Education Portfolio 2026

Design - Construction Administration - Interior Design - Programming - Master Planning


02

-

PROJECT EXPERIENCE

Bailey Junior High School Arlington ISD| Arlington, TX

PROJECT EXPERIENCE PROJECT TYPE

CONSTRUCTION COST

SIZE

COMPLETED

Addition / Renovation

$24 Million

40,000 SF

2024

Project Features: Arlington ISD engaged LBL in 2018 to perform some much-needed renovations and updates to the aging interior of Bailey Junior High. Those renovations included student restrooms for ADA compliance, a girls’ locker room, electrical and HVAC infrastructure replacements, and library and office renovations. Site improvements included expanding the drop-off lane and visitor parking, refurbishing the staff parking lot, and landscaping improvements to address drainage and curb appeal. Later, the building needed a complete re-roof and the replacement of numerous windows for waterproofing and energy efficiency. Thanks to LBL’s proven track record of timeliness and excellence on the previous Bailey improvements, as well as other AISD projects, the district chose LBL to perform the third phase, a $23 Million addition and renovation that included a 40,000 SF classroom addition with collaboration space, 10,000 SF expansion and renovation of the kitchen and Cafeteria kitchen, a new secure entry and covered drop off-pick up. Building Vestibule

Mechanical Upgrades

Renovation / Addition

Electrical Upgrades

Portables Removal

Plumbing Upgrades

Interior Renovations

Interior System Upgrades

Site Upgrades Exterior Envelope Upgrades Roofing Upgrades

Reference: Jaime Garcia (Now with DISD) | 817-995-6792

Storm Shelter


Project Highlights

03


04

-

PROJECT EXPERIENCE

Louise Wolfe Kahn Elementary Dallas ISD| Dallas, TX

PROJECT EXPERIENCE PROJECT TYPE

CONSTRUCTION COST

SIZE

COMPLETED

Renovation

$6.4 Million

74,000 SF

2024

Project Features: This project includes a complete reroof as well as a remodel of the front entry to add a secure

entry vestibule. Additionally, all interior lighting was replaced with new LED fixtures, and all air handling units were replaced, including the units buried in the central interior of the building. The project also included replacement of chiller and cooling towers, grease trap, and all kitchen waste piping. LBL also conducted additional site work for rain water management to alleviate flooding issues and added an electric marquee to the front.

Building Vestibule

Mechanical Upgrades

Renovation

Electrical Upgrades

Portables Removal

Plumbing Upgrades

Interior Renovations

Interior System Upgrades

Site Upgrades Exterior Envelope Upgrades Roofing Upgrades

Reference: Brent Alfred | 214-938-3208


PROJECT EXPERIENCE

Cesar Chavez Elementary Dallas ISD| Dallas, TX

PROJECT EXPERIENCE

PROJECT TYPE

CONSTRUCTION COST

SIZE

COMPLETED

Renovation

$5.3 Million

104,000 SF

2024

Project Features: This project involves an entryway remodel into a secure vestibule, complete lighting upgrade to

LED, and replacing 95% of the roof with mod. bit roofing material. There is also a replacement of 2 heat pumps, a chiller, a boiler, and several aging RTUs as well as the addition of security cameras and new electronic door access hardware.

Building Vestibule

Mechanical Upgrades

Renovation

Electrical Upgrades

Portables Removal

Plumbing Upgrades

Interior Renovations

Interior System Upgrades

Site Upgrades Exterior Envelope Upgrades Roofing Upgrades

Reference: Brent Alfred | 214-938-3208

05


06

-

PROJECT EXPERIENCE

Benbrook Middle High School Fort Worth ISD| Benbrook, TX

PROJECT EXPERIENCE PROJECT TYPE

CONSTRUCTION COST

SIZE

COMPLETED

Addition / Renovation

$15.5 Million

68,000 SF

2021

Project Features: LBL Architects was selected for a second time to expand Fort Worth ISD's Benbrook Middle High School campus. The 2016 expansion focused on increasing the number of typical and science classrooms. The Benbrook Middle High School expansion of nearly 50,000 SF focused on Fine Arts, Athletics, and CTE. The Fine Arts spaces include a new high school band, orchestra, and choir rooms with practice spaces and art rooms. Athletics expansion components include a New Competition Gym, a Field House, and Locker Rooms for all sports. CTE Spaces include Robotics Makerspace, Teaching Lab, Computer Graphics, and CAD Labs. The project also includes two Tornado Storm Shelters to comply with the 2018 International Building Code and ICC-500. The project also includes parking lot expansions to provide an additional 250 spaces on the campus. .

Building Vestibule

Mechanical Upgrades

Renovation / Addition

Electrical Upgrades

Interior Renovations

Plumbing Upgrades

Site Upgrades

Interior System Upgrades

Exterior Envelope Upgrades Roofing Upgrades

Reference: Russ Pounds (Former PM) | 817-814-2000

Storm Shelter


Project Highlights

07


08

-

PROJECT EXPERIENCE

Throckmorton CISD New School Throckmorton CISD| Throckmorton, TX

PROJECT EXPERIENCE PROJECT TYPE

CONSTRUCTION COST

SIZE

COMPLETED

New Construction

$31 Million

60,000 SF

2024

Project Features: Throckmorton CISD selected LBL Architects to assist with Bond Planning services and then for full architectural and engineering services. Throckmorton posted and passed a $30M bond, taking advantage of increased property value from a local wind farm to update and improve its facilities to attract students to the district and provide new programs to equip students with valuable skills. The wind farms provided nearly 70% of the funds for the project. The proposed 60,000 SF K-12 School building is designed to also support the Montessori teaching method and provides an ICC-500-compliant tornado storm shelter, media center, cafetorium and commercial kitchen, competition gym with a separate lobby with concessions, theater and fine arts spaces, Maker Space and CTE classrooms supporting HVAC technician, drone pilot, nursing, culinary, and STEM programs. The district is experiencing closeout difficulties with the contractor, and the LBL team, including President, Tom McCarty, is assisting district leadership in navigating the conflict.

Building Vestibule

Mechanical Upgrades

New Construction

Electrical Upgrades

Portables Removal

Plumbing Upgrades

Interior Renovations

Interior System Upgrades

Site Upgrades Exterior Envelope Upgrades Roofing Upgrades

Reference: Nick Heupel, Superintendent | 940-849-2411

Storm Shelter


Project Highlights

09


10

-

PROJECT EXPERIENCE

MH Moore Elementary Fort Worth ISD| Fort Worth, TX

PROJECT EXPERIENCE PROJECT TYPE

CONSTRUCTION COST

SIZE

COMPLETED

Addition / Renovation

$3 Million

36,000 SF

2010

Project Features: MH Moore Elementary School was slated for an expansion to provide more primary age classrooms. After visiting the School during the Pre Design Phase we recognized that many of the specialty rooms like Art and Music were simply old classrooms. Additionally the principal informed us that access to the outdoor gymnasium required the crossing of a drainage flume by the children. As a result we designed a “ specialty wing” at the far west of the main school building. This specialty wing also included a linking corridor so children could get to the gym without going outside. This linking corridor also served as a staging location for children as they waited for parents or the bus to pick them up at the new drop off lane.

Renovation / Addition Interior Renovations Exterior Envelope Upgrades Mechanical Upgrades Electrical Upgrades Plumbing Upgrades Interior System Upgrades Reference: Brent Alfred (Now with DISD) |214-938-3208 [] Walter Dansby (Now with Dikita) Reference Letter attached


Project Highlights

11


12


This page intentionally left blank.

13


14

-

PROJECT EXPERIENCE

Miller Elementary Arlington ISD| Arlington, TX

PROJECT EXPERIENCE PROJECT TYPE

CONSTRUCTION COST

SIZE

COMPLETED

Addition / Renovation

$7 Million

20,000 SF

2025

Project Features: The project at Miller Elementary School includes an addition to house a new gymnasium that also serves as an ICC-500 storm shelter. The existing gym will be converted into kindergarten classrooms, and the current K-pod building will be demolished to consolidate students within a secure structure. Campus-wide renovations and replacements include upgrading exterior and interior door hardware for accessibility, renovating toilet rooms, installing generator backup for the kitchen freezer/cooler, replacing ceilings, updating portions of site paving and perimeter fencing, and making various site improvements such as a new marquee sign, flagpoles, landscaping, a dumpster enclosure, and wayfinding signage.

Renovation / Addition

Interior Renovations Mechanical Upgrades Electrical Upgrades Plumbing Upgrades Interior System Upgrades Storm Shelter

Reference: Mike Parkos, Director of Facilities Planning and Construction | 972-837-9459


Project Highlights

15


16

-

PROJECT EXPERIENCE

Daggett Middle School

UNDER CONSTRUCTION

PROJECT EXPERIENCE PROJECT TYPE

CONSTRUCTION COST

SIZE

COMPLETED

Addition / Renovation

Est. $24.5 Million

79,000 SF

2026

Project Features: Originally constructed in 1955, LBL provided services for the historic renovation and addition as part of the FWISD Bond Program. The project required compliance with historic preservation standards and coordination through the approval process. Improvements included campus-wide flooring and ceiling replacements, new doors and hardware, and window replacements to restore the building’s original character. The expansion added a new administrative suite with a relocated entry, a two-story classroom addition with five classrooms and a weight room, and a new connecting stair. The project also incorporated school branding elements, exposed interior brick, and removal of portable buildings to consolidate campus functions within the facility.

Building Vestibule

Renovation / Addition Interior Renovations Site Upgrades Exterior Envelope Upgrades Roofing Upgrades

Mechanical Upgrades Electrical Upgrades Plumbing Upgrades Interior System Upgrades Storm Shelter

Reference: Maddy Sara-Colley - Procedeo | 915- 867– 6222


Project Highlights

17


18

-

PROJECT EXPERIENCE

Swift Elementary School Arlington ISD| Arlington, TX

PROJECT EXPERIENCE PROJECT TYPE

CONSTRUCTION COST

SIZE

COMPLETED

Addition / Renovation

$5.6 Million

20,000 SF

2026

Project Features: Phase 1 focused on the renovation of the former gymnasium into three Pre-K classrooms. The design features open ceilings to create a more spacious and engaging environment. A blue color palette was intentionally selected to create a calming and supportive setting for early learners. Additional improvements included replacing the existing hallway ceiling to enhance continuity and overall aesthetics. Phase 2 is a gym/ tornado storm shelter addition that is currently under construction.

Renovation / Addition

Interior Renovations Mechanical Upgrades Electrical Upgrades Plumbing Upgrades Interior System Upgrades Storm Shelter

Reference: Mike Parkos, Director of Facilities Planning and Construction | 682-867-7603


Project Highlights

19


This page intentionally left blank.

20


Arts and Technology

21


22

-

PROJECT EXPERIENCE Center for Family and Community Engagement (CFACE) TV Studio

PROJECT EXPERIENCE

Arlington ISD| Arlington, TX

PROJECT TYPE

CONSTRUCTION COST

SIZE

COMPLETED

Renovation

$1.1 Million

2,900 SF

2026

Project Features: The Arlington ISD Center for Family and Community Engagement (CFACE), underwent a renovation transforming an existing space into a modern multimedia studio designed for film and communications. Originally constructed as a grocery store, the space required extensive acoustic design to function as a “dead room.” Sound attenuation strategies included full-height sound walls extending to the deck, acoustical wall panels, a dedicated rooftop unit serving only the studio and adjacent hallway, and sound-blocking doors to isolate the space. The studio features a sound room, dressing area, storage, and flexible space designed to accommodate large production sets. Integrated green and blue walls support a variety of filming needs, creating a professionalgrade environment intended for districtwide media production rather than traditional classroom use. Enhancements include secure perimeter fencing, parking lot maintenance, and front office upgrades such as a new reception desk, updated finishes, improved wayfinding, new signage, new carpet and a recessed fire alarm panel. Interior Renovations Mechanical Upgrades Electrical Upgrades Plumbing Upgrades Interior System Upgrades

Reference: Mike Parkos, Director of Facilities Planning and Construction | 682-867-7603


Project Highlights

23


24

-

PROJECT EXPERIENCE

Theatre Arlington Arlington, TX

PROJECT EXPERIENCE PROJECT TYPE

CONSTRUCTION COST

SIZE

COMPLETED

Renovation

$2.5 Million

15,000 SF

2026

Project Features: Theatre Arlington is one of Arlington’s oldest institutions located in the heart of Arlington’s arts district. This project was an extensive renovation, including a remodel of the front entry, lobby, auditorium, stage and dressing rooms. The front entry was enclosed with new architectural features and lighting to bring a fresh and inviting look to the facility. This includes a new canopy, sign and all new storefront. The Lobby has been expanded with all new finishes including a new custom designed artistic feature wall between the lobby and Auditorium as well as a new ticket booth, bar, office and auxiliary audio/visual booth for lobby events. Other improvements include a new air conditioning system throughout, new LED lighting in all renovated systems, the addition of a sprinkler, smoke evacuation and fire alarm systems, as well as a new roof and repainted exterior.

Renovation / Addition Interior Renovations Exterior Envelope Upgrades Mechanical Upgrades Electrical Upgrades Plumbing Upgrades Interior System Upgrades Reference: Steve Morris | 817-261-9628 x 203


Project Highlights

25


This page intentionally left blank.

26


Collegiate Level Design

27


28

-

PROJECT EXPERIENCE

Arlington College and Career High School Arlington ISD | Arlington, TX

PROJECT EXPERIENCE PROJECT TYPE

CONSTRUCTION COST

SIZE

COMPLETED

Renovation

$7.6 Million

35,000 SF

2021

Project Features: ACCHS is closely partnered with Tarrant County College’s Southeast Campus and has been given an entirely new look inside and out. The 35,000 SF building received significant infrastructural improvements, including the complete replacement of the roof, HVAC system, sprinkler system, commercial kitchen, and student toilets, along with upgrades to the data, security, and electrical systems. The site was regraded and paved, receiving new lighting and landscaping. Generous improvements were made to give a more higher education feel, including painting the exterior and adding a generous outdoor covered porch with a wood look soffit, an inviting reception space with a secure vestibule, an ample dining space with decorative lighting, and decorative corridor lighting elements. The existing campus layout was reconfigured to include TCC-compliant science labs, a kinesiology room, computer labs, flexible meeting rooms, a digital media center with breakout rooms, and a large dining area that also serves as an after-hours meeting space. Building Vestibule

Mechanical Upgrades

Renovation

Electrical Upgrades

Interior Renovations

Plumbing Upgrades

Site Upgrades

Interior System Upgrades

Exterior Envelope Upgrades

Storm Shelter

Roofing Upgrades

Reference: Mike Parkos, Director of Facilities Planning and Construction | 682-867-7603


Project Highlights

29


30

-

PROJECT EXPERIENCE

TCU Bailey Hall Texas Christian University | Fort Worth, TX

PROJECT EXPERIENCE PROJECT TYPE

CONSTRUCTION COST

SIZE

COMPLETED

Renovation

$294,000

1,150 SF

2023

Project Features: LBL was tasked with renovating the existing Bailey Hall to open up space taken up by offices and restrictive class spaces. The inside space was demoed and replaced with open, windowed classrooms, new breakout spaces, additional office spaces, and storage areas. The interior was refreshed with TCU colors and branding, and the classroom spaces were designed to accommodate future virtual reality workstations and learning spaces.

Renovation Interior Renovations Mechanical Upgrades Electrical Upgrades Plumbing Upgrades Interior System Upgrades

Reference: Jack Washington | 817-257-4427


Project Highlights

31


32

-

PROJECT EXPERIENCE

TCU PT and Kinesiology Lab Texas Christian University | Fort Worth, TX

PROJECT EXPERIENCE PROJECT TYPE

CONSTRUCTION COST

SIZE

COMPLETED

Renovation

$1.3 Million

5,800 SF

2024

Project Features: This renovation was a complete remodel of an existing building to create a PT lab and Kinesiology lab for TCU. The Kinesiology space has a running track, pressure plates, high speed treadmill, and motion capture cameras for research. The PT space has physical therapy swings and tables with a full kitchen, washer and dryer, and a prop shower. Both spaces contain TCU brand finishes to enhance the appearance and provide a cohesive look with the main campus.

Renovation Interior Renovations Mechanical Upgrades Electrical Upgrades Plumbing Upgrades Interior System Upgrades

Reference: Jack Washington | 817-257-4427


Project Highlights

33


34

-

PROJECT EXPERIENCE

UTA Nancy Baker Golf Clubhouse UT Arlington | Arlington, TX

PROJECT EXPERIENCE PROJECT TYPE

CONSTRUCTION COST

SIZE

COMPLETED

Renovation

$200,000

5,000 SF

2016

Project Features: The University recognized a need to create a golf team club house and training facility. The newly renovated Gilstrap Athletic Complex features three coaches offices that are strategically adjacent to the teams meeting space. The clubhouse also features a large indoor putting green and a state of the art Virtual Golf Swing analyzer to improve players competitive abilities. This space also includes a TV and gaming lounge, and an Academic Advisor suite with a group study are for the team members. Finally, the Clubhouse is branded with a promenade “Maverick” LED backed logo in the ceiling.

Renovation Interior Renovations Mechanical Upgrades Electrical Upgrades Plumbing Upgrades Interior System Upgrades

Reference: John Hall, VP Campus Operations | 817-272-2102


Project Highlights

35


36

-

PROJECT EXPERIENCE

UNT Marquis Hall Historic Renovation University of North Texas | Denton, TX

PROJECT EXPERIENCE PROJECT TYPE

CONSTRUCTION COST

SIZE

COMPLETED

Renovation

$5.1 Million

40,000 SF

2015

Project Features: UNT’s International (UNTI) Department was segregated in several different buildings and this project brought all the Administrative, Academic and Student Support services for UNTI into one building. The building was originally constructed as the first Women’s dorm on campus in 1934 and has historical properties that the University wanted to remain, while converting the building from outdated office spaces and dorm rooms which were converted to classroom spaces. The entire building infrastructure was changed out with this project, which included new air handler in basement, all new chilled waterlines, ductwork, and controls. The building was equipped with fire sprinkler system, new fire alarm system, and emergency generator. The increased load of the building required a new panels, transformer and gas service. Increased energy efficiency of building was accomplished by LED lighting, added spray on roof insulation, and effective building controls. The interior was completely renovated with new terrazzo flooring featuring designs inspired by the building's history.

Renovation Interior Renovations Mechanical Upgrades Electrical Upgrades Plumbing Upgrades Interior System Upgrades

Reference: Neely Shirey, NCIDQ, Sr. Project Manager | 940-369-8264


Project Highlights

37


38

-

PROJECT EXPERIENCE

UTA West Master Plan UT Arlington | Fort Worth, TX

PROJECT EXPERIENCE PROJECT TYPE

CONSTRUCTION COST

SIZE

COMPLETED

Master Plan

N/A

100 Acres

2024

Project Features: Our team has worked closely with University staff to ensure that every aspect of the design aligns with UTA's mission and community needs. The scope of work includes comprehensive site planning, as well as the creation of detailed renderings that bring the vision for UTA West to life. Facilities include multipurpose spaces, living areas, parking structures, pedestrian features, and amenities.

Reference: John Hall, VP Campus Operations | 817-272-2102


39


Listen. Build. Lead 318 W. Main Street, Suite 200

Arlington, TX 76010


Turn static files into dynamic content formats.

Create a flipbook
LBL Architects 2026 Education Projects by lblarchitects - Issuu