Designed by: Lucy Hegarty- Division 9 Specifications of Tile and Wood, Performance Program of Project Data, and Conceptual Design of Flooring Lauren Miller- Division 9 Specifications of Carpet and Concrete Staining, Performance Program of People Data, and Conceptual Design of Ceilings Valentina Borrelli- Division 9 Specifications of Resilient and Laminate, Performance Program of Place Data, and Conceptual Design of Walls
Page 1 of 35
Table of Contents Executive Summary……………………………………………….pg 3 Division 9 Specifications………………………………………….pg 4-23 Design Program…………………………………………………...pg 24-28 Conceptual Design Program………………………………………pg 29-34 Bibliography……………………………………………………….pg 35
Page 2 of 35
Executive Summary The Pensacola Chamber of Commerce is the client we were presented with for our Integrated Applied Finish Wayfinding Project. The objectives of this project were to give our group of designers the opportunity to create a new concept for integrated wayfinding that includes using the research, context, and customized applied finishes in design that will aid for independent navigation throughout the interior space. We are to use the principles of universal design, demographic and human factors, and involve the brand of the Chamber to achieve and develop the objective of the integrated wayfinding. The mission of the Pensacola Chamber of Commerce is “to promote and endeavor in order to improve the quality of life in the region driven by the growth, success, and civic engagement of the business community.” They have the vision to be a “vibrant community working together to ensure a greater Pensacola that is rich in talent and resources, and committed to the ideals of excellence, prosperity, innovation, and responsible growth for future generations.” (About the Greater Pensacola Chamber, 2020, October 22.) As a brand, they seek to be an inclusive community that looks to improve as they are encouraged by their business community. The best way to help achieve their mission and vision is to start with the core. Helping them from the inside out through design will help accomplish their goals. The new design of the Chamber of Commerce will incorporate materials and designs of their local community and involve finishes that are sufficient for people of all ages. When creating the design concepts for the flooring, walls, and ceilings, we had to go back to our foundation of objectives and model our design through those guides. Background research of the flooring projected the start of the project. Then, we began to use the context and demographic of Pensacola to confirm further decision making when selecting the custom materials, finishes, and design of the Chamber. Wayfinding has a large role in the Integrated Applied Finish Wayfinding Project. Through finishes and materials, independent navigation can be achieved. Whether it is through a change of flooring, directional sign usage, or the manipulation of ceiling features and heights, wayfinding is a tool used in this specific design of the Pensacola Chamber of Commerce. As a team, we came together and researched our client and worked with one another to select finishes and materials for the Pensacola Chamber of Commerce. The new design integrates their local community, wayfinding, their corporate identity, and universal design. We have chosen materials that pass their needed tests surpassing the needed scores, impervious to moisture, and cost-efficient which all aid in the safety of the visitors and workers. Those who walk into the Chamber will feel the inclusion of the vibrant community while feeling at home with the selections made for the purpose of representing Pensacola.
Page 3 of 35
Master Flooring Specifications: Design Study for Pensacola Chamber of Commerce Integrated Applied Finish Wayfinding Plans
\
Page 4 of 35
SECTION #
TITLE
09 3000
TILING
09 3013 CERAMIC TILING 09 6200
SPECIALTY
09 6219 LAMINATE FLOORING 09 6400
WOOD
09 6429 WOOD STRIP AND PLANK FLOORING 09 6500
RESILIENT
09 6519 RESILIENT TILE FLOORING 09 6800
CARPET
09 6813 TILE CARPETING 099300
CONCRETE STAINING
** End of List **
Page 5 of 35
SECTION
09 3000 09 3013
TILING CERAMIC TILING
PART 1 -GENERAL 1.1
SECTION INCLUDES- Ceramic
1.2
RELATED SECTIONS
1.3
A.
Section 05 40 00 - Cold-Formed Metal Framing.
B.
Section 06 10 00 - Rough Carpentry.
C.
Section 09 30 50 - Tile Setting Materials and Accessories.
REFERENCES A.
ANSI A137.1 - American National Standard for Ceramic Tile
B.
ISO 10545-3- Water Absorption
C.
ISO 10545-7- Abrasion and Wear Resistance
D.
ISO 10545-4- Tensile Strength
E.
ASTM C648- Abrasion and Wear Resistance, Crazing Resistance, and Tensile Strength
F.
ASTM C650/C1378- Stain Resistance
SUBMITTALS A.
Submit under provisions of Section 01 30 00 - Administrative Requirements.
B.
Product Data: Manufacturer's data sheets on each product to be used, including: 1. Preparation instructions and recommendations. 2. Storage and handling requirements and recommendations. 3. Installation methods.
C. Selection Samples: For each product requiring color/texture selection, provide full size samples for final selection. D. 1.5
Verification Samples: For each product, color, and texture selected, provide two full-size units representing actual color and texture of products to be installed.
SAMPLE PANELS A.
Construct sample panel at location indicated or directed, and as follows: 1. Size: 4 feet by 4 feet (1.2 m by 1.2 m). 2. Include all unit types and sizes to be used, and mortar joint treatment.
B. Obtain Interior Designer's acceptance of a sample panel before beginning construction activities of this section.
Page 6 of 35
C. Do not remove the sample panel until construction activities of this section have been accepted by Interior Designer. 1.6
DELIVERY, STORAGE, AND HANDLING A.
Deliver products of this section on pallets, with individual faces protected; keep dry.
B. Store tile in a protected area or under cover on level ground; keep dry. Do not double-stack pallets. PART 2 -PRODUCTS 2.1
MANUFACTURERS A.
Acceptable Manufacturer: 1. Specialty Tile, 1275 Oakbrook Drive, Suite D, Norcross, Georgia 30093. 800.536.9224, www.specialtytile.com 2. TileBar, 45 W 21st Street, New York, New York 10010, 888.541.3840, www.tilebar.com 3. Porcelanosa, 600 Route 17 North, Ramsey, New Jersey 07446. 201.995.1310, www.porcelanosa-usa.com
2.2
B.
Requests for substitutions will be considered in accordance with provisions of Section 01 60 00 - Product Requirements.
C.
Substitutions: Not permitted.
TILE A. Type of Tile/Stone: Porcelain, Marble Tech Porcelain Tile, TLCMMRDBGP12X24 1. Manufacturer/Supplier: TileBar 2. Style/Type: Porcelain 3. Size: 12x24 in 4. Texture: N/A 5. Color: Bianco Gioia B. Type of Tile/Stone: Porcelain, Marble Tech Porcelain Tile, TLCMMRDGIP12X24 1. Manufacturer/Supplier: TileBar 2. Style/Type: Porcelain 3. Size: 12x24 in 4. Texture: N/A 5. Color: Grigio Imperiale C. Type of Tile/Stone: Porcelain, Marbella Porcelain Tile, TLMARSABBIA12X24 1. Manufacturer/Supplier: TileBar 2. Style/Type: Porcelain 3. Size: 12x24 in
Page 7 of 35
4. Texture: N/A 5. Color: Greige D. Type of Tile/Stone: Porcelain, Stuc, 100162825 1. Manufacturer/Supplier: Porcelanosa 2. Style/Type: Porcelain 3. Size: 12x24 in 4. Texture: N/A 5. Color: Grey E. Type of Tile/Stone: Porcelain, Stuc, 100162825 1. Manufacturer/Supplier: Porcelanosa 2. Style/Type: Porcelain 3. Size: 12x24 in 4. Texture: N/A 5. Color: Beige F. Type of Tile/Stone: Porcelain, Lux Wood, 16199980121 1. Manufacturer/Supplier: Architectural Ceramics 2. Style/Type: Porcelain 3. Size: 8in x 48in (Modular) 4. Texture: N/A 5. Color: Larch PART 3 -EXECUTION 3.1
INSTALLATION A.
Install units in accordance with manufacturer's instructions, approved submittals and in proper relationship with adjacent construction.
END OF SECTION
Page 8 of 35
SECTION
09 6200
SPECIALITY
09 6219
LAMINATE FLOORING
PART 1 -GENERAL 1.1
SECTION INCLUDES A.
1.2
Laminate
RELATED SECTIONS A.
Section 03 30 00 - Cast-in-Place Concrete. A. Section 06 10 00 - Rough Carpentry. B. Division 7 - Thermal and Moisture Protection.
1.3
REFERENCES A.
American Concrete Institute (ACI): 1. ACI 302.1R - Guide to Concrete Floor and Slab Construction. 2.
B.
1.4
ACI 302.2R - Guide for Concrete Slabs that Receive Moisture-Sensitive Flooring Materials.
ASTM International (ASTM): 1.
ASTM D 2047 - Standard Test Method for Static Coefficient of Friction of Polish-Coated Flooring Surfaces as Measured by the James Machine.
2.
ASTM E 648 / NFPA 253 - Standard Test Method for Critical Radiant Flux of Floor-Covering Systems Using a Radiant Heat Energy Source.
3.
ASTM E 662 - Standard Test Method for Specific Optical Density of Smoke Generated by Solid Materials.
4.
ASTM F 970 - Standard Test Method for Measuring Recovery Properties of Floor Coverings after Static Loading.
5.
ASTM F 2170 - Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in situ Probes.
SUBMITTALS A. Submit under provisions of Section 01 30 00 - Administrative Requirements. B. Product Data: Manufacturer's data sheets on each product to be used, including: 1. Preparation instructions and recommendations. 2. Storage and handling requirements and recommendations. 3. Installation methods.
Page 9 of 35
C.
Verification Samples: For each finish product specified, two samples, minimum size 6 inches (152 mm) square representing actual product, color, and patterns.
1.5
QUALITY ASSURANCE A. Manufacturer Qualifications: Minimum 5-year experience manufacturing similar products. B. Installer Qualifications: Trained journeymen with a minimum of three years successful experience in the installation of resilient flooring. C. Mock-Up: Provide a mock-up for evaluation of surface preparation techniques and application workmanship. 1. Finish areas designated by Interior Designer. 2. Do not proceed with remaining work until workmanship is approved by Interior Designer. 3. Remodel mock-up area as required to produce acceptable work. 1.6
PRE-INSTALLATION MEETINGS A. Convene minimum two weeks prior to starting work of this section.
1.7
DELIVERY, STORAGE, AND HANDLING A. Deliver and store products in manufacturer's unopened packaging bearing the brand name and manufacturer's identification until ready for installation. B. Handle materials to avoid damage.
1.8
PROJECT CONDITIONS A. Refer to manufacturer’s installation requirements for conditions related to material storing, temperature, and humidity. B. Allow sufficient time for proper preparation, installation and cuing. C. Close spaces to traffic during flooring installation until the installer is satisfied the adhesive has set. D. Conform to all pertinent manufacturer’s standards listed in, but not limited to, this specification. 1.9
SEQUENCING A. Ensure that products of this section are supplied to affected trades in time to prevent interruption of construction progress.
1.10
WARRANTY A. Warranty: Provide manufacturer's standard limited warranty. PART 2 -PRODUCTS 2.1 MANUFACTURERS A. Floor and Decor Commercial, 2500 Windy Ridge Parkway Atlanta, GA 30339, www.flooranddecor.com B. Requests for substitutions will be considered in accordance with provisions of Section 01 60 00 - Product Requirements. C. Substitutions: Not permitted. Page 10 of 35
2.2
SPECIALTY FLOORING A.
Type of Specialty Flooring: Laminate 1. Manufacturer: Floor and Decor Commercial 2. Style: Heather Slate Matte Water-Resistant Laminate, 100489863 3. Size: 7.72in x 47.72in 4. Texture: Authentic Textured (EIR) 5. Color: Heather Slate Matte
PART 3 -EXECUTION 3.1
INSTALLATION A.
Install units in accordance with manufacturer's instructions, approved submittals and in proper relationship with adjacent construction.
END OF SECTION
Page 11 of 35
SECTION
09 6400 09 6429
WOOD WOOD STRIP AND PLANK FLOORING
PART 1 -GENERAL 1.1 SECTION INCLUDES A. Engineered Wood Flooring: Real Wood Veneer Flooring of the following types1. LBI Boyd Design Resource- Awake Flooring Quiet Click Flooring Collection in color WQC-1000 2.1
RELATED SECTIONS A. Section 06 10 00 - Rough Carpentry. B.
Section 09 64 16 - Wood Block Flooring.
C.
Section 09 90 00 - Painting and Coating.
2.2
REFERENCES A. Forest Stewardship Council (FSC): 1. C FSCertification: FSC Chain-of-Custody certification.
2.3
SUBMITTALS A. Submit under provisions of Section 01 30 00 - Administrative Requirements. B. Product Data: 1. Manufacturer's data sheets on each product to be used. 2. Preparation instructions and recommendations. 3. Storage and handling requirements and recommendations. 4. Typical installation methods. C. Selection Samples: For each finish product specified, two complete sets of color chips representing manufacturer's full range of available colors and patterns. D. Verification Samples: For each finish product specified, two samples, minimum size 6 inches (150 mm) square representing actual product, color, and patterns. E. Shop Drawings: Include details of materials, construction and finish. Include relationship with adjacent construction.
2.4
QUALITY ASSURANCE A. B. C.
Manufacturer Qualifications: Company specializing in manufacturing products specified in this section with a minimum five years documented experience. Installer Qualifications: Company specializing in performing Work of this section with Mock-Up: Construct a mock-up with actual materials in sufficient time for Interior Designer's review and to not delay construction progress. Locate mock-up as acceptable to Interior Designer and provide temporary foundations and support. 1. Intent of mock-up is to demonstrate quality of workmanship and visual appearance. 2. If mock-up is not acceptable, rebuild mock-up until satisfactory results are achieved.
Page 12 of 35
3. Retain mock-up during construction as a standard for comparison with completed work. 4. Do not alter or remove mock-up until work is completed or removal is authorized. 2.5
PRE-INSTALLATION CONFERENCE A. Convene a conference approximately two weeks before scheduled commencement of the Work. Attendees shall include Interior Designer, Contractor and trades involved. Agenda shall include schedule, responsibilities, critical path items and approvals.
2.6
DELIVERY, STORAGE, AND HANDLING A. Store and handle in strict compliance with manufacturer's written instructions and recommendations. B. Protect from damage due to weather, excessive temperature, and construction operations. 2.7
PROJECT CONDITIONS A. Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer's recommended limits. 2.8
WARRANTY A. Manufacturer's Warranty: Provide manufacturer's standard limited warranty.
PART 3 -PRODUCTS 3.1 MANUFACTURERS A. Acceptable Manufacturer: LBI Boyd Design Resource, 2275 Auto Center Dr, Glendora, CA, 91740. 909-592-1100. https://www.lbiboyd.com/ B. Substitutions: Not permitted. C. Requests for substitutions will be considered in accordance with provisions of Section 01 60 00 - Product Requirements. 3.2
SOLID HARDWOOD FLOORING A. Engineered Type of Wood Flooring: Awake Flooring Quiet Click Flooring Collection in color WQC-1000 1. Species: Oak 2. Thickness: 8.7mm 1. 1.2mm Wood Veneer
PART 4 -EXECUTION 4.1 EXAMINATION A. Do not begin installation until substrates have been properly constructed and prepared. B. If substrate preparation is the responsibility of another installer, notify Interior Designer in writing of unsatisfactory preparation before proceeding. C. Install wood flooring only after interior temperature and humidity conditions can be maintained at conditions that mimic normal temperature and humidity conditions for the permanent system. Page 13 of 35
4.2
PREPARATION A. Clean surfaces thoroughly prior to installation. B. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.
4.3
INSTALLATION A. Install in accordance with manufacturer's instructions, approved submittals and in proper relationship with adjacent construction.
4.4
CLEANING AND PROTECTION A. Limit foot traffic on finished wood flooring. B. Protect from damage during construction operations. Promptly repair any damaged surfaces. Remove and replace work which cannot be satisfactorily repaired. C. Clean products in accordance with the manufacturer's recommendations. D. Touch-up, repair or replace damaged products before Substantial Completion.
END OF SECTION
Page 14 of 35
SECTION
09 6500 09 6519
RESILIENT RESILIENT TILE FLOORING
PART 5 -GENERAL 5.1 SECTION INCLUDES A. Resilient Tile Flooring 5.2
RELATED SECTIONS A. Section 03 30 00 - Cast-in-Place Concrete. B. Section 06 10 00 - Rough Carpentry. C. Division 7 - Thermal and Moisture Protection.
5.3
REFERENCES A. American Concrete Institute (ACI): 1. ACI 302.1R - Guide to Concrete Floor and Slab Construction. 2. ACI 302.2R - Guide for Concrete Slabs that Receive Moisture-Sensitive Flooring Materials. B. ASTM International (ASTM): 1. ASTM E 648 / NFPA 253 - Standard Test Method for Critical Radiant Flux of Floor-Covering Systems Using a Radiant Heat Energy Source. 2. ASTM E 662 - Standard Test Method for Specific Optical Density of Smoke Generated by Solid Materials. 3. ASTM F 710 - Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring. 4. ASTM F 970 - Standard Test Method for Measuring Recovery Properties of Floor Coverings after Static Loading. 5. ASTM E648 - Standard Test Method for Critical Radiant Flux of Floor-Covering Systems Using a Radiant Heat Energy Source 6. ASTM F1700 - Standard Specification for Solid Vinyl Floor Tile 7. ASTM F1515 Standard Test Method for Measuring Light Stability of Resilient Flooring by Color Change 8. ASTM F137 - Standard Test Method for Flexibility of Resilient Flooring Materials with Cylindrical Mandrel Apparatus 9. ASTM F1514 - Standard Test Method for Measuring Heat Stability of Resilient Flooring by Color Change 10. ASTM F2199 -Standard Test Method for Determining Dimensional Stability and Curling Properties of Resilient Flooring after Exposure to Heat 11. ASTM F970 Standard Test Method for Measuring Recovery Properties of Floor Coverings after Static Loading SUBMITTALS A. Submit under provisions of Section 01 30 00 - Administrative Requirements. B. Product Data: Manufacturer's data sheets on each product to be used, including: 1. Preparation instructions and recommendations. 2. Storage and handling requirements and recommendations.
5.4
Page 15 of 35
C.
5.5
3. Installation methods. Verification Samples: For each finished product specified, two samples, minimum size 6 inches (152 mm) square representing actual product, color, and patterns.
QUALITY ASSURANCE A. Installer Qualifications: Trained journeymen with a minimum of three years successful experience in the installation of resilient flooring. B. Regulatory Requirements: Provide slip resistant sheet vinyl safety flooring in compliance with the following: 1. Americans with Disabilities Act Architectural Guidelines (ADAAG). 2. Occupational Safety and Health Administration (OSHA). C. Mock-Up: Provide a mock-up for evaluation of surface preparation techniques and application workmanship. 1. Finish areas designated by Interior Designer. 2. Do not proceed with remaining work until workmanship is approved by the Interior Designer. 3. Remodel mock-up area as required to produce acceptable work.
5.6
PRE-INSTALLATION MEETINGS A. Convene a minimum two weeks prior to starting work of this section.
5.7
DELIVERY, STORAGE, AND HANDLING A. Deliver and store products in manufacturer's unopened packaging bearing the brand name and manufacturer's identification until ready for installation. B. Store rolls of sheet goods in a secured upright position. Store materials in dry spaces protected from the weather, with ambient temperatures not less than 55 degrees F (12.8 degrees C) or more than 85 degrees F (29.4 degrees C). C. Handle materials to avoid damage.
5.8
PROJECT CONDITIONS A. Refer to manufacturer’s installation requirements for conditions related to material storing, temperature, and humidity. B. Allow sufficient time for proper preparation, installation and cuing. C. Close spaces to traffic during flooring installation until the installer is satisfied the adhesive has set. D. Conform to all pertinent manufacturer’s standards listed in, but not limited to, this specification
1.1
SEQUENCING A. Ensure that products of this section are supplied to affected trades in time to prevent interruption of construction progress. WARRANTY B. Warranty: Provide manufacturer's standard limited warranty.
1.2
Page 16 of 35
PART 2 -PRODUCTS 2.1 MANUFACTURERS A. Acceptable Manufacturer: Mohawk Group, 160 South Industrial Boulevard Calhoun, Georgia 30701, 800.554.6637, www.mohawkgroup.com B. Requests for substitutions will be considered in accordance with provisions of Section 01 60 00 - Product Requirements. C. Substitutions: Not permitted. 2.2
RESILIENT FLOORING A. Type of Specialty Flooring: Resilient Tile 1. Manufacturer: Mohawk Group 2. Style: Bolder, C0010-832 3. Size: 36in W x 36in L (914.4mm x 914.4mm) 4. Texture: Light Emboss 5. Color: River Rock B. Type of Specialty Flooring: Resilient Tile 1. Manufacturer: Mohawk Group 2. Style: Bolder, C0010-925 3. Width: 36in W x 36in L (914.4mm x 914.4mm) 4. Texture: Light Emboss 5. Color: Pebble
PART 3 -EXECUTION 3.1 EXAMINATION A. Do not begin installation until substrates have been properly prepared. If substrate preparation is the responsibility of another installer, notify Interior Designer of unsatisfactory preparation before proceeding. B. Confirm concrete slabs conform to ACI 302.1R and ACI 302.2R. C. Perform moisture tests on concrete floors regardless of the age or grade level. Verify concrete substrate is dry in accordance with ASTM F 2170, in strict accordance with instructions. D. Meet and prepare concrete per ASTM F 710. For other monolithic floors; ASTM F 1482 Standard for Wood Subfloors. 3.2 PREPARATION A. Clean surfaces thoroughly prior to installation. B. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions. 3.3 INSTALLATION A. Install in accordance with manufacturer's instructions, approved submittals, and in proper relationship with adjacent materials. PROTECTION A. Protect installed products until completion of project. B. Cleaning: Remove temporary coverings and protection of adjacent work areas. Repair or replace damaged installed products. Clean installed products in accordance with
Page 17 of 35
manufacturer's instructions prior to Owner's acceptance. Remove construction debris from the project site and legally dispose of debris. C. Touch-up, repair or replace damaged products before Substantial Completion. END OF SECTION
Page 18 of 35
SECTION
09 6800 09 6813
CARPET TILE CARPETING
PART 1 -GENERAL 1.1
SECTION INCLUDES A.
1.2
RELATED SECTIONS A.
1.3
1.4
A.
Submit under provisions of Section 01 30 00 - Administrative Requirements.
B.
Product Data: Manufacturer's data sheets on each product to be used, including: 1. Preparation instructions and recommendations. 2. Storage and handling requirements and recommendations. 3. Installation methods.
C.
Verification Samples: For each finish product specified, two samples, representing actual product and finish.
D.
Extra Stock: Submit extra stock equal to 2% of total installed.
QUALITY ASSURANCE
B. C. D.
Manufacturer Qualifications: Minimum 5-year experience manufacturing similar products. Installer Qualifications: Minimum 2-year experience installing similar products. Performance: Fire performance meeting requirements of building code and local authorities. Mock-Up: Provide a mock-up for evaluation of surface preparation techniques and application workmanship. 1. Finish areas designated by Architect. 2. Do not proceed with remaining work until workmanship is approved by Architect. 3. Refinish mock-up area as required to produce acceptable work.
PRE-INSTALLATION MEETINGS A.
1.6
Section 03 30 00 - Cast-in-Place Concrete.
SUBMITTALS
A.
1.5
Carpet tile
Convene minimum two weeks prior to starting work of this section.
DELIVERY, STORAGE, AND HANDLING
Page 19 of 35
A. B. 1.7
PROJECT CONDITIONS A.
1.8
Deliver and store products in manufacturer's unopened packaging bearing the brand name and manufacturer's identification until ready for installation. Handling: Handle materials to avoid damage.
Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer's recommended limits.
SEQUENCING A.
Ensure that products of this section are supplied to affected trades in time to prevent interruption of construction progress.
PART 2 -PRODUCTS 2.1
2.2
MANUFACTURERS A.
Acceptable Manufacturers: 1. J+J Flooring 2. EF Contract
B.
Substitutions: Not permitted.
C.
Requests for substitutions will be considered in accordance with provisions of Section 01 60 00 - Product Requirements.
MATERIALS A.
Carpet Tile: 1. Manufacturer: 1. 2. 2.
Style: 1. 2. 3.
3.
J+J Flooring (Against the grain and Provision) EF Contract (Cascade)
Against the Grain Demi Plank, SKU: 1840-2825-12X48 Provision, SKU: 1831-2276-24X24 Cascade, SKU: KCSC-CSC24
Dimension: 1. 2. 3.
12 in X 48 in (Against the grain) 24 in X 24 in (Provision) 24 in X 24 in (Cascade)
Page 20 of 35
4.
Construction: Loop (All)
5.
Color(s): 1. 2. 3.
6.
Quinoa 1840-2817 (Against the Grain) Fare 1831-2276 (Provision) Splash KCSC-CSC24 (Cascade)
Auxiliary Materials: a. Edge guards. b. Adhesives, cements and fasteners. c. Leveling compound.
PART 3 -EXECUTION 2.3
EXAMINATION A. Do not begin installation until substrates have been properly prepared. B. If substrate preparation is the responsibility of another installer, notify Architect of unsatisfactory preparation before proceeding.
2.4
PREPARATION C. Clean surfaces thoroughly prior to installation. D. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.
2.5
INSTALLATION E. Install in accordance with manufacturer's instructions and in proper relationship with adjacent construction. Test for proper operation and adjust until satisfactory results are obtained. F. Comply with recommendations of Carpet and Rug Institute 'Specifier's Handbook'.
2.6
PROTECTION G. Protect installed products until completion of project. H. Touch-up, repair or replace damaged products before Substantial Completion.
END OF SECTION
Page 21 of 35
SECTION
099300
PART 1
-GENERAL
1.1
1.2
1.3
1.4
CONCRETE STAINING
SUMMARY A.
This Section specifies an applied stain and sealer for horizontal cast-in-place concrete surfaces.
B.
Related Sections: Refer to the following specification sections for coordination: 1. Section 033000 - Cast-In-Place Concrete.
SUBMITTALS A.
Product Data: Submit manufacturer's product data and installation instructions.
B.
Mock-Up: Prepare a test area minimum 2 by 2 feet in size to verify suitability of the stain, sealer and final appearance.
QUALITY ASSURANCE A.
Manufacturer: Minimum 10 years experience producing concrete coatings.
B.
Installer: Licensed installers, experienced and trained in the use of these products.
C.
Suitability of Substrate: Do not apply to concrete surfaces which may have insufficient chemical reaction, including older or weather concrete, concrete subject to runoff or weathered concrete, or heavily sandblasted concrete.
D.
Regulatory Requirements: Comply with requirements of authorities having jurisdiction and applicable codes at the location of the project.
DELIVERY, STORAGE AND HANDLING A.
Deliver materials and products in unopened factory labeled packages. Protect from damage.
B.
Store in a safe place, out of direct sunlight. Keep containers tightly sealed. Do not allow the product to freeze. Use within manufacturer’s recommended shelf life, approximately 12 months.
PART 2 - PRODUCTS 2.1
MATERIALS
Page 22 of 35
A.
Concrete Stain: Kemiko Concrete Floor Stain, Mailing Address: 6663 SW Beaverton-Hillsdale Hwy., Suite 242 Portland, OR 97225, 503-206-8631, http://w.kemikostain.com/staincolors.html 1. Type: Penetrating chemical stain which chemically reacts with concrete. 2. Stain Colors: Cola (No associated number) 3. Coverage: 200-300 square feet of concrete surface per gallon.
B.
Concrete Sealer: As recommended by stain manufacturer.
PART 3 - EXECUTION 3.1
PREPARATION A.
3.2
3.3
Inspection: Prior to start of application, inspect existing conditions to ensure surfaces are suitable for installation including the following: 1. Concrete has cured for a minimum of 28 days prior to application of stain. 2. Surface is completely free of sealers, oils, dirt, paint, alkali, penetrating sealers and foreign materials that would prevent the stain from penetrating the concrete surface. 3. Concrete has been swept clean. 4. Test area has been approved.
APPLICATION A.
Concrete Stain: Strictly comply with manufacturer’s installation recommendations including the following: 1. Use experienced installers wearing protective clothing and breathing apparatus. 2. Test surface for suitable reactivity. 3. Protect adjacent areas from over-spray, runoff, spills and tracking prior to application. 4. For areas requiring material from more than one container, mix together prior to application to avoid color variation. 5. Apply at rate recommended by manufacturer. 6. Clean, rinse and neutralize surface.
B.
Concrete Sealer: Strictly comply with manufacturer’s installation recommendations. Apply after stain has dried at rate recommended by manufacturer. Clean surface as recommended by manufacturer.
CLEANING AND PROTECTION A.
Protection: Do not cover but protect floor area from paint and other contaminates that could inhibit the stain.
END OF SECTION
Page 23 of 35
Performance Program Template: Design Study for Pensacola Chamber of Commerce Integrated Applied Finish Wayfinding Plans
Page 24 of 35
PROJECT DATA (Completed by Designer: Lucy Hegarty)
“A place that provides leadership and resources to a diverse audience that includes community, military leaders, educators, business executives, and entrepreneurs.” (About the Greater Pensacola Chamber, 2020, October 22.) Numerous programs and events are offered to help their members develop strategic relationships within the business community!
Pensacola Chamber of Commerce has the mission of seeking “to promote and endeavor in order to improve the quality of life in the region driven by the growth, success, and civic engagement of the business community.” (About the Greater Pensacola Chamber, 2020, October 22.) The design of the Chamber will focus on the improvement aspect of its mission. It will be achieved by first starting to improve themselves with a new design that promotes wayfinding through engagement within their own business community. Their vision is to be a “vibrant community working together to ensure a greater Pensacola that is rich in talent and resources, and committed to the ideals of excellence, prosperity, innovation, and responsible
growth for future generations.” (About the Greater Pensacola Chamber, 2020, October 22.) Their vision
will influence the design of the Chamber by providing an environment that welcomes and is suitable for the vibrant community to visit and navigate through. This will be achieved by signs, notable separation of spaces through floors and ceilings, and wayfinding/navigation like new floors and directional signs. The vibrance they want to display will be shown through more saturated walls and textures. The welcoming environment will supply the Chamber of Commerce with the diversity and community that they seek to attain their vision. The Greater Pensacola Chamber is fully committed to “enhancing, promoting, and improving the region through three main focuses: membership, armed services, and government affairs.” (About the Greater Pensacola Chamber, 2020, October 22.) It is important for the stakeholders to know that they are “dedicated to providing members with transparent, up to date, reliable information on current events and public policy.” (About the Greater Pensacola Chamber, 2020, October 22.) They advocate for a sound policy that supports their core values. This policy includes tax cuts and reform, support for veterans and the military, and protection of economic development resources. Pensacola Chamber of Commerce is a place of doing good and helping others, especially those in their community. The Chamber can benefit from considering factors such as keeping up with their demographic and adapting to it, continuing to build trust with their members, being aware of the competition, and being able to be progressive in all areas, especially the areas of developing with the new generations.
Page 25 of 35
PEOPLE DATA (Completed by Designer: Lauren Miller)
Figure 6 Pensacola The Upside of Florida (Image retrieved from NorthEscambia.com 2012)
Population Characteristics (About Our City): ● ● ● ● ●
Population: 51,923 Median Age: 41.9 Average Yearly Household Income: $44,144 Veterans: 5,895 Predominant Language: English
Naval Presence(About Our City): The Pensacola Naval Air Station provides a large military presence within the city. This can be seen with roughly 11% percent of the population being veterans. Pensacola can be known as the “Cradle of Naval Aviation,” and they are home to the renowned Blue Angels. The Blue Angels are the official U.S. Navy Flight Demonstration Squadron. This large military presence in the area is a commonality of the residents, that provides a unifying sense of patriotism. Figure 7 Blue Angel Plane (Image retrieved from NorthEscambia.com 2017)
Healthcare (About Our City) (Industries in Pensacola): Healthcare is a prominent industry in Pensacola, as it employs 17% of the working population. That is more than any other industry in the city. (Industries in Pensacola) The hospitals and retirement homes of Pensacola have won many awards. This has them ranking with the best facilities in the state of Florida. (About Our City)
Figure 8 Industry breakdown for Pensacola (Image retrieved from StatisticalAtlas.com)
Education (About Our City): There are more than forty primary and secondary schools in this city. And some of these schools have some of the highest scores on standardized testing in the state.
Influences that earned the name Pensacola (Buchanan, D.): The name Panzacola had Native American origin and was given to Pensacola Bay and the surrounding Spanish settlements (Buchanan, D.). This term was first presented by Juan Jordán de Reina who encountered Native Americans and transliterated (write or print a word of letter using the closest corresponding letters of a different language) their word for the Bay area. This group of Native Americans became known to the Spanish as the Panzacolas. As the area changed from Spanish control to English control, the English used their own form of the word. This is where the term Pensacola came from. The image on the right shows how close pensacola and its parts are to the bay
Page 26 of 35
PLACE DATA (Completed by Designer: Valentina Borrelli)
Figure 10. Pensacola Florida’s First & Future (Adapted from source: City of Pensacola)
About the city: Located in Florida’s panhandle, “Pensacola is surrounded by 50-plus miles of coastline which includes the emerald-green Gulf of Mexico waters and crystal clear bay areas.” “The city has a proud military heritage, thanks to the Naval Air Station. In addition to being the "Cradle of Naval Aviation," the Pensacola Bay Area is proud to call itself home to the renowned Blue Angels, officially known as the U.S. Navy Flight Demonstration Squadron.” (City Of Pensacola/About Our City, October 22.) The city’s background is essential when designing a space, since it provides ideas for decoration, materials, finishes and many others. History: The city of Pensacola was established in 1559 by Don Tristan de Luna and Spanish settlers, Pensacola is America’s First Settlement. Pensacola is often referred to as “The City of Five Flags”, due to the five governments that have ruled it during its history (City Of Pensacola/About Our City, October 22.) The history of Pensacola helps our design process, by giving us history and backgrounds to look at, when creating a space for people to feel at home. Climate conditions: Pensacola has a humid subtropical climate, with short, mild winters (Dec-Feb) and hot, humid summers (Jun-Sep). Hurricane season is Jun.–Nov. Knowing the climate conditions of Pensacola, affects the search of materials for the interior design process of The Greater Pensacola Chamber. Mission: "The City of Pensacola will create opportunities and avenues to enhance the quality of life for all citizens through innovation and cooperation in harmony with our core values.” (City Of Pensacola/About Our City, October 22). Natural features representative of the area: Pensacola Beach, one of the top 5 beaches in the nation. Located on Santa Rosa Island, also one of the longest barrier islands in the world. In addition to the sugar-white sand and crystal clear emerald waters, Pensacola Beach also offers first-rate fishing, many local hang-outs, and top-notch restaurants, as well as the historic Fort Pickens. Another popular attraction is the Gulf Islands National Seashore, which is the longest stretch of protected seashore in the United States. (City Of Pensacola/About Our City, October 22).
Figure 13. Fort Pickens. (Adapted from source: FortWiki) Figure 12. Pensacola Beach. (Adapted from source: Hilton Pensacola Beach)
Page 27 of 35
Conceptual Design Program Template: Design Study for Pensacola Chamber of Commerce Integrated Applied Finish Wayfinding Plans
Page 28 of 35
Mood Board of Conceptual Design
Page 29 of 35
First Floor Conceptual Design
Page 30 of 35
First Floor Continued
Page 31 of 35
First Floor Continued
Page 32 of 35
Second Floor Conceptual Design
Page 33 of 35
Second Floor Continued
The ceiling feature that is used on this floor as well as the first floor is laid longways in the hallway, to provide directionality to aid in wayfinding and to encourage movement. I chose the driftwood stain to play into the feeling of old dock wood which is often seen in the coastal area of Pensacola. I chose this feature instead of actual dock materials, so that it would be on par with code requirements. I chose the colors to provide differences in types of rooms, also providing wayfinding.
Page 34 of 35
Bibliography “About Our City: City of Pensacola, Florida Official Website.” About Our City | City of Pensacola, Florida Official Website. Accessed November 8, 2020. https://www.cityofpensacola.com/1200/About-Our-City. About the Greater Pensacola Chamber. (2020, October 22). Retrieved November 7, 2020, from https://www.pensacolachamber.com/ Buchanan, D. (2015, October 19). 5 Historical Facts You Didn't Know About Pensacola. Retrieved November 12, 2020, from https://thepulsepensacola.com/2015/09/5-historical-facts-you-didnt-know-about-pensacol a/ d.o.o., Yu Media Group. “Pensacola, FL - Detailed Climate Information and Monthly Weather Forecast.” Accessed November 8, 2020. https://www.weather-us.com/en/florida-usa/pensacola-climate. Fort Pickens. (n.d.). Retrieved December 08, 2020, from http://www.fortwiki.com/Fort_Pickens Florida Hotel Gulf Coast: Hilton Pensacola Beach: Our Rooms. (2019, October 15). Retrieved December 08, 2020, from https://hiltonpensacolabeach.com/rooms/ Google, (n.d.). Retrieved November-December 2020, from https://images.google.com/ Industries in Pensacola, Florida (City). (n.d.). Retrieved November 12, 2020, from https://statisticalatlas.com/place/Florida/Pensacola/Industries Material Bank - Search and Sample Materials Fast Sustainable Free. (n.d.). Retrieved October-December 2020, from https://www.materialbank.com/ Panzacola-Pensacola. (n.d.). Retrieved December 01, 2020, from http://www.pensacolathenandnow.com/1559-1821.html “Pensacola, Florida.” Wikipedia. Wikimedia Foundation, October 24, 2020. https://en.wikipedia.org/wiki/Pensacola,_Florida. Reynolds, W. (2012). NorthEscambia.com. Retrieved December 01, 2020, from http://www.northescambia.com/2012/07/new-logo-brand-welcome-to-pensacola-the-upsi de-of-florida Reynolds, W. (2017). NorthEscambia.com. Retrieved December 01, 2020, from http://www.northescambia.com/2017/07/safety-tips-for-blue-angels-weekend
Page 35 of 35