Korzell Coe | University of Detroit Mercy - School of Architecture | Fall 2019
(505) (513) (+39)
(313)
studio PORTFOLIO
cincinnati, ohio Page 18
chimayo, new mexico detroit, michigan Page 4
Page 28
volterra, italy Page 46
(313) DETROIT, michigan
4
detroit bike hub
+ COESPACES
ARCH 1400: Architectural Design IV Kutil Winter 2018 The Alley Project, or Detroit Bike Hub, was a two-part project. First being a group project. Later, redeveloping the ideas into an individual project using a place, node, or threshold of the alley. The Detroit Bike Hub was a proposal to be the main hub of the Detroit Slow Roll to either start or end at. The hub would be a gathering space that would be used by anyone - whether you were riding your bike, customizing your bike, or having lunch in the hub. The alley of the site was designed by William Teal to be bike storage areas and an interactive bike race lane, the seating/gathering space was designed by Emma Jeffrey inside of the current parking lot area of the alley, and the biking showcasing ramp was designed by me. The alley served as an exterior threshold to the larger place, which was the exisiting parking lot. The design took into architectural condiseration of the back entrances of the surrounding buildings, the exclusive bar, lighting, and the pre-existing function of the alley. As an individual, I chose to work with the threshold of the street facade of the site. It was the portal into the Detroit Bike Hub. Some architectural challenges were addressing the circulation between bikers and pedestrian. The showcase ramp allowed for bikes to ride along the ramp while showing their bikes off to the interior and exterior of the hub. The pedestrians would be able to store their bikes inside of the threshold facade and rent MoGo bikes if they did not have a bike to ride in Slow Roll. The interior space of the Detroit Bike Hub consisted of flexibile gathering spaces, water fountains, and the viewing of the bikes from people around Detroit. Both modes of circulation being able to view into Capitol Park was essential in the design. During the Slow Roll, Capitol Park would be blocked off from vehicular traffic to allow the overflow between the spaces.
5
the alley project 6
Upper Floor Plan
Ground Floor Plan
7
Elevations Above: Group - The Alley Project Below: Individual - The Alley Project/Threshold
8
OIT BIKE HUB CIRCULATION DIAGRAM
DETROIT BIKE HUB ELEVATION DIAGRAM
SECTION THROUGH NEW THRESHOLD BIKE SHOWCASE/STORAGE, SEATING, AND UPPER PEDESTRIAN LEVEL
920
co-work co-live project 10
COE Spaces is an extension proposal for a site in downtown Detroit across from Capitol Park located on Griswold Street. The existing site is used as a parking lot currently. Bridging the gap between the park and the alley, COE Spaces would provide more public/private spaces for all users to either work, live, grab a cup of coffee, have fun in the bike park that is in the basement, or take a shortcut from the alley through the greenway between the buildings and land in the historical Capitol Park. The main idea of using the program to always connect all of the users inside and outside of the site. The bike park can be seen from anywhere on the site. The building’s steep roof plays along the idea of bike ramps, but more importantly allow natural light to seap deep within the building. The facade uses the surrounding buildings around Capitol Park by window heights/widths, scale, verticality, glazing, brick, concrete, and its response to the sidewalk.
11
GROUND FLOOR PLAN
12 BASEMENT FLOOR PLAN
FIFTH FLOOR PLAN
FOURTH FLOOR PLAN
THIRD FLOOR PLAN
SECOND FLOOR PLAN
13
TRANSVERSE SECTION
14
LONGITUDINAL SECTION
COE SPACES MODEL - NORTH ELEVATION
COE SPACES WITHIN SURROUNDING CONTEXT
15
SITE MODEL
16
3d Rendering section perspective Mediums: watercolor, pastels, colored pencils, trace paper, and markers
17
(513) CINCINNATI, OHIO
18
PEEK - A - BOO ARCH 1300: Architectural Design III Heidgerken Fall 2017 Peek-A-Boo is a set of double duplexes that are located on Mount Adams in Cincinnati, Ohio. Each duplex contains a 700-900 square feet one single-bedroom and a two-bedroom unit being 1,000-1,400 square feet. The form development was created using the contextual lines of the neighboring buildings, sightlines toward Kentucky/Ohio River, downtown Cincinnati, and some of Oregon Street. Each duplex was designed to give the occupants two to four of those views, as well as the inner courtyard/entrances to each duplex. Four parking spots were provided underneath the cantilevered one-bedroom unit of the ground level duplex. Peek-A-Boo allowed walkers on the sidewalk to enjoy the view from the top of the hill by not blocking the view by putting both duplexes side by side. Addressing the streetscape but ignoring the apartment building on the south side of Oregon was a significant part of the design process. Mount Adams’ streets were tightly packed with houses that the views could not be seen from the sidewalk. A path was designed to flow down the northwestern side of the site that allowed walkers to still experience the view and create an access point to and from Baum Street. This placement ensured that privacy of the duplexes would still be kept although people would be walking down the hill. The gate along the street allows for privacy for the north facades of the ground level duplexes, which follows the double skin-layer facades. The site’s landscape had been regraded to follow the forms of the duplexes. The use of a wood double-skin paneling created a visual stacking experience from the exterior. The skin stopped for entrances and balconies (with the exception of the two-bedroom unit at ground level). At night, the landscape would glow and could be seen from the bottom of the hillside.
The interior lights from
the duplexes would be seen through the windows through the double-skin.
19
Major Viewlines
20
Viewlines of Each Duplex
Use of Double Skin
Baum Street Elevation
South Oregon Street Elevation
North Oregon Street Elevation
21
22
23
24
Ground Floor Plan / Site Plan
Lower Floor Plan
Second Floor Plan
25
26
27
(505) chimayo, new mexico
28
the sacred journey
The Alley Project, or Detroit Bike Hub, was a two-part project. First being a group project. Later, redeveloping the ideas into an individual project using a place, node, or threshold of the alley. The Detroit Bike Hub was a proposal to be the main hub of the Detroit Slow Roll to either start or end at. The hub would be a gathering space that would be used by anyone - whether you were riding your bike, customizing your bike, or having lunch in the hub. The alley of the site was designed by William Teal to be bike storage areas and an interactive bike race lane, the seating/gathering space was designed by Emma Jeffrey inside of the current parking lot area of the alley, and the biking showcasing ramp was designed by me. The alley served as an exterior threshold to the larger place, which was the exisiting parking lot. The design took into architectural condiseration of the back entrances of the surrounding buildings, the exclusive bar, lighting, and the pre-existing function of the alley. As an individual, I chose to work with the threshold of the street facade of the site. It was the portal into the Detroit Bike Hub. Some architectural challenges were addressing the circulation between bikers and pedestrian. The showcase ramp allowed for bikes to ride along the ramp while showing their bikes off to the interior and exterior of the hub. The pedestrians would be able to store their bikes inside of the threshold facade and rent MoGo bikes if they did not have a bike to ride in Slow Roll. The interior space of the Detroit Bike Hub consisted of flexibile gathering spaces, water fountains, and the viewing of the bikes from people around Detroit. Both modes of circulation being able to view into Capitol Park was essential in the design. During the Slow Roll, Capitol Park would be blocked off from vehicular traffic to allow the overflow between the spaces.
29
the sacred journey ARCH 2100: Architectural Design V Ibele Fall 2018
the story of chimayo, new mexico & el santuario de chimayo chapel
Permission from NM Government to build church.
1856
Fr. Bernado’s daughter, Carmen, inherits property.
1816
1815
Church in construction.
1814
Fr. Don Bernado and Fr. Alvarez built small chapel, Christ of Esquipulas Esquit
30
Letter from Bernado to Alvarez to build bigger church.
1813
Good Friday: Crucifix was found and dug up by Fr. Alvarez. Taken to Santa Cruz three times.
1810
1730
Chimayo, New Mexico was founded.
El Santuario de Chimayo Chapel is completed.
Fr. Bernado’s granddaughter, Maria, inherits propety.
2018
Santuario de Chimayo new design proposal for entire site for increase number of pilgrims/ visitors.
1970
1915
1929
Property sold to Spanish Colonial Arts Society.
Property donated to Roman Catholic Archidiocese of Sante Fe.
El Santuario de Chimayo became National Historic Landmark.
31
Navigating through sacred sites....
32
Designed from sacred testimonies... “When we first pulled up to this complex, I thought for sure we’d be in and out in 30 minutes. It didn’t look like much. As we started to wander around and read the plaques, and go into the different church buildings, I realized I was very wrong. This is obviously a retreat, a “sanctuary” in every sense of the word. I could’ve easily stayed for hours, just wandering around the grounds.” Anonymous, 2014
“Our objective is the compound of Sanctuario de Chimayo. We are fortunate that many of the original buildings are in excellent conditions and are open to the public. My wife discovers an “official Holy Dirt container and we proceed to Sanctuario de Chimayo to fill the container. My wife carefully runs her foot through the Holy Dirt. We are impressed with the number of crutches on display.” Savant, 2018
“As I stepped over the threshold of the entrance, tears sprang to my eyes and spilled over meandering down my face. I didn’t understand why I was crying. I didn’t feel sadness, only deep reverence for this place that had given so much hope to so many.” Betsy flowers, 2017
“Very picturesque drive along the nearby highways. Make sure to spend a few hours taking the High road to Taos. Stunning and vast. Very stunning sanctuary in a peaceful town.” Anonymous, 2013
“We enjoyed walking the grounds and visiting the churches. It sometimes feels a little kitschy, yet watching people praying, being pushed in wheelchairs, holding hands, or looking at all the pictures of loved ones, you feel a sense of deep faith and spirituality.” jackie j., 2018
33
site connection diagram
34
parti diagram
35
-8’
-5’
-5’
-8’ -7’ -6’ -5’ -4’
-3’
-3’
-2’ -2’
-2’ -1’ 0
elevational changes diagram
36
welcome center lobby/reception area seating areas admin. offices admin. conference room library exhibition hall lecture hall classroom study room 4 guestrooms kitchen
circulation diagram
cafe/outdoor seating area outdoor mass area restrooms/mech./storage 55 parking spaces
37
NORTH ELEVATION
38
SOUTH ELEVATION
39
EAST ELEVATION
40
WEST ELEVATION
41
SECTION THROUGH LECTURE HALL AND GUESTROOM
42
SECTION THROUGH CAFE AND OUTDOOR SEATING AREA
43
44 context plan
site plan
45
(+39) volterra, italy
46
ICNIV AD | VOLTERRA INSTITUTE Activated Walls of Volterra
Volterra Study Abroad Studio D. Pitera Summer 2019
The Cachophony Symphony holds an annual procession of 16 lit candles throughout the streets of Volterra. The new Da Vinci Volterra Institute is designed and celebrated from the box that contains these candles. The Da Vinci Volterra Institute is designed for the research and amplification of the Etruscan and Renaissance culture. The design challenges were access from stairs/street, site geometry, and building height. The building design was inspired by the Cachophony Society project and its symbolic relationship to the city at night. The beacon of light that is celebrated through a procession into the building’s main circulation is a symbol of activity within, around, or passing through.
47
The Cachophony Symphony
axonometric
Section
Plan
A Ritual to Capture the Momentary and the Fleeting 48
49
Design Sketches
50
51
Activated Walls of Volterra
52
Diagrams
Director’s office | 150 Kitchenette | 200 Liminal Entry | 300 (3) Offices | 450 (2) Conference Rooms. | 600 Cafe | 1,000 Living A&B | 1,200 (3) Classrooms | 1,500 Knowledge Exchange | 1,500 Library | 1,500 Addit. Program | 2,000 53
54
55
Elevation Studies
Punctured
Curtain Walls
56
Views
Lighting
Balconies
57
Elevation & exterior activated walls
58
59
first floor plan
60
fourth Floor Plan
third Floor Plan
Second Floor Plan
61
62
63
64
65