SELECTED ARCHITECTURAL PROJECTS BY
2 0 2 1 BUILDING AND HOUSING
P O R T F O L I O
LENY INDAH
1 1
content
1
1
2
4-36
content
the projects: // Project 01 : Vanilla Warehouse // Project 02 : A+I House // Project 03 : SMA N 01 Bukateja // Project 04 : J House
1. Content
2
2
2
the projects:
Portfolio 2021: Selected Works by Leny Indah
4 Professional Project // Architectural Cencept // Categories: Industrial Building //
PROJECT 01 Vanilla Warehouse Location : Ungaran, Central Java
Team Project: Dhanyianto (Principal) Guntoro (Senior) Leny Indah (Junior)
In this case, we design a warehouse from the herbs and spices company. One of the branch located in Ungaran, Jawa Tengah. The warehouse that we would to design was the vanilla warehouse. One of the company product is the extract of Vanilla. So, in this case, we concern about the steps and the special activities of how to extract the vanillas. Our design would be responsive through the activities.
Portfolio 2021: Selected Works by Leny Indah
5
SPECIAL ACTIVITIES Boil the Vanillas
Sort the Vanillas
Dry the Vanillas
Killing
Sortir
Cleaning Clean the Vanillas
Package the Vanillas
Sun Drying
Packaging
Sweating
Slow Drying
Penirisan vanili
Cool the Vanillas
PROGRAMATIC ACTIVITIES
Warehouse
Office
Worker Zone
The whole activities in this warehouse is about the users that has responsibility to do some job at there.
Killing & Cleansing
WAREHOUSE ACTIVITIES
Sun Drying
Sweating Sorting Worker Zone Slow In and Drying Out
SUPERVISOR ZONE
Workers - Processing the Vanillas - Taking a rest
Office
WORKER ZONE
Supervisors - Laboratorium Research - Supervising the activities - Meeting
Sun Drying Sorting & Sweating
Killing & Cleansing
Worker Zone Slow In and Drying Out
Office
6
7
LAYOUT
14
14
3 11
12
4
13
9
6
2
5
1
Legend: Warehouse Area
Office Area
1 Main Entrance
7 Guest Room
2 Loading Dock
8 Meeting Room
3 Killing and Cleaning Area
9 Staff Room
4 Sorting Area
10 Toilets
5 Sweating Area
11 Private Room (Research)
6 Slow Drying Area
12 Mushola 13 Terrace 14 Changing Room
Project 01: Vanilla Warehouse
7
10
8
8
ROOF
Keterangan
DETAILS
\\DHR-SERVER\Dhr Project\Logo d+hr.jpg
Revisi No
Project
Other concern of the design is about the temperature of this warehouse.
Gudang Indesso Vanili Location
We made some special treatment forIndesso the Ungaran roof. It has some layers to reduce the temperature from the roof. Scale
Cad Reference
Detail 1, 2, 4 Detail 3
1: 30 1:20
Designed Dhanyanto, ST Drawn No Approved Date 31/01/2019
Plot
A4-01
28/09/2021
Portfolio 2021: Selected Works by Leny Indah
9
Exterior Front Face
Exterior Roof
Exterior Back Face
Project 01: Vanilla Warehouse
10
Air Circulation and Natural Lighting Some of the area has a specific standard for the room because it will influence the process and the quality of the product. One of its specific standard is the temperature and the air quality. We designed the facade not just to be the face of its building but it also has a function to reduce and filter the dusts to come in.
FRONT
Tampak De
Ska
FACADE DETAIL
F
B
SECTION 1 E
D
Potongan A Skala 1 : 150
1
B
F
E
D
Tampak Ka
Ska
Portfolio 2021: Selected Works by Leny Indah Potongan B Skala 1 : 150
11
Tampak Depan Skala 1 : 150
AIR CIRCULATION AND NATURAL LIGHTING
Potongan C
Skala 1 : 150
RIGHT-SIDE
Tampak Kanan Skala 1 : 150
SECTION 2
FACADE DETAIL
Potongan D
Skala 1 : 150
The natural light comes from everywhere. We design this buiding to maximalize the natural lighting by using lots of wondows to catch the sunlight.
Project 01: Vanilla Warehouse
12
Sweating and Slow Drying Room
Sorting Area
Office
Portfolio 2021: Selected Works by Leny Indah
Professional Project // DED and Execution // Categories: Housing //
PROJECT 02 A+I HOUSE
Project location: Pandak, Purwokerto
Team Project: Aan Amri Setiawan (Principal) Leny Indah (Project Architect) Sofyan Efendy (Project Supervisor)
This project was the design and we realised it right after the drawing was completed. The project was the renovation for adding some rooms in its backyard. It takes about 33 m2 for two levels. In this project, the client need the service area to complete the room they need in their house.
Portfolio 2021: Selected Works by Leny Indah
15
MASSING
Existing
Renovation
Existing plan
Existing
1st Floor
2nd Floor
Renovation
16
LAYOUT
8
5
6
7
10 4 2 3 9
1
Legend: First Floor
Second Floor
1 Living Room
9 Mini Library
2 Kitchen
10 Laundry
3 Terrace 4 Area Wudhu 5 Mushola 6 Fish Pond 7 Filter Pond 8 Garden
Portfolio 2021: Selected Works by Leny Indah
17
SECTION In this project, I learn about the connection between the spaces, the human scale and the function of its space.
Section 1 (Left)
Section 2 (Right)
MUSHOLA
Section 3 (Front)
Section 4 (Behind)
MINI LIBRARY
18
STAIR 412 mm 412 mm
mm 900
mm 900
82 mm
1 2mm 412 3
12
412 mm
82 mm
4
5 1 2 3 6 11
8
10 9
7
15 14 13
4
16
mm 900
mm 900
1 2
12
3
400 mm
1 2
3
4
10 9
12 7 8 11
15 14 13
4 5 6
10 9
16
1. Terkecu gambar 2. Semua meter. 3. Pada el meter. 4. Tidak d pengga ada dal 5. Direkom pelaksa perenca 6. Kontrak desain, spesifik 7. Khusus metode
17
260 mm
5 6
11
15 14 13
5 6
12 7 11 8 10 9 82 mm 82 mm
Catata Gener
17
8
16
17 15 14 13
16
17
260 mm 400 mm
Keypla Keypla
7
DENAH TANGGA
2200 mm 260 mm 260 mm
1 : 25
DENAH TANGGA
2340 mm 400 mm 400 mm
2200 mm
1 : 25
2340 mm
175 175 175 175175 175175175 175 175 175 175 175 175
TAMPAK ANAK TANGGA
900 mm
Pemilik Owner
350 mm
Perenca Planner
900 mm
Principal Architect
Chief Architect
Architect
Project Manager Skala Scale
125 mm
900 mm 900 mm
125 mm
125 mm
350 mm
900 mm 125 mm
900 mm
900 mm
900 mm
900 mm
350 mm
350 mm
900 mm
900 mm
Proyek Project
Judul gam Drawing ti
PERSPEKTIF TANGGA 1 : 25
PERSPEKTI Pekerjaan
PERSPEKTIF PERSPEKTIF TANGGA 1TANGGA : 25 Job
ANAK TAMPAK TANGGA ANAK TANGGA 1 :TAMPAK 25 1 : 25
2340 mm 2340 mm
900 mm
1 : 25
2200 mm 2200 mm
1 : 25
175 175 175 175175175175175 175 175 175 175 175 175 175
175
175
175
175
175 175
TAMPAK ANAK TANGGA
125 mm
125 mm
125 mm
175
175
125 mm
175
175
175
175
175
175
175
2975 mm
175
175
175
175
2975 mm2975 mm
175
175
175
2975 mm
175
175
175
175
175
175
175
175
175
175
175
1 : 25
175 175 175 175 175
175
DENAH TANGGA DENAH TANGGA
1 : 25
1 : 25
1 : 25
Tanggal Date
The unique one of this project is adding the concrate spiral stair. We were adding this kind of stair to overcome the narrow space. Beside, because of its state, we also made it as a point of interest because it can be seen since the person come in to this house. We made the jagged style bellow the stair and concrete railing so the stair seems like not just an additional stair. We covered it with white paint as same as the main color of its project. Portfolio 2021: Selected Works by Leny Indah
19
SKYLIGHT We made the skylight at the laundry room to gain the sunlight and the weather so the client can manage the loundry without any worry if it’s on a rainy day.
The skylight is using clear glass and the hollow pipe as its structure.
LAUNDRY PROJECT 02: A+I House
SKYLIGHT
20
REUSING
Using square exposed LED lamp to harmonize the main shape of new additional room.
We were re-using the existing windows to another room for pressing the budget as the client asked.
22 Professional Project // Architectural Cencept // Categories: Industrial Building //
PROJECT 03 SMA N 01 Bukateja Location : Bukateja, Purbalingga
Team Project: Aan Amri Setiawan (Principal) Dimas Ario Kusuma (Senior) Leny Indah (Junior)
This project was the project I design for the front building of this school area. So the building I design may to represent about this school. The design was using the Local Government Regulation. The headmaster asked to design it as a lobby, headmaster room, teacher room, and some of classes.
Portfolio 2021: Selected Works by Leny Indah
PROJECT 03: SMA N 01 Bukateja
24
MASSING
STUDENT HALL
SIRCULATION CLASSES
TEACHER’S
LOBBY
ADMINISTRATION AND CURICULLUM
25
LAYOUTS
18 15 17
13
17
17
16
14
16
2nd Floor
12 11
9
8
7
6
5
3
3 4
10
2 1
1st Floor
Legend: First Floor
Second Floor
1 Lobby
13 Hall
2 Teacher Room
14 Ballroom
3 Toilets
15 Discussion Area
4 Administration Room
16 Toilets
5 Document Archieve
17 Classroom
6 Finance Desk
18 Hallway
7 Headmaster Office Room 8 Master Rest Room 9 Curriculum Desk 10 Inventaries Area 11 IT Room 12 Terrace
PROJECT 03: SMA N 01 Bukateja
26
SECTIONS
Front
Back
Left
Right
Portfolio 2021: Selected Works by Leny Indah
27
5120 4700
ORNAMENT DETAIL
1100 1029
1029
2200
1000
1000
TheDETAIL FASAD ORNAMEN (KIRI) SKALA 1 : 100
plester PLESTERANwall FIN. CATwith ABU-ABU GELAP TEBAL 60paint mm finish with
5120
PLESTERAN CETAK printed plester FIN. CAT ABU-ABU MUDA TEBAL 30 mmpaint finish
1100 558
559
2200
DETAIL FASAD ORNAMEN (KANAN) SKALA 1 : 100
Front
Back
150
600 1000
0
1000
28
PERSPECTIVE
Portfolio 2021: Selected Works by Leny Indah
30 Professional Project // DED and Execution // Categories: Housing //
PROJECT 04 J HOUSE
Project location: Berkoh, Purwokerto
Team Project: Dhanyianto (Principal) Guntoro (Senior) Leny Indah (Junior)
This project was the design for the house that the owner asked to design it on his land for about 100 m2 from the total of 827.7 m2. He has a plan to adding the warehouse behind for his own bussiness. In this case, we made a simple house based on his need and cost.
Portfolio 2021: Selected Works by Leny Indah
31
HINTS BY CLIENT
The client asked to make the space 5 m length for the maintanance. The client had been building the warehouse behind for his own bussiness
The client ask ed to plan the drainage as a water treatment for the warehouse and the house. The house stated in front of the warehouse with the space 5 m length between of them.
Main access for the warehouse and the house The Boundary Wall has been builiding for the whole area
Open Space for the house area
PROJECT 04: J House
32
MASSING
Entrance Point of Interest
Entrance
Privat Semi Servis Privat
Open Space
Service
Privat
Zoning
Adding Mass
Penambahan
33
LAYOUTS
5
1. Bedroom 1 2. Bedroom 2 3. Living Room 4. Dining Room 5. Terrace 6. Kitchen 7. Master Bedroom 8. Master Bathroom 9. Bathroom 10. Laundry
PROJECT 04: J House
3
1
9
8
7
6
4
2
34
10
Portfolio 2021: Selected Works by Leny Indah
35
1
2
roof have a surface with the 1 The asimetric angle of 30 degrees following the need of its spaces
wireframes and hollows of its 2 The facade shaped by following the wall. It can be used as vertical garden frames
PROJECT 04: J House
36
DETAILS
3 4 5
Teh rosters block arranged in front of the wall for the facade. Using exposed instant cement for the coloumn. There is lots of plants to make the good ambience of the house
3 5 4 5
5
4 5
Portfolio 2021: Selected Works by Leny Indah
P O R T F O L I O
2 0 2 1 BUILDING AND HOUSING SELECTED PROJECTS BY LENY INDAH