1 minute read

What would Near Surface Disposal Of Intermediate Level Wastes Look LIke? page 11

“CO-LOCATING” TO CUT COSTS

Alarmingly it is clear that the Near Surface vision is designed to cut costs by “co-locating” with a Geological Disposal Facility. Drigg with its location less than 5 miles from Sellafield would be an expedient location for NSD to “co-locate” with a subsea GDF.

Advertisement

"The assessment of disposal costs has been made on the assumption that a nearer- surface disposal facility for DNLEU would be co-located with a GDF. This is not an absolute requirement

This article is from: