SELECTED ARCHITECTURAL PROJECTS BY
2 0 2 1 URBAN DESIGN
P O R T F O L I O
LENY INDAH
1 1
content
1
1
2
4-37
content
the projects: // Project 01 : Community Centre as A Crative-Collaborative Space // Project 02 : Amrita Sanctuary // Project 03 : Municipal Wastewater Treatment System (IPAL) // Project 04 : Public Space in Kampoong
1. Content
2
2
2
the projects:
Portfolio 2021: Selected Works by Leny Indah
4 Final Project Assignment // Architectural Cencept // Categories: Public Space, Urban Design //
PROJECT 01 Community Centre as Creative-Collaborative Space Location : Purwokerto, Banyumas, Jawa Tengah
Final Project Assignment by Leny Indah Supervisors: Ofita Purwani, ST, Ph.D Ir. Leny Pramesti, MT.
Community Centre as Creative-Collaborative Space is a space that can be use by the community for supporting their creative activities. The creative people or their communities are also can use special facilities that can support to create some arts or generating the ideas. Some key aspects of this building are the services, spatial layouts and the ambiance of its spaces. As a final project, this concept has a specific research on paper about the interiors. You can visit this journal researh on bit.ly/ArtikelCoWorking Portfolio 2021: Selected Works by Leny Indah
5 Programmatic Activities (User) Programmatic Activities (Space) USER
USER
Public Communities
Creative Communities
Public Activities Creative-Collaborative Special Activities Recreation Apreciation Education
Interaction
Support Activities
Co-Working Sharing
Sharing
Selling
Recreation
Co Working
Interaction
Apresiation
Selling and Bazaar
USER Administrator
Administration Administration Service
Education
Reception
Service
In
Problem and Solution
Creating Creative-Collabortive Space
Programmatic Space
Out
Site
Service
Located in Purwokerto, Banyumas, Jawa Twngah
It located in midtown and has good access for the transport station and public service area.
Introducing creative-collaborative activities into building
Ambience, Accesibility, and Facade
Massing of Building
6
LANDSCAPE
SHAPE TRANSFORMATION
Vehicle sirculation
Bentuk Dasar
out
Walker Sirculation
BUILDING SIRCULATION PATTERN
Vegetation
1st Floor: Radial-Centered
2nd Floor: Linear
u
The site was chosen by identified the land-use and the crowds of the people around. It stated to provide and connect the interaction between people on the settlements, offices and public spaces to create some creative collaborations.
SITEPLAN
8
LAYOUTS 22 20
21 6
19
18 17 16
15
14 13 12 11 1 9
10
8
5 7
6
4
0
2 3
1ST FLOOR 0
Main Entrance
12 Collaboration Area
1 Lobby
13 Mini Library
2 Broadcast Area - Record Room - Radio Room - Digital Content Studio
14 Toilets
3 Mushola 4 Toilets 5 Pingpong Area 6 Free Disccuss Area
15 Side Entrance 16 Gathering Room 17 Toilets 18 Restaurant 19 Cooking Practice Room 20 Lounge
7 Lounge Area
21 Workshop Room
8 Print and Publication Room
22 Private Room
9 Craft Area
23 Seminar Room
10 Exhibiton Area 11 Theatre and Music Room
Portfolio 2021: Selected Works by Leny Indah
9
LAYOUTS 14
14
14
14
15 15 17
18
16 13
17 11
12
12
10
12
9
10
8 6 7
5
6
3
2
1
4
2ND FLOOR 1 Co-working: Walk-in Area 2
Co-working: Individual Rent Area
3 Toilets 4 Mushola 5 Co-working: Online Game Area 6 Co-working: Group Rent Area 7 Co-working: Discussion Room 8 Co-working: Rest Room 9 Dance Practice Room
13 Office Administrator Area
- Reseptions - Guest Room - Manager Room - Administration Room - Meeting Room - Finance Room - Files Room - Toilets - Mushola - Staff Room - Lounge - Pantry
10 Gathering Room 11 Discussion Room 12 Bridges
PROJECT 01: Community Centre as A Creative-Collaborative Space
14 Business Incubator Room 15 Meeting Room 16 Private Call Room 17 Presentation Room 18 Conference Room
10
VENTILATION AND LIGHTING Ventilation
Lighting
Portfolio 2021: Selected Works by Leny Indah
11
ZONING
1st Floor: Appreciate Zone
2nd Floor: Co-Working Zone
1st Floor: Recreation Zone 1st and 2nd Floor: Interaction and Collaboration Zone
1st Floor: Education Zone 2nd Floor: Administration Zone
1st Floor: Sharing Zone
1st Floor: Support Zone PROJECT 01: Community Centre as A Creative-Collaborative Space
12
ACCESIBILITY Accessibility for Formal Zone 1st floor
2nd floor
Accesibility for Ideas Zone 1st floor
2nd floor
Accesibility for Collaboration Zone 1st floor
2nd floor
Portfolio 2021: Selected Works by Leny Indah
13
EXTERIOR AND INTERIOR
Entrance
Collaboration
Group Rent Area PROJECT 01: Community Centre as A Creative-Collaborative Space
14
Playground
Temporary Tent Event
Discussion Area
Main Lobby
Individual Rent Area
Online Game Room Portfolio 2021: Selected Works by Leny Indah
16 Competition // Architectural Concept // Categories: Public Space, Urban Design //
PROJECT 02 Amrita Sanctuary
Location : Lake of Faculty of Agriculture, UNS, Surakarta
Competition Project by Leny Indah Alif Datu Okie Kristina M. Ghalfadi
It is Sansekertan language means Water of Life. Water is a main component from the nature that brings the confortable and zen feeling. The building states on lake of the Agriculture Faculty, so the space is a facility for students. The metaphore of a waterdrop represents about the feeling that happen when the water drops fall. It influences people to take a rest and feel confortable with the sound and the ambience of it. Portfolio 2021: Selected Works by Leny Indah
17
CONCEPT Water
ZEN
REJUVENATION
Green Architecture
Overthinker Student
The user who come to the third floor feels about zen. It shows the empty space and the skylight above.
In this step, the user who came to the 2nd floor will be feel comfort. Within staring the scenery around, the user can walk surounding the balcony.
Amrita Sanctuary
Spirit of Success
REMEMBER
The user who come to this first floor feels about the narrow space. It shows how over think the people and they need to heal. Social Aspect
Education Aspect
Environment Aspect
SHAPE TRANSFORMATION
Waterdrop as a based-shape
PROJECT 02: Amrita Sanctuary
Fit in element based
1st and 2nd floor larged for balcony
Combine the space in the waterdrop-shape and space as the hallway
18
LAYOUTS
SECTIONS
EXTERIORS
Portfolio 2021: Selected Works by Leny Indah
19
MODULS
AERODINAMIC SIRCULATION Easier air sirculation in site
SOUND OF NATURE (WATER) Because of water element in site, it produce the sound of nature (especially water drops those bring the nature ambience of the design)
SKYLIGHT The skylight give a zen ambience for the 3rd floor.
VERTICAL GARDEN The plants that surounding the sanctuary wall as a heat respons and produce the fresh air. HYDROPONIC The hydroponic plant makes the space more productive and it can be used for free. THE GREEN ROOF The Green Roof is the chosen element to create the nature and gree ambience.
PROJECT 02: Amrita Sanctuary
3 LEVEL FLOORS This design has 3 level floors with the different zone.
20
CONSTRUCTION STEPS
22
Professional Project // DED and Execution // Categories: Sanitation and Drainage //
PROJECT 03 Municipal Wastewater Treatment System (IPAL) Project location: Kelurahan Pasir Wetan, Purwokerto
This wastewater treatment system is a development infrastructure program from the govenment from the distric level to make a better habit and treatment of wastewater system in their village. We did this project by participatory planning and build. The government play a role as a facilitator for the people who live in there. This village get the fund for build 2 wastewater treatment systems. Each of it has the capacity for 50 families/houses. So it has 100 families/houses in total.
Portfolio 2021: Selected Works by Leny Indah
23
METHOD
MAPPING
FACILITATOR
COMMUNITIES
In this step, we introduced the program to built two the wastewater treatment systems. We asked to the communities to mapped the families who need the wastewater treatment and determind the site to put this wastewater treatment.
PLANNING
FACILITATOR
COMMUNITIES
In this step, we teach them how to built that treatment systems and we started to determining the volume. In this case we started to make the Design Engineering Drawing, Cost Estimation and Time Schedule. The communities create some division to manage this infrastrusture process.
EXECUTING
FACILITATOR
COMMUNITIES
In this step, we started to built the this. The communities had given their potential workers to built it, and the divisions to manage the report, the material and cost by their own communities.
24
WASTEWATER PATH
Portfolio 2021: Selected Works by Leny Indah
25 WASTEWATER SYSTEM 1: SLOPING PIPE
P11
P10
P0
P2
P6
P8
1
P1
IPAL 2 IPAL 2
P4
P3
+106.500 +106.000 +105.500
4
+105.000 +104.500 +104.000 +103.500
+102.500
+103.000
+102.000
+102.500
+101.500
+102.000
+101.000
+101.500
+100.500
+101.000
+100.000
+100.000
+99.500
+99.500
+99.000 NO. PATOK 16.3
49.4
+100.756
+100.000
0.500
0.500
KEMIRINGAN DASAR SALURAN
S=0.0163
S=0.056
S=0.039
S=0.024
S=0.014
MUKA TANAH DALAM GALIAN (H)
+99.500
+100.256
+101.469 0.500
+100.969
+101.860 0.500
+102.632
0.500
S=0.032
P3 22
22
JARAK LANGSUNG
0
+103.132
23.6
P4
JARAK ANTARA
23.6
73
+105.707
89.3
0.500
+105.207
JARINGAN PIPA
121.6
P0
0.500
+105.559
DALAM GALIAN (H)
32.3
167
P1
+106.059
ELEVASI
MUKA TANAH
45.4
P2
0 P7
0.448
0.500
JARINGAN PIPA
+101.426
21.5 188.5
JARAK LANGSUNG
P6
+102.028
JARAK ANTARA
P8
+101.580
P10
ELEVASI
P11
+101.360
+99.000 NO. PATOK
KEMIRINGAN DASAR SALURAN
DIMENSI SALURAN
+101.926
+100.500
S=0.007 P6
DIMENSI SALURAN
IPAL 2
P1 IPAL 2
KETERANGAN : : MT ( Muka Tanah ) : Pipa
HORISONTAL 1 : 600
2
P12
P13
KETERANGAN : : MT ( Muka Tanah ) : Pipa
H : Menyesuaikan Elevasi
POTONGAN MEMANJANG
5
Skala : NTS
SKALA : VERTIKAL
1 :100
Skala : NTS
+102.500 +102.000 +101.500
+101.500
+101.000
+101.000
+100.500
+100.500
+100.000
+100.000
+99.500
+99.500
+99.000 NO. PATOK
JARAK ANTARA
23.5
JARINGAN PIPA
+100.756
KEMIRINGAN DASAR SALURAN
+100.256
0.500
+100.478
0.465
+100.965
0.500
P2
S=0.020
P6 61.6
0
+100.943
31.6
+101.465
MUKA TANAH DALAM GALIAN (H)
P7 61.6
JARAK LANGSUNG
31.6
55.1
JARAK LANGSUNG
JARAK ANTARA
P1
MUKA TANAH
0
+101.860
P12
JARINGAN PIPA
0.500
0.500
+101.360
P13
ELEVASI
+99.000 NO. PATOK
ELEVASI
H : Menyesuaikan Elevasi
POTONGAN MEMANJANG
HORISONTAL 1 : 100
+102.314
1 :100
+101.814
SKALA : VERTIKAL
KEMIRINGAN DASAR SALURAN
S=0.007
DIMENSI SALURAN
S=0.007
DIMENSI SALURAN
IPAL 2
P8
P3 IPAL 2
KETERANGAN : : MT ( Muka Tanah ) : Pipa
P9
SKALA : VERTIKAL
HORISONTAL 1 : 200
+102.500
1 :100
6
POTONGAN MEMANJANG Skala : NTS
+102.000
POTONGAN MEMANJANG Skala : NTS
P9
+104.000 +103.500
+101.000
+103.000
+100.500
+102.500
+100.000
+102.000
+99.500
+101.500
+101.926
+101.469
0.465
0.500
0.500
+100.969
JARINGAN PIPA
KEMIRINGAN DASAR SALURAN
+101.000 +100.500
S=0.007
+100.000
0
+101.426
DALAM GALIAN (H)
25.6
+102.053
MUKA TANAH
58.8
+101.588
JARAK LANGSUNG
P2 25.6
S=0.018
DIMENSI SALURAN
+99.500 +99.000 NO. PATOK
P9
P8
JARAK ANTARA JARAK LANGSUNG MUKA TANAH
66.4 66.4
0
+103.132
P3 23.2
0.500
0.500
JARINGAN PIPA
+102.632
P5
ELEVASI
+99.000 NO. PATOK JARAK ANTARA
ELEVASI
HORISONTAL 1 : 200
+104.500
+101.500
+104.062
1 :100
H : Menyesuaikan Elevasi
H : Menyesuaikan Elevasi
+103.562
3
SKALA : VERTIKAL
KETERANGAN : : MT ( Muka Tanah ) : Pipa
P5
KEMIRINGAN DASAR SALURAN
S=0.014
DIMENSI SALURAN
PROJECT 03: Municipal Wastewater Treatment System KETERANGAN : : MT ( Muka Tanah ) : Pipa
SKALA : VERTIKAL
1 :100
HORISONTAL 1 : 200
H : Menyesuaikan Elevasi
Skala : NTS POTONGAN MEMANJANG
KETERANGAN : : MT ( Muka Tanah ) : Pipa
SKALA : VERTIKAL
1 :100
HORISONTAL 1 : 200
H : Menyesuaikan Elevasi
POTONGAN MEMANJANG Skala : NTS
26 DESIGN OF WASTEWATER SYSTEM 1 The Design of Wastewater System 1 has the site that the angle of its slope is really precipitous. So, we take an action by using cut and fill method to the site. In other hand, we still consider the design to use the measured slope. It would be help to minimize the cut and fill method. Beside, the flow of the wastewater system more easily.
Wastewater System
Flow
Materials
Portfolio 2021: Selected Works by Leny Indah
27 WASTEWATER SYSTEM 2: SLOPING PIPE
IPAL 1 P5 P4
P3
P1
P2
P0
IPAL 1
P19
1
+107.000 +106.500 +106.000 +105.500
P20
+105.000
5
+104.500 +104.000 +103.500 +103.000
+100.500
+102.500
+101.000
+101.500
+103.500
+101.000
+103.000 NO. PATOK
+100.500
P19 37.5
KEMIRINGAN DASAR SALURAN
S=0.025
+102.988
+100.000
0.500
0.500
0.500
0.500
+102.488
0
+99.500
P6
8.6 IPAL 1
+103.988
P7
36.9
S=0.041
S=0.014
S=0.035
37.5
MUKA TANAH
+103.488
+105.022
0.500
+105.780
0.500
JARINGAN PIPA
61.3
P0 8.6
+104.337
MUKA TANAH DALAM GALIAN (H)
P1 28.3
+103.837
+106.280
90.3
+105.522
120.3
JARAK LANGSUNG
P2 24.4
DALAM GALIAN (H)
0
+104.541
P3 29
0.500
0.500
+103.866
P4 30
ELEVASI
P5
JARAK ANTARA
+104.366
JARAK LANGSUNG
+99.000 NO. PATOK
ELEVASI
P20
JARAK ANTARA
+100.000 +99.500
JARINGAN PIPA
P14
KEMIRINGAN DASAR SALURAN
+103.491
+102.000
P13
IPAL 1
S=0.01
DIMENSI SALURAN P12
S=0.347
DIMENSI SALURAN
KETERANGAN : : MT ( Muka Tanah ) : Pipa
KETERANGAN : : MT ( Muka Tanah ) : Pipa
H : Menyesuaikan Elevasi
6
+105.500
SKALA : VERTIKAL
+105.000 +105.500
+105.000
+103.500
JARINGAN PIPA
0.500
+104.000 NO. PATOK
1.093
S=0.040
P11
JARINGAN PIPA
S=0.023IPAL 1
KEMIRINGAN DASAR SALURAN
S=0.007
P8
P17
SKALA : VERTIKAL +105.500 +105.000 +104.500
+102.000 NO. PATOK
+104.000 NO. PATOK
DALAM GALIAN (H)
P18
22.7 22.7
24
0.500
JARINGAN PIPA
KEMIRINGAN DASAR SALURAN
S=0.007
POTONGAN MEMANJANG Skala : NTS
S=0.023
+104.000 NO. PATOK
P9
P8
JARAK ANTARA 0
0.500
JARAK LANGSUNG MUKA TANAH DALAM GALIAN (H)
27.5 27.5
0
0.500
0.500
JARINGAN PIPA
KEMIRINGAN DASAR SALURAN
S=0.012
DIMENSI SALURAN
DIMENSI SALURAN
DIMENSI SALURAN
PROJECT 03: Municipal Wastewater Treatment System KETERANGAN : : MT ( Muka Tanah ) : Pipa
KETERANGAN : : MT ( Muka Tanah ) : Pipa
SKALA : VERTIKAL
1 :100
HORISONTAL 1 : 100
Skala : NTS
KETERANGAN : : MT ( Muka Tanah ) : Pipa
H : Menyesuaikan Elevasi
H : Menyesuaikan Elevasi
H : Menyesuaikan Elevasi
POTONGAN MEMANJANG
SKALA : VERTIKAL
1 :100
SKALA : VERTIKAL
+105.000
+105.214
ELEVASI
MUKA TANAH
KEMIRINGAN DASAR SALURAN
HORISONTAL 1 : 500 +105.500
P10
ELEVASI
JARAK LANGSUNG
+102.804 +103.897
JARINGAN PIPA
P11
JARAK ANTARA
24 0
1 :100
+104.500
+104.967
P17
JARAK ANTARA
MUKA TANAH
+105.533
+105.214 S=0.012
KETERANGAN : : MT ( Muka Tanah ) : Pipa
H : Menyesuaikan Elevasi
+105.033
Skala : NTS
+102.500
JARAK LANGSUNG
ELEVASI
8
POTONGAN MEMANJANG
+103.000
+104.467
HORISONTAL 1 : 400
+103.500
+102.972 +103.172
+104.000
JARINGAN PIPA
KEMIRINGAN DASAR SALURAN
P10
KETERANGAN : : MT ( Muka Tanah ) : Pipa
+105.492
1 :100
0.500
H : Menyesuaikan Elevasi
H : Menyesuaikan Elevasi
+104.992
4
SKALA : VERTIKAL
0
0.500
DIMENSI SALURAN
P18 KETERANGAN : : MT ( Muka Tanah ) : Pipa
DALAM GALIAN (H)
DIMENSI SALURAN
+102.634
S=0.014
DIMENSI SALURAN
0.500
+104.714
S=0.007
P9
P8 27.5
27.5
+104.714
1.053
MUKA TANAH
+105.033
+103.727
1.050
0.500
DALAM GALIAN (H)
JARAK LANGSUNG
+104.467
+103.897
0.570
Skala : NTS
P9
JARAK ANTARA 0
+105.533
KEMIRINGAN DASAR SALURAN
0
+102.844
1.093
+104.361
+104.459
0.500
JARINGAN PIPA
30
+104.541
MUKA TANAH DALAM GALIAN (H)
76
+103.491
+104.959
97.5
MUKA TANAH
P16 30
+104.931
121.5
JARAK LANGSUNG
P17 46
POTONGAN MEMANJANG
+104.992
P19 21.5
ELEVASI
P21 14
+104.000 NO. PATOK
P10 22.7
22.71 : 150 SKALA : VERTIKAL JARAK 1 :100LANGSUNG HORISONTAL
IPAL 1 P22
+105.000 +104.500
JARAK ANTARA
Skala : NTS
+105.500
H : Menyesuaikan Elevasi
P11
ELEVASI
POTONGAN MEMANJANG
+102.500
ELEVASI
+105.000 +104.500
+102.000 NO. PATOK
0.500
S=0.032
KETERANGAN : : MT ( Muka Tanah ) : Pipa
+105.500
+104.000
JARAK ANTARA
0
P10
S=0.084
+104.500
+103.500 HORISONTAL 1 : 500 +103.000
P8
+104.967
7
H : Menyesuaikan Elevasi
+105.000
1 :100
IPAL 1
DIMENSI SALURAN
P17
+105.492
KETERANGAN : : MT ( Muka Tanah ) : Pipa
33.5
+104.435
+105.522
0.500
KEMIRINGAN DASAR SALURAN P19
P12
P11
+105.022
ELEVASI
S=0.019
P22
DALAM GALIAN (H)
DIMENSI SALURAN
P21
P9
33.5
+106.280
MUKA TANAH
+105.043
+106.172
KEMIRINGAN DASAR SALURAN
P13 9
42.5
JARAK LANGSUNG
0.500
P16
P14
JARAK ANTARA
+105.543
+106.672
IPAL 1
0.500
JARINGAN PIPA
+103.000 NO. PATOK
0
+103.935
P6 57.1
DALAM GALIAN (H)
SKALA : VERTIKAL
Skala : NTS
+104.000 P7 57.1
MUKA TANAH
3
H : Menyesuaikan Elevasi
POTONGAN MEMANJANG
HORISONTAL 1 : 200
+104.500
+105.000 +104.500 NO. PATOK JARAK ANTARA JARAK LANGSUNG
ELEVASI
1 :100 +105.500
+105.780
2
HORISONTAL 1 : 500
POTONGAN MEMANJANG Skala : NTS
SKALA : VERTIKAL
1 :100
HORISONTAL 1 : 500
POTONGAN MEMANJANG Skala : NTS
1 :100
HORISONTAL 1 : 500
POTONGAN MEMANJANG Skala : NTS
28 DESIGN OF WASTEWATER SYSTEM 2 The Design of Wastewater System 2 has the site that stated on the flat area. We digged it in as the height of its pool that we designed.
Wastewater System
Flow
Materials
Portfolio 2021: Selected Works by Leny Indah
29 WASTEWATER FILTER METHOD
1. Reservoir Method
PROJECT 03: Municipal Wastewater Treatment System
30
2. Filter Method
Portfolio 2021: Selected Works by Leny Indah
32
Project Assignment and Competition // Research and Execution // Categories: Public Space, Urban Design //
PROJECT 04 PUBLIC SPACE IN KAMPOONG Case Study : Kampoong Sangkrah, Surakarta
Research Project by Leny Indah Valentinus Boris Mega Pratiwi Tiara Annya
A A Sekarsonya Windra Erpan David
Kampoong Sangkrah we chose as a research object because the infrastructure element in its community. It is one of the highest density of a district scale in Surakarta. There is lots of positif activities especially the social interaction on it. Developing public space is going to be an important way to increasing the quality of their life eventhogh they’re living in the suburban area. For more specific research, you can visit bit.ly/ArtikelGEOS
Portfolio 2021: Selected Works by Leny Indah
33
SITE
Kampung Dadapsari RW 03, Kelurahan Sangkrah, Surakarta
DESIGN METHOD Our design method was using participatory design and mapping. We involved their community to discuss about the solution that we would make together. In this case, we play a role as a facilator and the community as their own architect.
MAPPING
FGD 1 FGD 2
FGD
FGD 3
DESIGN
EXECUTE
34
1. MAPPING
We did the mapping methode to find the physical and social elements for their public space in their Kampoong. For the physical elements, we mapped the place that become their public space. For the social elements, we mapped the interaction that they do in a day.
Portfolio 2021: Selected Works by Leny Indah
35
2. FOCUS GROUP DISCUSSION We did FGD to find and determine the public space that we will design and develope it with the community.
FGD 1
For the first stage, we discussed about most potential public space that we may to design ant develop it.
FGD 2
For the second stage, we made the design as a plan to trigger the community to discussed and and find the solution by their version for the public space.
FGD 2 For the last stage, we discuss to decided the material, cost, and the time schedule to execute the public space and the design that had chosen.
PROJECT 04: Public Space in Kampoong
36
3. EXECUTION
Before we did the execution, we learned about the technique and collect the materials that wee need. When we did the execution, we learned about the process and the execution method on that real field. We also learned about the interaction we made, the bonding between us.
Portfolio 2021: Selected Works by Leny Indah
37
4. TRANSFORMATION Before
Design Plan
Execution
5. CONCLUSION Community Participation to design the public space become an important point for this research project. This is the graphic how the interest of the community to participate in this process devided by age group.
PROJECT 04: Public Space in Kampoong
P O R T F O L I O 2 0 2 1 URBAN DESIGN
SELECTED PROJECTS BY LENY INDAH