Skip to main content

Luigi Franco LAMANNA

Page 1

1

NAME Luigi Franco LAMANNA, SOCIAL POSITION Independent Consultant Tunneling , mining and Oil specialized in mechanized tunneling with Hard Rock TBM and Soft Soil EPB Shields, Expert and consultant in structural reinforcement (wood, masonry and concrete), Chief Executive Officer the FONDAZIONE INTERNAZIONALE DI CENTRO STUDI E RICERCHE - NGO, ADDRESS Via dei Serpenti 132, 00184 Rome, Italy, Phone: +39 06 4742581, e-mail: lamannaluigifranco@gmail.com LAMANNA Luigi Franco, performs for 45 years professional consulting and technical direction in the various sectors of civil, industrial, military, hydraulics, railway, highway and in the last 20 years in the sector of “tunneling” and “mining” on the correct use of special “resins” and related technologies for consolidation, repair and maintenance of masonry, concrete, iron and wood. Is the author of numerous scientific publications and is always engaged in the study and development of “innovative materials” and related techniques and technologies used. The activity has always been aimed at the development of

[also availing itself, if necessary, of the collaboration of

its integrated structure with consultancy services in the

structures and qualified professionals specialized in various

construction sector of large engineering works, aimed in

disciplines at an international level] for technical

particular, in addition to mining and underground

management,

construction activities, at the study for the determination of

assistance.

guidance

and

technical-administrative

the chemical - physical action effects - mechanical on concrete,

masonry,

steel

and

wood

and

related

MAIN AREAS OF SPECIALIZATION

consolidating and protective treatments. The feasibility

• restructuring, consolidation, recovery and conservation of

study, the correlation between design and consultancy and

concrete, steel, wood and masonry [existing buildings,

simple consultancy for:

bridges and viaducts, dams and hydro-thermoelectric

- industrial, civil and military complexes;

plants, petrochemical complexes, maritime constructions,

- bridges and viaducts;

multi-storey and underground car parks, subways and

- hydraulic and maritime works;

railways , railway and motorway hydraulic tunnels];

- underground works;- recovery and conservation of monumental works, concrete structures and masonry;

where it provides consultancy support, design and technical

- to the protection of the environment.

assistance during construction to design studios, general


2 construction companies, industries, entities (public and

of the food sector according to the C.E.E. [hygienic-sanitary

private sector) and companies in the sector, in direct

provisions in the production and marketing of food

contact with technicians and executors, for study right from

products and products of animal origin], for the chemical

the design stages, to the analysis of technical-economic

and pharmaceutical industry, for the electronics industry,

feasibility, to the correct choice of materials, to the

for the metalworking industry, for car parks, hangars and

regulatory constraints, to the prevention and / or

yards, garages, for hospital complexes [operating theaters -

intervention

diagnostic laboratories - physiotherapy rooms and large

tools

with

related

technologies

and

methodologies in progress.

endemic rooms] all in compliance with health and hygiene requirements and safety regulations;

In particular, with the collaboration of some chemical

• moreover, I had to deal with the recovery of facades in

industries in the sector, in the following sectors of

buildings of great historical and architectural value;

specialization: • as well as the restoration of old walls, subject to large • in the mining sector [resins and bolts for injection for coal

phenomena of condensation and / or capillary rising damp

and copper mines], that of tunneling and construction in

[of underground structures] and stone materials, for the

general: in the civil, industrial, military, hydraulic, railway

maintenance and conservation of the existing building

and motorway sectors, on the correct use of "resins" and

heritage, of significant historical-monumental interest-

related "technologies" and "methodology" for the correct

architectural.

use, in particular, during excavation in traditional tunnels [NATM system] and with mechanized systems [for underground transport, to block the presence of gas leaks and groundwater underground aquifers as well as, the study of particular additives for the "conditioning of the soil" especially in the excavation phase], through modern excavation systems using TBM-EPB type cutters. Also for the consolidation, repair and safety of underground reinforced concrete structures, as well as soils and rocks [consolidation, stabilization and waterstoping]. • anti-corrosion, anti-wear and fire-resistant coating systems for concrete, wood and steel [for industrial plants: chemical, petrochemical, refining and offshore]; • particular waterproofing techniques, in addition to traditional systems and / or prefabricated membranes and / or fairly well-known geomembranes and / or geocomposites, by means of "synthetic resin formulations" [Green] for civil and industrial roofing [roofs - terraces], hydraulic works [ dams - canals - basins - piers - natural water basins in earth and for drinking water], road and railway works [decks and bridges - natural or artificial tunnels], foundation works with particular attention to environmental protection; • in these long years I have also had to deal with cementitious and resinous industrial flooring for adaptation


3 WORK EXPERIENCE Year: 2004 - 2020 Position Held: Consulting Engineer / Consultant /Senior Structural Engineer / Technical Sales Manager for the supply of consumables during excavation / rehabilitation / restructuring

Honda di 11.400 m, diametro di scavo 4,04; diametro interno finito •

•

2004, Società Consortile a r.l. S.E.L.I. & MONTI – AURONZO DI

3,50 m - Tunnel Poza Honda-Mancha Grande di 4.100 m, diametro

CADORE - BELLUNO (ITALY) – Project tunnel ferroviaria km 2,700

di scavo 4,04 m, diametro interno finito 3,50 m – Bloccaggio di forti

variante di Calalzo tratto Belluno-Calalzo - Rfi Rete Ferroviaria

venute d’acqua in sottosuolo - resins for stabilising ground/rock

Italiana –- Location: CALALZO (ITALY)

before and after conventional digging or with TBM through

2004, Joint Venture IMPREGILO s.p.a. – GNOMON S.A. – TCGC S.A.

injections - Location: ECUADOR

– KARDITSA (GRECIA) - Project tunnel di derivazione – km 17,00 –

•

•

Location: KARDITSA (GRECIA)

Parbati Hydroelectric Project – Himachal Pradesh - INDIA – Project

2004, Joint Venture IMPREGILO s.p.a. – EMPEDOS S.A. – KARDITSA

tunnel per impianto idroelettrico – km 1,500 – resins for stabilising

(GRECIA) - Project Acheloos Diversion Tunnel to Thessaly –

ground/rock before and after conventional digging or with TBM

lunghezza tunnel 18 km – diam . 7,30 m – Location: KARDITSA

2004, Joint Venture S.E.L.I. Fincosit

•

•

•

•

SpA

s.p.a. - Grandi Angeles Construction

Construction

Corp. – ROMA & MANILA (PHILIPPINE)

- Project MWSS

Metropolitan

System,

Waterworks

and

Severage

Manila,

9,49 m – tratta Ethniki Amyna-Stavros – più costruzione di n° 8 pozzi da 25 x 25 m - Location: ATENE (GRECIA) •

2006, S.E.L.I. s.p.a. – ROMA (ITALY) - Project Kerman Water

Repubblica delle Filippine - galleria di derivazione – km 13,00 –

Transfer Tunnel – galleria da 70 km per impianto idraulico –

Location: MANILA (PHILIPPINE)

Location: IRAN

2005, Joint Venture S.E.L.I. – GHELLA s.p.a. – ROMA (ITALY) - Project

•

2006, S.E.L.I. s.p.a. – ROMA (ITALY) – Tunnel di derivazione da 7,081

IDROLETTRICO LA JOYA - COSTARICA - tunnel idraulico della Union

km di Ø 4,88 m dall’invaso sul torrente Menta (Reggio Calabria) -

Fenosa Internazionale S.A. - km 7,900 di Ø 6,18 m – Location:

Regione Calabria – Assessorato LL.PP. Settore 36 ter – Location:

COSTARICA

Reggio Calabria (ITALY)

2005, Joint Venture S.E.L.I. s.p.a. – ROMA (ITALY) - Project

•

2006, INC GENERAL CONTRACTOR s.p.a. – TORINO (ITALY) – Project

Underground Automatica di TORINO – Lotto n° 3 – Tratta Collegno-

tunnel autostradale – Autostrade Siciliane – Location: Castel di Tusa

Porta Nuova - km 2,800 – Location: TORINO (ITALY)

– MESSINA (ITALY) – lotto 29 Quater

2005, Joint Venture S.E.L.I. s.p.a. - Monti s.p.a. e Collini s.p.a. -

•

2006, Joint Venture ACS DRAGADOS, TECSA, JAEGHR, S.E.L.I. s.p.a.

ROMA (ITALY) - A.E.M. s.p.a. - Project tunnel di derivazione Nuovo

– ALORA, MALAGA (ESPANA) - Project Galleria Ferroviaria A.V. di

Canale Viola in provincia di SONDRIO – km 18,800 di Ø 3,70 m –

km 9,000 di Ø 10,00 m – Tunnel de Abdalajis ESTE – Location:

Location: SONDRIO (ITALY)

ALORA, MALAGA (ESPANA)

2005, Società Consortile CO.ME.TO. a r.l. - (S.E.L.I. spa - Grandi

•

2006, SACYR S.A.U. – MADRID (ESPANA) – Project Galleria

Lavori Fincosit spa) – ROMA (ITALY) - Project Underground

Ferroviaria A.V. di km 9,000 di Ø 10,00 m – Tunnel de Abdalajis

Automatica di TORINO – Lotto n° 4 – Tratta Collegno-Porta Nuova -

OESTE – Location: ALORA, MALAGA (ESPANA) •

2006, SALINI COSTRUTTORI s.p.a. – ROMA (ITALY) - Project Cantiere

2005, Società Consortile METROCENTRO a r.l. (S.E.L.I. spa, Grandi

Gilgel Gibe II – Hydroelectric Project - resins for stabilising

Lavori Fincosit spa, Grassetto spa, C.C.C. spa, COGEFA spa,

ground/rock before and after conventional digging or with TBM

Interstrade spa) – ROMA (ITALY) - Project Underground Automatica

through injections: - n° 1 tunnels di km 13,00 per Ø 6,98 m -n° 1

di TORINO – Lotto n° 5 – Tratta Collegno-Porta Nuova - Km 2,900 –

tunnels di km 12,00 per Ø 6,98 m Location: ETHIOPIAN

Location: TORINO (ITALY) •

2006, Joint Venture S.E.L.I. s.p.a. – AEGEK S.A. – AKTOR S.A. – ATENE (GRECIA) – Underground di Atene - lunghezza 3,330 km – diam .

Lavori

Km 2,360 – Location: TORINO (ITALY) •

through injections - Location: HIMACHAL PRADESH STATE - ( INDIA) •

(GRECIA) •

2006, NHPC - GAMMON INDIA Ltd. - MUMBAI – JAGER-S.E.L.I. -

•

2006, HIDROPASTAZA - NORBERTO ODEBRECH – AMBATO –

2006, CONSTRUCTORA NORBERTO ODEBRECH – ECUADOR - Project

TUNGRAHUA (ECUADOR) – Hydroelectric Power Project - Tunnel

n° 2 gallerie idrauliche – km 16,00 - Tunnel La Esperanza-Poza

San Francisco di km 15,000 di Ø 7,04 m – double Shield TBM - resins


4

•

for stabilising ground/rock before and after conventional digging or

D’ORO - km 5,638 di Ø 6,76 m – EPB – Tunnelling: Grease-Sealants

with TBM through injections - Location: ECUADOR

and Foams - Location: ROMA (ITALY)

2006, CONSORZIO MONTE GIGLIO a r.l. (S.E.L.I. s.p.a., STRABAG,

•

DEL FAVERO s.p.a) – ITALCEMENTI s.p.a. - Cementificio Nuova

Località STECCATO – Polimers for soil conditioning - Location:

Calusco - Tunnel di servizio per operazioni di trasporto

ALTOMONTE, COSENZA (ITALY)

automatizzati al cementificio di km 9,600 di Ø 4,30 m – Location:

•

Calusco d’Adda – BERGAMO (ITALY •

2006, FREJUS SOC. CONS. a r.l. (CLF s.p.a. – AR.FER s.r.l. – GEFER

ARZACHENA – Location: OLBIA, SARDEGNA (ITALY) •

s.p.a. - Rete Ferroviaria Italiana s.p.a. – Linea Ferroviaria TORINO-

& Polimers for soil •

after conventional digging or with TBM through injections -

d’eau de mer du HAMMA au reseau d’eau potable d’Alger -

Location: Bardonecchia ( ITALY)

Location: Alger (ALGERIA)

2006, ODEBRECHT - S.E.L.I. s.p.a. – Galleria Idroelettrica San

•

dessalem.

2008, SALINI COSTRUTTORI s.p.a. – ROMA (ITALY) - Project Cantiere

Ø 6,98 m - Tunnelling: Grease-Sealants and Foams - Location:

2006, TUNEL DEL PERTHUS - Project Galleria Ferroviaria A.V.

ETHIOPIAN •

2008, SECO-RAIL, NOUVETRA - FRANCE – Tunnel de MORNAY ,

Spagna-Francia (Figueres-Perpignan) di km 8,141 di Ø 10,00 m –

BOLOZON 2 – Modernisation de la ligne de Bourg-en-Bresse à

resins for stabilising ground/rock before and after conventional

Bellegarde-sur-Valserine (Ain) – Consolidation des maconneries -

digging or with TBM through injections - Location: LA JONQUERA,

Location: NURIEUX (FRANCE) •

2008, S.E.L.I. s.p.a. – Project: Metropolitana di ROMA, diramazione della “Linea B” – Location: ROMA (ITALY)

2007, CONSORZIO CONSOMETRO (S.I.F. s.p.a. – Società Italiana •

2009, S.E.L.I. s.p.a. fornitura per SALINI COSTRUTTORI s.p.a. –

ammodernamento della linea e riempimento dei vuoti a tergo dei

ROMA (ITALY) - Project Cantiere Gilgel Gibe II – Hydroelectric

conci con contestuale bloccaggio delle infiltrazioni d’acqua –

Project – n° 1 tunnels di km 26,00 per Ø 6,98 m - Tunnelling:

2007, SNC-LAVALIN-S.E.L.I. - Project “Canada Line” (Metropolitana

Grease-Sealants and Foams - Location: ETHIOPIAN •

2009, S.E.L.I. s.p.a. – Project: Metropolitana di ROMA, diramazione

di Vancouver - Canada) - n° 2 tunnels di km 2,500/cad per Ø 6,00 m

della “Linea B” – lotto B1 tra le stazioni di BOLOGNA e CONCA

– Location: Vancouver, CANADA

D’ORO - km 5,638 di Ø 6,76 m – EPB – Tunnelling: Grease-Sealants

2007, MAIRE ENGINEERING s.p.a. – MAIRE LAVORI SOC. COOP. a r.l.

- Location: ROMA (ITALY)

Catanzaro, km 2,362 di Ø 8,07 m – EPB – Location: Settingiano,

•

2009, L.I.S. s.r.l.- AOSTA – Project: Risanamento canale OLBIAARZACHENA – Location: OLBIA, SARDEGNA (ITALY)

•

2009, BEIJING KAIFU-STAR TECHNOLOGY CO. LTD. – Mining -

Catanzaro (ITALY)

Tunnelling: Grease-Sealants

2007 CONSORCIO VIA AMARELA (Odebrecht, OAS, Queiroz Galvao,

conditioning - Location: BEIJING (CHINA – R.P.C.)

Camago Corria, Andrade G) – Scavo eseguito da S.E.L.I. s.p.a. –

•

Metropolitana di San Paolo – Linea 4 - km 7.760 di Ø 9,50 m – EPB – Location: AMARELA – SAN PAOLO (BRASILE)

and Foams

& Polimers

for soil

20010, ASTALDI s.p.a. Succursale Algeria – Reservoir d’Eau HARCHA - Tunnelling: Foams - Location: Alger (ALGERIA)

•

2010, HAI WAI BU – ZHE JIANG CONSTRUCTION INVESTMENT

2007, CONSORZIO DI BONIFICA DEL CIXERRI, ITALIA – Diga di Madau

GROUP CO. LTD. – Metro HANGZHOU CITY, CHINA - Location:

Zirimilis – Bloccaggio di forte venute d’acqua all’interno dei cunicoli

HANGZHOU (CHINA – R.P.C.)

d’ispezione e ripristino delle condizioni idrogeologiche – Location:

•

de

stabilising ground/rock before and after conventional digging or

Lamezia Terme Centrale-Catanzaro Lido – Tratta Settingiano-

•

Station

Gilgel Gibe II – Hydroelectric Project – n° 1 tunnels di km 26,00 per

- S.E.L.I. s.p.a. - Project ITALFERR s.p.a. – Galleria Linea Ferroviaria

•

la

Francisco di km 15,000 di Ø 7,04 m – double Shield TBM - resins for

Location: ROMA (ITALY)

•

2008, ASTALDI s.p.a. Succursale Algeria – Tunel de raccordement de

Fondazioni in consorzio) – Metropolitana di Roma, Linea A – AMLA4

•

conditioning - Location: GEORGIA (U.S.A.)

– pendenza 30 %) - resins for stabilising ground/rock before and

ESPANA •

2008, STRATA GROUP COMPANIES – ATLANTA (GEORGIA) – U.S.A. – Project: Strata Mine Service – U.S.A. – Tunnelling Mining: Foams

with TBM through injections - Location: ECUADOR •

2008, L.I.S. s.r.l.- AOSTA – Project: Risanamento canale OLBIA-

s.p.a. – SALCEF s.p.a. – SECO-RAIL s.a. – VALDITERRA s.p.a.) – R.F.I.

MODANE – Tunnel du FREJUS – km 13,636 (lato italiano km 6,791

•

2008, SICIM s.p.a.- BUSSETO (PARMA) – Project: Cantiere IT 348

•

2010, BEIJING KAIFU-STAR TECHNOLOGY CO. LTD. – Tail Seal

SILIQUA (CAGLIARI), ITALY

Grease , Tunneling Equpipment Division - Tunnelling: Grease-

2008, S.E.L.I. s.p.a. – Project: Metropolitana di ROMA, diramazione

Sealants and Foams & Polimers for soil conditioning - Location:

della “Linea B” – lotto B1 tra le stazioni di BOLOGNA e CONCA

Factory in BEIJING (CHINA – R.P.C.)


5 •

2010, KUKEN PARTNERS CO. LTD. – Tunnelling and Mining Tunnelling: Grease-Sealants

and Foams

& Polimers

•

for soil

Tunnelling: Grease - Sealants – Railway Tunnel ZJX Project

conditioning - Location: Factory in TOKYO (JAPAN) •

•

2010, DONGAH GEOLOGICAL ENGINEERING CO., LTD - Tunnelling

•

– METRO PANAMA - for Constructora SELI PANAMA - Location:

2010, FUKUMATSU SHOJI CO., LTD – Agent KAWASAKI, Tunneling

PANAMA (REP. DE PANAMA) •

Project: Risanamento canale di Punta Calamaiu – Consorzio di

Location: Factory in SEUL (SUD KOREA)

Bonifica della Gallura, ARZACHENA (ORISTANO), Sardegna, Italia –

2010, FARZAN ZAREIAN CO., LTD – Tail Seal Grease , Tunneling

Location: ARZANA, SARDEGNA (ITALY) •

Prolungamento M5- Polimers for soil conditioning - Location:

Tunnelling: Grease-Sealants, resins for stabilising ground/rock

MILANO (ITALIA) •

Tunnelling: Grease – Sealants, resins for stabilising ground/rock

Location: TREBASELEGHE (PADOVA), ITALY2011, K. T. S. LTD. –

before and after conventional digging or with TBM through

Tunnelling and Mining - Tunnelling: Grease-Sealants and Foams

injections and Foams & Polimers for soil conditioning – Location:

& Polimers for soil conditioning - Location: NAGANO-KEN (JAPAN)

Factory in BEIJING (CHINA – R.P.C.)

2011, SUNGIANT INTERNATIONAL CO. LTD. –

•

POLYMERS

Tunnelling: Grease – Sealants, resins for stabilising ground/rock

2011, BEIJING CHENGSHI INVESTMENT CO. LTD. – POLYMERS

before and after conventional digging or with TBM through

FOAM for Mining - Resins for stabilising ground/rock before and

injections and Foams & Polimers for soil conditioning – Location:

after conventional digging or with TBM through injections -

Factory in BEIJING (CHINA – R.P.C.) •

and Foams & Polimers for soil

•

•

•

2013, GEO CONSTECH PVT. LTD. – NEW DELHI (INDIA) – Tunnelling & Mining – Location: Factory in NEW DELHI (INDIA)

2011, BEIJING KAISHENGAO IMPORT & EXPORT CO. LTD. –

•

2014, BEIJING KAISHENGAO IMPORT & EXPORT CO. LTD. –

Tunnelling: Grease-Sealants, resins for stabilising ground/rock

Tunnelling: Grease – Sealants, resins for stabilising ground/rock

before and after conventional digging or with TBM through

before and after conventional digging or with TBM through

injections and Foams & Polimers for soil conditioning - Location:

injections and Foams & Polimers for soil conditioning – Location:

Factory in BEIJING (CHINA – R.P.C.)

Factory in BEIJING (CHINA – R.P.C.)

2011, INNOTEK s.r.l. – ROMA (ITALY) – Tunnelling: Grease-Sealants

•

2014, T & M SAFEGUARD TECHNOLOGY (BEIJING) CO. LTD. –

for Constructora SELI PANAMA - Location: PANAMA (REP. DE

Tunnelling: Grease – Sealants, resins for stabilising ground/rock

PANAMA)

before and after conventional digging or with TBM through

2011, HAI WAI BU, ZHE JIANG CONSTRUCTION INVESTMENT

injections and Foams & Polimers for soil conditioning – Location:

GROUP CO. LTD. – Tunnelling: Grease-Sealants and Polimers for

Factory in BEIJING (CHINA – R.P.C.) •

soil conditioning - Location: HANGZHOU (CHINA – R.P.C.) •

2013, INNOTEK s.r.l. (S.E.L.I. s.p.a.) – ROMA (ITALY) – Tunnelling: Greases – Location: Factory in APRILIA (LATINA), ITALY

2011, T & M SAFEGUARD TECHNOLOGY (BEIJING) CO. LTD. –

conditioning - Location: BEIJING (CHINA – R.P.C.)

•

2013, T & M SAFEGUARD TECHNOLOGY (BEIJING) CO. LTD. –

FOAM for Tunnelling Mining - Location: TOKYO (JAPAN)

Tunnelling: Grease-Sealants

•

2013, BEIJING KAISHENGAO IMPORT & EXPORT CO. LTD. –

2011, SALVADOR INJECTIONS – Polymer resins for tunnelling -

Location: Factory BEIJING (CHINA – R.P.C.) •

2012, INNOTEK s.r.l. (S.E.L.I. s.p.a.) – ROMA (ITALY) – Tunnelling: Greases – Location: Factory in APRILIA (LATINA), ITALY

•

Factory in BEIJING (CHINA – R.P.C.)

•

2012, ASTALDI s.p.a. ROMA – Project: Metropolitana di Milano –

2011, BEIJING KAISHENGAO IMPORT & EXPORT CO. LTD. –

injections and Foams & Polimers for soil conditioning - Location:

•

2012, FRIDA COSTRUZIONI s.r.l.- ARZANA (SARDEGNA) – ITALY -

Grease-Sealants and Foams & Polimers for soil conditioning -

before and after conventional digging or with TBM through

•

2012, INNOTEK s.r.l. – ROMA (ITALY) – Tunnelling: Grease-Sealants

and Mining - Location: Factory in BUSAN (SUD KOREA)

Equpipment Division - Location: TEHRAN (IRAN) •

-

Location: BEIJING (CHINA – R.P.C.)

Equpipment Division, Seul Head Office, Sud Korea - Tunnelling:

•

2012, T & M SAFEGUARD TECHNOLOGY (BEIJING) CO. LTD. –

2014, SAHEL POR MOJ ASTARA CO. – Tunnelling: Grease – Sealants,

2012, BEIJING KAISHENGAO IMPORT & EXPORT CO. LTD. –

resins for stabilising ground/rock before and after conventional

Tunnelling: Grease-Sealants – METRO LINE 10 of BEIJING

digging or with TBM through injections and Foams & Polimers for

-

Location: BEIJING (CHINA – R.P.C.)

soil conditioning – METRO TEHERAN (IRAN) – Location: Factory in

2012, T & M SAFEGUARD TECHNOLOGY (BEIJING) CO. LTD. –

TEHERAN (IRAN)

Tunnelling: Grease-Sealants – METRO LINE 1 of XIAN - Location: XIAN (CHINA – R.P.C.)

•

2014, SAHEL POR MOJ ASTARA CO. – Tunnelling: Grease – Sealants, resins for stabilising ground/rock before and after conventional digging or with TBM through injections and Foams & Polimers for


6 soil conditioning – ALAMOT CONSTRUCTION CO. - LINE 1 METRO

•

Tunnelling: Grease – Sealants, resins for stabilising ground/rock

2014, BEIJING KAISHENGAO IMPORT & EXPORT CO. LTD. –

before and after conventional digging or with TBM through

Tunnelling: Grease – Sealants, resins for stabilising ground/rock

injections and Foams & Polimers for soil conditioning – Location:

before and after conventional digging or with TBM through

Factory in BEIJING (CHINA – R.P.C.)

2014, BEIJING KAISHENGAO IMPORT & EXPORT CO. LTD. –

before and after conventional digging or with TBM through

Tunnelling: Grease – Sealants, resins for stabilising ground/rock

injections and Foams & Polimers for soil conditioning – Location:

before and after conventional digging or with TBM through

Factory in BEIJING (CHINA – R.P.C.) and other projects

2014, MARAL GOSTAR SHOMAL KHAZAR CO. – Tunnelling: Grease

before and after conventional digging or with TBM through

– Sealants, resins for stabilising ground/rock before and after

injections ––

conventional digging or with TBM through injections and Foams &

(PANAMA REPUBLIC) 2017, BEIJING KAISHENGAO IMPORT & EXPORT CO. LTD. – Tunnelling: Grease – Sealants, resins for stabilising ground/rock

Tunnelling: Grease – Sealants, resins for stabilising ground/rock

before and after conventional digging or with TBM through

before and after conventional digging or with TBM through

injections and Foams & Polimers for soil conditioning – Location:

injections and Foams & Polimers for soil conditioning – Location:

Factory in BEIJING (CHINA – R.P.C.) and other projects •

2017, T & M SAFEGUARD TECHNOLOGY (BEIJING) CO. LTD. – since

2015, T & M SAFEGUARD TECHNOLOGY (BEIJING) CO. LTD. –

2010 - in collaboration with the CHINA RAILWAY ENGINEERING

Tunnelling: Grease – Sealants, resins for stabilising ground/rock

CORPORATION (CRECG) and CHINA RAILWAY GROUP LIMITED

before and after conventional digging or with TBM through

(CREG) - Tunnelling: Grease – Sealants, resins for stabilising

injections and Foams & Polimers for soil conditioning – Location:

ground/rock before and after conventional digging or with TBM

Factory in BEIJING (CHINA – R.P.C.)

through injections and Foams & Polimers for soil conditioning – Location: Factory in BEIJING (CHINA – R.P.C.) and other projects

2015, SAHEL POR MOJ ASTARA CO. – Tunnelling: Grease – Sealants, •

2017,

UNIQUE

ENGINEERING AND

COSTRUCTION

PUBLIC

digging or with TBM through injections and Foams & Polimers for

COMPANY LTD. – Tunnelling: resins for stabilising ground/rock

soil conditioning – METRO TEHERAN (IRAN) – Location: TEHERAN

before and after conventional digging or with TBM through

(IRAN)

injections and Foams & Polimers for soil conditioning – Location:

2015, BEIJING KAISHENGAO IMPORT & EXPORT CO. LTD. –

THAILANDIA construction site in MAE NGAT (THAILANDIA) •

2018-2020, UNIQUE ENGINEERING AND COSTRUCTION PUBLIC

before and after conventional digging or with TBM through

COMPANY LTD. – Tunnelling: resins for stabilising ground/rock

injections and Foams & Polimers for soil conditioning – Location:

before and after conventional digging or with TBM through

Factory in HONG KONG (CHINA – R.P.C.)

injections and Foams & Polimers for soil conditioning – Location: THAILANDIAconstruction site in MAE NGAT (THAILANDIA)

2015, MARAL GOSTAR SHOMAL KHAZAR CO. – Tunnelling: Grease – Sealants, resins for stabilising ground/rock before and after

•

•

Location: PANDO & MONTE LIRIO PANAMA

2015, BEIJING KAISHENGAO IMPORT & EXPORT CO. LTD. –

Tunnelling: Grease – Sealants, resins for stabilising ground/rock

•

the Hydroelectric Projects PANDO & MONTE LIRIO – ELECTRON INVESTMENT SA PANAMA CITY - Resins for stabilising ground/rock

resins for stabilising ground/rock before and after conventional

•

2016, CONSTRUCTORA SELI PANAMA S.A. – Headrace tunnels of

(CHINA – R.P.C.)

Factory in BEIJING (CHINA – R.P.C.)

•

•

Location: TIANJIN

Polimers for soil conditioning –– Location: ASTARA (IRAN)

•

2016, T & M SAFEGUARD TECHNOLOGY (BEIJING) CO. LTD. – Tunnelling: Grease – Sealants, resins for stabilising ground/rock

Project in China, TUNNEL YELLOW RIVER -

•

•

HONG KONG (CHINA – R.P.C.)

injections and Foams & Polimers for soil conditioning – Diversion

•

2016, BEIJING KAISHENGAO IMPORT & EXPORT CO. LTD. –

TABRIZ (IRAN) – Location: TABRIZ (IRAN)

injections and Foams & Polimers for soil conditioning – Location:

•

•

•

2018-2020, T & M SAFEGUARD TECHNOLOGY (BEIJING) CO. LTD. –

conventional digging or with TBM through injections and Foams &

since 2010 - in collaboration with the CHINA RAILWAY

Polimers for soil conditioning –– Location: TABRIZ (IRAN)

ENGINEERING CORPORATION (CRECG) and CHINA RAILWAY GROUP

2015, CONSTRUCTORA SELI PANAMA S.A. – Headrace tunnels of

LIMITED (CREG) – Tunnelling: Grease – Sealants, resins for

the Hydroelectric Projects PANDO & MONTE LIRIO – ELECTRON

stabilising ground/rock before and after conventional digging or

INVESTMENT SA PANAMA CITY - Resins for stabilising ground/rock

with TBM through injections and Foams & Polimers for soil

before and after conventional digging or with TBM through

conditioning – Location: Factory in District BEIJING (CHINA – R.P.C.)

injections ––

for the following construction sites: BEIJING;

Location: PANDO & MONTE LIRIO PANAMA

(PANAMA REPUBLIC)

TIANJIN; XI’AN;


7 CHANGSHA; GUANGDONG; LANZHOU; HARBIN; NANCHANG and other project.

EDITOR OF SCIENTIFIC JOURNAL AND MEMBER OF EDITORIAL BOARDS ( publication from the year 1998-2009 - from nr. 1 to nr. 66 only on request) Years: 2010 - 2022 79) - Considerazioni sull’ impiego del calcestruzzo fibrorinforzato 67) - Le problematiche nella fase di scavo di una galleria

nella realizzazione di conci autoportanti prefabbricati di gallerie

metropolitana, Strade & Autostrade, 1/2010

idrauliche, Strade & Autostrade, 4/2012

68) - Un esempio di consolidamento di una fondazione con pali

80) - Miglioramento e rinforzo di scarpate permanenti, Rivista

realizzati con resine espandenti, Strade & Autostrade, 2/2010

Scientifica, Anno 2017

69) - Il rivestimento di gallerie autostradali, ferroviarie e

81) - Consolidation injections system and waterproofing of rocks

metropolitane, Strade & Autostrade, 3/2010

and granular soils or stone structures with "colloidal silica", 2018

70) - il bloccaggio delle infiltrazioni d’acqua all’interno di una

82) - Criteria for the choice of materials and related methods of

galleria di servizi in Algeria, Strade & Autostrade, 5/2010

injection for the consolidation, strengthening and permanent

71) - Prova sperimentali per migliorare le caratteristiche

waterproofing of the ground, 2020-2022

geotecniche di terreni in gallerie scavate con TBM-EPB, Strade &

83) -Technologies and products for the permanent isolation of

Autostrade, 6/2010

toxic wast, 2020

72) - Risoluzione dei problemi di instabilita’ durante lo scavo con

84) - Brief illustration on the environmental and dynamic

TBM aperta, Strade & Autostrade, 2/2011

qualification study conducted on the performance characteristics

73) – La stabilita’ del fronte con la tecnologia di scavo TBM-EPB,

of a "Polymeric Structural Concrete" called "SPC" to be used as an

Strade & Autostrade, 3/2011

anti-seismic adjustment on the beam-pillar joints (NODO), for the

74) - TEST sulla biodegradabilita’ delle schiume per il

reinforcement of prefabricated reinforced concrete structures. and

condizionamento dei terreni scavati con TBM, Strade & Autostrade,

for the realization of longitudinal composite structures of the

4/2011

lattice or mixed steel-SPC type of bridges and viaducts, 2020

75) - Il trattamento impermeabile nelle gallerie idrauliche, Strade &

85) -Indicazioni su alcune nuove soluzioni sul come eseguire

Autostrade, 5/2011

l’intasamento a tergo del rivestimento realizzato con conci

76) - Prove di comparazione e di codificazione di formulati resinosi,

prefabbricati in calcestruzzo in una galleria in fase di realizzazione

Strade & Autostrade, 1/2012

e contemporanea risoluzione al problema delle infiltrazioni

77) - Le variabili tecniche e ambientali del terreno di scavo, Strade

d’acqua che si manifestano attraverso fessure che si presentano

& Autostrade, 2/2012

sugli stessi conci prefabbricati, 2020

78) - Bonifica dello smarino di scavo condizionato con agenti

86) - Repair and reinforcement of the cortical layer of concrete

schiumogeni e non durante lo scavo meccanizzato con EPB, Strade

inside a railway tunnel, 2020

& Autostrade, 3/2012


8 87) - Brief description on the anchoring and nailing of the rock

94) - Comparison and codification of resinous formulations for

during the excavation of railway tunnels with the traditional natm

preventive interventions of injection into loose soils or rocks during

method (new austrian tunnelling method), 2020

the progress of tunnel excavation and large underground works,

88) - Ground stabilization treatments in front of the excavation face

2021

of a tunnel whose excavation is carried out by means of a

95) - Foaming and polymeric agents used in tests for the

TBM,2020

conditioning of soils during the progress of excavation work for a

89) - Repair and reinforcement of the cortical layer of concrete

tunnel with a mechanized shield of the TBM-EPB type, 2022

inside a railway tunnel, 2020

96) - Even today part of a roman aqueduct dating back to the 2nd

90) - Short considerations on the "sodium silicate-based" setting

century bc. supplies the city of Rome with water (our proposal to

accelerator for the construction of the Spritz-Beton or Shotcrete

give it still a long life), 2022

inside a tunnel created by excavation with a Gripper TBM, 2020

97) - Reflections on the advantages and disadvantages of the

91) - The future miners of the earth's subsoil,2021

extraction of Rare Earths [REE], 2022

92) - Extraction of rare earths from the seabed, 2021

98) - Main bearing greases for TBM EPB, 2022

93) - Foaming and polymeric agents used in tests for the

99) - Criteria for the choice of materials and related methods of

conditioning of soils during the progress of excavation work for a

injection for the consolidation, strengthening and permanent

tunnel with a mechanized shield of the TBM-EPB type, 2021

waterproofing of the ground, 2022

PUBLICATION & PATENTS Year: 1988 – 2017 1) - Bonifica degli affreschi della Madonna del Siciolante, Restauro

5) - Le pavimentazioni di un poligono di tiro, IDEE - RICERCA –

della Cappella Cenci eseguita da Huguette GIRAUDS, 1988, De

TECNOLOGIE, anno 1992

Cristofaro

6) - Studio sui criteri di progettazione per il rinforzo dei nodi

Editore - Roma

2) - Il pavimento industriale, Edizioni FAENZA gruppo editoriale

trave-pilastro in zona sismica con calcestruzzo speciale a base di

C.E.L.I. s.p.a. - Faenza (Ravenna) anno 1990 - pagg. 288

polimeri, IDEE - RICERCA – TECNOLOGIE, anno 1992, Brevetto

3) - Tecniche e materiali per il risanamento statico nell'

industriale n° RM 92 A 886

ingegneria strutturale, Edizioni Scientifiche SIDEREA – Roma, I°

7) - Studing of an airfield damage repair, IDEE - RICERCA –

edizione - anno 1990, II° edizione - anno 1993 - pagg. 373

TECNOLOGIE, anno 1993, Directive N.A.T.O. - ACE DIRECTIVE

4) - Le pavimentazioni dei poligoni di tiro, EDILIZIA MILITARE -

80/15 - 03-03-1989, “testo secretato”

35/36 – 1992, Articolo pubblicato sulla rivista tecnica del

8) - Impermeabilizzazioni

MINISTERO della DIFESA - Direzione Generale Lavori Demanio e

piastrellature o quadrotti di cemento con sistemi

Materiali del Genio - GENIODIFE -1° Divisione Studi e Progetti -

elastomerici allo stato fluido, Scuola del GENIO MILITARE,

Edilizia Militare.

COMANDO - MINISTERO della DIFESA italiano, anno 1994

di

tetti

piani

con

vecchie


9 9) - Progettazione, costruzione e finitura di pavimenti industriali,

LACQUANITI - Direttore del Centro Sperimentale Stradale dell’

Scuola del GENIO MILITARE, COMANDO - MINISTERO della

A.N.A.S. per il risanamento delle strutture in calcestruzzo di ponti e

DIFESA, anno 1994

viadotti e che risponde agli aspetti tecnologici più aggiornati.

10) - Sintesi sulle caratteristiche delle resine e loro impiego in

20) - Ripristino di calcestruzzi di Ponti e Viadotti - “Linea Guida

edilizia per il ripristino e il consolidamento di murature,

N° 2- Analisi prezzi ed esempi di applicazione pratiche, A.N.A.S. -

cemento armato e strutture in legno, Scuola del GENIO

Centro Sperimentale Stradale di Cesano (Roma), GANGEMI Editore

MILITARE, COMANDO - MINISTERO della DIFESA, anno 1994

– Roma, anno 1998

11) - La pavimentazione industriale per i parcheggi, Relazione

21) - Tecnologie di Intervento, anno 1998, Dispensa del corso di

tenuta al 6° European Parking Congress di Roma - 14/17

formazione per Maestro d’Arte - Operatore Tecnico del Recupero

settembre 1994 presso l'Hotel Cavalieri Hilton organizzato dall'

Edilizio-Ambientale gestito dal Consorzio Nazionale per la

AICOPARK(Associazione Italiana tra le società concessionarie di

Formazione e la Ricerca – ASSOFORR

parcheggi) e dall'AIP (Associazione Italiana Parcheggi).

22) - L’Umidità nelle murature, CAROCCI Editore – Roma, anno

12) - Uso

delle

resine

per

la

protezione

delle

1998

pavimentazioni industriali per i parcheggi, Edizioni Scientifiche

23) - Il recupero in zone sismiche, CAROCCI Editore – Roma, anno

SIDEREA – Roma, anno 1995

1999, Tecniche e materiali

13) - Le resine - Difesa antiparassitaria per le pavimentazioni

24) - Calcestruzzo e additivi chimici, anno 1999 . Dispensa del

delle industrie alimentari, Edizioni Scientifiche SIDEREA – Roma,

corso di formazione per il Progetto INTERTECH-PARTENIO

anno 1995

P.O.209/A2/REG

14) - AMIANTO - Coperture in lastre di cemento amianto -

25) - Acciai e materiali metallici, anno 1999, Dispensa del corso di

Tecniche di bonifica e leggi vigenti IDEE - RICERCA – TECNOLOGIE,

formazione per il Progetto INTERTECH-PARTENIO P.O.209/A2/REG

anno 1995

26) - Il formatore sulle nuove tecnologie, anno 1999, Dispensa del

15) – Studio sull' impiego di resine epossidiche come additivi

corso di formazione per il Progetto INTERTECH-PARTENIO

per la modifica di malte legate con cemento, IDEE - RICERCA –

P.O.209/A2/REG

TECNOLOGIE, anno 1995, Traduzione ed ampliamento di uno

27) - Il formatore sui nuovi materiali, anno 1999, Dispensa del

studio del prof. S. POPOVICS, della Samuel S. Baxter - U.S.A., sulle

corso di formazione per il Progetto INTERTECH-PARTENIO

proprietà di impiego delle resine epossidiche per la modifica di

P.O.209/A2/REG

presa del cemento e dei loro processi di polimerizzazione.

28)- I calcestruzzi e materiali innovativi, anno 1999, Dispensa del

16) - Strutture in legno - le resine per il recupero e il

corso di formazione per il Progetto EUROCATS II-ANIEM

consolidamento, GANGEMI Editore – Roma, anno 1996

P.O.210/A2/REG

Pubblicazione iscritta nel registro bibliografico dell' Istituto

29)- Gli acciai e materiali metallici, anno 1999, Dispensa del corso

Centrale per il Restauro di Roma - Ministero per i Beni Culturali e

di formazione per il Progetto EUROCATS II-ANIDispensa del corso di

Ambientali - al numero 39572.

formazione per il Progetto EUROCATS II-ANIEM P.O.210/A2/REG

Pubblicazione iscritta nel registro bibliografico della

31) - Nuovi materiali per il recupero, anno 1999, Dispensa del

Soprintendenza per i beni Artistici e Storici di Napoli - Ministero

corso di formazione per il Progetto EUROCATS II-ANIEM

per i Beni Culturali e Ambientali - al numero 39762.

P.O.210/A2/REG

17) - Bridges engineers - Riparazione e consolidamento di ponti e

32) - Tecniche di risanamento degli edifici, CAROCCI Editore –

viadotti, GANGEMI Editore – Roma, anno 1996 (in italiano ed

Roma, anno 2000

inglese)

33) – Intonaci e tinteggio, CAROCCI Editore – Roma, anno 2002.

18) - Risanamento delle strutture in cemento armato -

34) - Ripristino del Calcestruzzo nelle Opere Stradali, EDIZIONI

“Capitolato Tecnico”, IDEE - RICERCA - TECNOLOGIE

EDI-CEM SPA – MILANO, anno 2006, Interventi ed esempi pratici

anno 1997

per la durabilità delle infrastrutture viarie

19) - Materiali

e tecniche di intervento per il ripristino di

36) – Tunnelling and civil engineering, IDEE - RICERCA –

calcestruzzi dei Ponti e Viadotti - “Linea Guida N° 1”, GANGEMI

TECNOLOGIE, E.P.C. CONSULTING SRL, anno 2017, (in lingua

Editore – Roma, anno 1997- Trattasi di una

inglese), Tools and products for TBM Machines

redatta

con

il

coordinamento

del

“Linea Guida”

dott. ing. Vincenzo


Turn static files into dynamic content formats.

Create a flipbook