SAN DIEGO PORTFOLIO
Our Company Stats
$190M 11 M+
2 024 SAN DIEGO
A NN UA L R E VE NUE
0
WORK HOURS
LOST-TIME INCIDENTS
.46 E MR
Our Market Sectors
$
1.5B 93%
AG G R E GATE
BON D ING CA PAC IT Y
REPEAT CLIENTS
CORPORATE
HOUSING / MIXED-USE
LIFE SCIENCES
EDUCATION
CIVIC
ADVANCED TECHNOLOGY
ENTERTAINMENT / HOSPITALITY
HEALTHCARE
SPECIAL PROJECTS
UNIVERSITY OF SAN DIEGO
KNAUSS CENTER FOR BUSINESS EDUCATION SIZE 72,000 SF
Ground-Up Building • Instructional Space • Collaboration Space • Computer & Financial Labs • Office Space •
OLIN HALL RENOVATION SIZE 41,671 SF
Office Space & Classrooms • Conference Rooms • Café •
OSIDE ARENA HOLDINGS FRONTWAVE ARENA SIZE 170,000 SF
State-of-the-Art Community Entertainment & Sports Arena • Home of the NBA G League’s San Diego Clippers • Home of the Major Arena Soccer League’s San Diego Sockers • Home of the Indoor Football League’s San Diego Strike Force • Holds up to 7,600 People • Includes Provisions for Hockey • Full-Service Restaurant / Bars / Concession Stands • 16 Luxury Suites / Plaza Area •
CHELSEA INVESTMENT CORPORATION HARRINGTON HEIGHTS SIZE 195,275 SF
14-story Affordable Housing Development • 273 Studio & Two-Bedroom Units • Below Ground Parking • Commercial Spaces • LEED Gold •
ALTOS LABS
OAS LAB BUILDOUT SIZE 159,000 SF
Cagewash • 75,000 SF Biology & Chemistry Lab Spaces • 20,000 SF Vivarium • 64,000 SF Office, Collaboration, & Amenity Spaces •
FRANCIS PARKER SCHOOL PHASE 8 ATHLETIC COMPLEX SIZE 48,770 SF
Athletic Complex • Concrete Parking Structure • New Aquatics Center • Multi-purpose Room • Locker Room • Classrooms • Office Suites • Open Office Layouts • Bleachers & Spectator Seating •
THE RICHMAN GROUP K1 330 13TH STREET SIZE 436,399 SF
23-Story Residential High-Rise • 222 Residential Units • 7,000 SF of Commercial Space • Fitness Center • Amenities Center with Media • Pool with Cafe Area • Below-Grade Parking • Adjoining Building with Restaurant •
MUSEUM OF CONTEMPORARY ART SAN DIEGO LA JOLLA EXPANSION SIZE 105,000 SF
40,000 SF Expansion • 50,000 SF Renovation • Newly Located & Redefined Main Entry • Bookstore • Gallery Spaces • Renovated Outdoor Viewing Spaces • Underground Parking Garage •
PALOMAR COMMUNITY COLLEGE DISTRICT MAINTENANCE & OPERATIONS COMPLEX SIZE 28,000 SF
Progressive Design-Build (Award Winner) • Net Zero Energy / LEED Platinum / LBC Petal • 2 Buildings with 344 Solar Panels Winner • Office Space of 16 • Collaborative Areas Project • Breakroom Awards • Warehousing, Metal / Welding Shop • Multiple Trades for Maintenance •
CITY OF SAN DIEGO
TORREY PINES FIRE STATION SIZE 12,300 SF
Design-Build, Two-Story Fire Station • Three Drive-Through Apparatus Bays • Lobby • Kitchen & Dining • Exercise Room • Locker Turnout • Ready Room & Dorm Rooms • New Emergency Signalization • LEED Silver •
Winner of 3 Project Awards
TRILINK BIOTECHNOLOGIES
FLANDERS 1 & 2 CORE / SHELL AND CGMP EXPANSION SIZE 61,000 SF
Six cGMP ISO 7 Manufacturing Suites • cGMP Warehouse Spaces including +4 / -20 Spaces • Automated SDS & Buffer & Waste Systems • RODI, CIP & Wifi Systems • Two Complete Separate Central Plants • 1.8 MW Generator Systems • QA / QC Lab Spaces • Office & Amenity Space • Conference & Wellness Rooms •
Whole arial pic with facility & field
UNIVERSITY OF SAN DIEGO REGGIE SMITH SOFTBALL FACILITY & FIELD SIZE 4,500 SF
Softball Team Building • Lockers • Office Space • Softball Stadium • Press Box / Dugout • Field Improvements •
PURCELL FAMILY CHAMPIONSHIP GOLF PRACTICE FACILITY SIZE 44,000 SF
Landscaping • Hardscaping • Demolition of Existing Structure • Protection of Habitat Areas •
HOGAN TENNIS CENTER SIZE 111,535 SF
Tennis Building • Sitework • Locker Rooms • Training Room • Collaborative Areas • Private Offices • Resurfaced Tennis Courts • Landscaping •
SEAWORLD SAN DIEGO
JEWELS OF THE SEA - THE JELLYFISH EXPERIENCE SIZE 11,673 SF
Jellyfish Exhibit • 10-Foot Tall Jellyfish passage • Total of 16 Kreisel Tanks • Retail Space • Occupied Park •
JAY PAUL COMPANY
SUMMIT RANCHO BERNARDO CAMPUS REPURPOSE SIZE 500,000 SF
Infrastructure Upgrades / Central Plants • Ten Entry Façades • Atrium Connector • Green Space Areas • Amenity Spaces • Fitness Center • Self-Perform Concrete •
SEAWORLD SAN DIEGO EMPEROR DIVE COASTER SIZE 3 ACRES
Longest, Tallest & Fastest Dive Roller Coaster in California • 153 ft. Tall • 143 ft. Facedown Vertical Drop •
MIRA COSTA COLLEGE DISTRICT LIBRARY RENOVATION SIZE 50,000 SF
Progressive Design-Build • Full 2-Story Renovation • Classroom Areas • Collaboration Areas • Library Space • Office Space • Occupied Campus •
WAKELAND HOUSING THE TERALTA
SIZE 102,692 SF
Six-Stories (Five Stories Over IA Podium) • 73 Units • 73 Parking Stalls (Underground) • Computer Lab • Kitchen • Common Spaces • Roof Deck & Community Garden • Kids Play Area & Movie Wall • Storage •
CONFIDENTIAL CLIENT
ADVANCED TECHNOLOGY TENANT IMPROVEMENTS SIZE 3.5M SF (TOTAL OF APPROXIMATELY 19 DIFFERENT PROJECTS)
R&D Labs • Office Space • RF Chambers • Ancillary IT Space • Break Areas •
CHELSEA INVESTMENT CORP. AND FATHER JOE’S VILLAGES SAINT TERESA OF CALCUTTA VILLA SIZE 330,000 SF
407-Unit Affordable Housing Development • Commercial & Lobby Space • Fitness Room & Community Room • Management Offices • Open Courtyard with Community Garden & Children’s Play Area •
TRILINK BIOTECHNOLOGIES PROJECTS SAPPHIRE & RUBY SIZE 5,000 SF + 14,516 SF
GMP Manufacturing • Non-GMP Manufacturing • Equipment Room • Glass Wash & Autoclave • Cold Room • Shipping & Receiving • Sampling Room • Structural Upgrades for Mechanical Shaft • Design-Build MEP •
JRMC REAL ESTATE
PALOMAR HEALTH RADIATION TREATMENT FACILITY TI & MOB Healthcare Clinic • Private Exam Rooms • Prefab HDR Brachytherapy Room • Varian Linear Accelerator Equipment • Philips CT Room With Lead Drywall • Lobby • Kitchen • Office Space •
SWIFT REAL ESTATE PARTNERS
RANCHO VISTA CAMPUS RENOVATION SIZE 105,000 SF
Extensive Tenant & Site Improvements • Renovations to the On-Site Café & Dining Building • Repositioning of Three Buildings • Central Plant Replacement • Extensive Amenity Areas • Utility Upgrades • 800 Parking Stalls • Self-Perform Concrete •
ALEXANDRIA REAL ESTATE EQUITIES (ARE) METACRINE TI SIZE 33,000 SF
Dry & Wet Lab Spaces • 1,000 SF Vivarium • Locker & Shower Rooms • Office Space • Conference Room • Kitchen / Breakroom •
INCEPTION THERAPEUTICS TI SIZE 33,000 SF
Dry & Wet Lab Spaces • 2,000 SF Vivarium • Locker & Shower Rooms • Office Space • Conference Room • Kitchen / Breakroom •
VIVIDION THERAPEUTICS TI SIZE 47,000 SF
Interior Mezzanine • Central Utilities Plant • Office Space • 4,000 SF Vivarium • Amenity Areas • Chemistry & Biology Labs •
WAKELAND HOUSING
RIVERWALK AFFORDABLE HOUSING SIZE 185,000 SF
Four Stories • Below Grade Parking • 190 Units • Lobby • Reception Area • Amenity Spaces •
FAMILY HEALTH CENTERS OF SAN DIEGO 2121 IMPERIAL AVENUE SIZE 42,081 SF
Lobby • Exam Rooms • Physical Therapy Rooms • Pharmacy • Blood Draw & Processing • PACE Program • Mental Health Offices •
SAN DIEGO UNIFIED SCHOOL DISTRICT CHESTERTON ELEMENTARY SCHOOL SIZE 64,000 SF
Five K-5 Educational Buildings & Admin Offices • New Solar & Battery Systems • New Playgrounds • New Grass Playing Field • Parking Lot • Occupied Campus •
CITY OF SAN DIEGO
FIRE STATION 48 - BLACK MOUNTAIN RANCH SIZE 158,800 SF
Design-Build Fire Station • Apparatus Bay • Fitness Center • Bunk / Captain Rooms • Day Room • Training Room • Kitchen / Dining Space •
HP INK LABS
HEWLETT PACKARD SIZE 50,000 SF
R&D Space • Dry Labs • Office Space • 1,600+ Pieces of HP Relocated Equipment • New MEP Distribution Systems • New Roof Mounted Mechanical Yard • Design-Build Renovation •
SAN DIEGO UNIFIED SCHOOL DISTRICT
NEW CLASSROOM BUILDING AT SAN DIEGO CHARTER SCHOOL SIZE 45,000 SF
Two-Story Classroom Building with Science Classrooms • Reading Library & Media Center • Wet Lab • Work Rooms • Elevator • Playground • Parking Lot • Landscaping / Hardscaping •
MISSION FEDERAL CREDIT UNION HEADQUARTERS TI SIZE 111,000 SF
Office Space • Conference Rooms • Full Scale Commercial Kitchen • Cafeteria Dining Space • Outdoor Amenity Spaces • Fitness Center • Collaborative Areas • Executive Suite Offices • Green Room for Filming •
PALA CASINO
SPA AND RESORT RENOVATION SIZE 155,706 SF
Pool & Spa • Café, Restaurant & Bar • 90,000 SF Gaming Floor Renovation • Suite Remodels •
SAN DIEGO ZOO GLOBAL MOUNTAIN LION EXHIBIT SIZE 2,200 SF
Secure Enclosure • CMU & Geogrid Retaining Walls • Shoring Pile Retaining Wall • CMU Management Building for Animal Care • Occupied Park • Completed in Four Months •
OMNIOME
LAB REPOSITIONING SIZE 73,500 SF
Bio-Chemistry Lab • Optics Lab, PCR Lab, Engineering Lab, Kitting Lab, Fill / Finish Lab, Flow Cell Lab, & Enzyme Lab • Office Space • New 5,000 lb. Service Elevator • Design-Build MEP •
PIER 32 MARINA
RV PARK & DOCK EXPANSION SIZE 136- SITE RV RESORT
136 RV Sites • 9 Eco-cabins • 29 Tent Sites • 3 Outbuildings • Shared Guest Amenities •
HEALTHPEAK
CLUB TORREY & COLLISION SPACE SIZE 11,000 SF
Conference Rooms • Private Office Space • Break Area • Amenity Suite • Restrooms •
QUALCOMM
QUALCOMM
SIZE 106,500 SF (TOTAL SIZE OF 13 PROJECTS)
SIZE 4,783 SF
VARIOUS PROJECTS West Chiller Plant Upgrade • 163 Lab • TBS Rack Room • Storage Phase 1 • High Piled Storage Remediation TI • Storage Phase 2 • Pentari Antenna Installation • Compressed Air • Pod UPS • SAN.WA SVE • Pentari Antenna Installation Project • SAN.WE TI • 413 Rack Room • W155 TI • Substation • Rack Room Remodel • 1 North Labs TI (Phase II) • 162 (Phase I) •
SAN.P DATA CENTER 2-Single Story Buildings • Data Center • Underground Electrical & Mechanical • Backup Electrical UPS Equipment • Exterior Mechanical Chiller & Water Storage Tanks •
ALEXANDRIA REAL ESTATE EQUITIES (ARE)
XERIS PHARMACEUTICALS TI SIZE 15,000 SF
Chemical Lab Spaces • Office Space • Conference Room • Amenities • Kitchen / Breakroom •
ONCOSEC TI
RADIAN BIO TI
SIZE 33,755 SF
SIZE 69,190 SF
Complete Core / Shell Renovation • Dry & Wet Lab Spaces • Office Space • Added Mezzanine Level • Exterior Walls & Service Elevators • Self-Perform Concrete •
R&D Lab Space • Office Space • Elevators • Amenities •
SAN DIEGO ZOO GLOBAL ASIAN LEOPARD EXHIBIT SIZE 16,500 SF
Three CMU Structures for Animal Management • Four Habitats in Separate Steel Enclosures • Underground Utilities • Operating Park •
SAN DIEGO 12626 High Bluff Drive, Suite 250 San Diego, CA 92130 (858) 939-9780
SILICON VALLEY 1050 Enterprise Way, Suite 250 Sunnyvale, CA 94089 (408) 747-5000
SAN FRANCISCO 577 2nd Street, Suite 101 San Francisco, CA 94107 (415) 766-2380
SACRAMENTO 2250 Douglas Blvd. Suite 150 Roseville, CA 95661 (916) 244-3148
AUSTIN 1023 Springdale Road, Suite 12E Austin, TX 78721 (512) 773-1020