Skip to main content

Part 1 of Portfolio 2021: Urban Design

Page 1

SELECTED ARCHITECTURAL PROJECTS BY

2 0 2 1 URBAN DESIGN

P O R T F O L I O

LENY INDAH


1 1

content

1

1

2

4-37

content

the projects: // Project 01 : Community Centre as A Crative-Collaborative Space // Project 02 : Amrita Sanctuary // Project 03 : Municipal Wastewater Treatment System (IPAL) // Project 04 : Public Space in Kampoong

1. Content

2


2

2

the projects:

Portfolio 2021: Selected Works by Leny Indah


4 Final Project Assignment // Architectural Cencept // Categories: Public Space, Urban Design //

PROJECT 01 Community Centre as Creative-Collaborative Space Location : Purwokerto, Banyumas, Jawa Tengah

Final Project Assignment by Leny Indah Supervisors: Ofita Purwani, ST, Ph.D Ir. Leny Pramesti, MT.

Community Centre as Creative-Collaborative Space is a space that can be use by the community for supporting their creative activities. The creative people or their communities are also can use special facilities that can support to create some arts or generating the ideas. Some key aspects of this building are the services, spatial layouts and the ambiance of its spaces. As a final project, this concept has a specific research on paper about the interiors. You can visit this journal researh on bit.ly/ArtikelCoWorking Portfolio 2021: Selected Works by Leny Indah


5 Programmatic Activities (User) Programmatic Activities (Space) USER

USER

Public Communities

Creative Communities

Public Activities Creative-Collaborative Special Activities Recreation Apreciation Education

Interaction

Support Activities

Co-Working Sharing

Sharing

Selling

Recreation

Co Working

Interaction

Apresiation

Selling and Bazaar

USER Administrator

Administration Administration Service

Education

Reception

Service

In

Problem and Solution

Creating Creative-Collabortive Space

Programmatic Space

Out

Site

Service

Located in Purwokerto, Banyumas, Jawa Twngah

It located in midtown and has good access for the transport station and public service area.

Introducing creative-collaborative activities into building

Ambience, Accesibility, and Facade

Massing of Building


6

LANDSCAPE

SHAPE TRANSFORMATION

Vehicle sirculation

Bentuk Dasar

out

Walker Sirculation

BUILDING SIRCULATION PATTERN

Vegetation

1st Floor: Radial-Centered

2nd Floor: Linear


u

The site was chosen by identified the land-use and the crowds of the people around. It stated to provide and connect the interaction between people on the settlements, offices and public spaces to create some creative collaborations.

SITEPLAN


8

LAYOUTS 22 20

21 6

19

18 17 16

15

14 13 12 11 1 9

10

8

5 7

6

4

0

2 3

1ST FLOOR 0

Main Entrance

12 Collaboration Area

1 Lobby

13 Mini Library

2 Broadcast Area - Record Room - Radio Room - Digital Content Studio

14 Toilets

3 Mushola 4 Toilets 5 Pingpong Area 6 Free Disccuss Area

15 Side Entrance 16 Gathering Room 17 Toilets 18 Restaurant 19 Cooking Practice Room 20 Lounge

7 Lounge Area

21 Workshop Room

8 Print and Publication Room

22 Private Room

9 Craft Area

23 Seminar Room

10 Exhibiton Area 11 Theatre and Music Room

Portfolio 2021: Selected Works by Leny Indah


9

LAYOUTS 14

14

14

14

15 15 17

18

16 13

17 11

12

12

10

12

9

10

8 6 7

5

6

3

2

1

4

2ND FLOOR 1 Co-working: Walk-in Area 2

Co-working: Individual Rent Area

3 Toilets 4 Mushola 5 Co-working: Online Game Area 6 Co-working: Group Rent Area 7 Co-working: Discussion Room 8 Co-working: Rest Room 9 Dance Practice Room

13 Office Administrator Area

- Reseptions - Guest Room - Manager Room - Administration Room - Meeting Room - Finance Room - Files Room - Toilets - Mushola - Staff Room - Lounge - Pantry

10 Gathering Room 11 Discussion Room 12 Bridges

PROJECT 01: Community Centre as A Creative-Collaborative Space

14 Business Incubator Room 15 Meeting Room 16 Private Call Room 17 Presentation Room 18 Conference Room


10

VENTILATION AND LIGHTING Ventilation

Lighting

Portfolio 2021: Selected Works by Leny Indah


11

ZONING

1st Floor: Appreciate Zone

2nd Floor: Co-Working Zone

1st Floor: Recreation Zone 1st and 2nd Floor: Interaction and Collaboration Zone

1st Floor: Education Zone 2nd Floor: Administration Zone

1st Floor: Sharing Zone

1st Floor: Support Zone PROJECT 01: Community Centre as A Creative-Collaborative Space


12

ACCESIBILITY Accessibility for Formal Zone 1st floor

2nd floor

Accesibility for Ideas Zone 1st floor

2nd floor

Accesibility for Collaboration Zone 1st floor

2nd floor

Portfolio 2021: Selected Works by Leny Indah


13

EXTERIOR AND INTERIOR

Entrance

Collaboration

Group Rent Area PROJECT 01: Community Centre as A Creative-Collaborative Space


14

Playground

Temporary Tent Event

Discussion Area

Main Lobby

Individual Rent Area

Online Game Room Portfolio 2021: Selected Works by Leny Indah


16 Competition // Architectural Concept // Categories: Public Space, Urban Design //

PROJECT 02 Amrita Sanctuary

Location : Lake of Faculty of Agriculture, UNS, Surakarta

Competition Project by Leny Indah Alif Datu Okie Kristina M. Ghalfadi

It is Sansekertan language means Water of Life. Water is a main component from the nature that brings the confortable and zen feeling. The building states on lake of the Agriculture Faculty, so the space is a facility for students. The metaphore of a waterdrop represents about the feeling that happen when the water drops fall. It influences people to take a rest and feel confortable with the sound and the ambience of it. Portfolio 2021: Selected Works by Leny Indah


17

CONCEPT Water

ZEN

REJUVENATION

Green Architecture

Overthinker Student

The user who come to the third floor feels about zen. It shows the empty space and the skylight above.

In this step, the user who came to the 2nd floor will be feel comfort. Within staring the scenery around, the user can walk surounding the balcony.

Amrita Sanctuary

Spirit of Success

REMEMBER

The user who come to this first floor feels about the narrow space. It shows how over think the people and they need to heal. Social Aspect

Education Aspect

Environment Aspect

SHAPE TRANSFORMATION

Waterdrop as a based-shape

PROJECT 02: Amrita Sanctuary

Fit in element based

1st and 2nd floor larged for balcony

Combine the space in the waterdrop-shape and space as the hallway


18

LAYOUTS

SECTIONS

EXTERIORS

Portfolio 2021: Selected Works by Leny Indah


19

MODULS

AERODINAMIC SIRCULATION Easier air sirculation in site

SOUND OF NATURE (WATER) Because of water element in site, it produce the sound of nature (especially water drops those bring the nature ambience of the design)

SKYLIGHT The skylight give a zen ambience for the 3rd floor.

VERTICAL GARDEN The plants that surounding the sanctuary wall as a heat respons and produce the fresh air. HYDROPONIC The hydroponic plant makes the space more productive and it can be used for free. THE GREEN ROOF The Green Roof is the chosen element to create the nature and gree ambience.

PROJECT 02: Amrita Sanctuary

3 LEVEL FLOORS This design has 3 level floors with the different zone.


20

CONSTRUCTION STEPS


22

Professional Project // DED and Execution // Categories: Sanitation and Drainage //

PROJECT 03 Municipal Wastewater Treatment System (IPAL) Project location: Kelurahan Pasir Wetan, Purwokerto

This wastewater treatment system is a development infrastructure program from the govenment from the distric level to make a better habit and treatment of wastewater system in their village. We did this project by participatory planning and build. The government play a role as a facilitator for the people who live in there. This village get the fund for build 2 wastewater treatment systems. Each of it has the capacity for 50 families/houses. So it has 100 families/houses in total.

Portfolio 2021: Selected Works by Leny Indah


23

METHOD

MAPPING

FACILITATOR

COMMUNITIES

In this step, we introduced the program to built two the wastewater treatment systems. We asked to the communities to mapped the families who need the wastewater treatment and determind the site to put this wastewater treatment.

PLANNING

FACILITATOR

COMMUNITIES

In this step, we teach them how to built that treatment systems and we started to determining the volume. In this case we started to make the Design Engineering Drawing, Cost Estimation and Time Schedule. The communities create some division to manage this infrastrusture process.

EXECUTING

FACILITATOR

COMMUNITIES

In this step, we started to built the this. The communities had given their potential workers to built it, and the divisions to manage the report, the material and cost by their own communities.


24

WASTEWATER PATH

Portfolio 2021: Selected Works by Leny Indah


25 WASTEWATER SYSTEM 1: SLOPING PIPE

P11

P10

P0

P2

P6

P8

1

P1

IPAL 2 IPAL 2

P4

P3

+106.500 +106.000 +105.500

4

+105.000 +104.500 +104.000 +103.500

+102.500

+103.000

+102.000

+102.500

+101.500

+102.000

+101.000

+101.500

+100.500

+101.000

+100.000

+100.000

+99.500

+99.500

+99.000 NO. PATOK 16.3

49.4

+100.756

+100.000

0.500

0.500

KEMIRINGAN DASAR SALURAN

S=0.0163

S=0.056

S=0.039

S=0.024

S=0.014

MUKA TANAH DALAM GALIAN (H)

+99.500

+100.256

+101.469 0.500

+100.969

+101.860 0.500

+102.632

0.500

S=0.032

P3 22

22

JARAK LANGSUNG

0

+103.132

23.6

P4

JARAK ANTARA

23.6

73

+105.707

89.3

0.500

+105.207

JARINGAN PIPA

121.6

P0

0.500

+105.559

DALAM GALIAN (H)

32.3

167

P1

+106.059

ELEVASI

MUKA TANAH

45.4

P2

0 P7

0.448

0.500

JARINGAN PIPA

+101.426

21.5 188.5

JARAK LANGSUNG

P6

+102.028

JARAK ANTARA

P8

+101.580

P10

ELEVASI

P11

+101.360

+99.000 NO. PATOK

KEMIRINGAN DASAR SALURAN

DIMENSI SALURAN

+101.926

+100.500

S=0.007 P6

DIMENSI SALURAN

IPAL 2

P1 IPAL 2

KETERANGAN : : MT ( Muka Tanah ) : Pipa

HORISONTAL 1 : 600

2

P12

P13

KETERANGAN : : MT ( Muka Tanah ) : Pipa

H : Menyesuaikan Elevasi

POTONGAN MEMANJANG

5

Skala : NTS

SKALA : VERTIKAL

1 :100

Skala : NTS

+102.500 +102.000 +101.500

+101.500

+101.000

+101.000

+100.500

+100.500

+100.000

+100.000

+99.500

+99.500

+99.000 NO. PATOK

JARAK ANTARA

23.5

JARINGAN PIPA

+100.756

KEMIRINGAN DASAR SALURAN

+100.256

0.500

+100.478

0.465

+100.965

0.500

P2

S=0.020

P6 61.6

0

+100.943

31.6

+101.465

MUKA TANAH DALAM GALIAN (H)

P7 61.6

JARAK LANGSUNG

31.6

55.1

JARAK LANGSUNG

JARAK ANTARA

P1

MUKA TANAH

0

+101.860

P12

JARINGAN PIPA

0.500

0.500

+101.360

P13

ELEVASI

+99.000 NO. PATOK

ELEVASI

H : Menyesuaikan Elevasi

POTONGAN MEMANJANG

HORISONTAL 1 : 100

+102.314

1 :100

+101.814

SKALA : VERTIKAL

KEMIRINGAN DASAR SALURAN

S=0.007

DIMENSI SALURAN

S=0.007

DIMENSI SALURAN

IPAL 2

P8

P3 IPAL 2

KETERANGAN : : MT ( Muka Tanah ) : Pipa

P9

SKALA : VERTIKAL

HORISONTAL 1 : 200

+102.500

1 :100

6

POTONGAN MEMANJANG Skala : NTS

+102.000

POTONGAN MEMANJANG Skala : NTS

P9

+104.000 +103.500

+101.000

+103.000

+100.500

+102.500

+100.000

+102.000

+99.500

+101.500

+101.926

+101.469

0.465

0.500

0.500

+100.969

JARINGAN PIPA

KEMIRINGAN DASAR SALURAN

+101.000 +100.500

S=0.007

+100.000

0

+101.426

DALAM GALIAN (H)

25.6

+102.053

MUKA TANAH

58.8

+101.588

JARAK LANGSUNG

P2 25.6

S=0.018

DIMENSI SALURAN

+99.500 +99.000 NO. PATOK

P9

P8

JARAK ANTARA JARAK LANGSUNG MUKA TANAH

66.4 66.4

0

+103.132

P3 23.2

0.500

0.500

JARINGAN PIPA

+102.632

P5

ELEVASI

+99.000 NO. PATOK JARAK ANTARA

ELEVASI

HORISONTAL 1 : 200

+104.500

+101.500

+104.062

1 :100

H : Menyesuaikan Elevasi

H : Menyesuaikan Elevasi

+103.562

3

SKALA : VERTIKAL

KETERANGAN : : MT ( Muka Tanah ) : Pipa

P5

KEMIRINGAN DASAR SALURAN

S=0.014

DIMENSI SALURAN

PROJECT 03: Municipal Wastewater Treatment System KETERANGAN : : MT ( Muka Tanah ) : Pipa

SKALA : VERTIKAL

1 :100

HORISONTAL 1 : 200

H : Menyesuaikan Elevasi

Skala : NTS POTONGAN MEMANJANG

KETERANGAN : : MT ( Muka Tanah ) : Pipa

SKALA : VERTIKAL

1 :100

HORISONTAL 1 : 200

H : Menyesuaikan Elevasi

POTONGAN MEMANJANG Skala : NTS


26 DESIGN OF WASTEWATER SYSTEM 1 The Design of Wastewater System 1 has the site that the angle of its slope is really precipitous. So, we take an action by using cut and fill method to the site. In other hand, we still consider the design to use the measured slope. It would be help to minimize the cut and fill method. Beside, the flow of the wastewater system more easily.

Wastewater System

Flow

Materials

Portfolio 2021: Selected Works by Leny Indah


27 WASTEWATER SYSTEM 2: SLOPING PIPE

IPAL 1 P5 P4

P3

P1

P2

P0

IPAL 1

P19

1

+107.000 +106.500 +106.000 +105.500

P20

+105.000

5

+104.500 +104.000 +103.500 +103.000

+100.500

+102.500

+101.000

+101.500

+103.500

+101.000

+103.000 NO. PATOK

+100.500

P19 37.5

KEMIRINGAN DASAR SALURAN

S=0.025

+102.988

+100.000

0.500

0.500

0.500

0.500

+102.488

0

+99.500

P6

8.6 IPAL 1

+103.988

P7

36.9

S=0.041

S=0.014

S=0.035

37.5

MUKA TANAH

+103.488

+105.022

0.500

+105.780

0.500

JARINGAN PIPA

61.3

P0 8.6

+104.337

MUKA TANAH DALAM GALIAN (H)

P1 28.3

+103.837

+106.280

90.3

+105.522

120.3

JARAK LANGSUNG

P2 24.4

DALAM GALIAN (H)

0

+104.541

P3 29

0.500

0.500

+103.866

P4 30

ELEVASI

P5

JARAK ANTARA

+104.366

JARAK LANGSUNG

+99.000 NO. PATOK

ELEVASI

P20

JARAK ANTARA

+100.000 +99.500

JARINGAN PIPA

P14

KEMIRINGAN DASAR SALURAN

+103.491

+102.000

P13

IPAL 1

S=0.01

DIMENSI SALURAN P12

S=0.347

DIMENSI SALURAN

KETERANGAN : : MT ( Muka Tanah ) : Pipa

KETERANGAN : : MT ( Muka Tanah ) : Pipa

H : Menyesuaikan Elevasi

6

+105.500

SKALA : VERTIKAL

+105.000 +105.500

+105.000

+103.500

JARINGAN PIPA

0.500

+104.000 NO. PATOK

1.093

S=0.040

P11

JARINGAN PIPA

S=0.023IPAL 1

KEMIRINGAN DASAR SALURAN

S=0.007

P8

P17

SKALA : VERTIKAL +105.500 +105.000 +104.500

+102.000 NO. PATOK

+104.000 NO. PATOK

DALAM GALIAN (H)

P18

22.7 22.7

24

0.500

JARINGAN PIPA

KEMIRINGAN DASAR SALURAN

S=0.007

POTONGAN MEMANJANG Skala : NTS

S=0.023

+104.000 NO. PATOK

P9

P8

JARAK ANTARA 0

0.500

JARAK LANGSUNG MUKA TANAH DALAM GALIAN (H)

27.5 27.5

0

0.500

0.500

JARINGAN PIPA

KEMIRINGAN DASAR SALURAN

S=0.012

DIMENSI SALURAN

DIMENSI SALURAN

DIMENSI SALURAN

PROJECT 03: Municipal Wastewater Treatment System KETERANGAN : : MT ( Muka Tanah ) : Pipa

KETERANGAN : : MT ( Muka Tanah ) : Pipa

SKALA : VERTIKAL

1 :100

HORISONTAL 1 : 100

Skala : NTS

KETERANGAN : : MT ( Muka Tanah ) : Pipa

H : Menyesuaikan Elevasi

H : Menyesuaikan Elevasi

H : Menyesuaikan Elevasi

POTONGAN MEMANJANG

SKALA : VERTIKAL

1 :100

SKALA : VERTIKAL

+105.000

+105.214

ELEVASI

MUKA TANAH

KEMIRINGAN DASAR SALURAN

HORISONTAL 1 : 500 +105.500

P10

ELEVASI

JARAK LANGSUNG

+102.804 +103.897

JARINGAN PIPA

P11

JARAK ANTARA

24 0

1 :100

+104.500

+104.967

P17

JARAK ANTARA

MUKA TANAH

+105.533

+105.214 S=0.012

KETERANGAN : : MT ( Muka Tanah ) : Pipa

H : Menyesuaikan Elevasi

+105.033

Skala : NTS

+102.500

JARAK LANGSUNG

ELEVASI

8

POTONGAN MEMANJANG

+103.000

+104.467

HORISONTAL 1 : 400

+103.500

+102.972 +103.172

+104.000

JARINGAN PIPA

KEMIRINGAN DASAR SALURAN

P10

KETERANGAN : : MT ( Muka Tanah ) : Pipa

+105.492

1 :100

0.500

H : Menyesuaikan Elevasi

H : Menyesuaikan Elevasi

+104.992

4

SKALA : VERTIKAL

0

0.500

DIMENSI SALURAN

P18 KETERANGAN : : MT ( Muka Tanah ) : Pipa

DALAM GALIAN (H)

DIMENSI SALURAN

+102.634

S=0.014

DIMENSI SALURAN

0.500

+104.714

S=0.007

P9

P8 27.5

27.5

+104.714

1.053

MUKA TANAH

+105.033

+103.727

1.050

0.500

DALAM GALIAN (H)

JARAK LANGSUNG

+104.467

+103.897

0.570

Skala : NTS

P9

JARAK ANTARA 0

+105.533

KEMIRINGAN DASAR SALURAN

0

+102.844

1.093

+104.361

+104.459

0.500

JARINGAN PIPA

30

+104.541

MUKA TANAH DALAM GALIAN (H)

76

+103.491

+104.959

97.5

MUKA TANAH

P16 30

+104.931

121.5

JARAK LANGSUNG

P17 46

POTONGAN MEMANJANG

+104.992

P19 21.5

ELEVASI

P21 14

+104.000 NO. PATOK

P10 22.7

22.71 : 150 SKALA : VERTIKAL JARAK 1 :100LANGSUNG HORISONTAL

IPAL 1 P22

+105.000 +104.500

JARAK ANTARA

Skala : NTS

+105.500

H : Menyesuaikan Elevasi

P11

ELEVASI

POTONGAN MEMANJANG

+102.500

ELEVASI

+105.000 +104.500

+102.000 NO. PATOK

0.500

S=0.032

KETERANGAN : : MT ( Muka Tanah ) : Pipa

+105.500

+104.000

JARAK ANTARA

0

P10

S=0.084

+104.500

+103.500 HORISONTAL 1 : 500 +103.000

P8

+104.967

7

H : Menyesuaikan Elevasi

+105.000

1 :100

IPAL 1

DIMENSI SALURAN

P17

+105.492

KETERANGAN : : MT ( Muka Tanah ) : Pipa

33.5

+104.435

+105.522

0.500

KEMIRINGAN DASAR SALURAN P19

P12

P11

+105.022

ELEVASI

S=0.019

P22

DALAM GALIAN (H)

DIMENSI SALURAN

P21

P9

33.5

+106.280

MUKA TANAH

+105.043

+106.172

KEMIRINGAN DASAR SALURAN

P13 9

42.5

JARAK LANGSUNG

0.500

P16

P14

JARAK ANTARA

+105.543

+106.672

IPAL 1

0.500

JARINGAN PIPA

+103.000 NO. PATOK

0

+103.935

P6 57.1

DALAM GALIAN (H)

SKALA : VERTIKAL

Skala : NTS

+104.000 P7 57.1

MUKA TANAH

3

H : Menyesuaikan Elevasi

POTONGAN MEMANJANG

HORISONTAL 1 : 200

+104.500

+105.000 +104.500 NO. PATOK JARAK ANTARA JARAK LANGSUNG

ELEVASI

1 :100 +105.500

+105.780

2

HORISONTAL 1 : 500

POTONGAN MEMANJANG Skala : NTS

SKALA : VERTIKAL

1 :100

HORISONTAL 1 : 500

POTONGAN MEMANJANG Skala : NTS

1 :100

HORISONTAL 1 : 500

POTONGAN MEMANJANG Skala : NTS


28 DESIGN OF WASTEWATER SYSTEM 2 The Design of Wastewater System 2 has the site that stated on the flat area. We digged it in as the height of its pool that we designed.

Wastewater System

Flow

Materials

Portfolio 2021: Selected Works by Leny Indah


29 WASTEWATER FILTER METHOD

1. Reservoir Method

PROJECT 03: Municipal Wastewater Treatment System


30

2. Filter Method

Portfolio 2021: Selected Works by Leny Indah


32

Project Assignment and Competition // Research and Execution // Categories: Public Space, Urban Design //

PROJECT 04 PUBLIC SPACE IN KAMPOONG Case Study : Kampoong Sangkrah, Surakarta

Research Project by Leny Indah Valentinus Boris Mega Pratiwi Tiara Annya

A A Sekarsonya Windra Erpan David

Kampoong Sangkrah we chose as a research object because the infrastructure element in its community. It is one of the highest density of a district scale in Surakarta. There is lots of positif activities especially the social interaction on it. Developing public space is going to be an important way to increasing the quality of their life eventhogh they’re living in the suburban area. For more specific research, you can visit bit.ly/ArtikelGEOS

Portfolio 2021: Selected Works by Leny Indah


33

SITE

Kampung Dadapsari RW 03, Kelurahan Sangkrah, Surakarta

DESIGN METHOD Our design method was using participatory design and mapping. We involved their community to discuss about the solution that we would make together. In this case, we play a role as a facilator and the community as their own architect.

MAPPING

FGD 1 FGD 2

FGD

FGD 3

DESIGN

EXECUTE


34

1. MAPPING

We did the mapping methode to find the physical and social elements for their public space in their Kampoong. For the physical elements, we mapped the place that become their public space. For the social elements, we mapped the interaction that they do in a day.

Portfolio 2021: Selected Works by Leny Indah


35

2. FOCUS GROUP DISCUSSION We did FGD to find and determine the public space that we will design and develope it with the community.

FGD 1

For the first stage, we discussed about most potential public space that we may to design ant develop it.

FGD 2

For the second stage, we made the design as a plan to trigger the community to discussed and and find the solution by their version for the public space.

FGD 2 For the last stage, we discuss to decided the material, cost, and the time schedule to execute the public space and the design that had chosen.

PROJECT 04: Public Space in Kampoong


36

3. EXECUTION

Before we did the execution, we learned about the technique and collect the materials that wee need. When we did the execution, we learned about the process and the execution method on that real field. We also learned about the interaction we made, the bonding between us.

Portfolio 2021: Selected Works by Leny Indah


37

4. TRANSFORMATION Before

Design Plan

Execution

5. CONCLUSION Community Participation to design the public space become an important point for this research project. This is the graphic how the interest of the community to participate in this process devided by age group.

PROJECT 04: Public Space in Kampoong


P O R T F O L I O 2 0 2 1 URBAN DESIGN

SELECTED PROJECTS BY LENY INDAH


Turn static files into dynamic content formats.

Create a flipbook
Part 1 of Portfolio 2021: Urban Design by lenyindah - Issuu