Cleveland Heights
Wayfinding Implementation Plan Engagement findings, precedents, and a proposed plan forward PREPARED FOR THE CITY OF CLEVELAND HEIGHTS BY LAND STUDIO NOVEMBER 2026
Contents Introduction
3
Voices from the Districts:
4-9
From Plan to Practice:
10–14
Three Tiers:
15–17
Looking Elsewhere:
18–31
The Plan Forward:
32–35
Feedback that Shapes the Strategy Aligning the County Plan with District Input What Gets Built, and by Whom A Wayfinding Precedent & Inspiration Catalog Timeline, District-Led Signage, Investment, & Next Steps
2
Cleveland Heights is a city of distinct business districts, each with its own character and the people who know it best.
INTRODUCTION
Introduction Over decades, the signage that connects them has accumulated without a system behind it. Some signs are failing, some point to places that have changed, and few share a common language. In October 2025, the Cuyahoga County Planning Commission completed a Gateway & Wayfinding Signage Plan for the City. It gave the City a strong technical foundation: an inventory of existing signs, recommended sign types, priority gateway locations, and guidance on cost and funding. The City then asked LAND studio to help turn that plan into a strategy it can act on. Along the way, we held working sessions with district stakeholders, surveyed people who work, own property, and live in the districts, reviewed the County plan against what we heard, and gathered precedents from other cities. That input helped inform the plan that follows, alongside the City’s priorities, its budget, and the County plan’s technical findings. This document brings that work together with a proposed plan forward. It organizes the system into three tiers (City Standard, District-Integrated, and District-Branded) so it is clear who designs, funds, and maintains each kind of sign. It sets out a phased path to design and install the citywide and district-integrated signage, explains how districts can lead their own signage creation, and names the decisions that will move the work ahead. Wayfinding & Signage Plan | November 2026
3
Voices from the Districts: Feedback that Shapes the Strategy Purpose This summary puts the districts’ own voices on the record. Between March and June 2026, LAND studio met with business-district representatives and gathered feedback through a district-wide survey to understand their priorities, identity, and ideas for wayfinding ahead of the design phase. It is organized by theme and reports the community's input.
4
Cedar Fairmount
Cedar Lee
Coventry Village
District-wide Survey
In-person Session
In-person Session
In-person Session
Virtual Feedback
March 2026
March 2026
April 2026
May – July 2026
Who We Heard From 32 survey respondents divided by role (one selection each): a portrait of district insiders, not visitors.
42%
Business owner / operator
23%
Property owner
16%
Resident
13%
Employee in the district Community / neighborhood leader Visitor
Wayfinding & Signage Plan | November 2026
6% 0% 5
VOICES FROM THE DISTRICT:
Every session was framed as a listening exercise. The City is proceeding thoughtfully, and district input is a central part of the strategy, not an afterthought. Participants reviewed the County plan’s proposed signage, marked priorities, and named what they would add or change.
Feedback that Shapes the Strategy
How We Engaged
How Current Wayfinding Ranks Across the survey, participants rated today’s wayfinding poorly on nearly every measure. The pattern is consistent with what we heard during disscussions: signs that are hard to read, hard to find, and inconsistent from block to block.
59%
Condition / maintenance
Ease of finding destinations
34%
56%
41%
59%
Visibility / placement
Fair
Good
41%
63%
Clarity of sign information Accessibility for all users
Poor
3%
31%
50%
3%
47%
9% 3%
Where Support is Needed Most Asked where wayfinding would help most, respondents pointed first to gateways and entries, followed by parking and key destinations. The pattern reinforces the sessions: the greatest need is helping people know they’ve arrived and where to go once they have. Note: respondents could select more than one.
65%
District gateways / entries
55%
Parking areas
45%
Key destinations / landmarks
42%
Business corridors Pedestrian wayfinding kiosk 6
35%
Cedar Fairmount
Raised Strongly
Cedar Lee
Present
Coventry
Not notable
Survey
Parking: knowing, not finding District identity should lead Knowing you’ve arrived / gateways Ideas for identity & character Connecting districts & destinations Bike, pedestrian, lighting & safety Conditions changed since fieldwork
Parking is about knowing, not finding
Districts want their identity to lead
In every district, the issue wasn’t a shortage of spaces. It was that visitors don’t know free public lots exist, or assume they’re private.
Participants identify with district names more than with the city name, and want the citywide brand to connect districts, not absorb them.
“People assume the lot is private when it’s actually free; they park far away and walk through.”
“We want to be magnets that draw people in, not toll booths they pass through.”
— Business owner, Cedar Fairmount
— SID representative, Coventry
Wayfinding & Signage Plan | November 2026
7
VOICES FROM THE DISTRICT:
Seven themes surfaced across the engagement. The matrix shows where each was voiced. A filled marker means the theme came through strongly in that district’s session or survey input. Parking and district arrival were near-universal.
Feedback that Shapes the Strategy
The Themes, and Who Raised Them
Identity Snapshots Each district described a distinct personality and a clear sense of what makes it unique. These snapshots capture how participants talked about their districts.
Cedar Fairmount
Cedar Lee
Coventry Village
The gateway to the Heights
An arts & makers district
Funky, diverse, a place you travel to
CHARACTER
CHARACTER
CHARACTER
• • •
1920s historic residential architecture Mixed medical, student & dining crowd Busy at all hours; a “Jane Jacobs” vibrancy
• • •
Emerging arts-district identity (brand launched 2026) Independent shops, makers & the region’s pro theater An all-day district; adult audience 21–75+
• • •
Classic architecture, counterculture spirit Diverse & evolving restaurant scene Walkable “sidewalk culture”
•
A more mature, middle/upper-income audience
•
Wants pedestrian-scale, cohesive feel end to end
•
Distinct north (emerging) & south (arts) ends
WANTS TO BE KNOWN FOR
WANTS TO BE KNOWN FOR
WANTS TO BE KNOWN FOR
A welcoming, walkable arrival point: “Eat, Drink, Shop”
Vibrant, eclectic & approachably sophisticated
An authentic, spectacle-worthy destination
Art as Wayfinding A cross district identity
All three SIDs see public art and sculptural elements doing the work of gateways, marking arrival and identity at once. Cedar Lee floated marquee-style signage playing off the theater; Coventry describe statement pieces that brand the district.
8
1
Parking clarity
2
District arrival & gateways
3
District identity leading
4
Destinations & connection
Communicate where parking is, that it’s free and public, and how to use it. Named in every session and by 55% of survey respondents. The problem is knowledge, not supply: visitors assume free lots are private, don’t know the reopened city garage exists, and can’t tell paid from free, so parking that already exists goes unused.
Help visitors know when they’ve entered a district, and clearly define its edges. The single most unclear thing on arrival (65% of survey respondents) and the top-requested support (65%).Coventry’s entrances read as “two gas stations” and a “hodgepodge”; Cedar Fairmount wants to convert pass-through traffic into visitors who stop.
Let each district’s identity come through, connected by a citywide layer rather than absorbed by it. Participants identify with district names more than with “Cleveland Heights,” and want the districts to act as magnets, not toll booths. Districts with established brands see the balance between city and district identity as the central question for the project.
Give visibility to destinations that aren't exposed and link districts into a navigable, walkable network. Cedar Fairmount wants flow toward Cedar Lee; Cedar Lee wants to “breadcrumb” visitors from its main hub to the quieter theater end and Cain Park. Districts see themselves as connected, not isolated, and want wayfinding to reflect that.
Wayfinding & Signage Plan | November 2026
9
VOICES FROM THE DISTRICT:
Taken together, the engagement points to a consistent set of priorities across the participating districts:
Feedback that Shapes the Strategy
Four Priorities the Community Named
From Plan to Practice: Aligning the County Plan w/ District Input Signage Plan Purpose The City of Cleveland Heights retained the Cuyahoga County Planning Commission to prepare a Gateway & Wayfinding Signage Plan for the City. Completed in October 2025, the plan provides a strong technical foundation: a 240-sign inventory, a community gateway prioritization matrix, a citywide decision-zone analysis, district-level sign maps, and cost and funding guidance. After the completion of the plan and some initial feedback from stakeholders, the City retained LAND studio to provide a peer review and additional insight into the plan, as well as guidance on design and/or fabrication RFQ(s). This work reviews the plan through the lens of the stakeholder engagement LAND studio has conducted with three of the City’s business districts, and identifies where that input confirms, refines, or extends what the plan proposes so the City can carry the strongest possible direction into the design RFQ. 10
DOCUMENT PREPARED: October 7, 2025
Between March and April 2026, LAND studio held in-person working sessions with three districts (Cedar Fairmount, Cedar Lee, and Coventry Village) and fielded a SID Wayfinding Feedback Survey (32 respondents spanning ten of the eleven districts). Full engagement detail is documented separately in the engagement summary; this section draws on that input only to inform the plan review.
Each opportunity below states what we heard, the plan element it touches, and an action: Refine (a plan decision that should be adjusted), Enhance (the plan is silent and stakeholders want it addressed), Validate (stakeholders confirmed the plan got it right), or Flag (a refinement that is more appropriately handled in the design/RFQ phase rather than this strategy).
Two characteristics of the input shape how it should be read: It reflects the perspective of district insiders, not visitors. Survey respondents were business owners (42%), property owners (23%), residents (16%), employees (13%), and neighborhood leaders (6%). None identified as visitors. The feedback is therefore strongest on what operators and residents know visitors struggle with — and lighter on direct visitor experience. It is weighted toward the active business districts. The three in-person sessions were with all SID districts, and survey responses concentrated in three districts (Cedar Lee, Cedar Taylor, and Coventry Village). The remaining districts each returned only one or two responses, and Fairmount Taylor has returned none. Conclusions below represent the active business districts most strongly; the smaller districts are thinly represented to date. Across every session and the survey, the signal was consistent: current wayfinding rates poorly, and the most-named needs were district gateways/entries (65%), parking (55%), and key destinations/landmarks (45%).
Wayfinding & Signage Plan | November 2026
#
Opportunity
Plan element it touches
Action
1
Where the plan got it right
Priorities, decision zones, phasing, SIDs
Validate
2
Parking is an information & perception problem, not a sign count
Parking typology & placement (p. 37)
Refine
3
District-vs-city branding hierarchy needs an explicit principle
Renderings (pp. 38–39); branding text (p. 37)
Refine / Flag
4
Visitors can't tell when they've entered the district; district gateways under-served
Gateway prioritization matrix (p. 30)
Refine / Enhance
5
Real needs the plan never contemplated (bike, district links, art, lighting)
Not addressed in plan
Enhance
6
Facts on the ground have changed since the fieldwork
District maps & inventory (fieldwork fall 2024, p. 6)
Refine (data)
11
FROM PLAN TO PRACTICE:
Opportunities for Refinement
Aligning the County Plan w/ District Input
What We Heard
VALIDATE 1. Where the plan got it right. The engagement also confirmed several of the plan’s core instincts, which strengthens the case for using it as a foundation: • Parking as a top priority. The plan named it; every district confirmed it. • The “approach / decide / arrive / depart” decision-zone logic. (p. 28) closely matches how stakeholders described their navigation confusion. • A phased implementation approach. The plan recommends it (p. 50), and stakeholders independently raised funding constraints that make phasing necessary (the City has less to spend than the County’s estimate assumed). • SIDs as critical implementation and maintenance partners. While the plan’s signage recommendations (p. 50) cover all 11 districts, the three SID districts have an existing organizational and funding structure that positions them to partner on rollout and upkeep in a way non-SID districts cannot.
The validation: Naming these confirms that refinement, not replacement, is the goal.
12
REFINE 2. Parking is an information and perception problem, not a sign-count problem. This was the single most-repeated issue across all three districts and the survey. But stakeholders did not describe a shortage of parking signs, they described people not knowing that parking exists, is free, or is public. In Cedar Fairmount, visitors assume the Firestone lot and the rear lots are private when they are free and public; the reopened city garage is unknown; and residents are occupying free visitor parking. In Cedar Lee, participants described a persistent problem: visitors don’t reliably know where to park or whether parking is paid or free. In Coventry, participants noted that a free city-owned garage is underused because it feels neglected and unwelcoming. The County plan treats parking primarily as a typology to place (parking signs near lot entrances, p. 37).
The refinement: The strategy should frame parking wayfinding around communicating availability, cost, and public-vs-private status — not just marking entrances. This reframes parking from a placement exercise into the districts’ top wayfinding priority, and defines a content problem the design phase must solve.
Across all three in-person sessions, districts expressed a strong desire for their own identities to lead. Cedar Lee and Coventry both emphasized that residents and visitors identify with district names more than with “Cleveland Heights,” and that the districts’ distinct character should come through first. Coventry framed the goal as districts acting as “magnets, not toll booths,” and the sessions surfaced an in-progress conversation about the right balance between a citywide identity and district identities (an “80/20” district-to-city ratio was discussed but not settled). The County plan’s illustrative renderings (pp. 38–39) and branding language (p. 37) lead with Cleveland Heights branding carried throughout, with districts incorporating their own elements within it. For districts that already hold established, recognized brands (Cedar Fairmount, Cedar Lee, Coventry, Cedar Taylor) the relationship between the two is the thing they most want to see resolved.
The refinement/flag: The strategy should articulate the brand-architecture principle, how a citywide identity and distinct district identities coauthor one coherent system, rather than leaving it implied. This is worth highlighting precisely because it is the question stakeholders care most about; getting the principle right early keeps the project on solid footing. The specific visual execution of that balance is a flag for the design RFQ.
Wayfinding & Signage Plan | November 2026
REFINE/ ENHANCE 4. Visitors can't tell when they've entered the district. The clearest single survey signal: 65% said “whether they’ve arrived in the district” is the most frequently unclear thing on arrival, ahead of parking. It aligns with district gateways/entries being the #1 requested support (65%), and with every meeting: Cedar Fairmount calling itself “the gateway to the Heights” and wanting pass-through traffic captured; Coventry noting its north and south entrances are undefined (“two gas stations” / “a hodgepodge of businesses”); and Cedar Lee wanting its mile-long district to read as one place. The County plan’s gateway prioritization matrix (p. 30) scores 18 community (city) gateway locations on traffic, condition, and primary/secondary status. It does not apply the same structured prioritization to district gateways, and its scoring weights were not tested with the districts whose entrances they affect.
The refinement/enhancement: District-gateway placement and prioritization deserve the same rigor the plan gave city gateways, with criteria that reflect district input, not traffic counts alone.
13
FROM PLAN TO PRACTICE:
3. The district-and-city branding relationship should be named explicitly.
Aligning the County Plan w/ District Input
REFINE/ FLAG
ENHANCE 5. Several real needs the plan never contemplated. Stakeholders raised concrete needs absent from the County plan: • Bike parking and bike wayfinding. Raised unprompted in Cedar Fairmount (“where to put the bike racks”); 39% of survey respondents flagged bike access/routes as unclear. The plan addresses pedestrian and vehicular wayfinding but not cyclists or bike parking. • District-to-district connection. Cedar Fairmount explicitly wants flow to Cedar Lee; Cedar Lee wants to connect its main hub to Cain Park via “breadcrumbing” street banners and murals. The plan treats districts as discrete units, not as a connected network.
6. Facts on the ground have changed since the County fieldwork.
• Lighting and safety as a precondition. Across all three districts, unlit and unreadable signs, dark streets, and lack of safety perception came up as reasons wayfinding fails at night. The plan notes sign condition but does not treat illumination as a wayfinding design driver.
The County inventory was conducted in fall 2024 (p. 6), and the district maps reflect conditions as of that fieldwork. Stakeholders identified several changes since then that the underlying data does not capture: Alcazar is now within the Cedar Fairmount district; the city garage behind Zhug/Vero has reopened after a multi-year structural closure; certain Cedar Fairmount lots have shifted from private to city-owned and public; and business hours have changed in ways that affect the “all-day district” picture (the bookstore, for example, now open to 9 PM). The plan does not state the ownership or open/closed status of individual lots, so these are less corrections to specific plan claims than updates to the conditions any design work will rely on.
The enhancement: These are additive opportunities — the strategy can name them as scope the RFQ should explicitly invite, even where the final treatment is a design decision.
The refinement: The district maps and destination data carried into the RFQ should be reconciled against current conditions so the design team is not working from inputs that predate these changes.
• Art as wayfinding and gateway identity. Cedar Lee (currently rebranding itself as an “Arts District”) and Coventry both see public art functioning as district gateway identity. The plan treats art and wayfinding separately.
14
REFINE
TIER
WHO DESIGNS
FUNDED BY
INSTALLED
Design Firm
City
By end of 2029
Design Firm
City / Districts
By end of 2029
District
Districts
District-led;
Tier 1 City-standard Citywide navigation & identity
(public art gateways by a commissioned artist)
Tier 2 District-integrated District identity inside the city system
Tier 3 District-expressive A district’s own signage, outside the system
Wayfinding & Signage Plan | November 2026
City focus beyond 2029
15
THREE TIERS:
What Gets Built, and by Whom
The system is organized in three tiers. The tier decides who designs a sign, who pays for it, and when it is installed. One design firm designs Tiers 1 and 2. Tier 3 is designed and funded by the districts.
What Gets Built, and by Whom
Three Tiers:
The System
Sign Types by Tier Some sign types appear at two levels. Primary is the higher-impact, higher-investment version; secondary is simpler and lower cost. Quantities come from the County plan inventory unless noted.
16
Tier
Sign type
Level
What it is
Qt
Made and installed by
1
City gateway
Public art
Signature gateways at the most-trafficked entries. A commissioned artist designs one design repeated at all three; the design firm provides guidance so they fit the system.
3
Artist and fabricator
1
City gateway
Primary
A well-designed gateway sign with quality materials at high-traffic entries.
5
Outside fabricator
1
City gateway
Secondary
A simple post-and-panel gateway sign at lower-traffic entries.
10
Outside fabricator
1
Parking
Primary
Larger, more visible signs directing drivers to key public lots and garages.
5
Outside fabricator
1
Parking
Secondary
Simple flat-panel parking signs.
26
City sign shop
1
Street signs
Primary
Standard City-branded street name signs.
–
City sign shop or outside fabricator
1
Vehicular wayfinding
–
Guides drivers to City amenities and between districts.
19
Outside fabricator
2
Banners
Primary
Banners marking entry into a district. Designed now; installed as timing and budget allow.
–
Outside fabricator
2
Pedestrian wayfinding
Primary
Directional signs that help people get around a district on foot.
9
Outside fabricator
2
District gateways
Secondary
Well-made district entry signs. Most share a post with vehicular or parking information.
22
Outside fabricator; City crews install
3
Banners
Secondary
Banners printed for a district's events or needs.
–
District-chosen fabricator
3
Pedestrian kiosks
–
Larger, map-based information kiosks.
10
District-chosen fabricator
3
Street signs
Secondary
Distinctive street signs for districts that want something different.
–
District-chosen fabricator
City Gateways
Tier 1 | City-standard
Tier 2 | District-integrated
Cleveland Heights identity at its most visible, marking arrival into the city. Public art gateways pair the City identity with an artist's work.
Built on the City sign family. A defined zone carries the district's name, color, or mark.
Parking
Street Signs
Tier 1 | City-standard
Tier 1 | City-standard
Tier 3 | District-expressive
City brand throughout, so public parking reads as Citymanaged. Clear distinctions include where parking is, that it's public, and whether it's free.
Primary street signs follow one City standard. Districts may design distinctive secondary street signs within the City's sign regulations.
Vehicular Wayfinding
Banners
Tier 1 | City-standard
Tier 1 | City-standard
Tier 3 | District-expressive
City brand, consistent on every corridor, pointing drivers to City amenities and between districts.
Primary banners use a City banner format carrying the district's name and colors. Secondary banners are designed by districts for events and seasons.
Pedestrian Wayfinding
Pedestrian Kiosk
Tier 2 | District-integrated
City layout and typography, with a district color accent or small mark in a set location.
*
District Gateways
Tier 3 | District-expressive
District identity leads, with Cleveland Heights acknowledged.
These images are illustrative only. They come from the Cuyahoga County Planning Commission's Gateway & Wayfinding Signage Plan (October 2025) and show the general form of each sign type. They are not final designs. The selected design firm will develop the look of Tier 1 and Tier 2 signs, and districts can design their own Tier 3 signage.
Wayfinding & Signage Plan | November 2026
17
THREE TIERS:
Illustrative sign types from the County's Gateway & Wayfinding Signage Plan, and how branding is applied in each tier.
What Gets Built, and by Whom
What Each Sign Type Looks Like
Looking Elsewhere: A Wayfinding Precedent & Inspiration Catalog Purpose This catalog gathers comparable wayfinding examples from municipalities and districts elsewhere, organized around the three tiers emerging from the Cleveland Heights wayfinding framework: City Standard, District-Integrated, and District-Expressive. It is intended as a shared visual reference, not a set of recommendations: a way to ground conversations about what’s possible within each tier before design standards are drafted. Examples are illustrative starting points for discussion, not endorsements of a specific direction for Cleveland Heights.
18
Full City of Cleveland Heights branding. No district variation. These are the signs that make the overall system function as a coherent network. Drivers and pedestrians moving across the city, not just within a single district, need these elements to behave the same way everywhere, regardless of which neighborhood or commercial district they’re passing through. Consistency here isn’t a design preference; in several cases it’s safety-adjacent, and in others it’s what allows Cleveland Heights to interface cleanly with county, regional, and state systems.
Sioux City, IA / Corbin Design
The precedents on the following pages illustrate how other municipalities have handled this same challenge: building a wayfinding layer that reads clearly and uniformly, city-wide, as the foundation the rest of the system sits on top of.
Kent, OH / Guide Studio
Typologies in this section: • City Gateway (Public Art, Primary, & Secondary) • Parking (Primary & Secondary) • Street Signs (Primary) • Vehicular Wayfinding
Cleveland, OH / Guide Studio
Wayfinding & Signage Plan | November 2026
19
LOOKING ELSEWHERE:
A Wayfinding Precedent & Inspiration Catalog
CITY STANDARD
Covina, CA / Hunt Design
Iowa City, IA / ArtHouse Design
Put-in-Bay, OH / Put-in-Bay Sign Commission
Cleveland, OH / Guide Studio
City Gateway Function: Mark arrival into Cleveland Heights at its entry points, scaled to traffic. Public art gateways, designed by a commissioned artist, sit at the mosttrafficked entries. Primary gateways in quality materials sit at high-traffic entries. Simple post-and-panel secondary gateways sit at lower-traffic entries.
CITY STANDARD
20
Akron, OH / John Comunale and Michael Marras
City / Source
Galway / FW.D Santa Barbara, CA / Hunt Design
Naperville, IL / Hitchcock Design Group
Parking Signage Function:Tells drivers where public parking is, that it's public, and whether it's free. Primary parking signs are larger and more visible, directing drivers to key public lots and garages. Secondary parking signs are simple flat panels at lot entrances.
CITY STANDARD
Wayfinding & Signage Plan | November 2026
Springvale to BSign Wayfinding Red Bank, NJ/ /ARex Company
Santa Monica \ smdp Cincinnati, OH / College Hill
Dana Point, CA / RSM Design
21
LOOKING ELSEWHERE:
A Wayfinding Precedent & Inspiration Catalog
Pittsburgh / Pittsburgh Union Progress Oakland, CA / RSM Design
Unknown
Austin, TX / High Tech Signs Unknown
Brent Cross Town, London / Creative Review
Celebration, FL / Warner Bros
Celebration, FL / Pentagram
Unknown
Street Signs / Primary Function: Standard City-branded street name signs. One consistent format citywide, so street names read clearly at every intersection and the City identity is present throughout.
CITY STANDARD
22
Watauga County, NC / Destination by Design Denver, CO / RSM Design
City / Source
Albuquerque, NM / Lance Wyman
Galway / FW.D Pasadena, CA / Hunt Design
Worcester, MA / Selbert Perkins Design
Santa Barbara, CA / Hunt Design
Vehicular Wayfinding Function: Guides drivers to City amenities, such as City Hall, library branches, and recreation centers, and between business districts, with consistent direction on primary and secondary streets.
CITY STANDARD
Wayfinding & Signage Plan | November 2026
Springvale / A to B Wayfinding
Detroit, MI / Lance Wyman
23
LOOKING ELSEWHERE:
Pittsburgh / Pittsburgh Union Progress
A Wayfinding Precedent & Inspiration Catalog
Perth, Australia / Diadem
Decatur, AL / McComm Group
DISTRICT-INTEGRATED City branding remains dominant, with a defined, bounded zone where district identity can appear. This tier functions as a shared system: the City establishes the structure, materials, and overall brand presence, while a deliberate, clearly defined zone allows district color, logo, or graphic pattern to appear alongside it. At a distance, the citywide system reads first; at closer range, district identity becomes visible. Cleveland Heights is the primary brand and the commercial district functions as a secondary brand, present in a designated location rather than throughout the piece. This is the tier that likely calls for the clearest design guidelines, since it depends on defining exactly what districts can and cannot do within their variable field. Acceptable logo formats, color constraints, and typography rules all matter more here than in either of the other two tiers.
Adelaide, Australia / Studio Binocular
The precedents on the following pages show how other places have approached this kind of shared or co-branded system, where a single sign family carries both a citywide identity and a secondary, localized one.
Typologies in this section: • Banners (Primary) • Pedestrian-scale Wayfinding • District Gateways Irvine, CA / RSM Design
24
Salt Lake City, UT / RSM Design
Galway / FW.D Cleveland, OH / Ohio City Inc.
Pittsburgh, PA / Pittsburgh Cultural Trust
Banners / Primary Function: Light-pole banners that mark entry into a district, using a City banner format with the district's name and colors. Designed now and installed as timing and budget allow.
DISTRICT-INTEGRATED
Wayfinding & Signage Plan | November 2026
Lincoln Park, IL / The Lakota Group
25
LOOKING ELSEWHERE:
Mount Prospect, IL / The Lakota Group
A Wayfinding Precedent & Inspiration Catalog
Chattanooga, TN / River City Company
Winnipeg, Canada / HTFC Planning & Design
Atlanta, GA / MKSK
Wilmington, CA / LA Más
San Diego, CA / RSM Design
Atlanta, GA / MKSK
Port Phillip / Arterial Design
Pedestrian-scale Wayfinding Function: Directional signs that help people get around a district on foot, pointing to destinations, parking, and nearby districts.
DISTRICT-INTEGRATED
26
City / Source
San Diego, CA / RSM Design
Galway / FW.D Asheville, NC / MERJE
Worcester, MA / Selbert Perkins Design
Kent, OH / Guide Studio
District Gateway Function: Marks entry into a business district. Gateways are well-made signs, possibly in interesting materials. Some could share a post with vehicular or parking information.
DISTRICT-INTEGRATED
Wayfinding & Signage Plan | November 2026
Athens, GA / Historic Cobbham Foundation
27
LOOKING ELSEWHERE:
A Wayfinding Precedent & Inspiration Catalog
Lincoln Park, IL / The Lakota Group
San Diego, CA / RSM Design
DISTRICT-EXPRESSIVE District identity leads. Cleveland Heights is present, but not dominant. This is the tier where commercial districts have the most latitude to express authentic neighborhood character and commission genuinely creative work. A gateway in one district can look entirely different from a gateway in another. The City’s role here shifts from design authority to permitting and quality authority: setting a baseline for legibility, material quality, and structural safety, and ensuring Cleveland Heights remains acknowledged rather than absent, without dictating what the design itself looks like. A streamlined, fast-tracked approval process matters here, since a lengthy review can discourage the kind of creative investment this tier is meant to enable. The precedents on the following pages show how other places have let district or neighborhood identity take the lead in wayfinding, through banners and streetscape elements that orient people and signal place without functioning as traditional signage.
Port Phillip / Arterial Design
Cleveland, OH / Ohio City, Inc.
Typologies in this section: • Banners (Secondary) • Pedestrian Information Kiosk • Street Signage (Secondary)
Cleveland Heights, OH / Studio Chartreuse
28
Galway / FW.D Chicago, IL / Cultural Arts Commission
San Diego, CA / Cedros Design District
Cape Town, South Africa / Warten Weg
Banners / Secondary Function: Banners designed and printed by districts for events, seasons, and district needs. City involvement is typically limited to structural and attachment standards.
DISTRICT-EXPRESSIVE
Wayfinding & Signage Plan | November 2026
Osaka, Japan / Port of Osaka
29
LOOKING ELSEWHERE:
A Wayfinding Precedent & Inspiration Catalog
Charlottesville, VA / Downtown Mall
Los Angeles, CA / Melrose Arts District
San Francisco, CA / Surfacedesign
Wilmington, CA / LA Más
Las Vegas, NV / Visual Asylum
Port Phillip / Arterial Design
Los Angeles, CA / Erin Williams
San Diego, CA / RSM Design
Pedestrian Information Kiosk Function: Larger, map-based kiosks that orient pedestrians within a district and point out nearby destinations.
DISTRICT-EXPRESSIVE
30
Richmond, BC / Lost & Found
Lincoln Park, IL / The Lakota Group
Albuquerque, NM / Lance Wyman
San Diego, CA / RSM Design
Galway / FW.D Asheville, NC / MERJE
Worcester,OR Portland, MA / Selbert Perkins Design
Toronto, Canada / Almag Aluminum
Street Signs / Secondary Function: Distinctive street signs for districts that want something different from the City standard. They carry district character while staying legible and meeting the City's sign regulations.
DISTRICT-EXPRESSIVE
Wayfinding & Signage Plan | November 2026
Oxnard, CA / RSM Design
31
LOOKING ELSEWHERE:
Montreal, Canada
A Wayfinding Precedent & Inspiration Catalog
Naples, FL / Creative Sign Designs
The Plan Forward: Timeline, District-Led Signage, Investment, & Next Steps Purpose The pages that follow set out how the City can move from design to installation: when each tier is designed and installed, how districts can lead their own signage, what the investment looks like, and the decisions that will keep the work moving.
In this section: • Implementation Timeline • District-Led Signage • Investment
32
Design: Removals, RFQ, & Design
2027 RFQ
2028
2030
Design 1
Tier 1: City gateways / secondary
2029
2
Public Art Gateways
Tier 1 Tier 1
Parking / primary Parking / secondary
Tier 1
Street signs / primary
Tier 1 Tier 1
Vehicular wayfinding City gateways / primary
Tier 1
Tier 2: Pedestrian wayfinding
Tier 2
District gateways / secondary
Tier 2
Primary banners / TBD
Tier 2
Tier 3: District-led, any time 1
Districts receive plan and review it.
2
Tier 3 Districts see the designs and choose: opt into the district-integrated designs, or commission their own.
Wayfinding & Signage Plan | November 2026
Removals
Open RFQ
Design Contract
Sign Installation
Sign Installation | Flexible Timing
Public Art Gateway | Funding TBD
33
THE PLAN FORWARD:
2026
NOTE: This is a preliminary timeline. All phases, dates, and sign types are subject to change at the City’s discretion, including in response to funding, bid results, and fabrication schedules.
Timeline, Investment, & Next Steps
*
Implementation Plan
District-led Signage Districts are welcome to build their own signage in two ways. They can replace a Tier 2 sign type with their own design, or add any Tier 3 sign type. In both cases the district pays, and its signs go through the same review as any other sign in the City.
PROCESS How to Develop Tier 3 Signage
Path
What it covers
Deadline
Funded by
Opt out of a Tier 2 sign type
Replace the design firm's pedestrian wayfinding, secondary district gateways, or primary banners with the district's own design
Notify the City by end of design phase
District
Add Tier 3 signage
Secondary banners, pedestrian kiosks, secondary street signs
None; any time
District
Why the Tier 2 deadline matters: The City needs a final count of Tier 2 signs to bid fabrication and installation for 2029. Districts will see draft Tier 2 designs at the stakeholder review in early 2027, before they decide. A district that does not notify the City by the end of the design phase receives the design firm's Tier 2 signs, funded by the City. A district can opt out of one Tier 2 sign type and keep the others.
1. Notify the City (Tier 2 opt-outs only). By the end of the design phase, send the City written notice naming the sign types and locations the district will provide itself. 2. Talk with City staff early. Confirm locations, whether a sign sits on City right-of-way or private property, and which approvals apply. 3. Design. The district hires its own designer. Signs follow the City's general sign regulations; there are no additional design standards. 4. Get approvals. District signs go through the City's standard sign review. Signs on City sidewalks or poles may also need a right-of-way permit. 5. Fabricate and install. The district hires its own fabricator and installer. 6. Maintain. The district maintains, repairs, and replaces its own signs. Common Questions: Does the City help pay for district signage? Not at this time. Districts fund the design, fabrication, installation, and upkeep of their own signs. When can a district start Tier 3 signage? Any time. Starting after Tier 1 and 2 designs are final lets district signs complement the citywide system. What if a district misses the end of design phase deadline? It receives the design firm's Tier 2 signs and can still add Tier 3 signage.
34
The plan is built to fit the City's annual wayfinding allocation. The first year's allocation funds the design contract. The next three years fund fabrication and installation of Tiers 1 and 2, estimated at about $235,000 against about $240,000 available. With design excluded, the total is about $305,000 against about $320,000 over four years. Unspent funds carry forward from year to year.
Tier
Sign Type
Qty
Estimated cost
–
Design contract
–
TBD
1
City gateways / primary
5
$70,000
1
City gateways / secondary
10
$50,000
1
Parking / primary
5
$15,000
1
Vehicular wayfinding
19
$60,000
1
Parking / secondary; Street signs / primary
26; TBD
1
City gateways: primary
5
$70,000
2
Pedestrian wayfinding / primary
9
$15,000
2
District gateways / secondary
22
$25,000
2
Banners / primary
TBD
As budget allows
Total (signs fabrication only)
*
–
~ $305,000
Public art city gateways The three public art city gateways sit outside the City's annual wayfinding allocation, which is committed to design and to Tiers 1 and 2. They could be funded separately, for example through grants, philanthropic partners, or public art funds, at an estimated $150,000 for one artist and one design repeated at all three gateways. Once funding is secured, the City can release an artist RFQ and add the gateways to the schedule.
Looking ahead With design underway, the first Tier 1 signs follow once design is complete, and each phase builds on the last. The City will keep districts informed as each phase moves forward.
NOTE: Estimates are rounded and planning-level, and include an allowance for fabricator setup, contingency, and permitting; they will be refined as bids come in. Sign shop work, City crew time, and signage removals are City costs outside the program budget.
Wayfinding & Signage Plan | November 2026
35
THE PLAN FORWARD:
Timeline, Investment, & Next Steps
Investment
CONTACT INFORMATION: Erin Guido Director of Arts & Culture | LAND studio EGuido@land-studio.org Katie St Surin Design & Comms Manager | LAND studio KStSurin@land-studio.org