Skip to main content

Portfolio2020_KoDi

Page 1

POR TFO L I O

KONSTANTINOS DIMOPOULOS

Architecture S u s t a i n a b i l i t y C o m p u t a t i o n a l

MArch Eng | MSc ASD


CONTENTS/00

CONTENTS

CHAPTER 00 | DATA Curriculum Vitae ................................................................................................................................................. p. 4-5 Introduction ......................................................................................................................................................... p. 7

CHAPTER 01 | COMPLETED PROJECTS BNP | Workplace Refurbishment ................................................................................................................. p. 10-17 Kings Mews | Residential Development .................................................................................................... p. 18-23 Muirfield | Luxurious Nursing Home ........................................................................................................... p. 24-27

CHAPTER 02 | AD. SUSTAINABLE DESIGN Stow | Sustainability and Spatial Investigations ..................................................................................... p. 30-31 Appleton Tower | Redesigned for Dubai’s Climate ................................................................................. p. 32-35 Galashiels | Welding Space ............................................................................................................................ p. 36-39

CHAPTER 03 | COMPUTATIONAL DESIGN Samothracean Wall | Cultural Research Center ..................................................................................... p. 42-47 Assodivers | Offices for Maritime Company ........................................................................................... p. 48-49

CHAPTER 04 | ONGOING PROJECTS Twickenham | Residential-Commercial Development ......................................................................... p. 52-55

PORTFOLIO | 3


KONSTANTINOS DIMOPOULOS Architect MArch Eng | MSc Advanced Sustainable Design ARB | National Technical Chamber of Greece

A: 102 Westminster Bridge Road, London, UK, SE1 7XT | C: +44[0]7986836025 E: kostas-dim@hotmail.com | L: Linkedin

EXPERIENCE 02.2018 | current

Architect | Interior Designer | MAA Architects London, England | UK 15-20 Architects & Designers

10.2016 | 01.2018

Role Description_ Organizing client and consultants coordination. Delivering feasibility studies, planning applications and drawing packages for construction. Implementing BIM CAD/3D methodologies throughout the design process. Involved at all RIBA stages and delivering projects in and around London.

Role Description_ Organizing and coordinating BIM 3D modeling processing. Delivering planning applications and drawing packages for construction. Basic Project_ Muirfield Nursing Home | Randolph Hill Group Gullane, Scotland

Basic Project_1 Twickenham Residential Development | 160 Units | Access Storage | Twickenham, London

Refurbishment, Conversion & New build Development Current status: Built | Budget: 6.1M Pounds

New build | Current status: Planning | Budget: 35M Pounds Basic Project_2 Workplace Design | Two Storey | BNP Paribas Real Estate Bank, London Refurbishment | Current status: Built: 1.85M Pounds

Software_ Revit | AutoCAD | Office Suite | Outlook | Adobe Suite 11.2011 | 06.2012 09.2014 | 08.2015

Student Intern | Architectural Assistant | MAS Associates Thessaloniki, Greece 20-25 Architects, Assistants & Structural Engineers

New Build | Current status: Built: N/A

Basic Project_ Energy Saving Upgrading & Energy Production out of Renewable Sources in a School Complex | Owner: Municipality of Thessaloniki | Area: 8360m2

Software_ AecoSim | Microstation 2D/3D | SketchUp | Adobe Suite | Excel

Software_ Rhino | Adobe Suite | AutoCAD | 3Ds Max + Vray

Basic Project_3 Residential Development Seven Units | JTC | Camden, London

4 | PORTFOLIO

Junior Architect | Gilberts Architects Edinburgh, Scotland | UK 10-12 Architects & Technicians


CURRICULUM VITAE/00

SKILLS

CERTIFICATIONS Revit Rhino AutoCAD Microstation SketchUp 3Ds Max

////////// ////////// ////////// ////////// ////////// //////////

IESVE Grasshopper Photoshop Illustrator InDesign Vray

////////// ////////// ////////// ////////// ////////// //////////

EDUCATION 2016

MSc Advanced Sustainable Design [180 ECTS] Merit | 68.5/100 | Edinburgh College of Art [ECA] The University of Edinburgh | Edinburgh, Scotland, UK Advanced Sustainable Design Dissertation_

Sustainability and Nanotechnology: “Is scientific enquiry and technological innovation in nano-materials for building skins based on sustainable principles?” 2013

Master’s in Architecture & Engineering [300 ECTS] Distinction | 8.62/10 | Department of Architecture [AUTH] Aristotle University of Thessaloniki | Thessaloniki, Greece Diploma Design Thesis_

The Samothracean Walls | A multiplex research center | 10/10 Excellent Research Thesis_

Another Interactive | Architecture & Art | 10/10 Excellent

LANGUAGES

09.2019

Microsoft Excel 2016 Intermediate | Royal Borough of Kingston upon Thames | Kingston Adult Education Centre

10.2018

Bentley Aecosim V8i | 3D Architectural Cadventure Ltd | Building Centre

02.2018

Microstation V8i for CAD Users Cadventure Ltd | Building Centre

07.2017

ARB Qualified “Architect” in UK National Council of Architectural Registration Boards (NCARB)

03.2017

Certified as an “Architect Engineer” in Greece Certified as an “Architect Engineer” in Greece

04.2015

Generative Fields Level 1 | Grasshopper Training Course decode fab lab | Official Mcneel Partner in Greece

10.2008

Intermediate Autodesk 3ds Max 2008 Level Certification Infotech Grouр | Official Autodesk Partner in Greece

TRAINING 05.2018 06.2018 03.2019 06.2019 09.2019

City Conversations The Invisible City 2: Soundscape Lecture | Building Centre NLA Annual Lecture 2018 by Amanda Levete CBE Lecture | NLA London’s changing skyline: the future of tall buildings Half Day Conference | NLA International Symposium: Shaping Better Cities Half Day Conference | NLA Designing for a changing climate: toward zero-carbon London | Half Day Conference | NLA

OTHER

Greek Native English Fluent | IELTS 7.0 | C1 Level 03.2015 Spanish | Basic | Inicial B1 Russian | Bilingual | Good Oral Speaking

11.2013 | 08.2014

Infantry Engineer | Mandatory National Service Hellenic Army

09.2005 | Current

EU Driving License

PORTFOLIO | 5


INTRODUCTION/00

The following portfolio is a selected sample of both professional and academic projects showcasing a variety of architectural projects the Architect Konstantinos Dimopoulos has been participated in his career. All drawings presented in this document have been conducted either fully or partly by the legal author and editor.

PORTFOLIO | 7


01

COMPLETED PROJECTS


BNP Workplace Refurbishment desk area

SECTOR

meet/work spaces

B1

meeting pods/rooms

ARCHITECT

hot food kitchen

MAA Architects

CLIENT

central hub

alternative work settings

BNP Paribas Real Estate

circulation

LOCATION London, UK

YEAR

2018 - 2019

AREA Data

BUDGET £1.85M

STAGE 2-6

SOFTWARE

SketchUp | Micorstation | Excel | Adobe Suite

3d floor | proposed

Reconfiguration of existing office space to accomodate flexible working strategy for Real Estate Management Team. The alternative working spaces are now located in a new modern central hub, encouraging social interactions and informal meeting opportunities. 2nd floor | proposed

0. Data 1. Axonometric Diagram | Timber Construction 0

2. Axonometric Diagram | Strategy

3

2

3. Perspective Panorama | Built 4. Timber Structure | Elevation Proposed 5. Timber Structure | Side Elevation | Entrance

1

10 | PORTFOLIO

4

5

6

6. Timber Structure | Side Elevation | Lounge


BNP/Completed Projects/01

PORTFOLIO | 11


Main Lounge Area | Details

1. Main Lounge Area | Plan 5 1

3. Perspective Photo | Built

3

4. Main Lounge Area | Detailed Section 4

2

12 | PORTFOLIO

2. Axonometric Location Diagram

5

5

5. Proposed Signed Off Visuals


BNP/Completed Projects/01

PORTFOLIO | 13


Meeting Rooms | Details

1. Meeting Room | Plan 4

1

2. Axonometric Location Diagram | Meeting

4

3. Perspective Photo | Built | Small Meeting 3

4. Proposed Detailed Layouts 4

4

6

5. Other Details | Floor Finishes Thresholds 6. Perspective Photo | Built | Executive Room

2

14 | PORTFOLIO

5

5


BNP/Completed Projects/01

PORTFOLIO | 15


 Hot Food Kitchens | Details

1. Hot Food Kitchen | Plan 4 1

4

4

2. Axonometric Location Diagram 3. Perspective Photo | Built | Kitchen Second Fl.

3

3

4. Proposed Detailed Layouts 5. Bespoke Timber Screen Detailing 5

2

16 | PORTFOLIO

5


BNP/Completed Projects/01

PORTFOLIO | 17


KINGS MEWS Residential Development SECTOR C1

ARCHITECT MAA Architects

CLIENT JTC

LOCATION

Kings Mews | London | UK

YEAR

2018 - 19

AREA

650 sq.m

BUDGET N/A

STAGE 3 - 5+

SOFTWARE

Microstation 2D/3D | Excel | InDesign

This Design has been prepared to accompany the application for the redevelopment of 10-11 King’s Mews, London, WC1N 2HZ. The site is currently empty, presenting a void along the mews street frontage. The site is flanked on either side by 3 storey private residential properties, generally with basements, either converted from the original mews buildings or new built in a style that follows the essence of the original mews buildings. The proposal is for a three storey (plus basement) residential building to include 7 flats.

0. Data 1

1. Axonometric Diagram | Existing

2

2. Axonometric Diagram | Massing Study 3. Axonometric Diagram | Storey Division 0

3

4

5

4. Axonometric Diagram | Massing Proposed 5. Photo | Perforated Brick | Elevation | Built

18 | PORTFOLIO


KINGS MEWS/Completed Projects/01

PORTFOLIO | 19


Details | Elevations

1. Proposed Street Elevation | DAS Addendum 2. Photo (Professional) | Built 3. Proposed Detail Elevation | Construction

1

4. Proposed Section | Construction 2

20 | PORTFOLIO

3

4


KINGS MEWS/Completed Projects/01

PORTFOLIO | 21


Sections | Details

1. Roof Details Proposed | Construction 1

1

3

4

2. Floor & Party Wall Detail | Construction 6

7

3. Vertical Section | Construction 4. Horizontal Section | Construction 5. Plan Proposed | Construction 6. Photo | Rear Roof light | Built

5 2

22 | PORTFOLIO

8

7. Rear Window & Wall Detail | Construction 8. Rear Roof light Details | Construction


KINGS MEWS/Completed Projects/01

PORTFOLIO | 23


MUIRFIELD Luxurious Nursing Home SECTOR C2

ARCHITECT

Gilberts Architects

CLIENT

Randolph Hill Group

LOCATION

Gullane, Scotland

YEAR

2015 - 2017

AREA

850 sq.m

BUDGET £6.1M

STAGE 3-7

SOFTWARE

Revit | AutoCAD | Adobe Photoshop Excel

Muirfiled nursing care home is located one hour away from the city centre of Edinburgh, at a small town named Gullane in the Scottish East Coast. The area is regarded as a unique place for people that want to live in a more relaxing and vibrant atmosphere, with the property values rising significantly over the last few years due to high demand. The project is divided into three phases, the first one is a demolition of an existing office building next to the old nursing home and the construction of the new nursing care home (diagrams on the right). 0. Data 1. Axonometric 3D BIM Model | Revit | Proposed 0

2. Photos | Demolition Diagrams | Proposed

3

2

3. Demolition | Elevations | Proposed 6

4. Existing | Plans 5. Demolition | Plans | Proposed

4 1

24 | PORTFOLIO

5

6. Photo | Built


MUIRFIELD/Completed Projects/01

PORTFOLIO | 25


3D BIM Model | Sections | Details The second stage is the partial demolition of the exisitng nursing home, and the construction of the rest of the new build care facilities with the plan to retain structural and facing walls of the old building. The planning commission advised the retain of the reusable building blocks of the previous facade as the area is of a historical significance. The 3D BIM model study (below, both pages) conducted to minimize errors during the erection and construction phase in order to maximize coordination and final results. Currently the project has been built and BIM 3D models have been used throughout all RIBA stages. More specifically, all planning amendments and even after built drawing packages were submitted through this model.

0. Data 2

1. Axonometric 3D BIM Model | Revit | Proposed

2 3

0

2. Fire Strategy | Plans | Proposed 3. Typical Roof Detailing

2

6

2

4. Axonometric 3D BIM Model Section | Exterior 5. Axonometric 3D BIM Model Section | Interior

1

26 | PORTFOLIO

4

5

6. Axonometric 3D BIM Model Section | Lobby


MUIRFIELD/Completed Projects/01

PORTFOLIO | 27


02

AD. SUSTAINABLE DESIGN


STOW Sustainability and Spatial Investigations SECTOR

Academic | MSc ASD

ARCHITECT

K. Dimopoulos, B. Murphy, E. Carvajal, E. Polychronidou

CLIENT N/A

LOCATION

Stow, Scottish Borders, UK

YEAR 2015

AREA N/A

BUDGET N/A

STAGE N/A

SOFTWARE

AutoCAD | Illustrator | Photoshop

The project assignment was to propose ideas and strategies for sustainable development at Scottish Borders after the completion of the railway reconnection with the mainland Scotland. The railway is expected to provide massive growth to the area as property values are expected to rise and while more and more people will prefer to live outside the cities and commute to work. The reduce in commute time will play major significant implications as investors and developers will foresee to capitalize from it. Our team focused in Stow a small village with a great natural habitat surrounding it. The main road (A7) is passing through the village and constitutes the one and only connection point to the rest of the country. The proposal was to develop strategic urban development proposal as growth has been considered as irreversible. The prediction in numbers based on data of similar case studies, usable agricultural land, free range livestock, climate change, flooding and architectural optimization were the main topics that determined our proposal.

30 | PORTFOLIO

The University of Edinburgh_MSc Advanced Sustainable Design_Design Methodologies_Infrastructure Networks_Group4_Carvajal Ernesto, Dimopoulos Konstantinos, Murphy Ben, Polychronidou Elina_Transcect

0. Data 1

3

5

1. Urban Plan | Proposed 2. Section | Strategy Timeline | Proposed 3. Utopian Image

0

6

2

4. Sustainability Diagram | Utilization Of Land 5. Existing And Future Transportation

4 7

6. Existing And Proposed Development 7. Proposed and Existing Energy/Waste Diagram


stow /Ad. Sustainable Design/02

PORTFOLIO | 31


APPLETON TOWER Redesigned for Dubai’s Climate SECTOR

Academic | MSc ASD

ARCHITECT

K. Dimopoulos | E. Polychronidou

CLIENT N/A

LOCATION

Edinburgh | Dubai

YEAR 2015

AREA

6370 sq.m

BUDGET N/A

STAGE N/A

SOFTWARE

Rhino | IESVE | Adobe Suite | 3Ds Max

Appleton Tower is a building located in the center of Edinburgh, in George square within The University of Edinburgh campus region. In this project we were given the frame structure of this particular building as initial framework and were asked to redesign & develop a concept that could be applied in different weather conditions and environments around the world. We selected Dubai as our location, due to extreme weather conditions and needs that are far opposite to UK standards. Our basic concept and development was inspired by middle eastern vernacular architectural techniques. Specifically, chimney ventilation systems were selected to cool down the building and mashrabia façade system in south view to protect the building from direct sunlight exposure. Chimneys, were developed in such way that could be transformable in order to adjust volume according to condition changes and building needs. In this way, energy demands were lowered significantly and according to calculations conducted, the spaces are functioning according to passive house standards.

32 | PORTFOLIO

0. Data 1. Axonometric Diagram | Section | Strategy 2

3

2. Existing Appleton Tower | Relocate to Dubai

1

3. Modular Proposal | Dubai Daylight Analysis 6

0

4. Kinetic Chimney Stack Cooling | Warming 5. Mashrabia Wall | South Elevation

4

5

6. Proposed Perspective | Modular Design


APPLETON TOWER/Ad. Sustainable Design/02

PORTFOLIO | 33


Sustainable Design | Strategy Another major element was the design of building components/spaces that had specific dimensions and placed in a way that could provide cavity spaces, protection from direct sunlight and green spaces within the cavities created. In addition, this rooms and spaces were placed above the main plates to create space for natural ventilation during the year.

0. Data

0 1

1

1

3

6

1. Morning | Afternoon | Evening | Simulation 2. Diagrammatic Representation | Plans

2

3. Adaptive Chimney | Summer And Winter 5

7

4. Section Diagram | Summer Strategy 5. Section Detail | Modular Living Space

4 8

6. Direct Sunlight Diagram | Summer Midday 7. Direct Sunlight Diagram | Winter Midday 8. Section Diagram | Winter Strategy

34 | PORTFOLIO


APPLETON TOWER/Ad. Sustainable Design/02

PORTFOLIO | 35


GALASHIELS Welding Space SECTOR

Academic | MSc ASD

ARCHITECT

Konstantinos Dimopoulos

CLIENT N/A

LOCATION

Galashiels, Scotland, UK

YEAR

2015-2016

AREA Data

BUDGET N/A

STAGE

Academic

SOFTWARE

Rhino | Revit | IESVE | 3Ds Max Adobe Illustrator

The proposal is to produce a building that will be used as an education resource to show how traditional methods for construction can be used in connection with modern methods of construction, as well as a café for the Skills Traditional Centre. Therefore, all elements and connections will be left visible where possible to allow for visual learning. Furthermore, many different types of material and methods will be used again to provide a visual learning experience. As a result of traditional building material being used the building will have a vernacular nature, this will be followed with the choice of modern materials where required. The building will be set up in a modular fashion to allow to for easy deconstruction and reconstruction (diagrams at the page across). Also the workshop area will allow for pre-construction on site. The aim of this project is to provide a remedy to the lack of traditional skilled talent in the Scottish Borders with a training center. As well as providing services to increase unemployment and improve the energy efficiency.

36 | PORTFOLIO

0. Data 1. Axonometric Model Section | Building Skin 2

4

1

2. Proposed Perspective | Visual 3. Adaptability | (De)Construction Processing

0

4. Proposed Plan 5 3

5. Proposed Section | Summer Strategy Diagram 6. Proposed Section | Winter Strategy Diagram

6


GALASHIELS/Ad. Sustainable Design/02

PORTFOLIO | 37


Sustainability Simulations | IES

A. North Facade | Type 2 Local Shade

B. North Facade | Type 3 Local Shade

C. Welding Space | 100% Glazing

D. Welding Space | Steel Frame

1. Simulated Area | Perspective Key Legend 2. External Envelope Results | Analysis 2

4

3

5

3. Internal Facilities Results | Analysis 4. Holistic Approach Simulation | Results 5. Lux Levels Analysis | Welding Space 6. Air Temperature Simulation | Results

1

38 | PORTFOLIO

6

7

7. Air Quality Simulation | CO2 Emission Results


GALASHIELS/Ad. Sustainable Design/02

Air Temperature Toilet Rooms

North Elevation | Lux Levels | Welding Space | 21 September 12:00AM GMT

South Elevation | Lux Levels | Welding Space | 21 September 12:00AM GMT

Air Temperature | 7th January | Welding Space

Air Temperature | Year Summary | Welding Space

Air Temperature | 17th July | Welding Space

C02 Levels | Year Summary | Welding Space

PORTFOLIO | 39


03

COMPUTATIONAL DESIGN


SAMOTHRACEAN WALL Cultural Research Center SECTOR

Academic | Design Thesis | MArch Eng

ARCHITECT

Konstantinos Dimopoulos

CLIENT N/A

LOCATION

Ancient Zone, Evros, Greece

YEAR

2012-2013

AREA

33140 sq.m

BUDGET N/A

STAGE N/A

SOFTWARE

Rhino + Grasshopper | 3Ds Max | Adobe Suite | Python

Homer refers to Samothrace describing Poseidon sitting on the top of its highest mountain watching the war across the sea between Trojans and Greeks. The “Great Gods” were worshipped widely at Kaberia Mysteries. The place of worship was at the North side of the island. In this particular place, according to Herodotus the first Greek settlers from Lesvos and/or Asia established. Very soon, after the establishment the city started to colonize the south coastline of Thrace, creating a vast number of colonies around the modern city of Alexandroupoli. Those cities are commonly known as the “Samothracean Walls” of Herodotus. Regarding the Dissertation Thesis, the idea was to create a cultural space next to the ancient city of Zone in the area of Maroneia, in Thrace. The waterfront of Thrace was the location were the colonies of Samothrace established, whereas 12 major city state colonies thrived. The proposal is a museum and a research facility center for archaeologists and scientists. It is an area of Greek mainland with great archaeological sites but with no museums or research center facilities.

42 | PORTFOLIO

0. Data 1. Existing Site | Accessibility Diagrammatic Analysis | Computational Methodology

1 0

2

2. Perspective Illustration


SAMOTHRACEAN WALLS/Computational Design/03

PORTFOLIO | 43


Morphogenetic Process

The analysis starts with the existing space of the ancient city, where dynamic interactions between the ancient buildings and their use is being interpolated into the coding where various diagrammatic morphologies are being born.

0. Data 1. Axonometric Diagram | Morphogenesis 1

2

2. Existing Site | Spatial Investigation and Interactions Analysis

3

3. Morphogenetic Process | Detailing Patterns 4. Spatial Investigations Vertical Results 5. Spatial Investigations Horizontal Results 0

44 | PORTFOLIO

4

5

6

6. Spatial Investigations Combined Results


SAMOTHRACEAN WALLS/Computational Design/03

PORTFOLIO | 45


Drawings | GF Plan | Sections

1. Axonometric Diagram | Morphogenesis | Final 3

4

2

2. Proposed Plan | Spatial Program 3. Morphogenetic Process | Detailing Patterns 4. Perspective Illustration | SW Entrance

1

5. Section B-B | Proposed 6. Perspective Illustration | NE Entrance 5

46 | PORTFOLIO

6


SAMOTHRACEAN WALLS/Computational Design/03

PORTFOLIO | 47


ASSODIVERS Offices for Maritime Company SECTOR B1

ARCHITECT

MAS Makrides Associates

CLIENT

Assodivers | Private

LOCATION

Piraeus, Greece

YEAR 2015

AREA

6135 sqm

BUDGET N/A

STAGE

Competition

SOFTWARE

Rhino + Grasshopper | 3Ds Max + Vray Adobe Suite | Rhino + Ladybug

An international maritime company assigned a private competition to the biggest and most respected architectural firms in Greece, to propose ideas for their new offices in Pireaus, Greece. MAS_Makridis Associates, selected to be one of these firms. The proposed office building is designed according to the planning restrictions and regulations of the specific area asked. The idea was to create a vibrant, sustainable working space that would also resemble as an icon for the future and the growth of the company 0. Data 1

1. Massing Processing | Concept Diagrams 3

0

2. Axonometric 3D Model | Elevations

5

3. Sustainability Analysis | Honeybee | Ladybug

2

4. Axonometric 3D Model | Lighting Design 5. Perspective Illustrations | Visuals | Exterior 4

48 | PORTFOLIO

6

5

6. Perspective Illustration | Visual | Interior


ASSODIVERS/Computational Design/03

PORTFOLIO | 49


04

ONGOING PROJECTS


TWICKENHAM

OPPORTUNITIES Site Analysis

Residential - Commercial Development

• VARSIT SIT S IT TY DRIV VE ESTA STATE STATE E

SECTOR

DWELLINGS WITH SOUTH FACING ASPECT

•

B1 | B8 | C3

•

MAA Architects

LOCATION YEAR 2018 +

AREA

12000 sq.m B1 & B8 + 160 Units

BUDGET £35M

STAGE 1-3

SOFTWARE

Microstation 2D/3D | SketchUp | Excel Adobe Suite

NEW RESIDENTIAL ADJACENT

centre

TO EXISTING RESIDENTIAL

EXISTING

•

Provide central green core which residential accommodation looks onto

SITE ACCESS DEDICATED TO

IMPROVED OUTLOOK FOR

RESIDENTIAL

EXISTING RESIDENTIAL

•

Improve outlook for existing residential neighbours

NEIGHBOURS

•

WHITTON BROOK

Give site an active commercial frontage to Rugby Road

PROVIDES BUFFER TO

CENTRAL

NEW BUILDINGS

GREEN CORE

•

Provide new access to site to enable dedicated entrances for residential and commercial uses

IMPROVED PUBLIC

•

REALM &

Improve public realm and biodiversity along Whitton Brook

BIODIVERSITY ALONG WHITTON

•

BROOK

Whitton Brook landscaped area provides buffer to new buildings

•

ACTIVE

We are working on a number of PRS schemes for Precis Holdings on their Access Self Storage sites. The concept is to retain the self storage on site in basement levels with PRS and Serviced Offices above. This scheme in Twickenham is for 10,000sqm self storage, 2,000sqm B1 office and 130 PRS apartments with associated communal facilities.

Re-locate commercial operations (storage loading bay) adjacent to existing trading

CLIENT

Twickenham, London

Locate new residential accommodation adjacent to existing residential area

ARCHITECT Precis Holdings

Maximize site potential by providing new residential & office accommodation

COMMERCIAL

TWICKENHAM

FRONTAGE TO

STADIUM

Provide dwellings with south facing aspect

TRADING CENTRE

RUGBY ROAD

NEW SITE ACCESS FOR COMMERCIAL

COMMERCIAL RE-LOCATED ADJACENT TO EXISTING TRADING CENTRE

Site Analysis: Opportunities

ACCESS TWICKENHAM

8

0. Data 1. Axonometric Sketch Diagram | Added Space 2. Opportunities Diagram | DAS Addendum

2 0

3. Pespective Proposed | *Visual | 3D Modeling 3

1

52 | PORTFOLIO

*Conducted By Visualizer | 3D Modeling Post Processing By Author


TWICKENHAM/Ongoing Projects /04

PORTFOLIO | 53


Elevations | Unit Layout Typology

1. Axonometric Diagram | Key Legend 2. Proposed North West Elevation | CAD 3

2

3. Proposed South East Elevation | Photoshop 4. Ground Floor Plan | Proposed | Planning 5. Fourth Floor Plan | Key Legend 6. 2B/4P Layout Typologies Study

4 1

54 | PORTFOLIO

5

6

6


TWICKENHAM/Ongoing Projects /04

FINAL DESIGN AMOUNT Typical Core / Flat Layout - Block A / F

The units have been laid out in accordance with LHDG and

Although this is above the 8 no. suggested by the London Plan

NDSS space planning standards. Vast majority of the units

SPG, the fact that the development is providing PRS flats, with

feature an ‘open plan’ approach for shared living. Where

a unit mix of 1 & 2 bedroom units, means that there are naturally

possible, bedrooms have been equally sized to support PRS.

more units per core that a development including 3 bed units.

Every flat has a garden, terrace or a balcony/juliette balcony. It is envisaged that internal finishes will be selected for longevity

The cruciform layout of the access route in block F means that

and ease of maintenance.

each route is accessed by only 3 flats and the distance from

Residential cores allow for 70% dual aspect units with no single

generous and varied, ranging from a minimum of 1100mm up to

aspect units facing directly North. The cores in block A, B, C and

1800mm adjacent to flat entrances. A larger 6x4m lobby area

D are accessed by 6 units or less per floor. Blocks E & F on the

is provided adjacent to the lift and stair, giving the circulation an

third and fourth floors, have 10 & 12 units per core respectively.

overall generous feeling.

lift lobby to flat entrance is minimized. The corridor widths are

Block F-4th Floor Plan

2B / 4P Flat Layout 0 Block A & F

2B / 4P Flat Layout - Block F

ACCESS TWICKENHAM

33

PORTFOLIO | 55


Konstantinos Dimopoulos

Architect MArch Eng | MSc Advanced Sustainable Design ARB | National Technical Chamber of Greece

A: 102 Westminster Bridge Road, London, UK, SE1 7XT | C: +44[0]7986836025 E: kostas-dim@hotmail.com | L: Linkedin


Turn static files into dynamic content formats.

Create a flipbook
Portfolio2020_KoDi by KoDimopoulos - Issuu