PORTFOLIO
[ LIZAVETA.PROSKURINS ]
lizaveta.proskurins@gmail.com +372 58269554 https://www.linkedin.com/in/lizaveta-proskurins-807030a4/ 4 1 - 17 PA E PA R G I , TA L L I N N , 1 1 4 17, E S TO N I A
EDUCATION M.SC. ARCHITETURE BNTU | Sep 14 - Jule 15
Belarusian National Technical University, Minsk (Republic of Belarus), faculty of Architecture. Dissertation topic: “Architectural design of quickly erectable modules for a multi-purpose facility”
PGD ARCHITECTURAL DESIGN BNTU | Sep 08 - Jule 14
Belarusian National Technical University, faculty of Architecture, department “Design of Architectural Environment”. Diploma topic: «Development concept of Republican Unitary
EXPERIENCE ARCHITECT
DEMICOLI & ASSOCIATES | Nov 16 – Jan 19 Malta Designing of architectural and interior design projects across all phases, from design concept through to construction site supervision; issuing drawings for applications; coordinating design decisions with consultants, engineers, contractors and suppliers, building code and fire safety regulations reviews; negotiating with the clients.
ARCHITECT/ARCHITECT DESIGNER AIT PROJEKT OÜ | Feb 14 -Feb 17 Estonia
Designing of small and medium scale projects across architectural phase, from conceptual design through to masterplaning and final project documentation; isuuing architectural documentation
ARCHITECT
ЕА RENG AS | July 13 - Nov 14 Belarusian Office Designing of construction drawings, details and windows/doors schedules; issuing documentation for construction site; designing of small architectural objects; collaboration with engineers and contractors.
SOFTWARE SKILLS REVIT
| ARCHICAD | AUTOCAD | PHOTOSHOP | IN DESIGN | 3DSMAX | TWINMOTION
LANGUAGE SKILLS ENGLISH [Advanced] | RUSSIAN [Native] | ESTONIAN [Intermediate]
SELECTED WORKS [2015-2019]
01
RETAIL COMPLEX [MALTA] p. 8-15
02 RAMLA BAY RESORT PHASE II [MALTA] p. 16-23
03 HOUSE OF CHARACTER [MALTA] p. 24-43
04
MUSEUM REDEVELOPMENT INTO RECREATION VILLAGE [ESTONIA] p. 44-51
05 PRIVATE HOUSE [ESTONIA] p. 52-57
01
RETAIL COMPLEX
Type: Commercial Size: 16 800 m2 Location: Triq Ninu Cremona/L-Ibjar, Paola, Malta Year: 2017-2018 Status: In progress
Company: DeMicoli & Associates Leader: David Anastasi Team: Lizaveta Proskurins Role: Architectural design, design of drawings and Revit modeling on architectural stage, leading of the project, working with related specialists, negotiating with the Client, release of documentation for Planning Authority. Combined structural system Materials: Lime stone blocks, concrete, steel, framed glazing.
FLEXIBILITY APPROACH Constructions flexibility was a main criterion in the project brief. Layouts were designed with maximum adoptability for different use. Intermidiate levels could be redeveloped to an extra parking due to special structure of floor slab. As per Phase I, the building designed as a shopping mall with office space on the upper floors. In case of unprofitability of trading premises, the building can be reconstructed into an office center. Parking spaces number can be increced by dint of changing internal constructural layout, as per Phase II. Special light structure of the Groung and 1st floor slabs can be partly removed and new slabs can be installed on an extra levels.
NINU CREMONA STREET ELEVATION
Ads displays are intended to be rotated and located face to oncoming traffic.
PHASE II
PHASE I
Offices Offices Loading Car Parking
GF
Commercial Car Parking
GF
Car Parking
L-IBJAR STREET ELEVATION
Car Parking
INTERNAL VIEW TO THE ATRIUM
P Entran Offices
Shopping
Separate entrances to the retail and office areas, as well as eccess to parking levels, allow to divide human flows. The penthouse level is occupied by offices, while the surrounding terrace is intended to be a garden space. Internal atrium is the main source of interior natural light. The overall exterior palette of metal, glass and concrete makes are extended into the interior of the building.
FLOOR PLANS LAYOUT
ROOF TOP Level +38.880
TYPICAL 3RD & 4TH FLOOR Level +35.450 Level +32.050
2nd FLOOR Level +28.650
1st FLOOR Level +24.650
Car Parking/ Loading/Unloading
GROUND FLOOR Level +19.950/+20.200
nce
g Mall
TYPICAL PARKING-1 & -2 FLOOR Level +18.700/+17.450 Level +16.200/+14.950
-3 PARKING FLOOR Level +13.700/+12.450
22.29m +20.839 +20.639 +20.555 +20.244 +19.826 +19.389 +19.097
38.42m 35.02m
+18.764
DC 15 Permitted height
Existing residental building
Existing Factory building height (to br demolished)
Proposed Retail Complex height
Existing residental building
DC 15 Permitted height
Approximate heigh of nearby tower
NINU CREMONA STREET ELEVATION Hieght Limitation Study
GROUND FLOOR LEVEL PLAN
Level +19.950/+20.200
TYPICAL PARKING-1 & -2 FLOOR Level +18.700/+17.450 Level +16.200/+14.950
16.85m
Datum 0m
TYPICAL 3RD & 4TH FLOOR Level +35.450 Level +32.050
02
RAMLA BAY RESORT PHASE II
Type: Residental/Commercial Size: 33 000 m2 Location: Triq Ir-Ramla, Il-Mellieha, Malta Year: 2018 Status: In progress
Company: DeMicoli & Associates Leader: Ray Demicoli Team: Vesna Obradovic, Lizaveta Proskurins, Annett Lakatsch, Davor Matijasic, Elwira Radziewska, Antonio Prosperi, Maksim Luzin, Duane Pace. Role: Design of drawings on architectural stage, Revit modeling, working with related specialists, masterplanning, presentations for government institutions, release of documentation for Planning Authority. Combined structural system Materials: Lime stone blocks, concrete, framed glazing, wood.
steel,
VIEW TO THE ATRIUM
DESIGN APPROACH The Ramla Bay Resort new extension overlooking the islands of Comino and Gozo. Phase 2 has been designed to blend seamlessly into Phase 1, creating an impressive main entrance with an atrium. This atrium is intended to be filled with very dense vegetation and roofed over in a translucent timber glu-lam structure. The design is organic, dynamic and curved shape which provides the architectural concept of flow and sleek lines to integrate with the natural context of sea and rocky shore. This New Atrium Wing consists of a number of versatile accommodation units with 405 rooms on seven levels complemented by a host of new facilities, such as new main kitchen and restaurant, mproved car access and car park facilities, new main reception, small boutique area, Gym and SPA, 600m2 banqueting area, split into 3 halls, pre function area and meeting room. As well as the creation of improved back of house operations, connecting kitchen with other food and beverage outlets, improved water sport facilities, beach bar and grill, new changing rooms and showers, intense landscaping all around the external areas.
TYPICAL GUEST ROOMS B
TYPICAL GUEST ROOM A
TYPICAL SECTION
penthouse guest room
guest room
guest room
guest room
double guest room
double guest room
Atrium / Internal garden
SPA
FLOOR PLANS LAYOUT
ROOF TOP LEVEL +26.600
TYPICAL 06 & 07 LEVEL +20.400 / +23.500
TYPICAL 04 & 05 LEVEL +14.200 / +17.300
03 LEVEL +11.100
Main Entrence
GROUND FLOOR LEVEL +8.000 01LEVEL +4.600 Underground Car Parking (entry from ground level)
Existing Underground Car Parking
Existing Back of House (underground level)
00 LEVEL +1.600/+3.000 EXISTING BUILDING Ramla Phase I
Access to the Beach area
Exit to the Garden and Beach
Lobby Terrace
Outdoor Terrace
Existing Indoor Sweeming Pool
Outdoor Garden
Proposed Marine Food Restaurant
Sandy Beach
Coast Line
EAST ELEVATION
Undergroung Car Parking
Proposed Roundabout (splitting human flows)
Existing Ramla Hotel Phase I
Welcoming Area
Back of House
Main Entrance
Foyer / Reception Desk
Guest Room Terraces with Sea View
Lobby / Bar
Entrance to the Buffet Restaurant / Banquet Entrance
SECTION THROUGH FOYER
03
HOUSE OF CHARACTER
Type: Residental Size: 520 m2 Location: Triq St. Katerina, Qormi, Malta Year: 2017-2019 Status: Compleated 2019
Internal alterations and Interior design to the beautiful private villa in the midle of the Mediterian island. Company: DeMicoli & Associates Leader: David Anastasi Team: Lizaveta Proskurins Role: Design and reliase of drawings for Planning Authority, interior design concept, meetings and negotioation with the Client, design of detailed drawings (including Lighting & ME) for architectural and construction stages, working with contractors and suppliers, construction site supervising and leading of the project on all stages. Materials: Lime stone, concrete, framed glass, stainless steel, marble, wood.
VIEW OF INTERNAL YARD. WORK IN PROGRESS
V
VIEW OF ENTRANCE HALL. WORK IN PROGRESS
DESIGN APPROACH The Client wanted this villa to be designed as a summer holiday house to enjoy it with family and friends. To keep existing look of common areas and to create a luxary suites was a main criterion in the project brief. The design scheme was focused on an open and welcoming interior layout, utilising natural lighting, materials and stabilising acoustical design.The subtle contrast between different natural stones from Malta and wood keep the palate harmonious, while the natural tones and varying finishes keep the mood simple and peaceful. On the ground floor is located 2 living rooms with internal yard between, guest bathroom, kitchen, dining area, study, as well as back yard guest bedroom with open ensuite. On the First floor we placed three guest bedrooms, each of them has its own ensuite. The Master bedroom, with marble finished open ensuite and walk in wardrobe, has a balcony with view into the back yard.
1.1
B4
B
B4
B4
2
2
A
B4
M4 OO DR BE sq.m 20.0
1
A
B C
4
B4
B4 B4
D
6 D
B4
-04
GP
5
B4
3
-03
7 C
05
GP
4 g MITE win SU dra 0 EN fer to -E-30 Re 915-A F2
CK
BA
D AR TY UR sq.m CO 50.4
3
R-0
DR
3
NG
DINI
OM
RO
DR
3
E
AC
RR
C
TE 5 MB nto Tale
MB
adbo
1
3
site
ard
2
DR
on
DR
m 95m
OM
RO
2.3
MB
ING
LIV AL RM FO sq.m 65.4
4
He
A
D
ER M ST MA DROO.m BE .8 sq 32
-12
GP
MB
R
FL
MB
1.1
4
MB
MB
R
R
FL R
FL
F/F
K1
MW O P/O
psum
2.8
H=
h gy
wit
ts to
shee od Wo es shelv
m
B3
C D
OD
HO
B
CE AN TR EN .6 sq.m 18 2
LL
HA
K3
ntry
Pa
D AR TY UR sq.m 49.5
Re 915-A -EF2 915-A F2
Wine r ole Co
es
elv
Sh
ntry
B1
2
Pa
B1
3
ING
2 B1 5 B1 6 B1
-08
-06
GP
sq.m 1 5.7 SUITE EN
M1 OO DR .m BE .6 sq 13
B1
M2 OO DR BE sq.m 12.8
A
B1
B2
4
03
M-
B
B3
B3
8
A
ing
B3
Exist
2
1 B3 B3
2 ITE .m wing SU 4 EN 6.0 sq to dra 30
1
2
ll
wa
cm
2
am
Be
23*60
2
B2
-Efer Re 915-A F2
B2
3.1 A
B
1
A B
D
AR
TY
UR
CO
7 C
B1
B
R
CL
LIV AL SU CA sq.m 26.0
1
CO
A
2 R CL ilo 2 Ph
M3 OO DR BE sq.m 13.8
D
1.1
K5
01
M-
-02
GP
D
GP
3 C
B1
B2
g win dra 3 to -E-30 fer -05 Re 915-A GP F2 -07 GP
C
K6
K4
sq.m 6.2 EST OM g GU THRO drawin 1, BA fer to -E-30301.1
-01
GP
EH
3
E
g win dra 305 -09 GP fer to -ERe 915-A F2
A
B2
B
P/O DW
EN CH KIT .1 sq.m 20 N
R OVE
C
IDOR RR CO sq.m 24.1
DOO
OUT NO FOR table) RSØ en MO gard (with
B3 4 M-04
3 ITE SU .m EN 5.1 sq
en
gth
stren
HO K2
3
MB
B
A
F
ver
Co
GE UN R/LO .m BA sq 28.0
B/L
E
F
C
e
lac
2
1
02
MD
3
2
Firep
EH
-E- 30 fer Re 915-A -EF2 915-A F2
ND
LAC
2
D
2
1 B/L
7.1 6 ISLA MBOON
1
1
FL
B/L
ER -11 ST GP MA SUITE .m g EN .0 sq win 6, 11 to dra 30 6.1
C B
B
R
FL
1
R-0
4
3
OM
RO R
CL
5
2 R CL lento Ta
1 e R CL zy tim La
SE CA .m AIR ST 7.3 sq
R
CL
4
E AG OR .m sq 2.0
SE
CA
AIR
ST
E AC RR TE sq.m 26.8
ST
PROPOSED GROUND FLOOR PLAN
PROPOSED FIRST FLOOR PLAN
KITCHEN SECTION WITH NEW EXTENSION
3RD PARTY
KITCHEN PH
3RD PARTY
3RD PARTY
1ST FLOOR TERRACE
PANTRY
FRIDGE
3RD PARTY
FREEZER
PANTRY
PANTRY
PANTRY
WINE CELLAR
PANTRY
DISHWASHER/ PULL OUT DRAWERS
INTERNAL YARD
HOTO Existing limestone in combination with new wooden frame window. Work in progress
VIEW OF KITCHEN. WORK IN PROGRESS
KITCHEN ELEVATION
FORMAL LIVING ROOM
3RD PARTY
3RD PARTY
CUPBOARD
CUPBOARD
CUPBOARD
MICROWAVE
FORMAL LIVING ROOM
HOOD
FREEZER
OVEN
HOB
DRAWER
DRAWER
CUPBOARD
DRAWER FOR POTS
EXISTING NICHE
3RD PARTY
FRIDGE
P
STAIRCASE SECTION
RST FLOOR
FIRST FLOOR
ROUND FLOOR
GROUND FLOOR
ROPOSED STAIRCASE VISUAL
CONSTRUCTION SITE PHOTO
STAIRCASE PHOTO WORK IN PROGRESS
MASTER BEDROOM PROPOSED DESIGN, VISUAL.
MASTER BEDROOM CONSTRUCTION SITE PHOTO
MB ELEVATION & FURNITURE DESIGN
drawer
Detail A
drawer
Det
Detail B
SCALE 1:5
SCAL
SCALE 1:5
Slab
Slab
Slab
Gypsum false ceiling
Gypsum false ceiling Strip light
Strip light
+2.850 AC grille
+2.500
SUSPENDED CEILING DETAIL Detail D
Gypsum false ceiling
+2.550
Detail E
Strip light
MASTER EN SUITE. CONSTRUCTION SITE PHOTO
MASTER EN SUITE ELEVATION
ROOF TOP
+0.660 above FFL +0.660 above FFL TOP OF THE SILL +0.600 above FFL
+0.580 above FFL TOP OF THE WINDOW OPENING
Side panel
+O.1OO above FFL
+O.OOO = FFL
+O.OOO = FFL
-O.O12
+O.OOO = FFL
MASTER EN SUITE DETAILED SECTION Suspended ceiling
+2.650
Grey Stone
Strip light behind mirror (3000 K) SLV GLENOS Linear profile 1107 Matt black.
Frame Mirror
Mirror Frame
Grey Stone
Marble sink
VIEW OF MAST CONSTRUCTION
TER EN SUITE N SITE PHOTO
GUEST EN SUITE 1
Detail F
GUEST EN SUITE FURNITURE DESIGN
SCALE 1:5
Slab
+2.850
Wooden existing beam
Gypsum false ceiling
Plywood
+2.500
Indentation of the gypsum partition from the edge of the soffit is 100 mm
SUSPENDED CEILING DETAIL
DeMicoli & Associates Architecture Interior design Civil Engineering
70 Mill Street Qormi, Malta e-mail: info@danda.com.mt tel:(+356)21381500 fax:21381600
General notes
Revisions
1. This drawing is not to be scaled. All dimensions to be checked by the Contractor and are to be his responsibility. 2. Drawing, dimension errors and omissions are to be reported to the Architect immediately on discovery. 3. All dimensions are in millimetres.
Rev
Description
-
-
VANITY CABINET
DETAILED SECTION MIRROR LIGHTING
Ceramic tiles Profile with strip light behind mirror (3000 K)
Frame
Mirror
Profile with strip light behind mirror (3000 K)
GUEST EN SUITE 2 PHOTO
MIRROR DETAIL CONSTRUCTION SITE PHOTO
04
MUSEUM REDEVELOPMENT INTO RECREATION VILLAGE
Type: Public/Commercial Size: 1 100 m2 Location: Toila, Estonia Year: 2016 Status: In progress
Company: AIT projekt OĂœ Leader: Andres Toome Team: Lizaveta Proskurins Role: Site surveying, redevelopment concept, design of drawings and Archicad modeling on architectural stage, fire safety drawings, masterplanning. Loadbearing structuras system. Materials: SIP panels, aerated concrete, glass.
Our scope was to redevelop non-used musem buildings and 16 000 m2 of surrounding area to a recreation Village «Tree of life” on the coast of river Pühajõgi (Toila city). As well as the connection bridge to the Oru-Toila park. The Client wanted main hotel building to be designed as per Historical palaces which were build in Russian empire time. To keep old looking facades and to create modern internal space was a main criterion in the project brief. Reconstruction and enlargement of museum building into all season hotel with sporting hall, design of a sports ground, small architectural forms, elements of landscape design, parking lot, design of a campsite was the brief of the Client. The main goal of the project was to dsign a recreation area with all necessary amenities for sporting and healthy leisure activities. The project is mainly focused on family holidays, athlete camps and yoga retreats.
ELEVATION 1-6
8°
VAAD +10,90 +10,10 +9,17 +8,93
+7,65
+8,20
+6,51
+6,50
+6,27
+6,07
+5,83
+5,50 +4,02
+5,50
+3,80
+3,07
+3,80
+2,50
+2,82
+2,50 +1,00
+1,00
±0,00
+2,30
+0,80 ±0,00
-0,27 -0,96 -1,70
-3,16
-3,60 -3,75
-3,23 350 350 300
6 250 6 700
8 300 7 500
1 380
350
6 360
14 590 14 590
1 500
2 040
57 7
TYPICAL GUEST ROOM
DE 1-6
720
TYPICAL GUEST APARTAMENT
+7,50
+6,07 +4,80 +4,26
+2,82 +2,58
+2,30
±0,00
-0,15
-0,27
2 490
28 590 28 930
550
Location study scheeme
6 480
8 280 530
14 600
7 500
240 1 900 2 560 1 280 1 280
172
530
DS-01
640
480 120 1080
600
100
3 950
100
4 050
4 050
4 050
4 050
Terass 8,45 m2
Terass 8,45 m2
Terass 8,45 m2
Terass 8,45 m2
Te 8,4
3 960
172
3 880
Elutuba 12,36 m2
172
3 880
Elutuba 12,09 m2
172
3 880
Elutuba 12,09 m2
172
3 880
Elutuba 12,09 m2
172
Elutuba 12,09 m2
640 96 544
120
El 12
1 910
1 83
1 040
WC 3,72 m2
544 96
WC 3,72 m2
SS-01
WC 3,72 m2
WC 3,75 m2
WC 3,75 m2
SS-01
SS-01
SS-02 544
96
DS-02
DS
Köök-Tuba 22,52 m2
Köök-Tuba 23,12 m2
Trepikoda 18,47 m2
Köök-Tuba 22,49 m2
Köök-Tuba 22,52 m2
DS-01
DS-01
Köök-Tuba 22,49 m2
DS-01
DS-01
780 900
1 200
Tuba 06 18,34 m2
1 930
Tuba 07 19,06 m2 3 990 DS-01
DS-01
Tuulekoda 4,72 m2
300
DS-01
Panipaik 2,84 m2
Tuulekoda 4,94 m2
Panipaik 2,84 m2
Tuulekoda 4,94 m2
Panipaik 2,84 m2
Tuulekoda 4,94 m2
Panipaik 2,84 m2
Tuulekoda 4,94 m2
Panipaik 2,84 m2
Panip 2,84
VS-04 60
150
530
3 950
250
Перепад высот 5 640 6 450 6 700
240
1 260
120 480 120 1 260
1 080
120 1 380 1 500 172
544
4 340 300
240
530
535
100
DS-01
SS-01 1 100
Tuba 05 18,35 m2
600
SS-01
Inventari ladu 8,47 m2
Trepikoda 15,36 m2
145
96
1 040
SS-01 2 600
WC 1,78 m2
Tuba 01 19,38 m2 1 200
120
96
3 950
6 390
14 350
120
4 320 1 600
100
60
1 100
120
Puhas pesu 3,69 m2
SS-02
Tuba 02 18,34 m2
280 96 96
Koridor SS-02 19,82 m2
172
SS-02
172
120
3 950
Terass 8,22 m2
900
14 640
Võimlemissaal 109,80 m2
1 880
Riietusruum M 11,02 m2
100
60 900
900
SS-01
3 840
VS-05
120 1 500 172
96
160
300 120
SS-01
96 280 1 080 96
900
240
DS-01
Tuba 03 18,34 m2
1 380
120
150
A
Tuba 04 18,34 m2
172
2 300
3 060
4 050
60 DS-02
Riietusruum N 11,49 m2
3 200 2 430
B
Personali tuba M 4,10 m2
172
VS-03
DS-01
Koridor 12,18 m2
1 400
120
15 120 1 400 1 830
C
DS-01
980
Koridor 18,56 m2
3 660 100 1 830
1
2 320 4 440 SS-01
120
D
3 320
1400
1 200
120
6 860 1780 120 1400 120
SS-01
VS-01
6 390
WC M 1,76 m2
2 900
3
300
240
WC N 1,76 m2
28 590
172
VS-04
120 1 600
Personali tuba N 8,21 m2
2 900
340
250 150
150 2 900
540
E
172
2
VS-02 VS-01
2 900
1 080
1 100
3 990
120
6 390
1 100
1 400
120
3 200
120
530
780 900
145
2 560 1 280 1 280 1 690
850
Masterplan concept
VS-02
7 500 8 300 7 500
VS-05
240
1 960
172
2 900
172
2 900
172 14 590 14 590
3 010
172
2 890
240
160 2 290 2 290
100
1 450
100
1 450
100
3 200
2 400
100 4 900
2 400
100
1 450
100
1 450
100
2 400
3 200
100 4 900
2 400
100
1 450
100
1 45
3 200
28 930 57 720
1
2
4
2
5
TINGMÄRGID - Kivisein
1ST FLOOR LEVEL GENERAL ARANGEMENT PLAN GSPublisherVersion 0.0.100.100
- Kivisein (tulemüür)
3
PUHK Aadre
- Isolatsioon (paigaldatav) - Kipsiseinad teraskarkassil
Jooni
- SIP paneel
OÜ AI
Koos
Toome
Masterplan phase I
6 220
8 300
240
7 500
240 1 900 2 560 1 280 1 280
60
A'
2 400
100 4 900
2 400
100
460 - Tulemüür, tulepüsivus EI-120
Töö nr.
1610-EP Mõõtkava
II korruse kavandatav plaan
Kuupäev
10.06.2016.a.
stas: Andres Toome
IT Projekt
e, Sompa küla, Jõhvi vald
M 1:100
Reg. nr 12443671 info.aitprojekt@gmail.com Tel.: 506 9034
Joonise nr.
AR-5-06
240
EI-30
150
EI-120
Tuba 09 18,34 m2
Tuba 08 19,38 m2
EI-30
EI-15
EI-15
EI-15
EI-15
EI-15
EI-15
TTS 11 12,53 m2 Ventkamber 12,40 m2
1 000
Trepikoda 16,94 m2
1 200
EVAK.TEE Lmax=12,6m TTS 12 181,82 m2
EI-15
Korist. 3,29 m2 Tuba 12 18,52 m2
Tuba 13 18,35 m2
Tuba 14 23,68 m2
EI-120
Koridor 20,07 m2
250
EI-120
Võimla all
WC 1,82 m2
TTS 4 16,92 m2
150
- Tuldtõkkestav sein, tulepüsivus EI-30
6
EI-15
EI-15
TTS 5 Riietusruum 12,08 m2
24 inimest
240
- Tuldtõkkestav sein, tulepüsivus EI-60
KELAAGER ess: Jõe 7, Jõe 7a Toila alevik, Toila vald
3 062
EI-120
EI-30
TINGMÄRGID
1 799 103 2 000
172
1 000
EI-30
610
2 900
Suitsueemaldusluuk laes. El.ajamiga 24 inimest
Trepikoda 9,52 m2
TTS 8 9,52 m2
150
A 100
1 480
240
Panipaik 3,53 m2
B
3 200 3 050
4 810 300
5 200
Rõdu 1,70 m2
Tuba 10 18,34 m2
Tuba 11 18,34 m2
Koridor 12,14 m2
Jooga saal 51,22 m2 Koridor 4,51 m2
172
780
C
2 120
Tuulekoda 4,94 m2
2 060
Tuulekoda 4,85 m2 4,94
paik 4 m2
1
14 580
340
240 3 181
1
Köök-Tuba 23,41 m2 DS-01
2 900
5 660
Köök-Tuba 22,52 m2 DS-01
172
2
EI-120
S-01
B'
D
2 900
EI-30
SS-01
Rõdu 1,74 m2
C'
TTS 10 70,83 m2
EI-30
WC 3,72 m2
EVAK.TEE Lmax=12m
1 950
150
WC 3,72 m2
120
15 120 1 400 2 850 2 850
1 930
610
3 660 2 840 150 6 040 240 290 1 100 96 1 860 96
1 930
86 86 86 86 172 1 930 172 15 120 2 100 10 800
120
6 230
6 860
2 900
3 120
Elutuba 12,49 m2
2 720
2 140
4 000
VS-03
30
172
900
8 240
D'
300
172
3 500
3 880
E
2 200
60
Terass 9,20 m2
lutuba 2,09 m2
is:
6 450
240
4 450
erass 45 m2
50
150
150
4 050
460
100
EI-120
4 300
1 400
100
1 560 1 280 1 280 1 690
3 950
Masterplan phase II
- Tuldtõkkestav sein, tulepüsivus EI-15
6 220 6 450 6 700
1
- Põhiline evakuatsiooni tee
- Teine (alternatiivne) evakuatsiooni tee - Pulber tulekustuti 6kg (paigaldada seinale kõrgusele kuni 1,5 m põrandast) - ATS käsiteadusti
GSPublisherEngine 0.0.100.100
240
7 500 8 300 7 500
2
2 400
180 240
1 960
172
2 928
172
2 898
172 14 580 14 590
28 790
TTS eksplikatsioon (III korrus) Nimetud Pind, m2 TTS 10 70,8 TTS 11 12,5 TTS 12 181,8 TTS 4 16,9 TTS 5 109,8 TTS 8 9,5 KOKKU: 401,3 м2
4
4 386
3 890 172 1 490
240 150
5
2 PUHKELAAGER Aadress: Jõe 7, Jõe 7a Toila alevik, Toila vald
Töö nr.
1610-EP
2ND FLOOR LEVEL FIRE SAFETY PLAN Joonis:
III korruse evakuatsiooni plaan
Koostas: Andres Toome OÜ AIT Projekt
Toome, Sompa küla, Jõhvi vald
Reg. nr 12443671 info.aitprojekt@gmail.com Tel.: 506 9034
Mõõtkava
M 1:100
Kuupäev
10.06.2016.a.
Joonise nr.
TO-5-03
KK-01
8°
8° +10.10
KL-02
VS-04
8°
KK-01
+8.68
VS-04
KK-03
17° +7.50
+6.80
+6.10
+6.01
lisasoojustus +100mm seina keskel
+5.70
VL-02
KK-01 VS-05
KL-01
DS-02
3,239
VS-04
+4.25
VL-01 DS-02
+2.77
DS-01 DS-01 KL-01
elastne vuuk
VL-02
PK-01
+0.00 288
+0.00
500
DS-01
+2.66
2,770
VS-01
-0.28
-0.50
elastne vuuk elastne vuuk
3,100
3,312
VK-02
-2.75
PK-02
-3.00
-3.60
1
2
3
4
5
LÕIGE 1-1
8°
8° +10.10
EI-60
8°
+8.68
17° +7.50
EI-60
+6.80 EI-60
EI-30
+6.01
EI-30
+6.10
Aken EI-30
+4.25
TTS 7 176,3m2
+0.00
+0.00 -0.28
TTS 1 126,5m2
3,312
EI-60
500 3,100
-0.50
288
EI-60
EI-60
-3.60
-2.75
-3.00
EI-15
TTS 5 178,1m2
EI-30
EI-30
+2.66
Uks EI-120
2,770
+2.77
TTS 12 181,8m2
EI-15
EI-60
EI-120
TTS 10 70,8m2
TulemüürEI-120
VL-02
3,239
+5.70
Soojustus: puiste kivivill, h=400mm Kipsplaat Sõrestik ''Knauf GKB'', 13mm Erikõva kipsplaat ''Knauf KEK'' Aurutõkke 13mm Laeroov 28x60; c-c 400mm Karkass Kipsplaatpuidust ''KnaufC24, GKF''45/70x2 2x13mm Mineraalvill 50+50mm Kipsplaat ''Knauf GKB'', 13mm Erikõva kipsplaat ''Knauf KEK'' 13mm Välisviimistlus: krohv+värv Siseviimistlus: krohv+värv
DS-01
jõusaali katuslagi
SECTION 1-1
CONSTRUCTION ELEMENTS TYPES
DS-02 VS-06
VS-04
VS-04 VS-06 KL-02
VS-04 KL-03
-
DS-02
+
Vahelagede ning põrandate konstruktisoonitüübid +4.85
DS-01
SS-02
+2.75
Märk DS-01
DS-01 DS-01
+2.70
VS-05 DS-01
VS-03
DS-01
Eskiis (1:50)
+
SS-02
VL-01
+
KL-03
±0.00
VK-01
Vahelagede ning põrandate konstruktisoonitüübid
VS-05
katusekatte konstruktsioon
SS-03
KK-01 SS-03
Märk
SS-03 Vahelagede ning põrandate konstruktisoonitüübid 6
Eskiis (1:50)
+
DS-02 VL-01
Märk
PUHKELAAGER DS-02 Aadress: Jõe 7, Jõe 7a, Toila alevi, Toila vald
Töö nr.
1610-EP Mõõtkava
1:100
Joonis: LÕIGE 1-1
Koostas: Andres Toome OÜ AIT Projekt Toome, Sompa küla, Jõhvi vald
Kuupäev
VL-01
+
Eskiis Vahelagede ning(1:50) põrandate konstruktisoonitüübid KK-01 Märk
10.06.2016
VL-01 Eskiis (1:50)
Joonise nr.
Reg. nr 12443671 info.aitprojekt@gmail.com Tel.: 506 9034
AR-6-09VS-06
SS-02 VL-01
+
SECTION 1-1
+
[FIRE SAFETY] VL-02 SS-02
SS-03 VL-02 DS-01
PK-01
PK-01
VS-06
+4.85
EI-30
+2.75
EI-30
VL-02
SS-03 KL-01 VL-02
KL-01
EI-15
EI-15
EI-15
EI-15
+2.70 TTS 9 289,7m2
±0.00
DS-02 PK-02
PK-02 DS-01
PK-01
6
KL-02 SS-02
Columbia-kivi
Soojustus: EPS-80,100mm puiste kivivill, h=400mm Soojustus: jäik betoonplokkidest sein 240mm Ol.ol. kivisein, Aurutõkke ehk 530mm hüdroisolatsioon (täisvalatud) kivivillaplaat,150mm Soojustus: puiste kivivill, h=400mm R/B õõnespaneel 220mm Siseviimistlus: krohv+värv Columbia-kivi Aurutõkke ehk hüdroisolatsioon Siseviimistlus: krohv+värv betoonplokkidest sein 240mm R/B õõnespaneel 220mm Columbia-kivi betoonplokkidest sein 240mm (täisvalatud) Laeroov 45x45; c-c 400mm (täisvalatud) Siseviimistlus: krohv+värv Kipsplaat ''Knauf GKB'' 2x13mm Siseviimistlus: krohv+värv
Kipsplaat ''Knauf KEK'', 13mm Vaheseinad teraskarkassil: Kipsplaat ''Knauf GKB'', 13mm Konstruktsioon Kipsplaat ''Knauf GKB'', Gyproc GD 70/70, samm 600 13mm Välisviimistlus: krohv+värv Erikõva kipsplaat ''Knauf KEK'' Erikõva kipsplaat ''Knauf KEK'' Soojustus: Mineraalvill, 13mm 75mm jäik 13mm kivivillaplaat,150mm Karkass puidust 13mm C24, 45/70x2 Kipsplaatpuidust ''Knauf KEK'', Columbia-kivi Kipsplaat ''Knauf KEK'', 13mm Karkass C24, 45/70x2 Mineraalvill 50+50mm betoonplokkidest sein 240mm Vaheseinad teraskarkassil: Mineraalvill 50+50mm Kipsplaat ''Knauf GKB'', 13mm (täisvalatud) Gyproc GD puiste 70/70,kivivill, samm h=400mm 600 Soojustus: Põrandakatte: PVC Erikõva kipsplaat ''Knauf KEK'' Kipsplaat ''Knauf GKB'', 13mm Vertikaalne karkass Mineraalvill, 75mm Aurutõkke ehk hüdroisolatsioon Põrandakipsplaat ''Knauf KEK'' 13mm Karkass 45x80 Kipsplaat ''Knauf KEK'', 13mm R/B õõnespaneel 220mm Erikõva kipsplaat ''Knauf KEK'' 2x13mm Soojustus: kivivillc-c 50+30 Laeroov 45x45; 400mm 13mm Siseviimistlus: krohv+värv Kipsplaat ''Knauf GKB'' 2x13mm Välisviimistlus: krohv+värv Sammumüra heliisolatsiooniplaat Kipsplaat ''Knauf GKB'', 13mm
Soojustus:20mm jäik ''Hunton'' Erikõva kipsplaat ''Knauf KEK'' 13mm (liimitud ja kruvitud) kivivillaplaat,150mm OSB plaat, 22mm SBS krohviga, 5mm C24; Siseviimistlus: pahtel+värv Columbia-kivi Vahelae talad, 45x220 c-c Konstruktsioon Kipsplaat ''Knauf GKBI'', 13mm Dekoratiivsed trapetsprussid, betoonplokkidest sein 240mm 600mm Kipsplaat ''Knauf GKBI'', 13mm Kipsplaat ''Knauf GKB'', 13mm hüdroisolatsiooni all ''Knauf GKB'', 13mm (täisvalatud)Kipsplaat Mineraalvill, talade vahel, 200mm Vaheseinad teraskarkassil: Vaheseinad teraskarkassil: SBS alumine, 3mm Vertikaalne Võrk, isolatsiooni hoidmiseks Põrandakatte: PVC samm Siseviimistlus: krohv+värv Gyproc GD 70/70x2, Gyproc GD karkass 70/70x2, samm 600 600 OSB 3 plaat, 22mm Põrandakipsplaat ''Knauf KEK'' Columbia-kivi Karkass 28x60; 45x80 Laeroov c-c 400mm Mineraalvill, 140mm Mineraalvill, 140mm 2x13mm ''Knauf GKB'', betoonplokkidest sein 240mm Sõrestik Kipsplaat 13mm Soojustus:''Knauf'' kivivill 50+30 Kipsplaat red GKF 2x13mm Sammumüra heliisolatsiooniplaat (täisvalatud) Kipsplaat ''Knauf GKB'', 13mm Kipsplaat ''Knauf GKBI'', 13mm ''Hunton'' 20mm Siseviimistlus: krohv+värv Konstruktsioon Siseviimistlus: krohv+värv Kipsplaat ''Knauf GKBI'', 13mm OSBkrohviga, plaat, 22mm (liimitud ja kruvitud) SBS 5mm Kipsplaat ''Knauf GKB'', 13mm Vahelae talad,trapetsprussid, 45x220 C24; c-c Dekoratiivsed Siseviimistlus: krohv+värv Erikõva kipsplaat ''Knauf KEK'' 600mm hüdroisolatsiooni all Mineraalvill, Columbia-kivi 13mm SBS alumine,talade 3mm vahel, 200mm Konstruktsioon Võrk, hoidmiseks OSB 3isolatsiooni plaat, 22mm betoonplokkidest sein 240mm Siseviimistlus: pahtel+värv Põrandakatte: PVC Laeroov 28x60; c-c 400mm Sõrestik (täisvalatud) Kipsplaat ''Knauf'' KEK'' red GKF 2x13mm Põrandakipsplaat ''Knauf Välisviimistlus: krohv+värv Siseviimistlus: krohv+värv 2x13mm Põrandakatte: PVC Soojustus: EPS-80,100mm Kipsplaat ''Knauf KEK'', 13mm SammumüraVaheseinad heliisolatsiooniplaat Põrandakipsplaat ''Knauf Ol.ol. kivisein, 530mm teraskarkassil:KEK'' 2x13mmGD 70/70, samm 600 Gyproc ''Hunton'' 20mm Sammumüra75mm heliisolatsiooniplaat Mineraalvill, OSB plaat, 22mm ja kruvitud) ''Hunton''(liimitud 20mm KEK'', Kipsplaat ''Knauf 13mm OSB plaat, 22mm (liimitud Vahelae talad, 45x220 C24; c-c ja kruvitud) Vahelae talad, 45x220 C24; c-c 600mm 600mm Mineraalvill, talade vahel, Mineraalvill, talade200mm vahel, 200mm Võrk, isolatsiooni hoidmiseks Võrk, isolatsiooni hoidmiseks Põrandakatte:Laeroov PVC28x60; ''Sport c-c Duo'' 400mm Laeroov 28x60; c-c 400mm Kipsplaat ''Knauf'' red GKF 2x13mm Tasanduskiht, 10mm ''Knauf KEK'', 13mm Kipsplaat ''Knauf'' red GKF 2x13mm Kipsplaat ''Knauf GKBI'', 13mm Põrandakatte: PVC ''Sport Duo'' R/b õõnespaneel, 220mm Kipsplaat ''Knauf GKB'', 13mm 13mm Vaheseinad teraskarkassil: Kipsplaat ''Knauf GKB'', Tasanduskiht, 10mm Laeroov 28x60, c-ckipsplaat 400mm Vaheseinad teraskarkassil: Erikõva ''Knauf KEK'' R/b õõnespaneel, 220mm Gyproc GD 70/70, samm 600 Gyproc GD 70/70x2, samm 13mm Kipsplaat ''Knauf GKF'', Laeroov 28x60, 2x15mm c-c 400mm 600 Mineraalvill, 75mm Mineraalvill, 140mm Karkass puidust C24, 45/70x2 Kipsplaat ''Knauf GKF'', 2x15mm Siseviimistlus: pahtel+värv Põrandakatte: PVC Kipsplaat ''Knauf GKB'', 13mm Põrandakatte: PVC Kipsplaat ''Knauf KEK'', 13mm Mineraalvill 50+50mm Siseviimistlus: pahtel+värv Kipsplaat ''Knauf GKBI'', 13mm Betoonikiht C20/25, 80mm Kipsplaat ''Knauf GKB'', 13mm Betoonikiht C20/25, 80mm (armeeritud) Erikõva kipsplaat ''Knauf KEK'' Välisviimistlus: krohv+värv (armeeritud) Hüdroisolatsioon 13mm Soojustus EPS 50, 2x100mm Soojustus: EPS-80,100mm Hüdroisolatsioon Liivaja killustiku alus 200mm Ol.ol. kivisein, 530mm Soojustus EPS 50, 2x100mm Tihendatud pinnas Liiva- ja killustiku alus 200mm Põrandakatte: PVC ''Sport Duo'' Tihendatud pinnas Tasanduskiht, 10mm R/b õõnespaneel, 220mm
KL-01 -
+ KL-01
Soojustus: EPS-80,100mm Columbia-kivi Ol.ol. kivisein, 530mm betoonplokkidest sein 240mm krohv+värv (täisvalatud)Välisviimistlus: Soojustus: jäik Siseviimistlus: krohv+värv kivivillaplaat,150mm Välisviimistlus: krohv+värv Välisviimistlus: krohv+värv
Laeroov 28x60, c-c 400mm Kipsplaat ''Knauf GKBI'', 13mm Soojustus: puiste kivivill, h=400mm Kipsplaat ''Knauf GKF'', 2x15mm Sõrestik Kipsplaat ''Knauf GKB'', 13mm Siseviimistlus: pahtel+värv Aurutõkke Vaheseinad teraskarkassil: Laeroov 28x60;krohv+värv c-c 400mm Siseviimistlus: Põrandakatte: PVC ''''Knauf Sport Duo'' Soojustus: kivivill, h=400mm Kipsplaat GKF'' 2x13mm Columbia-kivi Gyproc GDpuiste 70/70x2, samm 600 Põrandakatte: PVC Tasanduskiht, 10mm C20/25, betoonplokkidest sein 240mm Sõrestik 80mm Mineraalvill, Betoonikiht 140mm (täisvalatud) (armeeritud) R/b õõnespaneel, 220mm Aurutõkke Kipsplaat ''Knauf GKB'',krohv+värv 13mm Siseviimistlus: Hüdroisolatsioon Laeroov c-c 400mm Laeroov 28x60; c-c 400mm Soojustus EPS 50, 100mm Kipsplaat28x60, ''Knauf GKBI'', 13mm Kipsplaat GKF'', 2x15mm Liiva- ja killustiku alus 200mm Kipsplaat ''Knauf ''Knauf GKF'' 2x13mm Põrandakatte: PVC pinnas Tihendatud Siseviimistlus: pahtel+värv Kipsplaat ''Knauf GKB'', 13mm Betoonikiht C20/25, 80mm Erikõva kipsplaat ''Knauf (armeeritud) Soojustus: puisteKEK'' kivivill, h=400mm Sõrestik 13mm Hüdroisolatsioon Aurutõkke Soojustus: puiste kivivill, h=400mm Karkass puidust C24, 45/70x2 Soojustus EPS 50,28x60; 100mm Laeroov c-c 400mm Kipsplaat ''Knauf KEK'', 13mm Aurutõkke ehk hüdroisolatsioon Kipsplaat ''Knauf GKF'' 2x13mm Mineraalvill 50+50mm Vaheseinad teraskarkassil: Liiva- ja killustiku alus 200mm R/B õõnespaneel 220mm GyprocGKB'', GD 70/70, samm 600 Kipsplaat ''Knauf 13mm Tihendatud pinnas Mineraalvill, 75mm
05
PRIVATE HOUSE
Type: Residental Size: 182 m2 Location: Sütiste 1, Jõhvi, Estonia Year: 2016 Status: Built 2017
Company: AIT projekt OÜ Leader: Andres Toome Team: Lizaveta Proskurins
Role: Design of drawings and Archicad modeling on architectural stage, fire safety drawings, masterplanning, documentation for building permit. Loadbearing structuras system. Materials: Fiber concrete block, wood,
glass.
Maape
S
alse
aht – osa m
neto uletud
Ehitise
a
pind –
indala lune p (20,7 %
m3 1739
m2 181,8
- 259,3
krundi
m2
st) pindala
2
i pinda Krund
51 m la - 12
SECTION 1-1
5,460
5,310 4,470 3,800
3,300
3,190
2,920
2,800 2,300
2,700 2,300
2,700
1,800
3,000
2,100
2,300
0,900 0,000
0,000
-0,180
-0,180
-0,300
4 200
5 100 15 000
4
3
5 700
KATUSLAGI Katuseplekk Roovitus 25x100mm Distantsliist 25x50mm Aluskate, kõrgdiffusiooniline Sarikas 200x50, samm 600mm Kivivill 200 mm Puitkarkass 150x50, samm 600 Kivivill 150mm OSB plaat, sulundservaga Aurutõkkekile Karkass 45mm + kivivill 50mm Kipskartongplaat 12,5mm Laevärv
PÕRAND PINNASEL Parkett või ker.plaat R/B põrandaplaat 80mm (koos põrandakütte torustikuga) PE kile Soojustusplaat EPS-80, 2x100mm Tihendatud liiva-killustiku segu Mineraalne aluspinnas
2
1
SEIN Krohv 10 mm Fibo plokk 200 mm Soojustus (EPS-60) 200 mm Õhekrohv arm. võrgul 5 mm
TERRASSIKATUS Terrasilaust rest (eemaldatav) SBS keevisruberoid kahes kihis OSB plaat 15m m, sulundservaga Laelaudis 25mm, hööveldatud Puit-talad 150x50 mm, samm 580mm
SÕLM 1 M 1:20
VS-1
PÕRANDALIIST ELASTNE MASTIKS
ÕHEKROHV ARM.VÕRGUL SOOJUSTUS (EPS-60) FIBO PLOKK KROHV
5mm 200mm 200mm 10mm
DEF. VUUK 10 mm
EPS PERIMETER PLUS 100+100 mm
FIBO PLOKK 300 mm
ÕHEKROHV ARM.VÕRGUL 5mm
±0,000
Joonis:
SILLUTISRIBA BET. KIVIDEST 60MM -0,200
LÕIGE 1 - 1
Koostas: Andres Toome
-0,400
OÜ AIT Projekt
Toome, Sompa küla, Jõhvi vald
i = 5% -0,700 P-1 PÕRANDAKATE R/B BETOON KOOS KÜTTETORUDEGA 80mm SOOJUSTUS (EPS-80) 100mm SOOJUSTUS (EPS-80) 100mm PE-KILE TIHENDATUD LIIV 100mm TIHENDATUD KILLUSTIK, FR 10-25 500mm RADOONITÕKKEKILE TIHENDATUD LIIV 100mm OLEMA SOLEV PINNAS
-0,900 -1,000 300 400 EPS PERIMETER PLUSS 100 mm ARMEERITUD BETOON
ÜKSIKELAMU PROJEKT Aadress: Sütiste tn. 1, Jõhvi vald, Jõhvi linn
100
4
EPS PERIMETER PLUSS 50 mm STYROFOAM 300 SL-A-N 50 mm
Reg. nr 12443671 info.aitprojekt@gmail.com Tel.: 506 9034
Eluruumide pind 152,9 m2 Mitteeluruumide pind 28,9 m2
Köök/Söögituba 18,0 m2
Pesemisruum/WC 7,1 m2
Elutuba 29,9 m2
Tuulekoda 2,1 m2
Katlaruum 5,5 m2
Katusealune17,6 m2
Koridor 31,9 m2
Kabinet 8,1 m2 Garaž 23,4 m2. Tuldtõkkestav sein EI-60
Magamistuba 12,8 m2 Terrass 30,6 m2
Leiliruum 3,2 m2 Katusealune 24,0 m2
Magamistuba 19,9 m2
Sanõlm 7,8 m2
Magamistuba 11,3 m2
GENERAL ARANGEMENT PLAN
Eraldi tuletõkkesektsiooniks on eraldatud garaaž pindalaga 23,4 m2 Ülejäänud I korrus ruumid moodustavad ühte tuletõkkesektsiooni pindalaga 158,4 m2
HOUSE PHOTO
COVERED TERRACE PHOTO
MASTERPLAN
K I N D R E GAR D S, LI ZAVETA P R O S K U R I N S