
2 minute read
NOTICE OF TARIFFS FOR WATER AND WASTEWATER
from Loddon Herald 29 June 2023
by Loddon
Effective 1 July 2023
All charges are calculated on a daily basis unless otherwise stated, with amounts charged quarterly.
Advertisement
All charges, whether based on a three month period, a meter reading or other method, must be paid by the date specified in the invoice.
If no date is specified, then 28 days from the date the invoice was issued.
Prices exclude GST except where indicated on invoices.
For a full list of 2023/24 tariffs, please refer to coliban.com.au/about-us/fees-charges
RURAL TARIFF SCHEDULE 2023/24
3 prices are relevant to the Harcourt system.
4 Payable per ML of licence volume relinquished or traded outside of the Modernised system.
5 The Rural Transfer Admin Fee is applicable to all rural transfers. ML = Megalitre OTHER
Untreated District
Axedale, Barkers Creek, Bealiba, Bendigo, Boort, Bridgewater, Campbells Creek, Castlemaine, Chewton, Cohuna, Dunolly, Echuca, Elmore, Elphinstone, Fryerstown, Gannawarra, Goornong, Guildford, Gunbower, Harcourt, Heathcote, Huntly, Inglewood, Korong Vale, Kyneton, Laanecoorie, Leitchville, Lockington, Maiden Gully, Maldon, Maldon-Newstead Pipeline, Malmsbury, Mandurang, Marong, Mead, Newstead, Pyramid Hill, Raywood, Rochester, Sebastian, Serpentine, Strathfieldsaye, Taradale, Tarnagulla, Tooborac, Trentham, Tylden, Wedderburn, Yapeen.
Borung, Dingee, Elmore (untreated), Goornong (untreated), Jarklin, Kyneton (untreated), Macorna, Mitiamo, Mysia, Wychitella.
URBAN SEWER ACCESS FEES 2023/24
Residential and Non Residential$752.04
STED Sewer Rebate (Elmore only) - $133.08
SEWER VOLUME CHARGE 2023/24
Sewer Volume Charge 2 (per kL discharge above threshold) Non Residential Only $1.0718
2 Applies to discharge in excess of 0.63 kL per day, equivalent to 230 kL per year, in any given billing period. kL = Kilolitre
TRADE WASTE ACCESS FEES 2023/24
Minor Trade Waste (per annum) $176.38
Medium Trade Waste (per annum) $176.38
Major Trade Waste (per annum) In accordance with Pricing Principles
WATER METER & CONNECTION CHARGES 2023/24
Please refer to Coliban Water’s Schedule of Fees & Charges 2023/24 for all water meter and connection charges.
6 For subdivisions where maximum 2 additional lots created, each no larger than 450m2 Does not apply to greenfield growth suburbs (Bagshot, Huntly, Maiden Gully, Marong, Strathfieldsaye). Exludes instances where unserviced lots are created as part of the subdivision.
7 Discount applies where development requires developer-funded sewer pump stations to be constructed. Rebate amount (per lot) will depend on the cost of developer pump station works.
Fees and Charges are payable at Coliban Water, 37-45 Bridge Street, Bendigo; Australia Post Offices and Agencies; and other agencies as determined by Coliban Water. Support is available for any customers experiencing vulnerability. Ask us about about our Coliban Assist program. Concessions are available to eligible concession and HealthCare Card holders. Contact us for more information or apply online: www.coliban.com.au
8 Developer charge for the supply, installation, and ongoing maintenance requirements by Coliban Water for the pressure sewer property assets on each lot including tank, pump and control box. The supply and installation will be completed by our approved contractors after an application to connect is received.
9 A Special Meter Reading Fee (manual read) will apply in addition to this fee, of $21.80 ($0.00 if digital meter read).