Architecture Portfolio- Lorenia Beilis

Page 1

LORENIA BEILIS

ARCHITECTURE

PORTFOLIO PORTFOLIO

I am an architecture student. I believe that there is always something to learn and I am always very open to new adventures and challenges My goals are to apply my knowledge and talents to architecture

LORENIABEILIS Hello!
beilis@gmail com
lorenia
6311237337

At the moment, Im at the 6th semester of architecture at Tecnológico de Monterrey, campus Sonora, Norte

EDUCATION SKILLS

Creativity

Team working

Adaptability

Dedicated

Hard working

Problem solving

Efficent

Trustworthy

Willing to learn

LANGUAGES

Spanish as first language

English - B2 level

French (Begginer)

SOFTWARE PROFICIENCY

AutoCAD

SkethUp

Twinmotion

Microsoft Office

Revit

INTERESTS

Interior design

Bioclimatic architecture

Social Architecture

Construction

Travelling

Music

1.CASA MIGRANTE

2. CECOB

C O N T

E N T S

3.BLOQUE 5 2. CASA XYZ

CASA MIGRANTE

PERSPECTIVE

SECTIONAL ELEVATION 1'

SECTIONAL ELEVATION A'

The location of this project is at a migrant shelter in La Victoria, a town that is part of the municipality of Hermosillo, Sonora The site is surrounded by houses

Casa migrante was designed as an ephemeral dwelling for migrants It has the capacity to house 4 people and can be quickly assembled and transported thanks to the structural solution that allows this flexibility Bioclimatic strategies were also included in order to provide greater comfort to users without the need to consume electricity

STRUCTURE ASSEMBLY

A L M A C E N A M I E N T O A L M A C E N A M I E N T O
Beams and co umns 2 x 2 x 3/8"
1

BIOCLIMATIC STRATEGIES

Thecoo ngtowerclosed duringwn er

WINTER PERFORMANCE

Postoningofwalswth wndowsonya north andsou h

Shortenedoverhangfor therma gan nwin er

Leafesssdefns n wn erdonotstopthe passageofradaton

NORTH ELEVATION
ELEVATION Sout v Equnox Evaporatvecoolng tower Panta envro coolt Sdefn prot Soarpane +roof pro ectonagains radaton 100%LEDat ca gh ng Overhangtoregu ncdencedurng Summer sostce Wntersostic NORTH
SOUTH
PERFORMANCE
SUMMER
Therma
nsuaton
NORTH SOUTH

CECOB 2

This project is located in Hermosillo, Sonora at the Solidaridad neighborhood, which is a mainly residential area, however, there are a large number of small and family businesses such as groceries, tortilla shops, stationery stores, hardware stores, etc

The project consists of the remodeling of the facilities of a nursery that is no longer in use, in order to avail the existent construction to make room for the headquarters of Biciclando, a project that seeks to promote recycling and the circular economy, promoted by the city council of Hermosillo

The project seeks to create connections that facilitate the flow between the different dynamics that exist in the center

DESIGN PROCESS PERSPECTIVES

ARCHITECTURAL PROGRAM

Playgroup Offices Bicycle storage Cafeteria Classroom 1 2. 3 4 5 6 Urban garden 7. Yard 8 Restroom 9 Lobby 10 Storage room 8 8 8 3 9 4 5 5 6 1 7 8 8 8 2 10 10

WEST ELEVATION

SECTIONAL ELEVATION

SOUTH ELEVATION

SECTIONAL ELEVATION

EXISTING CONSTRUCTION

PROPOSAL FOR PROJECT BICICLANDO

BLOQUE CINCO 3

The site of Bloque cinco is located at the east end of Hermosillo, next to the Warehouse Districtthat is found between two neighborhoods: Las Amapolas and Las Riberas Residential

Bloque 5 is part of a housing complex of 5 collective housing buildings, which seeks to provide a worthy while economic housing space for the workers of Koval, a company that has its headquarters next to the site of the complex

The project is based on the concept of emerging, since with its design, the building perfectly incorporates the colors, textures and native vegetation of the context in which it is located, the Sonoran desert at Hermosillo It emerges from the earth to be a structure that pays homage to its context

Bloque 5 has a total of 35 apartments of 4 different types to offer a variety of options according to the users needs Type number 4 has an area that can function as a commercial space The building has a bicycle parking, rooftop, concept store, gym and laundry

E M E R G E E M E R G E
FLOOR PLAN LEVEL 1 FLOOR PLAN LEVEL 2-3

FLOOR PLANS

TYPOLOGY 1- 50 m2
3-
2
TYPOLOGY 2- 70 m2 TYPOLOGY
108 m
TYPOLOGY 4 - 98 m2

SECTIONAL ELEVATION

SECTIONAL ELEVATION

SECTIONAL ELEVATION

EAST ELEVATION

NORTH ELEVATION

CASA XYZ 4

The site of Casa XYZ is at Villa Alicanto Section, in Las

Mexico The lot has a total area of 493 m, however, only 278 93 m can be used for construction, due to the coefficient of land occupation established according to the regulations

Casa XYZ is a house designed for a family of three members, all of them of different generations (thats where the name of the house came from) The users are an elderly man with his daughter and granddaughter The house has a total of 392 m of construction

The house was designed with the different needs of each of its users in mind, which is why the floor plan includes a bedroom on the first level for the elderly person, as well as a home office and two bedrooms on the upper floor, spacious living rooms on both levels and outside All of the bedrooms have their own bathroom and walk-in closet

Riberas, Hermosillo, Sonora,
FLOOR PLAN - LEVEL 1 FLOOR PLAN - LEVEL 2 SITE CONTEXT 2 2 2

NORTH ELEVATION

SECTIONAL ELEVATION

SOUTH ELEVATION

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Architecture Portfolio- Lorenia Beilis by Lorenia Guadalupe Beilis Michel - Issuu