Skip to main content

Lucy Bambury Portfolio & CV | RIBA Part 2

Page 1

LUCY BAMBURY RIBA Part II Arch. Assistant | CV & Portfolio


LUCY BAMBURY MArch RIBA Part 2 | CV lucybambury96@googlemail.com London, NW

I am interested in a global Architecture - looking at architecture found throughout our world for inspiration and precedent. Understanding and learning from vernacular architectures, as a way to design passively in response to the climate crisis we are currently going through. I wou Id love to be pa rt of a team that designs for a variety of areas - that challenges the mainstream notion of what architecture is. Throughout my Architectural experience I have pursued to understand communities and the people I am designing for first and foremost. Especially when designing within the multicultural London context. I try and engage with the users personally if possible, turning to interviews and social media to connect with people. I use Rhino3D and Grasshopper to help model desings and to streamline workflow. The use of Grasshopper software has made designs that would otherwise be extremely difficult to realise, possible.

EDUCATION

SOFTWARES

M.Arch, University of Westminster, 2021 - July 2023

AutoCAD Rhino30 Grasshopper Adobe Photoshop Adobe Illlustrator Adobe lnDesign Vectorworks Sketch Up

B.Arch at University of Westminster, 2017 - 2020 Art Foundation Course at Bucks New University, 2016-17 Aylesbury High Grammar School, Secondary school, 2009 - 2016

PROFESSIONAL EXPERIENCE 2021 I RIBA PART 1 ARCHITECTURAL ASSISTANT, BICKERDIKE AND ALLEN PARTNERS As part of the core design team, I worked on a variety of projects at different scales. Re-cladding projects, commercial fit-out, initial design and feasibility proposals, Heritage building statements and works, helping coordinate a project and initial site surveying to generate GA drawings and a proposal, as well as sending this off for tender. I was responsible for CAD drawings, generating proposals, feasibility studies, sourcing materials and samples, technical specifications, Heritage statements, planning applications and fire safety drawings and correcting existing drawings so that they are compliant with new fire safety regulations post Grenfell fire.

2021 - 2023 I EDI STUDENT CHAMPION, UNIVERSITY OF WESTMINSTER I worked alongside the EDI (Equality, Diversity and Inclusion) Lead of the School of Architecture and Cities to create and implement various schemes focused on Equity within Architectural discourse. I helped with the creation of urban-equity.net, an open web source for the School and beyond. I lead a team of academics generating a reading list for the website, helped in the selecting of students to receive a new award relating to EDI in design. I Co-led a symposium relating to EDI in design at the University, inviting various professionals and academics to present, as well as leading a discussion panel following the talks. I generated the programme for the event, and coordinated the various presenters and their presentations.

2023 I COLLABORATOR, IKARCHITECTURE While freelancing for a couple months, I was part of a small, closely knit team. I used Adobe softwares as well as AutoCAD and ArchiCAD to work on interior, public and residential projects.


LUCY BAMBURY RIBA Part 2 Architectural Assistant Portfolio


M.ARCH FINAL PROJECT | WITHSTANDING THE TIDES

East ern Ha rb

Alexandria

Weste rn H arb ou r

Challenging governmental and industrial pressure to demolish and relocate residents of the Al Maks informal area in Western Alexandria, Egypt, ‘Withstanding the Tides’ strengthens the existing community using architectural interventions with a local circular economy at its core. Built with materials which will withstand predicted sea level rise, by the community themselves using earth brick, bamboo, timber from fishing boats, and left over rubble from previous demolition. Re-establishing the connection between the residents and the canal, the project will withstand the tides both literally and figuratively.

AL MAKS NEIGHBOURHOOD

Al Maks

r ou


M.Arch FINAL PROJECT | WITHSTANDING THE TIDES Alexandria, Egypt: The fragmented city Undress: using a hybrid of drawings and conceptual models, we undressed and dismantled the context to expose its condition and reveal its hidden potential. We then worked on reassembling the various fragments of the city by superimposing a new cityscape that sits above the existing, rising sea level, archaeological ruins, demolition rubble and in a metaphorical sense, the corruption of the construction industry.


3

MODELLING THE HOUSES Outer recycled timber cladding, on bamboo frame structure fixed to earth brick facade

A more sustainable alternative to first use timber, in collaboration with local boat builders, timber will be collected from abandoned boats and excess materials. Bamboo frame will be made using bamboo grown on site.

Earth brick walls

Earth bricks to be made using earth excavated in construction of dwellings, and from local areas.

Upcycled shading screens, made from the fibres from abandoned fishing nets

Piers for fishing boats to dock onto, with treated bamboo driven into river bank to support the structure.

Using timber piles instead of concrete pillars below piers, resulting in a lower embodied energy value.

2

1

Outer recycled timber cladding, on bamboo frame structure fixed to earth brick facade

A more sustainable alternative to first use timber, in collaboration with local boat builders, timber will be collected from abandoned boats and excess materials. Bamboo frame will be made using bamboo grown on site.

Earth brick walls

Earth bricks to be made using earth excavated in construction of dwellings, and from local areas.

Upcycled shading screens, made from the fibres from abandoned fishing nets

Piers for fishing boats to dock onto, with treated bamboo driven into river bank to support the structure.

Using timber piles instead of concrete pillars below piers, resulting in a lower embodied energy value.

4


M.Arch FINAL PROJECT | WITHSTANDING THE TIDES


M.Arch FINAL PROJECT|WITHSTANDING THE TIDES


M.Arch Digital Design module | Grasshopper and Rhino3D

The final surface, demonstrating the bounding boxes which a sphere has been morphed into.


M.Arch Year 1 Project | CROSSING BORDERS: OLD OAK HORTICULTURAL CENTRE


M.Arch Year 1 Project | Bangladeshi Heritage Pavilion Grasshopper Script to Fabrication

A canopy assembled annually by the local community residing in Sunbury House, and those working in the Sunbury workshops. There will be various workshops held under the canopy, educating and engaging with the public regarding Bangladeshi culture and heritage and the importance of ‘Victory Day’ for the Bangladeshi people, and the Bangladeshi community on Brick Lane.


Professional Work | Bickerdike Allen Partners

The below plan is taken from the GA drawings for an extension to Grade II listed Flint House in Oxfordshire. I was responsible for helping make and suggesting changes to the existing internal layout, being conscious of partitions which were part of the original heritage structure, and which were new additions. I also helped with the plan of the renovation of a new extension to the project, attached to the heritage building.

These elevations and details are for a high end commercial unit in Edinburgh. I was in charge of coming up with a pattern for the signage on the shop front, and presenting the options to the client. I also worked on putting together the internal elevations, indicating electrical fittings and final furnishings.

This drawing is to be read in services and any other releva

Any discrepancies are to be r dimensions have been taken must be verified on site by th and suppliers before comme

Do not scale from this drawin

FFL +72.00

01

MIELE

EL

DE

C2

R

C2

This drawing is to be read in conjunction with structural, services and any other relevant information.

ST

RE

ET

Key plan 1:200

Any discrepancies are to be reported to the Architect. All dimensions have been taken from existing records and must be verified on site by the contractor, sub-contractors and suppliers before commencing any work. Do not scale from this drawing. NOTES:

DIESEL GENERATOR NIA 29.3m²

WASTE GENERATOR COMPACTOR SECOND NIA 15.5m² NIA 10.4m²

VEG STORE NIA 3.3m²

GAS METERS NIA 3m² ELEC. SWITCH GEAR

BOILER G.1 NIA 22.9m²

NIA 9m²

FREEZER NIA 4.6m²

PREP DIRTY KITCHEN LAUNDRY G.1

COLD ROOM NIA 6.2m²

NIA 5.9m²

NIA 3.3m²

FEMALE STAFF CHANGING G.1

PASTRY NIA 12m²

NIA 15.9m²

OVENS NIA 41.5m²

FREEZER STORE

COLD ROOM STORE

FFL + 67.000

NIA 12.2m²

NIA 10.6m²

STORE G.4

SERVERY

WATER SOFTENER

MALE STAFF CHANGE G.2

NIA 1.7m²

DINING HALL

PORCH

01: Glazing section with signage (Scale 1:20)

NIA 4.1m²

NIA 26.6m²

DINING STORE

NIA 165.9m²

NIA 6m²

CONSTRUC

NIA 12.9m²

STORE G.3

OFFICE G.1

NIA 3.4m²

NIA 11.4m²

STORE G.2

LOUNGE

RECEPTION

NIA 123.7m²

NIA 2.6m²

NIA 4.2m²

CUPB OARD

MALE WC G.2

NIA 6.6m²

NIA 0.9m²

C2 12/03/21 'Miele' signa to match ma C1 11/03/21 Construction

NIA 4.5m²

OFFICE G.2 NIA 5.7m²

RECEPTION CORRIDOR

PHYSIO STORE NIA 4.9m²

MALE STAFF CHANGING G.1

Lockers

FEMALE CHANGING G.2 NIA 27.4m²

Bench

SKY ROOM

NIA 24.2m²

PHYSIO'S OFFICE 2 NIA 8.1m²

PHYSIO'S OFFICE NIA 7.1m²

BEDROOM 1

DIRTY LINEN G.2 CLEANER G.2

NIA 20.1 m²

NIA 9m²

BEDROOM 16

121 Salusbury Road, London Email: mail@bickerdikeallen. www.bickerdikeallen.com

KEY:

NIA 17.6m²

GYMNASIUM SPACE

NIA 83.5m²

NIA 112m²

Water Dispenser

NIA 17.6 m²

BEDROOM 14 NIA 17.6m²

50mm space horizontally and vertically between all socket coverings

OFFICE G.3 NIA 18 m²

BEDROOM 15

Water Dispenser

NIA 5.7m²

PHYSIO STORE

This drawing is to be read in conjunction with structural, services and any other relevant information.

Do not scale from this drawing.

Landlord's services based on BDP drawings. All sizes and positions TBC on stite Elevation shown in plan

DUCT

DUCT

NIA 54.6m²

DISABLED WC G.1 UTILITY G.1 NIA 4.3 m²

Any discrepancies are to be reported to the Architect. All dimensions have been taken from existing records and must be verified on site by the contractor, sub-contractors and suppliers before commencing any work.

KEY:

Laundry Main Display joinery sits in front of this elevation see ESJ-MIE-DRW-2007

NIA 2.7 m²

HYDROTHERAPY POOL

NIA 8.7m²

PHYSIOTHERAPY 2

NIA 75.3 m²

DUCT SHAFT 4

NIA 8.6 m²

DISABLED CHANGING ASST WC

A1

RECREATION ROOM 1

CORRIDOR 1.1

NIA 20m²

MALE CHANGING G.2

Elevation shown in plan

NIA 7.5 m²

BOILER ROOM G.2 NIA 82.9m²

Do not scale from this drawing.

NIA 3.8m²

NIA 40.4m²

PHYSIOTHERAPY 1

Any discrepancies are to be reported to the Architect. All dimensions have been taken from existing records and must be verified on site by the contractor, sub-contractors and suppliers before commencing any work.

RECREATION ROOM 2 CLEAN LINEN G.1

STORE G.5

Towel Storage

REVISIONS

This drawing is to be read in conjunction with structural, services and any other relevant information.

NIA 20.3 m²

NIA 36.9 m²

LIFT 2

New Water Dispenser

Spin Dryer

SHOWER CORRIDOR

TERRACE

CORRIDOR 2

SMOKING CANOPY

A1

STORE G.6

NIA 7.2 m²

RETAINING WALL

NIA 7.5m²

NIA 1.3m²

NIA 3.8m²

LIFT MOTOR ROOM

STAIR 6 CORRIDOR 1.3

NIA 14.6m²

LOBBY FEMALE WC G.1 MALE WC G.1 NIA 3.8m²

FFL 100.155

TIME TUNNEL

MALE STAFF WC

NIA 12.2m²

CLEANER STORE G.1 G.1 NIA 1.2m²

RAMP

FFL 100.000

HALL

CORRIDOR 1.2

LOBBY

FEMALE WC LIFT G.2

Miele Experience Cen Edinburgh St James Unit 2.38

SHAFT 2

BEDROOM 4 NIA 17.6 m²

Galleria Entrance Elev Entrance signage As Proposed

C2

ENTRANCE NIA 10.9m²

NIA 4.9m²

NIA 7.9m²

EQUIPMENT STORE

KEEP OFFICE

BEDROOM 13 NIA 17.6m²

BEDROOM 5

BEDROOM 12

BEDROOM 6

Laundry main display, 1:20 @ A1

NIA 17.6m²

South Wall, 1:20 @ A1

NIA 9.2m²

DRAWN: LB

SPA PLANT

NIA 4.8m²

NIA 57.4m²

NIA 17.5m²

EXERCISE POOL

NIA 110m²

A1

PRELIMINARY

NIA 199m²

EXERCISE ROOM

DATE: March 2021

NIA 17.9m²

POOL CHEMICAL STORE

BEDROOM 11 NIA 17.6m²

BEDROOM 7

BEDROOM 10

BEDROOM 8

NIA 17.3m²

DRAWING No:

This drawing is to be read in conjunction with structural, services and any other relevant information.

ESJ-MIE-DRW

A1

This drawing is to be read in conjunction with str services and any other relevant information.

Any discrepancies are to be reported to the Architect. All dimensions have been taken from existing records and must be verified on site by the contractor, sub-contractors and suppliers before commencing any work.

P109/07/21 Preliminary

Any discrepancies are to be reported to the Arch dimensions have been taken from existing record must be verified on site by the contractor, sub-co and suppliers before commencing any work.

Do not scale from this drawing.

RJ

REVISIONS

CONSTRUCTION

Elevation shown in plan

CONSTRUCTION NIA 17.2m²

C219/02/21 Dimensions & socket layout updated LB C116/02/21 Electrical setting out LB

KEY:

REVISIONS

REVISIONS

BEDROOM 9 NIA 17.6m²

121 Salusbury Road, London, NW6 6RG Email: mail@bickerdikeallen.com www.bickerdikeallen.com

Data and single socket on other side of wall in active kitchen

T: 0207 625 4411 F: 0207 625 0250

121 Salusbury Road, London, NW6 6RG Email: mail@bickerdikeallen.com www.bickerdikeallen.com

Police Rehabilitation Centre Goring-on-Thames

121 Salusbury Road, London, NW6 6RG Email: mail@bickerdikeallen.com www.bickerdikeallen.com

Flint House GA Existing Ground Floor Layout DRAWN: LB

CHECKED: RJ

DATE: July 2021

SCALE: 1:100 @ A0

DRAWING No:

Do not scale from this drawing.

Elevation shown in plan

KEY:

C219/02/21 Dimensions & socket layout updated LB C116/02/21 Miele elevations electrics LB

NIA 17.9m²

T: 0207 625 4411 F: 0207 625 0250

C2

Miele Internal Elevations South Wall

Miele Experience Centre Edinburgh St James Unit C2.38

C2

8888/D5001 Rev P01.

Plan, 1:100 @ A1 Dishwasher Wall and Coffee Built Freestanding with Hospitality , 1:20 @ A1

DRAWN: LB

Miele internal elevations Laundry Main Display

South Wall, 1:20 @ A1

DRAWN: LB

CHECKED:

DATE: 16/02/21

SCALE: 1:20 @ A1

DRAWING No:

T: 0207 625 4411 F: 0207 625 0250

Miele Experience Centre Edinburgh St James Unit C2.38

Plan, 1:100 @ A1

DATE: 16/02/21 DRAWING No:

CHECKED: INITIALS? SCALE: 1:20 @ A1

8766_SK(0)011 C2C2

8766_SK(0)012 C2

LED wall A and White and Black Design Kitchens, and Active Kitchen Backwall 1:20 @ A1

CONSTRUCTION

CONSTRUCTION

C219/02/21 Dimensions & socket layout updated LB C116/02/21 Miele elevations electics LB

C219/02/21 Dimensions & socket layout upd C116/02/21 Miele Elevations electrics

REVISIONS

REVISIONS

121 Salusbury Road, London, NW6 6RG Email: mail@bickerdikeallen.com www.bickerdikeallen.com

T: 0207 625 4411 F: 0207 625 0250

121 Salusbury Road, London, NW6 6RG Email: mail@bickerdikeallen.com www.bickerdikeallen.com

Miele Experience Centre Edinburgh St James Unit C2.38

Design Kitchen Grey, 1:20 @ A1

Plan, 1:100 @ A1

DRAWN: LB

CHECKED:

DATE: 16/02/21

SCALE: 1:20 @ A1

DRAWING No:

8766_SK(0)014 C2

T: 020 F: 020

Miele Experience Cente Edinburgh St James Unit C2.38

Miele Internal Elevations Coffee, Checkout and Grey Design Kitchen

Miele Internal Elevations White and Black Design Kitchens, and LED wall A DRAWN: LB DATE: 16/02/21

Plan, 1:100 @ A1

DRAWING No:

CHECKED: SCALE: 1:20 @ A1

8766_SK(0)0


Turn static files into dynamic content formats.

Create a flipbook
Lucy Bambury Portfolio & CV | RIBA Part 2 by Lucy Bambers - Issuu