (MBS) Marek Brothers Company (MBC) HOUSTON,TEXAS Blue Bell Place Builders Marek Brothers Company (MBC) Marek Brothers Systems (MBS) Oak Forest Lumber & Supply Company Stanley Construction Company SAN ANTONIO, TEXAS Marek Brothers Systems, Inc. (MBS) SAN ANTONIO/HARLINGEN, TEXAS Marek Brothers Systems, inc. (MBS)
The CWC is addressing the problem on three fronts: recruiting, training and re tention. Task forces within the CWC have par ticipated in career fairs at twenty Houston-area high schools, putting out the word about construction career oppor tunities and soliciting juniors and sen iors for immediate job openings. The CWC has formulated other teams to initiate recruiting efforts with other target groups. One of the critical areas the CWC is ad dressing is the training issue. All em ployees who participate must commit to placing new employees in a bonafide skills training program after thirty days of employment. The third area of focus for the CWC is retaining workers by serving as a refer ral service. Member employers are asked not to lay off workers in slow times but to send them back to the CWC for referral to another contractor. This will enable workers not only to have the potential for steadier work but to acquire skills in a variety of areas. This is the first attempt at creating a la bor pool for our entire industry that ex tends across all craft lines. It’s a positive
WANTED
V
The Construction Workforce Coalition is seeking men and women looking for career opportunities in construction in Houston. Immediate openings in all crafts for both exper ienced and inexperienced personnel. Skills training provided. Call the CWC at 281/694-3700.___________ approach and offers those interested in a career in construction an opportunity to look at different crafts. The goal of the CWC is to recruit and then be sure that they person whom they have recruited has an opportunity to learn a skill. The Marek Family of Companies is ac tive in both the State Drywall Associa tion and the Construction Workforce Coalition because our biggest challenge for the rest of the year and the foresee able future will be manning the work that has to be built. For all of us, it is time to show our pride to those new people entering our indus try. Welcome them, take the time to be a mentor. Someone along the way helped you to be a better craftsperson, so return the favor.
t
We are in a new Golden Age of Construction, and the Marek Family of Companies is committed to doing everything possible to rebuild pride in our industry and our communities.o
Insights 3539 Oak Forest Drive Suite 200 Houston, Texas 77018 J
'