CALIFORNIA COLLEGE OF THE ARTS ARCHITECTURE DIVISION Fall/2021 INTEGRATED STUDIO GEADA ALAGHA & LULU WANG
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
CORNUCOPIA ALEMANY FARMER’S MARKET
Team: Geada Alagha Lulu Wang Date: 12/13/2021
INDEX
SYMBOLS GRAPHIC COVER SHEET TITLE PAGE INDEX & SYMBOLS
01
DWG TITLE SCALE: XX” = 1’-0” SOURCE: CITATION & PAGE
Drawing Label
N
North Arrow
xx Ax.x
Elevation No Sheet No
xx Ax.x
Section No Sheet No
xx Ax.x
Detail No Sheet No
01
Column Grid Break Line
xx
Image Reference Point
A0.0 A0.1
PROJECT INTRODUCTION Thesis
A1.0 A1.1 A1.2 A1.3
RESEARCH & PRECEDENTS Key Concepts Precedent: Kitazawa Kenchiku Factory Key Concepts Precedent: Bergen Fish Market Key Concepts
A2.0 A2.1
SITE & CONTEXT Site Infrastructure
A3.0 A3.1 A3.2 A3.3 A3.4 A3.5
A6.0 A6.1 A6.2 A6.3 A6.4 A6.5 A6.6 A6.7 A6.8 A6.9
ENVIRONMENTAL SYSTEMS Key Concepts Integrated System Site Plan with diagrams for all systems Integrative System Section or Section Perspective Daylighting System / Section Detail Electrical Lighting System / Section Detail Thermal Performance System / Section Detail Water Systems / Section Detail Renewable Energy Systems Ecological Systems
PROGRAMMING & LIFE SAFETY Tectonic Modules Program Information Program Diagrams Egress Accessibility
A7.0 A7.1 A7.2 A7.3 A7.4
BUILDING ENVELOPE – MATERIAL & ASSEMBLY Key Concepts Assembly Diagrams Wall Section & Envelope Details. Material Strategy & Details
A4.0 A4.1.1 A4.1.2 A4.1.3 A4.2 A4.3 A4.4 A4.5 A4.6 A4.7
ARCHITECTURE Aerial views Exterior views Interior views Site Plan Site Sections Plans Building Sections Elevations Wall Section & Details
A8.0 PROCESS A8.1 Process Models A8.2 Process Drawings A8.3 Documentation of Decision-Making Process A8.4.1 Consultant Workshop One A8.4.2 Consultant Workshop Two A8.4.3 Consultant Workshop Three A8.5 Fire Safety Lecture A8.6 Final Review
A5.0 A5.1 A5.2 A5.3 A5.4 A5.5
STRUCTURAL SYSTEMS Key Concepts Structural Model Structural Framing Plans Main Structural Section & details Lateral Section Diagram & details
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang Date: 12/13/2021
INDEX & SYMBOLS
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
A 0.0 PROJECT INTRODUCTION
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A0.0
PROJECT INTRODUCTION
Cornucopia, “the horn of plenty“, is typically depicted as a goat’s horn or a woven basket of weeds or sticks overflowing with fresh fruit and vegetables, and holds the sentiment of thanksgiving, sharing of food, and bringing families, friends, and community together. For our project, we wanted to hold onto the sentiment of the market itself by making it a place where diverse communities can get together and exchange foods and other goods. Since Alemany market is the oldest farmer’s market in California, we wanted to preserve its oldest structure along with its murals, which symbolizes the weaving together of the old and the new, and the celebration of cultures. Here, the old concrete structure is restored and mirrored over and the new wooden structure now provides a second floor, hosting a variety of family-friendly programs aiming to bring the community together. The roof, then, spands over the market from one side to the other, shielding the occupants from the sun and rain while creating soft shading projecting down.
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A0.1
THESIS
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
A 1.0 RESEARCH & PRECEDENTS
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A1.0
RESEARCH & PRECEDENTS
BERGEN FISH MARKET Bergen Fish market was designed by Eder Biesel Arkitekter in 2012, aims to preserve the historical fish market while contextualizing it in the urban setting. The goal was to provide climatized protection, without dividing or isolating the space from the public way. The inspirations gathered from this market include the incorporation of the new structure over the old, historical market, and ways in which the program was laid out on the second-floor enclosures. Our project also aims to contextualize the market within the urban setting by adopting some of the existing forms and languages found on the site and in the historical market itself. KITAZAWA KENCHIKU FACTORY The Kitazawa Kenchiku Factory was designed by Fumiko Misawa and Masahiro Inayama in 2010, and it serves as a beautiful example of a contemporary timber structure made entirely of cedar wood. The structure encompasses a triangular exterior envelope, which is held together by main trusses and a set of beams connected on top and between them, resulting in a dome-like appearance of the interior envelope. Our project adopts the double-enclosure method but in ways that better works for the site. Instead of applying a triangular, we decided to imitate the form for the existing market stalls which is resembled as a curved opening within a rectangular frame, using a curve stitching method to obtain that interior curvature.
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A1.1
KEY CONCEPTS
KITAZAWA KENCHIKU Cornucopia
PROGRAM : WOOD WORKSHOP/FACTORY LOCATION : NAGANO, JAPAN ARCHITECT : FUMIKO MISAWA + MAAHIRO INAYAMA DIMENSIONS : 18M X 24M
CCA Integrated Studio Report
GENERAL In 2010 Japan’s earthquake caused many deaths under buildings collapsing, which resulted in the establishment of two basic building policies: promotion of the usability of wood in public buildings, and all Japanese public buildings not higher than three floors shall use a wooden structure as the main one. Wood structures have good seismic resistance and they are also very energy efficient. The structure uses locally harvested cedar.
Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
PROGRAMMATIC RESPONSE The workshop is used to utilize wood and produce wooden elements mainly for structure and architectural purposes.
Team: Geada Alagha Lulu Wang
IMAGE DESCRIPTION The images shown are exterior and interior photos of the wooden roof structure along with some construction photos.
Date: 12/13/2021
A1.2.1 01 SOURCE : KITAZAWA STRUCTURAL ANALYSIS - PIOTR ZBJERAJEWSKI
EXTERIOR & INTERIOR PHOTOS SOURCE: GOOGLE IMAGES
KITAZAWA KENCHIKU FACTORY
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang
03
Date: 12/13/2021
SECTION SCALE : NOT TO SCALE SOURCE: GOOGLE IMAGES
A1.2.2 02
SECTION SCALE : NOT TO SCALE SOURCE: GOOGLE IMAGES
01
ROOF PLAN SCALE : NOT TO SCALE SOURCE: GOOGLE IMAGES
SECTIONS & PLANS
STRUCTURE / SYSTEM The structure consists of four pillars, two sets of trusses, two layers of beams: top layer connects the top of the trusses, lower layer are diagonal beams connecting
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
02
LATERAL FORCE DIAGRAM SCALE: NOT TO SCALE SOURCE: KITAZAWA STRUCTURAL ANALYSIS - PIOTR ZBJERAJEWSKI
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A1.2.3 03
MODULE COMPONENT DIMENSIONS SCALE: NOT TO SCALE SOURCE: KITAZAWA STRUCTURAL ANALYSIS - PIOTR ZBJERAJEWSKI
01
STRUCTURE MODULE DIAGRAM SCALE: NOT TO SCALE SOURCE: KITAZAWA STRUCTURAL ANALYSIS - PIOTR ZBJERAJEWSKI
STRUCTURE & FORCE DIAGRAM
PROJECT MODULE TRANSITION AND MODIFICATION The main ideas for the project’s roof design is to deliniate the arch shape that is prominent throughout the original concrete stalls on the interior roof side, and keeping the exteior shape as a simple rectangular volume, so that the structure blends in with the surrounding site while the overall formal ideas mirrors the form of the original structures.
Cornucopia
CCA Integrated Studio Report
The module used in the project transitioned through two phases as shown in the diagram. Phase 1: Extention of the pillars to create rectangular exterior. Phase 2: Using a curve stitch form to create truss structure. KITAZAWA
PRECEDENT MODULE DIAGRAM
CORNUCOPIA
PROJECT MODULE DIAGRAM
Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang Date: 12/13/2021
PHASE 1
PHASE 1
PHASE 2
PHASE 2
ROOF DIAGRAM
A1.2.4 01
CONNECTION TO WOOD PRECEDENT DIAGRAMS SCALE: NOT TO SCALE
MODULE DIAGRAM
BERGEN FISH MARKET Cornucopia
PROGRAM : COMMUNITY MARKET LOCATION : BERGEN, NORWAY ARCHITECT : EDER BIESEL ARKITEKTER YEAR : 2009 - 12 AREA : 4260 M2
CCA Integrated Studio Report
GENERAL This project titled “History Continued” is a renovation of the century old existing market located by the Bergen Harbor, and in the heart of the city. The original market is an important tourist attraction, the new building on the open square provided comfort and hygiene all year round for both vendors and visitors. The continuous paving and glazing gives a sense of a continuous ground floor.
Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
URBAN CONTEXT The project provides necessary facilities while reflecting both the urban situation and history of the place. The height of the building allows for a view of the historical buildings behind, the all-around glazing on the ground floor provides a clear view of the market from the outside and a clear view of the harbor from within. The historic warehouse property lines are traced in the paving, and the materials and colors of the new structure reflects the history of the harbor.
Team: Geada Alagha Lulu Wang Date: 12/13/2021
HOURS OF OPERATION Market Norway mountain guides Tuesday - Thursday 11am - 6pm Sunday - Friday 7:30am - 9pm Friday - Saturday 9am - 10pm Fjellskål Restaurant Monday - Thursday 10am - 9pm Monday - Saturday 9am - 11pm Friday - Saturday 9am - 10pm Sunday 11am - 11pm Sunday 12pm - 9pm Tourist information center Public bathroom Monday - Saturday 9am - 4pm Everyday 8am - 12am VARIATION OF USE Market, restaurants, tourist information center, mountain guide center, public restroom IMAGE DESCRIPTIONS Images are photos of exterior and interior of the building, showing the concept of having a “floating” structure with all-around glazing for the ground floor, and the blurring of threshold between exterior and interior market spaces created by the continuity of existing paving into the market spaces.
A1.3.1 01
EXTERIOR & INTERIOR PHOTOS SOURCE: ARCH-DAILY
BERGEN FISH MARKET KEY CONCEPTS
IMAGE DESCRIPTIONS The ground floor and site plans show the relation between site and building, the use of historic property lines to determine market spaces.
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang Date: 12/13/2021
02
GROUND FLOOR PLAN SCALE: NOT TO SCALE SOURCE: ARCH-DAILY
A1.3.2 03
SITE PLAN SCALE: NOT TO SCALE SOURCE: ARCH-DAILY
01
SECOND FLOOR PLAN SCALE: NOT TO SCALE SOURCE: ARCH-DAILY
SITE & FLOOR PLANS
IMAGE DESCRIPTIONS The sections show the public spaces vs. storage spaces, public spaces consists of two levels, while storage spaces consists of three levels.
03
NORTH ELEVATION
Cornucopia
SCALE: NOT TO SCALE SOURCE: ARCH-DAILY
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang Date: 12/13/2021
02
EAST SECTION SCALE: NOT TO SCALE SOURCE: ARCH-DAILY
A1.3.3 01
NORTH SECTION SCALE: NOT TO SCALE SOURCE: ARCH-DAILY
SECTIONS & ELEVATIONS
DENSITY OVER COURSE OF WEEK/SEASON Most programs are open throughout the week, the market is closed Sunday and Monday, information centers are closed for one day of the week.
Cornucopia
CIRCULATION The main part of the market is located on the first floor, where vendors sell their fresh products or cook it and serve it to the customers. The first floor has four exits facing the sidewalk and six exits face the water. Those exits are placed parallel to each other to create a continuous path through the market and between the vendors. The second floor houses the visitor information center, office spaces, restrooms, rest area, and a panoramic view of the water. Visitors are lured into the second floor entrance through a staircase that merges from the sidewalk, or through the elevator on the first floor (for a more accessible option). A chunk of the building is dedicated for service and maintenance, housing storage spaces, freezers, ice makers, restrooms, wardrobes and other technical units. The whole structure was designed to be wheelchair accessible. The market, then, exits out to an open plaza, which connects to another set of restaurants and cafes, set up by temporary venues and canopies. ENERGY CONSIDERATION + DAYLIGHTING The floated volume of the roof creates the protected part of the market, acting as a shading device, the flexible glass facade also shelters towards wind and rain. The complete transparency of the ground floor allows maximum daylight.
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
02
CIRCULATION DIAGRAM
Team: Geada Alagha Lulu Wang
SCALE: NOT TO SCALE SOURCE: ARCH-DAILY
Date: 12/13/2021
IMAGE DESCRIPTIONS The circulation diagram shows pedestrian paths throughout the permanent market inside the building with the temporary outside dining spces. The photos show the ground floor glazing details and interior market spaces.
A1.3.4 01
INTERIOR PHOTOS SOURCE: ARCH-DAILY
CIRCULATION & OTHER INFORMATION
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
A 2.0 SITE & CONTEXT
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A2.0
SITE + CONTEXT
LAYOUT OF SELLING IN RELATION TO VISIBILITY, SITE, AND PARKING The central spine circulation provides great visibility for visitors and makes it easier to navigate to different vendors on both sides, however, some vendors choose to set up selling locations near the pedestrian entrance at the intersection of Peralta Ave. and Putnam St., making the entrance and the rest of the market somewhat invisible. Although the spine circulation provides good visibility for visitors who are already inside the market, the position of the built-in platforms forces vendors to park their trucks on the other side of the platforms, which creates a blocked view to pedestrians walking by/cars driving by outside of the market.
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures
From the parking lot, there is no prescribed direction of where the pathway to the market is, for first timers it might be confusing of where to go, they can only assume a general direction towards the crowd.
Instructors: Lisa Findley Mark Donahue
ACCESSIBILITY (PARKING, MOVEMENT AROUND SITE) The stalls are laid out as two long strips that are parallel and running East West. On the north side of the longer strip is the parking lot. On the south side of the shorter strip is Alemany Blvd. Pedestrians can enter from Alemany or from Putman street. Those who arrive by car can enter at Putnam and drive around the market to the lot at the north end. Foot circula-tion is mostly parallel to the 2 strips and crosses over at a center path in the middle of each strip or at either end. The strips are also raised on curbs but there was no wheelchair ramp present.
Team: Geada Alagha Lulu Wang Date: 12/13/2021
CONNECTION TO TRANSPORTATION Shoppers can arrive at the market as pedestrians from the neighborhood, by bus, and by car. The Muni 23 bus runs on Alemany Blvd in front of the market. The Muni 67 bus runs on Putnam close to the market. The location is at the intersection of 2 major freeways 101 and 280 and provides easy access from downtown or up from the peninsula. People can be dropped off near the entrance at the corner of Alemany and Putnam. A traffic island there becomes a convenient spot to unload passengers. IMAGE DESCRIPTIONS Photos show details of pedestrian entrance on Putnam St. along with existing concrete stalls and temporary tents.
A2.1.1 01
SITE PHOTOS
SITE INFRASTRUCTURE
VISIBILITY VISIBILITY DIAGRAM Central spine circulation provides great visibility for the visitors to navigate through the market products, built-in platforms are positioned for the vendors to unload their products, which blocks the view of the market and clusters the parking lot.
Central spine circula�on provides great visibility for the visitors to Central spine circulation navigate through the for market provides great visibility the products visitors to navigate through the market products.
Instead of using the existing platforms, some vendors chose to set up their venues near the pedestrian entrances, making the market hard to access.
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Built-in platforms Built-in pla�ormsareare posi�oned positioned for theto vendors for the vendors unloadtotheir unload their products, which products, which blocks the view blocks the view of the market of the market and clusters the and clusters the parking lot. parking lot
Team: Geada Alagha Lulu Wang Date: 12/13/2021
Instead Insteadofofusing usingthe theexisting exis�ng platforms, some vendors chose pla�orms, some vendors chose to set up their venues near thethe to set up their venues near pedestrian entrances, making pedestrian entrances, making the market hard to access.
the market hard to access.
A2.1.2 01
VISIBILITY DIAGRAM SCALE: 1”=100’-0” SOURCE: GOOGLE MAP
VISIBILITY DIAGRAM
ACCESSIBILITY ACCESSIBILITY DIAGRAM There are 2 main entrances located on the 2 ends of the market. An opening in the middle creates a cross path through the market to the parking lot.
Cornucopia
Pedestrianentrance Entrance Pedestrian
CCA Integrated Studio Report Fall/2021 Local Futures
Foot Foot traffic trafficpath path
Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang Date: 12/13/2021 Pedestrianentrance Entrance Pedestrian
A2.1.3 01
ACCESSIBILITY DIAGRAM SCALE: 1”=100’-0” SOURCE: GOOGLE MAPS
ACCESSIBILITY DIAGRAM
BUILT - IN PLATFORMS Platforms are useful for buyers but uncomfortable for vendors, having to bend over to talk to potential buyers.
Cornucopia
≈ 20’’ H x 180’’ L x 106.25’’ D SUN + RAIN PROTECTION Built-in and temporary canopies, temporary tents.
CCA Integrated Studio Report
TRASH LOCATIONS Movable trashcans are placed at the center cross-path and both ends of the market.
Fall/2021 Local Futures
TOILETS, CHANGING STATIONS, NURSING STATIONS, AND OTHER FACILITIES Toilets are located at the side of the Administrations building, no changing or nursing stations are found in the restrooms.
Instructors: Lisa Findley Mark Donahue
IMAGE DESCRIPTIONS Photos show the placement of temporary trash collecting locations and toilets, with temporary stall approximate measurements.
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A2.1.4 01
SITE PHOTOS
SITE FACILITIES
MURALS There are over 80 stalls with over 4000 square feet of mural space. This project was created by many artists, volunteers, and youth including the Youth Mural Workshop and all directed by Susan Kelk Cervantes, a pioneer of the San Francisco Community Mural movement for over 57 years.
Cornucopia
The project was funded by the Mayor’s Neighborhood Beautification Fund and the work was completed in 2003.
CCA Integrated Studio Report
The murals have a common theme of representing agricultural goods that are being sold in the market, a couple of facades also have paintings of farmers, showing the diversity of the vendors that sell there.
Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
IMAGE DESCRIPTIONS Photos show a panorama of the murals on a chunk of the permanent concrete stalls, along with photos of students working on the murals.
Team: Geada Alagha Lulu Wang
02
SITE PHOTOS
Date: 12/13/2021
A2.1.5 01
SITE PHOTOS SOURCE: GOOGLE IMAGES
SITE ARTWORKS
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
A 3.0 PROGRAMMING & LIFE SAFETY
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A3.0
PROGRAMMING & LIFE SAFETY
The program is split between the ground floor and the second floor. The ground floor houses the historical market (which preserves the original circulation) as well as the La Cocina incubator. The second floor houses the majority of the program including office spaces, the community garden and kitchens, and La Cocina kitchens. The community garden/kitchen space then opens up to the grand staircase/amphitheater where visitors can rest, hang out, and enjoy their food. The amphitheater then becomes the seating area for movie nights, and the market transforms to food truck vending space, making the market just as active during the nighttime as it would be during the day.
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A3.1
TECTONIC MODULES
The program originally starts at California’s local farms where the fresh produce is harvested and transported by the farmers to the market, where this produce plays an important role in the entirety of the market. Since they are the same ingredients that are utilized at the community kitchen or La Cocina kitchen to feed the present community, and they are the same ingredients taken home to feed families and communities that weren’t present.
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A3.2
PROGRAM INFORMATION
Cornucopia
ADMIN/OFFICES
COMMUNITY GARDEN
GRAND STAIRCASE/ AMPHITHEATER
COMMUNITY KITCHEN
RESTROOMS WALKING AREA
LA COCINA KITCHEN
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
60”
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A3.3 01
PROGRAM INFO SCALE: 0’ 3’ 6’
15’
PROGRAM DIAGRAMS
60”
94.5 ft/3= 31.5ft
125.6 ft/3= 41.9 ft Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
60”
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A3.4 03
EGRESS AMPHITHEATRE NOT TO SCALE
02
EGRESS SW NOT TO SCALE
01
EGRESS NE NOT TO SCALE
EGRESS
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A3.5 02
ELEVATOR SW NOT TO SCALE
01
ELEVATOR NE NOT TO SCALE
ACCESSIBILITY
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
A 4.0 ARCHITECTURE
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A4.0
ARCHITECTURE
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
02
ISOMETRIC NE SCALE: NOT TO SCALE
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A4.1 01
ISOMETRIC SW SCALE: NOT TO SCALE
AERIAL VIEWS
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
03
EXTERIOR PERSPECTIVE E SCALE: NOT TO SCALE
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A4.1.2 02
EXTERIOR PERSPECTIVE E SCALE: NOT TO SCALE
01
EXTERIOR PERSPECTIVE SW SCALE: NOT TO SCALE
EXTERIOR VIEWS
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A4.1.3 01
INTERIOR SECTION PERSPECTIVE SW SCALE: NOT TO SCALE
INTERIOR VIEWS
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A4.1.4 01
INTERIOR PERSPECTIVE NE SCALE: NOT TO SCALE
INTERIOR VIEWS
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures
02
INTERIOR PERSPECTIVE NE
Instructors: Lisa Findley Mark Donahue
SCALE: NOT TO SCALE
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A4.1.5 03
INTERIOR PERSPECTIVE E SCALE: NOT TO SCALE
01
INTERIOR PERSPECTIVE S SCALE: NOT TO SCALE
INTERIOR VIEWS
S R Q
Cornucopia
P O N M
01 .2 .4 A4
L
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
K J I H
Team: Geada Alagha Lulu Wang
G F E
Date: 12/13/2021
D C B A
1 2 3
4
A4.2
5 6 7
01
GROUND FLOOR PLAN SCALE: 1”=120’
SITE PLAN
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A4.3 01
SITE SECTION SCALE: 1”=120’
SITE SECTION
Cornucopia
CCA Integrated Studio Report
02 A4.7.1 01 A4.4.3
Fall/2021 Local Futures 60”
Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang
01 A4.7.1
Date: 12/13/2021
A4.4.1 01
OVERALL 2F PLAN SCALE: 0’ 3’ 6’
15’
PLANS
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A4.4.2 01
1F PLAN SCALE: 1/8”=1’
PLANS
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A4.4.3 02
2F PLAN SCALE: 1/16”=1’
PLANS
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue ”
60
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A4.4.4 01
GROUND FLOOR PLAN SCALE: 1”=120’
PLANS
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue ”
60
”
60
Team: Geada Alagha Lulu Wang 02 .5 A4 01 .5 A4
Date: 12/13/2021
01 .2 .7 A4
01 .1 .7 A4
A4.4.5 01
2ND FLOOR PLAN SCALE: 1”=120’
PLANS
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
02
SECTION THRU LA COCINA KITCHEN NE SCALE: 1/16”=1’
SECTION THRU LA COCINA KITCHEN + INCUBATOR SCALE : 1/8”=1’-0”
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A4.5 01
SECTION THRU RESTROOMS NE
SCALE: 1/16”=1’ SECTION THRU RESTROOMS SCALE : 1/8”=1’-0”
BUILDING SECTION
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A4.6 02
EXTERIOR ELEVATION SE SCALE: 1/12”=1’
01
INTERIOR ELEVATION SE SCALE: 1/12”=1’
ELEVATIONS
T.O. SLAB @ ROOF 50’-0”
TIMBER CLADDING
POLYGAL PANELS
Cornucopia
AIR CAVITY GYPSUM SHEATHING INSULATION
CCA Integrated Studio Report
VAPOR BARRIER INTERIOR WALL FINISH RAIN WATER COLLECTION PIPE
INTERIOR CEILING FINISH
T.O SECOND FLOOR SLAB 6’-8”
Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang
X-BRACING CABLES 42”
T.O. SLAB @ SECOND FLOOR 15’-0”
Date: 12/13/2021
GLAZING
SLAB VAPOR BARRIER GRADE BEAM FOUNDATION FOOTING
FIRST FLOOR 0’-0”
A4.7.1 01
SECTION THRU OFFICE SCALE: 1/12”=1’
WALL SECTION + DETAIL
T.O. SLAB @ ROOF 50’-0”
Cornucopia
TIMBER CLADDING AIR CAVITY GYPSUM SHEATHING INSULATION GLAZING INTERIOR WALL FINISH
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
VAPOR BARRIER
INTERIOR CEILING FINISH
Team: Geada Alagha Lulu Wang RAIN WATER COLLECTION PIPE T.O. SLAB @ SECOND FLOOR 15’-0”
GLAZING
Date: 12/13/2021
SLAB VAPOR BARRIER
FIRST FLOOR 0’-0”
GRADE BEAM FOUNDATION FOOTING
01
SECTION THRU LA COCINA KITCHEN NE SCALE: 1/12”=1’
A4.7.2
WALL SECTION + DETAIL
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
A 5.0 STRUCTURAL SYSTEMS
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A5.0
STRUCTURAL SYSTEMS
The project’s main roof structure is inspired by the Kitazawa Factory, the structure imitates the precedent by creating a relationship between the exterior and interior envelope through a set of beams and trusses, collectively composes a curve-stitching structure on the otherwise rectangular exterior surface. The design also follows the modular strategy, but instead using two bays as one single module, constructing a facaded roof surface for polygal panels to sit in a slanted manner to gather rainwater for programmatic purposes. The roof holds five layers of structural systems: 1. Curve-stitch Truss Frame 2. Diagonal beams connecting frames within a single module to its columns 3. Interior columns while defining enclosed spaces also as a tertiary structure for the primary frames 4. Cross bracings on the exteior carrying lateral loads 5. Top beams parallel along the long side of the building 1
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang
2
KITAZAWA
CORNUCOPIA
Date: 12/13/2021 3
4
5
PHASE 1
PHASE 2
ROOF DIAGRAM
A5.1
KEY CONCEPTS
6 7
1. BIPV 2. POLYGAL 3. 1’x1’ PRIMARY STRUCTURAL FRAMING 4. 5”x2” SECONDARY STRUCTURAL BEAM
TERTIARY STRUCTURE
Cornucopia POLYGAL + BIPV ROOF ENCLOSURE
CCA Integrated Studio Report PRIMARY STRUCTURE
Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
SECONDARY STRUCTURE
ENCLOSED BUILDINGS
Team: Geada Alagha Lulu Wang
SECOND LEVEL FLOOR PLATE
Date: 12/13/2021
QUATERNARY STRUCTURE
ORIGINAL CONCRETE STALLS ORIGINAL CONCRETE CANOPY NEW WOODEN STALLS RAIN WATER COLLECTION PIPES
A5.2.1 01
SYSTEMS EXPLODED AXONOMETRIC SCALE: 0’
15’
45’
75’
STRUCTURAL SYSTEMS
4
5
1
Cornucopia
2
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
3
6 7
8
1. BIPV 2. POLYGAL 3. 1’x1’ PRIMARY STRUCTURAL FRAMING 4. 5”x2” SECONDARY STRUCTURAL BEAM 5. TENSILE STRUCTURE CABLES 6. 1/2” FLITCH PLATE CONNECTION 7. LAP-JOINT CONNECTION 8. 3/4” BOLT
Team: Geada Alagha Lulu Wang
4
Date: 12/13/2021
5
JOINT CONNECTION DETAIL
TENSILE STRUCTURE DETAIL
01
CONNECTION JOINT DETAIL SCALE: 0’
1’
2’
3’
A5.2.2 01
STRUCTURAL SYSTEMS
ROOF MODULE EXPLODED AXONOMETRIC SCALE: 0’
15’
6
Cornucopia
A 9.51’
B
C 30.6’
D 32.08’
E 30.6’
F 15.3’
15.3’
G 30.6’
H 30.6’
I 30.6’
J 30.6’
K 30.6’
L 30.6’
M 30.6’
N 30.6’
O 30.6’
P 30.6’
Q 30.6’
R
9.5’
S 21.1’
T 30.6’
U 30.6’
CCA Integrated Studio Report Fall/2021 Local Futures
21’
2
Instructors: Lisa Findley Mark Donahue
13.1’
1
3 44.36’
Team: Geada Alagha Lulu Wang
21’
4
6
Date: 12/13/2021
13.1’
5
A5.3 01
FOUNDATION PLAN SCALE: 0’
15’
30’
STRUCTURAL FRAMING PLANS
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A5.4 01
MODULE STRUCTURE DETAIL AXON SCALE: 0
1’
2’
3’
MAIN STRUCTURAL SECTION + DETAILS
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A5.5 01
X-BRACING CABLES ELEVATION SCALE: 0’
3’
LATERAL SECTION DIAGRAM + DETAILS
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
A 6.0 ENVIRONMENTAL SYSTEMS
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A6.0
ENVIRONMENTAL SYSTEMS
Throughout this project, various methods of passive energy generation are used. While the outdoor market obviously relies on natural heating and cooling, passive heating and cooling is implemented in all of the office spaces through the use of thermal mass and by placing openings adjacent to one another to allow hot air to escape for natural cooling. Rain water is also harvested and stored in rainwater collector tanks, and later used in the community garden, as well as grey water for toilets. Solar panels are installed at the top of the structure over the office spaces and kitchens to enforce self-sustaining work spaces.
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang Date: 12/13/2021 1
2
3
4
A6.1
KEY CONCEPTS 5
-15°
N
15°
30
°
-30
Cornucopia
CCA Integrated Studio Report
°
-6 0
60
°
° 45
-4 5°
°
Instructors: Lisa Findley Mark Donahue
E
W
75°
-75°
Fall/2021 Local Futures
-105
105°
°
Team: Geada Alagha Lulu Wang
5°
3 -1
13
5°
0°
-12
12
0°
Date: 12/13/2021
15
0°
0°
-15 165°
S
°
-165
CLIMATE ANALYSIS
A6.2 01
SUN + WIND ANALYSIS DIAGRAM SCALE: 0’
100’
200’
300’
INTEGRATED SYSTEM SITE PLAN
T.O. SLAB @ ROOF 50’-0”
ELECTRIC LIGHTING
Cornucopia POLYGAL PANELS
CCA Integrated Studio Report GLAZING
Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
T.O SECOND FLOOR SLAB 6’-8”
ELECTRIC LIGHTING
42”
T.O. SLAB @ SECOND FLOOR 15’-0”
Team: Geada Alagha Lulu Wang Date: 12/13/2021
GLAZING
FIRST FLOOR 0’-0”
A6.3 01
DAYLIGHT + ELECTRIC LIGHT SYSTEM @ OFFICE SCALE: 1/12”=1’
INTEGRATIVE SYSTEM SECTION
T.O. SLAB @ ROOF 50’-0”
Cornucopia POLYGAL PANELS
CCA Integrated Studio Report GLAZING
Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
T.O SECOND FLOOR SLAB 6’-8”
42”
T.O. SLAB @ SECOND FLOOR 15’-0”
Team: Geada Alagha Lulu Wang Date: 12/13/2021
GLAZING
FIRST FLOOR 0’-0”
A6.4 01
DAYLIGHT SYSTEM @ OFFICE SCALE: 1/12”=1’
DAYLIGHTING SYSTEM / SECTION DETAIL
T.O. SLAB @ ROOF 50’-0”
ELECTRIC LIGHTING
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
T.O SECOND FLOOR SLAB 6’-8”
ELECTRIC LIGHTING
42”
T.O. SLAB @ SECOND FLOOR 15’-0”
Team: Geada Alagha Lulu Wang Date: 12/13/2021
FIRST FLOOR 0’-0”
A6.5 01
ELECTRIC LIGHT SYSTEM @ OFFICE SCALE: 1/12”=1’
ELECTRICAL LIGHTING SYSTEM / SECTION DETAIL
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A6.6.1 01
HEATING DIAGRAM SCALE: 1/12”=1’
THERMAL PERFORMANCE
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A6.6.2 01
NATURAL COOLING DIAGRAM SCALE: 1/12”=1’
THERMAL PERFORMANCE
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A6.7 01
RAINWATER COLLECTOR PIPE AXON SCALE: 0’
15’ 30’ 45’
WATER SYSTEMS
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A6.8 01
BIPV AXON SCALE: 0’
15’ 30’ 45’
RENEWABLE ENERGY SYSTEM
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A6.9 01
RAIN WATER COLLECTION SYSTEM SCALE: 0’
15’
30’
45’
ECOLOGICAL SYSTEMS
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
A 7.0 BUILDING ENVELOPE – MATERIAL & ASSEMBLY
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A7.0
BUILDING ENVELOPEMATERIAL & ASSEMBLY
Cornucopia
Since our structure represents the weave of a cornucopia, we wanted the materials to reflect that as well. Similarly to how a cornucopia is constructed using raw wooden cane or sticks, our project uses timber for almost the entirety of the structure, with the exception of the interior floor slabs which are made of concrete. The patterns and motifs shown throughout the project are inspired by weaving patterns in both plan and/or elevation, where they behave in a zig-zag pattern (plan) or weave and alternate between members (elevation). The end of the exterior form curves out and gets gradually smaller, which imitates the closed end of a cornucopia.
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
WEAVE IN PLAN
Team: Geada Alagha Lulu Wang Date: 12/13/2021
WEAVE IN ELEVATION
A7.1
KEY CONCEPTS
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A7.2 01
ENVELOPE ASSEMBLY EXPLODED AXON SCALE: 0’
10’
20’
30’
ASSEMBLY DIAGRAMS
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A7.3 02
WINDOW WALL SECTION @ OFFICE SCALE: 0’
1’
2’
3’
01
STOREFRONT SECTION @ OFFICE SCALE: 0’
1’
2’
3’
WALL SECTION + ENVELOPE DETAILS
T.O. SLAB @ ROOF 50’-0”
T.O. SLAB @ ROOF 50’-0”
MATERIALS Wood structure Concrete floor slabs + foundation Polygal roof enclosure Glazing in enclosed spaces for daylight systems
POLYGAL PANELS
POLYGAL PANELS
Cornucopia
TIMBER CLADDING
TIMBER CLADDING
AIR CAVITY
AIR CAVITY
GYPSUM SHEATHING
GYPSUM SHEATHING
INSULATION
INSULATION
VAPOR BARRIER
VAPOR BARRIER
INTERIOR WALL FINISH
INTERIOR WALL FINISH
CCA Integrated Studio Report Fall/2021 Local Futures
RAIN WATER COLLECTION PIPE RAIN WATER COLLECTION PIPE
Instructors: Lisa Findley Mark Donahue
INTERIOR CEILING FINISH
INTERIOR CEILING FINISH
T.O SECOND FLOOR SLAB 6’-8”
X-BRACING CABLES 42”
T.O SECOND FLOOR SLAB 6’-8”
Team: Geada Alagha Lulu Wang
X-BRACING CABLES
42”
Date: 12/13/2021
T.O. SLAB @ SECOND FLOOR 15’-0”
T.O. SLAB @ SECOND FLOOR 15’-0”
GLAZING
GLAZING
SLAB
SLAB
VAPOR BARRIER
VAPOR BARRIER
GRADE BEAM
GRADE BEAM
FOUNDATION FOOTING
FIRST FLOOR 0’-0”
FOUNDATION FOOTING
FIRST FLOOR 0’-0”
A7.4
MATERIAL STRATEGY + DETAILS
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
A 8.0 PROCESS
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A8.0
PROCESS
SUMMARY - Think about how to end the tail of the roof - Too much space on 2F, might block lilght on GF
Cornucopia
07
ELEVATION
03
SCALE: NOT TO SCALE DATE: 10/04/2021
INTERIOR GROUND FLOOR SCALE: NOT TO SCALE DATE: 10/04/2021
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang
05
AXONOMETRIC SCALE: NOT TO SCALE DATE: 10/04/2021
02
EXTERIOR NORTH
Date: 12/13/2021
SCALE: NOT TO SCALE DATE: 10/04/2021
A8.1.1 06
EXPLODED AXONOMETRIC SCALE: NOT TO SCALE DATE: 10/04/2021
04
INTERIOR SECOND FLOOR SCALE: NOT TO SCALE DATE: 10/04/2021
01
EXTERIOR EAST SCALE: NOT TO SCALE DATE: 10/04/2021
PROCESS MODELS
SUMMARY - Middle part is still awkward - Need third egress in the middle to meet code - Think about enclosed buildings
Cornucopia
06
INTERIOR GROUND FLOOR SCALE: NOT TO SCALE DATE: 10/07/2021
03
EXTERIOR SOUTH EAST SCALE: NOT TO SCALE DATE: 10/07/2021
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang
05
INTERIOR SECOND FLOOR SCALE: NOT TO SCALE DATE: 10/07/2021
02
EXTERIOR SOUTH EAST
Date: 12/13/2021
SCALE: NOT TO SCALE DATE: 10/07/2021
A8.1.2 07
EXPLODED AXONOMETRIC SCALE: NOT TO SCALE DATE: 10/07/2021
04
INTERIOR GROUND FLOOR SCALE: NOT TO SCALE DATE: 10/07/2021
01
EXTERIOR EAST SCALE: NOT TO SCALE DATE: 10/07/2021
PROCESS MODELS
SUMMARY - Think about building enclosure assembly - Rethink columns on 2F
Cornucopia
09
EXTERIOR PERSPECTIVE NW SCALE: NOT TO SCALE DATE: 10/11/2021
06
INTERIOR PERSPECTIVE 2F SCALE: NOT TO SCALE DATE: 10/11/2021
03
INTERIOR PERSPECTIVE 1F SCALE: NOT TO SCALE DATE: 10/11/2021
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang
08
EXTERIOR PERSPECTIVE SW SCALE: NOT TO SCALE DATE: 10/11/2021
05
INTERIOR PERSPECTIVE 2F SCALE: NOT TO SCALE DATE: 10/11/2021
02
ISOMETRIC NE
Date: 12/13/2021
SCALE: NOT TO SCALE DATE: 10/11/2021
A8.1.3 07
EXTERIOR PERSPECTIVE NE SCALE: NOT TO SCALE DATE: 10/11/2021
04
INTERIOR PERSPECTIVE 1F SCALE: NOT TO SCALE DATE: 10/11/2021
01
ISOMETRIC SW SCALE: NOT TO SCALE DATE: 10/11/2021
PROCESS MODELS
Cornucopia
09
INTERIOR PERSPECTIVE SCALE: NOT TO SCALE DATE: 10/25/2021
06
EXTERIOR PERSPECTIVE NE SCALE: NOT TO SCALE DATE: 10/25/2021
03
INTERIOR PERSPECTIVE AMPHITHEATRE SCALE: NOT TO SCALE DATE: 10/18/2021
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang
08
INTERIOR PERSPECTIVE SCALE: NOT TO SCALE DATE: 10/25/2021
05
EXTERIOR PERSPECTIVE NW SCALE: NOT TO SCALE DATE: 10/25/2021
02
INTERIOR PERSPECTIVE AMPHITHEATRE
Date: 12/13/2021
SCALE: NOT TO SCALE DATE: 10/18/2021
A8.1.4 07
EXTERIOR PERSPECTIVE SW SCALE: NOT TO SCALE DATE: 10/25/2021
04
INTERIOR PERSPECTIVE AMPHITHEATRE SCALE: NOT TO SCALE DATE: 10/18/2021
01
EXTEIOR PERSPECTIVE SE SCALE: NOT TO SCALE DATE: 10/11/2021
PROCESS MODELS
SUMMARY - Amphitheatre too big of a gesture to only use egress type stairs - How does water get collected, put on 2F to save energy
Cornucopia
09
EXTERIOR PERSPECTIVE SE SCALE: NOT TO SCALE DATE: 11/15/2021
06
INTERIOR PERSPECTIVE SW SCALE: NOT TO SCALE DATE: 11/15/2021
03
EXTERIOR PERSPECTIVE BACK OF OFFICE SCALE: NOT TO SCALE DATE: 11/04/2021
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang
08
INTERIOR PERSPECTIVE SCALE: NOT TO SCALE DATE: 11/15/2021
05
INTERIOR PERSPECTIVE SW SCALE: NOT TO SCALE DATE: 11/15/2021
02
INTERIOR PERSPECTIVE OFFICE
Date: 12/13/2021
SCALE: NOT TO SCALE DATE: 11/04/2021
A8.1.5 07
INTERIOR PERSPECTIVE SW SCALE: NOT TO SCALE DATE: 11/15/2021
04
EXTERIOR PERSPECTIVE NE SCALE: NOT TO SCALE DATE: 11/15/2021
01
EXTEIOR PERSPECTIVE SW SCALE: NOT TO SCALE DATE: 11/04/2021
PROCESS MODELS
SUMMARY - Finish adding railings - Fix amphitheatre - Remodel roof “tail”
Cornucopia
09
EXTERIOR PERSPECTIVE SCALE: NOT TO SCALE DATE: 11/18/2021
06
INTERIOR PERSPECTIVE SCALE: NOT TO SCALE DATE: 11/18/2021
03
EXTERIOR PERSPECTIVE SCALE: NOT TO SCALE DATE: 11/15/2021
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang
08
EXTERIOR PERSPECTIVE SE SCALE: NOT TO SCALE DATE: 11/18/2021
05
INTERIOR PERSPECTIVE SCALE: NOT TO SCALE DATE: 11/15/2021
02
EXTERIOR PERSPECTIVE
Date: 12/13/2021
SCALE: NOT TO SCALE DATE: 11/15/2021
A8.1.6 07
INTERIOR PERSPECTIVE SW SCALE: NOT TO SCALE DATE: 11/18/2021
04
EXTERIOR PERSPECTIVE SCALE: NOT TO SCALE DATE: 11/15/2021
01
EXTEIOR PERSPECTIVE SCALE: NOT TO SCALE DATE: 11/15/2021
PROCESS MODELS
SUMMARY - Project structure spans too long for precedent structure to work - Each structural frame spacing is too wide
Cornucopia
06
CCA Integrated Studio Report
SITE SECTION SCALE: NOT TO SCALE DATE: 09/30/2021
1”=20’-0
Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang
05
ZOOM IN SECTION SCALE: NOT TO SCALE DATE: 09/30/2021
1/8”=1’-0
04
SITE PLAN SCALE: NOT TO SCALE DATE: 09/27/2021
02
BIG IDEA DRAWING
Date: 12/13/2021
SCALE: NOT TO SCALE DATE: 09/23/2021
A8.2.1 03
SITE SECTION SCALE: NOT TO SCALE DATE: 09/27/2021
01
BIG IDEA DRAWING SCALE: NOT TO SCALE DATE: 09/23/2021
PROCESS DRAWINGS
SUMMARY - If don’t need to use concrete for project don’t use it - Too much space for programs, limit space to square footage given
Cornucopia
07
SITE SECTION
CCA Integrated Studio Report
1” = 20’-0”
SCALE: NOT TO SCALE DATE: 10/04/2021
Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Restrooms La Cocina incubator
Admin + Offices
Sea�ng area
06
ZOOM IN GROUND FLOOR PLAN SCALE: NOT TO SCALE DATE: 10/04/2021
04
Morning Tai Chi
Restrooms
Community garden
Community kitchen
Team: Geada Alagha Lulu Wang
Balcony
La Cocina Kitchen
PROGRAM DIAGRAM SCALE: NOT TO SCALE DATE: 10/04/2021
02
SITE PLAN SCALE: NOT TO SCALE DATE: 09/30/2021
A8.2.2
1/8” = 1’-0”
05
ZOOM IN SECTION SCALE: NOT TO SCALE DATE: 10/04/2021
Date: 12/13/2021
03
ZOOM IN FIRST FLOOR PLAN SCALE: NOT TO SCALE DATE: 09/30/2021
01
ZOOM IN SECOND FLOOR PLAN SCALE: NOT TO SCALE DATE: 09/30/2021
PROCESS DRAWINGS
SUMMARY - Old stalls are too weak to hold program - Middle part is akward - Canopy of old stalls not needed anymore
ROOF 50’-0”
Cornucopia
ROOF 50’-0”
SECOND FLOOR 15’-0”
FIRST FLOOR 0’-0”
04
SITE SECTION
02
SCALE: NOT TO SCALE DATE: 10/07/2021
ZOOM IN SECOND FLOOR PLAN SCALE: NOT TO SCALE DATE: 10/04/2021
SITE SECTION
SCALE : 1”=20’-0”
Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
SECOND FLOOR 15’-0”
FIRST FLOOR 0’-0”
Team: Geada Alagha Lulu Wang Date: 12/13/2021
EXPLODED ISOMETRIC + CIRCULATION SCALE : NOT TO SCALE
06
CCA Integrated Studio Report
CIRCULATION DIAGRAM SCALE: NOT TO SCALE DATE: 10/07/2021
A8.2.3 05
ZOOM IN SECTION SCALE: NOT TO SCALE DATE: 10/07/2021
SECTION
SCALE : 1/8”=1’-0”
03
SITE PLAN SCALE: NOT TO SCALE DATE: 10/04/2021
01
EXPLODED AXONOMETRIC + CIRCULATION SCALE: NOT TO SCALE DATE: 10/04/2021
PROCESS DRAWINGS
SUMMARY - Populate plans more, show surrounding context - Fix foundation
Cornucopia
A
LA
Y
IT
UN
M
M
CO
R
OM
EN
SE
G
IN
OM
RO
T ES
CH
KIT
AT
N
EN
CH
KIT
RO
ST
RE
CIN
CO
A CINTOR CO BA LA CU IN
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
EA
AR
DE
L
CIA
SO
ES
IC
RV
SE
Y
IT
UN
M
M
CO
R GA
IN
M
AD
05
ROOF PLAN
03
SCALE: NOT TO SCALE DATE: 10/11/2021
2ND FLOOR SITE PLAN SCALE: NOT TO SCALE DATE: 10/11/2021
02
T
KE
AR
M
1ST FLOOR SITE PLAN
Team: Geada Alagha Lulu Wang Date: 12/13/2021
SCALE: NOT TO SCALE DATE: 10/11/2021
ROOF 50’-0”
A8.2.4
SECOND FLOOR 15’-0”
FIRST FLOOR 0’-0”
04
SITE SECTION
01
SCALE: 1”=20’ SOURCE: STUDENT WORK SITE SECTION
SCALE : 1”=20’-0”
LONG SECTION SCALE: NOT TO SCALE DATE: 10/07/2021
PROCESS DRAWINGS
Cornucopia
06
SECTION THRU OFFICE SCALE: NOT TO SCALE DATE: 10/14/2021
03 SECTION SCALE : 1/8”=1’-0”
CCA Integrated Studio Report
SECTION THRU COMMUNITY ROOM SCALE: NOT TO SCALE DATE: 10/14/2021
SECTION
SCALE : 1/8”=1’-0”
Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang
07
ZOOM IN ELEVATION SE SCALE: NOT TO SCALE DATE: 10/18/2021
05
ZOOM IN ELEVATION SE SCALE: NOT TO SCALE DATE: 10/14/2021
02 ZOOM IN SE ELEVATION
Date: 12/13/2021
1ST FLOOR PLAN SCALE: NOT TO SCALE DATE: 10/11/2021
SCALE : 1/8”=1’-0”
60”
ROOF 50’-0”
SECOND FLOOR 15’-0”
FIRST FLOOR 0’-0”
04
FULL ELEVATION SE SCALE: NOT TO SCALE DATE: 10/14/2021
SE ELEVATION
SCALE : 1”=20’-0”
A8.2.5 01
2ND FLOOR PLAN SCALE: NOT TO SCALE DATE: 10/11/2021
PROCESS DRAWINGS
SUMMARY - Rethink amphitheatre - Scale is off - 2F building exteior forms need to be more in harmony with roof
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang
03
ELEVATION NE SCALE: NOT TO SCALE DATE: 10/21/2021
02
SECTION THRU GARDEN
Date: 12/13/2021
SCALE: NOT TO SCALE DATE: 10/21/2021
A8.2.6 04
EXPLODED AXON SCALE: NOT TO SCALE DATE: 10/21/2021
01
2ND FLOOR PLAN SCALE: NOT TO SCALE DATE: 10/18/2021
PROCESS DRAWINGS
SUMMARY - Think about color in drawings, not a CD set - Show details of joint connections
Cornucopia
02
SECTION THRU COMMUNITY KITCHEN NE SCALE: NOT TO SCALE DATE: 11/15/2021
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang
04
Date: 12/13/2021
SECTION THRU OFFICE NE SCALE: NOT TO SCALE DATE: 11/15/2021
A8.2.7 03
SECTION THRU RESTROOMS NE SCALE: NOT TO SCALE DATE: 11/15/2021
01
MODULE EXPLODED AXON SCALE: NOT TO SCALE DATE: 10/21/2021
PROCESS DRAWINGS
Cornucopia
09/30/2021
CCA Integrated Studio Report
09/30/2021
Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang Date: 12/13/2021
09/30/2021
09/27/2021
09/20/2021 SUMMARY - Rethink connection/walking pathways on 2F - Use curve stitch for roof, precedent module probably wouldn’t work for a longer span - Think about different views from people outside of building
A8.3.1 09/30/2021
09/27/2021
09/20/2021
DECISIONMAKING PROCESS
SUMMARY - Think about fire safety - Need third set of egress to meet code - Enclosed building roof, how can it carry the architectural language of roof
Cornucopia
CCA Integrated Studio Report
10/11/2021
Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang Date: 12/13/2021
10/11/2021
A8.3.2 09/30/2021
DECISIONMAKING PROCESS
SUMMARY - Zoom in on joint connection for roof - Think about how polygal panels are structured
Cornucopia
11/01/2021
10/25/2021
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A8.3.3 10/21/2021
10/21/2021
DECISIONMAKING PROCESS
SUMMARY - MEP in building can be exposed - Boxy roof seems out of place compared to rest of structure - Fix flitch plates and bolts based on consultant suggestions
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang Date: 12/13/2021
11/08/2021
11/08/2021
11/01/2021
A8.3.4 11/08/2021
11/01/2021
11/01/2021
DECISIONMAKING PROCESS
SUMMARY - Redo restroom layout - Show polygal paneling in drawing - Fix roof “tail“
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang
11/15/2021 Date: 12/13/2021
A8.3.5 11/15/2021
11/08/2021
DECISIONMAKING PROCESS
CONSULTATION SUMMATION 10/07/2021 CONSULTANTS: Jacquline Li [Structural Engineer]
Cornucopia
- Look at light weight bridges as precedents because of the long span - Have a good reason for the roof to be at maximum buildable height - Need further analysis for truss but seems do-able - Could have columns between to support the long span, use columns to determine enlosed programs - Top band with trusses are good, bottom band needs bracings on 25-30% of bays for lateral load transfer.
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A8.4.1
CONSULTATION WORKSHOP ONE
CONSULTATION SUMMATION 10/28/2021 CONSULTANTS: Jacquline Li [Structural Engineer] Lisa Follman + Gera Faigon [Building Energy] - Put rainwater collection pump on 2nd floor to save energy - Living Machine filtration - Think about how structural systems can do more than just structure - Think about energy loads, maybe use photovoltaic panels on roof - Play with the surface of the roof more - Use steel cables for cross bracing instead of wood to achieve lightness - Use a custom gusset plate for the knuckle of roof frame, cross bracing joint. - Insert flitch plate for all joints
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A8.4.2
CONSULTATION WORKSHOP TWO
CONSULTATION SUMMATION 11/11/2021 CONSULTANTS: Jacquline Li [Structural Engineer] Lisa Follman + Gera Faigon [Building Energy] - 2F needs thermal break whenever there’s a change from inside to outside - Add data for wind directions - Don’t need a big tank for water collecting - Need overhead clearance - Use drip irrigation - Bolts need 2” min distance from edge - 1/2” thickness for flitch plate - 3/4” bolts - Distance between holes should be 3” - 4 bolts/wing, add more if needed - Add another row of bolts if beam/girder has a lot of load - Continue frame diagonal members instead of top beam
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A8.4.3
CONSULTATION WORKSHOP THREE
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A8.5
FIRE SAFETY
Cornucopia
CCA Integrated Studio Report Fall/2021 Local Futures Instructors: Lisa Findley Mark Donahue
Team: Geada Alagha Lulu Wang Date: 12/13/2021
A8.6
FINAL REVIEW