Lane Cove Bicycle Plan 2026 September 2026
Document Control Title: Lane Cove Bicycle Plan 2026
Date of Publication: September 2026 Publisher: Lane Cove Council
Created: Institute for Sensible Transport
Version: This publication is for public exhibition © Lane Cove Council 2026 All rights reserved. Except as permitted under the Copyright Act 1968 (Cth), no part of this publication may be reproduced or transmitted in any form or by any means, electronic or mechanical, photocopying, recording or otherwise, without the prior permission of the publisher and copyright owner. All images are used with photographers kind permission.
The Institute for Sensible Transport acknowledges the people of the Wurundjeri Woi Wurrung language group of the eastern Kulin Nation on whose unceded lands we work. We respectfully acknowledge their Ancestors and Elders, past and present. We also acknowledge the Traditional Custodians and their Ancestors of the lands and waters across Australia where we conduct our business.
Any person who infringes the above in relation to this publication may be liable to criminal prosecution and civil claims for damages.
Acknowledgement of Country In the spirit of reconciliation Lane Cove Council acknowledges the Traditional Custodians of the Land, the Cameraygal people. We pay our respects to Elders past and present and extend that respect to all Aboriginal and Torres Strait Islander peoples today. 2
Institute for Sustainable Transport
Institute for Sensible Transport
ABN 74 678 316 875 202/26 Rokeby Street, Collingwood Melbourne, Australia VIC 3066 E: info@sensibletransport.org.au www.sensibletransport.org.au
Contents Executive Summary
6
Glossary
9
1.
Introduction 1.1 What the Bicycle Plan covers 1.2 Benefits of cycling 1.3 Developing the Bicycle Plan 1.4 Major challenges and key actions
11 12 12 13 13
2.
Strategic context 2.1 Local context 2.2 State context
15 16 17
3.
Vision, guiding pinciples and strategic objectives 3.1 Vision 3.2 Guiding Principles 3.3 Strategic Objectives
20 21 22 22
Community and stakeholder consultation 4.1 Summary of engagement activites 4.2 What we heard – barriers 4.3 What we heard – opportunities
23 24 25 27
How we move now, and in the future 5.1 How we get around now – all trip purposes 5.2 How we travel to work 5.3 Lane Cove’s exisiting cycling network 5.4 Where the potential for cycling is highest 5.5 Mode share targets 5.6 Forecast growth in cycling trips
28 29 30 31 35 36 36
4.
5.
6.
Connected network 6.1 Bicycle routes 6.2 Proposed infrastructure
37 38 41
7.
Prioritisation and Implementation Plan 7.1 Prioritisation of infrastructure actions 7.2 Funding the Bicycle Plan
49 50 53
8.
Policy and behaviour change
55
9.
Cost benefit analysis 9.1 Travel activity in Lane Cove 9.2 Modelling cycle mode share 9.3 Projecting cycling activity 9.4 Estimating costs and benefits
64 65 65 66 66
10. Monitoring and evaluation
68
Appendices
70
Appendix A: Bicycle Use Propensity Index
71
Appendix B: Road network classifications
72
Appendix C: Cycleway design toolkit
73
Appendix D: Crossings and intersections
81
Appendix E: Circulation Plan
83
Appendix F: Site audit
84
Appendix G: Cross sections
85
Lane Cove Council Bicycle Plan | 2026
3
Contents List of figures Figure 1 Benefits of riding a bike in Lane Cove Figure 2 Developing the Bicycle Plan – key stages Figure 3 The four types of bicycle riders Figure 4 Major challenges and key actions Figure 5 Position of the Bicycle Plan within the IP&R framework Figure 6 State Government policy framework Figure 7 Sydney Strategic Cycling Corridors Figure 8 Cycling treatments and level of comfort Figure 9 Vision, principles, objectives and actions Figure 10 Guiding principles Figure 11 Workshop activities Figure 12 Workshop activities Figure 13 The key community barriers to cycling Figure 14 Online mapping submissions Figure 15 Would you like to ride more? Figure 16 Key engagement opportunities – a summary Figure 17 Mode share of all trips by all purposes by Lane Cove residents Figure 18 Journey to work mode share, Lane Cove and Greater Sydney Figure 19 Mode share for work trips under 5 km Figure 20 Existing cycling network Figure 21 Variables for Bike Use Propensity Index Figure 22 Bicycle Use Propensity Index Figure 23 Mode share targets for cycling Figure 24 Estimated cycling trips per day
4
Institute for Sustainable Transport
12 13 13 14 16 17 18 19 21 22 24 25 26 26 27 27 29 30 31 34 35 35 36 36
Figure 25 Proposed bicycle routes Figure 26 Types of cycling infrastructure Figure 27 Proposed bicycle network infrastructure typologies Figure 28 Longueville Road concept design Figure 29 River Road concept design – cross-section Figure 30 River Road concept design Figure 31 Burns Bay Road concept design Figure 32 Burns Bay Road concept design – cross-section Figure 33 Penrose Street and Burns Bay Road intersection concept design Figure 34 St Leonards proposed network Figure 35 Variables in multi-criteria prioritisation framework Figure 36 Delivery phases of the Lane Cove Bicycle Plan Figure 37 Projected daily cycle trips 2026 to 2036 Figure 38 Bicycle Use Propensity Index – Origin Figure 39 Bicycle Use Propensity Index – Destination Figure 40 NSW Road Network Categorisation Figure 41 Cycling network design principles Figure 42 Bourke Street Cycleway Figure 43 Moore Park Road cycleway Figure 44 Shared path line marking guidance Figure 45 Design principles for managing bus stops on shared paths Figure 46 Traffic calming treatments options Figure 47 Concept design for quietway treatments Figure 48 Priority path crossing example
40 41 42 43 44 44 45 46 46 48 50 52 66 71 71 72 73 75 75 77 78 79 80 81
Contents Figure 49 Priority path crossing guidance Figure 50 Potential crossings and intersection upgrades Figure 51 Concept circulation plan Figure 52 Site audit observations Figure 53 Cross – sections key Figure 54 Orion Road – cross-section Figure 55 Cullen Street – cross-section Figure 56 Barwon Road – cross-section Figure 57 Hallam Avenue – cross-section Figure 58 Wood Street – cross-section Figure 59 Burns Bay Road – cross-section Figure 60 Riverview Street – cross-section Figure 61 Pengilly Street – cross-section Figure 62 Kenneth Street – cross-section Figure 63 Stuart Street – cross-section Figure 64 Northwood Road – cross-section Figure 65 Greenwich Road (north) – cross-section Figure 66 Gore Street – cross-section Figure 67 Carlotta Street – cross-section Figure 68 Greenwich Road (central) – cross-section Figure 69 Chisholm Street – cross-section Figure 70 Greenwich Road (south) – cross-section Figure 71 St Lawrence Street – cross-section
81 82 83 84 85 86 86 86 86 87 87 87 87 88 88 88 88 89 89 89 89 90 90
Figure 72 Longueville Road (central) – cross-section Figure 73 Dorritt Street – cross-section Figure 74 Phoenix Street (south) – cross-section Figure 75 Landers Road – cross-section Figure 76 Burley Street – cross-section Figure 77 Helen Street – cross-section
90 90 91 91 91 91
List of tables Table 1 Existing cycling network by infrastructure type Table 2 Bicycle riding network routes Table 3 Network implementation across phases Table 4 Prioritisation of routes Table 5 Policy and behaviour change actions Table 6 Mode share assumptions from HTS Table 7 Estimated bicycle network construction costs (2024 AUD) Table 8 Lane Cove Bicycle Plan Cost Benefit Analysis Table 9 Sensitivity CBA based on different infrastructure costings Table 10 Data required to measure progress Table 11 Cost estimates for cycling infrastructure by complexity level Table 12 Shared path widths Table 13 Separated path widths (two-way paths) Table 14 Cost rates for intersections and crossings
32 39 50 51 57 65 66 67 67 69 74 76 76 82
Lane Cove Council Bicycle Plan | 2026
5
Executive Summary
6
Institute for Sustainable Transport
Executive Summary This Bicycle Plan provides a blueprint for the next 10 years to give the Lane Cove community safe, comfortable and connected options to ride.
How we get around now and targets for the future
Vision
The implementation of the actions included in this Bicycle Plan is expected to result in a 2.4-fold growth in riding, to 2.4% in 2036, as highlighted in the graph below. With the network established and embedded, mode share is expected to continue to grow beyond 2036, reaching approximately 2.6% by 2041 as travel behaviours normalise and the benefits of a connected network are realised.
Lane Cove has a connected, sustainable transport network that supports and encourages safe cycling as an attractive choice for short to medium distance trips.
What we heard This Bicycle Plan has been developed with the community and professional stakeholders. We engaged Lane Cove residents, local businesses, neighbouring councils, and other relevant professional stakeholders. The major themes we heard are captured in the figure below.
Riding levels have remained low in Lane Cove for the last two decades, despite a range of local and State Government commitments to boost participation. Around 1% of trips are currently made by bike.
The implementation of the actions included in this Bicycle Plan are expected to result in a 2.4-fold increase in riding to 2.4% of trips by 2036. 3.0%
More protected / seperated bicycle infrastructure on major roads (e.g. River Road, Burns Bay Road, Centennial Avenue)
2.5%
More safe priority crossing opportunities on major transport infrastructure
1.5%
Safer speed limits on residential and commercial streets
0.5%
Behaviour change and education programs to encourage safe use of roads by all users Connect existing and future infrastructure up and with adjoining LGSs Key opportunities from stakeholders to improve cycling opportunities Source: Institute for Sensible Transport
2.0% 1.0% 0.0%
2.6%
2.4% 1.6% 1.0% 1.0%
2026
1.0%
2031
1.0%
2036
1.0%
2041
n Bicycle mode share – Business as usual n Bicycle mode share – Network development Cycling mode stars – Business as usual vs connected network Source: Institute for Sensible Transport Lane Cove Council Bicycle Plan | 2026
7
The connected network The proposed Lane Cove bicycle network is shown in the map to the right. The network is split into three route types: • Regional routes • Local routes • Neighbourhood routes. Each route type plays a specific function in the network, with further detail on the composition of each provided in Section 6. The proposed network has been developed through input from site assessments, stakeholder consultation, and the goal of giving every member of the community the freedom to choose riding as a safe and convenient option.
The goal is to give every member of the community the freedom to choose riding as a safe and convenient option.
Connected network Source: Institute for Sensible Transport
8
Institute for Sustainable Transport
Glossary
Lane Cove Council Bicycle Plan | 2026
9
Glossary Active transport: Any form of land transport that requires some form of human propulsion; principally walking, wheeling and riding.
Priority crossing: A priority crossing is a designated pedestrian or cyclist crossing where vehicles are required to stop and yield to users.
All ages and abilities: The users that cycling infrastructure needs to serve including all people, all types of bicycles and other devices and types of trip purposes.
Riding: The act of using a bicycle or micromobility device such as an e-bike, scooter, cargo bike or trike to move from one place to another.
Bicycle: A small vehicle with one or more wheels that is built to be propelled by human power through a belt, chain or gears, which can include unicycles and tricycles/trikes.
Shared path: A path that people either walking or riding can use, which is typically wider than a normal footpath.
Bicycle lane: A dedicated lane for bicycles, which can either be separated or not separated from vehicle traffic. Cycling: Moving from one place to another on a bike. This term is not often used as riding captures a greater diversity of users and trips. E-bike: A bike with an electric-powered motor, which primarily relies on human pedalling power, with the electric motor providing supplementary assistance. Car dooring: A type of crash where a person in a vehicle opens a door into the path of a rider. Micromobility: Refers to small, lightweight devices that are either human or electric powered, such as bicycles, scooters, skateboards, mobility scooters. Modal filter: An infrastructure treatment (sometimes called a point closure) that restricts through-access for motor vehicles while allowing continued permeability for active transport modes. Mode: Refers to the way in which people or goods are transported. For people, this is typically walking, riding, public transport or private vehicle.
10
Institute for Sustainable Transport
Shared Space: On road facility type – very low speed street (10 km/h) shared between pedestrians, bicycle riders and motor vehicle drivers. Safe intersection: An intersection design that prioritises the safety of people walking and riding by reducing vehicle speeds, minimizing conflict points, and providing physical separation or signal priority. Traffic calming: Road design techniques that improve safety for people cycling, micromobility and pedestrians by reducing traffic volumes and/or encouraging slower motor vehicle speeds. Toucan crossing: A toucan crossing is a light-controlled, pedestrian and cyclist crossing designed to allow both modes to cross simultaneously. Wayfinding: Signage and information that assists users to navigate to their destination. Can be both fixed infrastructure and digital. Wheeling: Moving from one place to another using a wheelchair, a scooter, skateboard, roller blades or pushing a pram. Quietway: On road facility type - safe speed traffic environment shared with motor vehicles.
Section 1: Introduction
Lane Cove Council Bicycle Plan | 2026 11
Section 1: Introduction Riding a bike is a healthy, affordable and climate-friendly mode of transport. Lane Cove Council recognises that more must be done to make riding a safe and attractive choice. As Lane Cove’s population continues to grow and the need to reduce emissions becomes more urgent, making cycling available to all becomes more important than ever. 1.1 What the Bicycle Plan covers The Lane Cove Bicycle Plan details Council’s plan to provide more sustainable transport options. It covers upgrades to infrastructure such as shared paths and bicycle paths, as well as policy changes, education programs and promotional activities. It seeks to remove barriers and create an environment where active transport is a safe, convenient and enjoyable choice for people making local trips.
1.2 Benefits of cycling There are a number of well recognised benefits associated with greater bike riding participation in Lane Cove. These have been illustrated in Figure 1. Council declared a Climate Emergency in 2019 which included a target of an 80% reduction in emissions by 2036 (based on the 2016/17 baseline). In the community, electricity is the largest contributor of the community’s emissions, averaging nearly 70%. Transport from both resident travel and workers is the second largest emissions source, averaging about 23%.
Transport is the fastest growing source of emissions and is expected to be the single largest source by 2030.
12
Institute for Sustainable Transport
Figure 1: Benefits of cycling in Lane Cove
1.3 Developing the Bicycle Plan
1.4 Major challenges and key actions
The Lane Cove Bicycle Plan has been a team effort. It has been developed through a multi-stage process that involved engagement with Councillors, direct conversations with locals and visitors to Lane Cove, bicycle planning experts and online community engagement via survey and workshops. Figure 2 below provides a summary of the key stages in developing the Bicycle Plan.
Through the development of this Bicycle Plan, a number of important challenges were identified that limit more people from choosing to ride as part of their everyday travel. These challenges include gaps in the network, safety concerns, connectivity to key destinations, and the overall comfort and convenience of riding in Lane Cove. Together, these challenges reduce the attractiveness of riding as a practical transport option for many residents. Research from Transport for NSW (TfNSW) indicates that some 70% of the population are interested in riding. As shown in Figure 3, almost half (48%) are described as ‘interested but concerned’. These riders require safer conditions before they feel comfortable to ride.
Figure 2 Developing the Bicycle Plan – key stages
Research from Transport for NSW indicates that some 70% of the population are interested in riding a bike.
Figure 3 The four types of bicycle riders Source: TfNSW
Lane Cove Council Bicycle Plan | 2026 13
Figure 4 highlights key challenges identified through desktop analysis, a physical site audit, and the engagement process. A summary of the site audit is provided in Appendix F. A set of targeted actions is included to address these challenges, focusing on improving network connectivity, safety, and creating a more supportive environment for riding. Collectively, these actions provide a clear path to enabling more people in Lane Cove to ride safely.
Figure 4 Major challenges and key actions Source: Institute for Sensible Transport 14
Institute for Sustainable Transport
Section 2: Strategic Context
Lane Cove Council Bicycle Plan | 2026 15
Section 2: Strategic Context The Lane Cove Bicycle Plan will play a crucial role in achieving the strategic outcome s of Liveable Lane Cove 2035 the Community Strategic Plan (CSP). The CSP details how Council, the community, businesses and other stakeholders will work together over the next 10 years. 2.1 Local context Liveable Lane Cove 2035 – The Community Strategic Plan (CSP) establishes the long-term vision and goals for the municipality. The Lane Cove Bicycle Plan sits within the broader Integrated Planning and Reporting (IP&R) framework and is delivered through the Delivery Program and Operational Plans (see Figure 5). It identifies the specific infrastructure and actions related to cycling that are required to support the strategic outcomes of the CSP. Lane Cove Council has a number of supporting policies that encourage increased uptake of cycling. For example, Council declared a Climate Emergency in 2019 and set emission reduction targets for both Council and the community. These include an 80% reduction in emissions by 2036. In the community, electricity is the largest contributor of the community’s emissions, averaging nearly 70%. Transport from both resident travel and workers is the second largest emissions source, averaging about 23% and is expected to be the single largest source by 2030. As a result, Council is focusing on transport as it has the potential for the biggest impact in reducing community emissions.
Transport in Lane Cove is the second largest emissions source, averaging about 23%.
16
Institute for Sustainable Transport
Liveable Lane Cove 2035 Community Strategic Plan
Delivery Program and Operational Plan
Pedestrian Access and Monthly Plan
Lane Cove Bicycle Plan
Figure 5 Position of the Bicycle Plan within the IP&R framework Source: Institute for Sensible Transport
Disability Inclusion Action Plan
Council passed a notice of motion at the March 2026 council meeting to improve walking and riding infrastructure in Lane Cove. This includes:1 • Committing to clear strategic priorities that support the delivery of more active transport infrastructure to encourage walking and riding in Lane Cove including: • Supporting an urban design led approach to improve walking and cycling amenity in the Lane Cove village and across the LGA – with a goal to create streets that are shared spaces for people not just cars . • Confirming that the Community Strategic Plan aims to ‘Prioritise walking, cycling, and public transport as alternatives to driving’ and affirms that these are preferred transport options .
2.2 State Context A range of NSW Government policies and guidance ha ve been developed since the 2019 Bicycle Plan (Figure 6). This includes the Cycleway Design Toolbox (2020) and the Design of Roads and Streets Manual (2024) which support the development of a more bike friendly transport system. Central to recent policy updates is the NSW Active Transport Strategy (2022) which commits to doubling active transport trips by 2042 and the NSW Climate Change Adaptation Strategy (2022) which includes emission targets of a 50% reduction on 2005 levels by 2030 , a 70% reduction on 2005 levels by 2035 and Net zero by 2050.
• Recognising that separated cycleways align with best practice and would provide the safest options for both people walking and riding. • Reconfirming Council’s commitment to ensure bike paths are not built in bushland. • Seeking to identify opportunities to reallocate road space to support the construction of safe separated cycleways to improve cycling connectivity and keep pedestrians safe. • Investigating options to better align the Pedestrian Access and Mobility Plan and the Bicycle Plan via the development of an Integrated Transport Strategy. • Considering setting measurable performance goals for the delivery of new active transport infrastructure for inclusion in relevant strategic documents. • Advocating to the Federal and State Mem bers for Lane Cove to: • Seek state and federal funding contributions in support of the active transport goals of Lane Cove • Advocate for increased state and federal budget allocations for active transport infrastructure across all levels of government.
1
Lane Cove Council: Ordinary Council Meeting 19 March 2026
Figure 6 State Government policy framework Source: NSW Government Lane Cove Council Bicycle Plan | 2026 17
The NSW Active Transport Strategy commits to doubling walking and riding trips by 2042. Alongside mode shift and emissions targets, NSW has long standing road safety related goals. The NSW Road Safety Action Plan 2026 aims to halve road fatalities and reduce serious injuries by 30% by 2030 and has committed to zero deaths and serious injuries on NSW roads in the longer term. The Eastern Harbour City Strategic Cycleway Corridors Program identifies four strategic connections in the Lane Cove LGA (see Figure 7). The Sydney CBD to St Leonards and Lane Cove is an immediate opportunity to connect important gaps in the network. The Lane Cove Bicycle Plan s upports the State government targets. Specifically, it aligns with the State government’s commitment to: • Develop continuous and connected cycling networks. • Enhance safety and comfort for walking and cycling. • Improve options for children’s independent mobility to and from school. • Integrate active and public transport for multimodal journeys. • Promote a shift to walking and cycling through the development of improved infrastructure. • Embrace emerging technologies like e bikes and micromobility devices. With changes in standards, infrastructure must be designed to align with people’s preferences, as well as real and perceived safety requirements. The type of infrastructure provided will significantly influence the range of people who will consider using it. As shown in Figure 8, three design options are identified as providing a comfortable facility, meaning they are safe for people of all ages and abilities. These include local street bikeways (quietways), protected bicycle lanes and off-road paths. Separated cycleways align with best practice and provide the safest options for both people walking and riding. Painted bike lanes and sharrows will generally provide a lower level of comfort and are unsuitable for an all ages and abilities facility. On-road, unprotected treatments should only be considered where there is a clear justification for not providing all ages and abilities infrastructure.
18
Institute for Sustainable Transport
Figure 7 Sydney Strategic Cycling Corridors Source: NSW Government
Figure 8 Cycling treatments and level of comfort Source: Institute for Sensible Transport
Painted bike lanes and sharrows will generally provide a lower level of comfort and are unsuitable for an all ages and abilities facility.
Lane Cove HowCouncil we developed Bicycle Plan this strategy | 2026 19
Section 3: Vision, guiding principles and strategic objectives
20
Institute for Sustainable Transport
Section 3: Vision, guiding principles and strategic objectives The Lane Cove Bicycle Plan is led by a vision, supported by a set of guiding principles and measurable strategic objectives. Figure 9 captures the structure of how the vision, guiding principles, strategic objectives and actions fit together.
The vision is supported by the guiding principles, which are underpinned by strategic objectives. The strategic objectives are designed to be measurable and time-based to enable Council to measure progress towards achieving the vision. The actions are the activities Council will pursue to create the change necessary to meet the future vision for active transport, over the next 10 years. The remainder of this section identifies Council’s vision for the Bicycle Plan, as well as the four guiding principles and five strategic objectives.
3.1 Vision The vision for the Lane Cove Bicycle Plan is that by 2036:
Lane Cove has a connected, sustainable transport network that supports and encourages safe cycling as an attractive choice for short to medium distance trips. Achieving this vision will not be easy and the Bicycle Plan has a suite of guiding principles, strategic objectives and actions that combine to support better transport choices and a more vibrant and attractive Lane Cove. Information on how the vision was developed is discussed in Box 1 (see Section 4).
Figure 9 Vision, principles, objectives and actions Lane Cove Council Bicycle Plan | 2026 21
3.2 Guiding Principles
3.3 Strategic Objectives
A set of guiding principles have been developed to support the vision for cycling in Lane Cove. The four guiding principles are designed to complement the Community Strategic Plan’s commitment to prioritising walking, cycling, and public transport as alternatives to driving. The four guiding principles are provided in Figure 10.
The strategic objectives build on the guiding principles by providing Council with more quantifiable, measurable targets. These allow us to measure progress and re-calibrate if necessary to achieve our shared vision. The Bicycle Plan objectives have been developed from Liveable Lane Cove 2035 – the Community Strategic Plan and other informing strategies . 1. Increase cycling mode share to 2.4% by 2036, to be measured in the NSW State Government Household Travel Survey (HTS) . 2. Double the proportion of students who ride a bicycle to schools in Lane Cove, in line with State Government targets.2 3. Increase the proportion of the population within 400m of a high-quality riding facility, measured every five years, to 2036. 4. Maintain zero fatalities and reduce serious bicycle crashes to 4 per five-year average by 2033 (from a baseline of 6 per five-year average to 2024).3
Figure 10 Guiding principles
5. Reduce community greenhouse gas emissions by 80% by 2036 from a FY16/17 baseline of 279,000 tonnes CO2-e.4
Progress towards this objective will be monitored through data collected as part of the school travel behaviour shift program (Policy and Behaviour Change Action 23). While the TfNSW target uses the 2018–2020 baseline, the Lane Cove Bicycle Plan target applies the most recent five-year data (2020–2024) as a baseline. 4 In line with targets in the Lane Cove Sustainability Action Plan 2022–2025 2 3
22
Institute for Sustainable Transport
Section 4: Community and stakeholder consultation
Lane Cove Council Bicycle Plan | 2026 23
Section 4: Community and stakeholder consultation The development of the Lane Cove Bicycle Plan involved a series of engagement activities with residents, workers, and visitors.
4.1 Summary of engagement activities Engagement activities undertaken as part of the Lane Cove Bicycle Plan included: • Workshops • Three workshops were held with a range of stakeholders, including Councillors, community members and advocacy groups. The workshops included interactive activities to identify issues and opportunities for cycling, as well as a street design exercise exploring how streets could function in the future (see Figure 11). • Online engagement • An online survey asked a range of questions to better understand what is required to improve the cycling experience. • An online mapping platform allowed community members to identify locations they would like to see improved. • Pop-up session • An all-day pop-up stall was held at The Canopy during the Lane Cove Makers Market, providing an opportunity to engage directly with members of the community.
Figure 11 Workshop activities Source: Institute for Sensible Transport
Over 500 contributions were made across the engagement activities.
24
Institute for Sustainable Transport
Hundreds of individual items of feedback were received from a diverse range of professional and community stakeholders. This included more than 500 online contributions and over 150 face-to-face interactions through workshops and popup sessions. This feedback has informed the development of the proposed bicycle network. A key component of the engagement process was the development of a shared vision for the Bicycle Plan. This is explored further in Box 1.
Developing the vision Developing a future vision for cycling in Lane Cove was a key component of the engagement process. During the Councillor and community workshop, participants were presented with five draft vision options that drew on Council’s broader strategic direction, including Liveable Lane Cove 2035 – The Community Strategic Plan and other relevant strategies.
281 online surveys were completed and 242 pins added to the online mapping tool.
Workshop discussions highlighted a strong desire for a transport network that is safe, sustainable and well connected. Participants consistently identified these themes as fundamental to encouraging more people of all ages and abilities to choose to ride for more everyday travel. Box 1 Developing the vision
4.2 What we heard – barriers During both the online engagement and the workshops (see Figure 12), the community was asked their key concerns when riding in Lane Cove and what would make cycling a more attractive choice. Interactive activities during workshops further explored barriers to cycling across the LGA. Key barriers identified through the engagement include: • A lack of dedicated and protected bicycle infrastructure results in frequent interactions with motor vehicles, pedestrians and parked vehicles, which can deter a broad range of users. • Gaps in the network between existing paths, through intersections and across major roads, as well as to adjoining LGAs, can force people onto unsafe sections of road. • Narrow sections of shared user paths and obstacles such as power poles, driveways or bus stops create pinch points and areas of conflict for people walking and riding. This is exacerbated in areas with high pedestrian activity, such as the Canopy. • Fast-moving motor vehicles, heavy traffic volumes and a strong driving culture can make local streets feel unsafe for people riding.
Figure 12: Workshop activities Source: Institute for Sensible Transport Lane Cove Council Bicycle Plan | 2026 25
The key barriers identified through the online survey are shown in Figure 13. There are not enough bike paths/lanes
26% 25%
I don’t like riding a bike with cars There is no separation between pedestrians and bikes
15%
Lack of safe crossing points
10%
It’s too hilly to ride
6%
Other (please specify)
6%
The distances I need to go are too far to ride
3%
Poor lighting at night
3%
I don’t like riding a bike
2%
I need to carry too many items
2%
I just like driving; it's easier
1%
I don't know how to ride a bike
1% 0%
5%
Figure 13 The key community barriers to cycling Source: Lane Cove Bicycle Plan – Online survey 26
Institute for Sustainable Transport
The spatial distribution of existing concerns and suggested improvements identified through the online mapping platform are shown in Figure 14.
10%
15%
20%
25%
30% Figure 14 Online mapping submissions Source: Lane Cove Bicycle Plan – Online mapping
4.3 What we heard – opportunities The community made it clear that more people would like to ride more often if conditions were safer and more convenient. Figure 15 shows that more than 8 in 10 respondents said they would like to ride more, with over 7 in 10 wanting to ride at least once a week. Popular trip purposes included riding to the shops, commuting to work, riding to school and for recreation
A summary of the opportunities from the engagement activities are provided in Figure 16. These highlight the key community enablers to make riding in Lane Cove safer and more convenient. More protected / seperated bicycle infrastructure on major roads (e.g. River Road, Burns Bay Road, Centennial Avenue) More safe priority crossing opportunities on major transport infrastructure
19.2%
Safer speed limits on residential and commercial streets
0.4%
Behaviour change and education programs to encourage safe use of roads by all users
3.2% 56.9%
5.3%
14.9%
Figure 16 Key engagement opportunities – a summary Source: Institute for Sensible Transport
n A few times a week Once a week n A few times a year
Connect existing and future infrastructure up and with adjoining LGSs
n Once a month
n Once a year
Overall, the key message from the engagement is that a more ambitious approach to the development of the cycling network is required to encourage more people to ride more often.
n No
Figure 15 Would you like to ride more? Source: Lane Cove Bicycle Plan – Online survey
More than 8 in 10 people told us they would like to ride more.
The key message from the engagement was to take a more ambitious approach to the development of the cycling network.
Lane Cove Council Bicycle Plan | 2026 27
Section 5: How we move now and, in the future
28
Institute for Sustainable Transport
Section 5: How we move now and, in the future This section offers a brief snapshot of how people in Lane Cove get around. As we move towards a safer, more sustainable transport system, this section also highlights future targets for cycling. 5.1 How we get around now – all trip purposes The NSW HTS records all trips by all purposes across NSW. The mode share of all trips by Lane Cove residents is shown in Figure 17. The HTS reveals that 1% of all trips are done by bicycle in Lane Cove.5
100%
1%
1%
2%
90%
23%
23%
17%
80% 70% 60% 50% 40%
2%
1%
1%
18%
15%
21%
16%
11%
20%
1%
1%
1%
1%
29%
22%
20%
21%
1%
1%
1%
1% 10%
15%
16%
21%
21%
21%
20%
11%
30% 20%
37%
44%
47%
37%
45%
43%
41%
2016-17
2017-18
2018-19
2019-20
2022/23
2023/24
2024/25
10% 0%
n Vehicle Driver n Vehicle Passenger n Public transport n Bicycle (estimated) n Walked n Other (estimated) Figure 17 Mode share of all trips by all purposes by Lane Cove residents Source: NSW Household Travel Survey The HTS does not separately report cycling, instead categorising it within the ‘other’ mode. The cycling mode share has therefore been estimated using other travel survey data and ABS Census data as benchmarks. Cycling is assumed to represent approximately 45% of all ‘other’ trips.
5
Lane Cove Council Bicycle Plan | 2026 29
5.2 How we travel to work ABS Census data shows a similar pattern. Figure 18 shows how our residents have travelled to work compared with Greater Sydney since 2011. Around 1% of work trips are by bicycle. 100% 90% 80% 70% 60%
1% 6%
3% 5%
2%
18%
28%
6% 4%
30%
3% 5%
1%
20%
36%
2% 9%
1%
4% 5%
1%
12%
14%
6%
6%
5%
4%
50% 40%
5%
1%
1%
58%
67%
52%
65%
69%
73%
Lane Cove
Greater Sydney
Lane Cove
Greater Sydney
Lane Cove
Greater Sydney
20% 10% 0%
2011
2016
2021
1%
Around 1 in 4 work trips is less than 5 km. 5.2.1 Car use has increased Despite both a state and local policy position to reduce car use, the proportion of people that used a car for their commute has increased from 52% in 2016 to 69% in 2021. While COVID-19 undoubtedly contributed to this, more will need to be done to arrest the growth in car use.
5.2.2 Cycling levels are low, but could be much higher Only 1% of Lane Cove residents reported riding a bike to work, a figure that has remained largely unchanged for at least the past 13 years. While this is similar to the rate for Greater Sydney, many short-distance car trips could be made by bike if the network was safer and more convenient. In 2021, around 25% of trips to work were less than 5 km. Despite these short distances, only 2% of Lane Cove residents rode a bicycle to work for these trips, while around 63% were by car. Women’s participation in cycling is half that of men. When having to ride on unprotected streets with motor vehicle traffic, women are less inclined to cycle.6 The proportion of short distance car trips in Lane Cove offers an indication of the potential for growing the number of cycling trips. This would help reduce congestion, lower transport emissions and costs, as well as enhance our health and liveability.
n Car, as driver n Car, as passenger n Public transport n Bicycle n Walked only n Other Figure 18 Journey to work mode share, Lane Cove and Greater Sydney Source: ABS Census 2021
Only 1% of Lane Cove residents cycle each day.
30
Institute for Sustainable Transport
Monash University – What do women want? To ride a bike without fear of injury and harassment
6
5.3 Lane Cove’s existing cycling network
For work trips under 5km, more than 60% were by car. 1600
Table 1 provides a snapshot of the existing network, comprising over 27km of bike lanes, paths and advisory marking. Approximately 63% of the network consists of off-road paths, with around 54% of these being shared user paths. This includes infrastructure on the border of Lane Cove, such as the Pacific Highway shared path and the western end of Mowbray Road, which are both located within neighbouring Willoughby City Council.
55%
Number of trips under 5km by mode
1400 1200
Around 63% of the network consists of off-road paths.
1000 800
Some shared paths have significant physical constraints, such as power poles and bus stops, reducing their effective width. Some shared paths also interact with frequent driveway crossovers which can create safety risks for people riding. These issues are likely to become more pronounced as cycling volumes increase.
25%
600 400 200
8%
8% 2%
0
n Car, as driver n Car, as passenger n Public transport n Bicycle n Walked only n Other
2%
Over one-third of the network is unprotected, with 20% consisting of little more than painted advisory markings on the road. This highlights that, across many parts of the network, infrastructure falls below the minimum standard required for most people to feel safe.
Nearly one-third of the network is unprotected.
Figure 19 Mode share for work trips under 5 km Source: ABS Census 2021
Lane Cove Council Bicycle Plan | 2026 31
Table 1 Existing cycling network by infrastructure type
Current Typology
Length (km)
%
Protected/separated infrastructure Separated bi-directional bicycle path (off-road)
2.4
9%
Shared user path (off-road)
15
54%
Shared space
0.3
1%
Painted bicycle lane (on-road)
3.5
13%
Wide kerbside bicycle lane (PS2 symbol painted in parking lanes)
0/9
3%
Advisory markings (PS2 symbol in travel lanes)
5.4
20%
Total
27.5
100%
Unprotected infrastructure
Source: Institute for Sensible Transport
Some examples of the different types of cycling infrastructure across Lane Cove are shown on the following page.7
7
The protected bike path example is located on Hume Street in North Sydney Council.
32
Institute for Sustainable Transport
Bi-directional protected bike path
Protected bike path (one-way pairs)
Shared user path
Advisory markings
Painted bike lane
Painted bike lane
Wide kerbside bike lane
Shared space Lane Cove Council Bicycle Plan | 2026 33
The existing cycling network, shown in Figure 20, lacks connectivity and protection at critical points. Some routes lack protected infrastructure that would encourage their use, such as the River Road and Burns Bay Road.
On-road bicycle infrastructure connecting to key destinations in Lane Cove is minimal and generally limited to painted lanes, which do not provide physical protection from motor vehicles.
Similarly, on-road bicycle infrastructure connecting to key destinations such as the Lane Cove Village is minimal and generally limited to painted lanes, which do not provide physical protection from motor vehicles. Figure 20 also identifies a number of routes that were included in the 2013 Lane Cove Bicycle Plan but have not been maintained or renewed over time. In many cases, advisory markings or other cycling treatments have been removed or allowed to deteriorate through routine renewal works without replacement. These routes have been identified to highlight where previous cycling infrastructure existed and should be investigated for reinstatement or upgrade as part of future works.
Figure 20 Existing cycling network Source: Institute for Sensible Transport
34
Institute for Sustainable Transport
5.4 Where the potential for cycling is highest The Background Assessment Report provided an analysis of demographic features that can help predict latent demand for cycling. Peer-reviewed research has identified the seven Census collected variables which inform the Bicycle Use Propensity Index as statistically significant predictors of cycling. These seven variables are shown in Figure 21, with the results of the analysis shown in Figure 22. Separate maps for origin and destination variables provided in Appendix A. When the index is overlaid with the existing cycling network in Lane Cove, it is clear we could be doing better at tapping into the potential we know exists to grow cycling. The future connected cycling network described in Section 6 focuses on maximising this potential by creating more cycling opportunities that connect all areas of Lane Cove, with a focus on the areas that will lead to the strongest uplift in participation.
Residentail population density people per hectare (SAI) Density of young adults number of people aged 18–34 per hectare (SAI) Low motor vehicle ownership number of households with zero or one cars per hectare (SAI) Bicycle use – origin number of people riding to work per hectare (SAI) Employment density number of people working per hectare (DZN) Bicycle use – destination number of people riding to work per hectare (DZN) Short car trips – destination number of people driving to work between 0 and 5km per hectare (DZN)
Figure 21 Variables for Bike Use Propensity Index Source: Institute for Sensible Transport
Figure 22 Bicycle Use Propensity Index Source: Institute for Sensible Transport using ABS Census
Areas of higher latent demand are concentrated in commercial areas, activity centres and locations with higher residential densities.
Lane Cove Council Bicycle Plan | 2026 35
5.5 Mode share targets
5.6 Forecast growth in cycling trips
This Bicycle Plan sets a mode share target of 2.4% by 2036, representing a 2.4fold increase in cycling on current levels. This mode share target reflects a realistic opportunity to increase cycling activity, which is supported by the modelling of the cost benefit analysis, and would achieve the State Government target of doubling active transport trips.
There are currently around 1,800 trips by bike in Lane Cove each day, with an average trip distance of 3.5 km, accounting for approximately 2,024,000 kilometres each year. Without further development of the cycling network, the cycling mode share is not expected to grow. Accounting for population growth, Lane Cove could expect around 2,000 trips by bicycle each day by 2036, totalling 2,612,000 kilometres travelled.
The mode share targets for this Bicycle Plan are shown in Figure 23; comparing what can be expected under a business-as-usual approach with the forecast mode share once the infrastructure included in this Bicycle Plan is built. These target years are aligned to ABS Census years and provide Council with a practical way to monitor progress. With the network established and embedded, mode share is expected to continue to grow beyond 2036, reaching approximately 2.6% by 2041 as travel behaviours normalise and the benefits of a connected network are realised.
2.6%
2.4%
2.0%
1.6%
1.5% 1.0% 1.0%
1.0%
1.0%
1.0%
4,000 3,000 2,000 1,000
0.5%
0 2026
2031
2036
n Bicycle mode share – Business as usual n Bicycle mode share –Network development Figure 23 Mode share targets for cycling Source: Institute for Sensible Transport
36
Daily cycling trips
2.5%
0.0%
6,000 5,000
3.0%
1.0%
The implementation of this Bicycle Plan will support more people to cycle. This is expected to generate an additional 2,800 trips by bicycle per day in 2036, for a total of 4,800 daily trips by bicycle, and over 6,172,000 million cycling kilometres each year. The estimated number of cycling trips per day is shown in Figure 24. More detailed discussion on modelling is provided in Section 9.
Institute for Sustainable Transport
2041
2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 Year
—–––– Cycle trips – Business as usual Figure 24 Estimated cycling trips per day Source: Institute for Sensible Transport
—–––– Cycle trips –Network development
Section 6: Connected network
Lane Cove Council Bicycle Plan | 2026 37
Section 6: Connected network This section provides a series of maps highlighting the proposed upgrades and expansions to the cycling network. Together, these upgrades will help create a safe and connected network that links key destinations and enables people to travel between suburbs and across the broader region. 6.1 Bicycle routes Three main route types have been used in the development of Lane Cove’s connected cycling network. These are described below and are broadly consistent with the NSW Cycleway Design Toolbox: •
Neighbourhood routes: Neighbourhood routes are important routes that provide safe and comfortable conditions for riding. These routes form the foundation of the network, enabling people of all ages and abilities to travel safely from their front door to connect with local and regional routes. Creating high-quality neighbourhood routes requires safe speed environments, traffic calming measures and treatments that reduce through traffic.
•
Local routes: Local routes connect neighbourhoods to adjoining neighbourhoods. These broaden the network to enable people to connect to higher order routes and travel to adjoining neighbourhoods.
•
Regional routes: Regional routes link key destinations across the wider region and reflect Lane Cove’s role as a strategic connector between North Sydney, the City of Sydney, and surrounding areas. Regional routes are located on State and Regional roads and align with the Strategic Cycleway Corridor program. These routes will require support from the State Government for their implementation.
Table 2 details the routes that form the Lane Cove network. A map of the routes is shown in Figure 25 on the following page.
38
Institute for Sustainable Transport
Table 2 Bicycle riding network routes
Route
Status
Neighbourhood Routes
NR1 Cullen St and Barwon Rd
Partially existing
Route length (km) 1.15
NR2 Helen St to Landers Rd
Partially existing
2.0
NR3 Riverview St to Fox St
Partially existing
1.31
NR4 Canberra Ave and Holdsworth Ave
Proposed
1.0
NR5 Park Rd
Proposed
0.34
NR6 Christie St and Nicholson St
Existing
0.44
NR7 Wilona Ave to Chisholm St
Proposed
1.07
NR8 Wood St to Penrose St
Proposed
0.61
NR9 Oscar St to Bay St
Partially existing
1.83
NR10 Dorritt St to Osborne Rd
Proposed
1.05
NR11 Berry Rd and Marshall Ave
Proposed
0.5
LR1 Longueville Rd
Local Routes
Partially existing
2.93
LR2 Burns Bay Rd
Partially existing
1.91
LR3 Greenwich Rd
Partially existing
2.31
LR4 Northwood Rd
Proposed
0.89
LR5 Tambourine Bay Rd
Partially existing
1.55
LR6 Lane Cove Business Park
Partially existing
2.4
LR7 Centennial Ave north
Existing
0.6
Regional Routes
RR1 Centennial Ave, Burns Bay Rd
Proposed
3.12
RR2 Pacific Hwy
Partially existing
3.86
RR3 Penrose, Bridge and River Rd
Partially existing
4.72
RR4 Mowbray Rd
Partially existing
2.9
RR5 Epping Rd
Existing
3.63
Lane Cove Council Bicycle Plan | 2026 39
This Bicycle Plan proposes a number of neighbourhood routes that connect into higher order local and regional routes, forming the foundation of the network. Many of the local routes have been identified and progressively implemented through Council’s previous 2013 and 2019 Bicycle Plans. This Plan builds on that work by proposing upgrades to existing routes to ensure they meet contemporary safety standards and support a wide range of users. The regional routes represent the highest order connections within the network, providing key links across Lane Cove and to surrounding LGAs. Delivering high-quality infrastructure along these corridors will be essential to achieving a safe and connected network. Implementation of these routes will require collaboration with the NSW Government on design, funding and delivery.
Lane Cove plays a critical role in connecting North Sydney and the City of Sydney to other parts of the region.
Figure 25 Proposed bicycle routes Source: Institute for Sensible Transport
40
Institute for Sustainable Transport
6.2 Proposed infrastructure Figure 26 shows the different types of riding infrastructure in the existing and future Lane Cove network and provides a description of how each functions. Further information on design requirements of the different types of riding infrastructure is outlined in Appendix C.
Figure 26 Types of cycling infrastructure Source: Institute for Sensible Transport
Lane Cove Council Bicycle Plan | 2026 41
Figure 27 shows the application of suitable typologies for the routes included in this Bicycle Plan. In some cases, infrastructure may already exist on certain routes; however, contemporary standards and best practice guidance call for higher levels of separation and protection. The network focuses on connecting key destinations such as schools, shops, open space and transport services with high-quality, connected routes that support riding as a viable mode of transport. This Bicycle Plan prioritises the routes into three delivery phases. More information on the prioritisation and outcomes can be found in Section 7. An overview of some of the important links in the network is described below.
Crossings and intersections Crossings and intersections are often key conflict points for people riding. Consideration must be given at transition points between different infrastructure to ensure they are safe and legible for all users. A map of intersections and crossing points requiring additional consideration is provided in Appendix C.
Figure 27 Proposed bicycle network infrastructure typologies Source: Institute for Sensible Transport
42
Institute for Sustainable Transport
6.2.1 Longueville Road The Lane Cove Village is the primary destination for most local trips and a critical link in the network. Stakeholder engagement consistently identified the current configuration on Longueville Road as unsafe for people riding. The existing conditions make cycling uncomfortable in traffic, while the use of shared paths in areas of high pedestrian activity creates conflict and reduces safety for everyone. To support a more people-focused environment, this Bicycle Plan proposes a one-way, low-speed shared space within the main commercial heart of Longueville Road. This is a high pedestrian activity area, and any upgrades should prioritise people over vehicles, focusing on creating a safe environment for everyone. Figure 28 presents a concept design of how this could function.
The Bicycle Plan proposes a peoplefocused shared space within the heart of Longueville Road, to prioritise people over vehicles.
To enable this outcome, both Longueville Road and some surrounding streets would need to be reconfigured to one-way operation. This would not result in any loss of vehicle access or car parking but would instead reconfigure vehicle movements to create a people and place-centred village. A circulation plan will need to be developed to guide how vehicles navigate the area. A concept circulation plan is provided in Appendix E, with further work required to assess impacts on bus stops and bus routes to maintain public transport access. Several key intersections, including Austin Street, Central Avenue and Birdwood Avenue, are currently designed primarily to prioritise vehicle movement, with limited cycling access and traffic calming to support a people-focused environment. These intersections will require upgrades to better support people walking and riding. A successful village centre must also be supported by safe and comfortable connections to the wider riding network. Priority should be given to improving connections from Longueville Road to nearby strategic links, including Burns Bay Road, River Road and the Epping Road cycleway.
Transforming Longueville Road into a low-speed, people and place-centred high street is a key priority of the Bicycle Plan. Figure 28 Longueville Road concept design Source: Institute for Sensible Transport Lane Cove Council Bicycle PlanGlossary | 2026 43
6.2.2 Penrose, Bridge and River Road connection. The current configuration is not suitable for riding on the road, and existing sections of shared path are constrained by trees, bus stops and other pinch points, limiting both safety and capacity. Previous plans have proposed continuing to upgrade footpaths to shared user paths; however, this can be cost-prohibitive, while still being physically constrained. This corridor is classified as a Regional road, meaning it is eligible for State Government financial assistance (limited to the carriageway only). Delivery of highquality cycling infrastructure along this corridor will require coordination with, and funding contributions from the NSW Government. This Bicycle Plan proposes a bi-directional bicycle lane along the corridor to provide safe infrastructure that is separated from both pedestrians and vehicles. Figure 30 shows how this could look and Figure 29 provides a cross-sectional diagram. Reallocating road space to enable safe on-road cycling offers a more cost-effective and scalable solution that can accommodate growing demand over time.
Figure 30 River Road concept design Source: Institute for Sensible Transport Figure 29 River Road concept design – cross-section Source: Institute for Sensible Transport 44
Institute for Sustainable Transport
6.2.3 Centennial Avenue and Burns Bay Road Centennial Avenue and Burns Bay Road form the primary north–south connection between Lane Cove North and Hunters Hill. The corridor provides the only crossing of the Lane Cove River between Epping Road and the Sydney Harbour Bridge and is identified as a key strategic route in the Strategic Cycleway Corridor program.
For Centennial Avenue and Burns Bay Road, a number of concept designs have been provided to illustrate how this proposal could function. Figure 31 presents a concept view of Burns Bay Road, showing how a bicycle lane could be integrated into the existing carriageway.
Centennial Avenue and Burns Bay Road is a key Strategic Cycleway Corridor for the region. Centennial Avenue and Burns Bay Road are categorised as a State Road under the authority of TfNSW. This means delivery of any upgrades will require collaboration on both funding and design to ensure alignment with State Government objectives. The NSW Government Road User Space Allocation Policy requires practitioners to consider cycling above general traffic, with separated cycleways the preference on priority routes. Previous plans and studies have identified this corridor for a shared user path. However, there are significant physical constraints, such as rock faces requiring excavation and stabilisation, the need for elevated structures in parts, and impacts to established trees and services (e.g. power poles). Even if these constraints could be addressed, the likely high volumes of people walking and riding mean a shared user path would reduce the level of service and safety for all users. This Plan proposes a continuous bi-directional protected bicycle lane along the length of the corridor. Delivering this infrastructure will require the reallocation of existing road space. Given the strategic function of the corridor for vehicular movement, a balanced approach is required to maintain network performance while improving safety and connectivity for people riding.
Figure 31 Burns Bay Road concept design Source: Institute for Sensible Transport
This Bicycle Plan proposes a continuous protected bicycle lane along the length of the corridor.
Lane Cove Council Bicycle Plan | 2026 45
Figure 32 then shows a cross-sectional view of this arrangement, where a bi-directional bicycle lane is provided with physical separation to improve safety and comfort for people riding. Further investigation will be required at the concept and detailed design stages to refine how the remaining space is allocated to motor vehicles. This includes refining designs around north and south bound traffic movements.
Figure 32 Burns Bay Road concept design – cross-section Source: Institute for Sensible Transport
Right-turn movements along Burns Bay Road and Centennial Avenue are already limited which simplifies the integration of cycling infrastructure. At locations where right turns are permitted (primarily at signalised intersections) targeted treatments will be required to safely accommodate interactions between turning vehicles and people riding through on bikes. Figure 33 presents a concept design for the intersection of Penrose Street and Burns Bay Road, illustrating how a bicycle lane could function. Cycling infrastructure is continued through the intersection with protection where required. Further investigation work and collaboration with TfNSW is required to refine how the remaining space is allocated to motor vehicles. 46
Institute for Sustainable Transport
Figure 33 Penrose Street and Burns Bay Road intersection concept design Source: Institute for Sensible Transport
6.2.4 St Leonards St Leonards is a key strategic hub in the Lane Cove bike network and forms part of the Strategic Cycleway Corridor program. St Leonards sits at the convergence of the Pacific Highway and the North Shore rail corridor, making it a primary connection point between Lane Cove, Crows Nest, North Sydney and the Sydney CBD. St Leonards is undergoing significant growth and development, in both St Leonards East and St Leonards South. Several existing plans and studies have considered the walking and cycling networks within St Leonards. These include the St Leonards Cumulative Transport and Accessibility Study and the St Leonards South Landscape Master Plan. This Bicycle Plan builds on these recommendations and provides greater detail on how contemporary cycling design standards will be applied across the precinct. Intersections are currently the weakest part of the St Leonards cycling network. Limited cyclist priority, unclear crossing points and complex traffic movements reduce safety and comfort. Improving connections to surrounding LGAs is also a priority, including: • Herbert Street — linking to Willoughby’s bike network;
Pacific Highway The Pacific Highway is a key regional route for residents of Lane Cove and nearby LGAs, including North Sydney, Willoughby and the City of Sydney. West of St Leonards, a shared user path exists on the northern side of the highway, within Willoughby City Council. East of St Leonards towards the Sydney Harbour Bridge, there is no safe or dedicated cycling infrastructure, representing a significant gap in the network. Council will advocate for a best-practice treatment of protected bicycle lanes (one-way pairs) on each side of the Pacific Highway. This represents a long-term initiative requiring collaboration with the NSW Government. The Oxford Street revitalisation is a good example of how this approach is achievable on a state road while maintaining traffic and bus operations.
Consistent with the North Sydney Bike Plan 2025–2045, Council will advocate for a best-practice treatment of protected bicycle lanes (one-way pairs) on each side of the Pacific Highway.
• Christie Street and Anderson Street — connecting to Crows Nest routes; • River Road — linking to proposed North Sydney and Sydney CBD connections. Figure 34 illustrates the proposed cycling network for St Leonards, including recommended route typologies, intersection upgrades and strategic connections to surrounding infrastructure.
In the interim, there is an opportunity to improve the existing shared user path experience by working with Willoughby City Council to prioritise safer crossing points at intersections. Strengthening connections to North Sydney cycling network via the Beencke bridge into Wollstonecraft is another interim measure to improve the connectivity of the network while longer-term infrastructure is progressed.
Lane Cove Council Bicycle Plan | 2026 47
Figure 34 St Leonards proposed network Source: Institute for Sensible Transport 48
Institute for Sustainable Transport
Section 7: Prioritisation and Implementation Plan
Lane Cove Council Bicycle Plan | 2026 49
Section 7: Prioritisation and Implementation Plan The connected network has been prioritised to ensure the projects that offer the most value to the community are delivered first. 7.1 Prioritisation of infrastructure actions
7.1.1 Results
A multi-criteria prioritisation framework was used to identify which connections should be delivered first. The framework helps guide the staging of actions by assessing both the need for a connection (desirability) and the ease with which it can be delivered (deliverability). The framework includes the factors outlined in Figure 35, with each route given a score of 1 to 3, with 3 being the best score. Each factor is relative, meaning that while a 1 is a lower score, this is only in relation to the other routes being prioritised.
Desirability Network cohesion
Role the route has in connecting to the broader network.
Strategic value
Strategic importance of destinations the route links to.
Delivererability
Cost
The capital cost of delivery: with high cost scoring 1 and low cost scoring 3.
Cycling growth
Safety
The degree to which the infrastructure reduces the risk of collision or injury.
Figure 35 Variables in multi-criteria prioritisation framework Institute for Sustainable Transport
A staged delivery program across 10 years was developed. The delivery phases of the network are then shown in Figure 36. Regional routes are considered high priority but are not included in the staging program, as they will require funding assistance and coordination with the State Government. These routes are critical to the overall network, and Council will advocate for their delivery as a priority.
Complexity
The technical and political ease with which the route can be implemented.
Potential for future cycling activity to be supported by development of the route.
50
The multi-criteria framework outlined in Figure 35 was used to determine when routes should be implemented, as shown in Table 3. The route-by-route results of the prioritisation of the local routes proposed as part of this Bicycle Plan is shown in Table 4 on the following page.
Table 3 Network implementation across phases
Phase
Time frame
Length (km)
Cost
1
Next 3 years
6.5
$5,156,255
2
4 - 6 years
9.0
$5,693,897
3
7+ years
6.1
$5,078,290
Subject to funding
Ongoing
10.9
$10,867,592
32.5
$26,796,034
Total
Table 4 Prioritisation of routes
Route
Network cohesion
Strategic value
Cycling Safety Complexity growth Neighbourhood Routes
Cost
Combined score
Delivery phase
Estimated cost
NR1 Cullen St and Barwon Rd
2
2
2
1
3
3
13
2
$401,661
NR2 Helen St to Landers Rd
3
2
2
1
3
3
14
1
$767,901
NR3 Riverview St to Fox St
3
2
2
2
2
2
13
2
$1,441,637
NR4 Canberra Ave and Holdsworth Ave
2
2
2
1
3
1
11
2
$923,385
NR5 Park Rd
2
2
2
1
3
1
11
3
$335,592
3
13
2
$530,358
NR6 Christie St and Nicholson St
Existing Route
NR7 Wilona Ave to Chisholm St
2
3
2
2
1
NR8 Wood St to Penrose St
1
1
1
1
3
3
10
2
$213,885
NR9 Oscar St to Bay St
1
1
1
2
3
3
11
2
$807,276
NR10 Dorritt St to Osborne Rd
2
2
2
1
2
1
10
3
$1,053,012
NR11 Berry Rd and Marshall Ave
2
2
2
1
3
1
11
2
$501,290
3
1
1
14
1
$2,754,111
Local Routes
LR1 Longueville Rd
3
3
3
LR2 Burns Bay Rd
3
3
2
3
1
1
13
1
$1,587,386
LR3 Greenwich Rd
2
2
2
2
1
1
10
3
$1,955,218
LR4 Northwood Rd
2
2
1
3
3
1
12
2
$887,447
LR5 Tambourine Bay Rd
1
1
1
1
3
3
10
1
$46,857
LR6 Lane Cove Business Park
2
2
1
2
2
2
11
3
$1,734,468
LR7 Centennial Ave north RR1 Centennial Ave, Burns Bay Rd
3
3
3
RR2 Pacific Hwy
3
3
RR3 Penrose, Bridge and River Rd
3
3
RR4 Mowbray Rd
3
3
RR5 Epping Rd
Regional Routes
Existing Route
3
1
1
14
Subject to funding
$3,119,358
3
3
1
3
16
Subject to funding
$582,918
3
3
1
1
14
Subject to funding
$4,719,542
2
3
2
1
14
Subject to funding
$2,445,775
Existing Route Lane Cove Council Bicycle Plan | 2026 51
Collaboration with government Delivering the proposed network will require collaboration between Council, neighbouring LGAs and the State Government. Roads in NSW are categorised as state, regional or local roads. State roads are managed by the State Government, while regional and local roads are managed by Council. Regional Roads are recognised as roads with roles of secondary importance and are eligible for State Government financial assistance limited to the carriageway only. A map of the road network classification in Lane Cove is provided in Appendix B. As some of the proposed upgrades are located on state and regional Roads, partnership with the State Government will be essential to secure funding and ensure designs align with broader transport priorities. Delivery will also require close coordination with neighbouring LGAs, including North Sydney and Willoughby, to provide a consistent and connected network across boundaries.
Figure 36 Delivery phases of the Lane Cove Bicycle Plan Source: Institute for Sensible Transport
52
Institute for Sustainable Transport
7.2 Funding the Bicycle Plan
7.2.2 State funding
Delivering the future cycling network will require a combination of Council funding and external investment. While Council has demonstrated an ongoing commitment to improving cycling conditions, the scale of improvements identified in this Bicycle Plan exceeds what can reasonably be delivered through existing funding alone. The following sections identify some of the current funding opportunities of relevance to the Bicycle Plan.
Several state government programs exist that could be leveraged to fund projects in this Bicycle Plan. Council will continue to seek funding through these programs as well as future funding initiatives. These include:
7.2.1 Local funding 7.2.1.1 Development Contributions Plan Council’s LGA-wide Section 7.11 Development Contributions Plan (DCP) outlines monetary contributions levied on developers at the development application stage to help pay for additional infrastructure. The DCP requires developers to contribute funds, land, or works toward public infrastructure (including cycling infrastructure) needed to support growth from new developments. The DCP includes dedicated funding allocations for cycling-related infrastructure. This includes approximately $3.8 million allocated toward implementation of the Bicycle Plan, as well as additional funding for specific cycling projects, Local Area Traffic Management (LATM) and bicycle facilities in key precincts.8 These figures are derived from the Section 94 Contributions Plan Works Schedule, which estimates the contributions required from developers to provide the infrastructure necessary to meet the demands of a growing population. While contributions are collected progressively as development occurs and funding availability will vary over time, the DCP provides an important and ongoing local funding source.
Lane Cove Section 7.11 Development Contributions Plans Get NSW Active 10 St Leonards Lunar Laneways 8 9
• Strategic Cycleway Corridor program • Road Safety program • Get NSW Active program • Get Kids Active • Open Streets program.
7.2.2.1 Get NSW active The Get NSW Active program provides funding for projects that make it easier, safer and more convenient for people to choose walking and riding as a preferred mode of transport. A total of $60 million is available for the FY2026/27 funding round. Of the $60 million funding, $10 million is allocated to Get Kids Active projects that enable walking or riding to school, with the remaining funding ($50 million) for broader active transport projects. Council has previously been successful in the FY25/26 program which contributed $163,735 toward the River Road shared path detailed design work.9 Future rounds of the program offer an opportunity to fund priority routes in this Bicycle Plan.
7.2.2.2 Open Streets Program The Open Streets Program is open to all councils across NSW. The Program provides funding to temporarily close streets to cars and open them on a day, or series of days, for placemaking events and activations. The purpose is to encourage collaboration between government, business and community to improve the vibrancy of local streets to support walking and cycling. Council was successful in previous rounds, receiving $331,500 for the St Leonards Lunar Laneways.10 Future rounds of the program present an opportunity to secure additional funding to support street closures and activations that promote cycling, demonstrate the benefits of safer streets, and encourage more people to ride. Lane Cove Council Bicycle Plan | 2026 53
7.2.3 Commonwealth funding
7.2.3.4 Urban Precincts and Partnerships Program
7.2.3.1 Active Transport Fund
The Commonwealth Urban Precincts and Partnerships Program seeks to align investment across all levels of government around shared outcomes like health, productivity, transport, sustainability and liveability. It seeks to support transformative investment in urban precincts based on the principles of unifying urban places, growing economies and serving communities. While the program is currently paused for new applicants, Council will apply for future funding opportunities to support the development of the Bicycle Plan.
The Active Transport Fund aims to encourage active transport across Australia. It was created under the National Road Safety Strategy 2021-30, to improve road safety outcomes.11 In the 2026–27 Budget, the Australian Government has committed ongoing funding for the Active Transport Fund. Council will continue to monitor Commonwealth programs for future opportunities and will prepare submissions for funding to deliver the priority projects identified in this Bicycle Plan.
7.2.3.2 Local Roads and Community Infrastructure Program The Local Roads and Community Infrastructure (LRCI) Program provides grant funding for projects that benefit local communities. Projects must be publicly accessible and represent additional commitments beyond Council’s baseline funding. The program has completed its fourth round, and Council has been successful in securing funding across the separate phases.12 Council will continue to apply for future funding opportunities to support the development of the Bicycle Plan.
7.2.3.3 Black Spot Program The Black Spot Program funds targeted road safety improvements at sites with a demonstrated history of crashes or a high risk of potential crashes. Council has secured funding through this program in FY24-25 for improvements to Northwood Road.13 A number of intersections identified in this Bicycle Plan will require safety improvements. Council will undertake Road Safety Audits at these locations to identify sites that meet the program’s eligibility criteria. This will enable Council to proactively seek Black Spot funding and incorporate cycling improvements into intersection upgrade designs.
Commonwealth Active Transport Fund Local Roads and Community Infrastructure (LRCI) Program 13 New South Wales Black Spot Program 2024-25 11 12
54
Institute for Sustainable Transport
Section 8: Policy and behaviour change
Section 8: Policy and behaviour change Creating a successful Bicycle Plan requires more than just infrastructure actions. Supporting policies and behaviour change programs that encourage people to ride are also critical. This section outlines the policy and behaviour change actions designed to complement the infrastructure actions. The actions included in this Bicycle Plan have been developed using the SMART approach, as outlined below.
SMART Actions The actions included in the Bicycle Plan have been developed to be SMART. That is, they are: •
Specific: Actions are as specific as possible. An example can be seen from our infrastructure actions, which identify where they are to start, finish and the recommended type of infrastructure.
•
Measurable: Quantifiable metrics have been used, such as the proportion of trips by bicycle, and these are linked to Census years, to make it as easy as possible to monitor progress.
•
Achievable: Targets have been chosen that are ambitious and achievable. The proposed network has been designed to minimise unnecessary disruption to the wider transport network, with partnerships with adjoining LGAs and the State Government.
•
•
56
Relevant: Each action aligns directly with the overarching vision and objectives of the Bicycle Plan, supporting safer, more connected, and more accessible cycling for all. Time-bound: Clear timeframes and milestones have been established for each action to ensure progress can be tracked.
Institute for Sustainable Transport
Table 5 on the following page offers a set of policy and behaviour change actions to help achieve the vision including the high-level cost, timeframe and agency. Cost refers to the estimated funding required from Council and does not reflect the total project cost. Each action is scored as a high-level estimate under one of three possible categories: • 1 – Low (from $0 up to $50,000) • 2 – Moderate (from $50,000 up to $500,000) • 3 – High ($500,000 up to $1 million). The figures provided are estimates only and detailed costings will be undertaken in the development of each action. As the cost for implementing this plan is high, funding allocation may be spread over multiple years. Where possible, Council will also seek support from State and Commonwealth Governments. A timeframe for each action is also included as follows: • Immediate – up to a year from adoption of the Plan • Short-term – between 1 to 4 years • Mid-term – between 5 to 8 years • Long-term – 8+ years • Ongoing – actions that require constant implementation.
Table 5 Policy and behaviour change actions
No.
Action
Description
Cost to Council
Timing
Agency
Policy and development
14 15
1
Align Council targets to the NSW State Government’s commitment to double active transport participation.
Lane Cove will use the NSW Government policies and strategies to help guide work in creating the environment in which cycling is safe and convenient. By improving cycling conditions, more people will have the freedom to ride for their everyday trips. Relevant documents include: • A Practitioner’s Guide to Movement and Place • TfNSW Cycleway Design Toolbox • NSW Active Transport Strategy 2022 • NSW Future Transport Strategy 2056 • NSW Road Safety Plan 2026 • Design of Roads and Streets Manual.
Low
Immediate
LCC
2
Apply the Road User Hierarchy in road space allocation and transport investment decisions.
Apply the NSW Road User Space Allocation Policy in decision making on road space allocation and transport investment.14
Low
Immediate
LCC
3
Maintain the walking and bike riding network.
Ensure that whenever road works occur that involve the removal and replacement of road surface on a designated bike riding route, any bicycle line marking or symbols that are disturbed are replaced when the works have been completed.
Low
Ongoing
LCC
4
Formalise the shared path network.
Formalise the shared user path network by installing mandatory shared path markings, symbols and text elements in line with the City Of Sydney Shared Pathways Pavement Markings Guidelines.15
Low
Short
LCC
5
Develop and implement a Lane Cove Wayfinding Strategy.
Collaborate with Willoughby City Council and North Sydney Council to develop a Lower North Shore Wayfinding Plan and consistent signage system across council boundaries. This should provide clear and legible information on direction, distance and travel time between key destinations.
Moderate
Short
LCC, North Sydney Council, Willoughby City Council
NSW Road User Space Allocation Policy City of Sydney Shared Pathways Pavement Markings Guidelines Lane Cove Council Bicycle Plan | 2026 57
No.
Action
Description
Cost to Council
Timing
Agency
6
Plan for micromobility sharing schemes.
Collaborate with the NSW Government and shared micromobility operators to implement the NSW Micromobility Sharing Scheme Framework within Lane Cove. This includes establishing mandatory parking zones, designated noparking areas and no-go zones, where appropriate, to support safe, accessible and well-managed shared micromobility services.16
Low
Short
LCC and TfNSW
7
Ensure future Council projects and private developments support rideable catchments.
New developments provide an opportunity to build active transport into the social and physical fabric, from day one. The following land use mechanisms are recommended to strengthen Lane Cove’s land use controls: • Development Control Plans (DCPs) • Include design principles to facilitate and encourage cycling as a primary mode of transport in all new developments. • Review car parking space maximums for new developments within areas identified as Strategic Precincts within the Lane Cove Council DCP. • Bicycle parking rates to be updated as part of a review of the Lane Cove Development Control Plan. At a minimum this should include a maximum of 20% of bike parking can be vertical (on a wall), with at least 80% horizontal (on the ground) and ensuring bike parking areas are convenient to the user and with consideration for theft minimisation (e.g. secured area, well lit, and with passive surveillance). • Review street design in new developments to ensure safe speeds, unless physically separated cycling infrastructure is provided. • Ensure active transport infrastructure in new developments connects with existing and planned infrastructure, as set out in this Bicycle Plan. • Sustainable Travel and Access Plans to be required for all commercial developments with a floor space over 600m2; industrial developments over 1,000m2, and all residential developments with 20 dwellings or greater. • Where full separation between pedestrians and cyclists is not feasible, shared paths with a minimum width of 4m to be provided in new public spaces, parks and reserves.
Low
Ongoing
LCC
16
58
NSW Government – Micromobility sharing schemes in NSW Institute for Sustainable Transport
No.
Action
Description
Cost to Council
Timing
Agency
8
Maximise opportunities for external funding of projects in the Bicycle Plan.
Prepare concept designs and undertake consultation for approximately 5% of the prioritised riding infrastructure identified in the Lane Cove Bicycle Plan each year to maximise Council’s readiness for external funding opportunities.
Low/ Moderate
Ongoing
LCC
9
Develop and implement a circulation plan.
Develop and implement a circulation plan for Lane Cove Village to enable more people-focused outcomes on Longueville Road.
Low/ Moderate
Short
LCC
10
Investigate accessible ramps at pedestrian bridges.
Investigate accessible ramps at pedestrian bridges, including along the Epping Road corridor at Longueville Road and Sam Johnson Way. This would improve accessibility for people walking and cycling by providing access across a key barrier in the network.
Moderate
Long
LCC and TfNSW
11
Review the Bicycle Plan every five years.
Review the Lane Cove Bicycle Plan every five years to maintain its relevance to contemporary planning issues and technology trends. Monitoring and evaluation will also be undertaken, including: • Implement a bike counter and vehicle speed evaluation program for the bicycle network. Bike counts and speed surveys should be conducted before cycleway construction for baseline data, immediately after construction and an 18-month following up. • Incorporate cycling satisfaction questions into the Annual Customer Survey to monitor satisfaction with cycling over time. • Conduct follow up surveys with cycling program participants to assess the shift in travel patterns toward cycling. • Conduct satisfaction surveys with participants in Council funded cycling programs and workshops. More information on Monitoring and evaluation can be found in Section 10.
Low
Mid
LCC
Lane Cove Council Bicycle Plan | 2026 59
No.
Action
Description
Cost to Council
Timing
Agency
Bicycle parking 12
Increase the availability of public on street bicycle parking.
Increase the availability of on-street bicycle parking across Lane Cove by installing: • A minimum of four bicycle parking hoops every 100 metres on each side of the street in high pedestrian activity areas (e.g. shopping strips) • A minimum of four bicycle parking hoops outside community facilities • A minimum of four bicycle parking hoops at ferry wharfs All installations should prioritise user convenience and bicycle security.
Low
Short
LCC
13
Increase the availability of offstreet bicycle parking in new developments.
Increase the availability of off-street bicycle parking in new developments. This includes: • Requiring one bicycle parking hoop per dwelling in multi-unit residential developments, plus one visitor space per ten dwellings. • Requiring one bicycle parking hoop per 150 m² of floor space and one visitor parking hoop per 400 m² in new commercial developments. • Requiring one bicycle parking space per two guest rooms in new visitor accommodation developments.
Low
Ongoing
LCC
Advocacy 14
Upgrade pedestrian crossings on shared paths to shared pedestrian–bicycle crossings.
Collaborate with the NSW Government to install bicycle lanterns (toucan crossings) at existing signalised intersections and crossings that connect shared user paths. This will formalise shared use and enable people riding to legally cross without dismounting.
Low
Short
LCC and TfNSW
15
Collaborate with adjoining LGAs.
Collaborate with adjoining LGAs to coordinate the planning and delivery of cross-border cycling connections. This includes working with Willoughby City Council to improve crossing priority along the Pacific Highway shared user path and with North Sydney Council to strengthen connections identified in the North Sydney Bike Plan.
Moderate
Ongoing
LCC, North Sydney Council, Willoughby City Council
60
Institute for Sustainable Transport
17
No.
Action
Description
Cost to Council
Timing
Agency
16
Meet regularly with neighbouring councils.
Meet regularly with neighbouring councils and relevant land authorities to plan riding connections across Council boundaries.
Low
Ongoing
LCC, North Sydney Council, Willoughby Council
17
Consult with the Bicycle Advisory Committee.
Consult regularly with the Bicycle Advisory Committee and other community stakeholders on network planning and path design to ensure the Bicycle Plan continues to reflect community needs.
Low
Ongoing
LCC
18
Safer speed limits on state roads.
Collaborate with the NSW Government to introduce safer speed limits on State roads where they pass through residential or commercial areas in Lane Cove (e.g. Burns Bay Road and Centennial Avenue).
Low
Mid
LCC and TfNSW
19
Adopt safer speed limits to support bicycle use.
Collaborate with the NSW Government to apply safer speed limits on the proposed riding network in line with NSW Speed Zoning Standard.17 This includes street design changes consistent with safer speed limits (i.e. speed humps, modal filters, speed tables and other traffic calming measures).
Moderate
Short
LCC and TfNSW
20
Advocate for regional routes.
Collaborate with the NSW Government to implement the proposed regional routes (RR1 Centennial Avenue, Burns Bay Rd, RR2 Pacific Hwy, RR3 Penrose, Bridge and River Rd and RR4 Mowbray Rd).
Low
Ongoing
LCC and TfNSW
21
Advocate for bus shelter transparency.
Advocate to the NSW Government for safer bus stop design on shared paths, recognising that shelters can create conflict points between people cycling and using public transport. Where shelters are located on shared paths, advertising panels should be avoided, or signage should be elevated to maintain visibility to reduce risk of collisions.
Low
Ongoing
LCC and TfNSW
NSW Speed Zoning Standard Lane Cove Council Bicycle Plan | 2026 61
No.
Action
Description
Cost to Council
Timing
Agency
Behaviour change 22
Become a community leader in active travel by preparing and implementing a Travel Plan for Council staff.
Create a Staff Travel Plan to help Council lead by example and support broader community change. It will be easier and more effective to implement a successful Plan for the whole community if Council staff have a lived experience of travelling, for at least some trips by bicycle. Typical interventions that are often used by Councils to encourage more sustainable staff travel include: • High quality, convenient bike parking, and attractive end of trip facilities like showers, lockers, ironing board etc • Ride to Work Day staff breakfasts and other events, supported by senior levels of Council • Council e-bike fleet, integrated into Council’s wider vehicle fleet, including booking system.
Moderate
Long
LCC
23
Continue participating in behaviour change events.
Continue delivering programs, workshops and events to encourage riding by teaching practical skills like bike maintenance and riding skills, as well as promoting behaviour change events such as Ride to Work Day, Ride to School Day and NSW Bike Week. Consideration will be given to engaging groups with lower participation rates, such as older adults, young people, and women.
Low
Ongoing
LCC
24
Investigate an ‘e-bike friendly businesses’ program.
Investigate an ‘e-bike friendly businesses’ program, in which businesses can elect to support people charging up their e-bike batteries. Cafes and libraries are examples of suitable locations.
Low
Long
LCC
25
Promote responsible use of e-bikes.
Develop and implement an e-bike education and information program that clearly outlines what constitutes compliant and non-compliant e-bikes, with a particular focus on appropriate use on shared spaces. This should include targeted messaging on speed management, interaction with pedestrians and be supported by coordination with relevant authorities on enforcement where required.
Low
Mid
LCC
62
Institute for Sustainable Transport
No.
Action
Description
Cost to Council
Timing
Agency
26
Encourage good etiquette among users of the network.
Encourage appropriate use of footpaths, shared paths, shared spaces and high pedestrian activity areas by ensuring: • Shared paths are designed to be sufficiently wide to accommodate expected user volumes and minimise conflicts • Pavement decals are used to promote safe speeds and bell use • Clear signage and line marking reinforce path etiquette, including keeping left, being mindful of other users, and encouraging faster riders to use alternative routes where available • Treatments such as rumble strips and pavement murals are applied to slow movement at key points such as junctions and high-traffic areas • Appropriate use of footpaths particularly in high pedestrian activity areas and where dismount zones and no cycling signage are in effect (e.g. The Canopy and Lane Cove Plaza).
Low
Ongoing
LCC
27
Support riding to and from school.
Develop and deliver a travel behaviour shift program that encourages schools to implement projects and programs that promote active and sustainable transport choices.
Low
Short
LCC
Lane Cove Council Bicycle Plan | 2026 63
Section 9: Cost benefit analysis
64
Institute for Sustainable Transport
Section 9: Cost benefit analysis A cost benefit analysis of the network has been undertaken to understand the value for money in delivering the Lane Cove cycling network. The analysis found that this Bicycle Plan will deliver an estimated $4.46 in benefits for every $1 invested. 9.1 Travel activity in Lane Cove
9.2 Modelling cycling mode share
The NSW HTS is conducted regularly, collecting data about how people travel across NSW.18 As noted in Section 5.1, data for bicycle use is not reported separately, but combined into an ‘other’ category. This other category has been disaggregated, which reveals a reasonably stable ratio of walking to cycling. Mode share assumptions are shown in Table 6, revealing an estimated current cycling mode share for all trips of 1%.
Current and future cycling mode share has been estimated based on the provision of cycling infrastructure. The Australian Transport Assessment and Planning Guidelines M4 Active travel – Background Report shows that there is a demonstrable link between the percentage of the road network which has infrastructure and bicycle activity.19 An elasticity of 0.35 has been determined based on analysis of 24 medium sized US cities.20
Table 6 Mode share assumptions from HTS
The total length of existing riding infrastructure, by typology, has been calculated for Lane Cove. This was then weighted against the confidence factors of each cycling infrastructure typology based on the City of Melbourne’s Near-Market Research Report.21 From this, the percentage of Lane Cove’s roads which have infrastructure provision was then calculated. Weighting infrastructure by confidence factor decreased the effect of low-quality infrastructure, such as bicycle symbols without any other treatment.
Disaggregated HTS
2024/25 mode Share
Vehicle passenger
20%
Bicycle (estimated)
1%
Vehicle driver
41%
Public Transport
16%
Walk only
21%
Other (estimated)
1%
Source: Household Travel Survey (2024/25) Transport for NSW Household Travel Survey (HTS) Australian Transport Assessment and Planning Guidelines 20 Marshall, W. E. & Garrick, N. W. 2010. Effect of Street Network Design on Walking and Biking. Transportation Research Record, 2198, 103-115. https://doi.org/10.3141/2198-12 21 City of Melbourne Bicycle User Confidence Study - Near-market Research Analysis Report
The total length of proposed cycling infrastructure, by typology, has been calculated for Lane Cove. Again, this was weighted by confidence factors, and the Australian Transport Assessment and Planning Guidelines M4 Active travel elasticity applied. This revealed a potential future mode share of 2.4%, a mode shift of 1.4%.
18 19
There is a potential for a future mode share of 2.4% by 2036, a shift of 1.4%.
Lane Cove Council Bicycle Plan | 2026 65
9.3 Projecting cycling activity
9.4 Estimating costs and benefits
The NSW HTS shows the total number of trips, which reveals that there has been an average of 4 trips per person across the last three survey periods. This has been used to project the total number of trips per day, based on population projections from the 2022 NSW Common Planning Assumption Projections.22
This Bicycle Plan contains 32.5km of infrastructure improvements, with an estimated total construction cost of $26.8 million, as shown in Table 7. Regional routes, which run on State Government roads, are estimated to cost $10.9 million, while local routes on Council roads are estimated to cost $15.9 million. The cost is due to high construction costs for protected cycling infrastructure. These costs would be spread over the life of the Bicycle Plan.
Based on the modelling above, the bicycle mode share was projected to increase as the network develops, from 1% in 2026 to 2.4% by 2036. A business-as-usual scenario, with no increase in mode share was also projected. The projected number of daily cycle trips, under a business-as-usual baseline scenario and network delivery scenario are shown in Figure 37. There are projected to be 5.3 million additional cycling trips in Lane Cove between 2026 and 2036 as a result of implementing this Bicycle Plan.
Proposed Change
Estimated cost per km
Total km proposed
Total cost
Advisory markings
$10,000
0
$0
Painted bicycle lane
$100,000
0
$0
Protected bicycle lane (one-way pairs)
$1,000,000
0.5
$504,038
2,000
Protected bicycle lane (bi-directional)
$1,000,000
17.9
$17,912,243
1,000
Quietway
$350,000
8.5
$2,963,632
Shared path
$1,000,000
5.3
$5,323,878
Shared space
$350,000
0.3
$92,243
32.5
$26,796,034
Daily cycling trips
6,000 5,000 4,000 3,000
0 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 Year
—–––– Cycle trips – Business as usual
—–––– Cycle trips –Network development
Figure 37 Projected daily cycle trips 2026 to 2036 Source: Institute for Sensible Transport
22
66
Table 7 Estimated bicycle network construction costs (2024 AUD)
NSW Population Projections 2024 Institute for Sustainable Transport
Total
A cost-benefit analysis was undertaken using the NSW Treasury CBA Tool.23 Costs of the network were spread evenly over the ten years from 2026 to 2036 and benefits from 2025 to 2045 were inputted. The results, assuming a 5% discount rate, are shown in Table 8. The Lane Cove Bicycle Plan has a BCR of 4.46, with a net present value of $75.8 million. Table 8 Lane Cove Bicycle Plan Cost Benefit Analysis
Undiscounted
Present Value
Costs
$26,796,034
$21,938,409
Benefits
$180,133,163
$97,751,934
Net Present Value
$75,813,525
Benefit to Cost Ratio
4.46
Note: Calculated with NSW Treasury CBA Tool 23
The Lane Cove Bicycle Plan has a BCR of 4.46, with a net present value of $75.8 million. A sensitivity analysis has been undertaken using the NSW Treasury Cost CBA Tool to test the robustness of the results under different cost and benefit assumptions. This analysis tests sensitivity to variations in infrastructure costs and benefits using the NSW Treasury CBA Tool, applying ±20% adjustments to costs and benefits independently. The results are summarised in Table 9.
23
The sensitivity analysis scenarios are defined as follows: • Best-case scenario (low cost / high benefit) assumes a 20% reduction in infrastructure costs and a 20% increase in cycling benefits. • Worst-case scenario (high cost / low benefit) assumes a 20% increase in infrastructure costs and a 20% reduction in cycling benefits. Table 9 Sensitivity CBA based on different infrastructure costings
Best-case scenario (low cost / high benefit)
Worst-case scenario (high cost / low benefit)
Present Value Costs
$17,550,727
$26,326,091
Present Value Benefits
$117,302,321
$78,201,547
Net Present Value
$99,751,594
$51,875,457
Benefit to Cost Ratio
6.684
2.970
The benefits calculated for this Bicycle Plan have only included estimated riding activity for Lane Cove residents. In reality, much of the new cycling generated from the provision of improved infrastructure will come from people that do not reside in Lane Cove. In effect, what this means is that the BCR is likely to be a significant underestimate of the benefits associated with this Bicycle Plan, relative to costs.
There are likely significant benefits beyond those identified in this Bicycle Plan, as the network will attract users from outside the local area.
Government Guide to Cost-Benefit Analysis Lane Cove Council Bicycle Plan | 2026 67
Section 10: Monitoring and evaluation
68
Institute for Sustainable Transport
Section 10: Monitoring and evaluation Monitoring and evaluation are critical components of this Bicycle Plan. It allows Council to track how well we are meeting our goals and objectives and allows us to adjust our approach where necessary. The framework is designed to monitor and evaluate the success of the Bicycle Plan as a whole, as well as individual projects. Data must be collected in order to measure progress towards the vision and transport objectives. Data should come from multiple sources, including Lane Cove Council’s own collection. A list of the strategic objectives and data sources are offered in Table 10. Table 10 Data required to measure progress
Strategic objective
Measure
Increase cycling mode share to 2.4% by 2036.
NSW State Government Household Travel Survey: • Number of trips (all purpose) by bicycle (note that this data is not currently included) • Percentage of trips (all purpose) by bicycle (note that this data is not currently included).
Double the number of children riding to school in Lane Cove.
As part of the school travel behaviour shift (Policy and Behaviour Change Action 27), collect data on school travel patterns to monitor progress towards this objective.
Increase the proportion of the population within 400 m of a high-quality riding facility, measured every five years, to 2036.
Percentage of population within 400 m of high-quality cycling infrastructure compliant with the NSW Cycleway Design Toolbox.24
Maintain zero fatalities and reduce serious bicycle crashes to 4 per five-year average by 2033 (from a baseline of 6 per five-year average to 2024).
NSW Centre for Road Safety – Crash Statistics • Number of crashes involving people riding in Lane Cove • Number of injuries involving people riding in Lane Cove • Number of fatalities involving people riding in Lane Cove.
Reduce community greenhouse gas emissions by 80% by 2036 (FY16/17 emissions baseline).
Carbon inventory accounting using the Global Protocol for Community-Scale Greenhouse Gas Inventories 1.1 compliant methods.25
Note: The HTS does not separately report cycling, instead categorising it within the ‘other’ mode. Cycling mode share can be estimated using other travel survey data and ABS Census data as benchmarks.
High-quality infrastructure can be considered infrastructure compliant with the TfNSW Cycleway Design Toolbox, that is suitable for all ages and abilities. These include local street bikeways (quietways), protected bicycle lanes and off-road paths. 25 Global Protocol for Community-Scale Greenhouse Gas Inventories. 24
Lane Cove Council Bicycle Plan | 2026 69
Appendices
70
Institute for Sustainable Transport
Appendix A: Bicycle Use Propensity Index A.1 Bicycle Use Propensity Index – origin
A.2 Bicycle Use Propensity Index – destination
Figure 38 Bicycle Use Propensity Index – Origin Source: Institute for Sensible Transport using ABS Census
Figure 39 Bicycle Use Propensity Index – Destination Source: Institute for Sensible Transport using ABS Census Lane Cove Council Bicycle Plan | 2026 71
Appendix B: Road network classifications Roads in Lane Cove are categorised as State, Regional or Local. State roads are managed by TfNSW, while Regional and Local roads are managed by Council. Council maintains approximately 110km of roadway and in excess of 150km of public pathways. Regional Roads are recognised as roads with roles of secondary importance, making them eligible for State Government financial assistance (limited to the carriageway only). State roads in Lane Cove include: • Epping Road • Centennial Avenue south of Epping Road • Pacific Highway • Burns Bay Road south of Centennial Avenue. Regional roads include: • Centennial Avenue north of Epping Road • Mowbray Road • Penrose Street east of Burns Bay Road • Bridge Street • River Road West • Northwood Rd between River Road West and River Road • Greenwich Road north of River Road • River Road. Figure 40 NSW Road Network Categorisation Source: TfNSW 72
Institute for Sustainable Transport
Appendix C: Cycleway design toolkit C.1 Cycling network planning Having a set of design principles ensures that future works follow a consistent philosophy. The six network design principles, shown in Figure 41, are recognised internationally, and are featured in the NSW Cycleway Design Toolbox. By applying the network design principles, cycling can become a more common transport option for people of all ages and abilities, and can be enjoyed equally, regardless of gender. These design principles will help Council integrate infrastructure in ways that balance a range of considerations. Designing for all ages and abilities is discussed further in Box 2.
Designing for all ages and abilities A well-designed network should cater to all users, ensuring that it is safe, and comfortable, for everyone. Designing for all ages and abilities means considering: •
All people – regardless of age, gender and background – including women, children, seniors, people living with disability, low-income households and people who are less confident riding.
•
All types of bicycles – including standard and electric bicycles, kick scooters, electric scooters, cargo bikes, folding bicycles, tricycles, unicycles and specialist bicycles for people living with disabilities.
•
All types of trip purposes – including commuting, school run, shopping and recreation.
Box 2 Designing for all ages and abilities Source: Institute for Sensible TransportSW
Figure 41 Cycling network design principles Source: Institute for Sensible Transport adapted from NSW Cycleway Design Toolbox Lane Cove Council Bicycle Plan | 2026 73
C.2 Types of infrastructure
C.2.1 Shared paths
The different types of infrastructure Council will use to support cycling across Lane Cove are outlined in Section 6.2 (Figure 26). The precise nature of the improvement will be determined following the outcome of future planning and detailed design works. Some upgrades may occur as part of routine maintenance, but fully implemented routes may require external funding.
The different types of infrastructure align with the NSW Government Cycleway Design Toolbox and the Design of Roads and Streets Manual. Table 11 provides high-level indicative cost ranges for the types of infrastructure proposed in this Bicycle Plan. These costs are a high-level guide only, with complete costings to occur at detailed design phase. Table 11 does not include shared zones and aggregates protected on-road infrastructure (both one-way and bi-directional configurations).
Low cost estimate
Medium cost estimate
High Cost estimate
Shared user path
$500,000
$900,000
$1,500,000
Quietways
$25,000
$350,000
-
Protected on-road infrastructure
$500,000
$1,000,000
$2,500,000
26
74
Trafficworks - Priority Cycling Corridor Investment Analysis Institute for Sustainable Transport
C.2.2 Quietways Quietways generally operate as mixed traffic solutions on local streets, supported by traffic calming and reduced through-traffic. They are typically lower cost, but complexity can increase when more substantive interventions are required. Simple treatments may involve signage and line marking, while more complex implementations require speed management, modal filters and intersection treatments to achieve safe conditions. Information on the design requirements for quietways is provided in Section C.4.
C.2.3 Protected on-road infrastructure
Table 11 Cost estimates for cycling infrastructure by complexity level
Source: Trafficworks26
Shared paths provide off-road facilities for people walking and cycling, typically along corridors where road space is constrained or separation is preferred. Costs are highly dependent on available space and civil works requirements. Lower-cost paths typically involve basic widening or surface upgrades to existing paths. Higher-cost projects typically require verge widening, retaining structures, drainage upgrades, tree removal, utility relocation and reconstruction of driveways/crossings. Information on preferred widths, line marking and pinch point management is provided in Section C.3.
On-road protected cycling infrastructure provides physically separated space for people cycling within the carriageway and is generally preferred on higher-speed or higher-volume roads. These facilities can be provided as one-way bicycle lanes on both sides of the road (one-way pairs) or as a bi-directional facility on one side of the carriageway. High-quality protected cycling infrastructure can be expensive, with costs varying depending on the type of treatment and the complexity of delivery. Lower-cost solutions, such as bolt-down kerbs or separators, can be installed quickly with minimal civil works. More permanent treatments, such as concrete kerbs or raised medians, involve greater construction complexity and higher costs but are generally more durable.
The cost differences between infrastructure types can significantly affect the extent of the network that can be delivered. For example, the Bourke Street cycleway shown in Figure 42 was Sydney’s first large-scale bidirectional, separated cycleway and involved full corridor upgrades including streetscape and services, resulting in a cost of $7.1m per kilometre. More recent projects such as the Campbell Street cycleway cost in the order of $4 million per kilometre.
Figure 43 shows a lower-cost pop-up treatment, which can be installed quickly, with less reconstruction of the existing road environment. Pop-up bike lanes have become increasingly common across Sydney as a way to rapidly deliver safer cycling infrastructure and trial new street configurations. Indicative costs for popup infrastructure typically range between $300,000 and $700,000 per kilometre, depending on the materials and level of supporting civil works required. This can provide significant cost saving compared to more permanent infrastructure. Examples of recently completed pop-up cycleways in Sydney include: • Pitt Street pop-up cycleway • Sydney Park Road pop-up cycleway • Dunning Avenue pop-up cycleway • Moore Park Road and Fitzroy Street pop-up cycleway (Figure 43).
Figure 42 Bourke Street Cycleway Source: City of Sydney
The cost difference between infrastructure types can significantly affect the extent of the network that can be delivered.
Figure 43 Moore Park Road cycleway Source: Bicycle NSW Lane Cove Council Bicycle Plan | 2026 75
C.3 Shared path design A shared path accommodates two-way bicycle and pedestrian movements along either the footpath or an off-road environment. The consultation undertaken as part of the Bicycle Plan made it clear that space constraints can make shared paths difficult to navigate, especially when there are groups of people walking or riding. As outlined in Table 12, shared path widths should respond to the context and expected user volumes. A desirable minimum width of 2.5 m is recommended for local routes, increasing to 3.0 m for higher-order regional routes. Wider paths of up to 4.0 m should be provided where demand and available space allow. Where more than 4.0 m is available, separated bicycle and pedestrian facilities should be considered, as outlined in Table 13. Table 12 Shared path widths
Local routes
Regional routes
Desirable minimum width
2.5m
3.0m
Minimum width – typical maximum
2.0m – 3.0m
2.5m – 4.0m
Source: Austroads Guide to Road Design Part 6A: Paths for Walking and Cycling Table 13 Separated path widths (two-way paths)
Bicycle path
Pedestrian path
Total width
Desirable minimum width
2.5m
2.0m
4.5m
Minimum width – typical maximum
2.0m – 3.0m
≥1.5m
≥4.5m
C.3.1 Signage and line marking The absence of a clear delineation between walking and cycling is a key feature of a shared path. Separation between opposite directions using line markings or distinguishable pavement surfaces (e.g. in colour or texture) should be considered when space allows for it. As part of this Bicycle Plan Council will adopt the City of Sydney Shared Pathways Pavement Markings Guidelines.27
C.3.2 Centrelines Evidence from the NSW Government on shared path user behaviour demonstrates that centreline delineation is an effective low-cost intervention for improving safety and performance on shared paths.28 The research found that: • Centreline marking can increase compliance with left-hand travel behaviour with 93% of both cyclists and pedestrians keeping left where a centreline was present • Centreline delineation was independently predictive of correct positioning, even after controlling for other contextual factors • Visual separation alone (e.g. colour or surface contrast without a line) did not produce comparable behavioural compliance. These findings indicate that centrelines provide a clear behavioural cue to encourage users to keep left. Figure 44 provides guidance on how shared paths of different widths will be line marked to ensure consistency across the network.
Source: Austroads Guide to Road Design Part 6A: Paths for Walking and Cycling 27 28
76
Institute for Sustainable Transport
City of Sydney Shared Pathways Pavement Markings Guidelines TfNSW Shared paths – Discussion of research findings and key safety
Figure 44 Shared path line marking guidance Source: Institute for Sensible Transport using City of Sydney Shared Pathways Pavement Markings Guidelines
Lane Cove Council Bicycle Plan | 2026 77
C.3.3 Managing pinch points path network. These constraints include bus stops, trees, power poles and cliff faces, which reduce the operational width of paths. Removing mature trees or modifying natural rock faces is costly, environmentally undesirable and inconsistent with broader Council objectives. These options should therefore be considered as a last resort where all other design responses have been exhausted. Bus stops are a common pinch point on the network. In NSW, the management of bus stops is a shared responsibility between TfNSW and the local Council. Figure 45 illustrates how the interaction between bus stops and shared paths should be managed, based on the design principles outlined in the Design of Roads and Streets Manual, and international best practice such as the Global Street Design Guide and the Transit Street Design Guide by National Association of City Transportation Officials (NACTO). This Bicycle Plan also includes an action to advocate and work with TfNSW for bus shelters consistent with Bus Stop Urban Design Guidelines29 on shared paths, that are either transparent or incorporate elevated advertising panels (advertising-free at lower levels) to maintain visibility through and beneath the shelter.
Figure 45 Design principles for managing bus stops on shared paths Source: Institute for Sensible Transport
29
78
TfNSW Bus Stop Urban Design Guideline
Institute for Sustainable Transport
C.4 Quietway design A quietway is a high-quality treatment where people riding travel in a mixed traffic environment and are positioned in the centre of the carriageway. Quietways are consistent with the Cycleway Design Toolbox and are considered yield streets within the Design of Roads and Streets Manual. They are typically applied on lower-volume local streets to create safe and comfortable conditions for people cycling to share the road. Key design characteristics include: • Minimising through-traffic by applying filtered permeability (<2,000 vehicles per day) • Safe and self-reinforcing speed limits (<30km/h) • Reduced road width (<3m per lane) • Traffic calming measures to encourage safe driving behaviour.
C.4.1 Traffic calming Quietways must be complemented by traffic calming treatments to provide a safe and comfortable environment for people riding. Where designed well, traffic calming measures benefit all road users including people walking, residents and businesses. A variety of traffic calming treatments are available to suit different contexts and outcomes, as shown in Figure 46.
C.4.2 Entry and exit points Entry and exit points are critical to the success of a quietway. The entry and exit points establish expectations on the street and reinforce the function as shared space between people riding and vehicles. Prominent features such as signs, architectural features or landscaping elements must indicate a change in the street environment. Where appropriate, filtered permeability treatments should be used at entry and exit points to discourage through-traffic and prioritise local access.
Figure 46 Traffic calming treatments options Source: Tasmania Cycling Infrastructure Design Guide Lane Cove Council Bicycle Plan | 2026 79
Figure 47 provides a concept for how quietways could function in Lane Cove using Kara Street as an example. While Kara Street has been used as an example, applying quietway design principles broadly across the network can make residential streets safe and comfortable places to ride for people of all ages and abilities. Where designed well, quietways benefit all users by making the street a more pleasant place to be.
Figure 47 Concept design for quietway treatments Source: Institute for Sensible Transport 80
Institute for Sustainable Transport
Appendix D: Crossings and intersections D.1 Crossings and priorities Crossing priority is a critical consideration in network design. Clear visual cues must communicate which users have priority and how space within the crossing is allocated so that users understand their obligations. Signalised crossings for bicycle users should apply toucan crossings or dedicated bicycle lanterns, with a signal lead phase and dedicated green time to remove conflicts with turning vehicles. Automatic loop detectors and adjusted signal controls can also be used to reduce waiting times for people riding. On shared paths, a joint toucan phase should be applied to enable concurrent crossing. For non-signalised priority crossings, a pedestrian (zebra) crossing adjacent to bicycle path crossings (all on raised platforms) should be applied as per Figure 49.30 Figure 49 shows an example of this in practice in North Sydney.
Figure 48 Priority path crossing example Source: TfNSW 30
NSW Government Movement and Place – Priority path crossings
Figure 49 Priority path crossing guidance Source: Institute for Sensible Transport Lane Cove Council Bicycle Plan | 2026 81
Figure 50 identifies locations across the proposed network that will require further investigation to provide a safe and comfortable environment for people riding. These include: • Locations for priority path crossings, such as along Epping Road and at the Pacific Highway shared user path. Figure 49 provides guidance on priority crossing treatments. • Existing signalised intersections where one or more legs require upgrades to toucan crossings to accommodate cycling movements and allow people riding to cross without dismounting. • Complex intersections where multiple routes and infrastructure types converge, requiring additional design consideration to ensure it is a safe intersection for all users. Table 14 provides indicative costs for the different types of crossing and intersection infrastructure. These are high-level costs to be used as a guide for future works. Table 14 Cost rates for intersections and crossings
Infrastructure type
Low cost
High cost
Intersection upgrade (general)
$200,000
$1,000,000
Signalised intersection
$200,000
$1,000,000
Pedestrian operated signal
$50,000
$1,500,000
Raised priority crossing
$60,000
$160,000
Source: Trafficworks 82
Institute for Sustainable Transport
Figure 50 Potential crossings and intersection upgrades Source: Institute for Sensible Transport
Appendix E: Circulation Plan To enable more people-focused outcomes, a circulation plan would need to be developed to reconfigure how traffic moves throughout the Lane Cove Village. This Bicycle Plan includes an action to develop and implement a circulation plan for the Lane Cove Village area. Figure 51 shows how traffic could be reconfigured to one-way movements on certain streets to enable more space at the northern end of Longueville Road. Reconfiguring Longueville Road to one-way northbound traffic and Little Street to one-way southbound movements would allow space to be reconfigured on Longueville Road for more people-focused outcomes, such as a shared zone that allows all modes of transport to share the space. This would not remove vehicle access from any street; however, it would restrict how vehicles move. Consideration would need to be given to the location of bus stops, delivery zones and access for emergency vehicles. A northbound one-way arrangement on Longueville Road is preferred as it reduces overall traffic conflicts and simplifies intersection operations compared to a southbound arrangement. In particular, a southbound arrangement would create more challenging turning movements and additional conflicts at key intersections, including Austin Street/Longueville Road/Central Avenue and Burns Bay Road/Longueville Road/Little Street.
Figure 51 Concept circulation plan Source: Institute for Sensible Transport Lane Cove Council Bicycle Plan | 2026 83
Appendix F: Site audit A detailed site audit was undertaken as part of the development of the Bicycle Plan. This occurred over several days in November 2025 and again in February 2026. Observations were grouped into the following categories: • Existing conditions – Dangerous • Existing conditions – Issues • Existing conditions – General Notes • Area of opportunity. Each observation included a geolocated tag of existing conditions, with photos attached to the record.
A total of 248 observations were recorded across Lane Cove. The 11 routes from the 2019 Lane Cove Bicycle Plan were assessed, along with an audit of wider network. Each route was assessed for its existing conditions and future opportunities. The findings of the site audit are detailed in a separate Site Assessment Report, which has directly informed the recommendations of this Bicycle Plan. Figure 52 Site audit observations Source: Institute for Sensible Transport 84
Institute for Sustainable Transport
Appendix G: Cross sections This section provides a series of indicative crosssections for the proposed bicycle network. The crosssections outline how cycling infrastructure is to be integrated within the road environment. Figure 53 provides a key map showing the location of each cross-section. Each cross-section has been assigned a corresponding number code. The cross sections are provided from Appendix G.1.1 to G.1.24 below.
The cross-sections outline how cycling infrastructure could be integrated into the road environment. The cross-sections are indicative only and show potential spatial arrangements. The side of the street on which key elements are shown, including footpaths, bicycle lanes and on-street parking, is indicative only and may change at detailed design stage through engineering assessment and community consultation as part of future implementation.
Figure 53 Cross-sections key Source: Institute for Sensible Transport Lane Cove Council Bicycle Plan | 2026 85
G.1.1 Orion Road
G.1.3 Barwon Road
Figure 54 Orion Road – cross-section Source: Institute for Sensible Transport
Figure 56 Barwon Road – cross-section Source: Institute for Sensible Transport
G.1.2 Cullen Street
G.1.4 Hallam Avenue
Figure 55 Cullen Street – cross-section Source: Institute for Sensible Transport
Figure 57 Hallam Avenue – cross-section Source: Institute for Sensible Transport
86
Institute for Sustainable Transport
G.1.5 Wood Street
G.1.7 Riverview Street
Figure 58 Wood Street – cross-section Source: Institute for Sensible Transport
Figure 60 Riverview Street – cross-section Source: Institute for Sensible Transport
G.1.6 Burns Bay Rd (E-W)
G.1.8 Pengilly Street
Figure 59 Burns Bay Road – cross-section Source: Institute for Sensible Transport
Figure 61 Pengilly Street – cross-section Source: Institute for Sensible Transport
Lane Cove Council Bicycle Plan | 2026 87
G.1.9 Kenneth Street
G.1.11 Northwood Road
Figure 62 Kenneth Street – cross-section Source: Institute for Sensible Transport
Figure 64 Northwood Road – cross-section Source: Institute for Sensible Transport
G.1.10 Stuart Street
G.1.12 Greenwich Road (north)
Figure 63 Stuart Street – cross-section Source: Institute for Sensible Transport
Figure 65 Greenwich Road (north) – cross-section Source: Institute for Sensible Transport
88
Institute for Sustainable Transport
G.1.13 Gore Street
G.1.15 Greenwich Road (central)
Figure 66 Gore Street – cross-section Source: Institute for Sensible Transport
Figure 68 Greenwich Road (central) – cross-section Source: Institute for Sensible Transport
G.1.14 Carlotta Street
G.1.16 Chisholm Street
Figure 67 Carlotta Street – cross-section Source: Institute for Sensible Transport
Figure 69 Chisholm Street – cross-section Source: Institute for Sensible Transport
Lane Cove Council Bicycle Plan | 2026 89
G.1.17 Greenwich Road (south)
G.1.19 Longueville Road (central)
Figure 70 Greenwich Road (south) – cross-section Source: Institute for Sensible Transport
Figure 72 Longueville Road (central) – cross-section Source: Institute for Sensible Transport
G.1.18 St Lawrence Street
G.1.20 Dorritt Street
Figure 71 St Lawrence Street – cross-section Source: Institute for Sensible Transport
Figure 73 Dorritt Street – cross-section Source: Institute for Sensible Transport
90
Institute for Sustainable Transport
G.1.21 Phoenix Street (south)
G.1.23 Burley Street
Figure 74 Phoenix Street (south) – cross-section Source: Institute for Sensible Transport
Figure 76 Burley Street – cross-section Source: Institute for Sensible Transport
G.1.22 Landers Road
G.1.24 Helen Street
Figure 75 Landers Road – cross-section Source: Institute for Sensible Transport
Figure 77 Helen Street – cross-section Source: Institute for Sensible Transport
Lane Cove Council Bicycle Plan | 2026 91