Skip to main content

Lawrence Sprague 2021 Portfolio

Page 1

02


03


East Elevation

Morris Adjmi Architects www.ma.com

Santa Clara City Center Related California

North Elevation Concept Design / 25 June 2019

Morris Adjmi Architects www.ma.com

Morris Adjmi Architects www.ma.com

Santa Clara City Center Related California

S B S

West Elevation Concept Design / 25 June 2019

series of cropped elevations The following images are a small selection of the work I have done while employed during my summers as a college student. Most of the work shown is from my last two summers spent at Morris Adjmi Architects, a small renovation job for a family friend’s new kitchen, and the design of a built portable greenhouse. The e levations shown above are an iteration from the design phase of a large housing project that I worked on at Morris Adjmi. Two of the projects are confidential and require cropped images and I cannot disclose the client or location.

CENTENNIAL BOULEVARD

Morris Adjmi A www.ma.com

1 PR-Key Plan

Concept Design / 25 June 2019

South Elevation

1" = 300'-0"

05


y Center

lifornia

I spent most of my time during the summer of 2019 working on a large housing project that is currently confidential. I was on a team that alternated between 2 and 3 architects including me. When I joined the project, it was in early schematic design and I worked on designing and modeling facade designs for both the low rise and the tower in sketches and in Rhino. I did massing organizations in Revit, constructed physical models, assembled material palettes and created images for the client presentations in Photoshop. These are cropped images of the work I would produce quickly as iterative examples for presentations to the clients and principal architect.

BLOCK A RESIDENTIAL

PEDESTRIAN ACCESS

SECOND ST

Blv d

st

Fir

St.

65'-0"

217'-0"

LEVEL 2 EL: 19'-0"

70'-0"

LEVEL 1 EL: 0" +/- 30' MSL

FIRST ST

- Internal drop-off for low-rise and high-rise residential - Drop-off access from Ave B

BLOCK G GLOBAL FOOD MARKET

- Pedestrian access from Centennial & 2nd St

BLOCK H OFFICE

11'-0" 85'-0"

LR LEVEL 3 HT:30'-0"

BLOCK K PARKING

RESI RESI RESI

GARDEN

RESI RESI

GARDEN

GARDEN

AMENITIES

PARKING RETAIL

AMENITIES

POOL

GARDEN

PARKING PARKING

PORTE COCHERE

RESI - LOBBY

PARKING PARKING

RETAIL

BLKD HT:189'-0"

+/- 219' MSL

HR ROOF HT:174'-0"

FIRST ST

135'-8" 174'-0"

55'-0"

PARKING ENTRY

RESI - CORNER BLD

HR LEVEL 3 HT:28'-8" LEVEL 2 EL: 19'-0" MEZZANINE EL: 9'-6"

38'-4" BASE

ial

17 ST

74'-0"

3 ST LANDSCAPED COURTYARD

nn

LOADING ENTRY

BEYOND

LR ROOF HT:85'-0" +/- 115' MSL

19'-0" 11'-0"11'-0"11'-0"11'-0"11'-0"

POOL 30' x 75'

nte

RESIDENTIAL TOWER

RESIDENTIAL TOWER

BLOCK J PARKING

SECOND ST

BLOCK C

PORTE COCHERE

AVENUE B

AMENITIES 6 ST

OPEN TO BELOW

71'-1"

75'-0"

75'-0"

30'-0"30'-0"

70'-11"

72'-5"

BLOCK B EQUINOX HOTEL

GARDEN 38’-4”

LOW RISE 74’-0”

Ce

2ND LANDSCAPED COURTYARD

20'-0"

AMENITIES 54’-0”

CENTENNIAL BOULEVARD

l tia en sid Off Re ropD

PORTE COCHERE BELOW

PEDESTRIAN ACCESS

262'-5"

t

dS 2n

75'-0"

TOWER 174’-0” GARDEN 30’-0”

LOW RISE 85’-0”

19'-0" 9'-8" 9'-8" 9'-8" 9'-8" 9'-8" 9'-8" 9'-8" 9'-8" 9'-8" 9'-8" 9'-8" 9'-8" 9'-8" 9'-8" 9'-8"10'-0"

LOW RISE RESIDENTIAL 7 ST

B

97'-1"

Ave

65'-0"

6 ST

189’-0” LOW RISE 74’-0”

15'-0"

192'-2"

56'-6"

20'-0"

40'-7"

75'-0"

262'-5"

64'-10"

BLOCK D GROCERY

LEVEL 1 EL: 0"

+/- 30' MSL

Section

- 1 residential lobby

Site Plan

- 2 elevator cores - Parking and loading access from Ave B

Morris Adjmi Architects www.ma.com Morris Adjmi Architects www.ma.com

Santa Clara City Center Related California

MASSING OPTIONS - AXONS 05/23/19

06

Santa Clara City Center Block C

Site Plan

Clara, California 06/03/19 MassingSanta Studies - Internal Porte Cochere

Design Progress / 09 August 2019

Morris Adjmi Architects www.ma.com

0

25' 50'

Morris Adjmi Architects www.ma.com

100'

200'

8

FP-02 Santa Clara City Center Related California

Massing Studies - Internal Porte Cochere

Santa Clara City Center Related California Design Progress / 09 August 2019 Santa Clara City Center Block C Santa Clara, California 04/25/19

FP-16

Morris Adjmi Architects www.ma.com

SECTION TOWER

12 1" = 40'-0"

SC-31

View from Centennial Blvd & Second St Design Progress / 09 August 2019


Santa Clara City Center Related California

Scheme B1

Scheme C1

Scheme B2

Scheme C2

Massing Model Studies Design Meeting / 24 May 2019

Santa Clara City Center Related California

10

View from First St & Avenue B Design Progress / 09 August 2019

Morris www.

07


These are some of the maisonette options I provided for another large housing project. I had previously worked on this project in 2018 in a similar design capacity to my wo rk on the previous project, massing and facade design. It was nearing its final CD phase and we had to quickly iterate on this area.

Morris Adjmi Architects www.ma.com

C ies

Morris Adjmi Architects www.ma.com

OPT 1option - CORBELED maisonette ABRICK WITH OPENINGS GPS Parcels B & C New City Properties

1

Design Meeting / 26 July 2019

maisonette option OPT 1 - CORBELED BRICKB WITH OPENINGS GPS Parcels B & C New City Properties

Morris Adjmi Architects www.ma.com

1

Design Meeting / 26 July 2019

Morris Adjmi Architects GPS Parcels B & C OPT 1 - CORBELED BRICK WITH OPENINGS www.ma.com New City Properties

OPT 3 - THIN BRICK COLUMNSC AND CORBELED maisonette option GPS Parcels B & C New City Properties

3

Design Meeting / 26 July 2019

OPT 1 - CORBELED BRICK WITH OPENINGS Design Meeting / 26 July 2019

1

Design Meeting / 26 July 2019

Morris Adjmi Architects www.ma.com

GPS Parcels B & C New City Properties

OPT 1 - CORBELED BRICK WITH OPENINGS Design Meeting / 26 July 2019

Morris Adjmi Architects www.ma.com

maisonette option D Morris Adjmi Architects www.ma.com

08

GPS Parcels B & C New City Properties

other Design Meeting / 26 July 2019

GPS Parcels B & C New City Properties

other

maisonette options E&G Design Meeting / 26 July 2019

5


NORTH TOWER

3A

3D

3C

3B

3E

RENTAL UNIT 3L

3B

3A

3C

3D

3K

3J

3F

3G

3H

3E

RENTAL UNIT 3L

3K

3J

3G

3H

3F

SOUTH TOWER

25'

50'

NOTES:

100'

  THIS FLOOR PLAN IS BASED ON CONSTRUCTION DRAWINGS AND IS SUBJECT TO NORMAL CONSTRUCTION VARIANCES AND TOLERANCES. ALL DIMENSIONS SHOWN, IF ANY, ARE APPROXIMATE AND SUBJECT TO NORMAL CONSTRUCTION VARIANCES AND TOLERANCES. PLANS AND DIMENSIONS MAY CONTAIN MINOR  VARIATIONS FROM FLOOR TO FLOOR. SQUARE FOOTAGE SHOWN, IF ANY, EXCEEDS THE USABLE FLOOR  AREA. THE COMPLETE OFFERING TERMS ARE IN AN OFFERING PLAN AVAILABLE FROM SPONSOR. MINOR  INACCURACIES IN SQUARE FOOTAGE AND INACCURACIES IN LAYOUT AND ROOM DIMENSIONS, TO THE  EXTENT SHOWN ON THIS FLOOR PLAN, WILL NOT EXCUSE A PURCHASER FROM COMPLETING THE PURCHASE OF A UNIT WITHOUT ABATEMENT IN PRICE OR RECOURSE AGAINST SPONSOR. SPONSOR RESERVES THE RIGHT TO MAKE CHANGES IN ACCORDANCE WITH THE OFFERING PLAN.

3RD FLOOR PLAN

85 Jay Street 85 Jay St Brooklyn, NY 11201

03/01/18















  













 



















  

 



 

 













  



 













 



  





 

  









0'







I spe nt a large  amount of time working on the Revit plans for this project titled 85       Jay St. located in New York, in 2018 especially. I would update redlined drawings and create new  sheets of details. In 2019 I helped update the drawings while Santa     Clara was on hold. 

09


This project was a wonderful opportunity thanks to Claudia Baez. Her daughter bought a new apartment in Brooklyn and the architect they had supervising the renovations wasn’t up to their standards so she asked me to take a look at the house and hired me to renovate the kitchen. I had conversations with her and her daughter over a couple of weeks and these were some of the final drawings I provided to them. While I was away at school, we continued an email chain about materials and found some lovely options for the new kitchen.

010


011


The Baum Greenhouse or the Portable Greenhouse is a gem of a project made in conjunction with artist, sculptor, and carpenter Jeb ah Baum. The project is the product of the simple desire to have a portable greenhouse to grow all sorts of foods and plants within. The resources were simple an iron frame with wheels attached, a collection of old windows of varying size, and lots of time and wood from Jebah’s shop in Gardiner, New York. In two short weeks, the greenhouse was designed, built, and full of seeds that quickly begun to sprout.

012


013


group project with: Jul i a Ocejo

exterior render

“Kindred Homes” is made up of spaces designed to suggest communal interactions and extraordinary amounts of sharing through its attention to raising the next generation to be more comfortable being open and informed. The project fosters a childhood full of sharing and interaction, as well as an opportunity for parents to re-think their priorities and allocations of energies. It pushes adults to reconnect with their youthful hearts and co-live in a home with a diverse selection of families.

015


016


017


Team:

Ty l er Va l g ora D y l a n C re an L i n d s ey Brow n

exterior render

For this competition I assembled a team of my colleagues from Syracuse University who I had past experience working alongside, and during the quarantine we experienced our first competition. It was a difficult transition, not only becuase we were learning how to work collaboratively on a non-academic project, but a lso because the pandemic had just hit and we had to learn how to design effectively thorugh zoom meetings.

019


A treehouse that lets you spin walls, step into the treetops, bring the forest into your room, and make your imagination run wild. The secret game of movable walls, shifting planes, and climbing ladders make your home into a game of exploration and mystery. Subdividing a cylinder into a series of connected modular rooms allows walls to move as radii or along the track circumference revealing a space to the outdoors with unhindered access or complete closure from unfriendly elements. The shifting walls allow various residents to continuously redefine their experience by editing their space. Even adults can become a child again as they spin a pirate wheel to reveal a drawbridge entrance ascending from a wall floating above. The ground module allows you to not only climb up a tree but also inside it. The tree trunk is replaced by a morphic sauna that allows you to relax at the base pool of roots or stretch to the sun in the highest branches of the canopy.

020


021


group project with Dylan Crean

sectional axonometric

Our main studio project while studying in Florence was the renovation of an old prison, Le Murate, into a library, organized through ritual. We made simple alterations to the existing building but we were largely focused on creating a new method for learning architecture through the ritual of collaboration. The ritual we designed is comprised by the separat ion of what we understand to be the 4 fundamental principles of architecture and pushing the scholars and students to study one subject through books and learn the others through discourse. The final discussion between all 4 categories occurs in the center of the public stair, for all to witness.

023


f u nct i o n t he o r y

f u n ct i o n

fu n c t i on re a l i t y

a rc h i t e c t u re

fo r m re ali t y

fo r m

form t h e ory

no t hi n g

ritual program plan diagram Our fundamental principles of Architecture: form reality the realization of formal design throu gh material. form theory an exploration fo formal architecture, its creation and impact. funciton reality study of engineering and building practicalities and essential elements function theory understanding timeless building strategies and theories

024


ritual sequence isometric diagram

section series

1 /8 ” - 1 ’

plan series

1 /8 ” - 1 ’

025


diagrammatic axonometric

For this second-year project, we were tasked with developing a design that covers a large swath of land directly off of Newtown Creek in Queens, New York. It was the largest site we had worked with yet and my solution for occupying 80% of the unprogrammed space was to create a series of formal variations upon the simple wood plank surface. Each component of the project was meant to engage with the expansive wood deck through varying levels and slopes in a way that stimulated a scalable space for the public.

027


physical model 1 : 25 0

main wall section

1/8 ” - 1’

central complex plan

1 /8 ” - 1 ’

full complex section

1 /1 6” - 1 ’

The designated program was to cover 20% of the site with all the needed components of a rock-climbing gym. I pushed this assignment one step further by making the e ntire site climbable. Keeping a continuous material as both the ground plane as well as the walls and roofs of the complex was meant to encourage the public to keep exploring and climbing even when they are not inside the gym.

028


exterior deck render

interior climbing wall render

029


graphic axonometric

The design of this project derives from the strategy used in “Carving Curves”, smooth, curving forms puncturing boxed spaces. However, for this site, the strategy was rotated 90 degrees. This simple move forced me to reconsider the design in exciting ways. The boxes then become the main programmatic spaces while the curves were meant for structure, circulation, and visual connections. The project also explores blackboard paint as a public magnet and graffiti alternative.

031


long section

1 /8 ” - 1 ’

physical models

032


ground floor plan

1 /8 ” - 1 ’

graphic narrative

033


group project with: Ty l er Va l g or a Kyle Ne uman E lise Z ilius D y l a n C rea n Lindsey Brown

section persepctive

My semester abroad in London largely revolved around the work of O.M.A., and this project is a creative architectural exploration of the potential of their Netherlands Architect ure Institute proposal in 1988. The project had simple and diagrammatic intentions, the black prism of the archive. We pushed this further and extruded this tilted black volume deep into the earth, exploring the true size and methods for archiving architecture.

035


“If Rem had your nerve, he would have won the competition.” Pe t e r W i l s on , Re m Ko o l ha a s’ TA Th e fi rs t com m e n t of ou r f i n a l c ri ti que

036


physical model 1/ 50 m - 1 ’m

above ground narrative plan

1 /8 ” - 1 ’

037


group project with Tyler Valgora

sectional axonometric

This third-year project was a housing development for the formerly homeless in New York City. Our approach to the project brief was to design a building that fostered community, safety, and a feeling of belonging in a city and society that has shunned them. We developed a form that emphasized community through visual connections, creating many connected balconies and valleys through which people can see their neighbors and feel like they are a part of a ne w rehabilitating ecosystem.

039


EXPLODED ISOMETRIC DIAGRAMS

INITIAL MASSING

We wanted at least 3 or 4 distinct mounds for housing. Having this many mounds would create MORE THAN 1 shared communal valley for gardening and other common park uses.

For our inital massing we used the FAN ORGANIZATION of the affordable housing in the immediate vicintiy to carve out the shared spaces we wanted to create for the project. The angles pinch together towards the side of the bike path and fan out from each other as they work their way towards the street. Imitating the formation of the buildings behind the project allows for an immediate contextual association.

SMOOTH EDGES

Once the mountain was created with the proper valley and mound conditions, we CONTOURED the object at 5 feet.

STEPPED LEVELS

Next, we took that inital massing and smoothed out the blocks, runed the blocky forms into an ORGANIC MOUNTAIN. This step created an entirely unique geometry that we could never have created by hand, the natural flow of the surface was very exciting. It was an intersting combination of computer generated yet organic.

Those contours then created a stacked condition of many levels at increments of 5 feet. We countoured at this increment because we wanted to keep the DETAIL and smooth surface of the original mountain. Stepping at this smaller scale allowed for an exterior at a closer to human scale.

RESOLVED FORM 1

RESOLVED FORM 2

From our initial massing we needed to resolve and reform our geometry to allow for more control over the design. We knew we wanted to keep the mini and major valleys and the three seperate peaks. Our initial design tests were all very short similar to our first design.

We kept the 4 foot stepping geometry because that strategy provedto create and excitign and engaging exterior.

This massing was the first iteration of our final form. The form undulates much more on the exterior and wraps and punctures into the solid walls of the buildng. The edges also dramatically simplify and straighten along longer axis to improve indoor spaces.

RESOLVED FORM 3

The major change in the form at this point was the introduction of 8 foot leveling on the valley walls. This change was to offer agreater occupiable shared balcony among each level, while each tenant has their own balcony. The 4 foot step is less prominent but still pulls away out of the larger walls to break down the scale in intimate moments.

Set of stairs along the back stepped platforms of the structure offers a quick route to connect all of the exterior platforms

CIRCULATION SYSTEM Another series of stairs snake along the open/ semi-public platforms on the West side of the building.

Three main elevator cores with stairs spiraling around them provide the main circulation routes for each tower.

STRUCTURAL SYSTEM A steel structure with concrete slabs formed ontop of corrogated steel make up the majority of the structure.

Large overhanging spaces along the street sides and a series of stepped platform hanging over the subground sspace are the main tructural difficulties of the project.

040

EIGHTH FLOOR


base unit plans

1/4 ” - 1’

N

THIRD FLOOR PLAN 1/8” - 1’

N

FOURTH FLOOR PLAN 1/8” - 1’

N

FIFTH FLOOR PLAN 1/8” - 1’

N

SIXTH FLOOR PLAN 1/8” - 1’

upper floor plans

1 /8 ” - 1 ’

ground floor plan

1 /8 ” - 1 ’

041


Level 8 +96’ -0”

Level 7 +84’ -0”

Level 6 +72’ -0”

Level 5 +60’ -0”

Level 4 +48’ -0”

Level 3 +36’ -0”

Level 2 +24’ -0”

Level 1 +12’ -0”

NW elevation

1 /8 ” - 1 ’

042


NE ELEVATIO

Level 8 +96’ -0”

Level 7 +84’ -0”

Level 6 +72’ -0”

Level 5 +60’ -0”

Level 4 +48’ -0”

Level 3 +36’ -0”

Level 2 +24’ -0”

Level 1 +12’ -0”

NE elevation

1 /8 ” - 1 ’

section facing north

1 /8 ” - 1 ’

043


044


Turn static files into dynamic content formats.

Create a flipbook
Lawrence Sprague 2021 Portfolio by Lawrence Sprague - Issuu