KIMBOLTON ROW
by landodb
chelsea , london
Following the excavation of a two-storey basement and steel frame superstructure, this was a project in two parts, with the early handover of the four-storey office portion of the development for the early occupation by our client, and full fit-out of both the residential and commercial portions to a very high standard.
Advertisement
Architecturally striking, the building has a façade of Portland stone cladding to the front, with a rear façade predominantly of brick, each elevation responding to the environment within which it sits on this tight central London site.
The interiors are architecturally contemporary, softened by the client’s more traditional aesthetic, and is made up of five bedroom suites, a large entertainment room comprising cinema, pool and tennis tables, family and professional kitchen, with a passenger lift to all floors. The property features underfloor heating and air conditioning throughout, solar panelling, Italian marble and bespoke joinery.
KEY CHALLENGES
Rescue of a project part-completed by a previous contractor, full assessment of works inherited with defects addressed before commencement.









Hyde Park Gardens
bayswater , london
Located just to the north of Hyde Park, the works involved the demolition and strip out of this 4-storey apartment, from 2nd floor to the roof, through to the complete fit-out to the very highest standards.
With a spectacular, elliptical central staircase, the apartment features highly detailed joinery, Italian marble, and underfloor heating and air conditioning throughout with AMX Touchscreen control.
PROPERTY
SIZE 4,000 sq ft
PROGRAMME 50 weeks
ARCHITECT Boundary Space
INTERIOR DESIGN ALJ Studio
KEY CHALLENGES Full demolition throughout including each floor plate within an occupied residential building.










Radstock House
battersea , london
Completion of a new build residential development of 8 apartments on the upper floors with two B1 units and car park on the ground floor. Works included substructures and frame; roof and external envelope; internal fit out of the apartments, car park and communal areas and shell only with capped services to the B1 units.
ARCHITECT
KEY CHALLENGES Stakeholder relations, tight programme including sectional completion and accelerated show apartment