This thesis is a proposal for a new zero energy ferry transit-hub in Redwood City. The architecture provides an access point for the people to the bay as well as bringing the South Bay and the broader Bay Area neighborhoods closer through the closely linked ferry services delivered. A highly efficient ferry service would ultimately alleviate the continually worsening Bay Area traffic congestion problem. Sustainability is the main priority for BAST. BAST takes net-zero energy from the grid by harvesting solar energy through the photovoltaic arrays on the building’s roof and using it to operate its electric ferry fleet. The building uses a set of floating pontoon foundations as a solution to the threat of increasing flooding events as well as the sea level rise.

Jang Ock Kim 04380054 Academy of Art University Graduate School of Architecture M.Arch (87 units)


0.02: Table of Contents

0.0 Preface 0.01 Project Abstract 0.02 Timeline of Study

02 04

1.0 THESIS RESEARCH

1.01 Concept Statement 1.02 User Group Narrative 1.03 Precedent Studies 1.04 Research 1.05 Research Summary 1.06 Site and Context Analysis 1.07 Existing Site Condition Site Plan 1.08 Area Master Plan 1.09 Spatial & Functional Program 1.10 Spatial Analysis 1.11 Building Code Analysis 1.12 A Site Model 1.13 Massing Study Models

07 09 12 26 88 90 102 108 113 117 121 124 128


2.0 THESIS PROJECT

2.00 Thesis Project 2.01 Development Models 2.02 Site Plan 2.03 Floor Plans 2.04 Building Sections 2.05 Elevations 2.06 Wall Section 2.07 Partial Elevation 2.08 Building Details 2.09 Sustainability Strategy 2.10 Egress Diagram 2.11 Structural Diagrams 2.12 Mechanical Diagrams 2.13 Building Section of Public Space

136 138 151 154 158 162 168 168 171 173 175 177 180 184

3.0 FINAL THESIS PRESENTATION

3.01 Exterior Perspectives 3.02 Interior Perspectives 3.03 Physical Model

189 194 198


0.0: Preface


0.01: Project Abstract

Inhabitants of the Bay Area have the tremendous privilege of having access to its incredible natural resources, with the bay itself as one of the most important natural resources in the region. This thesis is a proposal for a new Bay Area Solar Transit-hub (BAST), a zero-energy ferry transit center in Redwood City that has both social and environmental benefits. The innovative new architecture revitalizes the overlooked waterfront of Redwood City by providing services and spaces for people to come and enjoy the beautiful setting on the water’s edge. It provides an access point for the people to the bay and to other communities beyond by bringing the South Bay and the broader Bay Area neighborhoods closer through sustainable clean-energy ferry services. The ferry service ultimately alleviates the notorious Bay Area traffic congestion issue. BAST is a prototype for a sustainable waterway public transit system network that can be expanded throughout the Bay Area and other cities around the world that need effective waterway networks. The building emphasizes key sustainability aspects of architecture at the present time and the near future, including renewable energy and adaptive architecture for the climate crisis. BAST takes net-zero energy from the grid by harvesting solar energy through the photovoltaic arrays on the building’s roof and using it to operate its electric ferry fleet. The building rests on a set of floating pontoon foundations as a solution to the threat of increased flooding events and sea level rise.

2


0.02: Timeline of Study

ARH 650 (3units): Introductory Design Studio ARH 651 (3units): Design Process & 2D Media ARH 652 (3units): Architecture Tectonics

ARH 609 (6units): Intermediate Design Studio 1 ARH 620 (3units): Digitally Generated Morphology ARH 640 (3units): Architectural History - Introduction

ARH 619 (6units): Advanced Desi

ARH 641 (3units): Architectural History/ Modernism & Its Glolbal Impact

Fall 2016

Fall 2015

Fall 2017

Spring 2017

ARH 653 (3units): Introductory Design Studio 2 ARH 654 (3units): Design Process & 3D Media ARH 652 (3units): Graduate Design Technology 1/ Structures

3

IAD 608 (3

Summer 2017

Spring 2018

Su

ARH 608 (6units): Advanced Design Studio 1 ARH 601 (3units): Spatial Composition ARH 604 (3units): Material and Methods of Construction: Building Detailing


ign Studio 2

ARH 690 (3units): Thesis Preparation & Development ARH 614 (3units): Architectural Professional Practices ARH 659 (3units): Digitally Generated Fabrication

IAD 611 (3units): Building Information Modeling - Elective ARH 900-2 (3units): Internship:Architecture

3units): Digital Imaging - Elective Study

Fall 2018

ummer 2018

Fall 2019

Spring 2019

ARH 606 (3units): Construction Documents & Building Codes ARH 605 (3units): Graduate Design Technology 2/Enviromental Controls ARH 642 (3units): Architectural Theory

Spring 2020

ARH 810 (6units): Master of Architecture Thesis

Total Units: 87 Graduation Date: May 20, 2020

4


1.0: Thesis Research & Preliminary Design


1.01 Concept Statement Connecting the Bay and its people The Bay Area, as the name suggests, is known for the beautiful scenery of its natural environment provided by the surrounding bay as well as its unique urban character. The Bay has been strictly regulated and protected since the 1970s as it is recognized as one of the most ecologically important habitats in California where it supports a number of endangered species. However, does the Bay share similar intimate relationship with its people? Many communities are disconnected from the Bay, as it is often inaccessible due to a physical barriers such as freeways or other infrastructure where public access is limited. A close relationship between communities and the Bay is vital for the restoration/protection of the Bay to be successful and sustainable. What can be done to reconnect the Bay and its people?

Congested grid With the Bay Area’s continued economic growth and the popularity among city dwellers, its population has been steadily growing. Combined with the natural geological condition of the Bay, i.e. dependency on bridges, the challenges the Bay Area’s transit system faces have been growing and becoming a big issue. In the late 1800s, the Bay’s transit systems at the time played a large role. It was served by various ferry routes, some of which were even linking railroad systems across the Bay. The importance of the ferries declined rapidly with the completion of the Golden Gate Bridge and the Bay Bridge. Is there something to be learned from the past? The Bay Area’s current commuter traffic condition ranks as one of the worst in the nation. Can the Bay provide some relief to the Bay Area’s problematic transit condition?

Sustainability at its core The future of architecture must include sustainability as its core design element. Deploying sustainable green energy for this project should be a must-have not a nice-to-have. Since the project is about the Bay and its water, the architecture must have a solution to the increasing threat of the climate crisis, especially the sea level rise.

7


Redwood City Ferry Terminal

- Ferry Terminal - Public Plaza / Meeting point - Public Community Markets - Bicycle / Pedestrian trails - Shared Office Space - Restaurants / Cafes - Aquatic Center - Rowing and Paddling

Photo credit: https://clui.org/ludb/site/port-redwood-city 8


1.02 User Group Narratives Group I : Commuters using ferry services. Overall, the majority (about 70 percent) of the riders are between 25 and 54 years of age. The majority of this group are employees of tech companies located in the area known as Silicon Valley. This results in the ferry rider user group having a non-standard income distribution, as 45% of the ferry riders have an annual household income of more than $150,000. Group II : The residents of Redwood City and neighboring cities One of the proposed ferry terminal’s primary goals is to provide an access point to the Bay for the people of the nearby neighborhoods. The new pedestrian trails and transit transportation would make it easier for the residents of Redwood City and the broader area to reach the water’s edge for either travel purposes or recreational purposes. Group III: Bay Trail Users The terminal invites the Bay Trail users to make a stop or visit it as their final destination. The program includes a Bay Trail information center as well as a bycicle service/storage center. The cafes/restaurants also welcome the Bay Trail users as well as the general public

9


User Group Profile of Ferry Riders

User Group By Age

User Group By Race

User Group By Income

Source: http://www.bayareacensus.ca.gov/transportation/VitalSigns/ 10


11


1.03 Precedent Studies Yokohama International Ferry Terminal By Foriegn Office Architects

Vartaterminalen Ferry Terminal C. F. Møller Architects

Leixões Ferry Terminal Luís Pedro Silva Arquitecto

WMS Boat House at Clark Park Studio Gang

Public Water Transportation System in Venice, Italy

12


Case Study Yokohama international ferry terminal Foreign Office Architects (FOA) Yokohama, Japan 2002 The Terminal is integrated as part of the landscape of the city’s harbor that serves as a public space in addition to its core function; an international ferry terminal. The long span arched steel structure enables column-free wide open space. Undulating surfaces combined with various uses of ramp enables a seamless transition between the interior and the exterior space. The circulation system consists of a series of interlocking paths instead of isolated routes found in a typical termial settings. The open and flexible terminal floor works as coverd public space and is used for various purposes, such as events and public gatherings which draw the public to visit the terminal even though they have no intention to use the ferry service. The terminal successfully extends the city fabric onto the city’s harbor, bringing the people out to the waterfront and encourages then to engage with its physical environment of a terminal as well as the natural surrounding of the harbor.

Source: https://www.farshidmoussavi.com/node/15 13


14


Case Study vC. F. Møller Architects Stockholm, Sweden 2016

The new terminal for Stockholm’s permanent ferry connections to Finland and the Baltics recalls the shape of a moving vessel and the architecture - with large cranes and warehouses - that previously characterized the ports. The main idea has been to create natural links between central Stockholm and the new urban area in connection with the terminal, so that city life will naturally flow into the area. Therefore the terminal is raised to be at level with the urban zone, so it is easy for both pedestrians and traffic to access. At the same time the roof of the terminal building is designed as a varied green landscape with stairs, ramps, niches, and cosy corners, inviting both Stockholmers and passengers for a stroll or relaxing moments, while enjoying the view of the ferries, the archipelago, and the city skyline.

Source: https://www.cfmoller.com/ 15


16


Case Study Leixões Ferry Terminal Luís Pedro Silva Arquitecto Matosinhos, Portugal 2015

Porto Cruise Terminal is a small port complex, an initiative of the Administração dos Portos do Douro e Leixões, located at the South jetty in Matosinhos, Portugal. The strategic definition of a new cruise terminal had a double objective: improvement of the commercial efficiency and a better urban integration. That’s why the project integrates new buildings, berthing work and exterior spaces of public vocation. The main building shelters several programmatic components: cruise ship terminal, marina facilities, the Science and Technology Park of the Sea of the University of Porto, event rooms and a restaurant.

17


Source: https://www.archdaily.com/

18


Case Study WMS Boat House at Clark Park Studio Gang Chicago, Ilinois 2013 The boathouse provide a key public access point along the river’s edge, which led to the larger movement toward an ecological and recreational revival of the Chicago River. The design of the Eleanor Boathouse translates the motion of rowing, using two truss shapes to create a rhythmic roof form. In addition to highlighting the need for the continued revitalization of the river, the new facility—which also includes spaces for after-school mentoring and community events— allows for the expansion of these programs, extending their opportunities to people, and especially youth, on the South Side and across the city.

19

**Photo and drawing credit: Studio Gang


Eleanor Boat House at Park 571 Studio Gang Chicago, Ilinois 2016 Its alternating roof trusses were generated from studying this motion while creating functional south-facing clerestory windows that bring in sunlight to warm the boat storage facility in colder months using minimal energy. “The Chicago River boathouses are part of a new environmentally friendly vision for the city’s river. By making the riverfront a destination for recreation, anchored by dynamic sustainable architecture, we hope to catalyze long-term stewardship and support for the river’s remediation as well as improve the health of the communities that surround it.” —Jeanne Gang

**Photo and drawing credit: Studio Gang

20


Case Study Public Water Transportation System in Venice, Italy

Tourism

40%

Merchant

29%

Service

17%

Sport

10%

Gondola

4%

Water Taxi/Bus, Airport boats, Tour boats Cargo, Goods Delivery, etc..

Police, Ambulace, Garbage Collection, etc..

Photo Credit: https://www.reddit.com/r/interestingasfuck/comments/ayubz6/aerial_view_of_venice_italy/

21


Vaporetto(Water Bus)

Police Boat

Water Taxi

Gondola

Delivery Boat Photo Credit: https://www.welcomevenice.com/public-transport-in-venice-the-vaporetto/?lang=en http://www.venice-guide.info/Ships_Venice.php https://citywonders.com/blog/Italy/Venice/hiring-a-gondola-in-venice http://engineeringrome.org/transportation-traffic-control-in-venice/

22


Case Study Public Water Transportation Network in Venice, Italy

S.

G

IU

LI

A

N

O

I biglietti Actv sono acquistabili presso le biglietterie Venezia Unica, le biglietterie automatiche e i rivenditori autori Actv tickets can be bought from the Venezia Unica ticket points, the self-service ticket machines and the authorised rese

5.15.2 4.14.2

.1 24 4.

22

.1 25 5.

Night routes

AT CH O E

[R

R

5. 15 .2

5 6 4. .1 5 6 1 4 .2 .2

A

M O R n.] le St P.[Bus

PEOPLE MOVER

5 3 4. .1 5 3 1 4 .2 .2

ail

FE

w

R

ay RO St V n. I ] A

O

C

ET

TR

M

ER

H C N

TO

]

rk

O

Pa

[C

ar

TR

3 2 6 15. .2 5. .1 4 4

N

C

H

TR

ET

O

N

TO

TT O

.1 2 4 .1 4. .2 5 5

People Mover Funicolare terrestre Cable railway

5.15.2 4.14.2

YOU CAN EVEN PURCHASE ACTV TICKETS WITH AVM VENEZIA OFFICIAL APP

4.2 4.1 6 6 8 8

8 A quick and easy APP to download, enabling you to buy tickets directly with your smartphone, whenever you want and wherever you are.

16

10 R

Once the purchase is done, the ticket is loaded on your smartphone: near the smartphone to the appropriate scanner which reads the QR code that is visible on your screen.

4.2 4.1

4.2 4.1 6 6

8 8

8 8

16

AVM Venezia oďŹƒcial APP is downloadable free of charge from both Apple Stores and Google Play.

Ricordati di consultare gli orari esposti Remember to read the timetables shown

5.2 5.1 6 6 8 8

Punti vendita o biglietterie automatiche Venezia Unica Venezia Unica ticket points or self-service ticket machines

La linea ferma The waterbus does stop h

Informazioni turistiche Tourist information

La linea non ferma The waterbus does not st

Source: http://actv.avmspa.it/sites/default/files/mappa_linee_di_navigazione_NOV_2018_WEB.PDF

23

Presso i punti vendita Venezia Unica puoi trovare anche biglietti per eventi, musei, mostre e teatri // guide e m At the Venezia Unica ticket points you can also ďŹ nd tickets for events, museums, exhibitions and theaters // guides and


www.actv.it

@muoversivenezia

EL

LO

izzati (consulta la mappa nel sito www.actv.it), online su www.veneziaunica.it e con AVM Venezia Official App. ellers (see www.actv.it), online on www.veneziaunica.it and through the AVM Venezia Official App.

9

9

12

N

N

O

1 14 2

R

A

1412

12

B

U

4. 14 .2

.2 14 4. 3 .2 3 14 4. 3 3 .2 14 4. 3 3

TO

R

C

13 1412

3

3 3 1 4. 2 4. 7 18

14

3

4. 2 18 7 4.1

3 3

4. 24 .1

22

13 13

2 5. .2 4

)

VE

O

N

22 B

.te (F

13

3 12 1 2 4. .1 4

1 5. .1 4

13

22

4.2 4.1 7 18 18 12 12 13 13

22 13

22 .2 1 5 .2 5. .1 4 4

18

22 22 5.1 5.2 4.1 4.2

5.1 5.2 4.1 4.2

S.ZACCARIA

R R

818

LÒ

O O D IC LI .N S

4.2 4.1

B .2 B .1 5 .2 5 .1 4 4

D

O R LO ET EL PI ST S. I CA

I

A I e NN IN BIE

IN D

D

R

R IA

G

IA

G

4.2 4.1 5.2 5.1

.2 1 5 .2 5. .1 4 4

7

AT

LÒ O O O B D IC YLI .N RR S E F

S.MARCO PIAZZA S.MARCO

LE

20 19

14 8 18

4.2 4.1 5.1 5.2

R

.)

.E

10 5.2 5.1 6 8 14

20 20

Linea stagionale Seasonal route

20

here

M IA S. R ( A A M TT O A E D T B LI AN ISA S L E

.1 2 4 .1 4. .2 5 6 5 6

8 8

I D A O ZI D E LI EN V

15 14

.1 2 4 .1 4. .2 5 6 5 6 8 8

10

Validità dal 05.11.2018

BACINI - ARSENALE NORD

19

top here

mappe // tour // Venezia Unica // merchandising d maps // tours // Venezia Unica // merchandising

24


25


1.04 Research

Bay Area Traffic Bay Area Commute Flow Transit Usage Trend Travel Time Comparison on a weekday Ferry Terminals in San Francisco Current Ferry Operators in San Francisco Bay Bay Area Population Distribution Bay Regional Study - Mapping Bay Ship Traffic Study Sea Level Rise Bay Trail Electric Ferry Development

26


http://www.dot.ca.gov/hq/esc/tollbridge/SFOBB/Sfobbfacts.html http://www.dot.ca.gov/hq/esc/tollbridge/SM-Hay/SMfacts.html Dubmarton Corridor Transportation Study - San Mateo County Transit District. November 2017. http://goldengatebridge.org/tolls_traffic/

27


Bay Area Traffic

Richmond - San Rafael Bridge Avg Daily Traffic - 80,000 Vehicles Golden Gate Bridge Avg Daily Traffic - 112,000 Vehicles Bay Bridge Avg Daily Traffic - 270,000 Vehicles

San Mateo - Hayward Bridge Avg Daily Traffic - 81,000 Vehicles

Dumbarton Bridge Avg Daily Traffic - 70,000 Vehicles

An Average of 613,000 Vehicles Cross San Francisco Bay Daily. 28


Bay Area Traffic The Bay Area’s steady economic growth since early 2000s increased the region’s employment opportunities by 12% which resulted in population increase by 15%. As a result, the congestion in the region is worsening every year.

2010

89 % Increase Average Time Spent in Congested Freeways in Bay Area

Job Growth 12% Population Growth 15%

Source: Metropolitan Transportation Commission: Historical Congestion Analysis (1998-2017) Metropolitan Transportation Commission/Iteris: Congested Corridor Analysis (2017) California Employment Development Department: Labor Market Information (1998-2017) http://www.vitalsigns.mtc.ca.gov/time-spent-congestion

29

2017


While congestion only generates a few minutes of delay for the average commuter, commuters in a handful of high-demand corridors experience far worse conditions. The top ten most congested segments constitute nearly half of all regional freeway congestion, with just the top two segments along the Bay Bridge corridor constituting 16 percent all Bay Area traffic congestion. While congestion on other corridors in the region mirrors typical commute patterns, the Bay Bridge is affected by congestion for long periods throughout the day.

30


Bay Area Commute Flow

NAPA

SONOMA

10K

SOLANO

17K

MARIN 26K

CONTRA COSTA

50K

SF 43K

93K

40K

72

ALAMEDA

22K 75K

12K

20K

10K

34K

SAN MATEO

13K 10K

40K

65K 12K

19K

41K

50K

**Source: Bay Area Census Commute Data 2014

31

SANTA CLARA


32


Transit Usage Trend

33


Historical Trend for Commute Mode Choice in Bay Area

Metro Comparison for 2016 Commute Mode Choice

Source: U.S. Census Bureau: Decennial Census (1960-2000) - via MTC/ABAG Bay Area Census http://www.bayareacensus.ca.gov/transportation/Means19802000.htm https://www.vitalsigns.mtc.ca.gov/commute-mode-choice

34


Travel Time Comparison on a Weekday

San Francisco Ferry Terminal

65%

Drove Alone to work in 2016

10.2%

Used Carpool to work in 2016

11.9%

Used Transit to work in 2016 Redwood City Transit Center

35


Rush Hour

VS

Without Traffic Jam

1 Hour 30 Mins

45 Mins

1 Hour 9 Mins (Limited Service)

1 Hour 9 Mins (Limited Service)

54 Mins

54 Mins

36


Passenger Experience

37


Image Credit: https://anacortes.org/ferry-travel-what-to-know/

38


Health Risks of Commuting by Car in Traffic

39


Scientists from various organizations** found that driving more than 10 miles everyday results in

- Blood Sugar Rise - Higher Cholestrol Level - Higher Risk of Depression - Anxiety Increase - Reduced Happiness and Life Satisfaction - Blood Pressure Rise - Lower Level of Cardiovascular Fitness and physical activity - Lower Sleep Quality - Back Pain and Aches ** American Journal of Preventive Medicine, The University School of Medicine in Saint Louis, The Cooper Institute in Dallas, The U.K.’s Office of National Statistics, The University of Utah

Source: http://time.com/9912/10-things-y our-commute-does-to-your-body/

40


Redution of Cars on Roads by Ferry

1 Ferry Run

41

=

250 Less Cars on the Roads


Ferry Terminals in San Francisco Ferry Building Gate B Vallejo Route Gate 2 Gate 1 Golden Gate Ferry Terminal Canopy Structure Covering Appx 9,000 SQFT

Gate E Being Updated Gate F - New Harbor Bay, Richmond Gate G - New Alameda/Oakland

Pier 41 Marine Terminal

Ferries to Angel Island Alcatraz Ferry Building Pier 41 Terminal 10,000 SQFT is open to public and includs shops and cafes

Image Credit: Google Map 2019

42


Current Ferry Operators in San Francisco Bay San Francisco Bay Ferry San Francisco Bay Ferry is a service of the Water Emergency Transportation Authority (WETA) and is a non-profit organization. SF Bay Ferry carries over 2.8 million passengers annually utilizing a fleet of 14 high speed passenger-only ferry vessels SF Bay Ferry provides ferry services to Alameda Main Street, Harbor Bay, Oakland Jack London Square, Vallejo, San Francisco Ferry Building, Pier 41/Fisherman’s Wharf, and South San Francisco, along with seasonal service to Oracle Park.

Golden Gate Ferry Golden Gate Ferry is run by a government agency, Golden Gate Bridge Highway & Transporation District. Golden Gate Ferry (GGF) operates frequent ferry service between San Francisco and Larkspur in central Marin County, and between San Francisco and Sausalito and Tiburon in southern Marin County. Ferries depart from behind the center of the Ferry Building to Sausalito and Larkspur. Extra service is also offered from Larkspur to AT&T Park for Giants home games and other sporting and music events.

Blue & Gold Fleet Blue & Gold Fleet is a privately owned company and is the largest among the three ferry operators in SF Bay. It provides bay cruise and excursion services in San Francisco Bay as well as ferry services to Angel Island, Tiburon, Sausalito and Pier 41 (adjacent to Pier 39) and the popular Rocket Boat attraction.

Source: http://goldengate.org https://www.blueandgoldfleet.com/ https://weta.sanfranciscobayferry.com/

43


Ridership Statistics While there are more transportation alternatives than ever before, today’s congestion is worse than what was experienced during previous economic booms. More commuters are adopting the ferry services for their commute even though the services are limited to relatively small percentage of riders accross the Bay Area. The annual riderships for the ferry services over the San Francisco Bay has risen steadily since 2010.

5,412,538 Riderships over San Francisco Bay in 2018

44


Current Ferry Schedules

ALAMEDA / OAKLAND / SAN FRANCISCO Weekdays to San Francisco Depart Oakland

— 6:30 7:00 7:35 8:10 — 8:40 9:15 10:15 11:00 11:40 1:55 PM 2:40 3:50 4:30 5:05 5:55 6:20 7:05 8:45

Depart Alameda

6:00 AM 6:40 7:15 7:45 — 8:20 8:50 9:25 10:25 10:50 ▲ 11:30 ▲ 1:45 PM ▲ 2:25 ▲ 3:35 ▲ 4:15 ▲ 4:50 ▲ 5:45 ▲ 6:05 ▲ 6:55 ▲ 8:55

Arrive Ferry Building

6:20 AM 7:00 7:35 8:05 8:40 8:40 9:10 9:45 10:45 11:20 12:05 PM 2:15 3:05 4:20 5:00 5:30 6:20 6:50 7:30 9:25

Arrive Pier 41

— — — — — — — — 11:00 11:35 12:20 PM 2:30 — — — — — — — —

— — — — — — — — 10:50 12:30 PM 1:45 — 3:30 — — — — — — — — 8:05 —

Depart Ferry Building

6:25 AM ◆ 7:05 ◆ 7:35 7:45 8:10 ◆ 8:45 ◆ 9:40 10:30 11:05 12:45 PM ◆ 2:00 3:15 — 4:00 4:30 5:20 5:40 6:05 6:30 6:55 7:35 8:25 9:30

Arrive Alameda

7:10 AM 7:40 — 8:05 8:45 9:20 10:20 10:45 11:25 1:20 PM 2:20 3:30 4:10 4:20 4:45 5:40 6:00 6:35 6:50 7:15 7:55 8:45 9:50

9:10 AM 10:10 10:40 11:25 12:10 PM 1:10 1:40 2:55 3:55 4:55 5:40 7:40 9:10

V To S.F. via Oakland X To Alameda via Oakland . These departures are more likely to be at capacity. All arrival times are estimates.

8:55 AM ▲ 10:30 11:00 11:45 12:30 PM 1:30 1:55 3:15 4:15 5:15 5:55 7:55 9:25

Arrive Ferry Building

10:15 AM 10:55 11:25 12:10 PM 12:55 1:55 2:20 3:40 — 5:40 — — 9:50

Arrive Pier 41

9:40 AM 11:10 11:40 12:25 PM 1:10 2:10 — 3:55 4:45 5:55 6:20 8:25 10:05

Weekends from San Francisco Depart Pier 41

10:00 AM — 11:30 12:30 PM 1:00 2:15 3:15 4:15 5:00 5:30 6:30 7:00 8:30 10:15

Arrive Oakland

6:55 AM 7:30 8:00 — 8:35 9:10 10:10 10:55 11:35 1:05 PM 2:35 3:45 4:20 4:35 5:00 5:50 6:15 6:45 7:00 7:25 8:10 8:55 10:00

Depart Oakland

Depart Ferry Building

10:15 AM 11:00 11:45 12:45 PM 1:15 2:30 3:30 4:30 5:15 5:45 6:45 7:15 8:45 10:30

Arrive Alameda

Arrive Oakland

10:35 AM 11:20 12:05 PM 1:05 1:35 2:50 3:50 4:50 5:35 6:05 7:05 7:35 9:05 10:50

10:50 AM 11:35 12:20 PM 1:20 1:50 3:05 4:05 5:05 5:50 6:20 7:25 7:50 9:20 11:00

V To S.F. via Alameda These departures are more likely to be at capacity. All arrival times are estimates.

STANDARD FARES 1 Fares between Oakland, Alameda, SF Ferry Building and SF's Pier 41 One-way Regular $

7.00

$

Youth (5-18 years)

$

3.50

$

Senior (65+ yrs), Disabled, Medicare 2

$

3.50

$

Children under 5

FREE

FREE

School Groups

2.30

4

$

Short Hop 5 Adult Short Hop 5 Youth, Senior (65+ yrs), Disabled, Medicare 2

$

5:30 AM 6:00 6:30 7:00 7:45 8:30 9:30 10:30 12:00 PM 2:00 V 3:10 4:00 4:45 5:45 V 7:00

Arrive Ferry Building

6:30 AM 7:10 7:30 8:10 8:45 9:40 10:30 11:30 1:10 PM 3:20 4:10 5:00 5:45 7:05 8:00

6:35 AM 7:15 8:15 9:45 10:40 O 11:40 2:40 PM 3:30 4:30 5:00 5:30 6:00 7:15 8:15

Depart Pier 41

— — — — 11:00 — — 3:10 X — — — — 6:55 X —

Arrive Vallejo

7:35 AM 8:25 9:15 10:55 12:00 PM 12:40 3:50 4:30 5:30 6:00 6:40 7:00 8:15 9:15

Arrive Mare Island

— — — 11:05 AM 12:15 PM 12:55 — — — — 6:55 7:15 8:30 9:30

V To SF Ferry Building via Pier 41 X To Vallejo via SF Ferry Building O To Vallejo via Pier 41 These departures are more likely to be at capacity. All arrival times are estimates.

N/A $

0.80

$

1.70 0.80

SCHEDULE, SERVICE & FARE QUESTIONS?

Alameda/Oakland/San Francisco Route Harbor Bay/San Francisco Route Alameda/Oakland/South San Francisco Route Richmond/San Francisco Route

Alameda/Oakland/ Harbor Bay/ San Francisco San Francisco

S. San Francisco/ Alameda/Oakland

Richmond/ San Francisco

Memorial Day, Monday, May 27

Weekend Schedule

Weekend Schedule No Service

No Service

No Service

(415) 705-8291

July 4th, Thursday

See below*

See below*

No Service

No Service

No Service

Vallejo/San Francisco Route

Labor Day, Monday, September 2

Weekend Schedule

Weekend Schedule No Service

No Service

No Service

Columbus Day, Monday, Oct. 14

Weekday Schedule

Weekday Schedule

Weekday Schedule

Weekday Schedule

* Check website for schedule 1 Standard Fares and Clipper Cards cannot be used on AT&T Park Service. 2 Must have a Regional Transit Connection Clipper card, Medicare card, DMV placard, proof of veterans disability, proof of age 65 years or older, or Senior or Disabled ID issued by another California transit system and a valid photo ID. 3 Children under 5 years of age may ride FREE with each fare paying adult. 4 Fare applies to students, teachers, and chaperones. To qualify school groups must call for advanced approval and reservations. For Alameda/Oakland/SF, South SF/Alameda/Oakland, and Harbor Bay/San Francisco routes call (415) 705-8214. For Vallejo/San Francisco route call (707) 643-3779. 5 One-way between Oakland and Alameda or between the SF Ferry Building and Pier 41. 6 One-way between Mare Island and Vallejo or the SF Ferry Building and Pier 41. Fares subject to change.

Source: https://weta.sanfranciscobayferry.com/

— — — — — — 10:50 AM — — 3:00 PM — — — 6:45 —

Weekdays from San Francisco Depart Ferry Building

Vallejo/ San Francisco

Weekday Schedule

Arrive Pier 41

3.50

SF Bay Ferry provides service to Oracle Park for selected Giants games from Alameda, Oakland and Vallejo. For complete schedule information and to purchase tickets online visit SanFranciscoBayFerry.com.

45

Depart Vallejo

3.50

ORACLE PARK SERVICE FOR SF GIANTS GAMES

2019 Holidays

5:10 AM 5:40 6:10 6:40 — — — — — 1:40 PM 2:50 — — — —

5.30

1.70

$

Depart Mare Island

One-way Clipper

Adult

3

VALLEJO / SAN FRANCISCO Weekdays to San Francisco

Weekends to San Francisco Depart Alameda

Weekdays from San Francisco Depart Pier 41

Schedule Effective April 29 - June 30, 2019

(707) 643-3779 or (877) 643-3779 (Toll Free)

www.SanFranciscoBayFerry.com


e

Schedule Effective April 29 - June 30, 2019

Weekends to San Francisco Depart Mare Island

8:10 AM — — 2:10 PM 3:40 — —

Depart Vallejo

8:30 AM V 10:00 11:30 2:30 PM 4:00 V 5:15 7:30 V

Arrive Ferry Building

9:30 AM 11:20 — 3:50 PM 5:00 — 8:30 PM

Weekends from San Francisco Depart Ferry Building

10:00 AM 11:10 12:45 PM 3:40 5:35 6:30 9:00

Depart Pier 41

9:40 AM X 11:30 — 4:00 PM 5:15 X — 8:40 X

Schedule Effective April 29 - June 28, 2019

Weekdays to South San Francisco

Arrive Pier 41

9:50 AM 11:00 12:30 PM 3:30 5:25 6:15 8:50

SOUTH SAN FRANCISCO / ALAMEDA / OAKLAND

Arrive Vallejo

Arrive Mare Island

11:00 AM 12:30 PM 1:45 5:00 6:35 7:30 10:00

— 12:45 PM 2:00 — — 7:50 10:15

V To SF Ferry Building via Pier 41 X To Vallejo via SF Ferry Building All arrival times are estimates.

Depart Alameda

Depart Oakland

6:25 AM 7:30 8:00

Arrive S. San Francisco

6:40 AM 7:40 8:10

Weekdays from South San Francisco Depart S. San Francisco

Arrive Oakland

4:20 PM 5:20 7:00

Arrive Alameda

4:55 PM 6:00 O 7:50 O

5:10 PM 5:55 7:35

Fares between South San Francisco Oakland, Alameda and Harbor Bay

One-way Regular

One-way Clipper

Adult

$

8.80

$

7.90

Youth (5-18 years) Senior (65+ yrs), Disabled, Medicare 2 Children under 5 3

$

4.40

$

4.40

$

4.40

$

4.40

FREE $

School Groups 4

O Arrives at Alameda first. All arrival times are estimates.

! NEW

FARES

7:20 AM 8:20 8:50

2.90

FREE N/A

SOUTH SAN FRANCISCO / HARBOR BAY

Weekdays to Harbor Bay Depart South San Francisco

Arrive Harbor Bay

8:30 AM

8:55 AM

Weekdays from Harbor Bay Depart Harbor Bay

6:30 PM

Arrive South San Francisco

6:55 PM

STANDARD FARES 1 Between Vallejo, Mare Island, SF Ferry Building and SF's Pier 41 One-way Regular $

Adult

14.60

One-way Clipper $

11.00

Youth (5-18 years)

$

7.30

$

Senior (65+ yrs), Disabled, Medicare 2

$

7.30

$

Children under 5 3

FREE

FREE

School Groups 4

$

4.80

N/A

Short Hop6 Adult

$

1.70

Short Hop Youth, Senior (65+ yrs), Disabled, Medicare 2 6

$

7.30 7.30

1.70

$

0.80

0.80

$

Monthly Pass

Valid on ferry for one calendar month.

Weekdays to San Francisco Depart Harbor Bay

Arrive SF Ferry Building

6:30 AM 7:00 7:30 8:30 9:00 5:05 PM 6:05 7:05

6:55 AM 7:25 7:55 8:55 9:30 5:30 PM 6:30 7:30

Weekdays from San Francisco

MONTHLY PASSES 366.00

$

Schedule Effective April 29 - June 28, 2019

HARBOR BAY / SAN FRANCISCO

Depart SF Ferry Building

Arrive Harbor Bay

7:00 AM 8:00 4:35 PM 5:35 6:00 6:35 7:35

7:25 AM 8:25 5:00 PM 6:00 6:25 7:00 8:00

FARES Fares between Harbor Bay and San Francisco Ferry Building One-way Regular

One-way Clipper

Adult

$

7.30

$

Youth (5-18 years)

$

3.60

$

Senior (65+ yrs), Disabled, Medicare2

$

3.60

$

Children under 5 3

FREE

School Groups4

$

5.50 3.60 3.60

FREE

2.40

N/A

All arrival times are estimates.

Schedule Effective April 29 - June 28, 2019

RICHMOND / SAN FRANCISCO Weekdays to San Francisco Depart Richmond

6:10 AM 7:10 8:15 8:40 5:15 PM 6:05

Arrive SF Ferry Building

6:45 AM 7:45 8:45 9:15 5:50 PM 6:40

Weekdays from San Francisco Depart SF Ferry Building

6:25 AM 7:55 4:30 PM 5:20 6:40 7:10

Arrive Richmond

7:00 AM 8:30 5:05 PM 5:55 7:15 7:45

FARES Fares between Richmond and San Francisco Ferry Building One-way Regular

Adult Youth (5-18 years) Senior (65+ yrs), Disabled, Medicare 2 Children under 5 3 School Groups 4

$

One-way Clipper

9.00 $ 4.50

$

$

$

4.50

FREE $ 2.90

6.75 4.50

$

4.50

FREE N/A

All arrival times are estimates.

46


San Francisco Bay Ferry Fleet

San Francisco Bay Ferry Fleet Vessel (A)

Peralta

Encinal

Bay Breeze

Intintoli

Mare Island

1

1

1

1

Nichols Brothers Boat Builders

Nichols Brothers Boat Builders

Nichols Brothers Boat Builders

Dakota Creek Industries Dakota Creek Industries Dakota Creek

2002

1985

1994

1997

1997

2004

$5.2 million

$2.1 million

$2.1 million

$6 million

$6 million

$11.2 million

2

3

2

2

2

2

331

395

250

349

330

320

20

20

20

10

10

10

Wheelchair Access

Yes

Yes

Yes

Yes

Yes

Yes

Onboard Restrooms, Snacks, Drinks

Yes

Yes

Yes

Yes

Yes

Yes

2 x Cummins QSK50

2 x DD Series 4000

2 x MTU 16V2000

2 x MTU 16V4000 M73

2 x MTU 16V4000 M73 2 x MTU 16V4 2 x MJP 750 Mk 2 Water Jet

2 x Hamilton 8 Water Jet

No. of Vessels Build By

1

Solano

1

In Service Date

Original Cost Number of Decks Passenger Capacity Bike Capacity

Engines Propulsion

Propeller

Propeller

1994-2014: Water Jet 2 x MJP 750 Mk 2 2014 to present: Propeller Water Jet

Service Speed Knots (miles per hour)

25 (28.7)

23 (26.5)

26 (30)

34 (39)

34 (39)

34 (39)

Length, Overall (meters)

37

27.4

29.6

41.3

41.3

41.3

Beam, Extreme (meters)

10

9.6

8.9

12

12

12

2

2.7

1.2

1.5

1.5

1.5

91

96

97

95

95

91

Bio Diesel B5

Bio Diesel B5

Bio Diesel B5

Ultra Low Sulfur Diesel

Ultra Low Sulfur Diesel

Ultra Low Sulfu

4,400

5,400

2,000

5,000

5,000

6,600

750

500

750

500

500

500

Aluminum

Aluminum

Aluminum

Aluminum

Aluminum

Aluminum

2027

2017

2020

2022

2022

2029

Mean Draft, Loaded Gross Tonnage Fuel Type Fuel Capacity (US gallons) Fresh Water Capacity (US gallons) Hull Material Retirement Date Note

Replacement: Cetus

(A) There are 12 vessels in the WETA fleet including the M.V. Harbor Bay Express II which has been out of service for several years and is not detailed in this table. The ** Tier 3 engine with Selenium Catalytic Reduction = Tier 4 level emissions reduction.

47

Source: https://weta.sanfranciscobayferry.com/


Water Emergency Transportation Authority Vallejo

1

Gemini Class

1

Central Bay: Cetus

Central Bay: Vessels 3 & 4

North Bay/ Richmond High Speed

1

2

3

Kvichak Marine Industries Vigor and Nichols Brothers (formerly Kvichak Boat Builders Marine)

Vigor (formerly Kvichak Marine)

Vigor (formerly Kvichak Marine)

Dakota Creek Industries

1994

2008-2009

April 2017

July 2017

Projected #3: January 2018 #4: November 2018

Projected #1: December 2018 #2: July 2019 #3: December 2019

$3.2 million

$8.6 million each

$15.1 million

$15.1 million

$15.1 million each

$19.2 million each

2

2

2

2

2

2

267

Pisces and Gemini: 225 Taurus and Scorpio: 199

400

400

400

445

10

34

50

50

50

24

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes 2 MTU 16V4000 EPA Tier 4 2 Hamilton HT810 Water Jet

Industries Gladding-Hearn

4

Central Bay: Hydrus

4000 M71

2 x MTU 12V4000 M70 2 x MTU 16V2000

2 MTU 12V4000 EPA Tier 3**

2 MTU 12V4000 EPA Tier 3**

2 MTU 12V4000 EPA Tier 3**

811

2 x Hamilton 721 Water Jet

Propeller

Propeller

Propeller

Propeller

34 (39)

26 (30)

27 (31)

27 (31)

27 (31)

34 (39)

33.7

35.9

41

41

41

44

8.7

8.8

11.5

11.5

11.5

12

1

1.9/2.0

2

2

2

1.5

84

90

95

95

95

<100

Ultra Low Sulfur Diesel

Bio Diesel B5

Bio Diesel B5

Bio Diesel B5

Bio Diesel B5

Ultra Low Sulfur Diesel

4,500

2,400

3,000

3,000

3,000

4,400

400

500

500

500

500

600

Aluminum

Aluminum

Aluminum

Aluminum

Aluminum

Aluminum

2018

2033-2034

2042

2042

2043

2043-2044

ur Diesel

Replacement: new 34 knot high speed vessel

1st boat replaces MV Vallejo.

e M.V. Hydrus replaces the Express II.

48


Current Ferry Schedules

SAUSALITO

LARKSPUR Weekdays (excluding Holidays) Depart Larkspur

Arrive SF

Depart SF

Arrive Larkspur

5:20 am Route 24X bus to Financial District 5:45 6:35 * 7:00 *7:30 + 7:50 * * 8:20 + 8:50 * + 9:20 * + 10:10 * 11:10 11:40 12:40 + 2:15 2:50 – 3:40 4:10 – 5:10 5:40 6:40 7:25 8:50

6:15 7:05 7:30 8:00 8:20 8:50 9:20 9:55 10:45 11:45 12:15 1:15 2:50 3:25 – 4:15 4:45 – 5:45 6:15 7:10 8:00 9:25

6:20 7:10 7:35 – 8:30 9:10 – 10:10 10:55 11:55 12:25 1:25 3:00 3:30 4:00 4:30 5:00 5:30 6:00 6:30 7:20 8:10 9:35

6:50 7:40 8:05 – 9:05 9:45 – 10:45 11:30 12:30 1:00 + 2:00 *3:30 + 4:00 * + 4:30 * + 5:00 * *5:30 *6:00 + 6:30 * * 7:00 *7:50 8:40 10:05

Saturdays, Sundays & Holidays 9:30 + 11:40 + 1:40 + 4:45

10:30 12:30 2:30 5:35 –

– 12:40 3:45 6:25 7:25

+ +

–

1:30 4:35 7:15 + 8:10

Depart Sausalito Holiday service in effect on Presidents’, Memorial, Independence, and Labor days. GGF operates reduced 7:10 service on MLK Day, the day after Thanksgiving, and 8:15 around the Christmas and New Year’s holidays. See Transit Guide, visit goldengate.org, or call 511 for schedules. 10:55

NO SERVICE There is no Golden Gate Ferry service on New Year’s, Thanksgiving, and Christmas days. Tiburon Ferry does not operate on weekends or holidays – use Blue & Gold Fleet (blueandgoldfleet.com.)

MISSED LAST FERRY TO LARKSPUR? On weekdays from Mission & First bus stop, take Golden Gate Transit Route 30 or 70 bus. To access Larkspur Ferry Terminal, disembark at Hwy 101/Lucky Drive Bus Pad.

FREE FERRY SHUTTLES To/From Larkspur Ferry

ROUTE 25 along Sir Francis Drake Blvd from Fairfax/Manor.

49

Arrive SF

Depart SF

Arrive Sausalito Depart Tiburon

Arrive SF

Depart SF

6:00 7:10 8:25 9:35 – 5:35 6:50 8:00

6:00 7:15 8:30 – 4:25 5:45 6:55 8:05

Arriv

6 7 9 – 4 6 7 8

* Additional ferry service between Tiburon and P provided by Blue & Gold Fleet (blueandgoldflee

Depart SF

Arrive Sausalito

Light = A.M. Bold = P.M.

11:20 12:45 2:10 3:50

11:50 1:15 2:40 4:20

10:40 12:00 1:25 2:50 4:40 6:00

11:10 12:30 1:55 3:20 5:10 6:30

DON’T MISS THE BOAT! ARRIVE 20 MINUTES PRIOR TO DEPARTURE TIME!

* 5:35 * 6:45

6:05 7:15

–

–

–

–

– –

– –

* The 5:35 and 6:45 trips do not return to Sausalito.

FERRY TERMINAL LOCATIONS

Trips served by Route 25 shuttle *+ Trips served by Route 31 shuttle

5:30 6:40 7:55 9:10 – 5:05 6:20 7:30

Arrive SF

Depart Sausalito

ROUTE 31

Note: Shuttles may not run during holiday periods – visit website for info.

Weekdays only (excluding Holiday

7:40 7:35 8:10 10:00 8:45 10:30 11:35 11:25 12:05 12:15 12:55 12:45 1:25 1:55 2:35 2:25 3:05 3:15 4:00 3:45 4:30 4:45 5:30 5:15 6:00 6:10 6:45 6:35 7:10 7:20 7:55 7:50 8:20 Saturdays, Sundays & Holidays

from San Rafael Transit Center/SMART Train & Peacock Gap. Select weekday & weekend trips.

2.125

Source: http://goldengate.org https://www.blueandgoldfleet.com/ https://weta.sanfranciscobayferry.com/

TIBURON

Weekdays (excluding Holidays)

HOLIDAY SERVICE

Larkspur: 101 East Sir Francis Drake Blvd Sausalito: Humboldt & Anchor streets Tiburon: Tiburon Blvd & Main Street San Francisco: Foot of Market Street & Embarcadero, behind SF Ferry Building

BICYCLES PERMITTED ON FER

Space on high-speed vessels is limite Secure bike rack area available in Larks paid waiting area. Bikes left in excess 7 days will be removed. Electric bike are not permitted on GGF.

SERVICE ANIMALS

Service animals are welcome aboard. accordance with DOT regulations, a ser animal is any guide dog or other anim trained to perform tasks for an individ with a disability.

REASONABLE MODIFICATIO

For requests for ADA Reasonable Modifications, visit goldengate.org feedback/reasonable_modificatio

2.000


ys)*

ve Tiburon

6:30 7:45 9:00 â&#x20AC;&#x201C; 4:55 6:15 7:25 8:35

Pier 41 et.com).

R

RRIES

ed. spur of es

. In rvice mal dual

ONS

e g/ on.

50


Bay Area Population Distribution

NAPA

SONOMA

140,973

504,217

SOLANO 445,458

MARIN

260,955

CONTRA COSTA 884,363 SF

1,147,439

ALAMEDA SAN MATEO

1,663,190

771,410

SANTA CLARA

1,938,153

BAY AREA TOTAL : 7,756,158

**Data from 2017 US Census Bureau

51


Santa Clara Population Distribution

PALO ALTO 67,178 MOUNTAIN VIEW 81,438 SUNNYVALE 153,656 SANTA CLARA 127,134

MILPITAS 78,106

SAN JOSE 1,035,317

Cities immediate to the Bay 1,603,606 20% Bay Area Population 82% Santa Clara County Population

**Data from 2017 US Census Bureau

52


Alternative Transportation Options by Route

53


Bay Wind Analysis The wind statistics are based on real observations over a period of one year from the weather station at San Francisco Airport.

Wind Direction Distribution in %

Month of Year Dominant Wind Direction Wind Probability >= 4 Beaufort (%) Average Wind Speed Average Air Temp. (F)

54


Bay Ferry Route Map 22

20

21

17 18

16

23 24

15

Existing Terminals Proposed Terminals Water Taxi Landing Historical Ferry Landing Existing Ferry Route Water Taxi Route Special Event Route

14

25

13 27

26

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29

12

28

29 1 2 3 4 5

10 9

11

8

6

7

55

19

Proposed Ferry Route Historical Routes (Late 1800 - 1930s) Pier 41 Pier 33 SF Ferry Terminal AT&T Park Mission Bay South San Francisco Redwood City Harbor Bay - Alameda Seaplane - Alameda Alameda Oakland Emeryville Berkeley Richmond Point Richmond Hercules Rodeo Martinez Antioch Vallejo Mare Island Petaluma River Landing San Quentin Larkspur Tiburon Sausalito Angel Island Alcatraz Treasure Island


Bay Zoning Map

Port Water Related Industry Airport Wilelife Refuge Park Tidal Marsh

56


Depth Of the Bay

Depth of the Bay 0’ - 30’ 10’- 30’ 30’+

Port of Redwood City

57


Potential Redwood City Ferry Route 26 25

24 23 22

27

20

19

21

28

29

Existing Terminals Proposed Terminals Water Taxi Landing

18

30

16

17

15

31 34

32 33

14

35

36 1 2 3 4 5

12 11

13

10 9 6

7

8

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

Existing Marina / Harbor Potential Connections to South Bay Pier 41 Pier 33 SF Ferry Terminal AT&T Park Mission Bay South San Francisco Coyote Point Marina Redwood City San Leandro Marina Harbor Bay - Alameda Seaplane - Alameda Alameda Oakland Emeryville Berkeley Richmond Brick Yard Cove Marina Point San Pablo Harbor Hercules Martinez Antioch Benicia Glen Cove Vallejo Mare Island Point Sonama Marina Buckâ&#x20AC;&#x2122;s Launching Loch Lomond Marina Lowrie Yacht Harbor Larkspur Tiburon Sausalito Travis Marina Angel Island Alcatraz Treasure Island

58


Bay Ship Traffic Density - San Francisco Bay All traffic recorded in 2017

**Source: marinetraffic.com

59


Ship Traffic Density - Seattle / Vancouver All traffic recorded in 2017

60


Bay Ship Traffic over 24 hours How do big ships navigate the San Francisco Bay? The tracks on this map show telemetry data from 24 hours of activity archived by the US Coast Guard on September 1st, 2014, along with underwater bathymetry (depth) data provided by NOAA. Ship telemetry data has been anonymized by the USCG, so relative ship sizes are approximated based on their general behavior. **Source: marinetraffic.com

**Source: Animated marine traffic in the San Francisco Bay by Sam Kronick via mapbox.com

61


Not all of the bay is navigable to large ships. Some regions, such as the area between Richmond and Emeryville, are much too shallow for deep draft ships to passâ&#x20AC;&#x201D; as little as one meter in some places. Only boats over 60ft in length are required by law to transmit AIS telemetry data, so many smaller boats do not appear on this map.

62


Bay Ship Traffic over 24 hours Inside the Golden Gate, vessel traffic of all sizes zips from shore to shore. High speed ferries make regular crossings from San Francisco to destinations in Marin County and the East Bay. Tourist ferries shuttle sightseers to Alcatraz Island or underneath the Golden Gate Bridge. Big ships generally move along predictable routes travelling counter-clockwise around Alcatraz. No matter what happens, smaller boats must yield right of way to the big ships as they have limited maneuverability in close quarters.

**Source: Animated marine traffic in the San Francisco Bay by Sam Kronick via mapbox.com

63


Bay Ship Traffic - Real Time (30mins)

**Source: https://www.marinetraffic.com/

64


NOAA Nautical Chart

65


66


67


Regional Transit Route City Boundary Train Stops Access Limited Protected land

68


Shoreline Areas Vulnerable to Sea Level Rise: 2040-2060 Shoreline Area Vulerable to Sea Level Rise: 2040-2060

M e t ro p o li t an Tran s p o rt a t i on C om m i s s i o n Pla nning , F inanc ing a nd C o ordinati ng Tra n s p o r t a t i o n fo r t h e n i n e - c o u n t y S a n F ra n c i s c o B a y A re a

Res ea rch an d D e mo g ra p h i c Un i t

Map of the Month: June 2009

Ge ogra phic I nfo rma tion Syste ms Unit

Attachm en t 7

Napa Co.

See reverse for chart

Sonoma Co.

Solano Co.

Marin Co.

Contra Costa Co.

San Francisco Co. Oakland Int'l

Transportation Infrastructure Vulnerable to Sea Level Rise Current

Airport

Future

Seaport

Sea Level Rise

FEMA 100 Year Flood Boundary

San Francisco Int'l

Alameda Co.

San Mateo Co.

Note: According to a report being prepared by the Bay Conservation and Development Commission ("Living with a Rising Bay: Climate Change Impacts on San Francisco Bay and Adaptation Strategies," available in 2009), the sea level in the Bay could rise a foot or more, inundating some communities and covering both the San Francisco and Oakland airports, state highways, and other key road and transit infrastructure. The FEMA 100 year flood boundary is shown for reference purposes only. Source: MTC in collaboration with the San Francsico Bay Conservation and Development Commission. Inundation data provided by Dr. Noah Knowles, U.S. Geological Survey, with funding from the California Energy Commission's Public Interest Energy Research (PIER) Program through the California Climate Change Center at Scripps Institut ion of Oceanography, and from the CALFED Science Program CASCaDE Project. Additional salt pond data provided by Seigel and Bachand, 2002.

Santa Clara Co.

Cartography: MTC GIS, TeleAtlas January 2008. G:\_section\Planning\Sea_Level_Rise_Analysis\Arcmap_proj\Sea_Level_Rise_8x11.mxd

Scale: 1 in = 8 miles

0

69

Âź

½

Santa Clara C

1in.

Source: Metropolitan Transprotation Commission


Ecology of Redwood City Shore

Source: Spur Report / San Francisco Shoreline Adaptation Atlas

70


Alluvial Fans and Alluvial Plains Alluvial fans and alluvial plains are the areas built up over thousands of millennia with sand and gravel eroded from the Coast Range hills and deposited on the floor of the valley thatcurrently contains San Francisco Bay. The location and shape of the fans and plains influences the shape of the baylands, which generally have filled in the spaces between and in front of the fans/plains.

Source: Spur Report / San Francisco Shoreline Adaptation Atlas

71


Redwood City Shore

72


Adaptative measures for Sea Level Rise Natural & Nature-Based Measures - Mudflat Augmentation - Beach creation - Tidal Marshes - Polder Management - Ecotone Levees - Creek-to-baylands reconnection - Green Stormwater Infrastructure

73


Source: Spur Report / San Francisco Shoreline Adaptation Atlas

74


Adaptative measures for Sea Level Rise Grey Infrastructure - Levees and Dikes

- Super Levees

- Flood Walls

- Seawalls

- Revetments and Riprap

- Bulkheads

- Elevated Land - Elevate or Realign Transportation 75

Source: Spur Report / San Francisco Shoreline Adaptation Atlas


Source: https://baytrail.org/

76


Ecology of the Creek from Observation

ood Redw

77

k

Cree


Wildlife in Bair Island and surrounding area Birds Brown Pelican Double-crested Cormorant***1 Great Blue Heron White-tailed Kite**2 Caspian Tern Forsterâ&#x20AC;&#x2122;s Tern American Avocet Harbor Seal**3 Snowy Plover Northern Harrier***4 Burrowing Owl***5 Loggerhead Shrike ***6 Black-necked Stilt Sora Semipalmated Plover Long-billed Curlew Snowy Egret American White Pelican California Clapper Rail ***7 Alameda Song Sparrow***8 Killdeer Western Grebe American Coot Gulls 1

6

Native salt marsh plant species Pickleweed Cordgrass Mammals Salt marsh harvest mouse ***9 Salt-marsh Wandering Shrew***10 Raccoons striped skunks red foxes - non-native Reptiles/Amphibians Alligator lizard gopher snake Fish bay ray bay pipefish bay goby shiner surfperch starry flounder English sole *** Federal or State Endangered Species ** California Species of Special Concern

2

7

3

8

4

9

5

10

78


Current Electric Ferry Development Denmark Ellen / Electric Passenger Ferry

- Capable of carrying 30 vehicles and 200 passengers - 60m Long 13m wide - Operates between the island ports of Fynshav and Søby - Cruising speed 13-15.5knots (15-18mph)

*** Federal or State Endangered Species ** California Species of Special Concern

San Francisco Enhydra / Hybrid / Electric Passenger Ferry

- Has an e lectric traction motor and a biodiesel-powered engine - Capable of carrying 600 passengers - 128ft Long, three stories - Operates as a tour boat in San Francisco Bay - Top speed 8-10knots (9-11.5mph)

Source: https://www.electrive.com/2019/06/04/denmark-most-powerful-electric-ferry-named/ https://redandwhite.com/enhydra/ http://www.greencityferries.com/page1.html#header9-s https://www.wsdot.wa.gov/Ferries/yourwsf/ourfleet/name.htm https://www.kitsapsun.com/story/news/2018/09/12/washingtonstate-ferry-proposal-new-eco-friendly-vessels-fleet-2040/1284670002/

79


Norway Airiel / Electric Passenger Ferry

- Capable of carrying 75 passengers and 15 bycicles - Development stage in Stockholm - Cruising speed 25-30knots (28-34mph)

Seattle, WA Washington state plans to add 16 hybrid electric ferries by 2040 Tacoma / Being converted to Electric Passenger Ferry - Max Passengers: 2499, Max Vehicles: 202 - Cruising speed 18knots (20mph)

80


Electric Hydrogen Hybrid Boat Energy Observer - powered by electric propulsion from a mix of renewable energies and a hydrogen production system. Top speed at 10 knots. 30m long, 12.8m wide.

Source: https://www.tycoonstory.com/technology/sun-and-wind-to-power-energy-observer-catamaran-on-six-year-circumnavigation/

81


Source: https://www.marineinsight.com/shipping-news/energy-observer-vessel-fitted-with-oceanwings-wingsails-the-solution-devised-by-vplp-and-cnim-to-decarbonize-maritime-transport/

82


Zero Wave, Zero Emission, Zero Noise Boat - Seabubbles A French company, Hydroptere, developed a water transportation system that has minimal environmental impact. The companyâ&#x20AC;&#x2122;s first product, Seabubbles is a oval-shaped electric hydrofoil boat that carry upto four passengers.

Source: https://www.popsci.com/seabubbles-concept-wants-to-be-water-taxi-future/ https://plugboats.com/flybus-seabubbles-new-hydrofoil-electric-ferry/ http://sailinggab.com/sailing-videos/hydro-foil-sailing-the-future-of-sailing/ https://www.yachtingworld.com/special-reports/the-foiling-phenomenon-66269 https://www.cnn.com/2017/06/22/sport/ sailing-sailrocket2-paul-larsen-recordocean-crossing-blue-riband/index.html

16.3ft long, 8.2ft wide. Top speed 18 knots(20.5mph). 44kwh battery 83


Flybus Hydroptere is developing their second product Flybus, which is larger version of Seabubbles that can carry upto 32 passengers.

Competitive sailing industry brought a dramatic advancement in foiling technology in recent years. Paul Larsenâ&#x20AC;&#x2122;s Sailrocket holds a record for reaching a high speed of over 60knots.

84


Ferry Operation Scenario Assumptions:

1. Daily Commuters between SF and Santa Clara County: 19,000 (SF to Santa Clara county: 19,000, Santa Clara county to SF: 10,000) 2. Ferry Service takes on 10% of total commuter load : 1,900 passengers per day SF terminal to Redwood city terminal: 1,900 Passengers Redwood City terminal to SF terminal: 1,000 Passengers 3. A lightweight electric ferry carry upto 20 passengers per ride 4. Daily Commute hours(Peak hours): 7am - 10:30am, 4pm - 7:30pm 5. The cruising speed of the ferries : 35-40 knots (40-46mph) 6. One way trip travel time: 45mins 7. Approximate electric power required for 1 way journey from San Franciscio Ferry Building terminal to Redwood City Terminal: 125 kwh 8. Average hours for daily solar production in full capacity is 5 hours (factoring in weather, seasonal daylight difference) 9. 65% passengers drive

Known Factors:

- Available land for Parking/Solar Energy Harvesting: 650,000 sqft - One 21.125 sqft (39â&#x20AC;? x 78â&#x20AC;? panel, commercial size) solar panel unit with 360 Watt production rate will generate 0.36 Kwh (0.017Kwh per sqft)

Reference: https://www.solarpowerrocks.com/solar-basics/how-much-electricity-does-a-solar-panel-produce/

85


Preliminary conclusion:

1. Ferries run every 3mins during peak commute hours - 70 ferry rides (20 ferries per hour) 2. Off peak hour(10:30am - 4pm, 7:30pm - 9pm, total 7hrs) ferries run every 6 mins - 70 ferry rides 3. Minimum number of fleets: 35 ferries 4. Predicted Electric Power required for the ferries per day: 35 Mwh 5. Minimum required Solar Energy gain per hour: 7 Mwh 6. Required solar panel coverage area : 411,764 sqft surface area 7. Required parking space at Redwood City Terminal: 650 spotsv

Predicted Solar Energy Production:

- System Specification Location: 1548 Maple Street, Redwood City Latitude: 37.49 N, Longitude: 122.22 W DC System Size: 52kW per modules (individual panel size of 63.5â&#x20AC;&#x2122; x 55â&#x20AC;&#x2122;) Module Type: Standard Array Type: Fixed (open rack) Array Tilt Angle: 30 degree Array Azimuth: 180 degree (south facing) System Losses: 14.8% - Average daily solar energy generation per module: 234kWh - Number of photovoltaic module on the roof: 161 - Total daily solar energy generation (average): 37mW

Reference: https://pvwatts.nrel.gov/pvwatts.php

86


87


1.05 Research Summary Overall

Threats from Sea level Rise / Flood

The selected site near the port of Redwood City offers a good opportunity to demonstrate how architecture can connect people and the Bay as well as serving as a water transportation hub linking the South Bay and the other neighborhoods through the ferry service in the Bay.

It is neccesarry to consider threats from sea level rise and flooding as the site is in a risk zone for both. The design of Ferry terminal should respond to those risks.

Why Redwood City? Firstly, the waterâ&#x20AC;&#x2122;s edge adjacent to Redwood City has an amazing natural environment and public space. Yet, limited access due to the highway 101 and industrial activities alongside 101 discourage people from coming to the waterâ&#x20AC;&#x2122;s edge.

Ecology around the site The terminal will bring in ferry services and people close to Bair Island which is a protected natural habitat. The design of the terminal should consider the importance of respecting the precious wildlife habitiats surrouding it as well as encourage its users to understand its importance.

Secondly, there is an already available water way for the ferries to operate thanks to the port of Redwood City located near the site.

88


89


1.06 Site and Context Analysis

90


91


SITE 2

SITE 3

92


Redwood Creek Watershed Map Creeks, buried or drained Underground strom drains > 24â&#x20AC;? Redwood Creek, exposed

93


Physical Barriers Redwood Creek Industrial activities Barriors - 101, industrial buildings

94


Green Space - Protected Habitats, Parks

95


Nolli Map Study

Site

96


Zoning Map

1

1

97

Hospital School Marina Mixed Use Residential Commercial Industrial Industrial - Port Related Mixed Use - Downtown Park / Protected Land Urban Reserve - Salt Flat Transit Center


Flood Map

Special Flood Hazard areas 0.2 % Annual chance of flood hazard

98


Pedestrian & Car Access Pedestrian only path Major Road Highway 101

SITE

Highway 101

99


1

2

3

1 Maple Street 2 Woodside Rd at Highway 101 3 Redwood Creek & 101 intersection

100


101


1.07 Existing Site Condition Site Plan

102


Micro Site Plan - Site 1 / Initial Site Choice Stanford Rawing and Sailing Center Marine Science Institute Rental Accomodations Rental Accomodations Bair Island Marina Public Boat Launch Port of Redwood City Marina Seaport Conference Center Guest Dock Public Fishing Pier Redwood Landing Public Waterfront and Promenade Redwood City Port Wharf (3,4)

13

11 12 1 2 10

9

Ferry Terminal Site 8

6

7

Salt Pond (Man-made Wet Land) OfďŹ ces

4

5

103


Master Plan - Site 1 / Initial Site Choice

7

6

4

5

1 2 3 4 5 6 7

Ferry Entry Transit Connection - Bus Transit Connection - Barge Bike Trail Existing Bay Trail Planned Bay Trail Redwood City Downtown Redwood Transit Center Barge Landing Public Open Space Proposed Terminal Site Port of Redwood City Marina

7

4 3 1 2

104


Micro Site Plan - Site 3 / New Site Selection

1

1 2 3 4 5 6 7 8 9

1

Residential Apartments House Boats Rowing Club Homeless shelter Redwood City Police Department San Mateo County Womens Jail Office Retail Hotel

3 Ferry Terminal SIte 1 2 Maple Street

1

6 5 4

9 Highway 101

7

105

8


Site Photos

106


107


1.08 Area Master Plan

108


Master Plan - Site 3 / New Site Selection

109


Signage 1 Informaion on Redwood Creek

Signage 2 Salt Water / Fresh Water Ratio, Harbor Seal Habitat

Signage 3 Salt Water / Fresh Water Ratio, California Clapper Rail Habitat

Signage 4 Salt Water / Fresh Water Ratio, Salt Marsh Harvest Mouse Habitat

Signage 5 Salt Water / Fresh Water Ratio, Double Crested Cormorant Habitat

110


111


Collage

112


1.09 Spacial & Functional Program

113


Preliminary Programs

20,000 sqft

Ferry Terminal

20,000 sqft

Public Plaza / Multi-use

40,000 sqft

Community Market Hall

6000 sqft

Bicycle Sevice Center

6000 sqft

Bay Trail Information Center

12,000 sqft

Restaurant / Cafe

10,000 sqft

Administration Office

114


Preliminary Programs

I. Ferry Terminal

20,000 sqft

I.01 Ticket Windows / Kiosks I.02 Lounge / Information I.03 Passenger meeting / waiting area I.04 Cafe / Shop I.05 Restroom, M I.06 Restroom, F I.07 Restroom, wheelchair - accessible I.08 Information Desk I.09 Staff Area I.10 Staff Restroom, M I.11 Staff Restroom, F II. Public Plaza / Multi-Use Area

20,000 sqft

II.01 Flexible open space II.02 Passenger meeting / waiting area II.03 Restroom, M II.04 Restroom, F II.05 Restroom, wheelchair - accessible III. Community Market Hall III.01 General Market Hall III.02 Mixed Stores

115

40,000 sqft


IV. Bycycle Service Center

6,000 sqft

IV.01 Check-in / Check-out area IV.02 Technician work area IV.03 Bike Storage IV.03 Staff Room V. Bay Trail Information Center

6,000 sqft

I.01 Information Desks I.02 Lounge I.03 Display / Exhibit Area I.04 Staff room VI. Cafe, Restaurant

12,000 sqft

II.01 Cafe II.02 Restaurant II.03 Restroom, M II.04 Restroom, F II.05 Restroom, wheelchair - accessible VII. Administration Office

10,000 sqft

VII.01 Office VII.02 Staff Kitchen VII.03 Restroom, M VII.04 Restroom, F Total SQFT: 114,000

116


1.10 Spatial Analysis

117


Ferry Terminal Public Plaza/Multi-use Community Hall Bay Trail/Bike Center Cafe/Restaurants Administration Elevated Walk/Bike Trail

118


Spatial Analysis

119


120


1.11 Building Code Analysis

121


Construction Type : III-B

OCCUPANCY TYPE

A2: Assembly for restaurants and cafeterias A3: Waiting area in transportation terminals B: Business Offices Rowing & Paddling School Professional Services M: Mercantile for markets S2: Parking lots

SQFT 24,000 48,000 40,000

LOAD 2,181 2,400 400

40,200 155,700

670 778

Total Occupancy Load

6,429

122


123


1.12 Site Model

124


Site Model

Scale 1/128” = 1’

125


Scale 1/128” = 1’

126


127


1.13 Massing Study Models

128


Concept Models

1 2 3 4

Curled Skin Sliced + Shifted Extrusion Folding + Puncture

129

1

2

3

4


1 2 3 4

1

2

3

4

Undulating Ring Trumpet Parallax Vertices 130


Concept Models

1 Undulating Slope 2 Stacking 3 Bubbles 4 Structural Ribs 131

1

2

3

4


1 2 3 4

1

2

3

4

Extrusion + Bridging Extended Ground Intersecting Planes Peeling Ground 132


Concept Models

1

1 Fragmented

133


134


135


2.0: Thesis Project

136


137


2.01 Development Models

Concept Development - Site Plan / Phase 1 Concept Development - Site Plan / Phase 2 Photovoltaic Array Plan Studay Plan Developments Concept Development - Sectional Diagram Concept Development - Massing models

138


Concept Development - Site Plan / Phase 1 R416'-3 1/2"

One Section 60' x 85' 20 cars, 234 panels 83 sections for 19,444 panels

Scale 1' = 1/128"

One Section 60' x 85' 20 cars, 234 panels 83 sections for 19,444 panels

Scale 1' = 1/128"

139


Scale 1' = 1/128"

One Section 60' x 85' 20 cars, 234 panels 83 sections for 19,444 panels

Scale 1' = 1/128"

140


Concept Development - Site Plan / Phase 2

141


142


Concept Development - Placement / Orientation

One Section 60' x 85' 20 cars, 234 panels

71 0

83 sections for 19,444 panels

143

3/4

"

One Section 60' x 85' 20 cars, 234 panels

705'-7 1/2"

83 sections for 19,444 panels

83 sections for 19,444 panels

One Section 60' x 85' 20 cars, 234 panels

'-5

667'-10 1/4

"

One Section 60' x 85' 20 cars, 234 panels 83 sections for 19,444 panels

765'-6 3/4"


Photovoltaic Array Plan Study

3 8.5

3 14.5

Winter

11

8.5 20.5

17 22.5

10'-0"

25

28

20'-2 1/2"

32

26.5

44

46

44 50

52

57 61.5

58 62

67.5

69

69

67.5

71

47.5

53 47.5

42

42

36

36

36 29.5

29.5

29.5 24

24

24 18.5

18.5

18.5 13

13

8.5

59.5

53

53 47.5

42

13

7

7

1.5

65

59.5

59.5

53

71

65

65

45

76

76

71

60

73

76

71.5

71

67.5

61.5

73

63.5

30.5

38

57

54.5

23

32

50

46.5

16

20.5

38

40

38

14.5

32

34.5 39.5

Summer

Total 1115 of 30'x13' panels 434,850 sqft

26.5

45'-0"

17.5

5'-0"

5 10

45'-0"

2.5

10'-0"

Winter each panel 30'(27.8')x13'

7 1

1

1

Winter Months Arrangement

Summer Months Arrangement

Total 1086 of 30'x13' panels 423,540sqft

Total 1086 of 30'x13' panels 423,540sqft

4'-0"

32'-0"

4'-0" 4'-0"

4'-0"

4'-0" 4'-0"

144


Plan Development - Roof, Water Level (G)

Roof Level 1”=1/128’

Ground Level 1”=1/128’

145

Ground Level 1” = 1/128’


Plan Development - Parking Level (1F)

Public Transit Pick up/Drop off

Parking Level 1â&#x20AC;?=1/128â&#x20AC;&#x2122;

708 Parking spots

65

'-0

"

35

'-0

"

688 parking spots

146


Plan Development - Scheme 1

1

2

3

147

1 Water Level (G) Plan 2 Parking Level (1F) Plan 3 Roof Plan


Plan Development - Scheme 2

1

35

'-0

"

708 Parking spots

2

3

1 Water Level (G) Plan 2 Parking Level (1F) Plan 3 Roof Plan

148


Concept Development - Sectional Diagram

149


Concept Development - Massing Models

Scale 1/128â&#x20AC;? = 1â&#x20AC;&#x2122;

150


2.02 Site Plan

151


Galveston Dr

nd

Rd

ee t Str ple

ple

Str

ee t

Blomquist Street

Ma

Fre ewa y1 01

Seaport Blvd

Seaport Blvd

Isla

Ma

ir

Ba

Fre ewa y1 01

Site Plan 1/128â&#x20AC;? = 1â&#x20AC;&#x2122;

152


153


2.03 Floor Plans

154


Floor Plan - Water Level (G)

1. Passenger Boarding 3. Cafes 4. Restaurants 5. Rowing and Paddling School 6. Market Hall 7. Artisan Market 8. Mixed Shops 9. Arrival Hall / Information Center 10. Bay Trail Center 11. Bike Store / Bike Storage 12. Playground 14. Storage 13

1 12

3

4

1

2 10

11 3 5

7 4

6

9

14

8

Water Level Floor Plan

155

N

0 4’ 8’

16’

32’

64’


Floor Plan - Parking Level (1F)

Upper Floor Plan

N

0 4’ 8’

16’

32’

156

64’


157


2.04 Building Sections

158


Building Section - Cross

Cross Section

159

Scale 1/16” = 1’

0’

4’

8’

16’

32’


Building Section - Transverse

Transverse Section

Scale 1/16” = 1’

160

0’

4’

8’

16’

32’


161


2.05 Building Elevations

162


Southern Elevation

South Elevation

163

Scale : 1/16” = 1’


Northern Elevation

North Elevation

Scale : 1/16” = 1’

164


Eastern Elevation

East Elevation

165


Western Elevation

166


167


2.06, 2.07 Wall Section / Partial Elevation

168


1) 1’ D Steel Tube 2) 8” D Steel Tube 3) 8” Cross Laminated Timber 4) 1’ x 6” Laminated Spruce 5) 2” Thick Glass 6) 2’ Thick Concrete Pontoon Foundation 7) 2’ D Steel Column 8) Battered Piles 9) Photovoltaic Panels 10) Bladeless Wind Energy

10

2

1 9

2

7

1

3

4

5

6

8

169


170


2.08 Building Details Of Critical Areas

171


2” Laminated Galzing 1” Steel Railing Post 3/4” Deck Wood Board Wood Spacer Block Diagonal Column connection Recessed Frame System

2” Rigid Insualtion Waterproofing Membrane 2” Heating Screed Separating layer 3/4” Wood Floor Board

Metal Plate Waterproofing Membrane 8” CLT Railing Slab 3” Pervious Concrete Slab Drainage Drainage Spout 2” Rigid Insulation 8” CLT Floor Slab

Asphalt 3” Pervious Concrete Slab Drainage Waterproofing Membrane 2” Rigid Insulation 8” CLT Floor Slab Glazing Frame System 16” Glue-laminated spruce

172


2.09 Sustainability Strategy

173


174


2.10 Egress Diagram

175


Ground Floor Egress Route

1. Passenger Boarding 3. Cafes 4. Restaurants 5. Rowing and Paddling School 6. Market Hall 7. Artisan Market 8. Mixed Shops 9. Arrival Hall / Information Center 10. Bay Trail Center 11. Bike Store / Bike Storage 12. Playground 14. Storage 13

1 12

3

4

1

2 10

11 3 5

7 4

6

9

14

8

Water Level Floor Plan

N

0 4’ 8’

16’

32’

64’

176


2.11 Structural Diagrams

177


178


179


2.12 Mechanical Diagrams

180


Solar Vacuum Tubes

Solar Vacuum Tubes Electronic Control

Secondary COLD WATER FEED HOT WATER TO TAPS Heater

Water Tank

Horizontal Closed Loop System

181

Solar Sensor

Solar Vacuum Tubes Electronic Control

Heat Pump Flow Controller

Secondary COLD WATER FEED HOT WATER TO TAPS Heater

Water Tank

Horizontal Closed Loop System

Solar Sensor

Electronic Control

Heat Pump Flow Controller

Secondary COLD WATER FEED HOT WATER TO TAPS Heater

Water Tank

Horizontal Closed Loop System

S S

Heat Pump

Flow Control


Solar Vacuum Tubes

Solar Sensor

p

ller

Electronic Control

Secondary COLD WATER FEED HOT WATER TO TAPS Heater

Water Tank

Horizontal Closed Loop System

Solar Sensor

Heat Pump Flow Controller

Cross Section

Scale 1/16” = 1’

0’

4’

8’

16’

32’

182


183


2.13 Building Section of an Important Public Space

184


185


Cross Section

Scale 1/16” = 1’

0’

4’

8’

16’

32’

186


187


3.0: Final Thesis Presentation

188


3.01 Exterior Perspectives

189


Exterior View - View from Northside

190


Exterior Perspective - Aerial View

191


192


193


3.02 Interior Perspectives

194


Interior Perspective - View from Lower Deck

195


Interior Perspective - View from Upper Deck

196


197


3.03 Photos of Physical Model

198


Physical Model I - Top View

Scale 1/128” = 1’

199


Physical Model I - Perspective Views

Scale 1/128” = 1’

200


Physical Model II

Scale 1/8” = 1’

201


Physical Model II - Top View

Scale 1/8” = 1’

202


Physical Model II - East Elevation

Scale 1/8” = 1’

203


Physical Model II - West Elevation

Scale 1/8” = 1’

204


Physical Model II - South Elevation

Scale 1/8” = 1’

205


Physical Model II - North Elevation

Scale 1/8” = 1’

206


Physical Model II - South East Perspective

Scale 1/8” = 1’

207


Physical Model II - North West Perspective

Scale 1/8” = 1’

208


Physical Model II - South West Perspective

Scale 1/8” = 1’

209


Physical Model II - North East Perspective

Scale 1/8” = 1’

210