Skip to main content

Portfolio by Anna Kolator

Page 1

ANNA KOLATOR

architecture portfolio


MODULE prefabricated house

second prize in the competition "The Rhythm of Light - house based on Bauhaus principles" 3rd semester individual work, Gdansk University of Technology concept design, October - December 2017 supervisor: mgr inż. arch. Stanisław Dopierała This single-family house design tried to incorporate Bauhaus values - functionality and simplicity available for everyone. The "Module" concept is a house consisting of prefabricated elements, that can be juxtaposed at choice. Due to its repeatability, it is supposed to be a much cheaper solution than a custom architectural design. "Module" form emerged from a combination of the traditional polish house with a pitched roof and cubes inspired by modernism. The main module hosts traditional home functions that bring dwellers together - kitchen, living room and dining room. The additional modules can be bedroom, workplace, bathroom, garage or pantry all according to the needs of the users. These modules can be placed alongside the main one in countless ways. Different configurations are to ensure the most functionality and direct sunlight access optimization. On the north, there is only one window and it is non-translucent from the side of the street to maximize the privacy of the residents. CONFIGURATION OF THE MODULES bathroom living room

bedroom on mezzanine

kitchen

basic version

porch pantry

przedsionek

garage

bathroom

living room kitchen

gabinet workplace

sypialnia bedroom

single / couple porch pantry

przedsionek

bathroom

sypialnia bedroom

living room kitchen

workplace gabinet

bedroom sypialnia

family 2+1

garage

WC

porch

przedsionek

pantry

bedroom sypialnia

gabinet workplace bathroom bedroom master sypialnia bedroom

family 2+2

living room kitchen

bathroom

sypialnia bedroom


IDEA DEVELOPMENT typical Polish house

modernist cubes

+

=

MAIN MODULE

ADDITIONAL MODULES

garage 28 m²

pantry

porch toilet

3 m²

5 m²

2 m²

bedroom 14 m²

workplace 14 m²

living room+kitchen 55 m²

bathroom

hall

bathroom

6 m²

8 m²

hall

9 m²

6 m²

bedroom 14 m²

master bedroom 16 m²

ground floor plan 0

1

2

3

4

5m

terrace 30 m²

section


double HOUSE single family house design in Gdansk for private investors concept design July-August 2020 while working in MAKA STUDIO supervisor: arch. Wiktor Kurc This house design faced a few challenges as the plot had access from the south. MΛKΛ.STUDIO Therefore, there was a risk of compromising privacy with the idea of a living room with big windows facing the south that appealed to the investors. On top of that, the owners wanted to keep their distance from the neighbours on the west side. My solution was the house split into two parts, so the living and access areas were noticeably divided and not interfering with each other. The main living area was located on the east as well as the master bedroom according to the request of the investors.

KO8a

E: biuro@maka.studio T: 501 537 353 A: Gdynia ul. Kolejowa 6a/1 www.maka.studio

RZUTY

laundry room 8 m²

bathroom 7 m²

leisure room 15 m²

garage 35 m²

boiler room

hall

5 m²

13 m²

workplace 11 m²

bedroom

TERRACE

bedroom

15 m²

15 m²

bathroom 7 m²

hall

toilet

11 m²

pantry

2 m²

3 m²

porch

kitchen

4 m²

wardrobe

8 m²

5 m²

master bedroom 17 m²

WIĘKSZE ?

living room 41 m²

KO8a

MΛKΛ.STUDIO E: biuro@maka.studio T: 501 537 353 A: Gdynia ul. Kolejowa 6a/1 www.maka.studio

RZUTY

ground floor layout 0

1

2

3

4

projekt: adres:

5m

inwestor: autor:

Dom jednorodzinny

tytuł:

RZUTY

data:

CZERWIEC 2020

numer rysunku

RĘBIECHOWO, ul. Cienista

01

Przemysław i Marcelina Sorn arch Aleksandra Kurc

arch Wiktor Kurc

arch Anna Kolator

skala:

25/02/2021 22:23:19

laundry room 8 m²

bathroom 7 m²

leisure room 15 m²

garage 35 m²

boiler room

hall

5 m²

13 m²

workplace 11 m²

bedroom

TERRACE

bedroom

15 m²

15 m²

bathroom 7 m²

hall

11 m²

toilet

pantry

2 m²

porch

3 m²

kitchen

4 m²

wardrobe

8 m²

5 m²

master bedroom 17 m²

WIĘKSZE ?

living room 41 m²

first floor layout 0

1

2

3

4

5m

While working on this concept, I was responsible for developing the idea and form of the building supervised by the owner of the office. I also created the layouts having regard to guidelines and remarks of the investors. The render and schemes seen on the side were prepared by me as well. RZUTY projekt:

adres: inwestor: autor:

Dom jednorodzinny

numer rysunku

tytuł:

RĘBIECHOWO, ul. Cienista

01

Przemysław i Marcelina Sorn arch Aleksandra Kurc

arch Wiktor Kurc

arch Anna Kolator

data:

CZERWIEC 2020

skala:

25/02/2021 22:23:19


IDEA DEVELOPMENT

splitting in two the average house with pitched roof and ridgepole perpendicular to the street

shifting the two parts to create two separate blocks aligned with adjacent houses

pulling forward the wall and roof outline to ensure more privacy


HAVN multi-family re s i d e n t i a l

second prize according to external judge panel 5th semester group work, VIA University College, Horsens, Denmark Concept/Scheme Design/Detail 1, September-December 2018 supervisor: Steen Fynbo Larsen collaboration: Ana Ivanov, Olga Skosolas, Gareth Welsh The semester's assignment was to provide government-subsidized apartments and one commercial unit on the ground floor. The project had to meet the strict demands concerning maximum area, availability for handicapped people, 2018 Passive House Principles and cheap, simple construction process. Our team came up with the name Havn. It means harbour in Danish and indicates that flats are supposed to be a safe and welcoming place to live. It also stems from the nautical traditions of Horsens. During the scheme documentation stage, repetitive precast elements and modular brick system were incorporated to reduce waste, speed up the rate of construction and reduce labour costs. MY STUDIES WHILE SEARCHING FOR THE OPTIMAL APARTMENT LAYOUT

UP

Access balcony 16.5 m≤

DW DW Kitchen 21 m≤

DW Kitchen 20 m≤

Bathroom 6 m≤

Bedroom 1 11 m≤

Bedroom 2 12.5 m≤

e 92.5 m≤

Bathroom 5.5 m≤

Living room 30 m≤ Living room 28 m≤ Bedroom 1 16 m≤

Bedroom 1 15.5 m≤ Balcony 7.5 m≤

Balcony 11 m≤

ground floor plan

0

1

2

3

4

5m

UP

Access balcony 24.5 m≤

DW Kitchen 15 m≤

Bedroom 2 11 m≤

DW W

DW

Kitchen 15 m≤ Bathroom 5 m≤

DW DW

Living room 22.5 m≤

Bathroom 6 m≤

Bathroom 6 m≤

Bedroom 14.5 m≤

Bedroom 14.5 m≤

Living room 22.5 m≤

Kitchen 21 m≤

Bedroom 2 11 m≤

Kitchen 15 m≤ Living room 27 m≤

Bathroom 5 m≤

Living room 22.5 m≤ Bedroom 1 16 m≤

Bedroom 1 16 m≤ balcony 7.5 m≤

balcony 5.5 m≤

balcony 5.5 m≤

balcony 7.5 m≤

repetitive floor plan

0

1

2

3

4

5m

My role in this project was the idea of the architectural expression of the building. I solved the apartment layouts and designed the facade. During the scheme documentation, I drew the section and five details along with various calculations and technical analysis such as building component and rent calculations, life cycle costing and structural load calculations. I am also the author of the graphic presenting the design on the side.


IDEA DEVELOPMENT

buildings with pitched roofs standing in a frontage

putting a medium sized box in the frontage

creating a passage and separating the commercial unit

finishing the from by cutting out the balconies


academic

HOTEL 6th-7th semester final project, Gdansk Univeristy of Technology concept design with building phase elements March - December 2019 supervisor: dr inż. arch. Agnieszka Błażko The plot is located in the very centre of Gdansk Wrzeszcz. The proximity of the Gdansk University of Technology campus on the south, historic XIX-century residential mansions and social terraced houses create a highly defined background. MANSIONS - 3-4 high storeys - mansard roofs, rusty, lost prestige ABBEG'S COLONY - 2 low storeys - dense terraced residential GUT CAMPUS - big cubatures - varying forms, flat roofs

public campus square

Division of the site into six parts corresponding to neighbouring mansions seemed natural according to the existing context. The next step was to place the functions. I decided to accommodate the hotel lobby on the south as it is the main function of the development. The residential part of the hotel was meant to be on the first and second floors. In the next module, the student canteen was located. Another crucial element is the conference unit located on the ground floor. The last two parts were arranged as a water reservoir and a green square to preserve existing trees. There was also designed a vast underground car park to meet the needs of the whole campus users. An essential element in the design process was also the Abbeg's Colony. I have decided to incorporate the angled direction of the houses. The northern part designated the south edge of the building, and the southern one - the direction of the path through the squares.

site plan 0

10

20

30

40

50m


GASTRONOMY GASTRONOMY CONFERENCE CONFERENCE UNITSUNITS

WATER WATERGREENERY GREENERY HOTEL HOTEL SQUARE SQUARE SQUARE SQUARE

IDEA DEVELOPMENT

GASTRONOMY GASTRONOMY CONFERENCE CONFERENCE UNITSUNITS

WATER WATERGREENERY GREENERY HOTELHOTEL SQUARE SQUARESQUARE SQUARE


B A Sm2

B

7573 990

840

840 80

184

0.02

384.5

100

0.02

-

360.5 35

1'

1

952.5 952.5

2

3

słup żelbetowy 35x35cm

35

1%

F6

1.5%

słup żelbetowy

EI30

153

35535

-

+

0.02

0.10

0.34

+

0.10

+

+

0.58

0.70

3,5%

+

201

517

+

+

0.58

990

słup żelbetowy 35x35cm

20 517

1518 1391

85.5

1552.5

20

913

20 75.5

20

570

0.82

1.18

+

1.18

+

1.30

+

+

1.06

+

1.30

+

1.18

+

1.06

1.42

+

0.94

0.70

+

1.06

+

1.42

+

0.94

+

1.42

+

0.94

+

0.70

+

0.30

+

0.30

+

1.06

+

0.94

+

0.82

+

1.30

105.5

+

0.82

+

0.94

+

1.42

+

0.94

2383.5

50

840

2

+

0.15

+

0.15

4

6%

913 913

5

6

75.5

990

3

1391 1552.5

7

8

85.5

570

840

390 390

32

10

105.5

907.5 990

11

2383.5 2539

840

+

0.30

+

0.30

+

0.45

+

0.45

+

0.60

+

0.60

E

ground floor plan 3

4

5m

32

6

7

8

9

10

11

12

ZAPROJEKTOWANO PRZY UŻYCIU WERSJI STUDENCKIEJ PROGRAMU AUTODESK

11

10

9

8

7

6

5

3

4

4'

2

1

7582

section A-A 1

2

3

4

5m

- 4.88

P1

- 4.28

- 4.88

S6B

90.5

118

20

S6B

90.5

118 511.5

513.5 20

20 332

22 511.5

20 513.5

1225 1244 1225 1244

20 382.5

380.5 22

S4B

380.5 22

382.5 20 12

x 28 17

4.08 P2

x 17 12 28

4.08 P2

2.04

S1

S2

S4B P8a -

x 17 12 28

-

2.04

+ 1.88

+ 2.08

+ 1.88 - 2.02

S2

20

-

P8a -

15

.5 x 17 12 28

392 22

x 28 17

0.00 P8

15

392 22

20 394 12

+

394 20

P2

2.10

182

4.08

P8a +

202

-

.5 x 17 12 28

20

+ 2.08

- 2.22

S1

P2

- 0.34 0.50

x 17 28 .5

2.10

9022

4.08

- 0.14

P8a +

6020

-

P8

Sw2 P1

20 400

34

0.00

12

+ 6.11

+ 5.91 .5 x 17 11 28

0.00 P8

394

Sw2

- 0.34 0.50

+

- 0.59 - 0.855

+

394 60

Sw2

- 0.855

- 4.28

6.13

182

- 0.14

- 0.59

P1

P8a +

202

P8

4.20 P8

+ 6.11

+ 5.91 x 17 28 .5

x 17 28 .5

+

400

P8

+ 3.86

P4

4.20 P8 36520

0.00

S3 S3 S3

4.08

20

69

+

6.13

.5 x 17 11 28

12

S4B S4B

3.74

+ 35134

4.20

11.90 P8

+ 3.86

+ 4.06

P8a +

20

176

Sw2

Sw3A

+

+

- 4.88 P2 -

11

x 17 28 .5

34351

Sw2

Sw3A 20 333 333 20

S4C S4C

4.20

P1

8.05 P8

90

- 4.28

6.20

6.20

0.00=8.80 m n.p.m

+

60

-

- 5.60

3.74

P4

- 4.88 P2

P3

±

26.5345

4.08

P8

11

+

41

20

60

- 5.60

P2

0.00=8.80 m n.p.m

8.05

8.05 P8

210

P3

+

-

P4

0.50

±

11.90

462.5 26.5

0.00 83 325 15

P2 -

+

20 462.5

46 359 359 15 83

0.50

+ 4.06

P7

P7

Sw2

- 4.28

+

345 60

P2

-

P10

P7

+ P4

10.84

+

P13

+

332

259

20

69

Sw2 Sw2

3.36 0.00

+

Sw2

Sw2

Sw2

Sw6

- 1.58

- 0.14 - 0.34

- 1.38

P2

-

0

+

+

P8

+ 7.71

detal C

P7

Sw2

P8a

P10

S4B

126

4.28

69319

Sw2

256

- 1.58

P10

- 0.34 Sw6

20 20

- 1.38 + 1.18

- 0.14

8.05

Sw2

-

Sw2

+ 1.38

P8a

270

4.28

319 46

333 20 20 256 248

20

Sw2

P8a

P10

P7

+

10.84

34

S4B

126

8x 17 28

248

Sw2 22

1.36

-

3.36 4.20

+ 7.91

60

17 28

-

+ +

325 90

8x

12.43

1.36

+ 4.06

P9

detal C

P7

90

+

1.40

-

4.20

11.90

+ 7.71

P13

+ 3.86

20

8x 17 28 8x 17 28

+

+

+ 1.38

+ 1.18

270 192

12.43

17 28

P8a

Sw2 Sw2

8x

250 254

+

22 .5 17 8 x 28

0.00

+ 7.36 + 4.06 + 3.86

Sw2

8x 17 28

+

Sw6

20 333

1.40

Sw2

34

17 28 .5

254 246

.5 17 8 x 28

22

90

60

22

20

Sw6

Sw2 +

.5 17 8 x 28

250 89.5

0.00

P9

P9

89.5

P1

114

4.28

134

-

4.20 P8

34 385 246

577

258

272

22

20

34

20

22 238 114

P8a

- 12.65 P1

+

192

- 4.88

P8a

- 12.45

podnośnik przemysłowy NKPXL-220 Nowina Konopka

90

P1

60

- 4.28 60

90.5 60

-4.08

P1 89.5

P1

P8

Sw6

4.28

60 394

-

Sw2

Sw2

P1

- 4.88

garaż podziemny

20461

22

- 12.45

- 4.28 89.5 358

358 90.5 60 394

Sw2

S1

-4.08

P1

258

podnośnik przemysłowy NKPXL-220 Nowina Konopka

238

P8

2.80

+

8x

240 272

0.00

4.20 P8

22

+

134 240

+

P8a

34

+ 2.58

Sw6

P8

+

.5 17 8 x 28

2.80

17 28 .5

P8

P8

- 12.65

P1

+

8x

20 20

Sw6

+ 3.14

belka BS 300/400 + 0.00 Pekabex

Sw6

P8

- 0.34

garaż podziemny

P8a

+ 2.58 15

P11

- 0.34

- 0.14

S4B

420 15

4.20

Sw2

76 30 76

314

328 3020

30 314 50

328 20 358

50

+

+ 2.78

+ 3.41 - 0.14

20 394

Sw2

+ 3.14

belka BS 300/400 Pekabex

+ 3.61

Sw2

P8

34

358 394 20

0.00=8.80 m n.p.m.

+ 3.14

belka BS 300/400 Pekabex

P11

+ 2.78

+ 3.41 P12

34

parter

P10

Sw2

11

S1

364 35820

m n.p.m.

S2

+ 1.60=10.40

0.00=8.80 m n.p.m.

P8

3020

20

P10

S5

parter

Sw2

S5 S7

m n.p.m.

374 359 11

4.20

4.20

+ 3.61

+ 3.14

belka BS 300/400 Pekabex

+

8.05

+ 7.56

Sw2

4

S7 + 1.60=10.40

S2

pierwsze piętro

5.39

364 168 20358 166.5

+

374 4 359

4.20

P12

168 166.5

pierwsze piętro

+ 11.21 + 7.91

detal B

+

385

118 577

5.39

P13

+

+

+ 11.41

P9

P13

+ 7.36

461 20

+

8.05

8.05

+ 7.56 klapa oddymiająca jednoskrzydłowa mcr PROLIGHT PLUS TYP C 130X130 otwór w stropie 132x132cm

8.64 90.5

420

drugie piętro

S4B S4B

+

+

P13

20

8.05

P13

detal B

20

118

S4B

drugie piętro

klapa oddymiająca jednoskrzydłowa mcr PROLIGHT PLUS TYP C 130X130 otwór w stropie 132x132cm

8.64 90.5

+

25950

dach 11.90

P13

660

klapa oddymiająca jednoskrzydłowa mcr PROLIGHT PLUS TYP C 130X130 otwór w stropie 132x132cm

+ 11.21

12.49

S6B

+

11.90

365

+

69319

870

+ 11.41

319 34

P13

30

detal A

176210

960

210 164

570

34

270

164210

630

90

990

1

90

840

41

2

klapa oddymiająca jednoskrzydłowa mcr PROLIGHT PLUS TYP C 130X130 otwór w stropie 132x132cm

Sw2

840

50

840

41

S6B

7582

dach 11.90

3

4

12.49

Sw2

+

Sw2

detal A

Sw2

4'

660

Sw2

5

870

Sw2

6

30

Sw6

7

960

Sw6

8

570

Sw3A

9

270

Sw3A

10

630

Sw3A

11

990

Sw3A

12

840

S3

840

Sw2

840

41

390

1.40

+

1.40

54

ZAPROJEKTOWANO PRZY UŻYCIU WERSJI STUDENCKIEJ PROGRAMU AUTODESK

12

+

54

840

6%

2

1.54

12

50

840

6%

1

+

54

840

9

907.5

900

5

4

E

0

1.54

54

2539

990

+

7574

870

1'

2721 3371

+

0.94

+

7574

1

390

368 36824

3371

+

+

0.94

907.5

900

1.30

0.43

907.5

20

6%

913

0.82

+

0.82

20

+

1.06

164

20

82.5

1518

+

0.94

+

1.18

0.82

0.70 +

0.94

1852.5

0.82

0.02

0.43

1.06

+

1852.5

349 201

+

0.94

+

+

0.58

0.46

-

20

32

372.5

190 190190

+

+

722

0.02

1%

82.5

82.5

+

0.94

+

0.22 +

0.70

0.58

3,5%

0.02

-

+

+ +

0.46

0.10

0.70 0.82

1852.5

0.34

+

+

722

164

-

1%

słup żelbetowy 35x35cm

82.5

0.58

0.22

+

23.5 23.5 35 82.5

572

0.58

1%

23.5 23.5 2° 835

572

190190

4 x 15 190 4 x 15 190

+

35

82.5

23.5

+

1852.5

0.46

124

+

0.43

+

3,5% 0.10

+

0.30

+

751

+

0.02

2420

0.30

+

751

153

-

235 35

572

0.43 0.28

+ +

0.34

82

0.02

23.5

10

0.02

0.40 + 0.35

1.5%

201 349

153

0.46

+

20.5 35

-

572 572

50.5

751

+

odwodnienie liniowe

373

190

0.22

2420

35

1.0%

1.0%

+

201

0.02

+

+

F1 23.5

wycieraczka systemowa W2 260x120cm, ALUMATEX z aluminiowym systemem podstawy

10

-3610.0235x35cm

1.5% 1.5%

124

-

+

+

35

23.5

0.28 0.13

24366

50.5

+EI300.00

0.02

-

1186.5

35

373

słup żelbetowy 35x35cm

1.5%

1.0%

słup żelbetowy 35x35cm

361

4573

F6

belka BS 300/400 Pekabex

813.5

4573

słup żelbetowy 35x35cm

0.02

-

20 546.5

0.10

+

35 164

20.523587

°

+

odwodnienie liniowe

2721

35 1%

+EI300.00

0.02

0.00

+

344.5

35

90.04 m² P8

0.33

1186.5

35535

sprężona płyta kanałowa HC 200, Pekabex

344.5

słup żelbetowy 35x35cm

350

1.60

24

813.5

24 29

372.5 24

słup żelbetowy 35x35cm 375

+

0.34

EI30

0.02

0.13

zadaszenie 150x815cm

24

35355

belka BS 300/400 Pekabex

90.04 m² P8

260

słup żelbetowy 35x35cm

810.5

0.33

słup żelbetowy 35x35cm

81.43 m² P9

0.32

0.00

+

1.60

sprężona płyta kanałowa HC 200, Pekabex

35

200.5

35

+

24 29

260

1.5%

słup żelbetowy 35x35cm

1.5% + 0.40 + 0.35

546.5

153 341.5

2732.5

445

+

3,5%

35355

260

149

wycieraczka systemowa W2 słup żelbetowy 260x120cm, ALUMATEX 35x35cm z aluminiowym systemem podstawy

10

360.5 35 130

20

20 2732.5

20341.5

+

445

35535

260

0.22

0.02

0.02

-

870

S4A

660

41

F1

- powietrzna kurtyna 0.02 OPT 2000

260 260

S4A

26 952.5 660

41

0.00=8.80 m n.p.m

EI30 1%

0.02

+

35 35

597

572

24 29

-

1%

87

1%

-

+

164

S4A

słup żelbetowy 35x35cm

0.00=8.80 m n.p.m

±

140

383

870 952.5

110.69m² P8

EI30 597

°

35 220

0.10

słup żelbetowy 35x35cm

kurtyna powietrzna OPT 2000 słup żelbetowy 35x35cm wycieraczka systemowa W4 słup żelbetowy 255x120cm, ALUMATEX 35x35cm z aluminiową systemową ramką montażową

2 24 29 8

308

EI30

260 260

82

52

+

0.02

EI30

130

+

+

0.02

35

829.5

słup żelbetowy ° 35x35cm

-

35

35

D6

0.00

149

HC 200, Pekabex

S4A

26 140 140

25.89 m² 144 EI60 P8/P8a

25.89 m² P8/P8a

35355

210

104

360.5 35

słup żelbetowy 35x35cm

383

+

35535

Sw3C

104

36624 360.5 24

210

0.00

110.69m² P8

±

240.5

0.00

+

42.50 m² 0.08 EI30 słup żelbetowy P8 35x35cm

829.5

D6

210

140

+

35355

Sw3C

24366

Sw3A Sw3A

260 260

35

słup żelbetowy 35x35cm

52

144 EI60

243 0.01

21

35535

24

330.5 329

Sw2 206 329

Sw2

Sw2

299206

173

Sw2 299

173

360.5 35

220

0.00

wycieraczka systemowa W4 słup żelbetowy sprężona płyta kanałowa 255x120cm, ALUMATEX 35x35cm 200, Pekabex zHC aluminiową systemową ramką montażową

słup żelbetowy belka BS 300/400 35x35cm 0.00 Pekabex hydrant 25 wnękowy z gaśnicą wym. wnęki: 82x72x26cm wys. montażu: 135cm od zaworu

170 243

619.5

EI30 sprężona kanałowa Fw1płyta619.5

0.03

144

Sw2

12 x 17.0 28 12 x 17.0 12 870 x 17.5 28 28

29 24

0.03

+

279

12 x 17.0 28

EI30 Fw1 sprężona płyta kanałowa HC 200, Pekabex słup żelbetowy 35x35cm

EI30

35

220 279

35

306

HP 25

winda hydrauliczna GL-TML 1600

45

42.50 m² P8

+

144

m²

0.08

130

słup żelbetowy 35x35cm

360.5 35

8.34 P8

sprężona płyta kanałowa HC 200, Pekabex

35

sprężona płyta kanałowa HC 200, Pekabex

0.02

210

210

104

12 20 206 242 12

20 170

0.00

+

D2

belka BS 300/400 35 180.5 Pekabex hydrant 25 wnękowy z gaśnicą wym. wnęki: 82x72x26cm wys. montażu: 135cm od zaworu

0.01

125.5

5 7

210

104

104

Sw2

35

słup żelbetowy 35x35cm

148

EI30 180.5

308

125.5 125.5

24 155

5 5

15.36 m² P10

104

651

Sw6

810.5

1.5%

słup żelbetowy 35x35cm

10.43Sw3A m² P10 148

D2

BS 300/400 Pekabex

306

220

206 242

Sw3C

S3A

D1

104

420

hydrauliczna 12 x winda 17.0 GL-TML 1600 12 x 17.5 28 28

125.5

Sw2

m²

21

246

8.34 P8

331

Sw3A 30

80

sprężona 420płyta kanałowa HC 200, Pekabex

0.06

210 45EI30

HP 25

SW3C

104

24

7 5 5

2.047

15.36 m² P10 D2 104

S3A

0.07

30

240.5

12

24 24

7 5

306

Sw3C

Sw2

10

zadaszenie 150x815cm

24366

104

360.5 24

210

104

104

sprężona płyta kanałowa HC 200, Pekabex

słup żelbetowy 35x35cm

350

1,5%

słup żelbetowy 35x35cm

10.43 m² P10

651

Sw6

D2

35

805

0.00 0.02

-

słup żelbetowy 35x35cm

EI30

35

1%

366

35 363.5

Sw3A

363.5 18

Sw3A

18369

Sw6A

114 210

Sw3A

114 210

36924

Sw6A210

104

35

35

70.46 m² P8

0.31

-

282

BS 300/400 Pekabex

sprężona płyta kanałowa HC 200, Pekabex

0.06

331

32 390

210

184

360.5

184

Sw2

260

130

210

260

130

260

114 210

Sw2

44

130

sprężona płyta kanałowa słup żelbetowy HC 200, Pekabex 35x35cm

35

1.5%

1%

D2

81.43 m² P9

0.32

EI30

1.0%

1,5%

96

722

sprężona płyta kanałowa HC 200, Pekabex

35

70.46 m² P8

260

F2

35355

1.0%

windy samochodowe VL 30

12

EI30

2496

24 29

Sw2

44

HP 25

2496

słup żelbetowy 35x35cm

1.5%

35355

35330.5

130

Sw3A

375

58

1,0%

A

620

EI30

805

1,5% 1.5%

1.5%

44.5

Sw3B

1.0%

Sw2

282

318

104 80

D2

135

0.02

318

0.07 186

D2

104 104

sprężona płyta kanałowa HC 200, Pekabex

249

Sw2

72

246 84

12 24

Sw3C

Sw3C

D1

D1

210

12

Sw2

D2

210

104

51

129

210

104

słup żelbetowy 35x35cm

104

15.36 m² P10

8.5

D1

104 105 D1 210 EI30

12249

12

183

104 319

0.04

D2

51.5

105

SW3C

S4A

105

105

29 24 41

Sw3C

D1

104

51.5

51

kabiny sanitarne KABIS LIGHT HPL

36624 282 84

S4A

206 103.5

315

m²

242

15.36 m² P10

8.5 130

130 135

12 104 210 104

5.96 105 P10

156 5 Sw2 5 155

30629 24

330 41

210 104

0.05

2.04

-

104

m²

kabiny sanitarne 290 KABIS LIGHT HPL

366 2420

390 390 270 270 330

29 24

12

kabiny sanitarne 210 KABIS LIGHT HPL

315

183 156

-

D2

105

206 103.5

5.96 P10

0.05

124 282

1851

1852.5

290 105

12

1851

1852.5

104 kabiny sanitarne 210 KABIS LIGHT HPL

105

105

I J'

J

1%

A

24 29

620

windy samochodowe 642 VL 30

184

EI30

114

810.5

0.00

1,5%

1.5%

96 HP 25

D11

35

S5

0.31

58

1.0%

1.0%

726

114

29 24 1.5%

1,0%

belka BS 300/400 Pekabex

sprężona płyta kanałowa HC 200, Pekabex

319

20 12

105

242

105

129

105

72105

118 2420 12 124

105

H

J

słup żelbetowy 35x35cm

belka BS 300/400 Pekabex

125.12m² P8

260 114 210

EI30

sprężona płyta kanałowa HC 200, Pekabex

1,5%

1,5%

2.00

29.93 m² P10

0.30

12 12

44.5

sprężona płyta kanałowa belka BS 300/400 HC 200, Pekabex 722 Pekabex

114

D10

1.5%

1.5%

1.5%

sprężona płyta kanałowa belka BS 300/400 HC 200, Pekabex 726 Pekabex

810.5

1.5% 1%

642

184

753

435 29 24

S4C

1.5%

1.5%

Sw3B

EI30

29 24

1.5%

1.5%

zadaszenie o podkonstrukcji stalowej wykończone płytami StoVentec Glass

1.0%

1.0%

35

słup belka BSżelbetowy 300/400 35x35cm Pekabex

35535

35535

F3 20

2024 29 124 2024 29 124 12 118 206

780

206 118

12 118

780

20

J'

0.09

186

S4A 0.04

20

I

619.5

114 210

18369 65

F5

D10

belka BS 300/400 Pekabex

169

24

66.5

114

sprężona płyta kanałowa HC 200, Pekabex

Sw3B

114 210

S4C

267.5

1.5%

66.5

114

EI30

D10

EI30

F2

35355

F3

1086

1087.5 780

1086

780

F

H

125.12m² P8

słup żelbetowy sprężona płyta kanałowa 35x35cm HC 200, Pekabex

+

24 29

24 29

sprężona płyta kanałowa HC 200, Pekabex

-

1

G

35

słup żelbetowy 35x35cm

S4A

1

F

G

0.09 175

słup żelbetowy belka BS 300/400 35x35cm Pekabex

słup żelbetowy 35x35cm

4582.5

1087.5

4582.5

35

EI30

114

24

35

°

82

30 24 29

726

belka BS 300/400 Pekabex

D11

114 210

36924

65

355

+

E

130

35535 759 35 363.5 759 363.5 18 słup żelbetowy 35x35cm

wycieraczka systemowa W2 260x120cm, ALUMATEX z aluminiowym systemem podstawy

0.02

Sw2

35

260 114 210

448 435

267.5 belka BS 300/400 Pekabex

F5

+

1.5%

2.00

Sw2

12

200.5

-

7 x 14.5 30

29.93 m² 621 P10

0.30

0.00

169

24

hydrant 25 wnękowyD11 z gaśnicą wym. wnęki: 82x72x26cm EI30 wys. montażu: 135cm od zaworu

Sw3B

114

sprężona płyta kanałowa HC 200, Pekabex

D10

EI30

0.02

EI30

+

130

130 35 260

732.5

EI30

130

0.00

słup żelbetowy 35x35cm

11 35

35

726

114

1753

belka BS 300/400 Pekabex

sprężona płyta kanałowa HC 200, Pekabex

30 24 29

Dz2

słup żelbetowy 35x35cm

805

EI30

355

35

181

1.00

sprężona płyta kanałowa HC 200, Pekabex

184

0.00

hydrant 25 wnękowy z gaśnicą wym. wnęki: 82x72x26cm sprężona płyta kanałowawys. montażu: 135cm od zaworu słup żelbetowy HC 200, Pekabex 35x35cm

D11

F4

1%

35

słup żelbetowy 1753 35x35cm

732.5

słup żelbetowy 35x35cm

belka BS 300/400 Pekabex

100

+

621 7 x 14.5 30

S5

S4B

235 619.5

słup żelbetowy 35x35cm

172°

35

słup żelbetowy 35x35cm

zadaszenie o podkonstrukcji stalowej wykończone płytami StoVentec Glass

804.5

sprężona płyta kanałowa HC 200, Pekabex

172°

282.5

słup żelbetowy wycieraczka systemowa W2 35x35cm 260x120cm, ALUMATEX 570.5 z aluminiowym systemem podstawy

35

35

słup żelbetowy 35x35cm

sprężona płyta kanałowa HC 200, Pekabex

35

sprężona66.39 płyta kanałowa m² 0.29 HC 200, Pekabex P8

+

32

384.5

0.00

S4B

0.02

belka BS 300/400 805 Pekabex

35

184

+

45 24

+

840

- 184 0.02 11

375.5

słup żelbetowy 35x35cm

S3B

235

0.2935 66.39 m² P8

355

80 45 24

0.00 EI30

130 260

-

35 słup żelbetowy 35x35cm

słup żelbetowy 35x35cm

P8

950.5

114 210

448

35

35355

130

Sw6

263

Sw2 Sw2

240.5

EI30

słup żelbetowy 35x35cm

EI30

0.00

7 x 14.5 30

Sw2

°

wycieraczka systemowa W4 F4 255x120cm, ALUMATEX z aluminiową systemową ramką montażową

+

181

1.00

Dz2

0.02

375.5 -

belka BS 300/400 Pekabex

S3B

520.5

1%

35 słup żelbetowy 35x35cm

804.5

belka BS 300/400 Pekabex

82

0.00=8.80 m n.p.m

355

S5

EI30

130 260

S3A

29 2420

±

35 słup żelbetowy 35x35cm

658

belka BS 300/400 Pekabex

570.5

0.02 385 0.00

385

+

sprężona płyta kanałowa 67.39 m² 0.28 HC 200, Pekabex

753

belka BS 300/400 Pekabex

0.02

35355

belka BS 300/400 Pekabex kurtyna powietrzna OPT 2000

słup żelbetowy 35x35cm

35

35

902

D11

wycieraczka systemowa W4 255x120cm, ALUMATEX z aluminiową systemową ramką montażową

235

114

EI30

sprężona płyta kanałowa HC 200, Pekabex

0.00=8.80 m n.p.m

260

260

±

35

słup żelbetowy 35x35cm

902

słup żelbetowy 35x35cm

271.71m² P8

67.39 m² 0.28 35 P8

385

słup żelbetowy 35x35cm

D1125 wnękowy z gaśnicą hydrant wym. wnęki: 82x72x26cm EI30 wys. montażu: 135cm od zaworu HP 25

876

35

130

belka BS 300/400 Pekabex

kurtyna powietrzna OPT 2000 słup żelbetowy słup żelbetowy 35x35cm 35x35cm

950.5

sprężona płyta kanałowa HC 200, Pekabex 658

29 24

S3A

520.5

114

282.5

sprężona płyta kanałowa HC 200, Pekabex

0.22

35

114 210

144 210 24

10 88.5 12 33.5 HP 25

belka BS 300/400 Pekabex

271.71m² P8

F7

słup żelbetowy 35x35cm

S5

24

5

0.22

20 24

130

Sw6 24 29 595.5

595.5

140

D5 144

hydrant 25 wnękowy z gaśnicą wym. wnęki: 82x72x26cm wys. montażu: 135cm od zaworu

876

14.32 m² P10

487.5

P8

88.5 12 33.5

0.23

słup żelbetowy 35x35cm

sprężona płyta67.13 kanałowa m² 0.27 HC 200, Pekabex

EI60

263

126.5 5

67.13 m² P8

0.27 35

372.5

5 8 x 17.0 28

+

EI30

0.00

+

-

35 słup żelbetowy 35x35cm

144

19.46 m² P8/P8a

0.20

belka BS 300/400 Pekabex

10

0.00

385

840

EI30

2533

35 słup żelbetowy 35x35cm

260

210

24 29

144

140 140 140

86

210 366

144

144

86

24

210 36624

125.5 81 81

D5

+

487.5

EI30

24 55.5 10

144 EI60 205

35 słup żelbetowy 35x35cm

0.00

260

35

125.5 126.5

20

178

20 352

210

Sw2

Sw2

14.32 m² P10

0.23

235

378

213.5

-

0.00

+

175

0.00

481

260

belka BS 300/400 Pekabex

29 2420

0.00

+

Sw2

178206 318 198

262 198

240.5 318

104

210 104 104

210 12

262

24

35535

S4C

S4B

378 24

sprężona płyta kanałowa HC 200, Pekabex

636

+

słup żelbetowy 35x35cm

+

5053

372.5

0.02 +

Dz1

20

20

546

sprężona płyta kanałowa HC 200, Pekabex

372.5 35

330.535

26035

7

24 55.510

Sw2

słup żelbetowy 35x35cm

130

0.02

-

0.20

35

24

sprężona płyta kanałowa HC 200, Pekabex

481

19.46 m² 8 x 17.5 P8/P8a 28

246

246

20

20 1.0%

Sw2

206 198

104

198

104

352 12

315 149.5

Sw3C

16

149.515

104

15

104

268.5 137 125 12

137 20

104 20 16142

kabiny sanitarne KABIS LIGHT HPL

142

100

104

606 462 8 x 17.5 8 x 17.5 8 x 17.0 28 28 28 193.5

5

Sw2 5

0.00

+

1.36

-

210 12 12

Sw3C

105 105 105 105 268.5 12

1605 1605

125

100

5 7

87 20

Sw5B

D1

207.5

246

słup żelbetowy 35x35cm

EI30

390

210 546

D2

246

5 7 5

24

0.00

92

144 205 EI30

HC 200, Pekabex

0.00

S4B

E

315

105

2420 191 176

Sw6 S3

24 20 24 176

24 756 756

100

kabiny sanitarne

122

246

winda+ hydrauliczna GLF-MRL FC

D2

D2 210 KABIS LIGHT HPL

104

1.5%

słup żelbetowy 35x35cm

+

104

100

300

1.36

144

0.02

-

606 462 8 x 17.5 28 193.5

5

belka BS 300/400 Pekabex

104 12 63122 104 D2 104

46.77 m² P10 sprężona płyta kanałowa

35

260

159 330.5

130

0.02

-

29 24

1

100

24

Sw5B

m²

EI30

390

D

105

S3

191

24

12

S4B

1.5%

D2

210 21 Sw3C

S4C

186

D1

104

S4C

87

D2

Sw3A

35

8.67 P10

0.11

1.0% sprężona płyta kanałowa HC 200, Pekabex

104

207.5

-

m²

P10

12 63

16.46 m² 210 D1 P10

0.24

Sw3C 100

372.5

622

sprężona płyta kanałowa HC 200, Pekabex

Sw6

184

84

52.5 104

126 217 24 120147

0.10

159 366 29 24

390

1

1.5%

Sw2

147213.5 24 29

24

Sw5B Sw3C 0.25 8.06

7 5

24

winda hydrauliczna GLF-MRL FC

° 98

D

200

104

284 300

1.0%

46.77 m² 436 P10

20

sprężona płyta kanałowa HC 200, Pekabex

1.5%

Sw3A

sprężona płyta kanałowa HC 200, Pekabex

0.10

230

12

16.46 m² P10 Sw3C

159 1.0%

Sw2 12467

m²

200

D1

284

0.24

m²

636

Sw2

8.67 P10

0.11 636

Sw2

10.23 m² P10436

0.18

1524

260

sprężona płyta kanałowa HC 200, Pekabex

210

184

186 104

67

622

210

104

D2

10

sprężona płyta kanałowa HC 200, Pekabex hydrant 25 wnękowy z gaśnicą wym. wnęki: 82x72x26cm wys. montażu: 135cm od zaworu

24 29217 120

D1

Sw6

10

603

10424 52.5 126 84

210

210

210 Sw3A

104

15

EI30

10.84 m² P10

159

124

20

225.5

0.21

0.25

kabiny sanitarne LIGHT HPL 21 159 KABIS 104

S4B

210

210

366

144 104

36624 24

104

550

Sw3A

210

10

29 2420

10

8.06 P10

246

24

Sw5B

840

F7

° 98

24366

550

104

24

47.18 m² P10

0.12

376

104

P8 0.18 10.23 m² P10

30 104

210

m²

636

Sw2

sprężona płyta kanałowa HC 200, Pekabex

104

D2

12

2.33 P10

0.14

104

603 184 616

12

EI30

467 12

m²

m²

Dz2 Sw6

206.5

hydrant 25 wnękowy z gaśnicą wym. wnęki: 82x72x26cm 6.81 m² 0.19 wys. montażu: 135cm od zaworu

230

12

kabiny sanitarne KABIS LIGHT HPL

225.5

10.84 m² P10 S3

0.21

210

23 140 140 140

144 139 23 43.5

140

139 104 29

210

104

104

36624

Sw3A

210

D1 D1

12 10

104

43 45

D2

67

47.18 m² P10 2.33 0.13 260 P10

0.12

m²

m²

Sw2

S4B

2.33

376 P10

2.33 P10

104

EI30

EI30

210

150

12

0.14

D2 EI30 D1

39

104 210

24

D2 EI30

3029

104

210

150

12

m²

2.33 P10

0.16

S4B

210

D2

D2 104

150

sprężona płyta kanałowa HC 200, Pekabex

390

23

19.46 m² 150 12 P8/P8a

0.20

Sw3C

210

104

210

2.33 P10

0.15

C

104

43.5

210

210

104

104

210

36 24 158 2412 104 122420 177 104 158

1642.5

780

12

20 24366

0.16

1642.5

23 23

104 150

23 232.33104m² 23 104 0.15 23 232.33104m² 23 23 Sw3A104 0.13 104 P10 P10

150

C

144

125.5 21

24 29306

125.5 125.5 21

306 24 36 24 177

125.5

41 330

518

33060 518 60 780

1642.5

1642.5

D2

D2

23

C'

23 23

11.26 m²

150P10 12

43 45

m²

159

124

990

EI30

Dz1

1355 29 2420

104 210

C'

104

0.17

104

EI30

907.5

104 210

23 23

39

104 210

184 616

6.81 P8

0.19

630

907.5

288.5

S3

Dz2

10

2420

HP 25

104

150 Sw212

D2

D2

Sw3C

2124

186 D2

Sw6

D2

19.46 m² P8/P8a

0.20

28

0.00

73

184

206.5

144

+

EI60 EI30

26

P10

5

7

21

24

HP 25

23

173

Sw2

Sw2

2420

Dz1

0.00

+

194

21

S4C 270

570

S4B

5 5

11.26 m² 2.04Sw2 0.17 12 x 17.0

-

D2

B

12 x 17.0 636 28 12 x 17.0 12 x 17.5 28 28 308

7

5

7

0.00

186 EI30

26

Sw2 5

A'

S4B

596 68

144 0.02

+

EI60

24

S3 Sw6

B

2.04

155

173

144

21 -

0.00

+

990

S4B

29 24

5 5

12 x 17.5 28

Sw2

A

A A'

636 12 x 17.0 28 308

S3

155

A

144

734 7 5

29 24

660

Dz1

943

24 29

41

A

S4B

660

41

+

7 x 14.5 30

390

-

432

0.02

432

-

Sm2

2533

0.02

-

EI30

24 29

92

144

0.02

-

S5

1355

29 24366

907.5

7573 EI30 210

32

S5

288.5

840

5053

36624

184

990

24366

194

630

36624

0.02

270

36624

68

144

-

570

907.5

1100

734

73

1100

660 596

Sm1

210 943

Sm1

660

41

751

A

- 2.02 - 2.22


7582.5 990

570

270

630

3510

41

4072.5

140

125.5

178

Sw2

41 390

94 225

121

5.89 P10

1.43

27.79 m² P9

m²

556 195

155

Sw3C

m²

1.48

5.23 P9

20.87 m² P9

1.47

20.87 m² P9

95

65

24 141

m²

426 130

264

71

264

61

247

65

O2

126

1.5%

O2 134

61

126

1552.5 41

570

907.5

270

630

4.20

+ 65

(0) 260

65

O1

61

(0) 260

130

1.5%

(0) 260

S4C

O2 199

909

126

Sw3C

5.23 P9

1.45

29 24

81

(0) 260

65

130

(0) 260

341 183

O1

126

5.10

1.5%

D3

1.46

426 130

24 65

780

130

+

szyb windy samochodowej

S4C

Sw3C

1.42

312

S4C

126

O1

1.5%

1%

636

104.5

94 210

5.10

744.5

94

94

210

1%

1.5%

4%

EI30 234

12

180

24

104.5

D4

D1

113.5

113.5

180

Sw5B

94

324

Sw5B

+

4.20

154

90.5

+

210

2602.5

41

53

752.5

199

780

53

199

24 118

130 (0) 260

O1

5

m²

m²

65

O2

65 65

65

O2

780

53

(0) 260

199

24

1811 (0) 260

130

O1

390

366

sprężona płyta kanałowa HC 200, Pekabex

S4A

17.44 m² P9

126

1.07

m²

118

Sw3C 177

Sw2 24

199

D4

264

118 24

4.90 P10

118

189

88.5

130

177 24

Sw3A

D2

O1

m²

1.08 Sw3C

177 94

104 210

130 (0) 260

126

4.90 P10

210

94

12

118

17.44 m² P9

1.12

366

1.11

Sw2

114.5

11

88.5

58 Dn1 (0)78

EI30

10

70.5

366

(0) 260

130

189

Sw3C

9

59.5

1.15

17.44 m² P9 Sw3A

Sw3C

94

Sw5B

58 Dn1 (0)78

94

8

61

4.90 P10

210

D3

177

114.5

7

264

24

1.16

177

Sw3C

6

118

24 29

65

189

177 94

126

366

4.90 P10

118

1.18

327

88.5

5.30

17.44 m² P9

210

Sw5B

D1 EI30

+

1170

65

65 (0) 260

505.5

S5

61

O2

69

366

O2

61

65 (0) 260

130

189 177

Sw3C

94

1.17

210

177

Sw5B

Sw3C

1642.5

104

154

1170

173.5

58.5

EI30 Dz3

636

Sw3C

12

Sw3C

D3

104.5

EI30 234

24

Sw2

94

94 210

D2

EI30 332

12

792

S4B

199

D1

113.5

390 125.5

Sw5B

743.5

140

30

24 Dn1

szyb windy samochodowej

24

210

104

Dn1

1.5%

3%

3%

154

58

4.20

2%

Dn1

333.5

58 24 58

Sw3A 24

58 ( 0) 78

31

Sw3A

173.5

104

210

Sw3C

m²

2420

m²

2.54 P10

+

90.5

366

86

125.5

210

Sw3A

7.01 P8

1.51

216 24

D4

1.50

15

210

116.5

12 94

104 21031

102.5

Sw2

245 104

24

104

Sw3A

1.5%

264.5

126

104 72

482

197

D2

426

24

216

104

5

28 4512

belka BS 300/400 Pekabex

107.5

2.80

7

104

hydrant 25 wnękowy z gaśnicą wym. wnęki: 82x72x26cm wys. montażu: 135cm od zaworu

8 x 17.5 28

104

Sw6 636

D1 48

sprężona płyta kanałowa HC 200, Pekabex

104

104

81

312 116.5

Sw3C

94 113.5

24 29 205

+

3% EI60

246

24

D2

sprężona płyta kanałowa HC 200, Pekabex

Dn1

606 8 x 17.5 28 193.5

5

22.18 m² P8/P8a

EI30

210

285.5

285.5

26.5

58 (0)78

58 ( 0) 78

116.5

Sw3C

285.5

89.5 91

104

210

196.5 231.5 35

111

Sw3C

104 210

4.20

+

10

210

Sw3A 566

569.5

20.5 94

174.5 37.5

58 (0)78

197

Sw2

312

312

366

Sw2

24

174.5

171

276.5

belka BS 300/400 Pekabex 281.5 82

27

24 29

65

(0) 260 24 29

130

(0) 260

130

24 29

26.35 m² P9

1.04

8.64 P10

88.5

Sw3C

94

576

210

104 114.5 20

58 Dn1 (0)78

m²

O1

324

277

130 (0) 260

600

1.03

40 24

126

sprężona płyta kanałowa HC 200, Pekabex

Sw3C

264

D1

65

65 12 297

327

(0) 260 24 29

O2

61

EI30

130

hydrant 25 wnękowy z gaśnicą wym. wnęki: 82x72x26cm wys. montażu: 135cm od zaworu

D1

260

S4B

210

53

603

12

104

252

45

123

140

24 58

3.5

belka BS 300/400 231 Pekabex

35

Sw3A

4.20

+

41

41

D4

Dn1

202

88.5

24

25.89 m² P8/P8a

130 (0) 260

29 24

1.01

58

207.5 5

322

O1

68

125.5

870

D4

312

EI60

383

12 x 17.5 28

5 7

D2

Sw5B

104

D1

4.20

Sw3A

12 94

Sw2

21

+

308

155

29 24

11 x 17.5 28

12 x 17.5 28

140

125.5

5 5

Dn1172°

24

winda hydrauliczna GLF-MRL FC

24

17.44 m² P9

m²

Sw2

EI30

210

26

2.10 306

330

58 24 58

120.5

24

728

7 5

+

277

114.5

137.5

104 104

243

belka BS 300/400 Pekabex

Sw3A 226

słup żelbetowy 35x35cm

210

S3A

26.5

130

118

1.19

Sw3C

35 325.5

137

Sw2

181.02 m² P8

S3A

29 24

65

Sw3C

297

104

104

1.02

210 48

Sw2

246

270

4.20 sprężona płyta kanałowa HC 200, Pekabex

winda hydrauliczna GL-TML 1600

104 210

72

387

+

J'

104 137.5

Sw2

147

94

34

Dn1

24

279

24

D3 94

58 Dn1 (0)78

104

212.5

177

58 (0)78

58

20

12

210

246

24

1.49

94

7 5

55 10

1552.5

4.90 P10

177

D4

114.5 20 58 Dn1 (0)78

HP 25

156

EI30

210

277

Sw6

10

I

m²

D1

210

24 66.5

4.90 P10

210

114.5

Sw5A

1.06

EI30

94

177

356

(0) 260

D2

D4

Sw3C

88.5

104

m²

157.5 104

104

137

210

4.90 P10

1.20

sprężona płyta kanałowa HC 200, Pekabex

104

104

130 (0) 260

65

88.5

189

94 94

104

D2

22

94

177

D1

sprężona płyta kanałowa HC 200, Pekabex

Sw3C

16.80 m² P9

130

122 232 24

1.22

Sw3C

177

Sw5B

355

EI30

104 210

24

58 24 58

EI30

sprężona płyta kanałowa HC 200, Pekabex

189

126

390

356

1.05

O1

114.5

24

S4A

1852.5

264

H

94

D3

Sw3C

O1

24 88.5 177

94

Sw2

114.5

137.5

177 88.5

Sw2

73

(0) 260

Sw5A

17.44 m² P9

177

1.09

m²

210

4.90 P10

189 Sw3C

1.10

366

163 130

130

17.44 m² P9

58 Dn1 (0)78

104

137.5 Dn1

sprężona płyta kanałowa 35 HC 200, Pekabex

m²

202

24

366

1.21

D3

65

12

177 94

D1

104

5.73 P9

12

EI30

139

260 536

27.79 m² P10

Sw3C

75

158

Dn1

58 (0)78

24

58 (0)78

58 24 58

114.5

Sw3A

264 126

O1

S4C

Sw3C

Sw3A

189

Sw3C

1.42

m²

12

EI30

F9

366

17.44 m² P9

366

Sw3C

177

Sw5B

58 Dn1 (0)78

104

94

65

1.25

m²

5.02 P9

282

24

D2

104

1.41

106

4.90 P10

130

189

1.26

210

35

58 24 58

137

114.5

203

86

słup żelbetowy 35x35cm

(0) 260

130

D3 94

EI30

137.5

F8

210

58

257

130

24

D4

Sw3C

D1

210

D4

130

22.42 m² P10

Sw3C

12

24 29

210

104

94 210

130

D2

88.5

Sw3C

177

94

177

104 210

210

94

104

Sw5A

88.5

EI30

189

m²

D2

D4

Sw3C

Sw3C

366

65

780

4.90 P10

308.5

177

98 65

1.14

65

65 (0) 260

73

O2

17.44 m² P9

m²

327

EI30

186

24

4.90 P10 Sw2

94

EI30

5

24 29

41

153.5 130 61

327

1.13

65 (0) 260

256

26 24

1.40

355

130

189

177

Sw5B

1.30

sprężona płyta kanałowa HC 200, Pekabex

O2

65

65

130 88.5

słup żelbetowy 35x35cm

S4A

17.13 m² P9

210 471

° 82

12

114.5

104 325.5

390

1083.5

1087.5

1087.5

189 177 177

12 45

94 277

24

m²

Sw5B

45

Sw3A

1.29

Sw3C

3510

O2

S4A

1611 41

180

480

210

660

41

1612.5

1

1'

2

3

4

first floor plan 0

1

2

3

4

5m

ZAPROJEKTOWANO PRZY UŻYCIU WERSJI STUDENCKIEJ PROGRAMU AUTODESK

ZAPROJEKTOWANO PRZY UŻYCIU WERSJI STUDENCKIEJ PROGRAMU AUTODESKAUTODESK ZAPROJEKTOWANO PRZY UŻYCIU WERSJI STUDENCKIEJ PROGRAMU

4582.5

588

130

1.39

Dn1

belka BS 300/400 Pekabex

131 24

Sw3C

197

296.5

58 Dn1 (0)78

170

12

Sw3C

sprężona płyta kanałowa HC 200, Pekabex

belka BS 300/400 Pekabex

4.90 P10

12

Sw3C

20 58 Dn1 (0)78

65

19.50 m² P10

1.38

24

m²

210

104

114.5

słup żelbetowy 35x35cm

J

Sw3C

177

94

210

177

D3 94

EI30

143.5

D1

210

58

177

29 24

Dn1

E

G

(0) 260

65

67

104

104

137.5

114.5

5

636

m²

157

94

58 (0)78

3.5

4.90 P10

hydrant 25 wnękowy z gaśnicą wym. wnęki: 82x72x26cm wys. montażu: 135cm od zaworu

S4B

F

1.35

210

72

138

210

54

94

104

65 471

Sw2

7.35 P10

sprężona płyta kanałowa HC 200, Pekabex

210

EI30

65

1.37

172°

91

186

Sw5A

177

Sw3C

88.5

1.36

Sw5B

210

137

104

24

D2

D4

189

366

130

104

19.46 m² P8/P8a Sw2

175.5

94 104 137.5 58 24 58 137.5

Dn1

104

177

D1

sprężona płyta kanałowa HC 200, Pekabex

88.5

106 24

17.44 m² P9

648

D3

210

HP 25

157

EI30

D3

96

m²

12 94

104

Dn1

114.5

210

94

58 (0)78

24 140

4.90 P10

58 Dn1 (0)78

24

sprężona płyta kanałowa HC 200, Pekabex

17.44 m² P9

94 277

232

20

86 24 58

94

210

195 327

1.34

sprężona płyta kanałowa HC 200, Pekabex

210

Sw5A

177 177

Sw3C 189

75 65 65

366

65 96

S4B

94

Sw3C

32.5

177

Sw3C 189

277

88.5

114.5

Sw3C

684

Sw5A

75 130 366 161 24

264 61 69 61 264

390

126 151 2

O1

1020

58 ( 0) 78

130

61

58 ( 0) 78

m²

Sw2

1.24

D

104

114.5

58 (0)78

17.44 m² P9

1.27

1.23

(0) 260

31.5 58

24 36 24

60

126 780

m²

EI30

94

636

O1

O1 S5

264

°

(0) 260

126

98

65

O2

264

58 ( 0) 78

O2

4.90 P10

1.28

65 (0) 260

126

°

4.90 P10

D2

D4

Sw3A

O2

3510

329

98

C

Sw3C

88.5

130 636

D3

20

186

24 308.5

17.44 m² P9

1.32

1642.5

636

327

1.31

130 (0) 260

61

HP 25

Sw2

O1

104

210

1.33

104

195 309

EI30

Sw5B

EI60

65

D1

210

137

D1

Sw2

51 24 104

Sw3C

26 12 x 17.5 28

5

4.20

+

140

2.10

186

24 173

7

B

ZAPROJEKTOWANO PRZY UŻYCIU WERSJI STUDENCKIEJ PROGRAMU AUTODESK

12 x 17.5 28

21

306

5 5

125.5

330

520

+

636 12 x 17.5 28 308

125.5

155

140

7 5

29 24

A'

69

O2

24 29

41

A A

61

O1

(0) 260

O2 S4B

329

(0) 260

126

(0) 260

199

(0) 260

61

41

870

976

752.5

660

41

sketches and analysis

development of the ground floor plan (hotel lobby, café, restaurant room)

analysis - circulation of different users (hotel guests and students)

develpoment of the green roof layout (bee hives and urban farming)

A


SPECTRUM awarded finalist mention published in article on "Architectura&Biznes" website group work for Detroit Waterfront District competition by YAC concept design, December 2020 collaboration: Barbara Kobusińska, Michał Komosiński The competition brief asked to propose a new high-rise complex for the city of Detroit. The program covered a hotel, residential and commercial units, and a public square for the community. Our main inspiration for the design of the Detroit Waterfront District was sound, the sound spectrum to be precise. It came from two different sources. The first and more obvious one was the resemblance of the spectrum and Detroit’s skyline mirrored in the river. The second aroused from our research about the city. Detroit’s history is strongly intertwined with music. It is the place where legendary Motown was born, there was also the setting of the famous movie “8 Mile”. The musical aspect is visible not only in the form of the building but also in the courtyard design where a stage for the local community was arranged. In the commercial area closest to the waterfront, we planned a social music centre offering education for talented Detroit residents and showcasing the history of the city. The proposed skyscraper consists of dozens of green terraces on every level and a garden floor between the office units. They add aesthetic and functional value but also improve rainwater management, reduce the urban heat island effect and improve air quality. Other sustainable solutions that were incorporated are solar panels facing the south and steel construction. AXONOMETRIC DIAGRAM - PROGRAM

My role in this project was research and idea development. Then together we were modelling the shape and form of the building. I proposed the openings and terraces resembling sound spectrum. In the final stages of the concept design, I was working on the function distribution and general site plan layout as well as the logo.


IDEA DEVELOPMENT

AREA

OPENINGS

HEIGHTS

SOUND SPECTRUM

CIRCULATION

SUSTAINABILITY


residence in

ARLES house renovation and reconstruction for private investors obtaining the building permit, APD - PRO avant-projet définitif April-June 2021 while working at ECDM Architectes supervisor: arch. Dominique Marrec 15.25

11.56

13.55

14.22

While doing my internship I was assigned to take over the project of restructuration of a 19th-century villa in the historic centre of Arles in the south of France. Previously the building was divided into three separate flats, which were bought by private investors. Their intention was to unify them and create a holiday home for the family with a ground floor for services and an exhibition area. As the building is located in the historic city centre with a very characteristic and defined architectural character, no alterations were planned on the exterior, except for the necessary maintenance. The main aim of the project was to connect the many spaces of very different characters into a consistent system that functions well together. Thus, the imposing semicircular staircase was incorporated to facilitate convenient moving around between different floors. Another major intervention was to create accessible terraces on every floor, with a small swimming pool on the top. It refers to the local tradition of diverse rooftops and climate conditions. The renovation task was quite challenging as the building had undergone many alterations throughout the years. It was crucial to carefully identify them and assess whether they should be maintained or removed. Since in many rooms there were still present traditional ceramic floor coverings and original doors, the goal was to restore and preserve them as much as possible to maintain the original character of the mansion. DANS CETTE MAISON QU'IL HABITA EST MORT

HONORÉ CLAIR

ARCHEOLOGUE ARLESIEN DE L'ARLES ANTIQUE 1796 - 1882

15.25

renforcement fronton

restauration pierre d'angle

restauration des volets restauration des fenêtres

11.56

13.55

14.22

restauration des appuis de baies

restauration des volets restauration des fenêtres

restauration des appuis de baies DANS CETTE MAISON QU'IL HABITA EST MORT

HONORÉ CLAIR

ARCHEOLOGUE ARLESIEN DE L'ARLES ANTIQUE 1796 - 1882

restauration de porte restauration des volets restauration des fenêtres

restauration des appuis de baies

facade from the side of Place Honoré Clair 0

10

20

30

40

50m

My role in this project was preparing the drawings presented on the right side along with the sections, facades, and the photographical representation of the planned changes in the structure. This documentation was required to obtain the construction permit. I also drafted the electrical connections. Moreover, I was working on the interior design of selected rooms on the first floor as well as the exhibition space Les Rencontres d'Arles, an annual photography festival organised in Arles.


53

10.35

10.35

3.69

.15 2.76

2.52

4.40

1.02

3.53

.83

3.53

.20

1.49

.29 .30

.20

.46

1.48 1.49

.70

1.70

.46

6.18

1.12

.67

.70

3.21

.30

.97 .45 .93 1.73

6.73

1.80

curage parefeuilles démolition plancher

.75

e r

.30 .30

6.18

7.82 4.76

5.92 1.30

1.70

2.40

5.69

.37

7.86

7.56

curage parefeuilles

.25

2.06

dito

1.75

3.83

.80

.80

.29

.35

3.53 2.65

.53

3.03

3.22 3.83

1.12

2.76

.24

1.02 .15

.22 3.53

.24

.35 1.48

.80

.15

.58

3.16

2.51

1.00

.46

1.50

2.51 .70

8.20

1.50

1.48

1.49

.35 .80 .58

.15

.33

2.01

.33

1.00

1.49

.70

3.97 2.51

1.70 1.00

.46

.80

1.00

.88

.60

.15

6.13 .17 3.98

1.30

1.80 .30 .30 1.80

2.40

.30 .28 1.75

.70

ragréage + polymère 6mm + résine polurethane 3-4mm

3.83 2.26

.92

1.06

1.05

.90

3.22 1.02

.90

1.30

1.30 1.30

3.03 1.24

ragréage + polymère 6mm + résine polurethane 3-4mm

.70

.75

2.26

1.18

.67

1.51

3.22 1.02

3.83

.28

.70

1.15 2.56 1.06

1.51

2.52

2.76

1.75

.60

.15

2.66 .60

2.66 3.97 .60 .85 3.97 .12

3.49

5.22

3.80

3.57 1.13

1.38

3.83 1.16

.12

.10

1.30

2.65

18.37

.85

1.12

1.20

1.30

1.64

3.97

1.30

.36

.37

1.32

.85

.34

1.30

1.03

1.29

1.13 2.60

1.11 3.57 1.13

.85

.85

.36

.37

1.32

1.12

1.38

.10

1.20 2.65

3.83 1.16

.12

1.00

1.03

1.48

1.74 1.74

5.22 6.13

2.66 .60

.37

6.13

1.30

7.83 4.221.30

.36 3.49

5.22 .85 .10

.60

7.67

.60 5.30

4.62 1.03

7.24

.34

5.30

7.83 4.22

6.13

.90 .90

.89 .60 .19

1.74

7.83 1.94 4.22

3.49 7.67

.19

1.94

.15

.19

5.30

.15

1.94

2.46

1.40 .71

.89 5.30

2.46 .90.90

2.62 1.69

1.00 2.62

4.62

7.24

1.48

.87

.71

3.53 .89

3.53 1.97.90

.90

.87

7.67

.71

1.97

1.09

5.30 .87

.03

1.21 4.62

1.40 7.24

.20

.03 .37

1.21 .80 .50

1.69

1.48

3.53

1.09

3.53

3.53

.03

1.21 1.09

1.69

1.00

1.00 .67

.75

.66 2.62

1.40

2.46

.83

1.08 3.91

1.00

1.00 7.02 .20

.83 .37

.67

.75

.66

.50 1.08 .80

1.14 .25

.83

1.08 .20

1.00

3.53

5.30 7.02

.60

1.14 .25

4.14

3.91

7.02

4.14 1.14

.75 1.80 .30

1.30

2.26 1.05

.34

1.05

1.97

3.91 2.75

4.14 2.75

.60

2.75

1.00

1.80 .30

.30

.60 1.30

2.26 2.40

1.20 1.05 .60 4.67

.37

.30

.25

1.70 1.00

.46

.70

1.70

.60 4.67

1.00

1.50

.46 .70

1.50

2.51

1.49

3.16

3.21

.60 1.20 3.16

3.21 2.40

1.00 1.00 .17

1.80 .30

2.26

.67

.80

1.48

.58 .15

.35 2.51 1.48

.80 1.00 .58

.15

.33

.33

1.49

3.97 2.51

1.50

8.20 1.00 .46 .15 .70

1.70 .30

.90

.90 2.40

.90

.90 1.30

1.30 1.30

.90

.90

1.00

1.01

1.48 .15

3.98

6.13

.88 .88 1.30 1.303.21

3.75 2.00 .88

.17

1.20

1.30 1.30 .60 4.67

.88 .96

.60

2.01

1.74

.35 .80 .58 8.20

.88

3.75 2.00

5.67

3.97

3.16

8.20 1.00

.60

3.75 2.00

1.30

1.30

5.67 .96

.35

.22 1.74

.60

.45

1.73 2.01

.33

.60

1.00

1.49

3.40

3.40

.88

1.30

.96

.60

5.67 1.00

3.40

1.30 1.30

1.30 .60

.80

3.53 3.62 5.02

.22

5.02 .90

1.74

7.67 1.30 1.49

1.30

5.76

.19

.10

5.33

5.76

6.13 1.30

7.22

5.30

1.01 .45

5.26

1.30 .60

.45

1.73

1.30 5.33

5.26 5.76

5.33

7.22

5.30

1.30 .12

1.30 1.49

1.30 3.62 .10

.19

.90 1.93

7.22

1.30 1.49

7.675.30

.19

.10

7.24 5.30

1.00 4.00 .12 6.981.30

6.91 4.00 1.30

.12

1.73

5.02 .90 5.30 3.62

1.29 .90

5.30

1.44 4.00 6.98

1.00

1.93 1.30

1.44

7.24

1.20 .12

.17 1.69

6.91 1.44 4.00

2.62 1.44

7.24 4.00 6.98

3.53

.90

1.93

3.53

1.29

1.20

.12

5.00

1.44

.67

1.00 2.62 .27

.75

1.20

.66

.12

.17 1.69

1.44

2.62 6.91 4.00

3.98

3.73

5.00 1.00

1.69 3.73 .27

1.00

5.00

1.08

1.00 .27

1.00

.15

2.52 3.85

1.00 1.08.67

3.85 .75 .66

3.73

3.85

1.30

.24

.29

1.30

.80

.24 .80

.66

2.52

1.75 1.75 2.52

.36

1.80

.24 .30

2.63

.80 .29

1.30

2.63

.29

1.11

2.61

.80

1.29

3.80 1.16

2.61

.29

.17

.36

.75

.36

.75

1.75

1.00

.70

1.70

1.08

.67

.46

.30 1.80 .30

.30

.75

.29 .30

7.82 .30

6.73 4.76 .29

.30

.66

.70

.20

1.48

3.21

1.49

1.70

1.48

2.40

6.73

3.21 1.30

1.70

5.97 2.63

2.40

1.30 1.80

.80

.29

5.97

6.73 4.76

5.97

.75

.20

.29 .30

.46

1.49

6.18

.704.76

1.48

1.12

.67

5.92

1.30

7.82

7.86

3.21

.67

.97 7.86

.93 5.69 6.18

7.86

5.92

1.30

.37 7.56 1.30

1.40

2.40

.20 1.49

1.12

1.73

5.69

.29 .30

.75

.45 .97

2.32

.93

1.57

.93

4.22 1.41

.71 7.56

.93

1.30

5.92

1.12 .37

.67

.93 5.69

7.56 1.30

6.93

1.30 4.12

5.56 1.40

.80 7.82

1.73 1.73

1.94

1.41

1.24 .71

2.19 .451.22

1.30 1.73

.97

.71

1.40

.93

.46

.90

.45

1.24

2.19

1.22

.90 .69 5.30 1.30

1.94

1.24

.75 1.41

2.32

1.57

1.30

1.22

6.93

4.22

5.30

2.20

.82

.46

1.03 6.98 5.56 .90

1.02 4.12 1.16

.29

.34

5.30

.37

6.93

.57

3.53 4.40 1.30 .69

3.53

4.40

1.09

.46 .90

2.19

1.73

1.20 1.41

1.21 .97

.82

1.46

6.98

1.09

4.62 1.16

1.41

.29

1.93

.69 1.30

.83

.72

5.00

4.63

1.20

1.21 .97

1.41

1.46 1.93

4.62 .82

.46

2.20

1.16

.90 6.98

.29 1.02

1.03 .34

1.30

4.12

.57

2.52

3.35 5.00

4.74 1.14

.25 4.63

3.85 5.00

.72

4.63

.57

.15 2.76

1.75

.15

.75 3.85 1.02 2.76

2.52

1.75 .75

3.35

4.74 3.85

.83

5.56

3.83 1.16

.98

.37

.94

1.38

2.61

2.05

1.12

1.16

1.64

1.29

1.13 2.60

1.16

1.51

1.64

7.77

17.88

1.33

.74

7.43

.94

8.59

3.19 .06

2.90

2.86

17.85

2.32

2.52

17.28

.92

.37

.61

2.05

2.05

.93

1.15

1.75

.98

.97

21.19

17.28

parefeuilles protégées

2.05

3.80

.86

3.57 1.13 .97

8.70

.86

.94

1.93

.92

.37

.61

2.53

.37

8.70

.58

.50

1.02

.75

.75

1.14

4.06

1.00

.25

1.00

2.53

17.32

17.32

1.32

21.19

1.17

17.63

17.28

parefeuilles protégées

17.32

.98

1.20

2.051.01

2.05 1.17

.94

4.31

.58

17.63

.80

17.63

3.56

3.56

1.20

7.99

.80

1.01

.80

17.32

.80

.80

17.28 17.63

2.60

4.31

18.37

.25

1.27

1.35

.35

.97 .92

17.32

1.00

2.00

1.51

1.15

17.58

1.13

7.99

2.00

1.82 .16 .10

17.58

1.49

.89

.70

1.06

1.44

.92 21.19

3.56

2.65

18.37

.80 1.00

17.32

1.49

2.46 1.11

1.20

17.22

.86

4.31

1.20

1.45

.86

2.00

17.22 21.19

.45

17.28

2.56

.61

.67

1.55

1.82 .10

.80

.16

1.00

17.32

.92

.28

.28

.80

isolation 4 cm polyuréthane et étanchéité parefeuilles protégées dalles de pierre de fontvielle sur plots

1.17

17.63

.61

.70

17.63 .64

1.00 .28

.64

acrotère BA + pierre de fontvielle couronnement pierre d'estaillades

1.29

.80

.45.86

17.32

2.46

7.99

.67

.80

17.58

17.32 17.32

17.63

1.45

3.26 1.00 1.28

2.46 1.28

1.18 1.71

17.32

1.55

2.53 .34 .34 .67

basin BA monobloc isolation 4 cm polyuréthane et étanchéité dalles de pierre de fontvielle sur plots

17.58

21.19

.67

17.28 .80 17.58 1.29 21.19 17.32

8.70

1.73

.28

2.56

.62

.52

1.18 1.71

.89

1.44

.89

.22

3.26 1.28

21.19 1.28

acrotère BA + pierre de fontvielle couronnement pierre d'estaillades

17.32 20.301.01

.34 .34 2.53 .67

1.00

1.00 .15 20.30 17.63

17.32 .62

1.00

.15

1.18

.63

1.18

.52

1.54

.60

1.44

1.08

17.32 17.22

1.45

17.58

.22

17.07 21.19 17.32

3.63

17.07 1.54

3.27

4.26 4.26

2.15 21.19

21.192.15

17.32

.92

3.63

.63

6.42

1.71

1.82 17.58 .10 .80

.80

1.71

.70

17.63 1.08

2.53

1.38

1.73

3.22 1.02

1.18

1.39

.21

1.61

17.85 1.99

1.55

3.27

4.26 4.26

1.44

1.39

1.18 1.71

17.32

20.60

.28

6.42

.16

.45

17.32

.64

1.00

3.61

1.22

1.40

1.38

1.75

.30 .88

.11

.70

.75

3.22 1.02

.76

1.39 .60

.60

17.85 1.99

.52

20.30

.30

1.39

1.03

.66

.88

.79

ragréage + polymère 6mm + résine polurethane 3-4mm

3.61

1.22

1.40

1.51

1.75

5.52

17.88

1.28

20.60

.58

1.73

.79

.70 .70

1.61

1.54 3.27

4.26 4.26

18.14

20.303.26

1.18

basin BA monobloc

1.29 2.53

1.00

17.58 .70

2.12

17.32

1.49

1.38

1.98

1.39

5.52

1.98

ragréage + polymère 6mm + résine polurethane 3-4mm

3.22 1.02 .28 .25 .75

1.17 1.61

1.03

.11

2.15

.80

.76

20.30 20.30 17.58 21.19 19.99 17.32

.80

.67

1.15

.67

1.28

.21

.66

1.00

.6219.99

.86

.89

.89

.90

1.17 5.52

17.85 1.99

.88

.11

.15

20.30

.153.90 .63 .22

17.07

17.88

3.90

.76

1.08

18.14

21.19

4.51

6.31 1.15

4.42

3.61

1.22

1.40

1.10

2.98

1.33

1.10

2.98

1.33

4.42

1.39

1.03

.66

1.17

1.15

17.85

17.85

.30

.67

.79

.77

.77

1.72

.25

5.12

3.63

4.51

6.31

.21

1.98

1.72

.16

15.96

5.12

.83

.67

3.97 4.42

.89

.16

15.96

1.17

1.35

3.97

1.75

3.83 1.06

.83

17.85

2.98

1.35

1.10

1.33

.97

1.00

.34 .34 .67

1.00

.77

1.72

4.89 1.41

.91

.15

.67

.16

1.17

1.59

4.89 1.41

1.18

.67

17.85

5.12

2.35 6.42

4.06

1.34

1.59

1.15

1.34

.97

.91

3.81

5.93

20.60

3.85

1.35

1.17 15.96

1.15

.63

1.55

dalles + escalier BA résine fines de béton

.11

20.30

isolation 4 cm polyuréthane et étanchéité dalles de pierre de fontvielle sur plots

1.71

.70

17.88

.11

.67

2.86

.06

.60

.70

.75

.80 3.97 3.81

5.93

6.31

18.14 2.41 .80

acrotère BA + pierre de fontvielle couronnement pierre d'estaillades

2.35

3.85

4.89 1.41

.63

4.85

3.90

4.51

2.12

7.43

.60

basin BA monobloc 2.12

.83

2.86

1.34

.06

1.59

17.88

19.99

.25

.25

17.85

.15

4.06

.63 2.32 1.33

1.15

1.55

1.15

1.33

douche Corian chainage

17.88 1.27 4.85

.97

20.30

.11

.91

17.85

.90

.60

2.41

7.43

17.85

chainage

1.27

.80

17.85 3.81

5.93

7.77 .94

.60

.90

1.35

1.35

.60

1.21

.60

.35

1.21

3.85

.06

.93

2.32

8.70

.37

1.33

1.55 1.15

.93

1.59

3.71

1.62

2.08

1.03

18.23

recharge BA résine fines de béton parefeuilles protégées

dalles + escalier BA 6mm doucheragréage Corian + polymère résine fines de béton + résine polurethane 3-4mm

.90

3.80

1.18

1.70

recharge BA résine fines de béton ragréage polymère + résine polyuréthane

1.06

.92

.94

parefeuilles protégées ragréage polymère + résine polyuréthane

1.20

.25

3.80

13.71

.92

3.83 .90 .92

1.15

3.71

3.03 1.24 .67

.90 1.44

.74

1.20

3.83

.67

.60

7.77

1.38

1.38

.35

1.44

.61

.35

1.54

4.85 .35

1.54

.42

2.49 8.59

.61

7.43

8.59

1.20

2.56

.87

1.62 3.03 1.24

.87

17.28

.94

recharge béton repose navettes ou parefeuilles

2.05

2.05

13.71

1.15

.65

1.22

13.71

.74

2.86

2.32

1.15 1.59

5.86

1.03

18.23 1.12

.60

1.21

1.38

.35

1.54

.42

3.10

3.78

1.00

1.03

1.00

3.57

.30

1.70

4.17 1.43

1.26

2.05

plancher collaborant sur charpente metal + isolation 4 cm polyuréthane + étanchéité + ragréage dalles pierre de fontvielle sur plots polymère + résine polyuréthane

.60

.65

2.41

7.77

.93

1.59

.30

1.00

.36

1.12

1.00

1.12

6.59

8.59

3.57

.90

.21

.65

8.70

4.17 1.43

1.26

6.59

2.65

3.03 1.24

.87

1.62

3.71

13.71

1.89

4.31

1.74

17.28 13.71

17.32 13.97

1.22

2.05

21.19 3.56

2.08

1.74

1.12

.90

.51

.42 3.57 .72

2.33 1.46

17.63 1.46

21.19

.81

1.46

.29 .65 .16

.25

17.88 .74

.42

.65

1.01

.80 2.05

.65

17.63

.21

.10

.16 .22

17.28

arasage mur existant douchecouronnement Corian pierre d'estaillades

17.32

2.05

.29

.80

2.49

arasage mur existant chainage couronnement pierre d'estaillades recharge BA résine fines de béton plancher collaborant sur charpente metal + recharge béton isolation 4 cm polyuréthane + étanchéité + navettes ou parefeuilles dalles + escalier BA repose 17.58 douche Corian dalles pierre de fontvielle sur plots 1.22 résine fines de béton

.45 .90

.21

17.58 17.28

2.33

17.32 13.97

17.32 13.71

3.56 1.03

18.23

1.00 .97

17.28 .81

1.00 .28

13.97 13.97 .80

17.58 17.32

.93

.21 .92 13.71

17.63

.21

17.32

.92 1.23 .21 17.32 6.40 1.01 17.63

13.97 1.74 1.46

.26 .97 .72 21.19 .22 2.08

4.31

1.70

.64

.67 1.00 2.13 2.33 1.46 1.00 .67 2.98 2.53 1.46

17.63

.81

recharge béton repose navettes ou parefeuilles démolition plancher

1.01

.22 1.00

2.97

.72

3.93

.42

5.86 .64

13.71 1.00 1.50

1.89

.53

3.53 2.65

1.50 4.17 1.43

1.26

.28

2.973.78

1.55

.36

1.55

17.32 13.71 13.71

.51

3.93

2.69

.64

.35

.93

2.46

.30

1.98

2.49

2.70

17.22

1.00

1.41

.35

3.53 2.65

13.97

17.22

17.58 1.30 17.32 13.78 .80 .10 .80

1.23 6.40 2.46

.85

13.78

.26 2.08

.67

13.97

2.97

.35

1.72

3.22

2.86

1.33

1.15

17.88.56

2.95

3.93

1.19

2.06

1.21

1.98 .12.25 .25 .25

.64

.80 1.00

1.23

3.61 1.30 .67 .80 .45 2.98

1.00

13.71

.64 .42

1.01 1.30

1.30

.64

1.34 .15

.51

3.61 1.30 .30.43.29

21.19

.36

1.03

13.68

2.95

.84

1.55

.10

.97 1.71 .15

2.53 .85

17.32

17.32

.92

6.40 17.63

.93

1.01 1.00 3.69

17.32 17.32

1.341.29

.80 .84

.41

13.97

13.97

2.08

17.32 .41

13.85

.88

1.41

.60

3.62 .65

1.19

dalles BA finition résine fines de béton

.43 1.50 .30 .29

1.30 4.31

.12.25 .25 .25

6.59

1.72

1.21

ragréage + polymère 6mm + résine polurethane 3-4mm

1.37

3.22

1.89

.26

17.07 2.46

13.97

17.32 1.55 13.71

4.22

1.29

4.22

.60

13.68

17.85

dito escalier

1.59

.88

1.60

.75

1.27

17.85

3.10

douche Corian

13.972.56 1.71 17.58

.45

.70

17.58

17.32

17.32 2.56 13.78 2.1317.28

.64

1.98

1.37

1.21

dalles BA finition résine fines de béton

2.92

.64

.28 20.30

3.49 3.63 17.58 1.30

1.08

1.19

6.57 1.82

1.72

2.00

6.57 3.61 1.82

2.00

ragréage + polymère 6mm BA 3-4mm + résineescalier polurethane résine fines de béton

.12.25 .25 .25

13.68

17.85

1.21

3.61

1.41

6.11

2.92 1.55

.64

.70

1.48 1.55

.80

17.58

3.61 1.30

1.34

.35

6.111.61

5.30

4.88

6.51

1.33

1.15

3.53 2.65

1.75

6.35

3.69

.21

1.37

1.21

.84

1.15

1.33

1.30

dito escalier

1.75

13.68

13.97

1.21

2.98 .16

1.64

.33

4.42

escalier BA résine fines de béton

1.61 .60

4.63

3.11

3.62 .65

13.684.88

6.51

4.42

.43

3.49

3.69

6.35

.35

15.95

3.23

2.53

13.85

13.85

17.07 1.48 17.22 17.32

.88

17.85

13.68

.84

2.00

1.64

1.36

1.17

6.57 1.82

.77

.33 17.85 1.30

.19

13.68

21.19

4.63

4.96

1.30

4.22

.70 2.95

1.21

3.61 2.98 .16

15.95

3.23

parefeuilles protégées

10.76

4.30

1.30

1.08

1.36

1.15

1.33

1.17

1.41

4.96

1.30

2.92

3.62 .65

3.41

.88

17.32

3.63

.88

.77

13.68

.30 .29 1.29

21.19

1.21

.84

1.41

1.64

1.61

1.37

.43

6.11

.19

3.11

6.35

4.63

6.31

5.09

17.85

.70

4.30

13.68 5.20

1.61 4.88

6.51

1.21

1.11

4.42

5.20

6.31 3.41 18.14

17.88

5.30

.16

3.23

1.00

4.50 1.11

démolition plancher arasage mur existant couronnement pierre d'estaillades plancher collaborant sur charpente metal + isolation 4 cm polyuréthane + étanchéité + dalles pierre de fontvielle sur plots 3.10

2.71

3.49

17.32

17.88

.21

4.96

1.30

1.30 .74

17.07

18.14

.05

.21 3.63

4.50

5.80

1.36

7.86 2.98 1.37

1.17 15.95

1.15

17.88

.33

.05

.77

2.13 20.30

5.80

1.41

1.54

7.86

1.61

.43

10.35

17.85

1.00

13.68

.43

1.74

.88

1.74

5.09 3.15

3.15

6.31

13.68

13.68

.21

1.37 4.89 1.35

1.61

17.88

5.30

7.86

1.33

13.68

1.17

13.68

8.91

2.86

.88

1.15

1.15

4.89

1.35

1.15

.74

DM

3.15

13.68

1.34

5.93 3.15

1.17 .74

2.86

1.35

4.89

1.54

5.60 .75

17.58

5.20

1.17

3.15 5.93

3.27

1.34

.75 6.50

5.16

1.21

1.35

2.35

1.71

17.32 2.90 1.11

2.65

5.60 7.77

.60

1.38

.35

1.44

.61

douche Corian

2.71

.70

17.88

17.85

2.69

WM

.35

1.54

.42

2.49

18.14

2.70

1.00

1.12

2.06

10.35

1.26

18.46

1.54

3.27 1.26

1.13

1.15

18.46

1.33

1.29 .07

.70

1.29

3.19

.56

5.16

4.85 .35

1.54

.42

3.10

1.38

.80 1.21

1.35

1.27

.25

.91

.83

.11

.60

2.41

.60

1.98

2.03 1.00

1.00

.60

4.07

3.97

2.01

.48

2.03 8.15

.60

7.67 .60

1.29

5.58 .90

1.00

1.00

2.03

.27

.48

2.01

.60

.90

8.15 .90

1.00

1.00

.15

4.07

.17 3.97

7.67

1.00

8.15

.90

1.00

4.07

1.71

.17

.60

.62

.90

1.00

3.80 .62

.17

1.29 .15

.12

.10

.94

1.29 .15

.85 .12

.10 .85

.85

.36

.37

2.01

.48

.60

.90

1.98 .27

5.58

3.97

3.97

7.67

.12

.60

.60

1.09

1.29 .90

1.40

1.98

1.09

.60

.90

1.40

1.40

.60

1.29

1.09

2.66

.85

5.22

3.97

.85

.36

5.58

.60 1.48

3.97

6.13

.60

2.66

.85

.60

5.22 1.30

1.30 .37 1.30

1.30

1.48

2.66

1.74 5.22

.60 1.30

7.83 4.22

6.13

.10

.37

.36

3.49

1.30

5.30 .60 7.67 3.49

7.83 4.22

5.30

1.03 .34

1.48

1.74

.89 1.97

3.53

3.53

.19

.15

.87 .90

.60

.90

.89 .19

3.49

.19

1.74

7.83 4.22

.89

1.94

7.67

.71

.87

5.30

.90 .90

1.94

1.40

2.46

4.62 2.62

4.62

7.24

1.00

1.03 .34

.71

2.46

1.40

1.97

5.30 .03

7.24

1.09

1.21

4.62 1.69

1.03 .34

7.24

.25

1.08

.50

1.00

1.00 .67

2.62 .03.37 .20

.75

1.21.80

.66

.50

1.00 1.69

.15

.71

.87 .90

5.30

1.94

3.53 1.09

3.53

.03

1.21

7.02 .20

.83

1.14 .37 .80

1.69

.67

.75

.66

7.02

2.62 1.00

.90

5.30

7.02 .60

.83

3.91

2.75 1.08

1.00

4.14 1.00

3.91 .75

.66

.27

3.53

3.53

3.91

2.75

4.14

1.14 .25

.60

2.75

4.14

.83

1.14 .25

1.08

1.00

1.00 .20

.67

.70

1.70 .30 1.80 .30

2.26 .30

1.05

.37

1.48 .15

2.51

1.50 .46

.30 1.80 .30

1.30

.60 2.26 1.05

.30

.60 4.67 1.80

2.40

1.20 1.30 1.30 .60 .90 4.67

.90

1.30

2.26 1.05

.80

.35 .58

1.00

.33

.80

1.50 .46 .70

3.21

1.70

1.49 3.16

.60

2.51

1.208.20

2.40

3.16

3.21

1.00 .60 4.67

.70

.88

.60

1.20

.88

.88 .90

1.70

3.75 2.00

3.16

3.21

1.30 1.30

.90

.50

.33

1.49

1.74

.35 .80

1.48

.58

.15

.88 .60

3.75 1.49 2.00

1.50

.33 1.00 3.97

8.20 1.00

3.75 2.00 1.30 .96 .88

1.30 1.30

.90

.90

1.30 .96

.60

.46

1.73

1.741.30 1.49

1.01

.19

.45 5.67

.17

.96

.88 1.30 3.40

7.22 1.30 .60

5.67

1.30

1.30

2.01

.19

.45

3.40

1.73

6.13

5.76 5.67 .60 1.30

5.33

1.30 1.73

.60

3.40

1.30

1.30

3.98

5.02 1.93

1.30

.10

7.221.30 1.49

5.30 7.67

.19

5.26

7.22

5.30

5.30

5.33

5.76

.12

4.00 6.98 1.00 5.30

6.91 4.00

1.30

1.30

7.24 2.62

4.00 6.98

2.40

3.53

.22

1.30 1.49

1.30

.10

3.62 .90

3.53 3.62 .90 5.02 .90 5.30 1.30

7.24

1.93

.10

.17

.12 4.00 6.98

1.44

1.44

5.33

1.44

1.20

1.69

.27

2.62

.45

.12

5.00 1.00

.75 .66

6.91 4.00

1.20 .17

.12

1.69 1.44

1.44

.75 .66

1.29

3.73 .17

1.44

.67

5.00 1.08

1.00

1.00 .67

.27

.12

1.30

3.62

5.02

5.00 1.00 .27

3.85

1.00 3.73

3.85

1.08

1.00

1.00

2.52 1.75

3.73

.75

3.85

2.52 1.08

.57

1.30

.15

.36

1.75

1.30

.66

.62

4.17

.12

.62

.43

.19

.19

1.71

3.80 .62

.62

.19

.19

.62

.62

9.20

3.56 .60

.60

.28

6.91 4.00

4.17

.18

3.56 .60

4.27

.62

4.17

.60

.19

.43

3.80 .62

3.17 8.01

.60

9.20

.19

.18

3.17 8.01 1.64

1.71

3.17 8.01

3.88 4.37

.60

.60

.10 .43

.88 1.10

3.88 4.37

1.16

21.19

1.29

21.19

1.29

1.10

1.29

4.30 4.33

21.19

.60

3.88 4.37

1.13

.10 .43

3.56 .60

.43

2.65

3.83 1.16

.16

.10 .43

1.38

1.00

21.19

9.20

1.12

1.25

1.01

.19

.18

21.19

.88

.16

1.00

.28

1.20

.67 2.98

.28

.60

.60

1.29

1.64

.60

.67 2.98

4.27

1.00

1.00

4.30 4.33

3.57 1.13

2.61

1.32

5.82

.67

.67

4.27

3.83 1.16

1.00

1.00

1.01

.88

6.06

21.19

.84

5.26

20.30

6.42

2.60

1.16

1.25

.84

.41

21.19

.60

1.50

21.19

6.42 5.13

1.50 5.13

20.30 4.30 4.33

.57

5.82

1.01

20.60

.16

1.00

.60

1.38

5.82

1.54

.67 2.98

6.06

21.19

1.00

19.99 5.26

3.80

3.85

1.12

3.85

3.57 1.13

6.06

5.26

.36

3.85

5.66

21.19

1.64

1.13

1.11

2.60

1.51

5.66

1.32

2.65

3.90

20.30

.41

2.61

1.20

7.99

1.20 2.21

1.54

.98

3.56

18.37

3.80

.98

1.11

1.20 4.31

20.60

.94

1.20

7.99

.19

.67

.19

1.10

1.16

4.31

.70

1.20

.70

2.61

3.83 1.16

.94

2.00

parefeuilles protégées

.92

17.28

1.13

5.66

.61

1.38 2.05

2.60

.89

2.00

.98

17.32

1.12

.94

3.56 .97

.92

17.22

2.65

18.37

.35

2.05

17.28 2.05

21.19

.863.57 1.13

8.70

.97

17.32

.33

2.05

.61

1.45

21.19

1.17

17.32 .86

20.30 20.30 21.19 19.99 1.25

1.00

20.30

3.90

20.30

.35

8.70

2.4621.19 1.32

.92

17.22

1.11

.61

1.20

4.06

1.00

1.45 4.31

17.32

1.00

1.55

.33

parefeuilles protégées

1.17

17.63

17.28

17.63

1.50

2.21

.80

1.01

.80

17.63

2.46

1.54

2.05

17.63

.80

1.20

21.19

17.32

2.53

.92

17.32 17.63

17.58

1.49

21.19

1.18 1.71

17.28

2.00

18.37

1.15

1.82 .10

.80

.35

.58

.70

.28

1.00

.28

1.51

.64

acrotère BA + pierre de fontvielle .16 couronnement pierre d'estaillades

.84

.41

.19

1.01

17.58 .92 17.28 17.32

6.42 5.13

.70

.80

.16

.971.00

1.00

3.22 1.02

.52

17.63

3.26 1.28

.80

21.19

17.32

2.05

1.82 .10

.28 1.29 .80

.45

20.60 2.21

.33

isolation 4 cm polyuréthane et étanchéité dalles de pierre de fontvielle sur plots

.45

21.1917.32

.34 .34 .67 .64

.67

1.00 17.58

17.32

.80

2.53 20.3017.58

.86

.80

.15

2.53

3.27

1.18

1.49 .86

4.26 4.26

3.83

2.56

.67

2.15

1.20

1.44

.89

3.26 1.28 1.00

1.28

1.00

17.32

20.30

basin BA monobloc

1.29

1.17 .67

17.63

2.53

1.44

6.42

1.49

1.73

1.39

17.32

1.18 1.71

17.32

.80 1.00

.15

17.58 17.63 17.28 1.28

.62 17.32

.22

.58

1.38

1.99

.62

.52

17.07 17.22 17.32

.58

1.45

1.54

17.85

.70

.22

3.27

4.26 4.26

.80

.88

.60

1.39

.63

.80

3.61

1.22

1.40

1.99

1.08

17.07 3.63

.63

21.19

1.01

.34

19.99

3.90

2.41

20.30

17.32

.34

17.32.67

2.53

1.71 .92

.70 3.63

17.63

2.15

isolation 4 cm polyuréthane et étanchéité dalles de pierre de fontvielle sur plots

17.58 1.71

17.58

.80

.21

1.55

.30

1.55

1.00

.79

.28

.11

1.39

.60

1.82 .80 6.42 .10

.28

1.00

17.32

3.90

1.08 1.54

.67

1.73 1.98

1.73

3.22 1.02

1.61

17.32

2.12

19.99

.64

acrotère BA + pierre de fontvielle couronnement pierre d'estaillades

.45

.70

1.18 1.71

21.19 20.30 20.60

1.39

1.03

.89

7.99

17.85

.15 20.30

3.26 20.60 1.28

.80

17.58

20.30

4.06

.891.38

1.38

1.75 1.18

3.61

1.22

.92 .90

1.40

ragréage + polymère 6mm + résine polurethane 3-4mm

.70

.75

17.88

.79

.25

5.52

1.51 1.75

.90

.60

.88

.11

.70

3.83

17.32

.52

3.27

4.26 4.26

18.14

.76

1.28

.86

3.61 2.98

1.40 1.33

1.98

.67

1.61

2.35

.62

2.46 1.18

1.03

1.44

5.52

.89

2.56

.70

.75

4.51

.88

.66

1.17

.22

.67

.79 .77

2.98

1.10

1.33

.28

.25

6.31 .11

.30

.76

1.39

17.88

2.15

1.39

1.03

.63

.21

.89 .16

1.22 1.10

.77

1.72

3.22 1.02

ragréage + polymère 6mm + résine polurethane 3-4mm

.76

1.08

17.07

1.18

.66

1.17

1.15

17.85 1.99

4.42

.66

1.15

5.12

17.85

1.17

1.15

1.61

4.42

4.51

6.31

18.14

.83

17.85 5.52

2.12

.67

2.98

1.33 1.35

5.12

2.41

.86

4.89.77 1.41

1.981.72

3.97

.16

1.18

3.97

4.42

basin BA monobloc

3.90

.83

3.85

.16

1.10 1.17 15.96

1.35

dalles + escalier BA résine fines de béton

17.85

.97

17.32

.67

1.34

1.72 1.59

.91

19.99

17.58 2.53

3.63

.91

17.85

17.85

.97

.11

5.12

3.81

chainage

1.75

3.81

20.30

20.30 .15

3.85 .21

1.35

1.15

15.96

15.96

douche Corian

1.20 .70

.75

1.17

recharge BA résine fines de béton

.80

3.97

5.93

2.35

1.71

.70

.11

2.41

2.86

.63

1.17

1.59

4.89 1.41

dalles + escalier BA résine fines de béton

18.14 17.88

.80

.67

4.89 1.41 .06

1.55

4.85 .60

5.93

2.12

4.51

6.31

2.86

2.32 1.34 1.33

1.59

.75

.93

1.15

1.15

ragréage polymère + résine polyuréthane

4.85

7.43

.97 .90

2.41

1.00

.63

1.15

.60

1.34

chainage

.25

1.27

7.43

17.85

.63

.60

.25

1.59

1.27

1.55

1.21

1.35

.06

1.38

1.15

.35

1.33

.35

2.32

1.54

.93

8.59

1.59

3.80

1.06

.42

.25

13.71

.90

1.06

.92

3.71

1.62

17.28

2.56

3.10

1.55

1.00

.67

douche Corian

.90

parefeuilles protégées

8.70

18.23

1.03

3.71

3.03 1.24

1.15

recharge BA résine fines de béton

17.85 17.88

1.35

17.85

.60

1.22 2.05

1.20

3.57

.87

recharge béton repose navettes ou parefeuilles

.65

1.20

.90

.21

1.22

2.05

.9213.71

1.18

1.70

.30

1.00

17.32

1.06

1.62

ragréage polymère + résine polyuréthane

.65

17.63 1.46

13.71

.67 2.05

17.28

1.15

3.03 1.24

.22 .92

2.05

.90 21.19 17.32

1.74

.94

.60

.65

13.97 17.63

.74

3.81

5.93

.35

1.44 .94 7.77

.60

1.21

1.38

.35

17.88

1.01

plancher collaborant sur charpente metal + isolation 4 cm polyuréthane + étanchéité + dalles pierre de fontvielle sur plots

2.33 1.46

3.71

50m

.87

1.22

.80

17.63 .21

.81

1.46

.21

3.03 1.24

3.57

1.03

18.23

2.97

1.70

1.12

.81 17.63

.72

1.62

1.12

3.93

1.00

4.17 1.43

1.26

.42

2.08

40

.87

6.59

.36

1.00

30

20

4.31

4.17 1.43

1.26

.80

13.71

1.74

1.03

.97

1.23 6.40

17.28 13.71

13.71

1.89

.36

.10

.21

.92

13.97 17.32

.51

13.97

17.32 .16 .80 .10

recharge béton repose navettes ou parefeuilles 17.58 arasage mur existant 17.32 couronnement pierre d'estaillades

.45

17.58 .29 .90

1.00 .21

1.00 .28

1.74

1.23 6.40

13.78

.65

.80

.80 .45 17.28 17.58 13.78 13.97 17.58 17.32 2.33 13.97 17.32 .22 1.46 1.01 .65 .93

.26

.97 2.08

2.46 .28 13.71.80

.93

.72

3.56

18.23

.64

10

6.59

13.71 13.71

4.31

1.70

5.86

1.72

1.89

.42 1.12

.64 .85

.64

.26

17.32

2.97

1.19

1.98

1.50

1.43

13.71

3.93

1.50

.60

1.72

1.21

1.37

1.98

attic with terrace 0

3.78

1.19

1.41

17.22 2.08 21.19

1.30

1.46

13.97

.67 .64 2.98

3.61 13.97 2.53 1.30

2.97

1.37

1.21

2.00

3.61

6.57 1.82 1.41

4.17 17.22

1.00 1.55

.12.25 .25 .25

dalles BA finition résine fines de béton

.51

1.26 1.55

.30

2.95 .36

.12.25 .25 .25 6.59

.72

1.30

2.46

.60

13.68

17.85

1.30

4.22

.64

.35

2.92

.30 .29

.51

3.69

17.32

.43

1.89

13.68

6.11

escalier BA résine fines de béton

1.50

1.292.95

3.93

1.98

17.85

dito escalier dalles BA finition résine fines de béton

dito escalier

6.35

3.69 1.00

1.55 13.71

.30 .29 1.01 .42 .433.61 1.30

1.29 1.34

1.55 1.30

1.34 17.32

2.13 .67 .81

1.00

.65

.90

.61 .74

2.53 .21

1.71

.93 13.97 17.32

.15

1.21

6.57

1.72 2.00

1.15

1.33

1.19 1.82

1.61 1.41

4.22

3.62 .65

3.61

.84

1.64

1.21 1.15

1.37 1.33

2.98

6.51

4.42

13.68

4.63

6.11

4.88

2.92

1.55

13.97

17.32 13.71

.64

6.51

1.21

.16

3.23

6.35

4.63

17.07

2.33 2.13 1.46

plancher collaborant sur charpente metal + isolation 4 cm polyuréthane + étanchéité + dalles pierre de fontvielle sur plots douche Corian

7.77

8.59 1.54 .60

.35

1.44

.61

2.49

.42

.60

2.49

arasage mur existant couronnement pierre d'estaillades

17.32

.22

1.23 6.40

.70 13.78 13.85 17.58 13.97

3.10

1.71

17.58

.97 2.56

3.63 1.30 3.49

douche Corian démolition plancher

13.97 .70

20.30

3.61 1.30

17.32 .84 .41 2.08

3.49

13.85 3.63

17.07

13.68 1.61

.35

17.85

1.30 1.48

1.21

6.57 .84 1.82

2.001.64

13.68

4.96

4.88

4.22

21.19

.88

4.42 13.68

.19

.88

.77

.43

1.29

.70

2.92

4.30

3.62 .65

.16

3.23

.77

1.30

17.88

.88

3.41

1.08

15.95

4.96

1.30

.33

5.09

parefeuilles protégées

ragréage + polymère 6mm résine polurethane 3-4mm parefeuilles protégées

6.35

5.20

6.31

5.30

2.98

1.36

1.15 1.17

1.33

17.85 13.68

.43

1.30

escalier BA résine fines de béton

1.11

4.88

6.51

1.30

.33

18.14 13.68

13.97

1.34 3.11

1.55

4.50

1.21

.84 1.41

1.64 1.61

15.95

parefeuilles protégées

.74

13.85

6.31

.05

5.09

1.36

1.17

.43

1.00

1.30

.35

1.15

1.61

1.41

marches BA dito escalier

17.88

.33

.74

5.20

1.11

.77

1.74

.21

7.86 .16 1.36 1.37

1.17

7.86

1.15

parefeuilles protégées

démolition plancher

3.23

4.63

3.15

1.37

marches BA dito escalier

dépose soignée parfeuilles douche Corian coffrage placo h=1m

4.89

repose navettes

15.95

1.54

1.35 1.00

coffrage placo h=1m

18.14 17.88

.21

1.00

13.68 4.96

1.30

4.50

1.21

3.15

.43

.05

5.30

1.54

1.00

1.74

13.68

1.17

13.68

2.13

3.49

3.62 .65

4.89

1.35

13.68

3.15

5.93

parefeuilles protégées recharge BA et ragréage résine fines de beton

6.31

5.80

1.41

17.88

.64

2.86

1.33

1.61

1.15

repose navettes

1.33

alles de pierre de de niche fontvielle remplissage

13.68

1.34

2.71

5.20

1.11

5.93

3.15

.75

1.00 3.19

DM

.21

1.21

7.86 WM

5.60

DM

1.17

5.60

17.85 17.88

6.50

.88

1.60

1.15

4.41

WM

.56

7.77

1.37

1.15

parefeuilles protégées

6.50

3.15

8.91

.88

1.60

création rejingot BA repose navettes ou parefeuilles

polyurethane et étanchéité ierre de fontvielle sur plots

4.41

1.00

5.16

1.34

.75

.21

1.35

1.54

remplissage de niche

chainage

dalles + escalier BA résine fines de béton ragréage + polymère 6mm + résine polurethane 3-4mm

1.75

.60 4.67 1.05

.90 .88

.90

.17

.923.80

douche Corian

.70

.75

3.80 .90

1.20

1.30 1.30 1.00

3.83

.60 4.67

.60

1.00 .17

.88

3.75 2.00

8.20

.67

douche Corian

1.70

2.40

1.20

8.20

.30

3.21

3.16 .60

1.00

3.75 2.00 .88

3.97

13.71

.25

3.03 1.24

1.15

.60

.96

3.21

.22

2.01 1.74

1.01

1.00

1.74

3.97

3.98

.60 6.13

.35

1.01 1.48

.58 .15

.45

2.01

1.73 1.00

1.00

1.30 1.49 .19

.45 1.01

1.73 3.40

6.13 5.67

1.00 .15

1.30

1.30

1.30

1.30 .12

5.67 3.98

.60

1.30

5.33

5.76 .60

1.30

.96

.12

1.30

1.30

3.40

7.22

5.76

1.00

1.30

1.30

1.00

3.62

3.53

5.02

.22

1.93 3.62

1.29

5.02

7.67 1.30

.10

.90

.90

1.30

.19

7.67

5.76 5.33 5.26

7.22

5.307.67

5.30

5.26 5.30

5.30

4.00 6.98

2.62 6.91 4.00

7.24

1.30 1.74 1.49

5.30

1.93

1.44

1.00 4.00 7.24 6.98

1.93 .10

.90

.12

2.62

6.91 4.00

.90

7.24

1.44

1.00 .27 .17

1.44 1.69

1.20

5.26

1.29

.12

.17

1.20 1.44

.27

1.69

.75 .66

1.00 .67

.75 .66

1.00

2.05

.15

1.29

3.53

1.20 3.73

5.00 1.00

.67 1.08

1.08

.90

3.73

5.00

.90

2.52 1.00 3.85

1.00 .67

.75

.29

.29

parefeuilles protégées recharge BA résine fines de béton

1.20

.25

.90

1.75

1.75 3.85

.57

.57

2.62

.24 .24

.80

1.30

.80 .29

.29

.80

.66

.30 1.80 .30

1.70

.30 1.80

1.30 1.80 .30

2.63 .80

5.97

.30

4.76 7.82

2.63

6.73

.30

2.40

5.97 2.40

4.76 1.30

2.52

.36

.75

.36

.46

.70

1.70 .46

.70

3.21 2.40

4.76 6.73

1.30

1.70

.75

.20 1.49

.29 .30

.20

3.21

1.48

.46

.70

3.21

.67

5.69

7.86

.29 .30

.20 6.18

1.12 1.49

.67

.29 .30

1.12

6.18

1.73

.93 7.86 5.92

6.18

1.30 7.56.37

1.30 5.92

5.69

1.40

7.82

1.73

1.57 .69

1.301.41

1.24

1.73

.93 7.56 1.30

5.30

1.40

.37

1.30

1.49 1.48

.45

1.24

2.32

.45 .97

.75

.71

1.41

.37

.71

5.69 .97

4.22

1.30 .45

1.57

.93

2.32

1.22

5.30

.75 2.32 1.57 1.30

1.30

.36

4.40 1.30 .69

.75 .90

2.19

1.94

1.22

2.19 4.22

.90

1.30

1.94

4.22

1.73 .93

.97

1.09

.82

.46 .906.98

1.41 1.46 .46

2.20 .90

6.93

1.30 6.98 1.03

5.56

.34

5.30 6.93

5.56

4.12

1.73

1.94

3.53 4.40 1.09

1.21 1.41

1.20

2.20 1.03 1.16

4.62

.82 .34 .29

1.16

.29

1.02

4.12

6.98

1.03 .34

3.53

.90

1.09

1.21

.97

1.46

5.00

4.62

4.63

1.21 1.93 1.02

.97

1.41 1.46

1.93

2.20

1.73

3.35 .72

5.00

1.20 .83

1.14 .25

.72

4.63

3.85

1.20

.37

.57

3.53 4.40

1.02

.15 2.76

2.52

.83

3.85

.75

.25

4.74

2.76

2.52

5.00

.37

1.69

2.76

2.52

1.75

3.35

4.74

1.02

1.75

1.14

.15

1.75

3.35 4.74

.75

.75

.75

.83

.37

1.05

3.67

1.05

1.14

1.70

1.30

3.85

.25

2.26 3.67

1.30

.25

1.70

.25

5.96

1.14 3.05

.05

2.26

.96

1.13

.05

3.67

1.30

1.05

3.05

.96

1.30 7.86

5.96

1.14

7.56

.96

4.62

1.14 5.96 .25

2.26

1.13

.05

1.30

1.30

7.56

7.86 3.40

1.71 3.40

7.86 1.30

7.56

1.40

1.02

3.05

3.40

1.71

.15

1.40 .79

1.30

1.70

.04

1.71

1.43 .15

1.43 .17

.15

.90

1.16

6.66

1.41

.15

.79

.90 6.66

6.92 4.12 4.03 1.16 4.12

1.40

.37

.04

.10 .30

1.43 .15 .15

1.41

6.92

4.03 1.30

6.66

.75

.10 .30

.74

.74

.17

4.91

.74

1.93 .17 1.41

1.93

.90

6.92

4.031.16

.79

.75

2.76

4.91 2.76

4.91

1.30

recharge BA résine fines de béton 8.70

.15

3.71

ragréage polymère + résine polyuréthane parefeuilles protégées

ragréage polymère + résine polyuréthane

2.05

13.71

2.05

17.28

c

d r

recharge béton repose navettes ou parefeuilles

.65

1.20

3.80

17.28

3.57

1.62

2.08

1.03

douche Corian

1.22

17.32

17.28

1.18

1.70

.65

.65 recharge BA plancher collaborant sur charpente metal + résinerecharge fines debéton béton isolation 4 cm polyuréthane + étanchéité + repose navettes ou parefeuilles dalles pierre de fontvielle sur plots

2.05

21.19

13.71

1.62

3.71

.80 1.46

.90

.21

17.63

21.19

1.74

.87

5.86

.10

13.97 17.32 .92 17.28 17.63

3.57

.87

plancher collaborant sur charpente metal + isolation 4 cm polyuréthane + étanchéité + dalles pierre de fontvielle sur plots ragréage parefeuilles polymère +protégées résine polyuréthane arasage mur existant couronnement pierre d'estaillades

.29

17.58

8.70

.21

17.58 1.01 .81

.16

2.05

.72

3.57

3.78

2.08

1.00

1.93

1.00

4.12

5.86

.22 .16 17.32

.80

1.01

arasage mur existant douche Corian couronnement pierre d'estaillades

.90 2.33 1.22 17.32 2.05 1.46 .65 1.01

2.56 1.12

18.23

4.50

1.34

3.19

DM

DM

parefeuilles protégées

1.03

1.13

.70

.88

.07

1.60

8.91

6.69

1.28

.38

1.28

.38

1.91

2.69 3.83

dito escalier

.75

.35

17.85 17.88

13.68.05

1.74

3.19

.56

.75

1.00

1.00

parefeuilles protégées 6mm doucheragréage Corian + polymère dalles BA + résine polurethane 3-4mm finition résine fines de béton

.53

1.12

3.03

démolition plancher

VNC

3.83

.53

1.27

1.74

2.25

10.35

.39

1.27

.39

.25

6.69

.82

4.26

1.33

.75

3.78

.30

18.23

13.97 .45

.80

17.32

1.00

1.46 17.32

17.63

17.28

recharge béton repose navettes ou parefeuilles

17.58

1.00 2.33 1.46

2.98

.29 21.19 17.58 .21

8.70

4.17 1.43

1.26

.971.00

17.63 13.71 17.32

3.56

6.59 1.00

2.08

.36 4.31

2.97

1.19

1.72

.12.25 .25 .25

3.93

2.46

1.123.56

.80

.81

.28 1.23 6.40

.93

1.74

21.19 .92

17.32 .42

1.03

.45

.10

.72

13.71

.51

4.31

1.70

.30

.35

4.17 1.43

1.26

.88

1.21

1.37

1.72

.36

1.00

1.21

1.19

17.32

.26

.67 2.98 .64 .85

.80

13.78 17.58 13.97 17.32

13.71 .28 .80

.42 3.56

.26

17.2221.19 13.71

1.50

1.08

1.37

2.00

6.57 1.82 3.61

1.21

17.22

1.55

1.89

1.03

.64 .51 .85 .64

2.97 5.86 3.93 .64

3.62 .65

6.57 1.82

1.15

1.33

2.00

.64

1.01 1.30

2.08

.80 .67

douche Corian

démolition plancher

3.78

.35

3.61

.84

13.71 1.50

.60

.53

1.12

1.01 .30 .29

17.32

1.00

dalles BA finition résine fines de béton

.88

2.98

1.15

1.33

.16

2.65 3.53 2.65

.43

1.30

.30 .29

.15 2.46

.10

13.97 2.53 .6717.63

17.28

1.00

.93 2.53

1.71

2.13

.22

.92 1.00

1.23 .21 6.40 17.63

13.97

3.61 1.30 1.00 3.69

17.32 17.32

3.69

2.95

1.34

1.08

1.36

.84

1.64

ragréage + polymère 6mm + résine polurethane 3-4mm

2.69

5.30

.16

dito escalier

17.22 1.29

.80

.97

.15

.67

1.00

2.08

.45 13.97 2.56

.80

.70

1.00

13.78

.26

plancher collaborant sur charpente metal + isolation 4 cm polyuréthane + étanchéité + dalles pierre de fontvielle sur plots

.29

.16 1.00 2.53

17.58 17.58 17.32 17.32

.28

1.30

1.55

17.32

1.55

.64

17.07 .84 21.19 17.32

1.30

17.07

4.22

.60 6.59

1.98

1.21

5.30

1.41

1.64 3.61

1.41

1.48

4.22

2.92

.12.25 .25 .25

17.85

1.21

2.98

1.36

1.17

6.69

1.75

dalles BA finition résine fines de béton

.19

2.92

.41

.43

4.31

2.95

1.89

.88 .21

7.86 4.89 1.37

15.95

15.95

2.98

.60

.30 .29

3.63

2.46

1.98

17.85

5.80

1.41

1.17 1.61

6.69

.53

.70

21.19

.64

1.71 .84 2.56

.70 3.61.41 1.30

17.58 13.85 3.63 17.32 13.97

1.55

1.00 2.13

20.30 .67 2.98

1.00

20.30

3.69 3.49.85

1.01

1.48

1.29

13.68 6.352.95 21.19

.12.25 .25 .25

13.97

3.62 .65

1.35

1.15

4.89

1.91

13.68

1.61 6.11

3.11 13.85

17.32

1.34

.67

.64

1.37

1.61

1.74

17.85

4.42

1.61

5.80 1.21 1.08

7.86

1.15 1.54

3.91

6.51

13.68

6.11

6.35

.88

4.30

.21

5.30

2.86

4.89 1.35

1.33

1.15

1.91

6.69

ragréage + polymère 6mm escalier BA + résine polurethane 3-4mm résine fines de béton

3.53 2.65

.35

4.88

1.41

3.41

4.63

.88

6.11

1.30

4.42

escalier BA résine fines de béton dito escalier

1.75

4.88.77

6.51

3.23

1.00

.15

3.63 3.49

17.32

.19

13.68

13.68

17.85

.70

4.30

4.63

2.71

.84

.41

17.07

3.11

3.41

.30

.88 1.54

.20

1.91

2.25

3.83

parefeuilles protégées

2.86

1.33

1.15 1.60

1.74

1.74

dalles BA finition résine fines de béton parefeuilles protégées

5.80

.88

1.60

3.91

3.91

.75

10.76

.21

5.09

marches BA dito escalier parefeuilles protégées douche Corian escalier BA dépose soignée parfeuilles résine fines de béton

1.20

10.76

curage parefeuilles

.75

1.60

.75

2.86

.20

1.73

.33 5.09

dito escalier

parefeuilles protégées ragréage + polymère 6mm + résine polurethane 3-4mm

4.42

4.96

1.30

17.85

escalier BA résine fines de béton

2.90

17.88

6.50 3.15WM

.56

6.50 WM

curage parefeuilles

.75

2.65

1.30

4.26

1.30

3.91

2.25

.25

démolition podium

13.68 17.85

17.88

marches BA dito escalier démolition plancher coffrage placo h=1m parefeuilles protégées

.47

1.20

10.76

3.03

1.26

podium rechargedémolition BA et ragréage parefeuilles protégées résine fines de beton douche Corian repose navettes coffrage placo h=1m dépose soignée parfeuilles

recharge BA et ragréage résine fines de beton curage carrelage

.42

VNC

3.011.75

2.25

.82

1.77

1.77

.60

13.71

VNC 3.22

2.06

.70

3.01 2.12 1.83

17.28

.25

13.71 3.01 1.86

curage céramique dalles de pierre de fontvielle

.47

17.28

3.27

.65

1.20

.21

.42

2.12

6.32

10.63 1.13

1.46

1.91

13.71

3.57

6.77

repose navettes ou parefeuilles

3.22 .25

.35

3.22

2.70

3.15 7.77

4.41

5.60

marches BA dito escalier parefeuilles protégées dalles de pierre de fontvielle repose navettes curage carrelage

.42

.40 1.18

13.973.08

6.32

.96

3.03 1.28

1.86 .07

1.29 10.63 3.57 18.46

1.15

.20

1.74

1.28

.38

.88

1.60

3.91

3.91

10.43 1.83

6.77 .17

1.08

1.73

3.08 1.86

.96 .65

1.93

.90 17.63

4.41

parefeuilles protégées

coffrage placo h=1m nettoyage - isolation 4 cm polyurethane et étanchéité remplissage de niche de pierre de fontvielle sur plots démolition dalles plancher création rejingot BA

.90

13.71 1.18

1.83

17.63

.21

.40 6.32

10.43

1.46 1.45

.80

.21

10.43 10.63

13.71

.20

.39

1.27

.17

2.42

4.41

douche Corian curage parefeuilles

18.14 17.88

arasage mur existant démolition couronnement pierre plancher d'estaillades

2.86

.20

3.91

1.28

4.26 10.50

1.30

10.11

5.06

1.09

1.16

.60

.60

second floor plan .30

1.69

17.32

10.11

10.50

1.08

1.03

4.31

2.42

5.29

1.18

5.06

1.09

1.73

2.02

6.77

.30

1.36

1.18

dalles BA résine fines de béton

3.22

5.67

10.08

1.69

1.08

2.55

13.71

.17

1.03

1.36

1.36

1.39

1.87

dalles BA résine fines de béton escalier BA résine fines de béton

1.75

10.76

.75

1.17

5.16

7.77

1.00 8.91

remplissage de niche

recharge BA et ragréage céramique résine finescurage de beton

nettoyage - isolation 4 cm polyurethane et étanchéité .65 .47 de pierre de fontvielle sur plots dalles

.65

13.97

1.93

4.31

2.95

1.08

5.29

6.92

1.39

1.87

1.77

10.08

.20

.21 .10

1.45 1.28

2.03

13.71 13.71

10.50

1.36 .80

.22

.93

2.03

10.43 13.71

.20

2.04

.09

4.34 10.11

2.95

4.34

3.22

2.42

5.67

17.22

3.91

3.24

5.06

1.08 3.24

4.77

2.55

.82 1.09

.23

1.34

1.19

10.10

1.34

6.92

1.36

6.57 3.55

.30

1.36

4.85

2.02

6.26 17.88

1.08

1.98

13.68

6.26

1.08

1.98

10.10

13.71 1.23 2.04 .80 .12

.09 13.97 17.32

.93

.90

5.16

création rejingot BA

.65

2.54

13.97 17.58

.21 .65 .80 .10

1.23

10.43

1.36

13.78 17.58 13.97

.22

.71

.40

.65

1.46

1.93

2.54

1.30 .65

.74

13.78

13.78

1.30

1.69

6.57 1.93

10.10 1.93

3.22

5.67

13.68 1.33 10.08 10.10

13.71 17.32

1.30

1.19 .71

1.36

2.14

13.97

1.45 .74 .12

1.24

13.972.53

2.03

1.24

1.30 1.43 13.78

17.32

4.77

2.92

.60

1.39

1.18

1.49

1.23

17.85

1.55

1.49

escalier BA résine fines de béton

1.08 1.23

1.55

.61

1.49

tomettes conservées et protégées

1.36 1.58

1.78

13.71

4.34

17.22

1.33

.28

17.07

.28

2.92

4.85

.97

5.29

3.55

.61

1.87

.05

15.96

1.78

erre à poncer et proteger

démolition plancher

5.00 1.11

4.21

2.95

.23

6.35

repose navettes ou parefeuilles dalles de pierre de fontvielle repose navettes

2.53

.21

10.43

.97

1.43 .09

1.56

1.03

.05

17.85

13.68

17.88 2.41

3.24

.89

.50

1.23

13.78 2.14 13.85 17.58 13.97 17.07 13.97.93 2.04

.52

.52

.89

.50

1.34

1.58

6.92

1.55

1.49

1.28

1.49

1.11

1.28

1.95

dalles BA tomettes conservées et protégées résine fines de béton

10.10

13.68 2.156.35

.71

13.97

.65

.74

3.632.72

1.30

2.72

1.16

6.57

6.26

1.08

6.51

escalier BA résine fines de béton démolition plancher

2.06

parefeuilles protégées

1.30 .74

5.09

parefeuilles protégées

démolition plancher

VNC

13.71

.33

.43

.74

DM

8.91

nettoyage - isolation 4 cm polyurethane et étanchéité dalles de pierre de fontvielle sur plots

17.58

.22

1.56

13.85 3.63 1.19

2.55

.61

1.47

15.96

3.04

1.11

1.47

1.64

10.10

1.39

.97

13.78

.45

4.77

.45

1.43

4.68

6.51

10.10 1.11

1.93

.74

6.44

.88

1.98

13.68

13.68

1.30 .74

4.85 2.41

10.94.86

2.15

2.92

1.33

2.02 3.93

13.68

1.17 5.00 1.23 .77 4.2110.10

.26

1.39

2.02 3.93

10.94

.93

.24

4.96

.60

17.85

1.95

6.44 .91

.88

.93

1.58

.77

1.78

.86

18.14

.24

1.11

1.30

4.96

17.85

1.30

curage parefeuilles

2.94

6.51

6.31

1.17

.28

.89

13.68 6.35

.26

.60

.05 3.04

1.64

4.68

tomettes conservées et protégées

6.31

.50

4.55

13.97

2.12 1.24

6.50

5.93

démolition plancher .52

.91

1.43

1.28

1.88

1.49

1.88

1.10

terazzo à protéger

10.94

.77

10.10

4.55 5.66

2.94

5.66

poncer et proteger parefeuilles protégées

.75 1.20

3.23

8.59

5.60

création rejingot BA

13.97

.45

.74

1.43

.90

.90

18.14

2.02 3.93

.93

2.62

.59

1.83

marches BA dito escalier curage parefeuilles douche Corian

4.96

1.30

3.10

WM

remplissage de niche

2.12

repose navettes ou parefeuilles parefeuilles protégées

2.28

1.95

2.14

2.72

2.28

.24

2.62

1.47

1.30

1.11 15.96

.59

1.59

1.10

terazzo à protéger parefeuilles protégées

.83 1.00

2.94 13.68

13.68

4.96

10.14

1.83

2.62

4.68

1.64

1.59

7.86

1.13

1.31

17.88 .90

2.08

dépose soignée navettes

démolition plancher les carreaux céramiques

1.00 .90

.26

6.31

13.85

1.17

10.14

7.86

1.31

1.10

.66

curage sol souple

conservées et protégées

1.17

2.67

7.80

5.66

.83 7.80

2.08

3.83

démolition plancher

6.31

4.50

.77

13.68

.43

1.48

17.88

5.20

.88

.05

.19

18.14

21.19

1.61

marches BA dito escalier coffrage placo h=1m

dépose soignée parfeuilles

3.01 .25

17.88

parefeuilles protégées

4.50

1.11

1.74

17.85

dépose soignée parfeuilles

démolition podium

1.00

17.88

.70

6.31 4.30

.05

5.09

coffrage placo h=1m curage carrelage recharge BA et ragréage résine fines de beton

VNC

3.22 3.27

.74

1.34

.75

4.41

2.67 13.68

4.55

3.59

17.88 .70 .90 13.68

3.15

5.93

4.69

1.13

1.58

1.00

démolition plancher

4.69

1.88

dépose soignée navettes terazzo à protéger remplissage de niche

reaux céramiques parefeuilles protégées scalier terazzo à protéger curage carrelage

1.73

.88

.66

.61

1.83

1.12

1.13

3.15

5.93

5.20

3.41

1.74

3.19

.56

17.88

5.16

13.68 .70

17.85

DM

8.92

.59

1.59

1.58

ragréage et repose tomettes

5.55

WM

5.60 1.00

5.55

17.85 8.91

2.67

2.28

10.14 8.92

.90 3.15

7.77

repose navettes ou parefeuilles

.91

DM

5.93

5.60

2.61

1.31

7.86

1.13 .94

remplissage de niche

recharge BA et ragréage curagerésine parefeuilles fines de beton repose navettes démolition podium douche Corian

.42

.47

3.01 2.12

17.28

1.20

.25

3.83

3.03

1.26

1.20

dalles de pierre de fontvielle

1.11

5.93

1.00

17.32

.21

13.68

1.00

1.71

3.59

.83

17.85

6.50

6.50

.73

vées et protégées curage carrelage

1.73

2.61

17.85

2.08

2.06

.70

1.29

3.08 1.83 .90

.21

13.71

.96

.47

.65

1.17

13.68

2.56 .70

17.58

2.65

13.68

.70

7.80 2.47

.99

.66

1.58

17.85

13.68

17.85 4.69

ragréage et repose tomettes parefeuilles protégées

.38

1.46

17.63 13.97

17.88

3.153.15

douche Corian

2.71

3.11

18.14 17.88

10.35

17.85 1.17

1.00

WM

curage pierre pierre conservée erazzo à protéger remplissage de niche

3.27

1.13

.07

1.28

10.35

2.47

17.85 8.92

3.15 5.55

.88

.39

.21

10.35

.99

DM

.94

.61

.20

WM

17.85

4.10

10.63 3.57

1.26

18.46

4.26

1.30

6.77

.40

13.71

3.57 .70

1.29

recharge BA et ragréage parefeuilles protégées démolition plancher démolition podium résine fines de beton curage céramique remplissage de niche nettoyage - isolation 4 cm polyurethane et étanchéité coffrage placo h=1m dalles BA de pierre de fontvielle sur plots création rejingot dépose soignée parfeuilles

4.50

2.90

DM

5.60

17.85 17.88

.21

.05

2.70

1.03

6.50

remplissage de niche

1.86

.65

17.58

2.12

17.28

13.71 10.63

curage carrelage création rejingot BA

2.12

6.32

1.86

3.03

.38

2.53 1.46

13.97 13.97 2.54 .901.36

.65

1.93

10.43

.96

.65

WM

7.77

1.00

1.74 13.68

1.34

.75

17.88

2.69

5.60

.73

1.46

2.25

1.27

1.28

.07

1.28

18.46

4.10

1.00

3.91

.17

1.27

remplissage de niche

ragréagepierre et repose tomettes conservée

.39

10.35

first floor plan

1.73

.82

1.77

1.08

.60

3.27

remplissage de niche

4.26

1.30

1.28

seuil en pierre d'estaillades

3.91

.60

1.16

1.36

1.18

dalles BA résine fines de béton

1.69 5.29

6.92

.82

1.77

4.31

2.42

13.71

.80

17.63 13.97

3.03

10.50

repose navettes ou parefeuilles démolition plancher dalles de pierre de fontvielle repose navettes remplissage de niche

.40

13.68 17.85

6.50

20.30

1.17

3.19

.56

5.93 7.77 3.15

4.41

2.90

2.70

DM

8.91

5.60

5.16

repose navettes ou parefeuilles parefeuilles protégées

nettoyage - isolation 4 cm polyurethane et étanchéité dalles de pierre de fontvielle sur plots

parefeuilles protégées marches BA dito escalier dalles de pierre de fontvielle repose navettes 1.83 .42 curage démolition plancher nettoyage - isolation 4 cm polyurethane et céramique étanchéité .22 .10 .80 1.18 .65 dalles de pierre de fontvielle sur plots 17.28 curage carrelage

6.32 .65 1.18

1.45

.80.93

.10

.21 13.71

1.28

10.11

6.77

5.06

1.09

13.71 17.3213.71

10.50

4.31

.17

1.73

1.39

1.87

.30

5.29

6.92

1.36

1.18

1.08

3.91

1.39 6.57

1.87

1.55

dalles BA résine fines de béton

3.27

1.16

3.55

2.42

2.02

17.3213.71

3.08

.21

1.23

.903.08

.20

.20 10.11

2.95

.93

3.57

13.71 2.95

5.06

10.08

.60

.61

4.34

1.69

6.92

1.49

1.55

.05

17.22

.80

1.23 2.03

13.97

.71

13.97

1.36 1.18

.21

1.93

17.58

1.30

.22

2.14

.65

10.43 13.7810.43

1.03

6.57

1.28

2.02

17.58

17.63

.74

.96 1.45

2.54

.12

2.04 .71.12

.09

13.78

1.23

.93

13.97

13.78

1.30

13.71 17.321.301.19 13.78

4.34

4.77

3.22

5.67

1.09

1.19 .20

17.58

13.97 2.53 10.43

2.04

.09 2.03 17.32 1.43 17.07 13.71 17.32

1.16

.61

1.08

.30

17.58

.65 .80 .22

.74 .10

.80

2.14 13.78

13.97 1.24 17.07

.71 .97

.52

13.97

1.43

10.10

1.30 4.31

17.22

2.72

13.85

1.24 .12

1.30

13.85

1.56

2.55

3.55 3.04

.05

1.47

3.24

3.63

13.78

1.03

4.68

1.28

1.49

3.55

1.36 13.68

1.43

1.88

1.47

3.22

.23

5.67

13.68 6.26 17.88

2.55

4.68

1.08

10.10 1.08

.60

.59

17.85

4.77

2.922.95

2.92

1.34

.60

3.04

17.88

1.98

10.10

13.68

4.85

.23

17.32

.28

.28

6.35

1.34

3.24

1.23

1.36

4.85 17.22 2.15

2.4113.68

2.02

1.30 .89 1.56

2.41

1.33 6.35

10.08

escalier BA résine fines de béton

escalier BA résine fines de béton

3.22

1.98

1.08

1.93

1.78 6.51

tomettes conservées et protégées

pierre à poncer et proteger

13.68 1.58

2.12

.97

2.72

3.63

2.15

.50

1.39

6.51

.89

curage céramique

13.97

démolition plancher

1.34

6.50 WM

création rejingot BA

2.54

13.97

17.07

.52

.26

.45

1.39

1.33

10.10

2.12

2.53

1.43

2.92

6.44

.88

.91

.50

.26

.74

6.44

.88

.23

17.88

.86

1.17

5.00 1.23 1.11 4.21

17.85

6.57

démolition plancher

.77

1.58

.91 6.35

2.02 3.93

10.94.86

.77

1.93

tomettes conservées et protégées dalles BA résine fines de béton pierre à poncer et proteger

3.22

6.31 .93

10.10 13.68

4.96

13.68

5.00

6.31

13.68

1.17

.45

.74

1.43

7.86

escalier BA résine fines de béton

3.22

curage parefeuilles

17.85 17.85

4.21

VNC

1.11

1.30 1.78 1.95

1.49

1.30

18.14

10.94

18.14 .24

10.10

6.26

curage parefeuilles

1.26

5.00

4.21

1.95

1.49 1.11

pierre à poncer et proteger

13.71

2.15

2.62

1.88

1.11 15.96

VNC

1.01

2.94

5.66 1.30

17.854.96

15.96

tomettes conservées et protégées

2.62

.59

1.31

1.64 1.64 3.04

parefeuilles protégées

1.39

2.02 3.93

2.41

13.68

4.96

.90

1.10

démolition plancher

repose dalles carreaux céramiques

1.01

10.76

1.73

7.86 1.31

1.10

1.59

terazzo à protéger 2.85 .85

1.73

2.61

2.61

.66 .66

1.59 1.13

13.71

8.30

1.28

parefeuilles protégées

démolition plancher

10.35

seuil en pierre d'estaillades

1.58

repose dalles céramiques curagecarreaux parefeuilles

10.76

3.27 .05

1.26

1.13

.47

3.01

10.76

.05

1.58

10.63

carreaux conservées et protégées curage sol souple

1.81

.88

.93

.24

6.51

terazzo à protéger

8.30

10.50

2.82

1.23

1.00

17.85

1.83

2.72

13.85

6.44 .86

1.17

2.71

3.19

.56

.75

4.41

remplissage de niche

3.63

1.56

4.55

.90

démolition plancher

curage carrelage

5.50

10.08

escalier terazzo à protéger

2.94

démolition plancher

2.14

6.31

17.85 17.88

17.58

13.68

13.68 1.00

10.14

5.66

.26

2.28

4.55

.77

17.88

7.86

1.28

10.10

ragréage et résine fines de béton

3.01

.20

.47 .99

1.26 2.85 .85

13.71 10.63

1.00

.91

1.17

13.68

1.17

2.08

démolition plancher

18.14

10.14

7.80

2.28

2.67

.83

13.68 17.88 .90

1.83

8.91

3.59

17.85

.70

DM

3.59

5.93 17.85

1.00 5.93 3.15

.21

repose navettes ou parefeuilles

13.68

2.67

1.00.83

3.15 .90

5.60

terazzo à protéger dépose soignée navettes

curage souple dépose soignée navettes carreaux conservées etsol protégées

1.01 1.22

5.50

10.50

.88

8.30

seuil en pierre d'estaillades

13.71 1.22

3.01

13.71

10.10 5.67

démolition plancher

2.85 .85 .90

5.50

13.71

10.08

.61

CHAUFFE-EAU

13.71

.99

curage carrelage

1.23

2.82 1.81

13.71 .05

CHAUFFE-EAU

VNC

1.74

WM

5.60

4.69

DM

2.46

1.74 2.88

WM

7.80

8.92

5.55

2.08

6.50

curage carrelage parefeuilles protégées reposeescalier dalles carreaux terazzo àcéramiques protéger

.47

1.54

2.46

13.68

4.05

.72

5.16

remplissage de niche

1.81

2.46

.37

6.26

ragréage et résine fines de béton

parefeuilles protégées curage sol souple carreaux conservées et protégées remplissage de niche curage carrelage ragréage et repose tomettes

2.34

.90

2.47

17.85

6.50

.88

.94

parefeuilles protégées

.20 .80

5.16 .90

1.74 .20

2.88

2.82

13.71 5.16 13.97

1.49

.23 .23

.69

.72 1.74

10.63

.73

.40

1.49

5.67

4.05 .25 .35

10.43

.80

.42

13.71

1.23

.69

.90

.80

.42

13.71

10.50.36

.90

.99 1.54

13.97

1.49

10.10

démolition plancher

13.71 13.71

.36 1.16

4.34 10.10

4.34

tomettes conservées et protégées

2.34

10.43 .80

10.43

1.19

.37 .23 .23

13.78

1.16

10.43

3.86

13.68 6.26

13.78

1.19

1.30

13.70 10.10

1.22

1.36

.40

1.74

.97 2.88

3.86

3.35

4.86

.80 5.86

.72

1.30

MISE EN JEU 1.30

MISE EN JEU

13.97 .90

.25 .40

.97 1.74

1.36

MISE EN JEU

13.71 13.70 10.10

4.86 .15

2.93

5.67

10.08 10.10

pierre à poncer et proteger erre à poncer et proteger

.42

2.93

.29

6.64

ragréage et résine fines de béton tomettes conservées et protégées

13.97

1.49

.23 .23

.69 5.86

1.30

.25 .40 10.43

MISE EN JEU .36

1.34

4.34

1.15

3.35

5.01

démolition plancher déposé tomettes soignée pierre à poncer et proteger

1.34

.15

1.67

6.26

10.10

1.30

.15

.37 13.68

13.68 .33

1.15

.29

4.68

MISE EN JEU10.10

poncer et proteger

1.67

.25 .35

4.68

6.33

5.01

6.64

tomettes conservées et protégées

.15

13.68

MISE EN JEU

10.10

1.30

13.85 13.71

1.19

10.10 3.86

10.94

.33

déposé tomettes soignée

13.70 6.33

13.97

2.70

5.66

pierre à poncer et proteger ragréage résine fines de béton terazzo àetprotéger

4.86

10.94

.92

.93

.24

.61

curage pierre remplissage niche escalier terazzode à protéger ragréage et repose tomettes démolition plancher curage carrelage

CHAUFFE-EAU

curage pierre

1.16

2.70

13.68

dépose soignée navettes

1.54

10.43

1.30

2.93

2.13

13.85

MISE EN JEU 3.35

terazzo à protéger ragréage et résine fines de béton

13.78

.15

.93

.24

5.66

curage

4.05

13.68

.92

.29

déposé tomettes soignée déposé tomettes soignée

10.105.01 6.64

1.49

13.68

2.13 2.34

.80

1.49

.77

10.14

.25 .35

1.00

1.30

2.62

5.92 .33

.90

voile BA douche Corian

MISE EN JEU

1.15

5.86

cloisons parement de plâtre 1.30 plaques de.97

1.34

1.67

.31 .33

3.15

.15

.96

MISE EN JEU MISE EN JEU

.90

4.68

1.00

6.33

2.62

déposé tomettes soignée

ragréage et résine fines de béton

conservées et protégées

.77

10.94

10.14

.31 .33

1.00 5.92

.70

17.88 4.69

17.85

pierre conservée

17.85

1.00 .94

.73

remplissage de niche .40

1.36

13.68

7.77

5.16

.99

4.10

remplissage de niche

curage carrelage

voile BA douche Corian .25 .40

Cloisons - plan additions

.93

.24

3.15

7.80

cloisons plaques de parement de plâtre

.92

5.66

1.00

terazzo ragréage à protégeret résine fines de béton ragréage et résine fines de béton

13.97

2.70

2.57

déposé tomettes soignée

.96

MISE EN JEU

5.55

1.17

17.85

8.92

3.15

17.85

pierreprotégées conservée parefeuilles

2.47

17.85

5.60

5.93

2.12

DM

.99

4.10

Cloisons - plan additions

13.85

3.69

13.687.80

WM

.88

curage pierre ragréage et repose tomettes

13.68 13.68

.61

2.62

2.57

13.68

2.90

2.70 6.50

2.13

.72

.10 .04

3.69

.90 CHAUFFE-EAU

4.00

curage pierre vées et protégées

curage scalier terazzo à protéger

.77

10.14

13.68

déposé tomettes soignée déposé tomettes soignée

erazzo à protéger

1.00

CHAUFFE-EAU

5.92

17.85

.94

remplissage de niche

douche Corian

1.13

3.15

4.00

.73

voile BA .31 .33

7.80

3.59

cloisons plaques de parement de plâtre

.30

.96

MISE EN JEU 1.00

10.35

Cloisons - plan additions

déposé tomettes soignée

curage pierre ragréage et résine fines de béton

17.85

1.73

2.57

pierre conservée

1.03

10.35

2.47

17.85

17.85

2.61

ground floor plan

.99

4.10

13.68

dall finit

2.65

10.35 3.69

CHAUFFE-EAU

4.00

13.68

ragréage + polymère 6mm + résine polurethane 3-4mm

.24

1.30

3.27

d f esc rési

.30

2.63

4.76

.37 1.30

ragréage + polymère 6mm + résine polurethane 3-4mm

.75

3.22

3.57

1.13

pared

1.80

2.40

1.30

5.97

5.69 6.18

1.30

1.40

1.30

3.21

.45

1.73

1.57

.71

2.32 4.22 1.30

1.57

5.30

.75 1.57 5.30 2.32

4.22

1.30 5.56

3.83

.37

1.05

1.20

.25

10.76

1.75

1.03 .34

1.30

.37

.29 .30

1.94 .69

1.73

1.30 1.24

.90

.75 2.32

1.30

1.41

1.94 4.22

1.73

1.22

1.09

.90

1.94

.34

6.98 6.93

2.20

.93

.97 1.09 2.20 .46 .90

1.41

1.46

6.98

1.03

4.62 1.02 .29

4.12 1.02

.75

.97

1.21 1.41

1.20 4.62

.82 1.16

1.73

.72

1.21 1.93 .97

1.46

2.20

.90

4.40

1.09 3.53

1.20

1.21

4.40

5.00 5.00

.83

2.19

.72

1.14 4.63

1.46

.83

.34

13.71

17.28

.29

1.75

.15

2.52

.75

3.35 2.76

4.74

1.75

1.02

1.14

.75

3.85

1.20

1.03

1.30 1.05

.96

.80 .29

3.35 .25

3.85

4.74

3.35 4.74

.25

1.70

3.67 3.67

4.62

1.30 1.05

3.05

1.14 .05

2.26

5.96

1.13 3.05

.05

1.30 5.96 .96

1.30

1.02

1.14 1.13

3.40

.96 7.56

3.40

1.40

.25

.25 .25

1.70

3.05 5.96

2.26

1.30 7.86

7.56

.79

1.30

.37

1.71 3.40

1.71

6.66

1.70

1.43 .15

1.43

1.71

.15

.15

.15

.90 6.66

.90

.79

1.30

6.92

4.03

4.12 1.30

.75

.30 .04

.74 .17 1.41

.17

6.92

4.03 1.16

1.41

1.16

1.93

6.66

1.30

.80 .29

1.14

.30 .04 .10

2.76

.74

4.91 4.91

1.41

6.92

4.03

.29

.68

1.40

.80

4.12

6.73

.68 2.50 6.73

1.93

6.73

2.26

.58

7.86 2.26

.58

2.50

.17

.08

2.26

.68

.93

2.50 .08 1.06

.93

.08 1.06

.37

7.86

17.28

2.12

13.71

3.57

10.63

dé

pare déposedouche soignéeCorian parfeuilles p

6.69

.37

7.86

.93

1.06

.58

7.86

6.93 6.93

2.12

2.69

curage pierre

dé

démolition podium

6.69

.37

4.91

.90 .69

.90

4.12 .69

4.12 6.93

2.76

4.62 4.62

.90 .69

VNC 6.69

17.32

1.26

18.46

curage carrelage

1.20

3.08 1.86

.70

1.29

p mar

douche Corian

3.01

3.57

.38

d

curage parefeuilles démolition podium

3.08

13.71

.96

2.25

1.27

3.22

1.91

1.18

m

recharge BA et ragréage résine fines de beton curage carrelage

coff

17.63

.80

c repo d

curage céramique

.47 .65

1.18

17.28

.90

13.71 17.63

1.28

.07

.53

1.74

.80

13.97

1.91

3.27

2.65

1.91

.10

3.91

.10

6.32

.20

4.26

1.28

1.74 3.91

.80

dalles de pierre de fontvielle

.42

.65

2.12

1.46

1.74

.80

.12

r pare

3.08

17.58 .90 1.83

.96 .21

3.03

.39

.20

1.73

4.12

.20

3.91

1.73

1.16

1.30

13.97

.93

13.71

p

rem

curage carrelage nettoyage - isolation 4 cm polyurethane et étanchéité de pierre de fontvielle sur plots démolitiondalles plancher recharge BA et ragréage démolition podium curage céramique résine fines de beton

.65

.65

2.54

.12

13.97

dalles de pierre de fontvielle

1.18

2.53

17.63 1.46

.21 .22

13.7817.58 10.43

1.73

.82

1.77

.60

nettoyage - isolation 4 cm polyurethane et étanchéité dalles de pierre de fontvielle sur plots

.40

.80

.21

2.54 1.93 1.23

1.30

4.31

4.31

.10 .22

13.97

2.53

1.69

6.92

10.50 17.32

.80

1.23

.96

13.71

10.11

2.14

17.58 17.58 1.36

.65

17.58 1.30

1.16

13.71

.17

6.77

10.35

seuil en pierre d'estaillades

5.29

6.92

1.36

1.18

1.08

17.32

curage céramique

démolition plancher création rejingot BA

2.03

4.31

.20

.74

13.78 10.43 13.97 1.45 17.07 .93

2.04 .71

1.43 17.07 13.78 17.32 .20 13.71 17.32.71

2.95

2.95

1.24

13.97

1.56 13.78

.09

1.30

1.43

17.22

3.91

6.57

1.39 3.55 6.57

1.87

17.22

2.42

2.02

4.34

2.92

.60

3.55

1.49

1.55

.23

5.06

1.09

dalles BA résine fines de béton

3.22

.23

17.88

3.22

5.67

13.68

2.02

.30

escalier BA résine fines de béton

17.22

2.54

2.72

13.85 3.63

3.63

1.16

.61 3.04

1.08

10.08 17.88

.60

.05

démolition plancher

4.77

2.12

13.97 17.07

17.32

1.03

1.28

8.30

dalles BA résine fines de béton

13.68 2.15 6.35

2.41 3.24

17.85

1.56

r création rejingot BA

13.97

.12

1.19 1.30

2.41

1.34

17.85

3.55

curage parefeuilles pierre à poncer et proteger

2.92

repo

2.53

2.55

1.47

3.04

4.68

1.98

2.02

1.36

1.43

7.86

1.88

4.21

.28

2.15

10.10

.23

13.85 .97

1.43

1.39

4.85

.52

.26

.89

.50

13.68

.88

1.39

17.88

13.68

1.28

.35

.88

1.08

.91

2.15

6.44 6.35 .86

1.33 6.44 .86

10.10 6.26

1.93

18.14

1.17

13.68

5.00

4.21

tomettes conservées et protégées escalier BA résine fines de béton démolition plancher 5.50

1.26

18.14

6.51

1.17

.45

.74 1.39

6.31

démolition plancher

2.14

2.12

2.72

3.63

2.41

5.00

curage parefeuilles

10.76

6.44

2.02 3.93 .88

.86

10.94

.77

1.58

17.8517.85 1.23

1.30 1.78

17.85

pierre à poncer et proteger

3.22

2.62

.59

1.49

13.71

.93

1.17

17.58

3.91

1.73

7.86

4.62

2.61

2.61

1.11

démolition plancher parefeuilles protégées

5.50

1.91

3.27

10.35

parefeuilles protégées

tomettes conservées et protégées

1.01

3.27

2.65

4.21 1.11

.26

1.56

.24

10.76

13.71

.05

1.31

10.63

1.30 1.95

6.51

1.01

.91

6.31

.77

13.68

10.10

4.96

15.96

13.71

17.85

5.00

VNC

2.85 3.01 .85

18.14

13.68

4.55

2.94

17.88

r

13.68

1.17

13.68

.90

4.96

8.30

10.50

1.83

17.88

3.04

2.85 .85 1.26

.05

1.00

10.14

1.00

dépose soignée navettes terazzo à protéger

curage sol souple

5.50

.99

3.59

17.85

3.59

17.85

1.23

13.71 13.71

3.15

.90

5.93

1.64

VNC

3.01

13.71

DM

17.88

5.60

2.46

1.74 2.88

10.10

WM

5.66

démolition plancher curage carrelage repose dalles carreaux céramiques

.47

curage parefeuilles

.99

10.63

.88

terazzo à protéger

1.23

2.82

7.80 17.85

6.50

1.17

2.28

1.10

.90

13.71

5.16

.83

2.47

4.69

dépose soignée navettes curage sol souple

1.01

1.81

.69

1.22

1.22

.99

17.85

2.12

2.67

17.85

5.93

2.46

.72

1.59

2.46

.20

2.82

1.74

1.13

4.05

1.49

1.49

.42

13.71

13.71

2.85 .85

.53

1.28

.66

1.58

4.05

1.49

4.05 .25 .35

.35

1.49 2.70

10.50

1.28

1.91

1.60

CHAUFFE-EAU

13.97

.90

.72

2.88

10.10

.37

.99

1.54

10.43 13.71 .90

.69

.42

13.71

.61

parefeuilles protégées carreaux et protégées repose conservées dalles carreaux céramiques démolition plancher curage carrelage

.47

CHAUFFE-EAU

13.71

13.97 .90

.80

curage carrelage

1.54 1.81

5.16

2.34

1.74

.80 13.71

1.16

4.34

seuil en pierre d'estaillades

1.31

10.43 10.43 13.78

1.23

2.82 2.34

.70

13.68

1.00

curage sol souple

parefeuilles protégées escalier terazzo à protéger

.90

3.15

.88 2.08

curage et carrelage carreaux conservées protégées curage pierre

1.22

.80 .20

3.86

1.30

démolition plancher

.36

1.16

.36

1.60

3.27

.25 .35

10.63

1.31

1.28

.80 .97 .72

1.49

.37

10.08

13.68

démolition plancher

.53

13.78

13.70 13.71

MISE EN JEU

.23 .23

.69

1.74

5.67

8.30

.36

13.68

tomettes conservées et protégées ragréage et résine fines de béton

2.65

.36 .42

2.88

1.30

2.93

3.86

6.26

10.76

.35

1.26

10.35

.37

.23 .23

13.70

10.08

pierre à poncer et proteger

10.63 10.76

MISE EN JEU 1.30

.97

1.74

1.49

ragréage et résine fines de béton tomettes conservées et protégées

1.26

3.27

5.67

10.10

1.30

13.71

.25 .35

6.64

démolition plancher

pierre à poncer et proteger

.34

déposé carreaux céramique soignée

6.26

8.30

déposé carreaux céramique soignée

10.63

.34

10.63

.15

1.19 MISE EN JEU 4.34 MISE EN JEU

10.10

2.93

déposé tomettes soignée

3.01

1.91

1.28

10.11

13.68

5.01

pierre à poncer et proteger

10.63

1.60

3.86

remplissage de niche escalier terazzo à protéger démolition plancher curage carrelage parefeuilles protégées

CHAUFFE-EAU

.40

1.36

.90

13.97

2.70

10.11

1.31

.46

10.08

1.30

4.86

13.68

10.10 .33

.31 .33

10.08 5.67

curage parquet

MISE EN JEU

déposé tomettes soignée pierre à poncer et proteger

1.16 1.34

1.19

3.35

.46 .36

6.64

13.97 13.97

.25 .40

.61

.94

2.47

DM

17.85

5.60 5.93

.94 1.00

17.85

.73

curage pierre

1.54

10.43

13.85

1.15

1.34

.29

.48

1.67 1.30

13.68

MISE EN JEU

5.01

.29

6.26

curage parquet

3.01 10.76

1.26

.48

4.34

5.67

13.70

10.10

1.30

tomettes conservées et protégées

10.43

10.63

8.30

.45

6.26

.34

.33

curage

.45

4.99

10.10

déposé carreaux céramique soignée

10.11

.15

pierre à poncer et proteger

4.34

4.68

.46

10.08 10.10

pierre à poncer et proteger

2.13

13.78 13.85

MISE EN JEU .15

2.93 6.33

4.86

10.10

terazzo à protéger

MISE EN JEU

1.15

6.33

.42

.80

5.86

10.94

6.64

.73

ragréage et repose tomettes dépose soignée navettes

2.34

1.67

.15

13.68

terazzo à protéger curage

2.02

.45

.45

curage parquet

10.10

13.68

.92

5.01

.40

2.13 1.36

.25 .40

5.86 .97

1.30

.93

.24

10.43

1.47

.15

10.10

MISE EN JEU

.77

déposé tomettes soignée .42

10.43 2.04

.15

13.68

1.30

ragréage et résine fines de béton

3.01

2.02

carreaux conservées et protégées

.48

10.94

5.66

.33

4.10

remplissage de niche

pierre conservée

1.34

6.33

3.35

1.47

5.67 4.99

déposé tomettes soignée

escalier terazzo à protéger 4.11

2.04

10.10

6.26

pierre à poncer et proteger

1.00 5.92

10.43

4.34

10.10 10.10

3.15

curage carrelage

.92

.93

.24

.29

.45

10.10

.45

4.99

.15

pierre à poncer et proteger

curage parquet

1.00

carreaux conservées et protégées

13.97

douche Corian

.99

8.92

WM

5.55

MISE EN JEU

.77

.96

ragréage et résine fines de béton déposé tomettes soignée

4.68

5.93

1.00

MISE EN JEU

4.11

10.43

5.66

10.14

5.66 5.92

terazzo à protéger curage escalier terazzo à protéger

.90

3.15

.90

10.10

curage parquet

.96

13.68 13.68

1.00

.88 4.10

17.85

ragréage et repose tomettes pierre conservée parefeuillesde protégées remplissage niche

voile BA

13.85

7.80

13.68

ragréage et résine fines de béton

.42

.61

curage pierre

cloisons plaques de parement de plâtre

.31 .33

2.02

6.50

2.13

Cloisons - plan additions

13.68

2.70

10.94

déposé tomettes soignée

1.47

.77

3.59

17.85

.94

remplissage de niche

douche Corian

3.69

1.00

10.14

2.62

2.04

5.93

7.80

3.69

.90

2.57

.99

1.06

10.43

10.47

5.66

10.94

CHAUFFE-EAU

4.00

curage pierre carreaux conservées et protégées

10.10 2.44

.90

.90

4.11

.99

1.06

2.51

2.32

1.97

10.14

10.47

10.48

13.68

déposé tomettes soignée déposé tomettes soignée

2.57

2.32

1.97

.90

curage sol souple

escalier terazzo à protéger

CHAUFFE-EAU

5.92

ragréage et résine fines de béton

10.94

2.44

curage carrelage

3.15

4.00

curage pierre

5.93

2.51

2.62

10.48

10.14

17.85

1.73

5.66

curage sol souple curage parquet

.73

voile BA

2.47

17.85

.72

.10

cloisons plaques de parement de plâtre

.31 .33

1.00

.90

curage carrelage

project

Cloisons - plan additions .96

MISE EN JEU

.99

4.10

17.85

pierre conservée

1.02

2.76

13.68

déposé tomettes soignée

10.47

.99

1.06

.90

13.68

1.73

2.32

1.97

2.44

2.61

additions

2.51

2.57

demolitions

10.14

4.00

curage pierre

10.48

curage sol souple

.75

CHAUFFE-EAU

curage carrelage

.66

.94

.19

.19

.62

.62

.66

.94

ch

da rés


NYMPHAEUM staged in Genazzano

2nd semester project, Politecnico di Milano concept design, March-July 2022 supervisor: arch. Aleksa Korolija Aleksa, PhD collaboration: Adrianna Szmidt a Nymphaeum

in ancient Greece and Rome, a shrine dedicated to the nymphs, associated with springs, streams and rivers; often a rural cave with no architectural adornment or a grove with springs, later also special well structures. the Nymphaeum in Genazzano, the city in the Region of Lazio, Italy, an ancient building that was allegedly designed by famous Renaissance architect Donato Bramante for Cardinal Pompeo Colonna at the beginning of the 16th century. The task was to propose our intervention to the site of the slightly neglected Renaissance structure of Nymphaeum located close to the historical city centre of a small Italian town. Even though the original function of the building is unclear, some researchers argue that it was hosting theatrical performances for the Colonna family. We took this idea and decided to bring back this function to the place. We decided to grant new access to the site through the winding path framing the views. Along the path, hidden in the hill, there is located a water cellar referring to the tradition of mineral water springs of Aqua Santa in the area. new connection to Nymphaeum established in Genazzano

CONCEPT EXPLANATION

scene 1: framing the views scene 3: theatre resettlement

scene 2: mineral water spring reinterpretation

My role in this project was developing the concept and its execution together with my groupmate. I prepared the CAD file for the CNC machine to cut the terrain and our intervention for the model, which we assembled collectively. I also prepared the model of the water cellar by hand. Then during the preparation of final visuals, I was responsible individually for the diagrams explaining the idea, site plan and floorplans as well as the perspective views of the project along with my groupmate.


scene 1: framing the views

topography framing objet trouvé the path's shape is guided by many components of the setting which also enclose and differentiate the views along the way through the valley

closing the valley the path is the closure of the valley, visually and geometrically encompassing the topographical relief through the bridge diminishing in the terrain

scene 2: mineral water spring reinterpretation

Nymphaeum water cellar sunken in the topography water cellar opens out to the site’s surroundings, generating continuity in the space, forming a new hill in a place already surrounded by many

floorplan staircase pillars water combining simple forms together, the space is being treated like a sculpture, all parts of the building form an indivisible structure

floor plan 0

2,5

5

7,5

10 12,5m

scene 3: theatre resettlement

form carved out of concrete fragmentary amphitheatre is slightly skewed within the primal form, its symmetry is distorted by the fixed position of the central Nymphaeum axis

grand finale the pathway finds its closure reaching the final destination of the Nymphaeum either through the staircase or the sloped terrain

site plan 0 2,5 5 7,5 10 12,5m


front view 0

2,5

5

7,5

10 12,5m

section A-A 0

2,5

5

7,5

10 12,5m

section B-B 0

2,5

5

7,5

10 12,5m

7,5

10 12,5m

section 0

2,5

5


h a n d SKETCHES


ANNA KOLATOR c u r r i c u l u m v i t a e I am looking for an internship from February 2023.

Hello! My name is Anna. I am 25 year old student from Poland. I strongly believe that a good design should not only be beautiful but also functional, affordable, and particularly sustainable. I have also studied Management to better understand project processes and organisation. I enjoy acquiring new skills and broadening my knowledge. I think I learn the most while working with other people and exchanging experiences with them. I get really involved in any topic I find interesting (and I must admit I am curious about everything). I am mainly interested in science and psychology books. I also appreciate deepening my knowledge in the field of environmental sustainability. I appreciate yoga practice and cooking (especially baking) in my free time.

EXPERIENCE

04/2021 - 07/2021 ECDM, Paris, France: architectural intern • architectural survey, renovation project of a XVII century mansion, concept and building phase design drawings development 05/2020 - 09/2020 MAKA STUDIO, Gdansk, Poland: junior architect • architectural survey, concept and building phase design, coordination and contact with three subcontractors, clients and the city office 04/2018 - 01/2020 students' scientific association Hulaj Urban Squad, GUT, Poland: research on innnovative means of transport in the city • more than five events organisation and supervision, urban mobility infrastructure study, research, contact with sponsors 07/2018 ITO Design, Gdansk, Poland: architectural intern • architectural survey (inventories), building phase design, graphic design

EDUCATION

09/2021 - now Politecnico di Milano, Italy: Architecture and Urban Design, MArch

SKILLS responsibility organisation attention to detil creativity team work communication flexibility SOFTWARE drafting modelling BIM rendering graphics composition others LANGUAGES Polish English French

09/2020 - 04/2021 European Business School, Paris, France: International Business Management (Erasmus) 08/2018 - 01/2019 VIA University College, Horsens, Denmark: Architecture Technology and Construction Management (Erasmus) AutoCad Rhino+Grasshopper / Sketchup Revit / Archicad Lumion / Twinmotion Photoshop / Illustrator Indesign Metashape / Microsoft Office

10/2017 - now Gdansk University of Technology, Poland: Bachelor in Management 10/2016 - 01/2020 Gdansk University of Technology, Poland: Architecture engineering studies, Rector Scholarship for the students with the highest average grade graduated with distinction

ACHIEVEMENTS

native C1, advanced (IELTS 8.0) B1, intermediate

02/2021 Finalist mention "Detroit Waterfront District competition by YAC", publication in "Architektura&Biznes", group work 01/2020 Second prize "The Rhythm of Light - house based on Bauhaus principles", individual work

PERSONAL INFO date of birth email linked.in address

27/06/1997 kolator.ania@gmail.com /in/anna-kolator Giancarlo Sismondi 50 20133 Milano

06/2019 Honourable mention "Development of former farmer collective in Cedry Wielkie", group work 09/2018 Second prize according to external judge panel during the evaluation of projects in VIA University College, Horsens, group work I hereby give consent for my personal data included in my application to be processed for the purposes of the recruitment process under the European Parliament's and Council of the European Union Regulation on the Protection of Natural Persons as of 27 April 2016, with regard to the processing of personal data and on the free movement of such data, and repealing Directive 95/46/EC


REFERENCE l et ters

Gdańsk University of Technology 11/12 Narutowicza Street Gdańsk, Poland dziekan-arch@pg.edu.pl +48 (58) 347 23 15

Gdansk, 20.01.2021

To Whom it May Concern: I strongly recommend Anna Kolator as a candidate for Architecture Master Program student in Your School. My name is Agnieszka Błażko and I am a Doctor of Architecture Engineering in Department of Residential Architecture, Faculty of Architecture, Gdansk University of Technology. I have encountered many architecture students in my academic career. Anna Kolator is definitely one that positively stands out. I have been supervisor professor of Anna’s final project on which she had been working for two semesters in 2019. The design process was extremely complex – starting from concept idea to final technical drawings and details. During that year I had a chance to get to know both Anna’s personality traits and also her approach to work and design. From the beginning she was focused on creating the best concept design possible. She was open to my comments and remarks but also ready to stand up for and justify her ideas. I have noted that she is very diligent and scrupulous. She has great work organisation skills and therefore she had no problems meeting the deadlines while developing the project in a thoughtful and methodical way. I was also part of the committee on her final engineering exam covering all knowledge gained during her studies. She answered all questions correctly and got the highest grade possible, which proves her dedication and genuine interest in every aspect of Architecture. Anna is a creative, passionate and talented person. She is extremely ambitious while still maintaining a positive attitude. It was a pleasure to work with her and I think she will be a great addition to Your school. Sincerely,

Agnieszka Błażko, PhD Architecture Department of Residential Architecture, Faculty of Architecture Gdansk University of Technology ablazko@pg.edu.pl


Anna Kolator

22.01.2021 Gdańsk

E: kolator.ania@gmail.com A: ul. Osiedle Marynarzy 19, 82-300 Elbląg

LETTER of RECOMMENDATION

MAKA STUDIO WIKTOR KURC

NIP 5881985486 REGON 193047196

T: 501 537 3 53 E: biuro@maka.studio W: maka.studio

a d r e s: 84-200 Wejherowo Borowiacka 23 lok B

k o r e s p o n d e n c j a: 80-201 Gdańsk Kolejowa 6a/1

To Whom it May Concern: Anna Kolator was working in my architecture office MAKA Studio in 2020. I am Wiktor Kurc, an architect. I run with Aleksandra Kurc MAKA Studio based in Gdansk. Anna was hired in our office as Architect Assistant. While working with us, she was responsible for developing concept designs for clients, preparing technical documentation and graphic work. Anna proved herself to be a very hardworking and organised person. She is eager to learn and develop new skills. She performed well in concept design. Anna is characterized by good aesthetic sense and she is full of new ideas. She did not give up searching for better and more efficient solutions. While dealing with technical documentation she showed great attention to detail and neatness. Anna was always deeply engaged in the project we were currently working on. She worked extra hours to meet the deadlines and deliver the best design possible. She has exceptional cooperation and teamwork skills but also deals well with organising her responsibilities and planning work. Thus she is a very reliable and conscientious employee. Moreover, Anna has a nice personality and she established friendly relationships with her co-workers. She also easily communicated with our clients and collaborators. I can surely describe Anna Kolator as a dedicated young architect and I recommend her without hesitation. Sincerely,

arch. Wiktor Kurc MAKA STUDIO​– www.maka.studio Kolejowa 6A, 80-201 Gdansk, Poland biuro@maka.studio

T1​ :​501 537 353 :​500 073 746 T2​ `

E​ :​biuro@maka.studio :​​www.maka.studio S​

In​ :​​ instagram.com/makastudio :​​ facebook.com/makastudio Fb​


Paris on Jully 24, 2021

Lettre de recommandation

Sir or Madam,

Anna Kolator worked in our architectural firm as a project assistant intern for a period from April 19 to July 30, 2021. Anna has worked on several assignments in differents phases of study. First of all, she realized a study in order to obtain an administrative authorization for the transformation of a private hotel in Arles. She designed all the graphic pieces and structured the file. Then she worked within a project team on a competition of urbanism and housing in Marseille. In the framework of this competition, she worked on the mass plan and the urban schemes. Finally Anna realized the sales plans of a residential operation of 120 housings in StJacques de la Lande His time at the agency allowed us to appreciate his professional abilities and his sense of teamwork. Finally, her benevolence and her open-mindedness suggest a bright future as an architect, so we recommend this young architect. Please accept, Gentlemen, the expression of my best regards.

Emmanuel Combarel


Anna Kolator • Milano, Italy • October 2022


Turn static files into dynamic content formats.

Create a flipbook
Portfolio by Anna Kolator by Anna Kolator - Issuu