Skip to main content

Focus Project Structure Nicole Birrer HS 20

Page 1

Map Molino Nuovo 2020


Situation Ground Floor with Surroundings


Molino Nuovo Proposal


Existing Ground Floor with Surroundings


New Ground Floor with Surroundings


Existing load earing structure ground floor to 2nd floor Construction of a conctrete ring as a finisher of the existing structure New structure on the top two floors


New 3rd Floor with Surroundings


Construction


Turn static files into dynamic content formats.

Create a flipbook
Focus Project Structure Nicole Birrer HS 20 by Master Architektur - Issuu