Manufacturing Space
Market Hall and Stair
BIOMANUFACTURING CAMPUS EXPANSION
CRB Group
New Construction Office & Labs
Manufacturing & Warehouse
Confidential Client North Carolina
2025
RESPONSIBILITIES
Conceptual Design and Material Selection
Developed interior design concept for lobby, pantry, and open office. Coordinated with site leadership team for finishes selection and office design standards.
Presentation Deliverables
Developed client presentations, including floor plans for programming and used Enscape for conceptual renderings. Delivered in-person finish selection meetings with client’s leadership team.
Detail Design
With support of specifcation writer, coordinated specifications for the interior scope, selecting materials and researching interior systems. Coordinated furniture design intent and selections with furniture consultant. Including VE analysis of furniture and office design.
CONCEPT
The Campus Expansion celebrates the connection between science, people, and nature. The interior environment will be inviting and warm, one that is inspired by the surrounding landscape and aims to create a deeper connection to nature, well-being, and sustainability. Here, connections are renewed.
Lobby - Office Building Phase 2
Campus Rendering of Existing vs New Work
Manufacturing Manufacturing Support Office
CRB GROUP
CRB GROUP
Market Hall
Monumental Stair
HEALTHPARK AT KILDAIRE
LS3P
New Construction
94,000 SF
Cary, NC
2020 Completion
This core and shell building, located across from the central WakeMed Hospital in Cary, NC, is designed to accommodate overflow administrative and outpatient services for the hospital. The project features tilt-up concrete construction, aluminum storefronts, and black metal panel banding that unifies the east and west curtain wall volumes. I contributed throughout all phases, from schematic design to construction, including the design and selection of the lobby interiors.
UNCG NURSING & INSTRUCTIONAL BUILDING
LS3P and SmithGroup
New Construction
180,000 SF
Greensboro, NC
2020 Completion
In collaboration with SmithGroup as the Design Architect, the LS3P team developed the core and shell of the Nursing and Instructional building. Working closely with the Project Architect and design team, I focused on production of the Construction Documents. My responsibilities included detailing the building envelope, refining core elements in the floor plans, and coordinating document standards with SmithGroup.
2604 & 1301 HILLSBOROUGH ST
New City Design Group
New Construction
14,000 SF
Raleigh, NC 2015
Assisted the project team on a mixed-use urban infill project located across from the NC State campus, featuring street-front retail and student-centric housing above, with no on-site parking. Responsibilities included assisting with schematic models and renderings, securing site plan approval, developing presentation materials, and producing construction documents.
NCDG
LS3P LS3P
LS3P
VERITAS COLLABORATIVE EATING DISORDER CLINIC
New City Design Group
Interior Completion
90,000 SF Durham, NC Fall 2016
Veritas Collaborative provides innovative treatment for eating disorders, combining inpatient care, counseling, personalized meal planning, and educational support for younger patients. Working alongside the project architect, I developed construction documents in Revit—New City Design Group’s first project executed in this platform. I continued to support the project through construction, assisting with Construction Administration tasks.
FELTON GROVE HIGH SCHOOL
RATIO
New Construction
350,000 SF Apex, NC 2020-2021
As Project Architect, I led the internal architecture and interior design team under the guidance of the K-12 Education Studio Project Manager. Felton Grove High School embraces a forward-thinking educational model, providing students with a dynamic and adaptable learning environment that moves beyond traditional classroom designs.
My contributions included designing the exterior façade, which emphasized flexibility, seamless indoor-outdoor integration, and a vibrant central gathering space. The design was intended to foster a strong sense of community while enhancing the overall learning experience. I also collaborated with the specifications writer on exterior material selections, coordinated design details with the envelope consultant, and participated in client meetings focused on site development. Additionally, I developed floor plan layouts based on stakeholder needs and aligned with Wake County Public Schools’ design standards
LIFE SCIENCES CAMPUS RENOVATION
CRB Group
Renovation
1.6 Million SF
Confidential Client
Texas
Conceptual - 2023
RESPONSIBILITIES
Conceptual Design
Designed key spaces, including an atrium lobby, fitness center, and food-focused marketplace. Created deliverables for all spaces to present at client meetings.
Consultant Coordination
Coordinated with external consultants, stakeholders, and trade partners to ensure alignment on project scope and detailed design of interior elements. Revit Documentation
Served as Revit Champion, overseeing and managing Revit standards for both the Architecture and Interiors teams. Produced Design Development Drawings for estimating.
CONCEPT
CRB provided architectural design and engineering services for the $4 billion repositioning and renovation of Ross Perot’s former EDS Headquarters in Plano. The project involved the renovation of 1.6 million square feet of existing buildings, as well as the design of new manufacturing building shells, a Central Utility Plant, and extensive park and site improvements. Additionally, CRB was responsible for master planning 200 acres, contributing to one of the largest life sciences developments in the world.
Market Hall & Main Entry
CRB
CRB GROUP
Atrium Level 5
Atrium Market Hall
CRB GROUP
CRB GROUP
BARKITECTURE 2024 GRAND CHAMPION
CRB Group Sponsored In collaboration with Felipe Lopera Cadavid