Brookings High School Brookings, South Dakota


a


Brookings High School

BEFORE

Brookings High School needed a new kitchen and cafeteria, improved theater, school office and guidance areas and a recognizable front entry. Together these needs presented an opportunity to create an enhanced sense of place for the school. Working with the building committee, a network of gathering and circulation spaces is established to link and highlight key public areas - cafeteria, office, guidance, theater, gymnasium and library.


Brookings High School

Large windows allow natural light to saturate the space.

b


c


Brookings High School

A new entry and commons establish a memorable new image and a clear sense of arrival. The cureved forms are welcoming and contemporary. A substantially more secure environment is created while making the schools’ most important gathering area more accessible, functional, flexible and attractive.

d


e


Brookings High School

BEFORE

Renovated are the existing auditorium, administration and guidance areas. The existing cafeteria becomes a shop and a green room to serve the auditorium.


1

3

1/8" = 1'-0" 1

EAST ELEVATION 1/8" = 1'-0"

1/8" = 1'-0" 3

7.22 METAL WALL PANELS DIVISION 8 - OPENINGS 7.23 FLASHING (CLEAR FINISHED ALUMINUM). MATCH 8.03 DOOR 7.91 EXTERIOR INSULATION AND FINISH SYSTEM 8.04 WINDOW UNIT 8.05 ALUMINUM CURTAIN-WALL DIVISION 8 - OPENINGS 8.03 DOOR DIVISION 9 - FINISHES 8.04 WINDOW UNIT 9.24 3 5/8” STEEL STUDS 16” O.C. 8.05 ALUMINUM CURTAIN-WALL DIVISION 10 - SPECIALTIES DIVISION 9 - FINISHES 10.09 ALUMINUM LETTERING 9.24 3 5/8” STEEL STUDS 16” O.C. 10.44 FLAG POLE

7.14

NORTH ELEVATION 1/8" = 1'-0"

7.22 7.14

8.04

7.22 4.01

8.04

DIVISION 10 -CONDITIONING SPECIALTIES DIVISION 23 - HEATING VENTILATION AND AIR 10.09 ALUMINUM LETTERING 23.02 LOUVER - BY M.C. 10.44 FLAG POLE DIVISION 32 - EXTERIOR IMPROVEMENTS 32.22 RETAINING WALLDIVISION 23 - HEATING VENTILATION AND AIR CONDITIONING 23.02 LOUVER - BY M.C.

4.01 7.14 7.22

DIVISION 32 - EXTERIOR IMPROVEMENTS 32.22 RETAINING WALL

7.14

8.05

GENERAL NOTES

7.22

4.01 32.22

GENERAL NOTE

8.05

7. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS, ELEVATIONS AND DIMENSIONS.

4.01

10. PROVIDE FOR AND VERIFY LOCATION, SIZE, AND QUANTITY OF ALL EQUIPMENT PADS AS SHOWN ON ELECTRICAL AND MECHANICAL DRAWINGS. COORDINATE LOCATIONS WITH ALL PLANS, SECTIONS, AND DETAILS.7. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS, ELEVAT

32.22

10. PROVIDE FOR AND VERIFY LOCATION, SIZE, AND QUANTITY 12. PROTECT ALL EXISTING UTILITIES. SHOWN ON ELECTRICAL AND MECHANICAL DRAWINGS. COORD PLANS, SECTIONS, AND DETAILS. 14. SEE CIVIL, STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION RELEVANT TO DEMOLITION & PATCHING. 12. PROTECT ALL EXISTING UTILITIES. 5.41

2

5.41

SOUTH ELEVATION 1/8" = 1'-0"

16. SEE CIVIL, STRUCTURAL, MECHANICAL, AND ELECTRICAL FOR ADDITIONAL INFORMATION 14. SEE CIVIL, MECHANICAL,ELEVATIONS, AND ELECTRICAL AND COORDINATION. THE CONTRACTOR SHALLSTRUCTURAL, VERIFY ALL DIMENSIONS, AND DR INFORMATION RELEVANT TO DEMOLITION & PATCHING. CONDITIONS.

4.01

16. SEE CIVIL, STRUCTURAL, MECHANICAL, AND ELECTRICAL FO AND COORDINATION. THE CONTRACTOR SHALL VERIFY ALL DIM CONDITIONS.

4.01

SOUTH ELEVATION 2 1/8" = 1'-0"

4

NORTH ELEVATION -2 1/8" = 1'-0"

5

WEST ELEVATION 1/8" = 1'-0"

WEST ELEVATION 1/8" = 1'-0"

8 A5.1

RIBBON ELEVATION 1/8" = 1'-0"

1'-2" 10

8

8

5.17

1'-2" 10"

5.17

10"

3'-6"

A5.1

1'-6"

6'-0" 4'-4"

MAX.

3'-6"

BUILDING SIGN SECTION 1/2" = 1'-0"

10

10"

10"

5.17

1'-6"

8 1/2"

BUILDING SIGN ELEVATION 1/2" = 1'-0"

A5.1

5.17

10.09 4.39 6.13 7.23 9.24 5.09 5.10 5.18

6'-0" 4'-4"

VARIES

10" 3"

3'-6"

BUILDING SIGN ELEVATION 1/2" = 1'-0" 7

10.09

10"

VARIES

4.39 6.13 7.23 9.24 5.09 5.10 5.18

1'-0"

10" 3"

8 1/2"

10.09

10"

5.17 5.10

10.09

1'-0"

7 6

1'-2"

10"

8 1/2" 1'-0"

RIBBON ELEVATION 1/8" = 1'-0"

10" 5.17 5.10

7.23

5'-4"

8 1/2"

6

10" 12'-0" 10'-4"

5.17

10" 3'-6"

8 A5.1

1'-6"

10"

12'-0" 10'-4" 7.23

10"

10" 5.17

5'-4"

5

NORTH ELEVATION -2 1/8" = 1'-0"

1'-0"

4

9

EXT. BENCH ELEVATION 1/2" = 1'-0"

BUILDING SIGN SECTION 1/2" = 1'-0"

9

10

EXT. BENCH SECTION 1/2" = 1'-0"

EXT. BENCH ELEVATION 1/2" = 1'-0"

10

EXT. 1/2"


Brookings High School a b

e d

f The new Main Street transforms a typical high school hallway into an active, dynamic space, promoting interaction of students during the day and the community at other times.

c

Using new floor and ceiling finishes, improved lighting and distinctive“facades�for the theater, gym and library, key public spaces are highlighted and way finding is made intuitive. Tying it all together is a ribbon that shifts height to become a threshold, doorway, counter or seat, as needed.

g


f


Brookings High School

g



Brookings High School