Conducted product research on facility finishes for lab, office, and manufacturing. Coordinated largescale interior finish systems with installers.
Presentation Deliverables
Developed client presentations, including floor plans for programming, conceptual 3D renderings, and finish selection meetings.
Value Engineering and Documentation
Collaborated with internal Mechanical, Electrical, and Plumbing teams, Lab Planners, Subject Matter Experts, and external consultants to develop documents reflecting scope adjustments and cost reductions.
Construction Administration
Processed RFIs, submittals, and shop drawings while balancing cost-reduction efforts with the preservation of the client’s high design vision.
CONCEPT
This new research facility will capture the essence of the Research Tech Triangle, where natural beauty meets an industrial legacy. Focused on preserving memories lost to Alzheimer’s, the design will honor the past through its materials and setting, while creating a space that fosters future breakthroughs and new memories.
Lobby & Monumental Stair
CRB
Pantry and Collaboration Space
Open Office CRB
HEALTHPARK AT KILDAIRE
LS3P
New Construction
94,000 SF
Cary, NC
2020
This core and shell building, located across from the central WakeMed Hospital in Cary, NC, is designed to accommodate overflow administrative and outpatient services for the hospital. The project features tilt-up concrete construction, aluminum storefronts, and black metal panel banding that unifies the east and west curtain wall volumes. I contributed throughout all phases, from schematic design to construction, including the design and selection of the lobby interiors.
UNCG NURSING & INSTRUCTIONAL BUILDING
LS3P and SmithGroup
New Construction
180,000 SF
Greensboro, NC
2020
In collaboration with SmithGroup as the Design Architect, the LS3P team developed the core and shell of the Nursing and Instructional building. Working closely with the Project Architect and design team, I focused on production of the Construction Documents. My responsibilities included detailing the building envelope, refining core elements in the floor plans, and coordinating document standards with SmithGroup.
2604 & 1301 HILLSBOROUGH ST
New City Design Group
New Construction
14,000 SF
Raleigh, NC
2015
Assisted the project team on a mixed-use urban infill project located across from the NC State campus, featuring street-front retail and student-centric housing above, with no on-site parking. Responsibilities included assisting with schematic models and renderings, securing site plan approval, developing presentation materials, and producing construction documents.
NCDG
LS3P
LS3P
LS3P
VERITAS COLLABORATIVE EATING DISORDER CLINIC
New City Design Group
Interior Completion
90,000 SF Durham, NC Fall 2016
Veritas Collaborative provides innovative treatment for eating disorders, combining inpatient care, counseling, personalized meal planning, and educational support for younger patients. Working alongside the project architect, I developed construction documents in Revit—New City Design Group’s first project executed in this platform. I continued to support the project through construction, assisting with Construction Administration tasks.
FELTON GROVE HIGH SCHOOL
RATIO
New Construction
350,000 SF Apex, NC 2020-2021
As Project Architect, I led the internal architecture and interior design team under the guidance of the K-12 Education Studio Project Manager. Felton Grove High School embraces a forward-thinking educational model, providing students with a dynamic and adaptable learning environment that moves beyond traditional classroom designs.
My contributions included designing the exterior façade, which emphasized flexibility, seamless indoor-outdoor integration, and a vibrant central gathering space. The design was intended to foster a strong sense of community while enhancing the overall learning experience. I also collaborated with the specifications writer on exterior material selections, coordinated design details with the envelope consultant, and participated in client meetings focused on site development. Additionally, I developed floor plan layouts based on stakeholder needs and aligned with Wake County Public Schools’ design standards
LIFE SCIENCES CAMPUS RENOVATION
CRB Group
Renovation
1.6 Million SF
Conceptual - 2023
Confidential Client
Texas
RESPONSIBILITIES
Conceptual Design
Designed key spaces, including an atrium lobby, fitness center, and food-focused marketplace. Created deliverables for all spaces to present at client meetings.
Consultant Coordination
Coordinated with external consultants, stakeholders, and trade partners to ensure alignment on project scope and detailed design of interior elements. Revit Documentation
Served as Revit Champion, overseeing and managing Revit standards for both the Architecture and Interiors teams. Produced Design Development Drawings for estimating.
CONCEPT
CRB provided architectural design and engineering services for the $4 billion repositioning and renovation of Ross Perot’s former EDS Headquarters in Plano. The project involved the renovation of 1.6 million square feet of existing buildings, as well as the design of new manufacturing building shells, a Central Utility Plant, and extensive park and site improvements. Additionally, CRB was responsible for master planning 200 acres, contributing to one of the largest life sciences developments in the world.
Market Hall & Main Entry
CRB
CRB GROUP
Atrium Level 5
Atrium Market Hall
CRB GROUP
CRB GROUP
BARKITECTURE 2024 GRAND CHAMPION
CRB Group Sponsored In collaboration with Felipe Lopera Cadavid