圆 Insights
_ A publication of the Marek Family of Companies
^
Fall 1991
New Company Benefit: "One for Two In ’92" Helps Retirement Planning The Marek Family of Companies is pleased to announce that beginning January 1,1992, it will match a portion of employee’ contributions to the companies’ 40IK retire ment savings plan. Themed "One for Two in ’92' the plan calls for a company contribution of $ 1 for every $2 an employee puts into the plan. However, the maximum company contribution is limited to one percent of an employee’s
earnings, up to a maximum of $500. Under the plan, a $10 per hour employee ($20,000 per year), can receive up to approxi mately $200 of company matching based on the one per cent maximum. To get the $200, the employee would have to contribute $400 of his own money since the matching ratio is one for two. ’’The 401K savings plan, with its matching provision,allows us to join together with our em
ployees in a sharing process that helps build their retire ment program. We are very ex cited about this new benefit and hope our employees will be able to take advantage of it." says President Stan Marek. "We are reaching a major mile stone with this commitment to begin matching, however, our ability to continue to match, just like our ability to provide any benefit, will depend upon overall company performance and profitability." adds Stan.
How the fund would grow for a 35-year old employee who enrolled in the plan in 1991, and will retire in the year 2021. Based on a current annual salary of $20,800 5.00
$ 10.00
Monthly contribution
21.67
43.33
86.67
Annual contribution
260.00
520.00
U040.00
Employer matching
130.00
208.00
208.00
Total annual contribution
390.00
728.00
1,248.00
If you elect to contribribute weekly
$
$
20.00
If the investment earns 7% Balance after 5 years
2.327.00
4.344.00
7,446.00
Balance after 10 years
5.590.00
10.436.00
17,890.00
Balance at retirement
35,635.00
66.519.00
114,035.00
If the investment earns 8% Balance after 5 years
2.386.00
4,454.00
7,635.00 18,853.00
Balance after 10 years
5.892.00
10.998.00
Balance at retirement
42,575.00
79.473.00 136,241.00
If the investment earns 9% Balance after 5 years
2.446.00
4.566.00
7,828.00
Balance after 10 years
6.210.00
11.592.00
19,873.00
Balance at retirement
51,033.00
95.263.00 163,308.00
The figures shown here are for illustrative purposes only and assume the same annual contributions each year continuing until retirement. Investment results are not guaranteed.
Page 1
Employees will learn more about the 401K retirement sav ings plan in November in em ployee meetings. Following this educational process, em ployees will then be given the opportunity to elect to begin making contributions to the plan, or change any decisions concerning the 40IK plan made during September’s open enrollment. The "One for Two in ’92" theme is being used to help em ployees identify with the $1 match for $2 of employee con tributions. The company has had the 401K option as part of its profit shar ing plan since 1989. However, until the decision to provide a percentage match from the company, the plan was entirely funded by employee contribu tions. Already the plan has more than 300 employees making contri butions that have grown to more than $300,000. The plan’s funds are invested in certificates of deposit. Texas Commerce Bank is the custod ial trustee of the assets. Hand and Associates, a Houstonbased benefit consultant and actuarial company, provides administration of the plan. Federal tax law changes in recent years have made the 40 IK a popular way to fund retire ment plans on a pre-tax basis. In addition, interest earned by the money in the plan is not taxed until it is withdrawn, which is usually at retirement.
Safety At Work SA/Austin Celebrates An Accident-Free Year
Dinner on October 8 at Aggie Park. Employees and their spouses attended the event
§
i.
mi f
/
Around 160 people attended San Antomo/Austin s dinnei to celebrated a full year without lost time due to accidents orative plaque to mark this im pressive accomplishment.
Paul Mcirek and Larry Williams presenting the prestigious safety award to the San Antonio/Austin Office On August 31, Marek Brothers Systems San Antonio/Austin office completed a full year without any lost time due to accidents. To celebrate this great achievement, the company held a Safety Awards
Evening which included cock tails, appetizers and a sit down dinner. Paul Marek and Larry Williams then addressed the gathering of around 160 peo ple, and presented Dewitt Churchwell with a commem-
MBS/SA-Austin
Lackland Air Force Base. Di vision President Dewitt Churchwell, and acoustical manager Juan De Hoyos, teamed up to secure the job where MBS will be installing drywall, metal stud framing, acoustical ceilings, and metal linear pan ceilings in the Stu dent Housing and Dining Proj ect. And at the same base, we will be starting work in January on the BEQ, installing drywalls, metal stud framing, and acoustical and linear metal ceilings.
MBS has been awarded several contracts at air force bases in the San Antonio area. At the
Work will begin in February on the Service and Information
MIS/Atlanta Work is currently starting on an eight-story office build-out for Ernst Young. Project Manager David Salyers reports that MIS will be installing acousti cal ceilings. Work is also beginning on a three-floor executive office project for C&S/Sovrcin. MIS will be installing drywall, acoustical ceilings and plaster.
MIS Atlanta Named Safety Contractor Of The Week On September 19, MIS was named Safety Contractor of the Week on the Georgia Dome Project. Over 60 subcontrac tors and around 600 men and News Center at the Kelly Air Force Base where MBS will be installing drywall and metal stud framing, acoustical ceil ings, wall panels, linear metal pan ceilings and the exterior Durock System. Bob Lynch, and Juan De Hoyos were in strumental in securing this job.
MBS/Houston Work is scheduled to start in January on the new Landmark Graphics building off Dairy Ashford and Memorial in West Houston. In association with E.E. Reed Construction, MBS will be responsible for the drywall and interior painting in the six-story building. Scott Nichols is the Project Man ager/Estimator for the drywall work, and Randy Vierek is the
Page 2
women make up the overall team working on this highly prestigious building. It is of great credit to our Atlanta Of fice to have earned the distinction of being the safest company on the jobsite. Congratulations to all our safety conscious employees keep up the good work! Project Manager/Estimator for the paint contract. MBS has also been awarded a contract to install drywall and acoustical ceilings in the Memorial Presbyterian Church addition on Memorial Drive. The new building will house a library, a classroom and a sanctuary. Scott Nichols is the Drywall Estimator, Mark Mueller is the Project Manager, and Brendan Doyle is in charge of the project man agement and estimating on the acoustical work. MBS has also won a 150,000 square foot project with NASA in Clear Lake where we will be beginning drywall work in February on a new seven-story flight training building. Saied Alavi is the Project Manager and Wayne Lueckemeyer is the Estimator.
€
Major Projects Around The State On the job Production Manager Jay Richards,Foremen Paul Hering and Paul Nevlud,Fin ishing Foreman Jim Bicki and Specialities expert James Foley, have had to put in a lot of extra hours making sure that the work progressed smoothly and met the usual Marek stan dards of top notch quality.
SA/Austin Wins Major Resort Hotel Project
Paul Hering was one on the foremen on the TEPPC office build-out
MBS Houston: Building the "Office Of The Future1 Working to a gruelingly fast four-week schedule, MBS Houston had to put in a lot of ten-hour days, seven days a week building out the presti gious new Texas Eastern Products Pipeline Company (TEPPC) offices. The new of fices will span three floors of the American General Building on Allen Parkway, and cover 69,000 sq ft. What is unusual about this build-out is the futuristic office layout which was designed by Houston architects Ziegler Cooper. According to a spokesman at Texas Eastern, ''The offices are designed to promote creativity, innovation and teamwork." Many of the offices have no walls, while a three-story spiral staircase con necting the floors will encourage interaction between employees. Visitors entering the offices will not find a receptionist. In stead, a "greeter will emerge from another area,,walk into the visitors ’briefing center, and
welcome the visitor with a smile and a handshake. Working with contractor W.S. Bellows, MBS was responsible for the drywall and acoustical ceilings, and has been involved in completing some highly ex otic finishes. These include sponge painting and sheetrock ing round walls and a round atrium which encloses the spi ral stair. Project Manager on the drywall was Scott Nichols and Brendan Doyle was the Project Manager for acoustical ceilings.
Ken Lane measures sheetrock on the TEPPC project
MBS crews in San Antonio are already hard at work on the new Hyatt Resort Hotel which is being built in West San Antonio adjacent to Sea World. The new four-story hotel, which was designed by Hill Ar chitects, is being constructed by General Contractor Lyda Inc. It is being built to resemble a 19th century ranch and will be finished with native Texas stone on the exterior walls. The whole complex will include an 18-hole golf course and a golf club house, a man-made river for inner-tubing and swim ming, a frontier style saloon complete with a long bar,two banquet halls, and 500 rooms for guests. MBS won the drywall and acoustical ceilings contract on the new building, and will be playing a major role in the fin ishing of this lavish resort com plex, completing 450,000 sq ft. of build-out work by Septem ber 1992. On the exterior of the building MBS will install metal stud framing, Mansard roof framing, and sheathing. Inside the hotel, our crews will be re sponsible for interior metal studs, drywall, thermal and sound insulation, acoustical ceilings, metal panel ceilings and FRP panels. Mark Keith is the Drywall Project Manager on this project and Juan De Hoy os is the Acoustical Ceilings Project Manager. They are teamed up with Production Manager
Page 3
Grady Atnip and Supervisor John Hickey.
Dallas Starts Work On Second Phase Of Supercollider After completing the first phase of the Supercollider fa cilities, MBS is continuing to work two shifts with 40 men per shift to complete installa tion of dry wall and acoustical ceilings in a warehouse build ing which is being converted into offices and laboratories. The job is due to be completed in ten weeks. The 325,000-sq ft. facility will be subdivided by a two-hour fire rated parti tion 528 ft. by 36 ft. high. MBS has erected 90 intermediate support columns each consist ing of four 11W inch 16-gauge studs nested together and mea suring 40 ft. in height. The of fice section includes 40,000 sq ft. of open plan, 8,000 sq ft. of atrium and 42,000 sq ft. of of fices. The offices are typically light gauge walls, and under grid. The walls of the 30-foot high atrium are accented by re veals in a grid work pattern. The elevator has an exposed wall in the atrium which is built on a five-foot radius and has a clear span of 30 feet. Six sky light drywall coffers hang above the atrium at 30 feet. The waiting area in the atrium is surrounded by a grid network of 2ft-by-2ft drywall beams and 30-foot high columns. The 12-foot high acoustical ceil ings cover 132,000 sq ft. and are suspended from 28-foot wire hung from the roof deck above. In the offices, the acous tical ceilings are at 9 feet with a secondary ceiling at 12 feet, forming a plenum. Dennis Henderson is the Day Supervisor and Ed Kuta is the Night Supervisor. Randy Agnew is the Acoustical Supervisor and Johnny Pickett is the Project Manager.
O’Brien, Superintendent; Acoustical Foremen John Porter; and Finishing Foreman Bill O’Brien.
MBS/SA-Austin Our crews are completing a 200,000 square-foot office build-out for Builders Square's Corporate Headquarters. Turnkeying the job and work ing to a fast-paced two-month turnaround, MBS has been in stalling radius wood framing, radius metal framing, and radius concave vortexes made from wood framing, with sheetrock then applied over the frames. MBS has also been in stalling acoustical ceilings, hollow metal frames.
Rudy Carbajal and Jaime Vasquez (right) Rivina III - Site of the new Holiday Inn completing work on the St. Francis Nursing Home Worldwide Headquarters in Atlanta
MIS/Atlanta MIS Atlanta Starts Work On The New Georgia Dome In August, MIS started work on the new Georgia Dome in Atlanta, a multipurpose sta dium and convention facility. The dome will have 70,500 seats including 183 private boxes, and will cover a total area of 1,618,500 sq ft. The dome is scheduled to be com pleted by August 1992, in time for a late summer football game. Greg Stine is the Project Manager on the job where MIS is installing drywall and plaster in the new stadium. Heading up the job site crews are Pro duction Manager Fred Lay, Foremen Gilbert Shelton and Bob Mclver, and Finishing Foreman Jeff Gehan. Watch your Insights newsletter for more details of this major project. Continuing our track record of success on Ravina Drive, MIS will be installing drywall, ceil-
ings and plaster in the new Holiday Inn Worldwide Head quarters office space at III Ravina Drive. The offices were designed by Heery Inc. Archi tects for Hines Interests Ltd. Partnership. The work will be carried out on the first floor and floors 20 through 30. Working with the General Contractor, Cecil Malone Company, our crews started work in August and are sticking to a tight schedule for a December 20 completion. The offices cover approximately 250,000 sq ft., with complex variations in floor designs. These include re veals, radius walls and ornate gypsum ceilings. The final plaster work will be color tinted to match adjacent fin ishes. Key people working on this project include Drywall Foreman Tim Anthuis,Finish ing Foreman Ralph Stilz, Ceil ing Foreman Danny Williams, Plaster Foreman Billy Theiss, and lead men Sam Lawson, Myron Hale,Keith Escarra, Dave Williams, Teri Gibel,
Luther Nix Sr. and Luther Nix Jr. and Bill Pranger. Work is progressing well on the C&S Sovran building where Mike Feather is serving as the Project Manager on the 21 -floor, 400,000 build-out. The project calls for under grid drywall work and the installa tion of 40 GRG domes. By the middle of November, our crews will be simultaneously working on 15 floors. Han dling the construction are Su perintendent Mike 0,Brien, Foreman Mike Perry, Acoustical Ceilings Foreman Bill Pallino, and Finishing Fore man Mike Woodruff. Work is about to be completed on the 14-floor Wachovia Bank °f Borgia project where MIS is installing drywalls, aluminum door frames and ceilings, with Armstrong Cirrus Reveal edge panels. Key team members on this pioject include David Salyers, ^roj?ct Manager; Chuck Hamilton, Supervisor; Mike
Page 4
The drywall team was headed by Project Manager Mark Keith and foreman Ron Atnip. Juan De Hoyos was the Acoustical Project Manager and Eddie Atnip was the Acoustical Ceilings Foreman. Key employees who have helped keep the job on track include Antonio Puga, Russell Tanksley, Mike Cole, Gus Moreno, David Moore, Mark Taylor, Fernado Medrano and Gilbert Canales. MBS is also close to finishing work on the St. Francis Nursing Home where our crews have been installing exterior heavy gauge, interior framing and sheetrock. The building in corporates several unusual fea tures including high sloped ceilings, a radius on the second fioor,and a front entrance that spans the full height of the building. Drywall fore man is Bob Winder assisted by Rudy Carbajal, Epifanio Marquez, Pete Marquez, Abel Ochoa, Tony Puga, Jaime Vasquez and Julio Bazald ua. Under Drywall Foreman Grady Sexton’s direction, work is progressing well on the
. 餐
Municipal Courts’ interior office rernodeling where MBS is installing a large number of shaftwell separation walls and some 40-foot column wraps. Key men working on this project include Joe Cantu, Mike Cervantes, Jose Elizondo, Jessie Flores, David Ortiz, Lorenzo Pardo and Jose Martinez.
Joe Cantu is just one key member of the MBS team on the Municipal Courts project
MBS/Dallas Working with contractor Huber, Hunt and Nichols, MBS Dallas has started work on a 23,000 square-foot renovation and expansion project on the St. Paul Surgical Inten sive Ccivc Unit. The project has been divided into three phases. The first phase involves renovating the existing 7th floor where minor drywall and acoustical renovations will be made. This area will then be used as a temporary intensive care unit until the renovations on the 6th floor, where the ICU is nor mally located, have been com-
Hl=D,gphasetwo,both the 6th and 7th floors will be expanded, and a new elevator shaft W1ii be installed. MBS will be installing heavy gauge backup for both brick and a "Synerflex" exterior finish sys tem. The final phase will involve renovating the existing 6th floor surgical intensive care unit. The area will be com peted gutted and rebuilt. MBS s work scope includes in stalling drywall partitions, acoustical ceilings, rough carpentry,finishing and installing hollow metal door frames, doors and hardware and mis cellaneous accessories. Glenn McBride is the Project Man ager on this job, headed by Robert Brazel, Foreman, and Production Manager David Sparacino.
Production Manager David Sparacino and Production Co ordinator Lee Romine. Work on the new project started in April with a comple tion date of June 1992. MBS will then be bidding on the fu ture tenant build-out work.
MBS Houston MBS is handling the drywall, acoustical ceiling and paint work for IBM's office remodel ing at Riverway. The work is part of a ten-floor remodeling project which involves demoli tion and extensive updating of the facilities.
Work is progressing well on the new Electronic Data Sys tems Administrative Building in Plano Texas. The building, with its lavish interior and ex terior design,will be a land mark on the Plano horizon. Working with General Con tractor Austin Commercial, Inc., MBS will install all the drywall and acoustical work for the entire core package. Doug Laird, Drywall Parti tions, Ceilings and Furrdowns Project Manager, is working closely with Specialties Proj ect Manager Mary Coleman, Acoustical Project Manager Hal Waldrop and the field crews in the installation of 1.3 million sq ft. of drywall parti tions, and fabric wrapped fiber glass ceilings panels in 30-by30 inch modules. The project is presenting some interesting challenges. These include the installation of five-story ob long radiused glass reinforced gyp 娜 columns, light coves and beam wraps in seven of the different atrium areas. Other key members of the Dallas team include Project SuperCraig Dotterer, visor
Page 5
Dan Karsten is the Project Manager for dry wall, Brendan Doyle is in charge of acoustical ceilings and Randy Vierek is the Project Manager for the paint work. Under Chris Conner’s direc tion, MBS,s new Service Divi sion is carrying out renovation work on a tour-story remodel of the Esperson Building in Downtown Houston. Our ser vice division has been involved in demolition work, drywall, paint and ceiling replacement. Bob Cocran, Foreman,is supervising the field effort.
Is MBS Acoustical Division Going Back To School? Not exactly, but they are play ing a major role in the build ing of a number of new new schools in Greater Houston. Thanks to our reputation for quality work, an excellent track record and a "can-do" attitude, MBS has secured much of the acoustical work in these new schools. Work started in October on the Fort Bend Middle School where MBS will install 1/4 million sq ft. of acoustical ceilings and wall panels. The project is expected to last until the school opens in Au gust 1992. Frank Messina is the Project Manager and James Harvel is the Superintendant. Frank and James will also be in charge of installing acous tical ceilings and wall panels in a number of other schools. These include the Pugh Relief Elementary School、 a 100,000 sq ft. project; 50,000 sq ft. of acoustical work at Piney Point Elementary School for Humphries Con struction; and 80,000 sq ft. of ceiling and wall paneling at Kline Elementary. Meantime Larry Netardus will be the Project Manager at
the new King wood High School where MBS will in stall 200,000 square feet of acoustical ceilings and wall panels. Larry is also the Proj ect Manager on an 180,000square foot acoustical project at the new Clear Lake High School, working with contractors Braburn Construc tion, and a 50,000 sq ft. project for Deer Park Middle School for Temple and Asso ciates. Finally, Michael Moore will be the Project Manager on the Awty School project where MBS are installing 10,000 square feet of ceilings. These new school projects will provide a steady flow of work which will keep many of the acoustical field crews busy until summer 1992. It will also provide continuity to the crews who recently fin ished up nine schools in the Houston area which opened their doors to students in August. These schools include four schools in Pasadena, three schools in Spring, Southmore School and Miller Elementary.
11
during his ten years with us. He recently worked on the 28story Oryx Tower and the fast paced Supercollider project in Woxcihachie. Rolando's out standing peiformauces, espe cially under very demanding jpt, situations, is to be admired. His knowledge and experience ofwhat needs to happen from a logistical standpoint' to keep a large job going, is a great asset to our company. We are happy to liaVe Rolando as part of our team in Dallas, and are P leased to recognize him cis cm on tstanding employee.n
r1 f
Keny Norman: An Outstanding Employee
MBS/SA- Austin Special recognition to Kerry Norman who has been putting in double duty working in pay ables and payroll this fall while the department has been shorthanded. Kerry joined MBS in February 1989 and has im pressed everyone with her hard work. We appreciate her dedi cation.
M!S/Atlanta Congratulations to David Salyers, Acoustical Manager, and this issue’s outstanding employee. David joined the company in 1984 and is responsible for estimating and managing all our acoustical ceiling tile projects. According to Steve Shockley ''David is the most knowledgeable acoustical ceilings person in the business and one ofthe best negotiators I have ever seen. He is excellent at customer re lations and he can handle many things at once .David is just a real team player and a great asset to the company." David has been proving his worth by simultaneously han dling several current projects, including the 14-floor
Outstanding employee Rolando Maldonado with his son, Jesus, who recently joined MBS ect Manager Greg Stine who Wachovia Bank build-out, the will both be receiving ten-year five-story Cumberland Circle service rings this year. office building, and the eightstory build-out for Ernst Young. At the same time, he MBS/Dallas has been bidding on a number of other major acoustical jobs. Ten-year MBS veteran Special recognition to Produc Rolando Maldonado is recog tion Manager Fred Lay who nized as an outstanding emhas just celebrated 20 years ployee by MBS in Dallas. with the company, and Acous According to Production Mantical Superintendent Danny ager David Sparacino: Williams and Estimator/Proj"Rolando has been labor foreman for several large projects
Becky Scott has assumed the duties of Secretary/Reception ist. Besides her new responsi bilities, Becky will continue to perform many of her former duties, so the knowledge that she has acquired during her years helping in the accounting department will be well used. Congratulations Becky, keep up the good work!
MBC/Houston Special thanks for a job well done goes to crewleader Alfredo Moreno who recently completed several difficult jobs - and brought them all in under budget. Alfredo was pro-
births, Marriages and Anniversaries MBS/Houston Congratulations to Mike Syzdek and his wife Nancy, on the birth of their new baby daughter, Amy Michelle. Congratulations also to Stan Marek and his wife Reinnette, who are the proud parents of a new baby boy, Benjamin Joseph.
MBS/Dallas John Hinson and his wife Kelle, welcomed a new addi tion to their family on Sep tember 19, with the birth of a son,Colton John. Colton weighed in at 7 lbs. 13oz.,and
measured 20.5 inches. In John’s words: "He’s a keeper!"
MBC/Houston Best wishes to Isaac and Claudine Hernandez who were married on August 31 Isaac is an expert finisher with MBC and a right-hand man to crewleader Joe Rodri guez. Miguel Rodriguez, a • *°ng time drywall finishing crewleader and his wife Yolanda will celebrate their silver weddi anniversary on December 2, 1991. and Yolanda, will be Miguel looking back on 25 years of marriage.
Page 6
Among many other accomplishments, the Rodriguez's have six children: Miguel Jr., Jessie, Joe, Jimmy, Abran, and Rebecca.
MBS/ SA-Austin Mark Williams and his wife Eileen, are celebrating the birth of their second child. Shannon Lynn who was bom on August 9,and weighed 71bs. Dewitt Church'veH’s wife Gail gave birth to their second child on September 5th. A boy,Philip Michael. Their new arrival weighed a healthy 8 lbs. 2 oz.
moted to crewleader at MBC in the fall of 1990, and works pri marily in the custom housing department. His good attitude, finishing talents, people skills and dependability mean that the company can always rely on him to meet our customers’ expectations. His leadership skills have also proved a great asset in giving direction to his crew members Eliseo Uribe and Daniel Moreno.
Spot Light On Landscaping
:
Homer Garzci is a familiarfigure cit Blue Bell Village extremely diligent in mainSugerland where Landscap taining this attractive land ing have been contracted to scaping. handle all the landscaping work for the Church’s newest Welcome to Homer Garza, Maintenance Crew Supervi mission. Maintenance Supervisor sor, who has joined Stanley Osmar Acosta wins Out Construction to work on Blue standing Employee recogni Bell Village. Homer’s experi tion for the excellent work he ence includes three years as has done at Conoco’s World the Maintenance Superinten Headquarters in West Hous dent for the common areas of ton. Conoco’s 50-acre facility the Copperfield-Friendswood is a real show piece and the Development. Blue Bell Vil grounds surrounding the ele lage is one of Houston’s larg gant white office complex de est rental communities with mand a high level of attention multifamily and individual to detail. Keeping the grounds homes. The complex is in pristine condition is a sixnowned for its beautiful land day job and Osmar has been scaping.
Osmar Acosta working at the Conoco Headquarters
40-year employee "Bube n Hein Congratulations to Samuel "Bube" Hein who celebrated 40 years of employment with the Marek Brothers Company on October 10. Bube’s talents, dependability, and leadership through the years are just an other reason why the Marek organization has been a force in the drywall industry for so long. Pulte Home Customer Service Department has officially con gratulated Don Bockhorst, MBC’s customer service em ployee, for MBC’s diywall fin ishing expertise, courtesy and neatness, and Don’s efforts to provide a quality product. Don is an excellent team player who has helped make Pulte Homes proud to have MBC as their drywall contractor.
MBS/Houston Outstanding Employee recog nition goes to —Personnel Man-
Landscaping is scheduled to begin work in late November on the Japanese Gardens in Hermann Park. Our crews will be building an "Azumaja" under the direc tion of the highly acclaimed Mr. Ken Nakajima. Mr. Nakajima is recognized in Japan for his landscaping work in London, Moscow, and San Diego. He uses timehonored designs in the Japan ese tradition, blending history with native plant species and capitalizing on the typograph ical features of the site. Work is also starting on the latter Day Saints Church in ager, Randy Hageman. Randy has been a real asset to the company since he joined over three years ago .State and federal regulations have dramatically changed the roie of the Personn el Depnrtment, making it increasing complex to man.Thanks age a large work force ^ to his hard work and talent, Randy successfully hnndles all our field personnel issues smoothly and efTiciently. His work, which includes hiring, employee screening, directing ,and keeping safety efforts fast turnover oflen track ol ^
keeps Randy burning the mid night oil. Special thanks to Pat Allen who has been putting in a great deal of time and effort on the Shell project in Downtown Houston. Pat has been with MBS in Houston for five years and has handled everything from site scheduling and manpower to material expediting. His recent work on the fast paced and challenging Shell project has dictated a grueling work schedule including weekends, late nights and early mornings.
Page 7
Welcome to Rex Henly who has joined Chris Conner’s remodeling division as a Project Manager to handle service work. Congratulations to all our service award employees who celebrated their tenure with the MBS in Houston on October 17. Special recognition to Albino A Nunez for 25 years' service and Prentice Ray Herren and Wiley T. Herren who celebrate 20 years with the company.
,i
i
i|
I
As our statement of values indicates. The Mci rek Companies believe that finding and keeping good people isji iSt as important to our companies profits and growth CIS finding and keeping good customers." This philosophy of caring and sharing was the primary motive for starting our profit sharing plan in 1966. It has been a disappointing fact that the economy, and results from operations, have prevented us from making a contribution to the plan since 1985. And something that, at one time,was a real motivator, has now become somewhat of a demotivator. Unfortunately, the predictions for the near fu ture indicate more of the same, and that fact necessitates a reevaluation of our original goal and a change in approach as to what we are trying to accomplish. Enter the matching 40IK. The 40 IK option has been available as part of your Flex Plan for the past two years. What we intend
I
I
1
m
to do, beginning January 1, 1992, is to match a portion of your contribution to the plan. The matching concept is ex plained in our cover article and is a 50%, or "One for Two" match. Yours is a pre-tax pay roll deduction and our match will be done at the time you make your contribution. The "funds" will accumulate taxdeferred in your 40IK account, earning interest, and will be available for your future. You may be thinking, "What’s in this for the company?" The answer to that is easy. It gives us a way to provide those indi viduals who make our company a success another vehicle with which to plan for the future. The matching portion of the 40IK can only come from one place - profits. The difference between profit-sharing as we’ve known it,and the 401K matching, is that we are making a commitment to match your contribution prior to knowing whether we as a company will make money or not.
That’s called commitment and, in order to make this program and your future a success, we must continue to do the things we’ve always done to improve the bottom line: —Continue to be productive our field force is the best in the U.S. We have never gotten better costs and that means we can be more competitive in our bidding and win more work. —Work safe - our workers’ compensation rating is the lowest it has been in the past ten years, and that means lower insurance costs. —Eliminate waste of materials on jobs - materials are a multimillion dollar expenditure and only you can stop waste. 一 Use those PPOs for hospitalization needs - this can mean big savings which will ultimately lower our premiums. So you might say that our fu ture is in our hands - and I mean the hands of everyone of us without exception. We are making a commitment up front to put profits that we haven't yet made into the 40IK program. And each one of you can
The Marek Family Of Companies ATLANTA. GEORGIA Marek Interior Systems, Inc. (MISI) AUSTIN/SAN ANTONIO. TEXAS Marek Brothers Systems, Inc. (MBS) DALLAS, TEXAS Marek Brothers Systems, Inc. (MBS) HOUSTON, TEXAS Magnolia Gardens Marek Brothers Company (MBC) Marek Brothers Systems (MBS) Marek Brothers Landscaping Oak Forest Lumber and Supply Company Stanley Construction Company
Insights 3539 Oak Forest Drive Suite 200 Houston, Texas 77018
do your part by doing every thing in your power to help the COInpany be profitable. Obviously, if we are unable to maintain adequate profits, we have the option to cease match ing until profitability returns. But, this wouldn't happen w ithout ample notification and it in no way would affect what we’re already put into the plan. Our goal over the next month is to have someone from this office visit personally with each of you, to explain the 401K plan to you, and to an swer your questions about the Flex Plan. Our investment in you and these benefits is a big one, and it is crucial that each of you understands what's there for you. The Flex Plan is complicated because of the government regulations that apply, but someone will always be available to review it with you or your spouse. In conclusion, let me restate that our commitment is to you, and to making this a good place to work. All that we do restates our philosophy that people are our greatest asset.
Stan Marek
k