LIZ FRAKA
academic portfolio 2019-2023
LIZ FRAKA, AIAS +1.913.475.4549 | lizfraka@gmail.com | issuu.com/lizfraka | linkedin.com/in/lizfraka/
E D UCATIO N 2024
Master of Architecture, University of Kansas (expected) | 4.0
2019
Diploma, Mill Valley High School | Shawnee, KS
Studio 804 Study Abroad in Copenhagen, Denmark (Summer 2021) Certificate in Service Learning, Graduate Certificate in Design Build
E X P E RI E N C E May 2023 - Aug. 2023 Intern, Odimo, Kansas City, MO
- Guadalupe Apartments: Construction Documentation, Marketing Renderings, Addendum - Cherith Brook Catholic Worker House: Facade renovation construction documentation - UMKC Student Union Renovation: led the design for the renovation of the conference room
May 2021 - Aug. 2022 Intern, Clark Huesemann, Lawrence, KS
- Docking State Office Building: Directly worked on all aspects of Bridging Documentation with lead architect for $106 million, 270,000 sq ft project with a building EUI of 26
AWA RD S / AC T I V I T I E S 2023 - 2024
American Institute of Architecture Students (AIAS) Midwest Quad Director
2021 - 2022
AIAS Chapter President
- Managed weekly board meetings to ensure progress toward events
2020 - 2021
AIAS Secretary
2020 - 2021
AIAS Membership Committee, Member
2021 - 2022 2022 - 2023
2021 - 2023 2022, 2023 2020 - 2024 2019 - 2023
- Serves as the liaison between all university chapters in the Midwest Region and the National Board - Provides regular updates to chapter leaders through monthly pod calls - Liaison to the Board on the Governance Committee and Student Health and Wellbeing Task Force - Organized and hosted monthly professional development and general body meetings
- Founded and chaired the Advocacy Committee - Helped establish a regular panel series connecting students to professionals and hosted several of the panels - Recorded, edited, and managed the AIAS KU YouTube Channel to document all virtual events - Assisted in the creation of the “Benefits of Membership” guide that was presented at the national conference FORUM - Helped write the “Mentorship Guidebook” to be published on the national AIAS website
AIAS Education and Culture Task Force, Member
- Assisted in the revisions to the Learning and Teaching Culture Policy
AIAS Student Health and Wellbeing, Chair
- Host bi-weekly meetings - begin developing a brief, highly graphical resources guide for students struggling with different topics to make these resources more accessible for all students. - developing programing options for both in person and online conferences.
Alpha Sigma Kappa - Women in Technical Studies Finalist for KU Architecture Portfolio Awards The Honor Society of Phi Kappa Phi University of Kansas Chancellor’s Scholarship
P ROF I CI E N C I ES
Revit, SketchUp, AutoCAD, Lumion, Enscape, Rhino, Adobe, Microsoft Office, Microsoft Teams, Slack
RE F E RE N C ES
Dan Rockhill
+ 1. 785.3 93.074 7 d a n @ ro c khillan das s o c i a te s. c om
2
Amy Slat ter y
+ 1. 816 . 5 72 . 2 018 a sl a t te r y @ od i m o. us
Chad Kraus
+ 1. 785. 3 9 3. 6183 c kra us@ ku. e d u
TABLE OF CONTENTS STUDIO 804
4
WAYFINDING
8
HAVEN STUDIO
26
POLARIS
40
DENMARK
42
PROFESSIONAL
44
COVER: “MOTION” (SPRING 2020)
3
STUDIO 804 PROJECT BRIEF Dan Rockhill|2023-2024 Custom Single Family Home 436 Indiana, Lawrence, KS 1,890 sq ft
DESCRIPTION For my graduate year, I elected to participate in the world-renown and award-winning year-long design build studio, Studio 804. Along with my cohort, I have been working on the design and construction of a custom home. Each member of the studio took pieces of the project to take the lead on. My areas of focus include flashing and structural calculations, but I also spent a significant portion of my time in a project management role. I led daily team meetings, created construction schedules, and organized the team to efficiently achieve our big picture goals in a timely manner through smaller daily goals and check-ins. This project will be completed May 2024.
LEARNING OUTCOMES Good communication is the foundation of a strong team. The smallest details are essential to realizing the big picture goals.
4| STUDIO 804
Image Credit: Jackson Bontty
LIZ FRAKA |5
G. ACTION ITEMS a. INDIVIDUAL TASKS i. Liz: and team? Start mocking things up. Maybe something would be helpful ii. this week: decisions on garage iii. this week: interior finishes. iv. Cooper: doors downstairs. v. Andrew: ask Jordan, if we weigh options of w we run (thinking of solar too) see if we can go punch thru the trenches. Basically measure it vi. Fasteners: Jase you might wanna get on that vii. People have notes on their presentation b. Everyone i. Research companies, Update portfolios and sh you have time to fix things. ii. TASK PRESENTATIONS iii. SHOP DRAWINGS DUE OCT 3 1. If you finished your presentation but a drawings, they need to be complete by 2. East Hills final cleaning. 3. Site Work
MEETING AGENDA A. DAN UPDATES a. Structure Package to Barney b. Solar Permit c. Driveway Permit d. All next week devoted to interiors/lower box
B. ADMINISTRATIVE a. Shop Manager Update b. Material Contact Update c. Estimate Update i. STUDIO 804 COST ANALYSIS.xlsx
C. DESIGN UPDATES AND ISSUES a. Task Presentations i. 23.09.23_solar.pptx ii. 23.09.25 Monday Presentation.pptx iii. Varma_Insulation PPT.pptx iv. Paint Dev.pdf D. CONSTRUCTION UPDATES AND ISSUES a. Site Updates b. East Hills Updates E. COMMUNICATIONS/MARKETING a. Marketing Update b. Schemata Update F. MISC QUESTIONS a.
6| STUDIO 804
G. ACTION ITEMS a. INDIVIDUAL TASKS i. Liz: and team? Start mocking things up. Maybe having the corten or something would be helpful ii. this week: decisions on garage iii. this week: interior finishes. iv. Cooper: doors downstairs. v. Andrew: ask Jordan, if we weigh options of where to set meter, how far can we run (thinking of solar too) see if we can go under anything? Like can we punch thru the trenches. Basically measure it out and confirm it all. vi. Fasteners: Jase you might wanna get on that vii. People have notes on their presentation b. Everyone i. Research companies, Update portfolios and show Dan – before October so you have time to fix things. ii. TASK PRESENTATIONS iii. SHOP DRAWINGS DUE OCT 3 1. If you finished your presentation but aren’t done with your shop drawings, they need to be complete by Oct 3. 2. East Hills final cleaning. 3. Site Work c. ADMIN i. Operations Conversation 1. Anything we want to address to make life better for us? ii. Schedule 1. Studio 804_Construction Schedule_ver2 (FALL 2023 ONLY.xlsx d. EAST HILLS i. e. MATERIALS i. f. MARKETING i. Schemata 1. Need to print a copy of photography pdf per donor from last year and per student of 2023 class. 2. Need to purchase additional envelopes. LILY 3. Print mailing addresses once addresses verified. 4. Need to print more 804 return address labels (template already created for that and we have the stickers). ii. 4th Year Meeting 1. Poster g. SITE i. Trench machine, start digging when. ii. Are we watering 432 today? iii. Need to water that grass every day
c. ADMIN i. Operations Conversation 1. Anything we want to address to make ii. Schedule 1. Studio 804_Construction Schedule_ve d. EAST HILLS i. e. MATERIALS i. f. MARKETING i. Schemata 1. Need to print a copy of photography p and per student of 2023 class. 2. Need to purchase additional envelope 3. Print mailing addresses once addresse 4. Need to print more 804 return addres created for that and we have the stick th ii. 4 Year Meeting 1. Poster g. SITE i. Trench machine, start digging when. ii. Are we watering 432 today? iii. Need to water that grass every day
1. Sam P. - Mondays 2. Jodi - Tuesdays 3. Morgan – Wednesdays iv. Backburner 1. weed eating/mowing. 2. Countertop Repair h. DESIGN i. Issues Log – revisit and make a new list as a team. ii. Design Changes: Get plan squared away as soon as Get on structural again (send out tomorrow) permit u want to just send one page or a new set to Janet) i. CONSTRUCTION DOCUMENTS i. Deep outline every detail we could possibly need to ii. Go through the past permit that Dan sent Liz & addr we’re ready for it. iii. Quinn: Detail the railing in shop drawings: will mess the roof. Need to avoid penetrating the TPO. iv. Seth/Kyle combo: Scaffolding Plan: create a plan. Ru assemble, what’s needed. Sometimes you’ll lose scaf to take them down) learn how to secure them. Anyth the garage we will take. j. DAN QUESTIONS
e having the corten or
where to set meter, how far can o under anything? Like can we out and confirm it all.
how Dan – before October so
aren’t done with your shop y Oct 3.
e life better for us?
er2 (FALL 2023 ONLY.xlsx
pdf per donor from last year
e s. L I L Y es verified. ss labels (template already kers). TEAMS Abby – update budget/start outlining shop drawings for baseboards and blinds, any Corten follow up. Lead the charge for suppliers prep. Adam – formwork details, remake the takeoff, coordinate with concrete crew for rebar takeoff and inventory, What we have, what we need, LEED relation Alex – detailing, coordinating details, wall sections, updating and starting shop drawings Andrew - start working on presentation for areas, coordinate with Claudia for PV service entry, updating flooring budget, update budget/treasure chest for electrical, update budget/treasure chest for drywall
possible. Delay Barney. updated. (see if we
o figure out. ress things now so with the way we secure
ules of it, how to ffolding decks (we have hing that’s low around
AJ – rough carpentry takeoff sheet, go to site and get it ready for trees. helping the framing team with framing plans, updating the lumber budget Claudia – research on backup companies, coordinate with roof penetrations, frame design for solar, finalize solar permit, coordinate with Andrew for PV service entry, organizing fasteners Cooper – get smart on the doors again and revisit and fix stuff, comprehensive list of door stuff, coordinate with Lindsay for insulite for deck?, draw door jamb and sill details for interior and exterior doors, driveway details, any code stuff as necessary Danny – follow up with manufacturers, update window sheet with head, sill, jamb details, update window schedule. Erica – LEED, update budget for WRB, getting even smarter for WRB, treasure chest for WRB suppliers
Liz - cd management, plan the 4th year visit day (make poster, email it to school to advertise, print and hang in Marvin),, flashing shop drawings, flashing treasure chest, make flashing mockups, schemata prep Maddie – interior rendering, framing shop drawings and adding to model, siding management Mik – update concrete drawings/revit details, inventory, detailing sidewalk, design issues log, food donations (queen) Morgan –contact the Green Rater (Monday), support LEED, structural page for Barney, cumaru email for Dan. Nolan – paint presentation Quinn – revit, shop drawings for a steel structure Sam C – going to site, coordinate with drainage for new design, shop drawings for gutters and drainage. Sam P – framing takeoff, lumber sourcing, call list, update framing based on structural, shop management, update estimate Seth – takeoff for roofing things, update budget/call list for roof Ved – help with insulation budget and calculation, shop organization, coordinate with Lily. Whitten – start shop drawings for countertops – coordinate with Lily. Update budget and call list from treasure chest, shop organization
Jackson – create shop drawings for curtain wall details, Jared – create shop drawings for cumaru faced cabinets, Shop organization once shop drawings are done. Jase – U-values for windows, curtainwalls, R-Values for doors, figure out the fur down for the mechanical system, work on the HVAC plan, have an MEP coordination meeting, update budget Jodi – update budget for bathrooms and any treasure chest call list organization you still need to do. Pick fixtures and design the bathrooms now that they aren’t moving much. How to better utilize the foyer. Karolyn – support foyer effort, shop drawings for storage, organize fasteners, manage budget updates based on new design Kyle – support LEED, drainage plan, updating budget, scaffolding plan Lily – update insulation calculations and coordinate with Ved, kitchen design and layouts and appliance, schemata Lindsay – plumbing, WRB get smart
LIZ FRAKA |7
WAYFINDING PROJECT BRIEF Partner: Harleigh Brandon Nilou Vakil|Spring 2023 K-5 School for Visually Impaired 7412 E 26th Ave, Denver, CO 30,000 sq ft
DESCRIPTION In 1909, two brothers from Denver overcame monumental challenges to achieve their dream of recreating a Bleriot monoplane from scratch. The profile of a wing gives lift to achieve flight. The arc has been translated into the form of the building in both plan and section to evoke the inspirational feeling of overcoming challenges to achieve what seems impossible. The plan is organized into educational and public wings, connected through a central atrium, which curve around an outdoor space creating an identifiable landmark visible in all parts of the building. The two wings create clear and straightforward circulation paths without intersections. The site strategies for the project lean into the radial organization of the plan and celebrate the playground at the center of the radii. An indoor-outdoor flexible learning space is created through the deep southern overhang protecting the windows from glare and the patio wrapping the length of the building. Inside the building, contrasting floor textures and colors gently spill out into the hallway outside of spaces to signal to visually impaired students the changes in space. The specific needs of the visually impaired students have been addressed through redundant wayfinding strategies like trail rails, contrasting flooring materials, and strategic daylighting to shape space for all types of impairments. Through these strategies, the project will lift and support students to overcome their own challenges and achieve what feels impossible.
LEARNING OUTCOMES Empathy creates the best designs.
8| WAYFINDING
Image Credit: Liz Fraka
LIZ FRAKA |9
VISUAL IMPAIRMENT SIMULATION
Our class had the opportunity to work with and learn from Orientation and Mobility Specialist Leah Enright, who helped us to understand what life with various visual impairments was really like so that we could design our projects with empathy for the user group. We tried on an array of simulation goggles and tried to navigate Marvin Hall, a building we already knew well. Needless to say, we learned a lot from this experience.
10| WAYFINDING
CATARACTS
The cataracts goggles made it challenging to navigate spaces with low light and that colors started to blend together. Our field of vision and depth perception were also highly impacted. The image shows what it was like looking at a television screen with this impairment.
20/400 VISION
The 20/400 vision goggles were extremely disorienting. While we could see enough in good lighting to make out letters, reading was very challenging. Contrast was an issue, as profiles became indistinct. Additionally, direct light was nearly blinding as it washed out everything else. Finally, unexpected motion was much more startling. The images show the contrast of different light levels with this visual impairment.
GENERAL REFLECTIONS
From our experience with the simulation goggles, we truly understood the design considerations necessary to design for this population. This emphasized the need to reduce glare, control lighting, and create predictable layouts, as well as create sensory spaces to give students a break from the taxing effort of processing incomplete visual information.
LIZ FRAKA |11
BASE UNIT
Image Credit: Liz Fraka and Harleigh Brandon
12| WAYFINDING
Our first task was to design a repeatable unit: the classroom. The classroom design splits a grade level in half, and the two rooms share a restroom between the rooms and a learning pod accessed from the hallway, creating flexibility for learning types and styles. The classroom itself features a reading nook along the windows and a quiet space tucked around the corner to take a step away. The hallway facilitates wayfinding through contrasting floor colors at thresholds and a rail trail.
Exploded Axonometric Massing Diagram Image Credit: Liz Fraka and Harleigh Brandon
LIZ FRAKA |13
2 3
2 2
3 2
$
2
3 4
2
4 1
$ %
& '
(
)
KEY 1 LIBRARY 2 CLASSROOM 3 LEARNING POD 4 SPECIAL CLASSROOM 5 ACTIVITY HALLWAY 6 ATRIUM 7 OFFICE 8 CAFETERIA 9 GYMNASIUM
$
LEVEL 1 PLAN Image Credit: Liz Fraka and Harleigh Brandon
14| WAYFINDING
2 5
3
3
$
$
-
2
2
3
2
7 2
3 2
4
6
4 8
$
$
9 * +
0
12
24
36
48
60 FT
LIZ FRAKA |15
4" METAL STUD STANDING SEAM METAL ROOF MOISTURE BARRIER F
1/2" OSB SHEATHING 7" POLYISO RIGID INSULATION 1/2" OSB SHEATHING W10X15 12" BATT INSULATION TAPERED W36X160 1/2" 12"X48" HORIZONTAL GFRC PANEL IN POLAR WHITE FERRO AND INTEGRATED CLIP SYSTEM
Level 5 31' - 0"
1" AIR GAP 1/2" OSB SHEATHING 2 LAYERS OF 1 3/4" POLYISO RIGID INSULATION 1/2" OSB SHEATHING 4" METAL STUD FRAME INFILLED WITH BATT INSULATION 5/8" GYP. PAINTED
3
5/8" GYP. SILL, PAINTED INSULATED STOREFRONT SYSTEM WITH INTEGRATED COPING GREY NORMAN BRICK FACADE WITH GREY MORTAR
PHYSICAL MODEL ATRIUM - ROOF TO WALL 1/2" = 1'-0"
F
1" AIR GAP
4" METAL STUD
1/2" OSB SHEATHING
STANDING SEAM METAL ROOF
2 LAYERS OF 1 3/4" POLYISO RIGID INSULATION 1/2" OSB SHEATHING 4" METAL STUD FRAME INFILLED WITH BATT INSULATION
INSULATED STOREFRONT SYSTEM 1/2" OSB SHEATHING RUBBER GASKET 7" POLYISO RIGID INSULATION
MOISTURE BARRIER
1" TERRAZZO FLOOR 1/2" OSB SHEATHING
5/8" GYP. PAINTED TIE-BACKS
First Floor 0' - 0"
4" BLACK RUBBER BASE TRIM
1/2" 12"X48" HORIZONTAL W10X15 BEAM GFRC PANEL IN POLAR WHITE FERRO AND INTEGRATED CLIP SYSTEM 12" C JOIST
1" TERRAZZO FLOOR VAPOR AND MOISTURE BARRIER
1" AIR GAP TELECOMMUNICATIONS, 1/2" OSB SHEATHING ELECTRICAL, PLUMBING
4" CONCRETE FOUNDATION 2" POLYISO RIGID INSULATION
2 LAYERS OF 1 3/4" POLYISO RIGID INSULATION 1/2" OSBDUCT SHEATHING 12" HVAC
6" GRAVEL
4" METAL STUD FRAME INFILLED INTEGRATED BAR LIGHT WITH BATT INSULATION
CONCRETE FOOTING 4" PERFORATED DRAINAGE PIPE STRUCTURAL TIE
5/8" GYP. PAINTED SUSPENDED 24"X24" ACOUSTIC CEILING TILES
1
16| WAYFINDING
1 1/2" METAL DECK WITHW10X15 3" CONCRETE TOP 12" BATT INSULATION W12X26 BEAM TAPERED W36X160
PHYSICAL MODEL ATRIUM FOUNDATION 1/2" = 1'-0"
5/8" GYP. SILL, PAINTED INSULATED STOREFRONT SYSTEM WITH INTEGRATED COPING GREY NORMAN BRICK FACADE WITH GREY MORTAR 1" AIR GAP 1/2" OSB SHEATHING 2 LAYERS OF 1 3/4" POLYISO RIGID INSULATION 1/2" OSB SHEATHING
2
PHYSICAL MOD WALL 1/2" = 1'-0"
/HYHO
5RRI
/HYHO
AL STUD
/HYHO
AL ROOF
BARRIER F
EATHING
6HFRQG )ORRU
ULATION
EATHING W10X15
ULATION
W36X160
AL GFRC E FERRO SYSTEM
Level 5 31' - 0"
AIR GAP
EATHING
)LUVW )ORRU
ULATION EATHING NFILLED ULATION
PAINTED 0
3
6
9
PHYSICAL MODEL ATRIUM - ROOF TO WALL 3 1/2" = 1'-0"
, PAINTED T SYSTEM D COPING K FACADE MORTAR
12
15 FT
F
" AIR GAP
HEATHING
" POLYISO SULATION HEATHING INFILLED SULATION
INSULATED STOREFRONT SYSTEM
F
J
RUBBER GASKET 1" TERRAZZO FLOOR
. PAINTED
1 1/2" METAL DECK WITH 3" CONCRETE TOP
IE-BACKS
First Floor 0' - 0"
ASE TRIM
ZO FLOOR
Level 5 31' - 0"
W10X15 BEAM
BARRIER
12" C JOIST
UNDATION
TELECOMMUNICATIONS, ELECTRICAL, PLUMBING
SULATION
" GRAVEL
Second Floor 12' - 0"
W12X26 BEAM
12" HVAC DUCT
FOOTING
INTEGRATED BAR LIGHT
AGE PIPE TURAL TIE
SUSPENDED 24"X24" ACOUSTIC CEILING TILES
PHYSICAL MODEL ATRIUM - TO PHYSICAL MODEL ATRIUM - ROOF FOUNDATION WALL 1 3 = 1'-0" 1/2" =1/2" 1'-0"
2
LIZ FRAKA |17
F
INSULATED STOREFRONT SYSTEM RUBBER GASKET
PHYSICAL MODEL ATRIUM - FLOOR TO WALL 1/2" = 1'-0"
J
Baseline EUI
Fans 2.85
Hot Water Pumps 3.1 0.7
BASELINE
Cooling 2.68
Equipment 8.33
Heating 16.22
Lighting 5.8 Project EUI
Hot Water 5.16
LOUVERS FINAL
Cooling 0.09 Heating 7.52
Pumps 0 Fans 1.38
Equipment 5.38
Image Credit: Liz Fraka and Harleigh Brandon
18| WAYFINDING
Lighting 4.3
Never Daylit
Pass
Mostly Daylit
1
Never Daylit
Pass
Mostly Daylit
3 1
Ext_Dec_9_Louver_Axo
WINTER
Ext_Dec_3_Louver_Axo
Ext_June_9_Louver_Axo
SUMMER
LIZ FRAKA |19
SECTIONAL MODEL My partner and I worked together to create a 1/4” =1’ sectional model of our project. We elected to cut through the atrium and a classroom to capture the varied spatial conditions that help users orient themselves in the building based on the different light and sound qualities of these spaces.
20| WAYFINDING
LIZ FRAKA |21
22| WAYFINDING
LIZ FRAKA |23
20/400 Vision
Image Credit: Liz Fraka and Harleigh Brandon
24| WAYFINDING
Cataracts
LIZ FRAKA |25
HAVEN STUDIO PROJECT BRIEF DIRT WORKS STUDIO Chad Kraus| Fall 2021-Spring 2023 Studio Space and Demonstration Home 3813 Greenway Drive, Lawrence, KS 500 sq ft
DESCRIPTION The Dirt Works Studio entered in the 2023 US Department of Energy Solar Decathlon Build Challenge. As one of the original team members, the Dirt Works Studio and I began work on the design of Haven in late October 2021. In the summer of 2022, our funding availability shifted and upon returning in the fall, 10 now fourth-year students from the original project were joined by a new semester of the Dirt Works Studio to redesign and construct Haven Studio. Haven Studio is an interactive, full-scale, teaching tool and learning environment to benefit current and future generations of students as well as our broader community. Due to its location adjacent to the KU School of Architecture and Design’s 67,000 sq ft East Hills Designbuild Lab, this project will serve to educate many different groups on sustainability and net-zero building solutions. Dirt Works Studio has gained a large amount of support from sponsors and communities nationwide. In addition to in-kind donations valued at well over $100,000, we set up a crowdfunding page through our University that raised almost $27,000 from businesses and individuals in our community. My role in this project was Student Team Lead, so I focused on project management and written content for deliverables. I was also heavily involved in all major design decisions. This role has provided me a diverse range of learning opportunities, from helping my professor coordinate efficient and effective construction progress between the several sections, to organizing fundraising events, to building cabinets. The construction was completed during the Spring 2023 semester.
LEARNING OUTCOMES Keeping an open mind to new possibilities will bring the best possible solutions. Nothing prepares you better than diving in headfirst (among many, many others).
26| HAVEN STUDIO
LIZ FRAKA |27
28| HAVEN STUDIO
DESIGNED BY DIRT WORKS STUDIO
LIZ FRAKA |29
30| HAVEN STUDIO
UNDER CONSTRUCTION During the Fall 2022 semester, my group was tasked with creating the cabinet wall, the primary interior feature. We reclaimed birch pieces from our designbuild lab and pieced them together to create custom wardrobe, fridge, and dishwasher boxes, and faces for our IKEA bases. We sanded and refinished these pieces to give them new life.
Over winter break, I worked with team members to prep for and pour our pier foundation. During the concrete pour, I followed behind the rest of the team to finish the tops of each pier.
When we returned in Spring 2023, we installed our prefabricated floor, had our plumbing inspection, and in just a few hours, installed all our Build Smart prefabricated wall panels. We quickly got the project dried in, and completed construction by mid-April, in time for the Solar Decathlon Competition event.
LIZ FRAKA |31
32| HAVEN STUDIO
PROJECT MANAGER My main role over this two-year project was to assist my professor in organizing my peers across different class sections and grade levels and keeping the project moving forward. I learned to use Gantt Charts to find the critical path of construction to keep us on schedule and we successfully completed the project on time for the open house.
LIZ FRAKA |33
34| HAVEN STUDIO
OPEN HOU SE I led the planning and organization of the open house event for the project and emceed the ribbon cutting event. We welcomed over 200 guests through interactive displays of our materials, a photo timeline of our process, the deliverables for the competition event, and a kids station with coloring pages before reaching the tour of he house.
LIZ FRAKA |35
COMPETITION EVENT Myself and three of my peers had the priviledge of traveling to the National Renewable Energy Lab in Golden, Colorado to present our project at the 2023 Solar Decathlon Build Competition. We gave 6 presentations in total, one per juried subcontest, along with the 4 quantitative sub-contests
36| HAVEN STUDIO
completed in Lawrence. The team placed 1st in the Energy Performance and 2nd in the Comfort and Environmental Quality sub-contests, and ultimately placed 5th overall, out of the 11 teams selected to compete.
LIZ FRAKA |37
38| HAVEN STUDIO
LIZ FRAKA |39
POL ARIS PROJECT BRIEF DIRT WORKS STUDIO Chad Kraus| Fall 2021 Picnic Pavilion Wells Overlook Park, Lawrence, KS
DESCRIPTION The Polaris Pavilion identifies and meets the need for equitable access to parks. Wells Overlook Park sits atop a hill just south of Lawrence, providing beautiful views of the city and the surrounding land. However, the existing infrastructure can only be reached by walking up a steep slope, inaccessible to those with mobility limitations. The Polaris Pavilion, the new picnic structure, is the sister project to the Passerine Pavilion, the overlook structure. Both projects are on grade with the road and can be utilized by all visitors. The engaging and thoughtful design makes them desirable to visit regardless of mobility needs, making the accessible structure appealing to all.
PROJECT M ANAGER For construction, the studio split into groups to specialize on certain elements of the construction. Some students spent their days on the roof creating the NLT structure. Other students worked on the bench and screen system. My role was unique. Early in the process, I took the initiative to learn the previous studio’s construction documents. I quickly became the go-to person anytime someone had a question about the design, or what they should be doing, as well as manage the materials. This role allowed me the flexibility of switching tasks as needed, and to assist my professor when it came to solving larger issues on site.
LEARNING OUTCOMES The smallest details become the most important.
40| POL ARIS
NOTE This project was designed by the Fall 2020 Dirt Works Studio. The Fall 2020 studio created all the drawings and prefabricated the materials. Due to COVID-19 changing in-person scheduling, the studio was unable to complete construction. The Fall 2021 Dirt Works Studio took the design and completed the build. All work credit Dirt Work Studio.
LIZ FRAKA |41
DENMARK PROJECT BRIEF Chad Kraus| Summer 2021 Sketches Copenhagen, Denmark
DESCRIPTION During the summer of 2021 I had the opportunity to study abroad for two weeks in Denmark. I visited both historical and contemporary projects and learned how the geographical location and political history of Denmark had shaped its local design principles. In this time, I also was sketching more regularly. Sketching regularly improved my technical drawing skills and changed how I see a building and break it down in my head.
LEARNING OUTCOMES First-hand experience of a place is invaluable to a deeper understanding.
42| DENMA RK
LIZ FRAKA |43
PROFESSIONAL PROJECT BRIEF Odimo | Summer 2023 Guadalupe Apartments Affordable Housing Complex The Guadalupe Apartment will provide affordable housing for teachers at Guadalupe Centers, an agency that supports the Latinx community. I supported this project through client meetings, construction documentation, and creating marketing materials.
44| PROFESSIONAL WORK
LIZ FRAKA |45
4 4
1 3
4
2
3
3
4 5 3
4
3
4
1 2 3 4 5 6
LOBBY PUBLIC RESTROOM ONE BEDROOM UNIT TWO BEDROOM UNIT PUBLIC PATIO COMMUNITY ROOM
3
4
FIRST FLOOR PLAN
46| PROFESSIONAL WORK
4
0’
4’
8’
16’
32’
LIZ FRAKA |47
PROFESSIONAL PROJECT BRIEF Odimo | Summer 2023 Cherith Brooks Catholic Workers House Nonprofit Facade Update The simple scope of this project has a great impact. Colloquially known as “The Shower House,” the Cherith Brooks Catholic Workers House supports the community’s most vulnerable population through hot meals, showers, and a clothing closet, among other services. The facade refresh helps to lift the street presence and bring more natural light into the space. I supported this project through client meetings, design iterations, and leading the construction documentation.
48| PROFESSIONAL WORK
LIZ FRAKA |49
THANK YO U
LI Z F RAK A , AI AS +1.913.475.4549 lizfraka@gmail.com https://www.linkedin.com/in/lizfraka/ https://issuu.com/lizfraka