J-13 Master Bedroom (Interior Working Drawings Sample)

Page 1

1085

470 100

No.

Revision/Issue

Date

-General Contractors Must Visit The Site In Order To Become Familiar With What Could Hinder Their Work In Any Way. -The Contractor Is Responsible For Checking All Dimensions Related To His Scope Before Work Commences On Site. -All Errors Or Anomalies Should Be Reported. -The Contractor Should Coordinate The Drawings With All Related Disciplines. -Architectural Drawings Should Be Revised With Interior Design Package And Landscape Package. -All Dimensions Are In MM.

6215

3165

3735

1280

General Notes

4455 4310

Key Plan

145

Mortal

680

3850

668

Brick

Demolished

1638

1091

1650

15 3

4605

Start: 0mm Height: 2900mm

145

160 Start: 0mm Height: 2220mm

600

2257

Sheet Name.

3597

Master BR As Built & Demo.

180

1935

Sheet No.

1215

Start: 0mm Height: 1210mm

1215 790

1600

2355

3597

2257 2502

2060

854

4250

3585

285 1460

3472

3676 1110

574

1303

120

160

2395

125

ID-401 04.06.2020

A3

Project Name

1

Master BR - As Built SCALE: 1 : 50

2

Master BR - Demolished SCALE: 1 : 50

J-13 Interior Project Address

Package Code

5th Settlement Project Code

ID | J-13

Scale

As indicated


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.