Work Samples 2016-2020 Jang Ock Kim
Jang Ock Kim / Work Samples
BAST: Bay Area Solar Transit-Hub Gaduate Thesis Project / Fall 2019 Faculty: Mark Mueckenheim Site: Docktown Marina, Redwood City, CA
Galveston Dr
nd
ir
Rd
Isla
Seaport Blvd
Seaport Blvd
Ba
Stre Ma ple
eway 101
et
Fre
Ma
ple
Stre
et
Blomquist Street
Fre
eway 101
Site Plan 1/128� = 1’
01
02
This thesis is a proposal for a new zero energy ferry transit-hub in Redwood City. The architecture provides an access point for the people to the bay as well as bringing the South Bay and the broader Bay Area neighborhoods closer through the closely linked ferry services delivered. A highly efficient ferry service would ultimately alleviate the continually worsening Bay Area traffic congestion problem. Sustainability is the main priority for BAST. BAST takes net-zero energy from the grid by harvesting solar energy through the photovoltaic arrays on the building’s roof and using it to operate its electric ferry fleet. The building uses a set of floating pontoon foundations as a solution to the threat of increasing flooding events as well as the sea level rise. 1) 1’ D Steel Tube 2) 8� D Steel Tube 3) 8� Cross Laminated Timber 4) 1’ x 6� Laminated Spruce 5) 2� Thick Glass 6) 2’ Thick Concrete Pontoon Foundation 7) 2’ D Steel Column 8) Battered Piles 9) Photovoltaic Panels 10) Bladeless Wind Energy
10
2
03
1 9
1. Passenger Boarding 2
3. Cafes 4. Restaurants 5. Rowing and Paddling School 6. Market Hall 7. Artisan Market 8. Mixed Shops 9. Arrival Hall / Information Center 10. Bay Trail Center 11. Bike Store / Bike Storage 12. Playground 14. Storage
7
13 1
1 12
3
4
1
3
4
2 10 5
11 3 5
6
7 4
6
9
14
8
8
05
Water Level Floor Plan
N
0 4’ 8’
16’
32’
64’
06 01 Site Plan 02 Exterior Perspective 03 Perspective - Aerial View
04 Water Level Plan 05 Wall Section 06 Partial Elevation
04
2
Jang Ock Kim / Work Samples
BAST: Bay Area Solar Transit-Hub
01 Cross Section
02
Scale 1/16” = 1’
01 02 03 04 05 06 07
03 North Elevation
0’
4’
8’
16’
32’
Cross Section East Elevation North Elevation Perspective - Lower Deck Perspective - Upper Deck Site Model Physical Model
Scale : 1/16” = 1’
East Elevation
04
05
06
07
3
Jang Ock Kim / Work Samples
Espirit Park Natatorium Advanced Design Studio II / Spring 2018 Faculty: David Gill & Ethen Wood Site: Espirit Park, San Francisco
This project proposes a tenth public swimming pool in San Francisco. The primary function of Espirit Park Natatorium is to provide a place to swim. The facility includes a lap pool, a recreational pool and hot pools as well as additional public space such as cafes, community rooms.
1
2
3
4
5
6
7
4
Jang Ock Kim / Work Samples
Espirit Park Natatorium
Wood Cladding
Roof - Glulam
Columns - Glulam
Mullions - Aluminium
01 02 03 04 05 06
Structural Diagram Unrolled Elevation North Elevation East Elevation South Elevation West Elevation
Reinforced Concrete 01
02
03
04
05
06
5
San Francisco Museum of Contemporary Art
Jang Ock Kim / Work Samples
Advanced Design Studio I / Fall 2017 Faculty: Mark Mueckenheim & Maria Paz De Moura Castro Site: Embarcadero, San Francisco This project is a proposal for the new Contemporary Art Museum of San Francisco. The proposal for SF Moca challenges the museum typology by incorporating both large void and small, narrow spaces. By playing with the contrast of high ceiling voids vs small narrow spaces, the museum itself offers visitors a unique experience in addition to the various interesting exhibitions in it.
6
San Francisco Museum of Contemporary Art
Jang Ock Kim / Work Samples
Section AA
Section BB
7
Billboard Green House / Residential Intermediate Design Studio I / Spring 2017 Faculty: Peter Suen & Mark Myers Site: Bernal Heights, San Francisco, CA
Jang Ock Kim / Work Samples
The Billboard Green House project started by developing a single housing module that fits within the space of a billboard then multiples of a module were developed for a senior housing collective. The proposed housing collective is designed for a group of senior citizens who lead their urban life through a communal lifestyle and collective urban farming.
01
02
01 02 03 04
03
Concept Collage Site Context Site Plan Typical Unit Layout
04
8
Billboard Green House / Residential
Jang Ock Kim / Work Samples
01
01 5F Plan 02 Section 03 East Elevation
02
03
9
Jang Ock Kim / Work Samples
Pier 70 Promenade / Public Multi-use Space Introductory Design Studio II / Fall 2016 Faculty: Keith Plymale & Eric Reeder Site: Pier 70, San Francisco, CA
Film and architecture/ film as architecture The design process began by reviewing the 1962 film La Jetée by Chris Marker. Therein lies the foundation for the studio. In La Jetée, we extract forms of content through structure, organization, cinematic space, time/ sequence and contrast, all of which can be narratives for architecture. The Project’s three conceptual elements, [Frame, Rhythm, folding] come from a critical film study of ‘La Jetee’. The physical history of Pier 70 gives the project material & structural organization. The poetic quality of the pier’s decay establishes a point of departure for its future form. The site is read as a changing ground. By tracing the ‘fragments’ and footprint of Pier 70, a map of chages begins to emerge.
A
A
B
01
C
C
B 02
03
01 Section BB 02 Section AA
10
Jang Ock Kim / Work Samples
Pier 70 Promenade / Public Multi-use Space
01
ne
Cra
on
lati cu Cir
ms
gra Pro
st We
tric me no Axo
d un Gro
st
Ea
de
รงa Fa
w Vie
el Lev
de
รงa Fa
01 Changing Ground 02 Existing Pier Surface Condition Map 03 Longitudinal Section
02
03
11
Jang Ock Kim / Work Samples
Wall Section / Technical Drawings
B
FALL
A
Sections 1/2" = 1'-0"
B
ARH 604 01 MATERIAL AND METHODS OF CONSTRUCTION: BUILDING DETAILING
INSTRUCTOR: DAVID GILL STUDENT: JANG OCK KIM
ARH 604 01 MATERIAL AND METHODS OF CONSTRUCTION: BUILDING DETAILING
ELEVATIONS 1/2" = 1'-0"
A
FALL 2017
Material and Methods of Construction: Building Detailing / Fall 2017 Faculty: David Gill Site: San Francisco, CA
A1
01 / Section AA 02 / Section BB 01
A2
02
SectionSection BB BB
FALL 2017
FALL 2017
SectionSection AA AA
WOOD DECKING WATERPROOF MEMBRANE ADJUSTABLE DECK SUPPORT RIGID INSULATION
BOTTOM RUBBER SEAL
PARAPET WALL COPING CAP
INTERIOR
ALUMINIUM SIDING
ALUMINIUM SIDING
PERIMETER INSULATION
DETAIL 3" = 1'-0"
WATERPROOF MEMBRANE
SUB FLOORING
PLYWOOD SHEATHING
RIGID INSULATION
DETAIL 3" = 1'-0"
FIBER GLASS INSULATION HARDWOOD FLOORING WATERPROOF MEMBRANE
SUBSOIL DRAIN SYSTEM
SCUPPER DRAIN RIGID INSULATION METAL FLASHING METAL FLANGE ROOFING
DRUM ROLLER
ARH 604 01 MATERIAL AND METHODS OF CONSTRUCTION: BUILDING DETAILING
Wall & Balcony
3" = 1'-0"
Parapet &Scupper 3" = 1'-0"
A4
1
A5
Garage Door 3" = 1'-0"
FALL 2017
1
3" = 1'-0"
INSTRUCTOR: DAVID GILL STUDENT: JANG OCK KIM
ARH 604 01 MATERIAL AND METHODS OF CONSTRUCTION: BUILDING DETAILING
Foundation
2
FALL 2017
2
JAB PLATE
INSTRUCTOR: DAVID GILL STUDENT: JANG OCK KIM
TRACK SPLICE PLATE ALUMINIUM PANELS
WOODEN BRACKET METAL MESH METAL FLASHING
METAL FLANGE
EXTERIOR
INTERIOR
INTERIOR
EXTERIOR
EXTERIOR
INTERIOR
PERFORATED METAL PANELS
Fixed Window Head 3" = 1'-0"
4
Sliding Window Head
1
3" = 1'-0"
Door Head
GLASS
3" = 1'-0"
STEEL FRAME RAILING
WATERPROOF MEMBRAME SHIM
DETAIL 3" = 1'-0"
DETAIL 3" = 1'-0"
7
STRAP LIFT PERIMETER SEAL MOTOR
BULB SEAL STEEL DOOR FRAME METAL FLASHING ALUMINIM CLADDING WATERPROOFING MEMBRANE
ALUMINIUM CLADDING
EXTERIOR
INTERIOR
5
Sliding Window Jamb
METAL BRACKET
2
3" = 1'-0"
EXTERIOR
INTERIOR
Door Jamb 3" = 1'-0"
INTERIOR
EXTERIOR
ACOUSTIC STEEL DOOR SOUND DEADENER FIXED SWEEP SEAL 1 4"
9
Fixed Window Sill 3" = 1'-0"
6
Sliding Window Sill 3" = 1'-0"
FLAT ACOUSTIC THRESH HOLD
3
Door Sill 3" = 1'-0"
ARH 604 01 MATERIAL AND METHODS OF CONSTRUCTION: BUILDING DETAILING
3" = 1'-0"
A6
2
INSTRUCTOR: DAVID GILL STUDENT: JANG OCK KIM
Fixed Window Jamb
INSTRUCTOR: DAVID GILL STUDENT: JANG OCK KIM
8
ARH 604 01 MATERIAL AND METHODS OF CONSTRUCTION: BUILDING DETAILING
METAL MESH
Guardrail 3" = 1'-0"
1
Bifolding Door 3" = 1'-0"
A7 12