BAST:
BAY AREA SOLAR TRANSIT-HUB
JANG OCK KIM
BAST:
BAY AREA SOLAR TRANSIT-HUB
JANG OCK KIM FALL 2019 Student ID: 04380054
BAST:
BAY AREA SOLAR TRANSIT-HUB
This thesis is a proposal for a new zero energy ferry transit-hub in Redwood City. The architecture provides an access point for the people to the bay as well as bringing the South Bay and the broader Bay Area neighborhoods closer through the closely linked ferry services delivered. A highly efficient ferry service would ultimately alleviate the continually worsening Bay Area traffic congestion problem. Sustainability is the main priority for BAST. BAST takes net-zero energy from the grid by harvesting solar energy through the photovoltaic arrays on the building’s roof and using it to operate its electric ferry fleet. The building uses a set of floating pontoon foundations as a solution to the threat of increasing flooding events as well as the sea level rise.
Jang Ock Kim 04380054 Academy of Art University Graduate School of Architecture M.Arch (87 units)
0.02: Table of Contents
0.0 Preface 0.01 Project Abstract 0.02 Timeline of Study
02 04
1.0 THESIS RESEARCH
1.01 Concept Statement 1.02 User Group Narrative 1.03 Precedent Studies 1.04 Research 1.05 Research Summary 1.06 Site and Context Analysis 1.07 Existing Site Condition Site Plan 1.08 Area Master Plan 1.09 Spatial & Functional Program 1.10 Spatial Analysis 1.11 Building Code Analysis 1.12 A Site Model 1.13 Massing Study Models
07 09 12 26 88 90 102 108 113 117 121 124 128
2.0 THESIS PROJECT
2.00 Thesis Project 2.01 Development Models 2.02 Site Plan 2.03 Floor Plans 2.04 Building Sections 2.05 Elevations 2.06 Wall Section 2.07 Partial Elevation 2.08 Building Details 2.09 Sustainability Strategy 2.10 Egress Diagram 2.11 Structural Diagrams 2.12 Mechanical Diagrams 2.13 Building Section of Public Space
136 138 151 154 158 162 168 168 171 173 175 177 180 184
3.0 FINAL THESIS PRESENTATION
3.01 Exterior Perspectives 3.02 Interior Perspectives 3.03 Physical Model
189 194 198
0.0: Preface
0.01: Project Abstract
Inhabitants of the Bay Area have the tremendous privilege of having access to its incredible natural resources, with the bay itself as one of the most important natural resources in the region. This thesis is a proposal for a new Bay Area Solar Transit-hub (BAST), a zero-energy ferry transit center in Redwood City that has both social and environmental benefits. The innovative new architecture revitalizes the overlooked waterfront of Redwood City by providing services and spaces for people to come and enjoy the beautiful setting on the water’s edge. It provides an access point for the people to the bay and to other communities beyond by bringing the South Bay and the broader Bay Area neighborhoods closer through sustainable clean-energy ferry services. The ferry service ultimately alleviates the notorious Bay Area traffic congestion issue. BAST is a prototype for a sustainable waterway public transit system network that can be expanded throughout the Bay Area and other cities around the world that need effective waterway networks. The building emphasizes key sustainability aspects of architecture at the present time and the near future, including renewable energy and adaptive architecture for the climate crisis. BAST takes net-zero energy from the grid by harvesting solar energy through the photovoltaic arrays on the building’s roof and using it to operate its electric ferry fleet. The building rests on a set of floating pontoon foundations as a solution to the threat of increased flooding events and sea level rise.
2
0.02: Timeline of Study
ARH 650 (3units): Introductory Design Studio ARH 651 (3units): Design Process & 2D Media ARH 652 (3units): Architecture Tectonics
ARH 609 (6units): Intermediate Design Studio 1 ARH 620 (3units): Digitally Generated Morphology ARH 640 (3units): Architectural History - Introduction
ARH 619 (6units): Advanced Desi
ARH 641 (3units): Architectural History/ Modernism & Its Glolbal Impact
Fall 2016
Fall 2015
Fall 2017
Spring 2017
ARH 653 (3units): Introductory Design Studio 2 ARH 654 (3units): Design Process & 3D Media ARH 652 (3units): Graduate Design Technology 1/ Structures
3
IAD 608 (3
Summer 2017
Spring 2018
Su
ARH 608 (6units): Advanced Design Studio 1 ARH 601 (3units): Spatial Composition ARH 604 (3units): Material and Methods of Construction: Building Detailing
ign Studio 2
ARH 690 (3units): Thesis Preparation & Development ARH 614 (3units): Architectural Professional Practices ARH 659 (3units): Digitally Generated Fabrication
IAD 611 (3units): Building Information Modeling - Elective ARH 900-2 (3units): Internship:Architecture
3units): Digital Imaging - Elective Study
Fall 2018
ummer 2018
Fall 2019
Spring 2019
ARH 606 (3units): Construction Documents & Building Codes ARH 605 (3units): Graduate Design Technology 2/Enviromental Controls ARH 642 (3units): Architectural Theory
Spring 2020
ARH 810 (6units): Master of Architecture Thesis
Total Units: 87 Graduation Date: May 20, 2020
4
1.0: Thesis Research & Preliminary Design
1.01 Concept Statement Connecting the Bay and its people The Bay Area, as the name suggests, is known for the beautiful scenery of its natural environment provided by the surrounding bay as well as its unique urban character. The Bay has been strictly regulated and protected since the 1970s as it is recognized as one of the most ecologically important habitats in California where it supports a number of endangered species. However, does the Bay share similar intimate relationship with its people? Many communities are disconnected from the Bay, as it is often inaccessible due to a physical barriers such as freeways or other infrastructure where public access is limited. A close relationship between communities and the Bay is vital for the restoration/protection of the Bay to be successful and sustainable. What can be done to reconnect the Bay and its people?
Congested grid With the Bay Area’s continued economic growth and the popularity among city dwellers, its population has been steadily growing. Combined with the natural geological condition of the Bay, i.e. dependency on bridges, the challenges the Bay Area’s transit system faces have been growing and becoming a big issue. In the late 1800s, the Bay’s transit systems at the time played a large role. It was served by various ferry routes, some of which were even linking railroad systems across the Bay. The importance of the ferries declined rapidly with the completion of the Golden Gate Bridge and the Bay Bridge. Is there something to be learned from the past? The Bay Area’s current commuter traffic condition ranks as one of the worst in the nation. Can the Bay provide some relief to the Bay Area’s problematic transit condition?
Sustainability at its core The future of architecture must include sustainability as its core design element. Deploying sustainable green energy for this project should be a must-have not a nice-to-have. Since the project is about the Bay and its water, the architecture must have a solution to the increasing threat of the climate crisis, especially the sea level rise.
7
Redwood City Ferry Terminal
- Ferry Terminal - Public Plaza / Meeting point - Public Community Markets - Bicycle / Pedestrian trails - Shared Office Space - Restaurants / Cafes - Aquatic Center - Rowing and Paddling
Photo credit: https://clui.org/ludb/site/port-redwood-city 8
1.02 User Group Narratives Group I : Commuters using ferry services. Overall, the majority (about 70 percent) of the riders are between 25 and 54 years of age. The majority of this group are employees of tech companies located in the area known as Silicon Valley. This results in the ferry rider user group having a non-standard income distribution, as 45% of the ferry riders have an annual household income of more than $150,000. Group II : The residents of Redwood City and neighboring cities One of the proposed ferry terminal’s primary goals is to provide an access point to the Bay for the people of the nearby neighborhoods. The new pedestrian trails and transit transportation would make it easier for the residents of Redwood City and the broader area to reach the water’s edge for either travel purposes or recreational purposes. Group III: Bay Trail Users The terminal invites the Bay Trail users to make a stop or visit it as their final destination. The program includes a Bay Trail information center as well as a bycicle service/storage center. The cafes/restaurants also welcome the Bay Trail users as well as the general public
9
User Group Profile of Ferry Riders
User Group By Age
User Group By Race
User Group By Income
Source: http://www.bayareacensus.ca.gov/transportation/VitalSigns/ 10
11
1.03 Precedent Studies Yokohama International Ferry Terminal By Foriegn Office Architects
Vartaterminalen Ferry Terminal C. F. Møller Architects
Leixões Ferry Terminal Luís Pedro Silva Arquitecto
WMS Boat House at Clark Park Studio Gang
Public Water Transportation System in Venice, Italy
12
Case Study Yokohama international ferry terminal Foreign Office Architects (FOA) Yokohama, Japan 2002 The Terminal is integrated as part of the landscape of the city’s harbor that serves as a public space in addition to its core function; an international ferry terminal. The long span arched steel structure enables column-free wide open space. Undulating surfaces combined with various uses of ramp enables a seamless transition between the interior and the exterior space. The circulation system consists of a series of interlocking paths instead of isolated routes found in a typical termial settings. The open and flexible terminal floor works as coverd public space and is used for various purposes, such as events and public gatherings which draw the public to visit the terminal even though they have no intention to use the ferry service. The terminal successfully extends the city fabric onto the city’s harbor, bringing the people out to the waterfront and encourages then to engage with its physical environment of a terminal as well as the natural surrounding of the harbor.
Source: https://www.farshidmoussavi.com/node/15 13
14
Case Study vC. F. Møller Architects Stockholm, Sweden 2016
The new terminal for Stockholm’s permanent ferry connections to Finland and the Baltics recalls the shape of a moving vessel and the architecture - with large cranes and warehouses - that previously characterized the ports. The main idea has been to create natural links between central Stockholm and the new urban area in connection with the terminal, so that city life will naturally flow into the area. Therefore the terminal is raised to be at level with the urban zone, so it is easy for both pedestrians and traffic to access. At the same time the roof of the terminal building is designed as a varied green landscape with stairs, ramps, niches, and cosy corners, inviting both Stockholmers and passengers for a stroll or relaxing moments, while enjoying the view of the ferries, the archipelago, and the city skyline.
Source: https://www.cfmoller.com/ 15
16
Case Study Leixões Ferry Terminal Luís Pedro Silva Arquitecto Matosinhos, Portugal 2015
Porto Cruise Terminal is a small port complex, an initiative of the Administração dos Portos do Douro e Leixões, located at the South jetty in Matosinhos, Portugal. The strategic definition of a new cruise terminal had a double objective: improvement of the commercial efficiency and a better urban integration. That’s why the project integrates new buildings, berthing work and exterior spaces of public vocation. The main building shelters several programmatic components: cruise ship terminal, marina facilities, the Science and Technology Park of the Sea of the University of Porto, event rooms and a restaurant.
17
Source: https://www.archdaily.com/
18
Case Study WMS Boat House at Clark Park Studio Gang Chicago, Ilinois 2013 The boathouse provide a key public access point along the river’s edge, which led to the larger movement toward an ecological and recreational revival of the Chicago River. The design of the Eleanor Boathouse translates the motion of rowing, using two truss shapes to create a rhythmic roof form. In addition to highlighting the need for the continued revitalization of the river, the new facility—which also includes spaces for after-school mentoring and community events— allows for the expansion of these programs, extending their opportunities to people, and especially youth, on the South Side and across the city.
19
**Photo and drawing credit: Studio Gang
Eleanor Boat House at Park 571 Studio Gang Chicago, Ilinois 2016 Its alternating roof trusses were generated from studying this motion while creating functional south-facing clerestory windows that bring in sunlight to warm the boat storage facility in colder months using minimal energy. “The Chicago River boathouses are part of a new environmentally friendly vision for the city’s river. By making the riverfront a destination for recreation, anchored by dynamic sustainable architecture, we hope to catalyze long-term stewardship and support for the river’s remediation as well as improve the health of the communities that surround it.” —Jeanne Gang
**Photo and drawing credit: Studio Gang
20
Case Study Public Water Transportation System in Venice, Italy
Tourism
40%
Merchant
29%
Service
17%
Sport
10%
Gondola
4%
Water Taxi/Bus, Airport boats, Tour boats Cargo, Goods Delivery, etc..
Police, Ambulace, Garbage Collection, etc..
Photo Credit: https://www.reddit.com/r/interestingasfuck/comments/ayubz6/aerial_view_of_venice_italy/
21
Vaporetto(Water Bus)
Police Boat
Water Taxi
Gondola
Delivery Boat Photo Credit: https://www.welcomevenice.com/public-transport-in-venice-the-vaporetto/?lang=en http://www.venice-guide.info/Ships_Venice.php https://citywonders.com/blog/Italy/Venice/hiring-a-gondola-in-venice http://engineeringrome.org/transportation-traffic-control-in-venice/
22
Case Study Public Water Transportation Network in Venice, Italy
S.
G
IU
LI
A
N
O
I biglietti Actv sono acquistabili presso le biglietterie Venezia Unica, le biglietterie automatiche e i rivenditori autori Actv tickets can be bought from the Venezia Unica ticket points, the self-service ticket machines and the authorised rese
5.15.2 4.14.2
.1 24 4.
22
.1 25 5.
Night routes
AT CH O E
[R
R
5. 15 .2
5 6 4. .1 5 6 1 4 .2 .2
A
M O R n.] le St P.[Bus
PEOPLE MOVER
5 3 4. .1 5 3 1 4 .2 .2
ail
FE
w
R
ay RO St V n. I ] A
O
C
ET
TR
M
ER
H C N
TO
]
rk
O
Pa
[C
ar
TR
3 2 6 15. .2 5. .1 4 4
N
C
H
TR
ET
O
N
TO
TT O
.1 2 4 .1 4. .2 5 5
People Mover Funicolare terrestre Cable railway
5.15.2 4.14.2
YOU CAN EVEN PURCHASE ACTV TICKETS WITH AVM VENEZIA OFFICIAL APP
4.2 4.1 6 6 8 8
8 A quick and easy APP to download, enabling you to buy tickets directly with your smartphone, whenever you want and wherever you are.
16
10 R
Once the purchase is done, the ticket is loaded on your smartphone: near the smartphone to the appropriate scanner which reads the QR code that is visible on your screen.
4.2 4.1
4.2 4.1 6 6
8 8
8 8
16
AVM Venezia oďŹƒcial APP is downloadable free of charge from both Apple Stores and Google Play.
Ricordati di consultare gli orari esposti Remember to read the timetables shown
5.2 5.1 6 6 8 8
Punti vendita o biglietterie automatiche Venezia Unica Venezia Unica ticket points or self-service ticket machines
La linea ferma The waterbus does stop h
Informazioni turistiche Tourist information
La linea non ferma The waterbus does not st
Source: http://actv.avmspa.it/sites/default/files/mappa_linee_di_navigazione_NOV_2018_WEB.PDF
23
Presso i punti vendita Venezia Unica puoi trovare anche biglietti per eventi, musei, mostre e teatri // guide e m At the Venezia Unica ticket points you can also ďŹ nd tickets for events, museums, exhibitions and theaters // guides and
www.actv.it
@muoversivenezia
EL
LO
izzati (consulta la mappa nel sito www.actv.it), online su www.veneziaunica.it e con AVM Venezia Official App. ellers (see www.actv.it), online on www.veneziaunica.it and through the AVM Venezia Official App.
9
9
12
N
N
O
1 14 2
R
A
1412
12
B
U
4. 14 .2
.2 14 4. 3 .2 3 14 4. 3 3 .2 14 4. 3 3
TO
R
C
13 1412
3
3 3 1 4. 2 4. 7 18
14
3
4. 2 18 7 4.1
3 3
4. 24 .1
22
13 13
2 5. .2 4
)
VE
O
N
22 B
.te (F
13
3 12 1 2 4. .1 4
1 5. .1 4
13
22
4.2 4.1 7 18 18 12 12 13 13
22 13
22 .2 1 5 .2 5. .1 4 4
18
22 22 5.1 5.2 4.1 4.2
5.1 5.2 4.1 4.2
S.ZACCARIA
R R
818
LÒ
O O D IC LI .N S
4.2 4.1
B .2 B .1 5 .2 5 .1 4 4
D
O R LO ET EL PI ST S. I CA
I
A I e NN IN BIE
IN D
D
R
R IA
G
IA
G
4.2 4.1 5.2 5.1
.2 1 5 .2 5. .1 4 4
7
AT
LÒ O O O B D IC YLI .N RR S E F
S.MARCO PIAZZA S.MARCO
LE
20 19
14 8 18
4.2 4.1 5.1 5.2
R
.)
.E
10 5.2 5.1 6 8 14
20 20
Linea stagionale Seasonal route
20
here
M IA S. R ( A A M TT O A E D T B LI AN ISA S L E
.1 2 4 .1 4. .2 5 6 5 6
8 8
I D A O ZI D E LI EN V
15 14
.1 2 4 .1 4. .2 5 6 5 6 8 8
10
Validità dal 05.11.2018
BACINI - ARSENALE NORD
19
top here
mappe // tour // Venezia Unica // merchandising d maps // tours // Venezia Unica // merchandising
24
25
1.04 Research
Bay Area Traffic Bay Area Commute Flow Transit Usage Trend Travel Time Comparison on a weekday Ferry Terminals in San Francisco Current Ferry Operators in San Francisco Bay Bay Area Population Distribution Bay Regional Study - Mapping Bay Ship Traffic Study Sea Level Rise Bay Trail Electric Ferry Development
26
http://www.dot.ca.gov/hq/esc/tollbridge/SFOBB/Sfobbfacts.html http://www.dot.ca.gov/hq/esc/tollbridge/SM-Hay/SMfacts.html Dubmarton Corridor Transportation Study - San Mateo County Transit District. November 2017. http://goldengatebridge.org/tolls_traffic/
27
Bay Area Traffic
Richmond - San Rafael Bridge Avg Daily Traffic - 80,000 Vehicles Golden Gate Bridge Avg Daily Traffic - 112,000 Vehicles Bay Bridge Avg Daily Traffic - 270,000 Vehicles
San Mateo - Hayward Bridge Avg Daily Traffic - 81,000 Vehicles
Dumbarton Bridge Avg Daily Traffic - 70,000 Vehicles
An Average of 613,000 Vehicles Cross San Francisco Bay Daily. 28
Bay Area Traffic The Bay Area’s steady economic growth since early 2000s increased the region’s employment opportunities by 12% which resulted in population increase by 15%. As a result, the congestion in the region is worsening every year.
2010
89 % Increase Average Time Spent in Congested Freeways in Bay Area
Job Growth 12% Population Growth 15%
Source: Metropolitan Transportation Commission: Historical Congestion Analysis (1998-2017) Metropolitan Transportation Commission/Iteris: Congested Corridor Analysis (2017) California Employment Development Department: Labor Market Information (1998-2017) http://www.vitalsigns.mtc.ca.gov/time-spent-congestion
29
2017
While congestion only generates a few minutes of delay for the average commuter, commuters in a handful of high-demand corridors experience far worse conditions. The top ten most congested segments constitute nearly half of all regional freeway congestion, with just the top two segments along the Bay Bridge corridor constituting 16 percent all Bay Area traffic congestion. While congestion on other corridors in the region mirrors typical commute patterns, the Bay Bridge is affected by congestion for long periods throughout the day.
30
Bay Area Commute Flow
NAPA
SONOMA
10K
SOLANO
17K
MARIN 26K
CONTRA COSTA
50K
SF 43K
93K
40K
72
ALAMEDA
22K 75K
12K
20K
10K
34K
SAN MATEO
13K 10K
40K
65K 12K
19K
41K
50K
**Source: Bay Area Census Commute Data 2014
31
SANTA CLARA
32
Transit Usage Trend
33
Historical Trend for Commute Mode Choice in Bay Area
Metro Comparison for 2016 Commute Mode Choice
Source: U.S. Census Bureau: Decennial Census (1960-2000) - via MTC/ABAG Bay Area Census http://www.bayareacensus.ca.gov/transportation/Means19802000.htm https://www.vitalsigns.mtc.ca.gov/commute-mode-choice
34
Travel Time Comparison on a Weekday
San Francisco Ferry Terminal
65%
Drove Alone to work in 2016
10.2%
Used Carpool to work in 2016
11.9%
Used Transit to work in 2016 Redwood City Transit Center
35
Rush Hour
VS
Without Traffic Jam
1 Hour 30 Mins
45 Mins
1 Hour 9 Mins (Limited Service)
1 Hour 9 Mins (Limited Service)
54 Mins
54 Mins
36
Passenger Experience
37
Image Credit: https://anacortes.org/ferry-travel-what-to-know/
38
Health Risks of Commuting by Car in Traffic
39
Scientists from various organizations** found that driving more than 10 miles everyday results in
- Blood Sugar Rise - Higher Cholestrol Level - Higher Risk of Depression - Anxiety Increase - Reduced Happiness and Life Satisfaction - Blood Pressure Rise - Lower Level of Cardiovascular Fitness and physical activity - Lower Sleep Quality - Back Pain and Aches ** American Journal of Preventive Medicine, The University School of Medicine in Saint Louis, The Cooper Institute in Dallas, The U.K.’s Office of National Statistics, The University of Utah
Source: http://time.com/9912/10-things-y our-commute-does-to-your-body/
40
Redution of Cars on Roads by Ferry
1 Ferry Run
41
=
250 Less Cars on the Roads
Ferry Terminals in San Francisco Ferry Building Gate B Vallejo Route Gate 2 Gate 1 Golden Gate Ferry Terminal Canopy Structure Covering Appx 9,000 SQFT
Gate E Being Updated Gate F - New Harbor Bay, Richmond Gate G - New Alameda/Oakland
Pier 41 Marine Terminal
Ferries to Angel Island Alcatraz Ferry Building Pier 41 Terminal 10,000 SQFT is open to public and includs shops and cafes
Image Credit: Google Map 2019
42
Current Ferry Operators in San Francisco Bay San Francisco Bay Ferry San Francisco Bay Ferry is a service of the Water Emergency Transportation Authority (WETA) and is a non-profit organization. SF Bay Ferry carries over 2.8 million passengers annually utilizing a fleet of 14 high speed passenger-only ferry vessels SF Bay Ferry provides ferry services to Alameda Main Street, Harbor Bay, Oakland Jack London Square, Vallejo, San Francisco Ferry Building, Pier 41/Fisherman’s Wharf, and South San Francisco, along with seasonal service to Oracle Park.
Golden Gate Ferry Golden Gate Ferry is run by a government agency, Golden Gate Bridge Highway & Transporation District. Golden Gate Ferry (GGF) operates frequent ferry service between San Francisco and Larkspur in central Marin County, and between San Francisco and Sausalito and Tiburon in southern Marin County. Ferries depart from behind the center of the Ferry Building to Sausalito and Larkspur. Extra service is also offered from Larkspur to AT&T Park for Giants home games and other sporting and music events.
Blue & Gold Fleet Blue & Gold Fleet is a privately owned company and is the largest among the three ferry operators in SF Bay. It provides bay cruise and excursion services in San Francisco Bay as well as ferry services to Angel Island, Tiburon, Sausalito and Pier 41 (adjacent to Pier 39) and the popular Rocket Boat attraction.
Source: http://goldengate.org https://www.blueandgoldfleet.com/ https://weta.sanfranciscobayferry.com/
43
Ridership Statistics While there are more transportation alternatives than ever before, today’s congestion is worse than what was experienced during previous economic booms. More commuters are adopting the ferry services for their commute even though the services are limited to relatively small percentage of riders accross the Bay Area. The annual riderships for the ferry services over the San Francisco Bay has risen steadily since 2010.
5,412,538 Riderships over San Francisco Bay in 2018
44
Current Ferry Schedules
ALAMEDA / OAKLAND / SAN FRANCISCO Weekdays to San Francisco Depart Oakland
— 6:30 7:00 7:35 8:10 — 8:40 9:15 10:15 11:00 11:40 1:55 PM 2:40 3:50 4:30 5:05 5:55 6:20 7:05 8:45
Depart Alameda
6:00 AM 6:40 7:15 7:45 — 8:20 8:50 9:25 10:25 10:50 ▲ 11:30 ▲ 1:45 PM ▲ 2:25 ▲ 3:35 ▲ 4:15 ▲ 4:50 ▲ 5:45 ▲ 6:05 ▲ 6:55 ▲ 8:55
Arrive Ferry Building
6:20 AM 7:00 7:35 8:05 8:40 8:40 9:10 9:45 10:45 11:20 12:05 PM 2:15 3:05 4:20 5:00 5:30 6:20 6:50 7:30 9:25
Arrive Pier 41
— — — — — — — — 11:00 11:35 12:20 PM 2:30 — — — — — — — —
— — — — — — — — 10:50 12:30 PM 1:45 — 3:30 — — — — — — — — 8:05 —
Depart Ferry Building
6:25 AM ◆ 7:05 ◆ 7:35 7:45 8:10 ◆ 8:45 ◆ 9:40 10:30 11:05 12:45 PM ◆ 2:00 3:15 — 4:00 4:30 5:20 5:40 6:05 6:30 6:55 7:35 8:25 9:30
Arrive Alameda
7:10 AM 7:40 — 8:05 8:45 9:20 10:20 10:45 11:25 1:20 PM 2:20 3:30 4:10 4:20 4:45 5:40 6:00 6:35 6:50 7:15 7:55 8:45 9:50
9:10 AM 10:10 10:40 11:25 12:10 PM 1:10 1:40 2:55 3:55 4:55 5:40 7:40 9:10
V To S.F. via Oakland X To Alameda via Oakland . These departures are more likely to be at capacity. All arrival times are estimates.
8:55 AM ▲ 10:30 11:00 11:45 12:30 PM 1:30 1:55 3:15 4:15 5:15 5:55 7:55 9:25
Arrive Ferry Building
10:15 AM 10:55 11:25 12:10 PM 12:55 1:55 2:20 3:40 — 5:40 — — 9:50
Arrive Pier 41
9:40 AM 11:10 11:40 12:25 PM 1:10 2:10 — 3:55 4:45 5:55 6:20 8:25 10:05
Weekends from San Francisco Depart Pier 41
10:00 AM — 11:30 12:30 PM 1:00 2:15 3:15 4:15 5:00 5:30 6:30 7:00 8:30 10:15
Arrive Oakland
6:55 AM 7:30 8:00 — 8:35 9:10 10:10 10:55 11:35 1:05 PM 2:35 3:45 4:20 4:35 5:00 5:50 6:15 6:45 7:00 7:25 8:10 8:55 10:00
Depart Oakland
Depart Ferry Building
10:15 AM 11:00 11:45 12:45 PM 1:15 2:30 3:30 4:30 5:15 5:45 6:45 7:15 8:45 10:30
Arrive Alameda
Arrive Oakland
10:35 AM 11:20 12:05 PM 1:05 1:35 2:50 3:50 4:50 5:35 6:05 7:05 7:35 9:05 10:50
10:50 AM 11:35 12:20 PM 1:20 1:50 3:05 4:05 5:05 5:50 6:20 7:25 7:50 9:20 11:00
V To S.F. via Alameda These departures are more likely to be at capacity. All arrival times are estimates.
STANDARD FARES 1 Fares between Oakland, Alameda, SF Ferry Building and SF's Pier 41 One-way Regular $
7.00
$
Youth (5-18 years)
$
3.50
$
Senior (65+ yrs), Disabled, Medicare 2
$
3.50
$
Children under 5
FREE
FREE
School Groups
2.30
4
$
Short Hop 5 Adult Short Hop 5 Youth, Senior (65+ yrs), Disabled, Medicare 2
$
5:30 AM 6:00 6:30 7:00 7:45 8:30 9:30 10:30 12:00 PM 2:00 V 3:10 4:00 4:45 5:45 V 7:00
Arrive Ferry Building
6:30 AM 7:10 7:30 8:10 8:45 9:40 10:30 11:30 1:10 PM 3:20 4:10 5:00 5:45 7:05 8:00
6:35 AM 7:15 8:15 9:45 10:40 O 11:40 2:40 PM 3:30 4:30 5:00 5:30 6:00 7:15 8:15
Depart Pier 41
— — — — 11:00 — — 3:10 X — — — — 6:55 X —
Arrive Vallejo
7:35 AM 8:25 9:15 10:55 12:00 PM 12:40 3:50 4:30 5:30 6:00 6:40 7:00 8:15 9:15
Arrive Mare Island
— — — 11:05 AM 12:15 PM 12:55 — — — — 6:55 7:15 8:30 9:30
V To SF Ferry Building via Pier 41 X To Vallejo via SF Ferry Building O To Vallejo via Pier 41 These departures are more likely to be at capacity. All arrival times are estimates.
N/A $
0.80
$
1.70 0.80
SCHEDULE, SERVICE & FARE QUESTIONS?
Alameda/Oakland/San Francisco Route Harbor Bay/San Francisco Route Alameda/Oakland/South San Francisco Route Richmond/San Francisco Route
Alameda/Oakland/ Harbor Bay/ San Francisco San Francisco
S. San Francisco/ Alameda/Oakland
Richmond/ San Francisco
Memorial Day, Monday, May 27
Weekend Schedule
Weekend Schedule No Service
No Service
No Service
(415) 705-8291
July 4th, Thursday
See below*
See below*
No Service
No Service
No Service
Vallejo/San Francisco Route
Labor Day, Monday, September 2
Weekend Schedule
Weekend Schedule No Service
No Service
No Service
Columbus Day, Monday, Oct. 14
Weekday Schedule
Weekday Schedule
Weekday Schedule
Weekday Schedule
* Check website for schedule 1 Standard Fares and Clipper Cards cannot be used on AT&T Park Service. 2 Must have a Regional Transit Connection Clipper card, Medicare card, DMV placard, proof of veterans disability, proof of age 65 years or older, or Senior or Disabled ID issued by another California transit system and a valid photo ID. 3 Children under 5 years of age may ride FREE with each fare paying adult. 4 Fare applies to students, teachers, and chaperones. To qualify school groups must call for advanced approval and reservations. For Alameda/Oakland/SF, South SF/Alameda/Oakland, and Harbor Bay/San Francisco routes call (415) 705-8214. For Vallejo/San Francisco route call (707) 643-3779. 5 One-way between Oakland and Alameda or between the SF Ferry Building and Pier 41. 6 One-way between Mare Island and Vallejo or the SF Ferry Building and Pier 41. Fares subject to change.
Source: https://weta.sanfranciscobayferry.com/
— — — — — — 10:50 AM — — 3:00 PM — — — 6:45 —
Weekdays from San Francisco Depart Ferry Building
Vallejo/ San Francisco
Weekday Schedule
Arrive Pier 41
3.50
SF Bay Ferry provides service to Oracle Park for selected Giants games from Alameda, Oakland and Vallejo. For complete schedule information and to purchase tickets online visit SanFranciscoBayFerry.com.
45
Depart Vallejo
3.50
ORACLE PARK SERVICE FOR SF GIANTS GAMES
2019 Holidays
5:10 AM 5:40 6:10 6:40 — — — — — 1:40 PM 2:50 — — — —
5.30
1.70
$
Depart Mare Island
One-way Clipper
Adult
3
VALLEJO / SAN FRANCISCO Weekdays to San Francisco
Weekends to San Francisco Depart Alameda
Weekdays from San Francisco Depart Pier 41
Schedule Effective April 29 - June 30, 2019
(707) 643-3779 or (877) 643-3779 (Toll Free)
www.SanFranciscoBayFerry.com
e
Schedule Effective April 29 - June 30, 2019
Weekends to San Francisco Depart Mare Island
8:10 AM — — 2:10 PM 3:40 — —
Depart Vallejo
8:30 AM V 10:00 11:30 2:30 PM 4:00 V 5:15 7:30 V
Arrive Ferry Building
9:30 AM 11:20 — 3:50 PM 5:00 — 8:30 PM
Weekends from San Francisco Depart Ferry Building
10:00 AM 11:10 12:45 PM 3:40 5:35 6:30 9:00
Depart Pier 41
9:40 AM X 11:30 — 4:00 PM 5:15 X — 8:40 X
Schedule Effective April 29 - June 28, 2019
Weekdays to South San Francisco
Arrive Pier 41
9:50 AM 11:00 12:30 PM 3:30 5:25 6:15 8:50
SOUTH SAN FRANCISCO / ALAMEDA / OAKLAND
Arrive Vallejo
Arrive Mare Island
11:00 AM 12:30 PM 1:45 5:00 6:35 7:30 10:00
— 12:45 PM 2:00 — — 7:50 10:15
V To SF Ferry Building via Pier 41 X To Vallejo via SF Ferry Building All arrival times are estimates.
Depart Alameda
Depart Oakland
6:25 AM 7:30 8:00
Arrive S. San Francisco
6:40 AM 7:40 8:10
Weekdays from South San Francisco Depart S. San Francisco
Arrive Oakland
4:20 PM 5:20 7:00
Arrive Alameda
4:55 PM 6:00 O 7:50 O
5:10 PM 5:55 7:35
Fares between South San Francisco Oakland, Alameda and Harbor Bay
One-way Regular
One-way Clipper
Adult
$
8.80
$
7.90
Youth (5-18 years) Senior (65+ yrs), Disabled, Medicare 2 Children under 5 3
$
4.40
$
4.40
$
4.40
$
4.40
FREE $
School Groups 4
O Arrives at Alameda first. All arrival times are estimates.
! NEW
FARES
7:20 AM 8:20 8:50
2.90
FREE N/A
SOUTH SAN FRANCISCO / HARBOR BAY
Weekdays to Harbor Bay Depart South San Francisco
Arrive Harbor Bay
8:30 AM
8:55 AM
Weekdays from Harbor Bay Depart Harbor Bay
6:30 PM
Arrive South San Francisco
6:55 PM
STANDARD FARES 1 Between Vallejo, Mare Island, SF Ferry Building and SF's Pier 41 One-way Regular $
Adult
14.60
One-way Clipper $
11.00
Youth (5-18 years)
$
7.30
$
Senior (65+ yrs), Disabled, Medicare 2
$
7.30
$
Children under 5 3
FREE
FREE
School Groups 4
$
4.80
N/A
Short Hop6 Adult
$
1.70
Short Hop Youth, Senior (65+ yrs), Disabled, Medicare 2 6
$
7.30 7.30
1.70
$
0.80
0.80
$
Monthly Pass
Valid on ferry for one calendar month.
Weekdays to San Francisco Depart Harbor Bay
Arrive SF Ferry Building
6:30 AM 7:00 7:30 8:30 9:00 5:05 PM 6:05 7:05
6:55 AM 7:25 7:55 8:55 9:30 5:30 PM 6:30 7:30
Weekdays from San Francisco
MONTHLY PASSES 366.00
$
Schedule Effective April 29 - June 28, 2019
HARBOR BAY / SAN FRANCISCO
Depart SF Ferry Building
Arrive Harbor Bay
7:00 AM 8:00 4:35 PM 5:35 6:00 6:35 7:35
7:25 AM 8:25 5:00 PM 6:00 6:25 7:00 8:00
FARES Fares between Harbor Bay and San Francisco Ferry Building One-way Regular
One-way Clipper
Adult
$
7.30
$
Youth (5-18 years)
$
3.60
$
Senior (65+ yrs), Disabled, Medicare2
$
3.60
$
Children under 5 3
FREE
School Groups4
$
5.50 3.60 3.60
FREE
2.40
N/A
All arrival times are estimates.
Schedule Effective April 29 - June 28, 2019
RICHMOND / SAN FRANCISCO Weekdays to San Francisco Depart Richmond
6:10 AM 7:10 8:15 8:40 5:15 PM 6:05
Arrive SF Ferry Building
6:45 AM 7:45 8:45 9:15 5:50 PM 6:40
Weekdays from San Francisco Depart SF Ferry Building
6:25 AM 7:55 4:30 PM 5:20 6:40 7:10
Arrive Richmond
7:00 AM 8:30 5:05 PM 5:55 7:15 7:45
FARES Fares between Richmond and San Francisco Ferry Building One-way Regular
Adult Youth (5-18 years) Senior (65+ yrs), Disabled, Medicare 2 Children under 5 3 School Groups 4
$
One-way Clipper
9.00 $ 4.50
$
$
$
4.50
FREE $ 2.90
6.75 4.50
$
4.50
FREE N/A
All arrival times are estimates.
46
San Francisco Bay Ferry Fleet
San Francisco Bay Ferry Fleet Vessel (A)
Peralta
Encinal
Bay Breeze
Intintoli
Mare Island
1
1
1
1
Nichols Brothers Boat Builders
Nichols Brothers Boat Builders
Nichols Brothers Boat Builders
Dakota Creek Industries Dakota Creek Industries Dakota Creek
2002
1985
1994
1997
1997
2004
$5.2 million
$2.1 million
$2.1 million
$6 million
$6 million
$11.2 million
2
3
2
2
2
2
331
395
250
349
330
320
20
20
20
10
10
10
Wheelchair Access
Yes
Yes
Yes
Yes
Yes
Yes
Onboard Restrooms, Snacks, Drinks
Yes
Yes
Yes
Yes
Yes
Yes
2 x Cummins QSK50
2 x DD Series 4000
2 x MTU 16V2000
2 x MTU 16V4000 M73
2 x MTU 16V4000 M73 2 x MTU 16V4 2 x MJP 750 Mk 2 Water Jet
2 x Hamilton 8 Water Jet
No. of Vessels Build By
1
Solano
1
In Service Date
Original Cost Number of Decks Passenger Capacity Bike Capacity
Engines Propulsion
Propeller
Propeller
1994-2014: Water Jet 2 x MJP 750 Mk 2 2014 to present: Propeller Water Jet
Service Speed Knots (miles per hour)
25 (28.7)
23 (26.5)
26 (30)
34 (39)
34 (39)
34 (39)
Length, Overall (meters)
37
27.4
29.6
41.3
41.3
41.3
Beam, Extreme (meters)
10
9.6
8.9
12
12
12
2
2.7
1.2
1.5
1.5
1.5
91
96
97
95
95
91
Bio Diesel B5
Bio Diesel B5
Bio Diesel B5
Ultra Low Sulfur Diesel
Ultra Low Sulfur Diesel
Ultra Low Sulfu
4,400
5,400
2,000
5,000
5,000
6,600
750
500
750
500
500
500
Aluminum
Aluminum
Aluminum
Aluminum
Aluminum
Aluminum
2027
2017
2020
2022
2022
2029
Mean Draft, Loaded Gross Tonnage Fuel Type Fuel Capacity (US gallons) Fresh Water Capacity (US gallons) Hull Material Retirement Date Note
Replacement: Cetus
(A) There are 12 vessels in the WETA fleet including the M.V. Harbor Bay Express II which has been out of service for several years and is not detailed in this table. The ** Tier 3 engine with Selenium Catalytic Reduction = Tier 4 level emissions reduction.
47
Source: https://weta.sanfranciscobayferry.com/
Water Emergency Transportation Authority Vallejo
1
Gemini Class
1
Central Bay: Cetus
Central Bay: Vessels 3 & 4
North Bay/ Richmond High Speed
1
2
3
Kvichak Marine Industries Vigor and Nichols Brothers (formerly Kvichak Boat Builders Marine)
Vigor (formerly Kvichak Marine)
Vigor (formerly Kvichak Marine)
Dakota Creek Industries
1994
2008-2009
April 2017
July 2017
Projected #3: January 2018 #4: November 2018
Projected #1: December 2018 #2: July 2019 #3: December 2019
$3.2 million
$8.6 million each
$15.1 million
$15.1 million
$15.1 million each
$19.2 million each
2
2
2
2
2
2
267
Pisces and Gemini: 225 Taurus and Scorpio: 199
400
400
400
445
10
34
50
50
50
24
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes 2 MTU 16V4000 EPA Tier 4 2 Hamilton HT810 Water Jet
Industries Gladding-Hearn
4
Central Bay: Hydrus
4000 M71
2 x MTU 12V4000 M70 2 x MTU 16V2000
2 MTU 12V4000 EPA Tier 3**
2 MTU 12V4000 EPA Tier 3**
2 MTU 12V4000 EPA Tier 3**
811
2 x Hamilton 721 Water Jet
Propeller
Propeller
Propeller
Propeller
34 (39)
26 (30)
27 (31)
27 (31)
27 (31)
34 (39)
33.7
35.9
41
41
41
44
8.7
8.8
11.5
11.5
11.5
12
1
1.9/2.0
2
2
2
1.5
84
90
95
95
95
<100
Ultra Low Sulfur Diesel
Bio Diesel B5
Bio Diesel B5
Bio Diesel B5
Bio Diesel B5
Ultra Low Sulfur Diesel
4,500
2,400
3,000
3,000
3,000
4,400
400
500
500
500
500
600
Aluminum
Aluminum
Aluminum
Aluminum
Aluminum
Aluminum
2018
2033-2034
2042
2042
2043
2043-2044
ur Diesel
Replacement: new 34 knot high speed vessel
1st boat replaces MV Vallejo.
e M.V. Hydrus replaces the Express II.
48
Current Ferry Schedules
SAUSALITO
LARKSPUR Weekdays (excluding Holidays) Depart Larkspur
Arrive SF
Depart SF
Arrive Larkspur
5:20 am Route 24X bus to Financial District 5:45 6:35 * 7:00 *7:30 + 7:50 * * 8:20 + 8:50 * + 9:20 * + 10:10 * 11:10 11:40 12:40 + 2:15 2:50 – 3:40 4:10 – 5:10 5:40 6:40 7:25 8:50
6:15 7:05 7:30 8:00 8:20 8:50 9:20 9:55 10:45 11:45 12:15 1:15 2:50 3:25 – 4:15 4:45 – 5:45 6:15 7:10 8:00 9:25
6:20 7:10 7:35 – 8:30 9:10 – 10:10 10:55 11:55 12:25 1:25 3:00 3:30 4:00 4:30 5:00 5:30 6:00 6:30 7:20 8:10 9:35
6:50 7:40 8:05 – 9:05 9:45 – 10:45 11:30 12:30 1:00 + 2:00 *3:30 + 4:00 * + 4:30 * + 5:00 * *5:30 *6:00 + 6:30 * * 7:00 *7:50 8:40 10:05
Saturdays, Sundays & Holidays 9:30 + 11:40 + 1:40 + 4:45
10:30 12:30 2:30 5:35 –
– 12:40 3:45 6:25 7:25
+ +
–
1:30 4:35 7:15 + 8:10
Depart Sausalito Holiday service in effect on Presidents’, Memorial, Independence, and Labor days. GGF operates reduced 7:10 service on MLK Day, the day after Thanksgiving, and 8:15 around the Christmas and New Year’s holidays. See Transit Guide, visit goldengate.org, or call 511 for schedules. 10:55
NO SERVICE There is no Golden Gate Ferry service on New Year’s, Thanksgiving, and Christmas days. Tiburon Ferry does not operate on weekends or holidays – use Blue & Gold Fleet (blueandgoldfleet.com.)
MISSED LAST FERRY TO LARKSPUR? On weekdays from Mission & First bus stop, take Golden Gate Transit Route 30 or 70 bus. To access Larkspur Ferry Terminal, disembark at Hwy 101/Lucky Drive Bus Pad.
FREE FERRY SHUTTLES To/From Larkspur Ferry
ROUTE 25 along Sir Francis Drake Blvd from Fairfax/Manor.
49
Arrive SF
Depart SF
Arrive Sausalito Depart Tiburon
Arrive SF
Depart SF
6:00 7:10 8:25 9:35 – 5:35 6:50 8:00
6:00 7:15 8:30 – 4:25 5:45 6:55 8:05
Arriv
6 7 9 – 4 6 7 8
* Additional ferry service between Tiburon and P provided by Blue & Gold Fleet (blueandgoldflee
Depart SF
Arrive Sausalito
Light = A.M. Bold = P.M.
11:20 12:45 2:10 3:50
11:50 1:15 2:40 4:20
10:40 12:00 1:25 2:50 4:40 6:00
11:10 12:30 1:55 3:20 5:10 6:30
DON’T MISS THE BOAT! ARRIVE 20 MINUTES PRIOR TO DEPARTURE TIME!
* 5:35 * 6:45
6:05 7:15
–
–
–
–
– –
– –
* The 5:35 and 6:45 trips do not return to Sausalito.
FERRY TERMINAL LOCATIONS
Trips served by Route 25 shuttle *+ Trips served by Route 31 shuttle
5:30 6:40 7:55 9:10 – 5:05 6:20 7:30
Arrive SF
Depart Sausalito
ROUTE 31
Note: Shuttles may not run during holiday periods – visit website for info.
Weekdays only (excluding Holiday
7:40 7:35 8:10 10:00 8:45 10:30 11:35 11:25 12:05 12:15 12:55 12:45 1:25 1:55 2:35 2:25 3:05 3:15 4:00 3:45 4:30 4:45 5:30 5:15 6:00 6:10 6:45 6:35 7:10 7:20 7:55 7:50 8:20 Saturdays, Sundays & Holidays
from San Rafael Transit Center/SMART Train & Peacock Gap. Select weekday & weekend trips.
2.125
Source: http://goldengate.org https://www.blueandgoldfleet.com/ https://weta.sanfranciscobayferry.com/
TIBURON
Weekdays (excluding Holidays)
HOLIDAY SERVICE
Larkspur: 101 East Sir Francis Drake Blvd Sausalito: Humboldt & Anchor streets Tiburon: Tiburon Blvd & Main Street San Francisco: Foot of Market Street & Embarcadero, behind SF Ferry Building
BICYCLES PERMITTED ON FER
Space on high-speed vessels is limite Secure bike rack area available in Larks paid waiting area. Bikes left in excess 7 days will be removed. Electric bike are not permitted on GGF.
SERVICE ANIMALS
Service animals are welcome aboard. accordance with DOT regulations, a ser animal is any guide dog or other anim trained to perform tasks for an individ with a disability.
REASONABLE MODIFICATIO
For requests for ADA Reasonable Modifications, visit goldengate.org feedback/reasonable_modificatio
2.000
ys)*
ve Tiburon
6:30 7:45 9:00 – 4:55 6:15 7:25 8:35
Pier 41 et.com).
R
RRIES
ed. spur of es
. In rvice mal dual
ONS
e g/ on.
50
Bay Area Population Distribution
NAPA
SONOMA
140,973
504,217
SOLANO 445,458
MARIN
260,955
CONTRA COSTA 884,363 SF
1,147,439
ALAMEDA SAN MATEO
1,663,190
771,410
SANTA CLARA
1,938,153
BAY AREA TOTAL : 7,756,158
**Data from 2017 US Census Bureau
51
Santa Clara Population Distribution
PALO ALTO 67,178 MOUNTAIN VIEW 81,438 SUNNYVALE 153,656 SANTA CLARA 127,134
MILPITAS 78,106
SAN JOSE 1,035,317
Cities immediate to the Bay 1,603,606 20% Bay Area Population 82% Santa Clara County Population
**Data from 2017 US Census Bureau
52
Alternative Transportation Options by Route
53
Bay Wind Analysis The wind statistics are based on real observations over a period of one year from the weather station at San Francisco Airport.
Wind Direction Distribution in %
Month of Year Dominant Wind Direction Wind Probability >= 4 Beaufort (%) Average Wind Speed Average Air Temp. (F)
54
Bay Ferry Route Map 22
20
21
17 18
16
23 24
15
Existing Terminals Proposed Terminals Water Taxi Landing Historical Ferry Landing Existing Ferry Route Water Taxi Route Special Event Route
14
25
13 27
26
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
12
28
29 1 2 3 4 5
10 9
11
8
6
7
55
19
Proposed Ferry Route Historical Routes (Late 1800 - 1930s) Pier 41 Pier 33 SF Ferry Terminal AT&T Park Mission Bay South San Francisco Redwood City Harbor Bay - Alameda Seaplane - Alameda Alameda Oakland Emeryville Berkeley Richmond Point Richmond Hercules Rodeo Martinez Antioch Vallejo Mare Island Petaluma River Landing San Quentin Larkspur Tiburon Sausalito Angel Island Alcatraz Treasure Island
Bay Zoning Map
Port Water Related Industry Airport Wilelife Refuge Park Tidal Marsh
56
Depth Of the Bay
Depth of the Bay 0’ - 30’ 10’- 30’ 30’+
Port of Redwood City
57
Potential Redwood City Ferry Route 26 25
24 23 22
27
20
19
21
28
29
Existing Terminals Proposed Terminals Water Taxi Landing
18
30
16
17
15
31 34
32 33
14
35
36 1 2 3 4 5
12 11
13
10 9 6
7
8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
Existing Marina / Harbor Potential Connections to South Bay Pier 41 Pier 33 SF Ferry Terminal AT&T Park Mission Bay South San Francisco Coyote Point Marina Redwood City San Leandro Marina Harbor Bay - Alameda Seaplane - Alameda Alameda Oakland Emeryville Berkeley Richmond Brick Yard Cove Marina Point San Pablo Harbor Hercules Martinez Antioch Benicia Glen Cove Vallejo Mare Island Point Sonama Marina Buck’s Launching Loch Lomond Marina Lowrie Yacht Harbor Larkspur Tiburon Sausalito Travis Marina Angel Island Alcatraz Treasure Island
58
Bay Ship Traffic Density - San Francisco Bay All traffic recorded in 2017
**Source: marinetraffic.com
59
Ship Traffic Density - Seattle / Vancouver All traffic recorded in 2017
60
Bay Ship Traffic over 24 hours How do big ships navigate the San Francisco Bay? The tracks on this map show telemetry data from 24 hours of activity archived by the US Coast Guard on September 1st, 2014, along with underwater bathymetry (depth) data provided by NOAA. Ship telemetry data has been anonymized by the USCG, so relative ship sizes are approximated based on their general behavior. **Source: marinetraffic.com
**Source: Animated marine traffic in the San Francisco Bay by Sam Kronick via mapbox.com
61
Not all of the bay is navigable to large ships. Some regions, such as the area between Richmond and Emeryville, are much too shallow for deep draft ships to pass— as little as one meter in some places. Only boats over 60ft in length are required by law to transmit AIS telemetry data, so many smaller boats do not appear on this map.
62
Bay Ship Traffic over 24 hours Inside the Golden Gate, vessel traffic of all sizes zips from shore to shore. High speed ferries make regular crossings from San Francisco to destinations in Marin County and the East Bay. Tourist ferries shuttle sightseers to Alcatraz Island or underneath the Golden Gate Bridge. Big ships generally move along predictable routes travelling counter-clockwise around Alcatraz. No matter what happens, smaller boats must yield right of way to the big ships as they have limited maneuverability in close quarters.
**Source: Animated marine traffic in the San Francisco Bay by Sam Kronick via mapbox.com
63
Bay Ship Traffic - Real Time (30mins)
**Source: https://www.marinetraffic.com/
64
NOAA Nautical Chart
65
66
67
Regional Transit Route City Boundary Train Stops Access Limited Protected land
68
Shoreline Areas Vulnerable to Sea Level Rise: 2040-2060 Shoreline Area Vulerable to Sea Level Rise: 2040-2060
M e t ro p o li t an Tran s p o rt a t i on C om m i s s i o n Pla nning , F inanc ing a nd C o ordinati ng Tra n s p o r t a t i o n fo r t h e n i n e - c o u n t y S a n F ra n c i s c o B a y A re a
Res ea rch an d D e mo g ra p h i c Un i t
Map of the Month: June 2009
Ge ogra phic I nfo rma tion Syste ms Unit
Attachm en t 7
Napa Co.
See reverse for chart
Sonoma Co.
Solano Co.
Marin Co.
Contra Costa Co.
San Francisco Co. Oakland Int'l
Transportation Infrastructure Vulnerable to Sea Level Rise Current
Airport
Future
Seaport
Sea Level Rise
FEMA 100 Year Flood Boundary
San Francisco Int'l
Alameda Co.
San Mateo Co.
Note: According to a report being prepared by the Bay Conservation and Development Commission ("Living with a Rising Bay: Climate Change Impacts on San Francisco Bay and Adaptation Strategies," available in 2009), the sea level in the Bay could rise a foot or more, inundating some communities and covering both the San Francisco and Oakland airports, state highways, and other key road and transit infrastructure. The FEMA 100 year flood boundary is shown for reference purposes only. Source: MTC in collaboration with the San Francsico Bay Conservation and Development Commission. Inundation data provided by Dr. Noah Knowles, U.S. Geological Survey, with funding from the California Energy Commission's Public Interest Energy Research (PIER) Program through the California Climate Change Center at Scripps Institut ion of Oceanography, and from the CALFED Science Program CASCaDE Project. Additional salt pond data provided by Seigel and Bachand, 2002.
Santa Clara Co.
Cartography: MTC GIS, TeleAtlas January 2008. G:\_section\Planning\Sea_Level_Rise_Analysis\Arcmap_proj\Sea_Level_Rise_8x11.mxd
Scale: 1 in = 8 miles
0
69
Âź
½
Santa Clara C
1in.
Source: Metropolitan Transprotation Commission
Ecology of Redwood City Shore
Source: Spur Report / San Francisco Shoreline Adaptation Atlas
70
Alluvial Fans and Alluvial Plains Alluvial fans and alluvial plains are the areas built up over thousands of millennia with sand and gravel eroded from the Coast Range hills and deposited on the floor of the valley thatcurrently contains San Francisco Bay. The location and shape of the fans and plains influences the shape of the baylands, which generally have filled in the spaces between and in front of the fans/plains.
Source: Spur Report / San Francisco Shoreline Adaptation Atlas
71
Redwood City Shore
72
Adaptative measures for Sea Level Rise Natural & Nature-Based Measures - Mudflat Augmentation - Beach creation - Tidal Marshes - Polder Management - Ecotone Levees - Creek-to-baylands reconnection - Green Stormwater Infrastructure
73
Source: Spur Report / San Francisco Shoreline Adaptation Atlas
74
Adaptative measures for Sea Level Rise Grey Infrastructure - Levees and Dikes
- Super Levees
- Flood Walls
- Seawalls
- Revetments and Riprap
- Bulkheads
- Elevated Land - Elevate or Realign Transportation 75
Source: Spur Report / San Francisco Shoreline Adaptation Atlas
Source: https://baytrail.org/
76
Ecology of the Creek from Observation
ood Redw
77
k
Cree
Wildlife in Bair Island and surrounding area Birds Brown Pelican Double-crested Cormorant***1 Great Blue Heron White-tailed Kite**2 Caspian Tern Forster’s Tern American Avocet Harbor Seal**3 Snowy Plover Northern Harrier***4 Burrowing Owl***5 Loggerhead Shrike ***6 Black-necked Stilt Sora Semipalmated Plover Long-billed Curlew Snowy Egret American White Pelican California Clapper Rail ***7 Alameda Song Sparrow***8 Killdeer Western Grebe American Coot Gulls 1
6
Native salt marsh plant species Pickleweed Cordgrass Mammals Salt marsh harvest mouse ***9 Salt-marsh Wandering Shrew***10 Raccoons striped skunks red foxes - non-native Reptiles/Amphibians Alligator lizard gopher snake Fish bay ray bay pipefish bay goby shiner surfperch starry flounder English sole *** Federal or State Endangered Species ** California Species of Special Concern
2
7
3
8
4
9
5
10
78
Current Electric Ferry Development Denmark Ellen / Electric Passenger Ferry
- Capable of carrying 30 vehicles and 200 passengers - 60m Long 13m wide - Operates between the island ports of Fynshav and Søby - Cruising speed 13-15.5knots (15-18mph)
*** Federal or State Endangered Species ** California Species of Special Concern
San Francisco Enhydra / Hybrid / Electric Passenger Ferry
- Has an e lectric traction motor and a biodiesel-powered engine - Capable of carrying 600 passengers - 128ft Long, three stories - Operates as a tour boat in San Francisco Bay - Top speed 8-10knots (9-11.5mph)
Source: https://www.electrive.com/2019/06/04/denmark-most-powerful-electric-ferry-named/ https://redandwhite.com/enhydra/ http://www.greencityferries.com/page1.html#header9-s https://www.wsdot.wa.gov/Ferries/yourwsf/ourfleet/name.htm https://www.kitsapsun.com/story/news/2018/09/12/washingtonstate-ferry-proposal-new-eco-friendly-vessels-fleet-2040/1284670002/
79
Norway Airiel / Electric Passenger Ferry
- Capable of carrying 75 passengers and 15 bycicles - Development stage in Stockholm - Cruising speed 25-30knots (28-34mph)
Seattle, WA Washington state plans to add 16 hybrid electric ferries by 2040 Tacoma / Being converted to Electric Passenger Ferry - Max Passengers: 2499, Max Vehicles: 202 - Cruising speed 18knots (20mph)
80
Electric Hydrogen Hybrid Boat Energy Observer - powered by electric propulsion from a mix of renewable energies and a hydrogen production system. Top speed at 10 knots. 30m long, 12.8m wide.
Source: https://www.tycoonstory.com/technology/sun-and-wind-to-power-energy-observer-catamaran-on-six-year-circumnavigation/
81
Source: https://www.marineinsight.com/shipping-news/energy-observer-vessel-fitted-with-oceanwings-wingsails-the-solution-devised-by-vplp-and-cnim-to-decarbonize-maritime-transport/
82
Zero Wave, Zero Emission, Zero Noise Boat - Seabubbles A French company, Hydroptere, developed a water transportation system that has minimal environmental impact. The company’s first product, Seabubbles is a oval-shaped electric hydrofoil boat that carry upto four passengers.
Source: https://www.popsci.com/seabubbles-concept-wants-to-be-water-taxi-future/ https://plugboats.com/flybus-seabubbles-new-hydrofoil-electric-ferry/ http://sailinggab.com/sailing-videos/hydro-foil-sailing-the-future-of-sailing/ https://www.yachtingworld.com/special-reports/the-foiling-phenomenon-66269 https://www.cnn.com/2017/06/22/sport/ sailing-sailrocket2-paul-larsen-recordocean-crossing-blue-riband/index.html
16.3ft long, 8.2ft wide. Top speed 18 knots(20.5mph). 44kwh battery 83
Flybus Hydroptere is developing their second product Flybus, which is larger version of Seabubbles that can carry upto 32 passengers.
Competitive sailing industry brought a dramatic advancement in foiling technology in recent years. Paul Larsen’s Sailrocket holds a record for reaching a high speed of over 60knots.
84
Ferry Operation Scenario Assumptions:
1. Daily Commuters between SF and Santa Clara County: 19,000 (SF to Santa Clara county: 19,000, Santa Clara county to SF: 10,000) 2. Ferry Service takes on 10% of total commuter load : 1,900 passengers per day SF terminal to Redwood city terminal: 1,900 Passengers Redwood City terminal to SF terminal: 1,000 Passengers 3. A lightweight electric ferry carry upto 20 passengers per ride 4. Daily Commute hours(Peak hours): 7am - 10:30am, 4pm - 7:30pm 5. The cruising speed of the ferries : 35-40 knots (40-46mph) 6. One way trip travel time: 45mins 7. Approximate electric power required for 1 way journey from San Franciscio Ferry Building terminal to Redwood City Terminal: 125 kwh 8. Average hours for daily solar production in full capacity is 5 hours (factoring in weather, seasonal daylight difference) 9. 65% passengers drive
Known Factors:
- Available land for Parking/Solar Energy Harvesting: 650,000 sqft - One 21.125 sqft (39� x 78� panel, commercial size) solar panel unit with 360 Watt production rate will generate 0.36 Kwh (0.017Kwh per sqft)
Reference: https://www.solarpowerrocks.com/solar-basics/how-much-electricity-does-a-solar-panel-produce/
85
Preliminary conclusion:
1. Ferries run every 3mins during peak commute hours - 70 ferry rides (20 ferries per hour) 2. Off peak hour(10:30am - 4pm, 7:30pm - 9pm, total 7hrs) ferries run every 6 mins - 70 ferry rides 3. Minimum number of fleets: 35 ferries 4. Predicted Electric Power required for the ferries per day: 35 Mwh 5. Minimum required Solar Energy gain per hour: 7 Mwh 6. Required solar panel coverage area : 411,764 sqft surface area 7. Required parking space at Redwood City Terminal: 650 spotsv
Predicted Solar Energy Production:
- System Specification Location: 1548 Maple Street, Redwood City Latitude: 37.49 N, Longitude: 122.22 W DC System Size: 52kW per modules (individual panel size of 63.5’ x 55’) Module Type: Standard Array Type: Fixed (open rack) Array Tilt Angle: 30 degree Array Azimuth: 180 degree (south facing) System Losses: 14.8% - Average daily solar energy generation per module: 234kWh - Number of photovoltaic module on the roof: 161 - Total daily solar energy generation (average): 37mW
Reference: https://pvwatts.nrel.gov/pvwatts.php
86
87
1.05 Research Summary Overall
Threats from Sea level Rise / Flood
The selected site near the port of Redwood City offers a good opportunity to demonstrate how architecture can connect people and the Bay as well as serving as a water transportation hub linking the South Bay and the other neighborhoods through the ferry service in the Bay.
It is neccesarry to consider threats from sea level rise and flooding as the site is in a risk zone for both. The design of Ferry terminal should respond to those risks.
Why Redwood City? Firstly, the water’s edge adjacent to Redwood City has an amazing natural environment and public space. Yet, limited access due to the highway 101 and industrial activities alongside 101 discourage people from coming to the water’s edge.
Ecology around the site The terminal will bring in ferry services and people close to Bair Island which is a protected natural habitat. The design of the terminal should consider the importance of respecting the precious wildlife habitiats surrouding it as well as encourage its users to understand its importance.
Secondly, there is an already available water way for the ferries to operate thanks to the port of Redwood City located near the site.
88
89
1.06 Site and Context Analysis
90
91
SITE 2
SITE 3
92
Redwood Creek Watershed Map Creeks, buried or drained Underground strom drains > 24� Redwood Creek, exposed
93
Physical Barriers Redwood Creek Industrial activities Barriors - 101, industrial buildings
94
Green Space - Protected Habitats, Parks
95
Nolli Map Study
Site
96
Zoning Map
1
1
97
Hospital School Marina Mixed Use Residential Commercial Industrial Industrial - Port Related Mixed Use - Downtown Park / Protected Land Urban Reserve - Salt Flat Transit Center
Flood Map
Special Flood Hazard areas 0.2 % Annual chance of flood hazard
98
Pedestrian & Car Access Pedestrian only path Major Road Highway 101
SITE
Highway 101
99
1
2
3
1 Maple Street 2 Woodside Rd at Highway 101 3 Redwood Creek & 101 intersection
100
101
1.07 Existing Site Condition Site Plan
102
Micro Site Plan - Site 1 / Initial Site Choice Stanford Rawing and Sailing Center Marine Science Institute Rental Accomodations Rental Accomodations Bair Island Marina Public Boat Launch Port of Redwood City Marina Seaport Conference Center Guest Dock Public Fishing Pier Redwood Landing Public Waterfront and Promenade Redwood City Port Wharf (3,4)
13
11 12 1 2 10
9
Ferry Terminal Site 8
6
7
Salt Pond (Man-made Wet Land) OfďŹ ces
4
5
103
Master Plan - Site 1 / Initial Site Choice
7
6
4
5
1 2 3 4 5 6 7
Ferry Entry Transit Connection - Bus Transit Connection - Barge Bike Trail Existing Bay Trail Planned Bay Trail Redwood City Downtown Redwood Transit Center Barge Landing Public Open Space Proposed Terminal Site Port of Redwood City Marina
7
4 3 1 2
104
Micro Site Plan - Site 3 / New Site Selection
1
1 2 3 4 5 6 7 8 9
1
Residential Apartments House Boats Rowing Club Homeless shelter Redwood City Police Department San Mateo County Womens Jail Office Retail Hotel
3 Ferry Terminal SIte 1 2 Maple Street
1
6 5 4
9 Highway 101
7
105
8
Site Photos
106
107
1.08 Area Master Plan
108
Master Plan - Site 3 / New Site Selection
109
Signage 1 Informaion on Redwood Creek
Signage 2 Salt Water / Fresh Water Ratio, Harbor Seal Habitat
Signage 3 Salt Water / Fresh Water Ratio, California Clapper Rail Habitat
Signage 4 Salt Water / Fresh Water Ratio, Salt Marsh Harvest Mouse Habitat
Signage 5 Salt Water / Fresh Water Ratio, Double Crested Cormorant Habitat
110
111
Collage
112
1.09 Spacial & Functional Program
113
Preliminary Programs
20,000 sqft
Ferry Terminal
20,000 sqft
Public Plaza / Multi-use
40,000 sqft
Community Market Hall
6000 sqft
Bicycle Sevice Center
6000 sqft
Bay Trail Information Center
12,000 sqft
Restaurant / Cafe
10,000 sqft
Administration Office
114
Preliminary Programs
I. Ferry Terminal
20,000 sqft
I.01 Ticket Windows / Kiosks I.02 Lounge / Information I.03 Passenger meeting / waiting area I.04 Cafe / Shop I.05 Restroom, M I.06 Restroom, F I.07 Restroom, wheelchair - accessible I.08 Information Desk I.09 Staff Area I.10 Staff Restroom, M I.11 Staff Restroom, F II. Public Plaza / Multi-Use Area
20,000 sqft
II.01 Flexible open space II.02 Passenger meeting / waiting area II.03 Restroom, M II.04 Restroom, F II.05 Restroom, wheelchair - accessible III. Community Market Hall III.01 General Market Hall III.02 Mixed Stores
115
40,000 sqft
IV. Bycycle Service Center
6,000 sqft
IV.01 Check-in / Check-out area IV.02 Technician work area IV.03 Bike Storage IV.03 Staff Room V. Bay Trail Information Center
6,000 sqft
I.01 Information Desks I.02 Lounge I.03 Display / Exhibit Area I.04 Staff room VI. Cafe, Restaurant
12,000 sqft
II.01 Cafe II.02 Restaurant II.03 Restroom, M II.04 Restroom, F II.05 Restroom, wheelchair - accessible VII. Administration Office
10,000 sqft
VII.01 Office VII.02 Staff Kitchen VII.03 Restroom, M VII.04 Restroom, F Total SQFT: 114,000
116
1.10 Spatial Analysis
117
Ferry Terminal Public Plaza/Multi-use Community Hall Bay Trail/Bike Center Cafe/Restaurants Administration Elevated Walk/Bike Trail
118
Spatial Analysis
119
120
1.11 Building Code Analysis
121
Construction Type : III-B
OCCUPANCY TYPE
A2: Assembly for restaurants and cafeterias A3: Waiting area in transportation terminals B: Business Offices Rowing & Paddling School Professional Services M: Mercantile for markets S2: Parking lots
SQFT 24,000 48,000 40,000
LOAD 2,181 2,400 400
40,200 155,700
670 778
Total Occupancy Load
6,429
122
123
1.12 Site Model
124
Site Model
Scale 1/128” = 1’
125
Scale 1/128” = 1’
126
127
1.13 Massing Study Models
128
Concept Models
1 2 3 4
Curled Skin Sliced + Shifted Extrusion Folding + Puncture
129
1
2
3
4
1 2 3 4
1
2
3
4
Undulating Ring Trumpet Parallax Vertices 130
Concept Models
1 Undulating Slope 2 Stacking 3 Bubbles 4 Structural Ribs 131
1
2
3
4
1 2 3 4
1
2
3
4
Extrusion + Bridging Extended Ground Intersecting Planes Peeling Ground 132
Concept Models
1
1 Fragmented
133
134
135
2.0: Thesis Project
136
137
2.01 Development Models
Concept Development - Site Plan / Phase 1 Concept Development - Site Plan / Phase 2 Photovoltaic Array Plan Studay Plan Developments Concept Development - Sectional Diagram Concept Development - Massing models
138
Concept Development - Site Plan / Phase 1 R416'-3 1/2"
One Section 60' x 85' 20 cars, 234 panels 83 sections for 19,444 panels
Scale 1' = 1/128"
One Section 60' x 85' 20 cars, 234 panels 83 sections for 19,444 panels
Scale 1' = 1/128"
139
Scale 1' = 1/128"
One Section 60' x 85' 20 cars, 234 panels 83 sections for 19,444 panels
Scale 1' = 1/128"
140
Concept Development - Site Plan / Phase 2
141
142
Concept Development - Placement / Orientation
One Section 60' x 85' 20 cars, 234 panels
71 0
83 sections for 19,444 panels
143
3/4
"
One Section 60' x 85' 20 cars, 234 panels
705'-7 1/2"
83 sections for 19,444 panels
83 sections for 19,444 panels
One Section 60' x 85' 20 cars, 234 panels
'-5
667'-10 1/4
"
One Section 60' x 85' 20 cars, 234 panels 83 sections for 19,444 panels
765'-6 3/4"
Photovoltaic Array Plan Study
3 8.5
3 14.5
Winter
11
8.5 20.5
17 22.5
10'-0"
25
28
20'-2 1/2"
32
26.5
44
46
44 50
52
57 61.5
58 62
67.5
69
69
67.5
71
47.5
53 47.5
42
42
36
36
36 29.5
29.5
29.5 24
24
24 18.5
18.5
18.5 13
13
8.5
59.5
53
53 47.5
42
13
7
7
1.5
65
59.5
59.5
53
71
65
65
45
76
76
71
60
73
76
71.5
71
67.5
61.5
73
63.5
30.5
38
57
54.5
23
32
50
46.5
16
20.5
38
40
38
14.5
32
34.5 39.5
Summer
Total 1115 of 30'x13' panels 434,850 sqft
26.5
45'-0"
17.5
5'-0"
5 10
45'-0"
2.5
10'-0"
Winter each panel 30'(27.8')x13'
7 1
1
1
Winter Months Arrangement
Summer Months Arrangement
Total 1086 of 30'x13' panels 423,540sqft
Total 1086 of 30'x13' panels 423,540sqft
4'-0"
32'-0"
4'-0" 4'-0"
4'-0"
4'-0" 4'-0"
144
Plan Development - Roof, Water Level (G)
Roof Level 1”=1/128’
Ground Level 1”=1/128’
145
Ground Level 1” = 1/128’
Plan Development - Parking Level (1F)
Public Transit Pick up/Drop off
Parking Level 1�=1/128’
708 Parking spots
65
'-0
"
35
'-0
"
688 parking spots
146
Plan Development - Scheme 1
1
2
3
147
1 Water Level (G) Plan 2 Parking Level (1F) Plan 3 Roof Plan
Plan Development - Scheme 2
1
35
'-0
"
708 Parking spots
2
3
1 Water Level (G) Plan 2 Parking Level (1F) Plan 3 Roof Plan
148
Concept Development - Sectional Diagram
149
Concept Development - Massing Models
Scale 1/128� = 1’
150
2.02 Site Plan
151
Galveston Dr
nd
Rd
ee t Str ple
ple
Str
ee t
Blomquist Street
Ma
Fre ewa y1 01
Seaport Blvd
Seaport Blvd
Isla
Ma
ir
Ba
Fre ewa y1 01
Site Plan 1/128� = 1’
152
153
2.03 Floor Plans
154
Floor Plan - Water Level (G)
1. Passenger Boarding 3. Cafes 4. Restaurants 5. Rowing and Paddling School 6. Market Hall 7. Artisan Market 8. Mixed Shops 9. Arrival Hall / Information Center 10. Bay Trail Center 11. Bike Store / Bike Storage 12. Playground 14. Storage 13
1 12
3
4
1
2 10
11 3 5
7 4
6
9
14
8
Water Level Floor Plan
155
N
0 4’ 8’
16’
32’
64’
Floor Plan - Parking Level (1F)
Upper Floor Plan
N
0 4’ 8’
16’
32’
156
64’
157
2.04 Building Sections
158
Building Section - Cross
Cross Section
159
Scale 1/16” = 1’
0’
4’
8’
16’
32’
Building Section - Transverse
Transverse Section
Scale 1/16” = 1’
160
0’
4’
8’
16’
32’
161
2.05 Building Elevations
162
Southern Elevation
South Elevation
163
Scale : 1/16” = 1’
Northern Elevation
North Elevation
Scale : 1/16” = 1’
164
Eastern Elevation
East Elevation
165
Western Elevation
166
167
2.06, 2.07 Wall Section / Partial Elevation
168
1) 1’ D Steel Tube 2) 8” D Steel Tube 3) 8” Cross Laminated Timber 4) 1’ x 6” Laminated Spruce 5) 2” Thick Glass 6) 2’ Thick Concrete Pontoon Foundation 7) 2’ D Steel Column 8) Battered Piles 9) Photovoltaic Panels 10) Bladeless Wind Energy
10
2
1 9
2
7
1
3
4
5
6
8
169
170
2.08 Building Details Of Critical Areas
171
2” Laminated Galzing 1” Steel Railing Post 3/4” Deck Wood Board Wood Spacer Block Diagonal Column connection Recessed Frame System
2” Rigid Insualtion Waterproofing Membrane 2” Heating Screed Separating layer 3/4” Wood Floor Board
Metal Plate Waterproofing Membrane 8” CLT Railing Slab 3” Pervious Concrete Slab Drainage Drainage Spout 2” Rigid Insulation 8” CLT Floor Slab
Asphalt 3” Pervious Concrete Slab Drainage Waterproofing Membrane 2” Rigid Insulation 8” CLT Floor Slab Glazing Frame System 16” Glue-laminated spruce
172
2.09 Sustainability Strategy
173
174
2.10 Egress Diagram
175
Ground Floor Egress Route
1. Passenger Boarding 3. Cafes 4. Restaurants 5. Rowing and Paddling School 6. Market Hall 7. Artisan Market 8. Mixed Shops 9. Arrival Hall / Information Center 10. Bay Trail Center 11. Bike Store / Bike Storage 12. Playground 14. Storage 13
1 12
3
4
1
2 10
11 3 5
7 4
6
9
14
8
Water Level Floor Plan
N
0 4’ 8’
16’
32’
64’
176
2.11 Structural Diagrams
177
178
179
2.12 Mechanical Diagrams
180
Solar Vacuum Tubes
Solar Vacuum Tubes Electronic Control
Secondary COLD WATER FEED HOT WATER TO TAPS Heater
Water Tank
Horizontal Closed Loop System
181
Solar Sensor
Solar Vacuum Tubes Electronic Control
Heat Pump Flow Controller
Secondary COLD WATER FEED HOT WATER TO TAPS Heater
Water Tank
Horizontal Closed Loop System
Solar Sensor
Electronic Control
Heat Pump Flow Controller
Secondary COLD WATER FEED HOT WATER TO TAPS Heater
Water Tank
Horizontal Closed Loop System
S S
Heat Pump
Flow Control
Solar Vacuum Tubes
Solar Sensor
p
ller
Electronic Control
Secondary COLD WATER FEED HOT WATER TO TAPS Heater
Water Tank
Horizontal Closed Loop System
Solar Sensor
Heat Pump Flow Controller
Cross Section
Scale 1/16” = 1’
0’
4’
8’
16’
32’
182
183
2.13 Building Section of an Important Public Space
184
185
Cross Section
Scale 1/16” = 1’
0’
4’
8’
16’
32’
186
187
3.0: Final Thesis Presentation
188
3.01 Exterior Perspectives
189
Exterior View - View from Northside
190
Exterior Perspective - Aerial View
191
192
193
3.02 Interior Perspectives
194
Interior Perspective - View from Lower Deck
195
Interior Perspective - View from Upper Deck
196
197
3.03 Photos of Physical Model
198
Physical Model I - Top View
Scale 1/128” = 1’
199
Physical Model I - Perspective Views
Scale 1/128” = 1’
200
Physical Model II
Scale 1/8” = 1’
201
Physical Model II - Top View
Scale 1/8” = 1’
202
Physical Model II - East Elevation
Scale 1/8” = 1’
203
Physical Model II - West Elevation
Scale 1/8” = 1’
204
Physical Model II - South Elevation
Scale 1/8” = 1’
205
Physical Model II - North Elevation
Scale 1/8” = 1’
206
Physical Model II - South East Perspective
Scale 1/8” = 1’
207
Physical Model II - North West Perspective
Scale 1/8” = 1’
208
Physical Model II - South West Perspective
Scale 1/8” = 1’
209
Physical Model II - North East Perspective
Scale 1/8” = 1’
210