BSCS SEM 3 KHOR JO DENG 0345203

Page 1

S E M 3 BUILDING SCIENCE AND SERVICES TAYLORUNIVERSITY KHORJODENG 0345203 BIA (INTERIORARCHITECTURE)
BLD62304 BUILDINGSCIENCEANDSERVICES ASSIGNMENT1 LIGHTNINGANDVAC DESIGNFOR COMFORT NAME:KHORJODENG STUDENTID:0345203 PROGRAMME:BACHELOR’SININTERIOR ARCHITECTURE(BIA)

PLACECHOSSEN:DKSENZAUNIT13-08

LIVINGROOM

PROBLEM1:

Lackof airflow inthestudyareaandtheneedtoopentwofansatatimetogetacooler surrounding.

NEED TO OPEN BOTH FAN ONLY WILL GET A BETTER AIR CIRCULATION

STUDY PLACE

Image of living room and study area

SOLUTION:

Addastandfaninthestudyareatomakethesurroundingcooleranddonotneedtoopentwo fanstosaveelectricity.

Removetheoriginallyplacedceilingfanbecauseithastwofansinthesamespacewecan usethestandfan forthediningareatooanditalsowillsavethecostofelectricitybill.

Living room perspective view adding stand fan and removing the ceiling fan

MASTERBEDROOM

PROBLEM2:

1. Theairconditionerplacementdoesnotfunctionwellbecauseitstraightblewintothe studyareaandmakespeoplefeelveryuncomfortablewhensittinginthestudyarea

2. Theairconditionerpositiondoesn’tmakethewholeroomcoolerandneededtoopen earlytomakethewholeroomcooleranditalsowasteselectricity.

PROBLEM3:

1. The fan position doesn’t work well becauseitplacesatthecenterofthebed,andit doesn’tmakethebedareabecomecooler

2. Needtochangetheplaceoropentheair conditionertomaketheroombecomecooler.

PROBLEM4:

The lightning position wasplacedunfriendlybecauseitonlyshinesinthestudyareaand makespeoplefeeluncomfortablewhenwatchingbooksorphonesinbedbecauseofthelack ofalightsource.

PROBLEM5:

Thelightingwastoobrightalthoughtheoriginalceilinglightcanbechangedintothenight light.

PROBLEM2

THEAIRCONDITIONER STRAIGHTLYBLEWINTOTHE STUDYAREAANDTAKESA VERYLONGTIMETOMAKE THEWHOLEROOMCOOLER

STUDYAREA

Image of master bedroom and study area

PROBLEM3

FANPOSITIONDOESN’TWORKWELL

PROBLEM4 DONOTHAVEENOUGHLIGHTSOURCEIN THE BEDAREA

PROBLEM5 TOBRIGHTFORANIGHTLIGHT

Image of master bedroom

SOLUTIONFORPROBLEM2:

Repositiontheairconditionerontheaboveorstudyareatomaketheairflowcanbesmoother andcoolerforthewholeroom.

SOLUTIONFORPROBLEM3:

Remove the original ceiling fan and place a stand fan inthestudyareawhichcaneasilyget betterairflowfromthebedtothestudyareaandcansaveelectricityregardingopenair conditioner.

SOLUTIONFORPROBLEM4:

Replacethelightontheoriginalfanpositionwhichisatthecenterbetweenthestudyarea andbedareatogetanevenlightsourceforbothplaces.

SOLUTIONFORPROBLEM5:

Addasmalltablenightlampbesidethebed.

Master bedroom perspective view of changing position ceiling light and air conditioner and adding stand fan and night table lamp

BEDROOM1&BEDROOM2

PROBLEM6:

Wasteofelectricitybecauseneededtoopentheairconditionerthewholedayduetonot havingafan.

PROBLEM7:

Lackoflightsourceina certainplace

Bedroom1:lackalightsourceinthestudyareaandshelfarea,needtoopenanothersource suchasaphoneflashlightortorchlighttogetabetterviewwhenusingthoseplacesinwhen eveningoratnight.

Bedroom2:lackalightsourceatthesmallwalkwayintheroomandmakesthewholeroom feelsverydimanduncomfortable

Image of bedroom 1 Image of bedroom 2 Image of bedroom 1 Image of bedroom 2 PROBLEM6 NEEDTOOPENACTOGETAGOOD AIRCIRCULATION PROBLEM7
LACKOFLIGHTSOURCE

SOLUTIONFORPROBLEM6:

Addastandfanforeachbedroom

Bedroomtcanplacebetweenthestudyarea andthebedtomakethewholeroomhave abetteraircirculation

Bedroom2canplacebesidetheshelftomakethewholeroomhaveabetterair circulation

Bedroom 1 perspective view of adding stand fan

Bedroom 2 perspective view of adding stand fan

SOLUTIONFORPROBLEM7:

Replaceacircleceilinglightontopofbothareastogetabetterlightsource.

Bedroom 1 perspective view of adding circle ceiling light

Bedroom 2 perspective view of adding circle ceiling light

BILLOFQUANTITES

LINKFORCLEARVISIONOFFLOORPLANAND BILLOFQUANTITIES

https://drive.google.com/file/d/1KtPVeK0F1nRhrRX8wgty XZW7aV6IlWnH/view?usp=sharing

ASSIGNMENT 2

Indoor Comfort Design & ‘Invention’

NAME:KHORJODENG STUDENTID:0345203

PROGRAMME:BACHELOR’SININTERIORARCHITECTURE(BIA)

ASSIGNMENT

2A

INDEX

ITEM PAGE

Introduction 4

R-values 6

Heatflowcalculationformula 8

WallA 9 WallB 13 WallC 19 WallD 25 WallE 28 Summmary 30

Problemstatement 32

Ideaproduction 33 Prototype 34 Materialusedandfunction 35 Prototypeprocess 38

Costofmaterials 43 Designvalue 47 Reflection 48

2B
2

ASSIGNMENT

2A

Recordingandmeasurementof4facingsofexternalwallsof thechosenbuilding

3

Introduction

TheplacethatIchooseisDK SenzaResidence.SenzaResidence isahigh-riseresidential developmentlocatedwithinthe thrivinghubofBandarSunwayin SubangJaya.Itcomprisesasingle blockofa24-storytallbuilding,of which16-storiesisforserviced residence.

FLOORPLAN

ThesitethatIchooseforthis assignmentisabedroomwithan areaof211.62ft2whichislocated atlevel13andtheentranceofthe doorfacesnorth.Itisamaster bedroomusedforsleeping, working,andstoringpurposes. Basedonthefloorplantherewill be5wallswillberecordedand calculatetheheattransfer.

4
5

R-VALUES

Theterm"R-value"inthebuildingindustryreferstothermalresistance"perunitarea."Ifthe SIunitsareused,itissometimesdenotedasRSI-value.AnR-valuecanbeassignedtoa material(forexample,polyethylenefoam)ortoamaterialassembly(e.g.awallora window).ItisfrequentlyexpressedintermsofR-valuepermeterinthecaseofmaterials.For materiallayers,R-valuesareadditive,andthehighertheR-value,thebettertheperformance.

R-valuecalculationformulawhere:

● F°=temperature,inDegreesFahrenheit

● Ft2=area,infeetsquare

● Hr=time,inhour

● BTU(BritishThermalUnit)=theamountofheatrequiredtoraisethetemperatureof onepoundofwaterbyonedegreeFahrenheit

6

TablesofBuildingMaterialR-values

7

Heatflowcalculationformula

Thisistheformulausedtocalculatetheheatflowthroughasolidbyconduction.Therearethree variablestoconsider: the area of the surface, the resistance of that surface to heat flow or how well that surface is insulated, and the size of the temperature differential across the surface

Heatflowcalculationformulawhere

● q=heatflow,Btu/hr

● A=area,ft2

● R=resistance,ft2-hr-°F/Btu

● =temperaturedifferential,°F (highertemperature-lowertemperature)

8
7:00AM 8: 12 1 6 9

CAU TIME

7:00AM8:00AM 12:00PM1:00PM 6:00PM 7:00AM-8:00AM 12:00PM-1:00PM 6:00PM

10
Temperaturerecord TIME INDOOR 7:00AM 8: 12 1 6 11

CAU

TIME 7:00AM8:00AM 12:00PM1:00PM 6:00PM 7:00AM-8:00AM 12:00PM-1:00PM 6:00PM

TOTALqofWALLA(ELEVATIONA+ELEVATIOND)

TIME q(btu/hr)

7:00AM-8:00AM 341711+159273=3576.383 12:00PM-1:00PM 420165+159273=4360.923 6:00PM 4185.95+159.273=4345.223

12
7:00AM 8: 12 1 6 13

TIME 7:00 8:00AM

12:00PM1:00PM 6:00PM

NORTH

2900x2900 =8410000mm2 ≈90.52ft2

Doorarea 1016x2184 =2218944mm2 ≈23.88ft2

1.11 F° (CONCRETE) 2.17F° (WOODENDOOR)

28.4 21 28.4-21=7.4°C ≈45.32°F 14

Areawithout door 90.52ft2 -23.88 ft2=66.64ft2

TIME q

7:00AM-8:00AM

12:00PM-1:00PM

6:00PM

Woodendoor Concretewall

Totalqofelevationa=494.55btu/hr+2720.81btu/hr =3215.36btu/hr

15
TIME INDOOR 7:00AM 8: 12 1 6 16

CA TIME

=580000mm2 ≈6.24ft2

7:00AM8:00AM EAST

12:00PM1:00PM

Areawithcabinet 2200x2900 =6380000mm2 ≈68.67ft2

Cabinetarea (include3mm thicknessofmirror &glass) 2100x2900 =2218944mm2 ≈23.88ft2

1.11 F° (CONCRETE) 1.25 F° (PLYWOOD) 28.4 21 28.4-21=7.4°C ≈45.32°F

6:q00PM

Areamirrorcabinet &lacqueredglass 750x1930 =1447500mm2 ≈1.58ft2x2 ≈3.16ft2

PlywoodCabinet 23.88-3.16 =20.72ft2

17

TIME q

7:00AM-8:00AM

PlywoodCabinet Concretewall

12:00PM-1:00PM

6:00PM

Totalqofelevationc=751.22btu/hr+254.77btu/hr =1005.99btu/hr

TOTALqofWALLB(ELEVATIONA+ELEVATIONC)

TIME q(btu/hr)

7:00AM-8:00AM

321536btu/hr+100599btu/hr =4221.35btu/hr 12:00PM-1:00PM 6:00PM

18
7:00AM 8: 12 1 6 19

TIME 7:00 8:00AM SOUTH

12:00PM1:00PM 6:00PM

=62350000mm2 ≈671.12ft2

Doorarea 1016x2184 =2218944mm2 ≈23.88ft2

1.11 F° (CONCRETE) 2.17F° (WOODENDOOR)

28.4 21 28.4-21=7.4°C ≈45.32°F 20

Areawithout door 671.12ft2 -23.88 ft2=647.24ft2

TIME q

7:00AM-8:00AM

Woodendoor Concretewall

12:00PM-1:00PM

6:00PM

Totalqofelevationa=494.55btu/hr+26426.05btu/hr =26920.6btu/hr

21
22

CAU TIME

7:00AM8:00AM 12:00PM1:00PM 6:00PM 7:00AM-8:00AM 12:00PM-1:00PM 6:00PM

23

TOTALqofWALLC(ELEVATIONB+ELEVATIONC)

TIME q(btu/hr)

7:00AM-8:00AM

12:00PM-1:00PM

6:00PM

275565btu/hr+269206btu/hr =29676.25btu/hr

338833btu/hr+269206btu/hr =30308.93btu/hr

337567btu/hr+269206btu/hr =30296.27btu/hr

24
25

7:008:00AM SOUTH

2900x3750 =10875000mm2 ≈117.06ft2

Windowarea 1935x1780 =3444300mm2 ≈37.07 ft2

Wallarea(without window) 117.06-37.07 =79.99ft2

1.11 F° (CONCRETE) 0.91 F° (singlepanel glazing)

25.0 21

≈39.2°F 12:00PM1:00PM 30.0 30-21=9°C ≈48.2°F 6:00PM 29.9 29.9-21=8.9°C ≈48.02°F

TIME q

Concretewall Singlepanelglazing

7:00AM-8:00 AM

26

12:00PM-1:00 PM

6:00PM TOTALqofWALLD(WALL+WINDOW)

TIME q(btu/hr)

7:00AM-8:00AM

12:00PM-1:00PM

344572btu/hr+275565btu/hr =6201.37btu/hr

160971btu/hr+423683btu/hr =5846.54btu/hr 6:00PM

160369btu/hr+422101btu/hr =5824.7btu/hr

27

CAU TIME

7:00AM8:00AM 12:00PM1:00PM 6:00PM 7:00AM-8:00AM 12:00PM-1:00PM 6:00PM

29

Summary

WALL/TIME 7:00AM-8:00AM 12:00PM-1:00PM 6:00PM

WALLA 3417.11btu/hr 4201.65btu/hr 4185.95btu/hr

WALLB 26920.6btu/hr 26920.6btu/hr 26920.6btu/hr

WALLC 29676.25btu/hr 30308.93btu/hr 30296.27btu/hr

WALLD 6201.37btu/hr 5846.54btu/hr 5824.7btu/hr

WALLE 4023.82btu/hr 4947.66btu/hr 4929.18btu/hr

Aftercalculateallthewallheattransfer,thehighestheattransferthathasisthe wall D atthe periodtimeof 7:00 am to 8:00 am whichis 6201.37btu/hr thereasonthattheheattransfer valuewassohighthefirstreasonisthatitwasfacingtheplacewherethesunriseontheeast sideandthesunwillstraightlyshineintotheroomthroughwallDwindowanotherreasonis thatthereisonlyoneplacethatwillabsorbmoreheatthanotherwallisthattherehasa windowonthiswall,thewindowwilltransfertheheatintotheroomandmaketheroom becomehotteratthesideofwallD.Exceptthatthiswallalsogetsthehighestheattransfer valueamongotherwallswhichis 5846.54btu/hr from 12:00 pm to 1:00 pm and 5824.7btu/hr from 6:00 pm.

30

ASSIGNMENT

2B

31
Passive/GreenInsulationProductDevelopment

BasedonthecriticalwallidentifiedfrompartawhichiswallD(orangecolor).However,to fulfilltherequirementofassignment2bwearerequiredtoformaprototypetoreducethe heattransfer.soIdecidedtochoosewallDasmyassignment2b.

Mirror of wall d Image when the sun shines on the room

Duetothelargewindowareaintheroom,theroomislitupbythedaylightduringdaytime. However,thereisglarepenetratingthroughthewindowwhichhasaffectedthethermal comfortoftheroom.thisisalsooneofthereasonsthatincreasedtheroomtemperatureand affectthethermalcomfortoftheroom.toreducetheheattransfer,Iplantodesignapanelthat canplaceonthewindowtoreducethesun'sstraightshineintomyroomduringthemorning andafternoon.

32

IDEAINTRODUCTION

Afterbrowsingthroughthewebsitetogetideasandimageinspiration,theinspiredideato makeformyprototypewasfromthesunshadesofthecar.toreducetheheattransferthrough thewallandwindow,themainmaterialswouldhavepropertiesthatlook-alikeisthe sunshadesofthecar

Typeofsunshadesofthecar

Themainpurposeofthissunshadeistopreventfromabsorbingtheheatofthesunlight.The sunshadeshelptoreducetheinsidetemperatureofcarasithasalayerofaluminumwhich canreflectthesunlightanditwillnotabsorbtheheatfromthesunlightbutharmful substances.

33

PROTOTYPEPROCESS

Theheatinsulationpanelhas2layers.Oneisthesunshadecarsheetwhichcanreflectthesunlight thusreducingtheheatgainandthesecondlayeristhecoverwithfunctionaltohaveabetter appearance

Inthisprototype,Iwilldivideitinto3parts.eachpartofthemcanbekeptwellwithfasteningtape andexpandedoutwhenneeded.thepanelcanbeflippedindifferentdirectionstocoverthesunlight dependingondifferentsituationstoconnectthepanelIdecidedtousedoublesidetapetotapeone sideofthesunshadeandstickonthesupporterofthepanelwhichismadeofawoodenstickwith 10mmthickness.

Withoutfurtheradotousethesunlight,therewillalsoberopeshangingthroughthepaneltomakeit becomeasmallhangertohangthingsonitatthefirstandsecondpartsandthebottompartofthe panelwillbeplacedwithsomedecorationandfairylightstobecomeanightlight.andthebottompart isthestorageboxwhichsupportsthewholeprototype

34
Prototypeofpanel
MATERIALUSED ANDFUNCTION MATERIAL FUNCTION Mdfboard Baseofthepanelandalsocanbecomeastorage place Woodenstickwith10mmthickness ToSupportandconnectthepaneltopanelon thewindowframe Sunshadepanel Tocoverthesunlightshineintotheroom 35
Wire Tosupportthewoodenstick Fasteningtape Tokeepthesunshadepanelandstickthe sunshadepanelwhenitopen Strings Tohangontheclothforhangingclothorother objectpurpose Woodenclip Tocliponthestring 36
Cloth
Fornightlightpurpose 37
Tobeautifythepanelandhangstringonit Ledfairylight
PROTOTYPEPROCESS Measurethesizeofthebasementneededforthepanelandthencutit Aftermeasuring,theMDFboard,starttomeasurethesunshadeaccordingtothewindowsizeinto3 parts 38
Aftermeasuringandcuttingout,removethestringcloththatsurroundedatthesunshade. Afterthataddtheadditionalpartofthewoodensticktomakeitbiomethesizeofthewindowpanel 39

Afterconnectingthewoodenstickmeasuretheheightofthespaceneededtospaceandusewiretowire theshapeofthewoodensticksupporter. Afterthatstickthewoodenstickontothesunshadepanelwithdoublesidetape

40

afterstickingonthewoodenstickwiththesunshadepanel,stickthefasteningtapeatthepanelandthe woodenstick Afterdoingfinishthepanelstartedtodothedecorationpartwiththecloth

Makeaholeintheclothtotiethestringonit 41
Afterfinishingtiethestringandplaceitonthepanel TryoutandplacethestorageboxandfairylightontheMDFboard 42

FASTENINGTAPE

Fasteningtapeprice=RM1490

Totalused=1 Totalprice=RM14.90

MDFBOARD

MDFboardprice=RM16.50

Areaofmdfboard=24X36inch =864inch2

Areausedofmdfboard=91.5cm x20.5cm =187575cm2 =290.74inch2

Totalpriceused=areausedof mdfboardxtotalprice/areaof mdfboard =29074inch2x1650/864inch2 =RM5.55

COSTOFMATERIAL
43

Clothprice per1=RM5.90 Totalused=1 Totalprice=RM5.90 WOODENSTICK

Woodenstickper1item=RM 530 Woodenstickused=5

CLOTH
44
Totalwoodenstickused =RM530X5 =RM26.5

SUNSHADE

Sunshadetotalpriceforone item =RM9.20

Sunshadeused =2 Totalsunshadeprice =RM9.20x2 =RM18.40

HT sehave LIP have )

45

MATERIAL PRICE

String RM008 Woodenclip RM021 Ledlight RM1390 Sunshade RM18.40 Woodenstick RM265 Cloth RM5.90 MDFboard RM555 Fasteningtape RM1490

TOTALCOST RM85.44

BasedontheprototypethatIhavedonethetotalpriceisRM85.44.

46

BelowistheresultthatIgetaftermypresentation(CANREFERTOHARDCOPY) AUDIENCE RATINGPRICE

1 RM10 2 RM30 3 RM70 4 RM45 5 RM30 6 RM30 7 RM5 8 RM15 9 RM20 10 RM30 11 RM10 12 RM30 13 RM10 14 RM15 15 RM30 16 RM15 17 RM10 18 RM30 19 RM15 20 RM25 21 RM20 22 RM25

TOTALSUM RM708.90

DESIGNVALUE
AVERAGEMARKETINGPRICE RM70890/22=RM3215 DESIGNVALUE RM8544-RM3215=RM5322 47

REFLECTION

TheaveragevaluethatIgotafterthepresentationwas3222 ItwasahugedifferencefromwhatI spent TheaveragepriceIgotwasabitshockingforme,honestly BecauseIthinkthatIwillgetan averagepriceofaboutrm50andabove ButaftergettingthepriceIthinkthatthereasonthatIgetthe valueisbecauseoftheoutlookthatmyproductlooksabitcheaperandalsomypresentationskillwas notverywell Throughoutthisassignment,Ilearnedhowtobrainstormaprototypewhenfounda problemstatementtosolvetheproblemthatwasfacedinthesituation Withoutfurtherado,Ialso learnedthatwhendoingaproductweneedtocontrolwiselythecostofthematerialalsopresentation skillswereveryimportantasadesignerbecauseitshowsconfidenceintheproductthatwasmade. Lastbutnotleastitisagreatexperienceonthisassignment!

48

ASSIGNMENT 3

Design Of Building Services

NAME:KHORJODENG STUDENTID:0345203

PROGRAMME:BACHELOR’SININTERIORARCHITECTURE(BIA)

SITESELECTIONANDQUALITATIVEDESCRIPTION OFINCORPORATEDBUILDINGSERVICES

Forthisfinalassignment,thefloorthatIchooseisthe4thfloorfromCRAFTYOURS’ whichismyIAD3Finalprojectsite.Inmyproject,theselectedareaisabouttheexperience ofmakingtraditionalart,batik.Whenreachinglevel4,thereareyouwillseeaplacewhichis calledExhibido.Exhibidoisaplacethatcanletpeopleexperienceacombinationofartinthis siteitalsocanbecomeasmallworkshopsuchasweaving,embroidery,makingwau,paper cutting,shadow,andotheractivitiesexperiencedafterthattherightsidefromthefloorisa placecalledBatikry.inthisroomyoucanhavemorerecognitionofthemakingprocessesof batik.withinthat,thereisalsoaplacethatcanletpeopleexperiencemakingbatiktoo.After theBatikry,istheplacewhichisthewashingpartofbatik(waterfeatures),andfurtherisan areacalledKaChak-Kachakwhichisapalacetoletpeoplehavephotoshootsthere.

Thebuildingservicesincludeinthisspacesuchaslightning,VAC,andwatersupplydrainage. ForlightningmostlyusedspotdownlightlampsforthespaceinExhibidoandBatikry,to achieveenoughlightningilluminancelevel.Next,therewillbeledstripsaddedatthe photoshootandwashingareatoachieveenoughlightingandbeautifythenightlandscapeof thesite.ForVACtherewillbeinstalledcassettetocooltheentirespace.withinthatthere werealsofanstocooldowntheopenspace.Thewatersupplywaslocatedinthewashing areaofthebatik.

EXHIBIDO
BATIKRY
KACHAKKACHAK

DESIGNINGANDJUSTIFICATIONOFBUILDINGSERVICESSELECTIONAND LOCATION

2.1SPECIFICATION

Lightning

1)SurfaceMountedSpotlights

SPECIFICATION`

Material&Finished

● Heatsink:Aluminumbodywithhighcorrosionresistanceandpowdered paint.Mattwhite/blackcoloroptions,otherRALcolorsavailableonrequest.

● Lens/diffuser:PMMAlens,non-yellowing.

● Powersupply:Indoordriverwithplasticbody,topqualitycomponentswith freeflicker.Efficiencyfrom82%to90%dependsondifferentwattages,with ripplecurrent<5%.

● Lightsource:BridgeluxCOBasstandard,CREE/CITIZENavailableif needed.AllisRA90atleast,bettertoshowrealcolorsofobjects.

● Surfacehardware:Plastic,white/blackfinished.Itisadjustable.

Electrical&Optical

● Inputvoltage:100-265VAC50/60Hzor220-240VAC50/60Hz.

● PowerFactor:>0.5or>0.9

● CRI(Ra):>90(>97Maxavailable)

● Lumens:90lm-100lm/Woutput.

● SDCM:<5(<3available)

● Efficiency:>86%

● IPRating:IP22Indooruse

● IKRating:IK07

● Colortemperature:3000KWarmwhite;4500KNaturalwhite,6000Kcoolwhite.

● Beamangle:24°/36°

● Surgeprotection:1KV-2KV

● Lifetime:>50000Hrs

● Workingtemperature:-25℃/+55℃

● Compliance:CERoHSCertified

● Warranty:2/3/5Years.

AdditionalOptions

● ZigbeeSmartspotlights.

● PWM/0-10V/DALIDimmable

● LowvoltageinputvoltageDC12V/DC24V/DC36V/DC48V/60V

● Emergencybattery

InstallationandMounting

Fixtheplatetotheceilingwithscrews(notsupplied).Connectthesupplycabletothefast connector

2)CasingModernLEDCeilingLight

SPECIFICATION

Materials&Finished

● Heatsink(Housing):Metalbottom,2.5mmthickness-3mmthickness,white finished.

● Frame:Squareshapeflataluminumtrim,strip/flattype,whitefinishedas standard,

● Diffuser/cover:PolystyrenePSCover,noyellowing,highlighttransmittance.

● Lens:Hightemperatureresistantopticallens,uniformlightemission

● PCB:Highthermalconductivityaluminumsubstrate

● Lightsource:Bridgelux/SamsungSMDLEDChips,100lm/Woutput.

● Leddriver:includedexternalisolateddriver,Over-voltage,over-temperature, anti-surgeprotection.

AdditionalOptions

● TRIAC/0-10V/DALIdimmable

● Emergencybackup(30%powerwith1hrs2hrsor3hoursduration)

● Clipsforclip-recessedinstallation

● Steelropesforsuspendedinstallation

● Surfaceframeforsurface-mountedinstallation Electrical&Optical

● Dimension:295*295mm,295*595mm,595*595mm,1195*295mm,1195*595mm optional.

● Inputvoltage:220-240VAC50/60Hz

● PowerFactor:>0.9

● LEDChips:SMD2835

● Colorrenderingindex:>80

● Lumens:100lm/W

● THD:<15%

● SDCM:<5

● Efficiency:>89%

● IPRating: IP65waterproof

● Beamangle:120°wide

● Colortemperature:3000K/4000K/6500K

● Workingtemperature:-25℃/+55℃

● Compliance:CERoHSCertified

● ManufacturerWarranty:2/3/5Years

AIRCONDITIONER

1)Samsung1.0HPW

● Productname;Samsung1.0HP AirCondwithInverter

● Capacity(Cooling,Btu/hr) 9400Btu/hr

● Capacity(Cooling,kW) 2.75kW

● EER(Cooling,W/W) 3.01W/W

● ElectricityConsumption(Cooling,W) 870W

● NetDimension(Outdoor,WxHxD) 660*475*242mm

● FastCooling:Coolroomrapidlyandeffectively

● HDFilter:Effectiveatcapturingdust,airbornecontaminantsandallergens

● GoodSleepMode:Createsthedesirableclimateforagoodnight’ssleep

VAC

SPECIFICATION

FeaturesandBenefits:

● Industrialstandardwithmostaestheticsdesign&finishing

● Heavy-dutyindustrialwallfan

● Strong&SilentWind

● Fullpowdercoated–nicerandlonglasting

● Highdensitygrilldesign

● Lownoise

● Powerconsumption:190wattNS

2)IndustrialWallFan

CAUCALATION

Exhibido

spacearea

=6mx7m =42m2 Totalheattransfer Btu/hr=42m2x700 =29400Btu/hr

Occupantx500 10peoplex500=5000Btu/hr

Heatofelectricalequipmentx3.5

Lightning:12wx15=180w 180wx3.5=630Btu/hr

TotalBtu/hr: (29400+5000+630)Btu/hr=35030Btu/hr

Airconditionersize 1.0hp

32774btu/hr

occupantx500

10peoplex500=5000btu/hr

Heatofelectricalequipmentx3.5

Lightning:10wx6=60w

Fan:190w

Total=250wx3.5 =822.5Btu/hr

Totalbtu/hr

(32774+5000+822.5)btu/hr=38596.5btu/hr

Lightningilluminancelevels’

Exhibidoarea=6x7=42m2 =452.08ft2

Totallumen=452.08x50 =22604lm

Numofcubeceilinglampneed =22604/10000 =2.26 Batikryarea =(5.8x3.7)+(4.7x5.4) =21.46+25.38 =46.48m2 =500.3ft2

Totallumen 500.34x50 =25017lm

Numspotlightneeded=25017/10000 =2.5

Theexhibidoandbatikryareawillgenerallyenquirearound50lumenpersquarefeet.the totallumensneededfortheexhibidois22604lumenswhereas,thebatikrywilltotaluse 25017lumens.

Condwith Inverter

4 190 760 14 hrs 2660 26.6

IndustrialWall Fan

Totaldailyusage(kWHr) 53.08

Totalmonthlyusage(kWhr) 1592.4

TOTALBILL RM894.7 3

TOTALBILL=(0.435X200)+(0.509X1392.4) =87+708.73 =RM894.73

EXHIBIDO CHAKKACHAKKA CHAK KA CHAK KA
TREEHOUSE5 ROOF
BATIKRY WASHINGBATIK
EXHIBIDO CHAKKACHAKKA CHAK KA CHAK KA
WASHINGBATIK
TREEHOUSE5 ROOF
BATIKRY

THANK YOU

Giggling Platypus www.reallygreatsite.com

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.