Skip to main content

2019-2023 Undergraduate Architecture Portfolio

Page 1

L I LY ST E WA R T Architecture Portfolio Selected Work 2019 - 2023


Lily Stewart Architecture Portfolio Selected Work 2019 - 2023 Savannah College of Art & Design BFA Architecture 23’


ABOUT ME

I am a fourth year architecture student with a minor in architectural history at the Savannah College of Art & Design in Savannah, Georgia. When I was young, I was never good with words. I had them, the words, but I always struggled getting them out. Needless to say, I had to find a different way of expressing myself. Taking what was in my mind and making it into a piece of art became my way of communicating with others. Be it drawing or sculpting, I’ve always had this tendency of taking my thoughts and ideas and making them tangible, more digestible for others. Overtime I began to see the value of what I viewed as just a quirk. School is where I found myself. My biggest struggle each year was deciding if I should take a math-based elective or an art-based one. Math had just always made sense to me, and I enjoyed how it was definitive in places where art was not. Both allowed me to excel and push myself to new limits. The satisfaction I received from finishing a page long equation versus finishing a painting was analogous. I came to the realization in middle school that the field of architecture was where I needed to be. Architecture gives me the opportunity to combine my two passions to develop a product that can be utilized by an unfathomable amount of people for generations to come. My designs come from a place of care for the general welfare of every living thing. I wish to connect with everyone that interacts with my work on a common ground of empathetic understanding. I seek to continue conversations of the human condition and how it relates to our built environment, as this is how we progress. But like I said, I was never good with words.

II


L I LY S T E WA R T

919-397-7913 lilyannstewart0@gmail.com

ASPIRING ARCHITECT / DESIGNER / STUDENT EDUCATION Savannah College of Art and Design Savannah, GA

lily-stewart.format.com

SOFTWARE

Bachelor of Fine Arts - Architecture (May 2023) Integrated Path to Architectural Licensure (IPAL) SCAD

Rhino

Revit

AutoCad

SketchUp

Enscape

Grasshopper

Photoshop

Illustrator

Indesign

After Effects

Google Suite

Microsoft Office

2019 - Present

Minor : Architectural History

WORK EXPERIENCE Verdant Enterprises - Design Associate Savannah, GA

February 2022 - Present

- On-site mapping/design for residential and commercial projects - Drafting plans in AutoCad - Preparation of construction documents (i.e. Exisitng Conditions, Site Prep & Demo, Hardscape, Grading & Drainage, Planting, Custom Details) - General office responsibilities (i.e. communication with clients & city officials)

BSA LifeStructures - Intern Designer Raleigh, NC

January 2019 - May 2019

- Modeling and schematic design in Revit for plans of Alamance Community College - Modeling with point clouds for Yendi Municipal Hospital in Ghana - Clean-up and organization of construction documents

AWARDS SCAD Academic Honors Scholarship 2019 - 2022

SCAD Achievement Honors Scholarship 2019 - 2022

SCAD Dean’s List 2019 - 2022

SKILLS Sustainable Design Project management Customer Service Organizational Critical thinking Problem-solving Leadership

ABOUT ME March 3rd, 2001

Rockville, MD 2001 - 2009

Wake Forest, NC 2009 - 2019

Wake Forest High School C/O 19’

Savannah, GA 2019 - Present


TA B L E O F CONTENTS STUDENT WORK REZERVAT (Winter/Spring 2022) Refugee Center

LVL

(Fall 2022) Skate Park

FYLLALUND (Spring 2022) Observatory

DACHA

(Fall 2021) Low-Income Development

1 13 21 29

PROFESSIONAL WORK 288 TRADING POST TRAIL, OKATIE, SC

39

SAPELO ISLAND VISITORS CENTER

47

(2022 - 2024) Residential

(2022 - Present) State Government Office + Park

IV


R E Z E R VAT

Rezovo, Bulgaria

60,000 sq. ft.

Refugee Center

Located just south of the village of Resovo in Bulgaria is, REZERVAT, a multi-functional border checkpoint and refugee resource center. Asylum seekers have always existed in place where persecution takes historical precedence. This phenomenon seems to never be slowing with ongoing political unrest and environmental crisis around every corner. What’s unique about this particular border crossing facility is the principle of humanitarianism, and operating on an agenda of benevolence, where no human seeking asylum is subject to refoulment or further persecution. This facility is Parti Diagram full service in its range of accommodations with an attempt to manage both the traffic of individuals across this border, but also for the processing of various identities. It is at the point of identification where immediate accommodations are made for those that are able to be defined with refugee status. With the goal of resolution for every person that has taken it upon themselves to find their way here, it is paramount that needs are met first and arrangements are made where called for. Facilities like these play a major role in the story of any and every migrant for generations to come, and given that significance, it needs to be done right.


N

Continent Map: Europe

2


IA

ER

BO

AR

B L AC K SEA

BU

LG

RD

/T

UR

KE

Y

INTRODUCTION

N

OPPORTUNITIES: LAND USE MAP Proximity

Water

Land Type

Economy

CONSTRAINTS:

RESIDENTIAL MUNICIPAL MARKETS HOTELS RESTAURANTS

There is very little pre-existing industry in the town of Rezovo. There seems to be a prioritization of tourists with several hotels available within the quaint town. Given its extensive history, it can be interpreted that the town would like to keep their local community fairly close knit, with little plans to grow industry wise.

Industry

H I STO RY : 681 The Bulgarian state is established

1

1914 1918

1919 1925

WW1 begins 120,000 refugees enter Bulgaria

180,000 settled in Bulgaria postRussian Civil War

Defined the term ‘refugee’ and outlined the rights of refugees, as well as the legal obligations of states to protect them

1951 The 1951 Geneva Convention is held 1

2

1989

1990

Opposition Union of Democratic Forces (UDF) is formed

Communist party reinvents itself as the Bulgarian Socialist Party

‘The Republic of Bulgaria shall grant asylum to foreigners persecuted for their opinions or activity in the defense of internationally recognized rights and freedom’


G OA L S / O B J E C T I V E S : SAFETY The first and foremost priority of any center of this variety is safety. The ability to secure a level of protection and dignity for all persons is a bare minimum. Those that are forced to travel this way, must be met with the highest of standards when it comes to the safety and security of themselves and loved ones. This is met by: - Policies of non-refoulment and innocent until proven guilty - Health related services that provide screenings for every individual upon entry - Adequate accommodations for the sustaining of life while in the camp (food, water, shelter)

E D U C AT I O N Education, from an objective standpoint, provides people a level of stability. It is something that can never be taken away from you. For refugees, education opens doors to the more productive and fulfilling lives that await them. This is met by: - Full transparency legal counsel and processing procedures - Traditional K through 12 schooling for those under 18 and trade facilities for those 18+

COMMUNITY Its during times of crisis that strong communities are most crucial. Community is a critical aspect of this facility as it offers guests something that no material accommodation could ever, a sense of belonging. Its these bonds that will see these guests into each and every new day. This is met by: - Design that prioritizes socialization - Meeting the bare necessities to allow for worry-free existence - Offering x-programs that remove guests from their day to day and allow for commonalities to be found

RESETTLEMENT With the understanding that no newly established center would be able to accommodate migrant flow alone, transportation services will be key to appropriate and strategic resettlement of those that may be better suited at a center elsewhere. This is met by: - Efficient and timely processing of identities - Transportation accommodations (bus services)

1991 Bulgarian constitution introduces art. 27 2, 2 1 (1), 6 3(3), and 6 4 (4)

3

2004

2007

2013

Bulgaria is admitted into NATO

Bulgaria enters the European Union

11,000 asylum seekers arrived in Bulgaria at the start of the Syrian War

Principle of non-refoulment : no person will be returned to a country where they would face persecution

2016 2021

2022 2023

120,000 refugees seek asylum in Bulgaria, mainly from Afghanistan, Syria, and Iraq

According to the WHO, more than 500,000 Ukrainian refugees have entered Bulgaria

4

Principle of non-punishment of asylum seekers and refugees for their illegal entry

4


SITE PLAN

PUSH

BASE

EXTRACT

FINAL


FLOOR

FLOOR

FLOOR

FLOOR

6


1

MINI WIND TURBINE 12

6 7 11 10

1 2

9

8

1. GYPSUM WALL BOARD 2. SERVICE GAP 3. 3-PLY CLT WALL PANEL 4. INSULATION 5. WOOD CLADDING 6. CLT WALL 7. PIEZOELECTRIC BAR 8. SPRING 9. ROTATING SHAFT 10. LEVER 11. GENERATOR 12. NACELLE 13. BLADES

13 3

E N E R GY : PASSIVE DESIGN STRATEGIES ARE IMPLEMENTED IN EACH AND EVERY ROOM. THE AIRTIGHT, HIGH-PERFORMANCE ENVELOPE FEATURES OPERABLE WINDOWS THAT ARE POSITIONED FOR A MIX OF CROSS AND STACK VENTILATION WHILE LARGER FIXED WINDOWS MAXIMIZE DAYLIGHT HOURS. THE SITE INTEGRATION WAS PLANNED SO AS TO WORK WITH LOCAL WIND PATTERNS THAT ACTIVATE THE MINIATURE WIND TURBINES IN THE WIND TUNNEL OF THE NORTHERN BUILDINGS. PHOTOVOLTAIC ROOF TILES ARE INCLUDED AS A POTENTIAL OVER-KILL TO THE HIGHLY PASSIVE FACILITY.

4 5

1


S U S TA I N A B I L I T Y W I N D P O W E R C A L C U L AT I O N S :

2 3 POWER = .5 (COEFFIECIENT OF PERFORMANCE) (AIR DENSITY) (3.14) (BLADE LENGTH) (WIND SPEED) POWER = WATTS COEFFICIENT OF PERFORMANCE = 59.3% (ACCORDING TO BETZ LIMIT) 3 AIR DENSITY = 1.293 KG/M BLADE LENGTH = .33’ WIND SPEED = 6 M/S (ON AVERAGE) POWER = 2.4 WATTS/HR = 57.6 WATTS/DAY = 21,024 WATTS/YR = 21 KW/YR X 519 MINIATURE WIND MILLS

= 11,0 0 0 K W/YR

WIND TUNNEL EFFECT: THE CLOSER THE PROXIMITY OF TWO PARALEL WALLS THE FASTER THE WIND TRAVELS BETWEEN THEM. AIR PRESSURE DROPS AND CIRCLES BETWEEN THE FLAT SURFACES. ANGLED IN THE DIRECTION OF HIGHEST WIND SPEEDS, THIS WIND TUNNEL IS DESIGNED TO THE FLOW OF LOCAL AIR PATTERNS.

8


RENDERS SYSTEMS WATER COLLECTION/RECYCLING :

- GUTTERS - RAIN CHAINS - CHANNEL DRAINS - REVERSE OSMOSIS SEPTIC SYSTEM

PASSIVE HEATING/COOLING :

- CROSS VENTILATION - OVERHANGS - LOUVERS - SOLAR ORIENTATION - THERMAL MASS (CLT CONSTRUCTION)

WIND TUNNEL

ENERGY :

- WIND TUNNEL - MINIATURE WIND MILLS - SOLAR PANELS

PRECIPITATION

3

GREYWATER TANK

RAINWATER CISTERN

GUTTER + RAIN CHAIN

FILTER BLACKWATER TO CITY SEPTIC

SYS T E M S I N S E C T I O N

SUMMER


S TA F F O F F I C E S

LO B BY + O F F I C E S

S TA F F O F F I C E S

SUMMER PRECIPITATION WINTER

WINTER

CHANNEL DRAIN

GUTTER + RAIN CHAIN

FILTER

LEGEND

GREYWATER TANK

RAINWATER CISTERN

CROSS/STACK VENTILATION

GREY WATER GROUND WATER BLACK WATER POTABLE WATER

10


CONSTRUCTION D E TA I L S WAT E R :

1

WITH AN AVERAGE RAINFALL OF 25 INCHES ANNUALLY, REZERVAT WORKS TO CONSERVE EVERY DROP. A GROOVED TILE ROOF FUNNELS WATER TO A GUTTER SYSTEM WHERE A MAJORITY OF COLLECTION BEGINS. CATCH BASINS AND CHANNEL DRAINS ARE PLACED AT LOW POINTS TO MANAGE WATER COLLECTION FROM IMPERVIOUS SURFACES. RAINWATER ENTERS A REVERSE OSMOSIS SYSTEM AND GRAY WATER IS FILTERED BACK INTO POTABLE WATER OR REUSED FOR IRRIGATION AND SEPTIC RELATED APPLICATIONS. WATER IS A CRUCIAL RESOURCE AND IT IS TREATED AS SUCH FOR THE FACILITIES FUNCTIONS AND OVERALL SUSTAINABILITY TO OFFSET NEGATIVITIES OF THE FACILITIES IMPLEMENTATION.

2 3

ECONOMY:

4

5

LOW MATERIAL COSTS AND SIMPLE, UNIFORM CONSTRUCTION REDUCES EXTRANEOUS EXPENSES. CLT CONSTRUCTION WITH A MAJORITY OF GROUND FLOORS HAVING STRUCTURAL FINISHES HAS BEEN PROVEN TO BE HIGHLY COST EFFICIENT. IT IS DESIGNED TO LAST WITH STRATEGIC PLANNING FOR SIZE AND ENERGY CONSUMPTION, TAILORED TO MEET DEMANDS. THE PROGRAM SERVES AS A CATALYST FOR THE LOCAL ECONOMY, GIVING PURPOSE TO THIS SIGNIFICANT LAND BORDER.

RESOURCES: 7 6

REZERVAT UTILIZES BOTH CROSS-LAMINATED TIMBER AND CONCRETE AS ITS MAIN CONSTRUCTION MATERIALS, BOTH OF WHICH ARE UBIQUITOUS THROUGHOUT THE COUNTRY. THE SELECTION OF SUCH MATERIALS WAS MADE THROUGH AN INFORMED OBSERVATION OF THE COUNTRIES MAJOR EXPORTATIONS. THESE BUILDING MATERIALS ARE REFLECTIVE OF WHAT HAS BEEN USED BOTH LOCALLY AND REGIONALLY THROUGHOUT THE BALKANS, PROVING TO BE EFFECTIVE AGAINST THE REGIONS CLIMATIC CONDITIONS.

4

6

6 7 1. COMPOSITE ROOF TILES 2. CLT ROOF ASSEMBLY 3. METAL RAFTER CAPS 4. TRIPLE GLAZED TILT-TURN WINDOWS 5. HORIZONTAL BLADE LOUVERS 6. CLT FLOOR ASSEMBY

8

9

5 10

2 WA L L S E C T I O N

7. CLT WALL ASSEMBLY 8. CHANNEL DRAIN 9. CONCRETE SLAB ON GRADE 10. STRUCTURAL FOOTING - 48” BELOW GRADE


1. COMPOSITE ROOF TILES 2. RAFTER EMBEDDED GUTTERS 3. HEAVY TIMBER ARCH 4. METAL CAP 5. RAIN CHAIN 6. LED BOLLARD LIGHT

7. CATCH BASIN 8. CHANNEL DRAIN 9. PLANTER BOXES FOR WATER FILTRATION 10. PERVIOUS PARKING LOT

1. COMPOSITE ROOF TILES 2. RAFTER EMBEDDED GUTTERS 3. HEAVY TIMBER ARCH 4. METAL CAP

5. CHANNEL DRAIN 6. PERVIOUS PARKING LOT 7. MURPHY STYLE PULL-DOWN BEDS

4 2

1

1 2 3

3

6

4

7 5 5

7

6

9

7 10

8

4 WA L L E M B E D D E D B E D S 3 WAT E R C O L L E C T I O N 1 2 7 1 2 3 4 5

1. HEAVY TIMBER COLUMN 2. TIGHT FIT BOLTS 3. METAL PLATE 4. ANCHOR BOLTS 5. CONCRETE SLAB ON GRADE 6. CONCRETE FOOTING W/ REBAR 7. 2” CONCRETE TOPPING SLAB 8. CLT FLOORING 9. THREADED SCREW 10. METAL BRACKET 11. HEAVY TIMBER BEAM

8 3

9

10

10 11 3

9 6

5 C O LU M N TO FO OT E R

1

6 COLUMN TO FLOOR

12


LV L

501 Old Town Mall, Baltimore, MD 21202

7,300 sq. ft.

Skate Shop/Park

The site of Old town Mall in Baltimore Maryland has experienced extreme levels of neglect and disrepair over the course of 200+ years. Situated in the heart of the oldest black neighborhood in Baltimore, the spot has gone through several phases of revitalization and ultimate decline. What was missing from each intervention was an appeal to the average resident. With thorough analysis and a complete urban investigation of the site, the true character of the neighborhood began to reveal itself. What this neighborhood needed was a program that would not only reflect but support its culture. LVL is more than just a skate park, but a haven. Offering both street and park obstacles, it is a space where people are welcome to leave their mark. It teaches while also providing a safe place for all people regardless of background. The shop itself was made to be worn. The design utilizes an existing building on-site and cascades out towards the south end. With nearly all surfaces able to be skated on, it allows the skater to open their mind to new possibilities and truly push themselves to the limit.


N

ORLEANS ST

14


A N A LY S I S P R O J E C T G OA L S Entertainment:

Community:

The space will allow visitors to find entertainment through social recreation. It should be seen under the same light as basketball courts and football fields and should be met with the same support from a parks and recreation perspective.

LVL encourages community engagement based on common ground. To have a space that is accepting of everyone regardless of background is exactly what the city needs. The sociability of a space is improved when people are encouraged to interact.

Economic Development:

Public Safety:

Skate parks act as hot spots for the youth in a city. Given the sites lack of any formal parks, the foot traffic in the area alone could be greatened exponentially. Having more “feet on the street” could also be seen as a way for other businesses in the area to get more traction.

About one person a week dies from skateboarding, with a majority being motor-vehicle related. Today, the area has no skate parks meaning the youth are left to their devices, trespassing property and vandalizing architecture on streets that do not prioritize them.

R AC I A L C O M P O S I T I O N

P O P U L AT I O N P Y R A M I D 80

BLACK OR AFRICAN AMERICAN: 62.26% WHITE: 29.72%

50

TWO OR MORE RACES: 3.20% 25

ASIAN: 2.48%

0

NATIVE HAWAIIAN OR PACIFIC ISLANDER: .03%

00

30K 25K 20K 15K 10K 5K

NATIVE AMERICAN: 2%

MALE

5K 10K 15K 20K 25K 30K

OTHER: 2%

FEMALE


N

PLAZA

S K AT E SHOP

S K AT E PA R K

SITE PLAN

16


SECTIONS

C

M AT E R I A L S ON

CR ET

E

G L ASS

M E TA L

WO O D

Materials were chosen on the basis of standards set by precedent skate parks. Concrete is much more slick than other materials and offers guests easier momentum. Glass is used to accentuate the form of the building as well as provide ample light to the interior. Wood is used for the bowl on the east end. It is also used alongside metal as accents throughout the building.

E A S T - W E S T E L E VAT I O N

DOUBLE BRICK WALL

CONSTRUCTION D E TA I L

METAL DECK W/ CONCRETE 2 X 14 WOOD JOIST W12 X 20 STEEL BEAM 6 X 10 ALUMINUM COLUMN CONCRETE W/ WWF


S TA I R D E TA I L STEP COUNT: 10 RISER HEIGHT: 7” TREAD DEPTH: 11” STEP WIDTH: 44”

This project involves the restoration of a previously existing building on site. Given occupancy, square footage, and program, there are some exceptions to building codes in terms of egress requirements. In a space where circulation is constant and egress is made more efficient through the use of skateboards, emergency exit systems are abundant.

NORTH

- SOUT

H ELEV

AT I O N

18


RENDERS


FLOOR PLANS

N

TH IR

The third floor acts as not only the starting point for the snake run, but also as a vantage point to the surrounding park. It is a space for both skaters and those that choose to spectate.

D FL O O R

S EC O N D FL O O

The second floor is just skate park. It features two of the larger bowls in the project; one made of concrete and the other of wood. Both interior and exterior spaces provide ample room for skaters to manipulate the space for their advantage.

R

FI R ST FL O O R

The first floor features a tri-fold garage door, multiple park obstacles, lockers, and the skate shop. The shop is depressed into the ground to allow for the bowl on the second floor to dip down. The glass bottom of this bowl not only opens up the space but gives guests a new way to watch and understand the sport of skating itself.

20


FYLLALUND

Saksun, Streymoy, Faroe Islands 60,000 sq. ft. Observatory

Fyllalund serves the greater community of the Faro Islands by offering guests a chance to come closer than ever before to the spaces that define the culture of this historic country. The Faroe Islands are notable for their extreme terrain, unpredictable weather, and dynamic marine ecosystem stirred by powerful currents. Fyllalund is an observatory to the natural phenomena that encompass the archipelago year-round. The facility provides guests with panoramic views to take in events such as the Aurora Borealis, the powerful storms up the western coastline, and the annual migration of native pilot whales. It is a space for consideration, study, and appreciation, giving guests the opportunity to become fully immersed in the transitional space where the sky meets the sea.

FAROE ISLAND MAP


N

REGIONAL SITE MAP

LOCAL SITE MAP

22


DESIGN

INSPO

Located on the western cliff side of the Island of Streymoy, in the town of Saksun is where our design intention lies. The form was derived from its integration into the landscape and its overall purpose. It takes inspiration from stretched out fishing nets that are then draped over the cliff side into the water. Situated much like a barnacle on the side of a fishing boat, the facility straddles two cliff peaks. The curved walls elicit movement both on the ground and with the eye. The curves optimize the ability of the material, provide more viewing space with expansive views, and allow the building to work with the coastal winds rather than stand against it.

PRINCIPAL ELEVATION OBSERVATORY STAIRCASE


Each segment of the building works as an observatory towards a specific natural event. The one end dives down towards the water isolating the viewer with a near “splash-zone” -esque design, where the main body of the facility works with views of the sky as they meet the water in the horizon.

NORTH - WEST SECTION NORTH VIEW - CAFE

24


FLOORS PLANS

UPPER DECK LEVEL

ENTRANCE LEVEL

MIDDLE VIEWING DECK

LOWER VIEWING DECK


PROGRAM P R O G R A M F E AT U R E S 1. CAFE - MULTIPURPOSE 2. PRIMARY OBSERVATION DECK 3. GRANDE STAIRCASE 4. LOBBY 5. THEATRE - LOWER LOOK-OUT DECKS

1

6

6. OFFICE - STORAGE

3 5

2 4 CIRCULATION DIAGRAM

26


FORM DEVELOPMENT

STAGE 1

STAGE 2

STAGE 3

STAGE 4

STAGE 5

STAGE 6


STRUCTURE

28


DAC H A

Bluffton, South Carolina

10 Acres

Low Income Development

DACHA is a residential neighborhood that serves the broader community of Bluffton, SC and the in-coming generation of residents that seek to find a sense of home in the heart of the southern low country region. It is a home not only for small families, but young professionals and the working class. During these unprecedented times, it is especially crucial for the designs of tomorrow to be prioritized and arranged in a manner that not just satisfies the bare necessities but goes beyond and serves the residents in ways never once considered. The Town of Bluffton is seeking the development of affordable/workforce housing that will serve the community in years to come. Through accurate and detailed site analysis one can get a better understanding of not only the specific site but the community that will be affected most by the establishment of such a facility. With such an examination, there is the opportunity for a more catered project that not only satisfies the bare necessities, but also works with the town and its agenda for progress in ways never before considered.

South Carolina 5.2 Million Citizens

Beaufort County 198,614 Citizens

City of Bluffton 30,937 Citizens


Site Map: 115 Bluffton Rd

N

115 Bluffton Rd

30


MASTER PLAN

S I T E D E TA I L S

T E C H N I C A L S I T E D E TA I L S

- 59 residential units

- General mixed use zoning (GM)

- 30 three bedroom units

- Hamlet center zoning

- 29 two bedroom units

- Neighborhood zoning

- Pool/Pool house on west side of site

- Zoning Designation: Suburban

- Community garden on east side of site

- District Character: High Density

- Central Pond divides site

- Parcel size: 9.96 acres

- Two-way main road through center of site

- Wetlands: 3.36 acres

- Leads to medical center on NE side of site

- Uplands: 6 acres


THREE BEDROOM

TWO BEDROOM

RECREATIONAL CENTERS

N

MAPS

RESIDENTIAL LAND USE

COMMERCIAL LAND USE

AVG. YEARLY INCOME ZONING

32


FORM DEVELOPMENT T WO B E D R O O M U N I T

PULL

PUSH

SLANT

The two units were formed in a manner that optimizes space. Much like puzzle pieces, the units fit together on the lot. The two bedroom unit has a heavier base, prioritizing the living spaces, and tapers upwards with the rest of the amenities.

THREE BEDROOM UNIT

PULL

CUT

SLANT

The three bedroom unit has a heavier top with a more narrow base so as to work with the projections of the other units north facade. Though the living space is smaller on the first floor, it is made up for by the ample space provided on the other 3 floors.


S U S TA I N A B I L I T Y M E AU S R E S

1

LO U V E R SYS T E M

2

S O L A R PA N E L S

3

RAIN COLLECTION

This will provide the homes with a passive heating and cooling system that optimizes the angle of the sun relative to the time of year.

Angled at approx. 30 degrees to get the most sunlight possible year round, these solar panels will be reflected on the south facing roof of each dwelling.

Rain water will be collected from the roof as well as the patios of each home. Slats in the patio floor will allow water to flow through pipes within the walls to then be carried to a drainage system along the walkway.

34


T W O B E D R O O M AT D A C H A THIRD FLOOR

SECOND FLOOR

FIRST FLOOR

1242 SQ. FT.

FEATURES: - 2 Bedrooms - 1.5 Bathrooms - 3 Stories - 1 Rooftop Patio - Front Porch - Back Porch - Office Space - Ample Storage - Private Driveway - Solar Panels - Energy Star Appliances


LEVEL 3 : OFFICE VIEW SOUTH ELEVATION

LEVEL 2 : BEDROOM VIEW NORTH - SOUTH SECTION

LEVEL 1 : LIVING ROOM VIEW WEST ELEVATION 36


T H R E E B E D R O O M AT D A C H A 1980 SQ. FT.

FIRST FLOOR

SECOND FLOOR

FEATURES: - 3 Bedrooms - 2.5 Bathrooms - 4 Stories - 2 Rooftop Patios - Front Porch

THIRD FLOOR

- Office Space - Ample Storage - Recreation Room - Solar Panels - Energy Star Appliances

FOURTH FLOOR


PLAYROOM SOUTH ELEVATION

BEDROOM

WEST ELEVATION

OFFICE

LIVING ROOM NORTH - SOUTH SECTION 38


R E S I D E N C E AT 15 TRADING POST TRAIL .42 Acres

Residential


S I T E P R E PA R AT I O N + DEMOLITION At Verdant Enterprises, we begin each project by mapping every detail of our sites by hand in the field. With an accurate base map of existing conditions we are able to work remotely from our sites while still having a full comprehension of what currently exists on the site. The first sheet in our construction documents submittal is a Site Preparation and Demolition sheet which notes all that must be done to a site in order to prepare it for the construction process. This includes removals of specific vegetation, demolition of hardscape items, and transplants that will be held on site to then be replanted in the final design. The pink bubbles on the sheet note the specific location of items that correspond to a Construction and Planting schedule for the final design.

41

40


UNIT BID ITEMS The Unit Bid sheet is typically our second sheet in the submittal that works with the hardscape plan to show the exact items we will be implementing. Again on this sheet, the pink bubbles work with the items to note their exact location on the site. Items implemented on this plan include: - Improvements to existing grading and drainage

- Improvements to existing Rock Troughs

- Driveway expansion

- New Rock trough along house dripline

- New walkway system

- Improvements to exisitng paths

- Front garden

- Seating node + Bench

- Front porch additions

- Lighting improvements - Irrigation updates

42


PLAN - NEW WALKWAY SYSTEM

ISOMETRIC - STEEL BORDER

ELEVATION - FENCE

SECTION - LAMINATED FENCE POST

SECTION - WOOD DECK

SECTION - WOOD BENCH


CONSTRUCTION D E TA I L S The third sheet in the submittal set tends to be our construction details sheet. On this sheet we have scaled detail drawings of the hardscape elements going into the final design. Its on this sheet where specifications are noted and general notes regarding the construction of the item are discussed. Each detail that Verdant Enterprises produces is custom to each project we take on.

SECTION - TOP RAIL

SECTION - WALKWAY AT PARKING

SECTION - STAKE AT CORNER

SECTION - ROCK TROUGH

44


PLANTING PLAN The last sheet of every Verdant Enterprise submittal set is the planting plan. The bread and butter of our work is our planting plans which works with existing vegetation on site to create a comprehensive redo on all sides of the property. From entry plantings, to the backyard, every plant has its place. On this sheet we are able to point out every tree, shrub, and groundcover that is to go on a site, along with its quantity and size which can be found on the planting schedule attached.

46


SAPELO ISLAND VISITORS CENTER Verdant Enterprises latest endeavor is a collaboration with the Sapelo Island Visitors Center. A complete redo of the 11 acre site is to be done over the course of the next two years. So far, we have been able to map out the existing conditions of the site, and develop a conceptual master plan that is awaiting approval from the board of directors at Sapelo Island. New features of the site include: - Enhancements to the wetland garden - Wood landing + Footbridge - Nature Trails - Pergolas - Swale - Pile wall circle w/ bench & sand infill - Native Demonstration Gardens - Wire grid vine trellis’ - Restored Observation Deck - Pile walls at entry points - Cleared views to marsh - Gazebo - Fire Pit - Rain Garden - Collector walk to dock

11 Acres

State Government Office + Park


I L L U S T R AT I V E MASTER PLAN

48


THANK YO U

h t t p s : / / l i l y -st ewa r t.fo r m a t. c o m lilyannstewart0@gmail.com 9 1 9 - 3 9 7-7 9 1 3


2019 - 2023


Turn static files into dynamic content formats.

Create a flipbook
2019-2023 Undergraduate Architecture Portfolio by lily stewart - Issuu