
1 minute read
Folsom Lake College New Science Building 04
Professional Practice @ HMC
Location: Folsom Lake, CA
Advertisement
Project Year: 2019 Sumemr - Present
Scale: 74,637 sq. ft.
Type of Construction: Type II-B
Colleagues : Arturo Levenfeld, Jaepyo Park Roel of Me: Site/ daylight analysis; Contact manufacture for product selection and detail drawings; Collaborate with consultants and preparing submital package for DSA review and backchecks;
Media: Revit, BIM 360

Vehicle Circulation Study



Pedestrain Circulation Study
Mass Study
Daylight Distribution Study
Building Section

During schematic design phase, I completed site analysis for topo, daylight and existing campus planing study. We need to create a new and welcoming edge, while respecting the philosophy of surrounding context. I also joined the user workshop to understand the functional requirements or this building, especially for biology and chemistry department. I originated creative design concepts and developed solutions to design problems. During DD and CD, I worked closely with different consultants and manufactures to sudy the constructability of different design systems and details.



