Skip to main content

Settlement Patterns

Page 1

A high expression of WORK is to LIVE A life filled with MANUAL and DOMESTIC work

Income patching is an opportunity to supplement PROFESSIONAL LIFE with DOMESTIC WORK

The Act of Work is a Means of Enrichment

When your product is natural You are exposed to nature Unit of Production Individual Person A Day’s Endeavors


A theoretical model of DEVELOPMENT where citizens live in dispersed settlements and work as STEWARDS of the landscape

A FRINGE Dynamic within a NODAL network

DESIGN and its ENVIRONMENT The demonstrated NEED for design

Actual resources COMMITTED to design


and Atrophe.

Territorial Occupations An ATTRACTIVE occupation:

A DISTANCING occupation:

conserves resources + facilitates connectivity + creates anonymity

embeds individuals in the landscape + creates separation + creates neighborly identity

Attracting Condition

Distancing Condition

Hybrid Condition

Growth...


An occupation network: areas of VESTED interest

WILLOW CREEK: Conservation Study Site

An enfranchised citizen base can be a tool for conservation


URBAN GROWTH BOUNDARY: EUGENE

WILLOW CREEK DEVELOPMENT PLAN PHASE ONE


Eugene Public Works Acts and Manager

Willow Creek Wetland:

“The community has a significant opportunity in West Eugene...To create DEVELOPMENT that recognizes and is sensitive to its adjacent natural resources.” -West Eugene Wetlands Plan

Create Environments that Filter

Balance Environmental Concern Costs and Responsibilities are Split with Development need amongst several sources

Hierarchical Conservation Agenda


BEST MANAGEMENT PRACTICES: Tem porar y erosio n co n tro l d ur ing bui l d On site detention o r re te n ti o n o f s to r m wate r S hallow grassy swal te s : r un to s to r m Oil and grease se parato rs at s tre e t j un c ti o n Porous pavem ent fo r parking Vegetated areas to f i l te r r un o ff L im it post develo pme n t r un o ff to predevelopm ent l e vel s

HIGH VALUE LANDSCAPE if the site is or has: 1. Relativeley UNDISTURBED 2. Contains rare plants 3. Large or CONTIGUOUS with system 4. Locally significant or rare HABITAT RECOMMENDED ACTION: “use cooperative arrangements with PRIVATE LAND OWNERS to implement the management plan.” -WEWP 1992


A Willow Creek DEVELOPMENT plan a single step slowly leads to several more

The first interventions on the delicate site are to build a simple studio, which sits lightly on the pengra silt, and to build a shop, which is embeded in the firmer edge. Living on site, the occupant can begin to cultivate and to listen.

Healthful role modeling attracts others to the place. Employees of a central business, or folks of like lifestyle, begin to settle in their own fashion. Nuclear environments expand to suit individual occupant needs. The drainage system organizes the growth

Areas of Occupation:

Attraction, Distance and Linear Flow

The two structures exhibit independent spheres of influence. The studio, being a more refined environment, is used for sleeping, eating, gardening, and painting. The shop enables the capacity for increased local production.

Individual occupations split as local attraction generates more buildings. As outsiders come to join the colonial project they distance themselves from existing occupants. A balance is found between proximity and distance. People walk the site. They live slowly and mindfully.


Local nodes develop at points of intersection. The subdivision of existing occupations demonstrates attractive density. Yet people retain their sense of open space.

As the downtown core continues on a perpetual growth trajectory, it surpasses its carrying capacity. Refugees push further outwards. They push up against the urban growth boundary. The now 15 year old settlement attracts a second phase of colonists who desire codoesque living located more densely along the edge.

A cellular GROWTH PATTERN develops. It reacts to SITE and CULTURAL conditions. Some are EXISTING and others are EMERGENT. As the culture of the place changes. Some originary settlers UPROOT and move on, others ADAPT and commit to stay. The hope is that the place is better for their having been there.


Interventions

Geologic Time

Hydrologic Time

All that is done is slowly and undeniably undone

mountains crumble from just rain, time, and mist


Willow Creek Wetland Soil Conditions

The property constitutes a combination of silty loams which are generally saturated. Site conditions are relatively corrosive to concrete and steel. Water levels fluctuate seasonally. Soils are nutrient rich but ultimately difficult to farm. The site includes sensitive ecological habitat Building in human time, driven pilings support light floating planes.

Bracketed structural components facilite disassembly and maintence.

Site Section


ACENTUATE AN EXISTING POINT OF INTEREST

THE PLATFORM STEPPE Scaled 1/4”:1’


ENGAGED CITZENS Opportunities for Intervention

A platform to encourage spontaneous gatherings as well as intentional workshops. Space to meet, relax, observe, and engage all while not disturbing easily eroded conditions.

A path meets the swelling of a stream and they become a point of attraction A LATENT DESIGN OPPORTUNITY

living next to a wetland provides an opportunity to engage with the natural area. Collaboration with regional conservation efforts makes for a strong stream of advocacy


Studio Interior


A 1 Storey Grandmother’s Cottage

A wetland occupation BEGINS

Expressive Loft

1 Storey Studio

B

B

A Occupiable Loft

1.5 Storey House

1st Floor Plan scaled 1/8”:1’


Section AA - Looking East scaled 1/8”: 1’

Section BB - Looking South scaled 1/8”: 1’


Stages of Development The house as ATTRACTION, DISTANCE, and REPAIR

cooking - sleeping - producing

a seperate space

Looking West expanding autonomous family

improved accessibility

scaled 1/4”: 1’


Cedar siding Furring Moisture barrier Sheathing 2 x 6 cavity Mineral wool batt Interior Finish Caulk airseal Vapor barrier

Wall and Foundation scaled 1”: 1’

Wall and Roof scaled 1”: 1’


STUDIO PLATFORM STRUCTURE 2’4”

20’

Dead and Live Load = 30 PSF = 60 PLF 2’ o.c. End Wall = 300 lbs every 2’

Platform Joist

End Joists

2 x 6 at fb = 1,428 psi < Fb = 1,743psi 80% bending utilization fv =85 psi < Fv = 166 psi

R1 = R2 = 920 lbs

50% shear utilization

V max= 470 lbs

M max = 900 ft lbs

R1 = R2 = 3,329 lbs

V max= 2580 lbs

W 6 X 9 at fb = 19 ksi < fb = 22 ksi 88% utilization

M max = 8,820 ft lbs


Beam W 6 X 20 at fb = 17ksi < Fb = 22ksi 79% utilization

R1 = R2 = 10,070 lbs

V max= 5,240

M max = 18,890 ft lbs


View of Studio from Shop


Slowing the flow of WATER

Retention depression to minimize run off onto asphalt A stonework retaining wall supports the wrapped paving

Terraced retention basins slow runoff FILTER - CHARGE - REMOVE

Parking Lot Looking North scaled 1/16”: 1’


a studio

The first intervention on the delicate site is to build a simple studio which sits lightly on the pengra silt . Living on site, the occupant can begin to cultivate and to listen.

a workshop

The second intervention is to lay basic infrastructure on the site while erecting a modestly sized workspace. This will serve as the staging ground for future development THERMAL STRATEGIES Shop PROGRAM requires low conditioning needs

9:12 pitch H2O(high winter gain) Daylight Aperture 4:12 pitch PV (high summer gain) Seasonal Windbreak

Shop looking East scaled 1/8”: 1’


Third Floor Plan

Bracing Plan

scaled 1/16”: 1’

scaled 1/32”: 1’

Second Floor Plan scaled 1/16”: 1’

Shop Ground Plan scaled 3/32”: 1’


Cedar siding Furring Moisture barrier Sheathing 2 x 4 cavity Mineral wool batt Interior Finish Vapor barrier Tension brace Rain screen roof Structural timber

Shop Wall scaled 1”: 1’


Turn static files into dynamic content formats.

Create a flipbook
Settlement Patterns by Luke Larsen - Issuu