1 minute read
HAINES CAN MEET YUKON MINES' NEEDS
Next Article
The Yukon mining officials also gave feedback on R&M's Lutak Dock design plans (at the time, the Borough was moving forward with the design from page 38, which involved demolishing the dock face).
From the designs, Joel Schirrif, Yukon tidewater engineer, said that current plans would work for mineral export, but described their ideal situation:
To extend the dock face out for a deeper draft, to be able to utilize the entire dock face, and project completion by 2024.
MARCH 24, 2022 Ports & Harbors Meeting
Mining reps looked over and gave feedback on R&M's 2021 Lutak Dock design
IDEAL SITUATION:
Extend dock out 10-15 ft to get a deeper draft
IDEAL SITUATION:
600 ft dock face to allow for multi loading points for a ship