Petrotechnics Sakhalin Case Study

Page 1

WORLD’S LARGEST Vertically Integrated Oil and Gas Project Implements Petrotechnics ‘INTEGRATED SAFE SYSTEM OF WORK’

SEIC Client Profile

Client Needs

R es ults

Sakhalin Energy Investment Company Ltd (SEIC) is the Shell-led operating company for the Sakhalin II project. The objective of this project was to construct a world class oil and gas infrastructure to manage upstream, midstream and downstream operations from reservoirs in the Sea of Okhotsk, off the east coast of Sakhalin Island, Russia. This project is the world’s largest vertically integrated oil and gas project comprising 3 offshore platforms, onshore and offshore pipelines, an onshore processing facility, a Liquefied Natural Gas (LNG) plant and an oil export terminal, in addition to the necessary infrastructure and utilities to support the operations.

In order to successfully complete the Sakhalin II project and due to the level of complexity involved, SEIC recognized the need to implement a single, standardised business process from the outset. This process had to promote best practice across the diverse assets, whilst ensuring work would be carried out in a uniform manner.

- Integ rat ed Asset So lut ion

The opportunity to work with SEIC arose through exposure to Petrotechnics Integrated Safe System of Work (ISSOW) solution, Sentinel PRO ®, within Shell in another region. Sentinel PRO ® was recognized by SEIC as having the necessary capabilities to deliver best practice and meet a demanding set of objectives for their work execution requirements.

The key requirement was a solution to focus on safety performance, along with operational effectiveness to provide clear communications from senior management to the frontline. The solution needed to be capable of transcending cultural and language differences. It was also necessary to provide a transparent audit of work execution that would satisfy both HSE and the main stakeholders.

- Retu rn on invest me nt va lue wa s recog niz ed ba sed on proce ss effect ive ne ss an d un de rlying co mpete nce - Se nti ne l PR O® wa s a cata lyst for ch an ge in Ru ssi an reg ulatio n for pe rm it an d ris k assessm ent proce sse s - Proce ss conforma nce an d reg ulatory co mp lia nce as a by-p rod uct , an d not a drivi ng force, for effect ive wo rk ex ecution bu sin ess proce ss - ISSO W pro vid es a powe rfu l group an d sit e HS E au dit an d co mp lia nce vehicle - Integ rat ed up strea m/LN G

Additionally, the Sakhalin II project needed an enterprise level application built on leading technologies with low cost of deployment and low total cost of ownership.

te ch nics are a global de m on strat ed th at Petro with wo rld cl ass im plem entatio n pa rtn er l as pe ct s of so lut ion brea dt h an d de pt h in al m an ag em ent int rod uctio n an d ch an ge

NOTES

Mo likpaq

Bu sin ess Proce ss


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.