Skip to main content

DRI WDS digital issue 2026

Page 1

www.demolitionandrecycling.media

A KHL Group publication

WDS L IA SPEC E ISSU

High reach excavators DEMOLITION SUMMIT2O26

EVENT GUIDE

Conference programme and awards shortlist for Madrid summit

OUTLOOK 2027

Contractors and OEMs on today’s market and future expectations

TOPLIST

The world’s 100 largest demolition contractors ranked by turnover


Komatsu PC950LC-11

When heavy demolition work demands maximum power and precision, the PC950LC-11 delivers. With the stability to handle tools weighing up to 11 tonnes, it ensures safe, reliable performance. Its high-flow hydraulic system, supplying up to 1160 ltr per minute to the attachment, makes quick work of even the heaviest structures, driving efficiency on every demolition site.

Komatsu Europe International N.V. · Mechelsesteenweg 586 · B-1800 Vilvoorde · Belgium · All rights reserved

komatsu.eu


COMMENT AND CONTENTS

EDITOR’S NOTE The World Demolition Summit and Awards are upon us – the culmination of months of preparation and hard graft pulling together an event that shines brightly in the industry calendar. Fortunately, I work with a great team of people with a very special set of skills, and they make the process a whole lot smoother. Well-established events like the Summit are central to keeping an industry connected. Nothing can replace meeting up with old pals in the flesh and nowhere else are you able to extend your business network while learning and having fun at the same time. As the world becomes ever more digital, it is vital to nurture these traditions and make time for the people that make the global demolition community so special. In this issue of Demolition & Recycling International, we take a look at what has happened in the year until now and gaze towards the next 12 months with 2027 fast appearing on the horizon. We talk to contractors, suppliers and associations about the topics that concern them most and hear from their experience. A substantial number of pages are given over to a preview of the WDS conference programme complemented by a detailed presentation of the companies shortlisted for an award. Finally, for those of you I haven’t yet met since taking over as editor of this esteemed title back in January: Hello, it’s nice to meet you. And to each and every reader, a very warm welcome to our special WDS issue. I hope you enjoy it.

4 NEWS REVIEW

The news stories that made the headlines in 2026

9 THE BIGGER PICTURE REGIONAL FOCUS: Europe

12 TOP PROJECTS 2026

From complex dismantling to explosive demolition

16 D&RI100

Annual list of top 100 global demolition contractors, ranked by turnover, returns showcasing encouraging momentum

20 INDUSTRY OUTLOOK 2027

Views on current challenges and future trends in demolition 27 C ONFERENCE PREVIEW 31 PROGRAMME SCHEDULE 34 AWARDS AND JUDGES 36 CIVILS AWARD 37 COLLABORATION AWARD 38 CONTRACT OVER US$ 1M

42 P LANT & EQUIPMENT

39 CONTRACT UNDER US$ 1M

43 TOOLS & ATTACHMENTS

40 ENVIRONMENTAL AWARD

44 RECYCLING AWARD

EXPLOSIVE DEMOLITION

45 SAFETY AND TRAINING

41 INDUSTRIAL DEMOLITION

47 URBAN DEMOLITION

48 EQUIPMENT: HIGH-REACH EXCAVATORS Reaching high while keeping stable

53 COLEMANS: MENTAL HEALTH MATTERS Interview with CEO Mark Coleman

57 C ELEBRATING 50 YEARS OF DEMOLITION ENGINEERING A word from the newly appointed president of the IDE

58 A YEAR OF CONVERSATIONS AND PRACTICAL WORK

Best wishes NEEL MADSEN Editor

EDA president’s review of the year and look towards 2027

Volume 28 ■ Number 1 ■ 2026

D&RI TEAM

EDITOR Neel Madsen neel.madsen@khl.com BRAND MANAGER Peter Collinson +44 (0)7957 870982 | peter.collinson@khl.com CLIENT DELIVERY & SUCCESS MANAGER Charlotte Kemp | charlotte.kemp@khl.com GROUP DESIGNER Jade Hudson CUSTOMER SUCCESS & CREATIVE ASSISTANT Cuan Hansbury

www.demolitionsummit.com

www.khl.com/newsletters

EVENTS MANAGER Steve Webb | steve.webb@khl.com

KHL OFFICES

DATA MANAGER Anna Philo | anna.philo@khl.com DATA EXECUTIVE Vicki Rummery | vicki.rummery@khl.com CHIEF FINANCIAL OFFICER Paul Baker CHIEF EXECUTIVE OFFICER James King

INTERNATIONAL MEDIA PARTNER OF: ISSN No: 1465-9778 (print) ISSN No: 3049-4559 (online)

© Copyright KHL Group 2026

www.demolitionandrecycling.media

UNITED KINGDOM (HEAD OFFICE) Southfields, South View Road, Wadhurst, East Sussex TN5 6TP, UK. +44 (0)1892 784088 www.khl.com USA OFFICE KHL Group Americas LLC 11811 N Tatum Blvd, Ste P118, Phoenix, AZ 85028 americas@khl.com

Scan the QR code to find us on LinkedIn: Demolition and Recycling International (D&Ri)

SOUTH AMERICA OFFICE KHL Group Américas LLC Av. Manquehue Sur 520, of. 205, Las Condes, Santiago, Chile +56 9 7798 7493 | cristian.peters@khl.com CHINA OFFICE KHL Group China Room 769, Poly Plaza, No.14, South Dong Zhi Men Street, Dong Cheng District, Beijing 100027, P.R. China +86 (0)10 6553 6676 | cathy.yao@khl.com Demolition & Recycling International (D&Ri) makes every effort to report news accurately, but is not responsible for the validity of claims. All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopy, recording or information storage or retrieval system without written permission from the publisher.

d&ri 2026 3


NEWS REVIEW

A year in demolition

FEBRUARY

Over 1,200 members gather in Phoenix, Arizona, for the NDA’s convention and expo. In addition to a programme of educational sessions, presentations and demo dialogues, 83 exhibitors greet contractors, industry leaders and others at the convention centre and the live demo site outside city. Volvo CE launches its new EC950 High Reach demolition excavator in North America. Weighing over 400,000 lb (181 tonnes), it can operate at up to 161 ft (49.1 metres) with a 7,500 lb (3.4-tonne) attachment. The first machine later goes to Adamo Demolition in Detroit. Volvo also completes the acquisition of Swecon Group, its biggest European dealer, with Tomas Kuta as new head. Steelwrist promotes Peter Gaj to vice president region Americas, following three years leading its sales organisation here. The company also expands its assembly and testing capabilities at the Newington, Connecticut, facility to meet demand for tiltrotators and automatic quick couplers. Komatsu North America agrees to acquire the assets of Kentucky-based SRC of Lexington to expand its remanufacturing capabilities. Volvo’s new EC950 High Reach excavator PHOTO: VOLVO CE 4 d&ri 2026

As 2026 draws to a close, we look back at some of the stories that made the headlines, revisiting key developments and moments from across the industry.

Kobelco opened new European HQ PHOTO: KHL Peter Gaj, Steelwrist VP Americas PHOTO: STEELWRIST

The deal will provide Komatsu with a dedicated US facility for restoring used construction and mining equipment components. Caterpillar’s Tony Fassino retires as group president of Construction Industries, following 30 years with the company. Caterpillar veteran Rod Shurman succeeds him, with Fassino remaining with the company as group president, retired, during a transition period.

the Caterpillar 319 compact-radius excavator suited to demolition and urban jobsites where working space is restricted; HD Hyundai’s five Next Generation HX excavator models with fully electrohydraulic (FEH) controls; and Komatsu’s Smart Construction new hardware and software for its connected jobsite system. CM Labs Simulations introduces a new suite of products designed to simulate realworld demolition operations within a virtual environment with attachments including hydraulic hammers, shear jaws and grapples to offer “an integrated approach to demolition training.” Hosted by the German Demolition Association, Fachtagung Abbruch in Berlin is visited by more than 1,300 professionals. Supported by 125 companies, the event combines an exhibition, networking and presentations covering machinery, safety, digitalisation, AI, circularity and recycling. NDA welcomed members to Demolition Phoenix

PHOTO: KHL

JANUARY

Kobelco Construction Machinery Europe appoints Takemichi Hirakawa as new managing director and excavator division director, succeeding division founder Makoto Kato. This follows KCME’s move to new headquarters and demonstration centre in Lelystad, the Netherlands. At Canadian contractor Priestly Demolition, Shane Stewart takes over as new president and CEO. Brian Priestly becomes COO and Andrew Smith CFO, while Ryan Priestly steps down as CEO to focus on the company’s long-term strategic oversight. Sanho Shin steps in as CEO of newly rebranded Hyundai Construction Equipment Europe, reporting to HD Hyundai CEE president, Jayden Lim. With more than 20 years of experience and leadership in construction equipment, Shin was most recently director of sales management at HD Hyundai Infracore Europe.

MARCH

ConExpo 2026 welcomes 140,000 visitors from 128 countries to the Las Vegas event in early March. Across more than 3 million square feet of space, over 2,000 exhibitors showcase their latest equipment, technology and services covering every major construction sector. A swathe of machinery and technologies are introduced at the US show, including Hitachi’s ZX500LCK-6 64-tonne high-reach demolition excavator featuring a 270 kW engine and a maximum working height of 27 metres;

ConExpo returned to Las Vegas PHOTO: CONEXPO

www.demolitionandrecycling.media


NEWS REVIEW quality over quantity as it pursues more disciplined, sustainable growth and expects a profitable 2026.

JUNE

Live demos at SaMoTer in Italy PHOTO: KHL The UK-based Institute of Demolition Engineers (IDE) announces the formation of its first international chapter covering the Asia-Pacific region, while also celebrating its 50th anniversary.

APRIL

Hyundai CEE identifies demolition as an key growth market as new CEO Sanho Shin unveils the company’s plan to increase revenue from a projected €5.8 billion in 2026 to €8.7 billion in 2030. It introduces the HX520A HRD high-reach excavator developed in cooperation with Dutch demolition specialist STC. Demolition specialist Jet Demolition, based in Johannesburg (SA), highlights the importance of integrating asbestos abatement into largescale industrial projects, noting that early identification and removal by specialists are key to ensuring full safety and efficiency. The NDA and the Concrete Sawing and Drilling Association (CSDA) signs an agreement to co-locate their annual meetings with both scheduled to be held in Fort Worth, Texas,

www.demolitionandrecycling.media

EDA remembering Liam Horgan of Hegarty Demolition PHOTO: EDA Hyundai CEO Sanho Shin PHOTO: KHL in February 2027. The National Federation of Demolition Contractors, in partnership with the Health and Safety Executive and the IDE, announces the return of its NFDC Talks seminar series on Intelligent Demolition Planning to be held across the UK between June and November.

MAY

SaMoTer opens its doors in Verona, Italy, to 42,000 visitors and an area up by 20% compared to 2023. Attachment specialist MB Crusher celebrates its 25th anniversary at the fair where it first introduced its crusher bucket technology two decades ago. Steelwrist’s SQ40 fully automatic coupler and Kobelco’s SK165SRLC crawler excavator receive SaMoTer Innovation awards. Collins Demolition takes delivery of the UK’s first Volvo EC500HR High Reach excavator, extending the contractor’s demolition reach up to 32 metres (105 ft) while enabling the use of heavier attachments for complex structural dismantling projects. Keltbray Built Environment reports underlying pre-tax profit of £5.3 million for the year ended October 2025, up from £3.2 million in 2024, despite a fall in revenue. The UK company says it is prioritising

The EDA’s annual convention gathers demolition, decontamination and recycling professionals in Dublin, Ireland. Held at Croke Park, the event offers special recognition to the Irish Association of Demolition Contractors (IADC) and remembers Liam Horgan, late managing director of Hegarty Demolition. Komatsu’s PC220LCi-12 excavator is the focus of a VIP event at Atlassian Williams F1 HQ in Oxfordshire, where the 300 guests are treated to a tour of the race team’s Heritage Museum. Later, in September, the company announces the extension of its partnership with Williams. A sold-out Hillhead show takes place in Buxton, Derbyshire, during soaring temperatures with 18,340 visitors attending. More than 620 exhibitors, including all 15 of the world’s top heavy construction equipment OEMs, showcase their solutions for quarrying, construction and recycling in a working quarry environment. JCB’s 520X crawler excavator, the largest and most powerful to date, is launched at Hillhead. Part of the Heavyline range, the 50-tonne class excavator has been developed for heavy-duty applications, from mass excavation and aggregate extraction to demolition and crusher loading. Kobelco’s European arm invites the press to the Netherlands facility and discusses its strategy to increase regional market share across mini excavators and heavy equipment from 6–7% to over 10%. Meanwhile, Japanbased Kobelco Construction Machinery signs an MOU with the UN Development Programme to test the K-DIVE remote operation technology in Ukraine.

JULY

“From launch era to demolition challenge: decommissioning the historic test stands

>7

Komatsu at Atlassian Williams F1 HQ PHOTO: KHL

2026 d&ri 5


CALL IT OL’FAITHFUL CALL IT ZW310-7 CALL IT THE RELIABLE ORANGE And from April 2027, call Hitachi Construction Machinery LANDCROS


NEWS REVIEW Forshaw Demolition in the UK goes into administration. The family-owned company, based in Westhoughton, Bolton, was established in 2003 and provided demolition services mainly across the north of the country. The demolition of Gateshead flyover, a key transport link in north-east England, enters its third and final phase. More than 19,600 tonnes of material have been demolished, processed and removed, according to BAM UK & Ireland working with demolition contractor Thompsons of Prudhoe.

at NASA Marshall Space Flight Center” is announced as the keynote for the World Demolition Summit 2026. The presentation will be delivered by stakeholders NASA, Target Contractors and DetX. Blackpool-based JN Civils commissions a new construction, demolition and excavation waste recycling wash plant from CDE Group, as it moves from outsourcing to in-house processing and creates a new revenue stream. MB Crusher details how two infrastructure projects in India and Australia have demonstrated the advantages of recycling demolition and excavation material directly on site, reducing truck movements, disposal costs and the demand for virgin aggregates. In Mumbai, the Brihanmumbai Municipal Corporation announces it will launch a digital platform for monitoring C&D waste. The portal is introduced in the face of the city’s major redevelopment boom, which sees large volumes of demolition debris and excavated material generated.

SEPTEMBER

Epiroc opens an expanded attachment manufacturing facility in Kalmar, Sweden, to consolidate its European production. The new plant will produce its range of hydraulic breakers for excavators in construction, demolition, quarrying, mining and infrastructure applications. Aggregates Europe, Concrete Europe, EAPA, FEAD, FIR, Recycling Europe and FIEC issue a joint response raising ‘serious concerns’ about the European Commission’s Joint Research Centre (JRC) proposal for EU-wide

PHOTO: JCB

AUGUST

Rugby World Cup-winning England international and sports commentator Matt Dawson MBE is announced as the host of the 2026 World Demolition Awards, which will be held on the final evening of the World Demolition Summit in Madrid, Spain. Meanwhile it is revealed who have made the shortlist at the World Demolition Awards 2026. The nominees across all 12 categories are announced after the scores from the expert judges are collated and cross-checked. In Portland, Oregon, Staton Companies mobilises to Centennial Mills, where the derelict building has been left at risk of collapse following a large. The water tower on top of the building is subsequent brought down safely by explosives experts DetX, before the remaining building are removed by Staton.

JCB 520x crawler excavator at Hillhead

end-of-waste criteria for recycled aggregates from construction and demolition waste. The EDA welcomes the Fédération des Métiers de la Dépollution et de la Décontamination (FMDD) to its growing network. Other new members in 2026 include Ambigroup, Beilite Europe, Eddie Precision, Montabert, STC Solutions and O’Kelly Brothers Demolition, while Perses Group joined at the end of 2025. Heidelberg Materials UK expands its recycling capabilities in Leeds with the opening of a new construction, demolition and excavation waste recycling facility that can process around 250,000 tonnes of materials a year. Steelwrist appoints new CEO Jon Lind to succeed founder Stefan Stockhaus, who after more than 20 years in the post will transition to a role as industrial advisor to Solix, which is the owner of TerraTech Group and its subsidiary Steelwrist.

OCTOBER

D&Ri speaks to Stephen McCann, the newly appointed president of the Institute of Demolition Engineers, about his views of the demolition industry, the role of the IDE, international expansion and the future of demolition. UK-based Collard Group acquires a 40-acre recycling site in Hampshire as part of a plan to extend its network across the south of England. The Rookery Recycling Facility will reopen for construction and demolition waste and soil recycling. Kobelco Construction Machinery announces plans to build a new facility in Yamakuni Industrial Park, Kato City, Japan, to consolidate its ‘dispersed’ R&D, testing and evaluation functions for construction machinery. Husqvarna Construction adds two new demolition robots to its portfolio, taking the line up to seven models. Developed in a compact format, the remote-controlled DXR 705 and DXR 715 are designed for a range of demanding demolition and industrial applications.

NOVEMBER

JN Civils’ new recycling plant in Blackpool PHOTO: CDE www.demolitionandrecycling.media

The World Demolition Summit and Awards 2026 industry event takes place in Spain, with a comprehensive conference programme discussing issues in demolition and recycling, while presenting some of the world’s biggest projects. The annual awards gala dinner follows with trophies handed out to the winners of the 12 categories, plus the ■ crowning of the Best of Best entry. 2026 d&ri 7


DEMOLITION PULVERIZER Installed on excavators, backhoe loaders and skid steer loaders, they are designed for primary and secondary crushing. 1,5 - 25 ton

Scan for the full range of attachments MBCRUSHER.COM


REGIONAL FOCUS EUROPE

The bigger picture Increased legislation, labour shortages and innovation are shaping demolition in Europe.

E

urope’s demolition sector continues to evolve as infrastructure investment, urban regeneration and increasingly ambitious circular economy targets reshape market priorities. While activity varies between countries, demolition contractors across the region are adapting to tighter environmental regulation, changes in available workforce, and rapid advances in technology.

MARKET VALUE

According to market research company IBISWorld, the wider demolition and sitepreparation market is valued at just under €127 billion (US$ 142 billion) in 2026, with an expected annual revenue growth rate of 9.4%. It is a large, but highly fragmented sector, supported by Europe’s ageing

Urban regeneration is another busy segment in Europe PHOTO: ECO DEMOLIZIONI Growth in chemical plant demolition is providing opportunities PHOTO: DESPE

www.demolitionandrecycling.media

building stock, infrastructure renewal and increasingly demanding circular-economy requirements. While the current economic climate is injecting much volatility into all markets due to the constant shift in fuel prices and interest rates, the overall outlook for the demolition sector in Europe (with UK as the exception) can be said to be cautiously optimistic. Growth is likely to be strongest in specialist decommissioning, infrastructure, selective demolition and materials recovery compared to conventional building demolition; however, Europe’s ageing building stock also creates a substantial need for urban regeneration. According to the European Commission, around 85% of buildings in the EU were constructed before 2000, while 75% have poor energy performance. The Commission’s Renovation Wave strategy aims to renovate 35 million buildings by 2030, potentially creating opportunities for demolition contractors in strip-out, selective dismantling and material recovery alongside wider redevelopment.

WASTE RECYCLING

More than 30% of the EU’s environmental footprint comes from buildings, making it the sector with the highest environmental impact, according to the EEA report, Addressing the environmental and climate footprint of buildings 2025. Their decommissioning leads to the largest waste stream in the EU by weight – construction and demolition waste (CDW) accounts for more than a third of all waste in the region. The good news is that overall, the landfill rate has gone down considerably (from 23% to 16% between 2010 and 2020) in the 27 EU countries, even though the total amount of waste generated has continued to increase. But while recycling rates are high, most material is downcycled into lower value uses, the report states, despite the potentially high resource value of some CDW components. However, the level of CDW recycling and material recovery varies greatly across the region, ranging from less than 10% to over 90%. EU countries apply different definitions of CDW, which makes crosscountry comparisons difficult. The Commission’s Joint Research Centre (JRC) recently issued a new proposal for end-of-waste criteria. The proposal defines when recycled materials stop being legally >10 classified as waste and become usable 2026 d&ri 9


REGIONAL FOCUS EUROPE products, an important initiative in the work towards reaching the EU’s circular economy goals. But the reaction from industry was not unanimously positive. A coalition of associations, including Aggregates Europe, Concrete Europe, EAPA, FEAD, FIR, Recycling Europe and FIEC, have raised ‘significant and serious concerns’ about the proposal. They warned that overly complex criteria could in fact result in fewer materials achieving end-of-waste status, lower recycling rates, more usable material going to landfill and reduced investment in circular business models. Instead, they suggest that the EU criteria should act as a common baseline, or minimum safeguard, that still allows individual member states to keep their national systems that better reflect local geology, groundwater, climate and environmental conditions.

WORKFORCE ISSUES

Much have been said already about the labour challenges that continue to haunt the industry, as it contends with an ageing workforce, the retirement of experienced personnel and strong competition for staff from other sectors. Finding new operators is proving increasingly difficult as the number of working age people in Europe is declining. According to Eurostat, those aged 20–64 (i.e. who are of working age) in relation to the number of older people (aged 65+) fell from 3.7 in 2005 to 2.7 in 2025. And there is no sign that this downward trend will reverse – in fact by 2100 the ratio may be as low as 1.5 – meaning the pool of working age people will continue to dwindle. The situation is compounded by a declining interest among younger generations to enter the trades. This is driven partly by society’s strong emphasis on higher education and many young people’s changing expectations of and attitudes to work and career development. At the same time, outdated perceptions of demolition, and indeed construction, obscure the increasingly skilled and technology-led nature of the work, making

10 d&ri 2026

Komatsu PC210 LCE electric excavator at work in Oslo PHOTO: KLIMA OSLO it harder to attract new entrants and replace the knowledge being lost. There is an insufficient awareness of the broad range of careers available, and in many countries, only limited or inconsistent apprenticeship and training routes exist. As experienced demolition professionals from the larger generations retire – i.e. the remaining baby boomers and the oldest members of generation X – the industry faces not only a lack of staff but also a serious skills drain. These people take decades of practical experience and in-depth knowledge with them, making recruitment, training and the transfer of expertise to the next generation is more important than ever.

TECHNOLOGY INNOVATION

The adoption of new technologies is widely seen as the answer to the challenges faced by the European demolition industry. These include highly automated equipment, lowemission machinery and digital solutions developed to address the lack of operators, cost pressures, circular demolition goals and shortened timelines. While fully autonomous machines of the size needed on large demolition projects are a long way off, excavators are increasingly fitted with advanced control systems, geofencing, proximity sensors and operatorassist technologies, among others. These features improve accuracy and boost productivity by helping operators to work more efficiently. They also improve safety both on site (and nearby) by keeping operation within defined limits and detecting movement within the work zone. Europe is also leading the way to cleaner

construction and demolition, with Norway and the Netherlands proving that zeroemission sites are technically feasible and effective. However, higher equipment cost, lack of charging infrastructure and limited options for heavy-duty applications, including demolition, are some of the barriers to adoption of low-emission machinery, whether these run on electric power, hydrogen, HVO (hydrotreated vegetable oil) or other alternative fuels. And finally, at the forefront of developments in recycling, AI-driven technology is being used to create new ways of improving materials recovery. One example is the EU-funded DISCOVER project which aims to ‘revolutionise’ the construction and demolition industry. It combines robotics, AI and continuous scanning to create detailed building models that help optimise resource use, reduce environmental impacts and support circular construction. By identifying all the materials that can be recovered and reused, the project promises to help turn demolition sites into ‘material banks’ where waste becomes a valuable commodity and diverted from landfill.

CONCLUSION

The shift towards circular construction is changing demolition’s role in Europe, supported by legislation and new technology. There is a greater emphasis on retaining the value of buildings, components and materials which encourages selective dismantling, reuse and higher-quality recycling, rather than simply clearing sites. For demolition contractors, this creates opportunities to become material recovery specialists, while demanding more detailed planning, sorting and collaboration with designers and clients. On the other side of the coin, the dwindling population and low interest in entering this trade, present problems in an industry that will endure as infrastructure renewal and urban regeneration continue. ■ www.demolitionandrecycling.media


ENGINEERED FOR

UNLOCKING VALUE FROM CONTAMINATED WASTE Discover how challenging waste streams from major construction and infrastructure projects, including PFAS, hydrocarbon and heavy metal contaminated soils, are being successfully treated, recovered and diverted from landfill creating new revenue streams while actively contributing to the circular economy.

For more details, visit cdegroup.com


TOP PROJECTS

Global demolition excellence

From complex dismantling to explosive demolition, we revisit the projects that featured in D&Ri over the past 12 months. GOVE REFINERY

close collaboration with Rio Tinto and all stakeholders. The detailed methodologies were analysed, refined and validated using ASI’s Extreme Loading for Structures software to ensure the structures behaved as designed throughout the induced collapse.

NASA TEST STANDS

On 10 January, joint venture Ahtna-Target, with Rose PE Engineering and DetX imploded two of NASA’s most historic aerospace test structures at Marshall Space Flight Center, at Redstone Arsenal near Huntsville, Alabama. The 410-foot Saturn V Dynamic Test Stand and the Saturn I Static Test Stand (known as T-Tower) were built in the late 1950s and early 1960s to withstand the forces of rocket testing. They played a vital role in the success of the Apollo moon missions, the Space Shuttle programme, PHOTOS: AHTNA-TARGET

The demolition of the Gove alumina refinery in Australia ranks as one of the largest projects in the Southern Hemisphere to date. Located on the Gove Peninsula in the Northern Territory, the Rio Tinto-owned refinery supplied the global aluminium industry with bauxite for more than 40 years before it ceased production in 2014. Managed by Liberty Industrial, the finale of this project involved three blasts taking down the 86 metre (282 ft) chimney stack, three silo roofs and 70 metre (230 ft) high stair tower. The contractor was supported by a team of in-house engineers and explosive specialists, consultants from around the world, Rio Tinto itself and local community stakeholders. “Due to the height and the composition of these structures, some of which were significantly dilapidated, we determined early on that induced collapse using explosive demolition methods would be required to minimise risk and interruption to operational areas,” explained Liberty’s director Simon Gill. The engineering team had engaged in an eight-month planning phase in

Blowdown at Marshall Space Flight Center

Blasting the three silo roofs at Gove PHOTO: LIBERTY INDUSTRIAL

and many other historic achievements. The carefully coordinated implosions successfully brought down both towers as planned, but not before the team had faced an exceptional range of challenges in the months leading up to the event. First, a clerical oversight had left the Dynamic Test Stand on the National Register of Historic Places. Second, a nationwide explosives supply crisis forced real-time redesign of alternative formulations. Third, a NASA stop-work order issued 14 days before the event was due to take place required extra workers and changes to the sequence of final preparations. Despite these crises, both towers imploded as planned, each collapsing within its designed footprint with no safety incidents or impact to adjacent NASA assets. “In all my years, this implosion event ranks as one of the top toughest of all times,” said legendary explosives expert Ron Gilbert, VP blasting operations, DetX. “Years in the making through meticulous planning and preparation, this team endured challenges few will ever experience.” This unique project will be discussed during a keynote presentation at the World Demolition Summit 2026.

WEST BURTON A

Brown & Mason demolished the boiler house at West Burton A power station in Nottinghamshire, UK, in late January using controlled explosives. The 782,000-cubicmetre building was the largest single

BELL BAY POWER STATION

T-Tower before the blast 12 d&ri 2026

In another Australian blast, McMahon Services completed the final major demolition at the former Bell Bay Power Station in northern Tasmania. This Hydro Tasmania project saw the 110-metre (360 ft) smokestack brought down in a controlled blast on 12 January. Works to prepare for the demolition of the power station, which was first www.demolitionandrecycling.media


TOP PROJECTS ABERTHAW B POWER STATION

In February, the DA (Deaerator) bay and turbine hall roof at the former Aberthaw B power station in the Vale of Glamorgan, Wales, were demolished by Erith Contractors, in collaboration with explosive engineering specialists Precision Demolition Company (PDC). This was followed by the blowdown of the iconic 156 metre (512 ft) tall chimney stack in June. The turbine hall was one of the largest remaining structures on the 500-acre Aberthaw site which closed in March 2020. Extending for over 230 metres (755 ft) and constructed from reinforced concrete and structural steel, the building historically housed the main turbine and auxiliary plant used in electricity generation. “The turbine hall was a large and technically complex structure, requiring detailed engineering assessment and a rigorous, safety-led approach,” said Andy Dyson, Erith’s operations director. Cormac McLean, managing director of PDC, added, “The controlled demolition of a structure of this scale and complexity requires extensive modelling, precise sequencing and close coordination. The turbine hall blowdown was the result of months of preparation, and we are pleased to have delivered a safe and accurate outcome.” Aberthaw site after the chimney was taken down. PHOTO: PDC The interior of West Burton A boiler house

ARGYLE DIAMOND MINE

PHOTO: BROWN & MASON

commissioned in the early 1970s, began in April 2024. The boiler house taken down in October 2025. To bring down the stack – said to be one of the tallest structures in Tasmania – a total of 41 kg of explosives were used in a controlled implosion, with electronic detonators programmed to control timing. Hydro Tasmania project director Aaron McCreath commented that the final big www.demolitionandrecycling.media

Helicopter on demolition duty at Argyle PHOTO: LIBERTY INDUSTRIAL

structure at the former coal-fired power station and housed four boilers, each supplying steam to a 500 MW turbine. The project with EDF Energy was initiated in February 2024 with the demolition of precipitators 3 and 4, while 1 and 2 were taken down in May that year. In July 2025, it was the turn of the turbine hall and DA bay, followed in October by a triple explosive blowdown of two flue gas absorbers and a coal boom stacker. The full site is due to be cleared by 2028. Constructed in 1961, West Burton A power station, operated by EDF, ceased generation in March 2023 after 57 years of electricity generation. The site is set for the UK’s first prototype fusion energy plant, planned for opening in 2040. Brown & Mason described the event as “another milestone in the country’s transition from fossil fuels towards greener energy sources, with West Burton being home to STEP (Spherical Tokamak for Energy Production) Fusion, the UK’s programme to create a UK-led fusion industry.”

At Rio Tinto’s former Argyle diamond mine in Western Australia, Liberty Industrial successfully delivered the decommissioning and removal of communications infrastructure with a difference – by using a helicopter. The helicopter-based approach was deployed in partnership with McDermott Aviation and HeliSpirit to overcome the complex challenges of the site’s remote and elevated terrain. It allowed the team to carry out the works in just three weeks with no impact to other operations. Some 15 helicopter lifts were carried out, with around 10 tonnes of remote infrastructure

removed for sorting and recycling. Located in the East Kimberley region of Western Australia, the Argyle was one of the world’s largest diamond mines before operations ceased in 2020. Following the closure, Liberty was given the demolition contract by Rio Tinto. For this second phase of the closure, the contractor initially conducted a feasibility study to identify the most suitable method while accounting for harsh weather, access constraints and environmental concerns. “The heli works at East Ridge and Mt Evelyn are just one of the unique approaches we have undertaken as part of a broader above ground infrastructure closure programme,” said divisional manager Brett Kirby. “This approach was preferred for its ability to minimise environmental impact by removing the need for new ground-level infrastructure or track construction, while preserving the surrounding land.”

LA SEVILLANA (PUERTOLLANO)

For more than half a century, the large chimney of the former Puertollano thermal power plant, in Ciudad Real, Spain, was part >15 blast had been a success. “Bringing down such a tall and narrow structure is very complex work and requires a highly skilled specialist team,” he said. McMahon Services also managed asbestos and hazardous material at the site in accordance with Work, Health & Safety regulations, guidelines and safe work practices, including oversight from an independent asbestos assessor.

Bell Bay chimney demolition PHOTO: HYDRO TASMANIA

2026 d&ri 13


This is how it’s done As Japan’s leading manufacturer of demolition equipment, we know what it takes to perform in the world’s toughest market. We combine proven engineering excellence with long experience and a hands-on approach, ensuring that we understand your challenges. This is how our expertise becomes your confidence, and our heritage drives your success.

KOBELCO.eu

KOBELCO.usa

SK650DLC-11: nominated for the 2026 Manufacturers’ Innovation Plant & Equipment Award

KOBELCO CONSTRUCTION MACHINERY EUROPE B.V. KOBELCO CONSTRUCTION MACHINERY USA INC

14102026_EN_WDS_D&RI Magazine_Demolition_EU+USA_W200 x H273 mm.indd 1

WWW.KOBELCO-EUROPE.COM WWW.KOBELCO-USA.COM

30/09/2026 12:05


TOP PROJECTS NAGA THERMAL POWER

Erri Berri preparing for the blowdown at Puertollano. PHOTO: ERRI BERRI of the city’s industrial landscape. As part of the dismantling project led by Spanish demolition specialist Erri Berri, the 120 metre (394 ft) structure was successfully demolished using a controlled blast. “This high-precision operation, carefully planned and coordinated by our technical teams, allowed us to bring down the chimney cleanly and safely,” said Javier Vidaurre, production manager at Erri Berri. “This milestone is the result of collaborative work between our professionals, in close partnership with the technical teams of the owner Repsol Generación Ciclos Combinados SLU, as well as with blasting specialists dMol Demoliciones.” Famously known as La Sevillana, the 220 MW station opened in 1972 and stopped generating in 2013. Demolition has taken over a decade, with Erri Berri leading ‘Phase 2: Boiler and Turbines’ covering the main buildings, material recycling and reuse for site preparation from 2023.

LIDDELL POWER STATION

Another project in Australia saw CMA Contracting successfully bring down the chimney stacks at Liddell power station in the Hunter Valley region in New South Wales. The two 168 metre (551 ft) high reinforced concrete structures at were demolished using more than 500 kg of high explosives on 26 May. The event was a major milestone in a two-year demolition programme, said CMA, noting it was the result of tens of thousands of work hours invested by its client AGL, the local community and regulatory stakeholders, in combination with CMA’s delivery, inhouse and third-party engineering, and specialist blasting teams.

Double chimney blast at Liddell. PHOTO: AGL “From detailed methodology development, structural and blast engineering coordination, and preweakening and drilling works to explosive charge installation, exclusion zone implementation, and environmental monitoring controls – this was nothing but a team effort,” a spokesperson from CMA Contracting told D&Ri. “Our carefully sequenced felling methodology was tailored to site constraints, adjacent live assets and broader demolition staging requirements.” The coal-fired plant opened in 1971 and supplied electricity for almost 52 years before closing in 2023. The event was broadcast to more than 33,000 people who tuned in to see the fells via a live stream.

AKMENĖ CEMENT PLANT

Another double chimney demolition took place at the operational Akmenė cement plant in northern Lithuania, where Next Level Demolition completed the dismantling of two reinforced concrete stack measuring 100 and 150 metres (328 and 492 ft). Working within a live industrial site, the Latvian contractor used a specially manufactured telescopic platform system from SAEclimber, alongside two remotecontrolled demolition robots from Brokk and Husqvarna, to reduce both structures to the 30-metre mark. From there, a high-reach excavator took over. The large elevator platform provided a stable and secure working area for both personnel and machinery, allowing the robots to carry out demolition at height. Its Telescopic platform system at Akmenė PHOTO: NEXT LEVEL

www.demolitionandrecycling.media

In the central Philippines, PDC alongside Megabuild 101 carried out the explosive demolition of the 110-metre concrete smokestack at the Naga Thermal Power Complex, on the island of Cebu. Originally built in the 1960s without seismic reinforcement, the chimney had later been retrofitted with four large concrete buttresses. The structure, sat in one of the most seismically active regions on earth, had already defeated three contractors attempting various mechanical methods. This was only the second smokestack to be felled by explosives in the country, with PDC delivering the works directly to the client, Aboitiz Thermal. “What followed was not simply an exercise in explosives engineering. It was a project that demanded equal measures of technical precision and cultural intelligence, under conditions that tested both,” commented Cormac McLean, PDC’s managing director. A 6.9 magnitude earthquake struck the day before the team landed, the strongest in recent local history. The following day, a 6.5 magnitude event occurred, with aftershocks for weeks. But the team prevailed. The structure collapsed in 22 seconds, within two seconds of the modelled time. It fell exactly as designed, with all debris contained within the prepared landing zone. Taking part in local traditions and sharing food was a key part of the project PHOTO: PDC telescopic design enabled it to adjust to the changing dimensions of each chimney as work progressed. As the platform moved upward, it narrowed to follow the chimney’s tapering profile, expanding again as it descended towards the wider sections below. This adaptability allowed the system to accommodate the structures’ varying diameters throughout the process. Construction of the Akmenė plant began in 1947, with its first clinker kiln entering operation in 1952. The site reached an annual output of 3.4 million tonnes after further kilns were added in the 1970s. A major modernisation followed in 2014, when a new dry-process production line ■ began operating. 2026 d&ri 15


2026

Encouraging momentum C

ompiling a global picture of the demolition contracting market, the d&ri100 ranks entrants according to their 2025 turnover in US dollars. It provides an opportunity to examine industry trends, see where growth has been achieved and highlight the companies operating at scale across different regions.

returns for 2026 to offer a snapshot of the international demolition industry. It provides an overview of the changes in revenues, movement among the leaders and the regional trends shaping the sector. POSITION 2025 2024 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

1⊲

5▲ 3⊲ 4⊲ 2▼ 6⊲ 10 ▲ 7▼ 8▼ 13 ▲ 11 ⊲ 12 ⊲ 16 ▲ 17 ▲ 20 ▲ 19 ▲ 24 ▲ 25 ▲ 23 ▲ 15 ▼ 22 ▲ 21 ▼ 27 ▲ 31 ▲ 26 ▲ 28 ▲

16 d&ri 2026

COMPANY NAME

North Star Hagedorn Unternehmensgruppe Ferraro Group Erith Contractors Keltbray Brandenburg Industrial Service Co DH Griffin Wrecking Co Max Wild Penhall Company Freimuth Abbruch und Recycling McGee Group AF Gruppen Independence Excavating Select Demo Services John F Hunt Tscherning A/S Priestly Demolition Integrated Demolition JDC Demolition Co Cardem Eiffage-Demcy Liberty Industrial McMahon Services Bierlein Companies Lindamood Inc Manafort Brothers

CHALLENGING YEAR

It goes without saying that 2025 was a difficult year on many fronts, with multiple conflicts and political uncertainty throwing markets into volatile waters. Labour shortages, rising costs, supply chain pressures and regulatory changes affected businesses across the demolition industry, while decarbonisation, new technologies and the push towards greater reuse and recycling continued to influence its direction. The year was, to put it mildly, unpredictable and challenging. Even so this year’s ranking points to very encouraging momentum, with an overall growth rate across all 100 companies of more than 9%. As such, the performances of the companies featured in this year’s top list provide an interesting view of how the global demolition market fared during a year of considerable change and unrest.

LOCATION

New York, NY Gütersloh Neunkirchen Erith Esher Chicago, IL Greensboro, NC Berkheim Irving, TX Bülkau Wembley Oslo Brecksville, OH Salem, MA Grays Hedehusene King, ON California, CA Boston, MA Bischheim Velizy-Villacoublay Glebe Dry Creek Midland, MI Irving, TX Plainville, CT

COUNTRY

United States Germany Germany United Kingdom United Kingdom United States United States Germany United States Germany United Kingdom Norway United States United States United Kingdom Denmark Canada United States United States France France Australia Australia United States United States United States

Tiny’s Demolition taking down Nashville detention centre PHOTO: TINY’S

HEADLINE NUMBERS

When the d&ri100 was first compiled back in 2001, editor Steve Brown described the result as surprising. “Not many would have thought the total revenue for these contractors combined is almost US$2 billion,” he noted, as he began to analyse the numbers. Fast forward to today and we find that the 100 largest demolition contractors in 2025 recorded an estimated total turnover of $9.23 billion; a figure up by a healthy 9.19% compared to the year before. However, with five new entrants and some turnover figures

TURNOVER (US$ M) 2024

578.71 292.94 311.87 306.38 401.39 279.22 211.26 274.44 272.00 176.80 190.71 152.51 141.90 130.50 112.39 95.47 110.60 109.24 110.70 EST 142.30 117.63 112.00 100.10 EST 85.20 EST 110.00 EST 93.00 EST

TURNOVER (US$ M) 2025 512.74 421.00 378.56 369.63 352.41 306.09 299.90 275.00 235.00 EST 234.30 172.84 165.74 150.00 149.82 132.21 127.29 120.75 113.46 113.00 EST 112.20 109.69 109.21 105.00 EST 101.50 EST 100.00 EST 95.79 EST

www.demolitionandrecycling.media

EST=estimate

The d&ri100


2026 Regional breakdown

contractors totals $3.91 compared to $3.66 billion in 2024 – a much lower growth rate of 6.8%. As a percentage of the total revenue however, each region’s share remains broadly the same with Europe up by 0.9%, North America down by 1% and the rest of the world gaining 0.1%.

2025

Total revenue: US$M 9,233.94

Europe 49.0%

North America 42.3%

RoW 8.6%

North America 43.3%

Europe 48.1%

2024

Total revenue: US$M 8,456.91

estimated from available information, the increase is not strictly like for like. Nevertheless, it points to sustainable and continued momentum with an even better result than the 8.2% rise achieved by the 2024 total. Looking at the two major regions, Europe (including the UK) accounts for $4.53 billion across 43 companies, up from $4.07 billion and equal to an increase of 11.2%. The turnover for the 44 North American Trifecta carrying out asbestos abatement and fall protection PHOTO: TRIFECTA

POSITION 2025 2024 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52

30 ▲ 32 ▲ 54 ▲ 14 ▼ 60 ▲ 38 ▲ 44 ▲ 40 ▲ 41 ▲ 46 ▲ 61 ▲ 43 ▲ 35 ▼ 45 ▲ 37 ▼ 49 ▲ NEW 39 ▼ 34 ▼ 18 ▼ 57 ▲ 47 ▼ 69 ▲ 50 ⊲ 56 ▲ 52 ⊲

COMPANY NAME

AMPCO Contracting Delsan AIM Despe Adex Groep O'Rourke Wrecking Company Avenir Deconstruction ISI Demolition Milburn Van Vliet Demolition Sessler Companies R Collard AWR Abbruch Volgaspecstroy Thompsons of Prudhoe Deconstruct UK Trifecta Services Company Reforma Group PP O'Connor Hughes and Salvidge Wahl Group Jackson Demolition Services North American Dismantling Corp B&B Wrecking Crushmash Brown and Mason Nabekai Corporation

www.demolitionandrecycling.media

LOCATION

California, CA Montréal Torre de Roveri Harderwijk Cincinatti, OH Artigues White Marsh, MD Bellwood, IL Gorinchem Waterloo Hook Urmitz Nizhny Novgorod Prudhoe London Charlotte, NC Ekaterinburg Manchester Portsmouth Remagen Schenectady, NY Lapeer, MI Cleveland, OH Moscow Dartford Tokyo

COUNTRY

United States Canada Italy Netherlands United States France United States United States Netherlands Unites States United Kingdom Germany Russia United Kingdom United Kingdom United States Russia United Kingdom United Kingdom Germany United States United States United States Russia United Kingdom Japan

MOVEMENT AT THE TOP

In terms of size, the largest contractors account for a substantial share. The top ten generate $3.38 billion or 36.7% of ranked turnover. The top 20 account for 51.4%, demonstrating the scale of the leading businesses within the d&ri100. An important note here is that in some cases, whole group turnover has been used where demolition-only related turnover cannot be sourced, making direct comparison indicative rather than exact. At the top, NorthStar retains its lead despite a fall of just over 11%. Its $512.74 million places it first, while Hagedorn moves from fifth to second with $421 million, narrowing the gap between the two. Keltbray (Built Environment division) meanwhile takes up fifth position from second last year with turnover down 12.2%, reflecting the whole group’s lower revenue in 2025, despite improved underlying profitability. DH Griffin meanwhile advances from tenth to seventh, reporting $299.90 million, a substantial increase of 42.0% on 2024. It is also worth highlighting the five newcomers on the list – McDonagh Demolition and Spirtas Worldwide both >19 from the United States, Erri Berri from

TURNOVER (US$ M) 2024

90.00 84.00 57.22 74.47 54.00 72.92 69.80 EST 71.10 EST 70.50 EST 62.59 EST 53.71 70.04 EST 75.20 69.30 74.98 61.63 NEW 72.60 79.72 70.45 EST 56.25 EST 62.40 EST 44.50 61.30 56.34 58.48 EST

TURNOVER (US$ M) 2025 95.00 EST 91.50 86.82 86.35 83.60 81.00 80.95 EST 79.50 EST 77.30 76.86 76.63 75.00 EST 74.36 73.72 73.69 73.00 71.50 71.40 70.26 68.75 EST 68.00 66.50 EST 66.19 65.70 65.55 60.00 EST

EST=estimate

RoW 8.7%

2026 d&ri 17


XT

The Evolution of Scrap Shears – Engineered for Maximum Performance, Enhanced Stability and Extended Service Life.

www.genesis-europe.com


2026 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91

92 93 94 95 96 97 98 99 100

72 ▲ 36 ▼ 53 ▼ 9▼ 48 ▼ 59 ▲ NEW 62 ▲ 68 ▲ 42 ▼ 64 ▲ 65 ▲ 66 ▲ 70 ▲ 67 ⊲ 76 ▲ 81 ▲ 71 ▲ 78 ▲ 74 ▲ 79 ▲ NEW 74 ▼ 83 ▲ 76 ▼ NEW 87 ▲ 89 ▲ 63 ▼ 77 ▼ 91 ▲ 82 ▼ 81 ▼ 92 ▲ 58 ▼ 55 ▼ NEW 51 ▼ 85 ▼ 86 ▼ 88 ▼ 96 ▲ 90 ▼ 84 ▼ 94 ▼ 96 ▼ 98 ▼ 95 ▼

COMPANY NAME

Lezama Demoliciones DDM City Circle MGL Demolition Envirocon Takayama Kogyo McDonagh Demolition Alloy Group Likvidator Veit & Co MCM Management Corporation Plannerer Moß Abbruch Erdbau Recycling Berg Corporation DSM Demolition SDL Citybaumanagement Cawarden Group Precision Demolition Grupo Mitre ARC Abatement Kroecker Inc Erri Berri RGS Groep Tiny's Demolition & Recycling Grupo Flesan Spirtas Worldwide KDC Veolia Decommissioning Colemans Dickson Company Fabio Bruno Construcoes Morrisroe Demolition Costello Dismantling Central Environmental Inc Fratelli Omini Adamo Group Matsuda City Development Haywood Crushing Demolition Lotus Demolition National Wrecking Company

LOCATION

Bizkaia De Meern Kew East Durham Boston, MA Tokyo Chicago, IL Export, PA Lipetsk Rogers, MN Sylvan Lake, MI Pullenreuth Lingen Baltimore, MD Birmingham Berlin Derby Lewisville, TX Buenos Airies Waco, TX California, CA Navarre Rijssen Nashville, TN Santiago St Louis, MO Manchester Birmingham Tacoma, WA Rio de Janeiro Watford West Wareham, MA Anchorage, AK Novate Milanese Detroit, MI Fukuoka Wellington Vantaa Chicago, IL

COUNTRY

Grant Mackay Demolition Dem-Master Demolition Pece of Mind Environmental Mrozek Pacific Blasting & Demolition American Demolition Corporation Sabre Demolition Target Contractors Ambigroup Demolition

Woods Cross, UT Bathgate Orlando, FL Bystrice Burnaby Elgin, IL Warners, NY South Carolina, SC Arranho

United States United Kingdom United States Czech Republic Canada United States United States United States Portugal

New entrant Spirtas Worldwide taking down a chimney at Cahokia power plant PHOTO: SPIRTAS

Spain Netherlands Australia United Kingdom United States Japan United States United States Russia United States United States Germany Germany United States United Kingdom Germany United Kingdom United States Argentina United States United States Spain Netherlands United States Chile United States United Kingdom United Kingdom United States Brazil United Kingdom United States United States Italy United States Japan United Kingdom Finland United States

Spain, Haywood Crushing Demolition (UK) and Reforma Group (Russia) – which further strengthen the ranking’s coverage, without indicating that these are newly established businesses.

INDUSTRY BENCHMARK

Over the year since its first appearance, the d&ri100 ranking has established itself as a benchmark. It provides a strong indication of long-term industry trends and showcases the resilience of the global demolition industry, as evidenced by the continued growth rate. More analysis based on this unique top 100 list will be developed over the coming months and published on the D&Ri website, as we dig deeper into the numbers. Even www.demolitionandrecycling.media

TURNOVER (US$ M) 2024

TURNOVER (US$ M) 2025

26.74 EST 25.34 19.95 EST 24.57 EST 30.21 20.40 EST 19.95 EST 19.73 EST 26.80

28.40 EST 25.79 25.00 24.98 EST 22.83 21.80 EST 20.50 EST 20.45 EST 19.45

42.11 76.72 57.57 EST 57.62 62.20 EST 54.70 EST NEW 52.50 EST 46.15 70.30 50.13 EST 49.92 47.49 EST 44.13 EST 47.40 40.96 EST 34.02 43.34 EST 34.27 41.80 EST 34.12 EST NEW 41.28 EST 31.00 39.26 NEW 26.02 25.18 52.40 34.52 EST 23.48 32.50 32.90 EST 22.53 EST 55.30 56.91 EST NEW 60.20 EST 29.53 EST

58.89 58.88 58.50 EST 55.55 55.00 EST 54.70 EST 53.75 52.50 EST 51.73 51.56 51.50 EST 51.00 EST 49.50 EST 46.34 EST 45.79 44.24 EST 43.58 43.50 EST 43.30 43.05 EST 42.50 42.21 EST 41.50 EST 41.00 40.30 EST 38.50 EST 38.29 38.11 37.90 36.25 EST 36.11 34.13 EST 33.21 EST 32.52 32.20 32.00 EST 31.59 30.80 30.50 EST

EST=estimate

POSITION 2025 2024

EDIITORIAL NOTE: Not all contractors disclose detailed financial information, so where necessary, turnover figures have been estimated using available data and industry sources. Every effort has been made to ensure the figures are as accurate as possible to provide a meaningful picture of the global market. Exchange rates used to convert domestic currencies to US dollars are from a rolling five-year average between 2021 and 2025.

though this year’s ranking has now been published, contractors are still encouraged to submit their 2025 turnover figures (new or actual where an estimate has been used), to help build a bigger and more detailed picture of the global demolition market. Please email the editor at neel.madsen@khl.com ■ with any new information. 2026 d&ri 19


MARKET OUTLOOK

Under pressure D&Ri asks demolition contractors and suppliers for their take on today’s global market and the outlook for 2027.

T

he global demolition market remains highly fragmented. Political and economic uncertainty is slowing activity in some regions, while others continue to see healthy demand or are poised for significant growth.

AMERICAN DEMAND

According to Tony den Hoed, director of national accounts – demolition & forestry at Volvo Construction Equipment North America, demand from customers remains high, driven by infrastructure projects, industrial redevelopment, power plant decommissioning and urban renewal. “Demand is still very strong and, honestly, I think it’s stronger than it was a year ago,” he declares, but adds that although demolition customers are busy, they are becoming more selective in their equipment investment as they seek to maximise productivity and profitability. Select Demo Services in the US is seeing a healthy pipeline across its markets, says Sarah Marcone, vice president of business development. “The demolition market throughout the eastern United States remains strong, particularly for contractors with the workforce, equipment and experience to execute large, complex projects and those capable of self-performing both demolition and environmental remediation.” She explains, however, that the work is becoming increasingly challenging and that balancing those demands is not always straightforward. “Aggressive schedules, increased safety requirements – which we recognise are necessary – along with competition bidding below sustainable market rates and highly restrictive work windows are becoming the norm.” Competition on price is also highlighted by Stephen McCann, who, as managing director of Perses Group, works with demolition clients across the globe. He describes the North American market as “pretty solid” but notes that it is large and 20 d&ri 2026

complex, with each state operating under varying laws, market requirements and funding. He says that major demolition projects across the region, such as the General Motors Renaissance Centre in Detroit and mine closures, continue to keep the market buoyant.

EUROPEAN MARKET

Europe’s demolition market is also healthy, driven by chemical plant and steel mill closures caused by rising energy costs and Asian competition, says McCann. This opinion is confirmed by Mario Subijana, business director at Lezama Demoliciones in Spain, who says that the industrial sector is still the biggest market, while urban and rehabilitation are emerging sectors that should be considered. He comments, “There is a significant pipeline of projects linked to the transformation of the energy sector, the closure or conversion of industrial facilities, and the redevelopment of obsolete sites.” Subijana explains that one of the main challenges in Spain is the increasing contractual complexity of projects and the growing transfer of risk to contractors. “Responsibility for uncertain conditions such as hazardous materials, contamination, underground services or the actual condition of existing structures is currently the main challenge when facing agreements,” he says. “Combined with tight programmes and continued pressure on prices, this makes effective contract and risk management increasingly important.” The company has participated in the dismantling of several of Spain’s largest thermal power plants. It is currently decommissioning the country’s largest coal-fired power plant, As Pontes, and taking on its first overseas project in Chile, working on the Tarapacá power plant. Offering a supplier’s point of view, Olivier Rasmont, Stephen McCann, Perses Group

Sarah Marcone, Select Demo general manager marketing and engineering, Kobelco Construction Machinery Europe, says that the European market presents a somewhat mixed picture. The OEM has noticed a sharp slowdown in France and softer demand in the UK over the course of this year. Meanwhile, Germany, Italy and the Netherlands remain on the same level as in 2025. “Customers are showing greater interest in versatile machines that can accommodate different front attachments, work across a range of applications and move relatively easily between sites,” he says, explaining that when investing in equipment, contractors place particular emphasis on durability, reliability and controllability, as well as their relationship with the dealer.

UK SLOWDOWN

In contrast to mainland Europe, the UK is experiencing a downturn in work. Danny Byng, chief operating officer at demolition contractor Hughes & Salvidge in Portsmouth, describes his home market as challenging, saying there is “a noticeable overall degree of caution,” but adding that it remains active in more specialist areas. The lack of projects coming forward to tender and increased competition for the opportunities that are available is putting pressure on pricing and margins, according to Byng. With companies operating at “different levels of accreditation, experience and capability but competing for the same work, it is an ongoing challenge for established contractors to maintain the high standards expected around health and safety, environmental performance, quality and compliance while remaining commercially www.demolitionandrecycling.media


MARKET OUTLOOK Lezama is active in Spain and internationally

matter, which is why the strongest value often comes from matching the right machine, work tool, technology and aftermarket support to the application.” In Spain, Lezama has gathered valuable experience working on the decommissioning of coal-fired power stations. This activity is decreasing in the country, says Mario Subijana, meaning the company is now looking globally, towards South America, to capitalise on this expertise. But other industrial facilities, such as refineries, petrochemical plants, steelworks and more, are also facing modernisations or closures that require demolition works, he explains. “Renewable energy developments, industrial land regeneration and the conversion of former production sites creates more opportunities. Selective dismantling, asset recovery and the reuse of materials and equipment are becoming increasingly important parts of these projects, and we expect that this will become more important in near future,” he says. For Hughes & Salvidge in the UK, it is aviation, framework-led work and the petrochemical and wider industrial sectors that are currently providing some of the strongest opportunities, says Danny Byng. The company has a long-standing presence at London Heathrow airport and experience across other major UK airports, while its industrial and petrochemical expertise

PHOTO: LEZAMA

Jean-Christophe Etienne, Caterpillar competitive,” he states. McCann agrees, noting that state of the UK market is prompting some contractors to seek work further afield. He says, “The slowdown in the UK has significantly increased competition in some areas, creating a very tight market where contractors are forced to race to the bottom on price to secure turnover.” He highlights that even in London, long considered recession-proof due to the sheer volume of house builders, the market is no longer as active. Major global trends that are providing significant volumes of work include the move away from fossil fuel and polluting industrial manufacturing as well as mining operations. Jean-Christophe Etienne, industrial segment specialist at Caterpillar, says that demolition work continues with urban redevelopment, infrastructure renewal and the need to safely deconstruct ageing structures. He explains that customers seek out equipment and support that will help them improve productivity, uptime and jobsite efficiency. He says, “Customers continue to place strong emphasis on purpose-built demolition equipment that helps improve safety, versatility and efficiency on complex jobsites, particularly demolition or highreach excavator configurations.” Caterpillar is also observing a growing interest in connected solutions and fleet management tools that help monitor utilisation, plan maintenance and keep equipment productive. “Productivity, uptime, operating cost and versatility all www.demolitionandrecycling.media

PHOTO: M SCHMID

GROWTH OPPORTUNITIES

Mario Subijana, Lezama Demoliciones supports projects involving decommissioning, dismantling, hazardous materials and complex demolition. “These are areas where specialist knowledge, established relationships and the ability to operate safely within complex or live environments are particularly important,” he says. In addition, international work continues to create more opportunities beyond the UK for the company. Meanwhile, Select Demo’s Sarah Marcone points to a diverse range of sectors, including healthcare, higher education, K12, infrastructure, transportation, utilities and government work as areas that continue to generate work for company. The Massachusetts-headquartered business grew its annual turnover by nearly 15% in 2025 compared to the year before, moving up from 17th to 14th in the d&ri100 ranking of global demolition contractors. Select Demo is also seeing more activity around data centres, power and large-scale redevelopment, she says, noting: “We expect these sectors to remain strong, particularly throughout the Eastern US, where aging infrastructure and facilities continue to require significant investment and modernisation.” The growth in data centre construction globally has increased work for demolition contractors, including soft strip >23 work, as existing buildings are Danny Byng, Hughes & Salvidge

Select Demo taking down the Joslin Diabetes Center in the heart of Boston’s medical district 2026 d&ri 21


Less downtime on tool changes. More time getting the job done. CEJN BLX is the next level of hydraulic quick couplings for the toughest demolition, construction and recycling environments where speed and operational reliability are key.

www.cejn.com CEJN full page ad - WDS special edition.indd 1

2026-09-24 08:31:43


MARKET OUTLOOK Tony den Hoed, Volvo CE

repurposed, according to Stephen McCann. He says there is a larger question globally around the impact data centres will have on the economy and the environment due to their vast energy and water consumption. “This could be good for the demolition sector in the future as technologies improve and data centres become redundant.”

OUTLOOK 2027

With economic instability comes reluctance to invest, and as we head towards 2027, it is clear that the industry is facing a challenging, and much less predictable, market. The uncertainty across the wider construction sector is naturally having a big impact on demolition contractors. Danny Byng says that Hughes & Salvidge is seeing projects delayed, postponed or put on hold at various stages, from smaller developments through to major schemes. “Uncertainty around market conditions, funding, investment decisions and planning is making it increasingly difficult to predict exactly when projects will progress to procurement and delivery. This in turn creates challenges around forward workload, resource planning, investment and maintaining skilled teams,” he explains. Across the pond, Select Demo remains optimistic about 2027, says Sarah Marcone. The company’s order backlog and the opportunities it is tracking indicate continued demand. Investment in public infrastructure, healthcare, government and energy-related is expected to provide a solid base of work. Olivier Rasmont, Kobelco CME

PHOTO: HUGHES & SALVIDGE

Hughes & Salvidge is shortlisted in the industrial category at the WDA 2026 for the Matosinhos Refinery project in Portugal

www.demolitionandrecycling.media

One of the biggest issues will be pricing pressure and maintaining responsible bidding practices in an increasingly competitive market, she says. “Demolition contractors are being asked to meet higher safety, environmental, insurance and compliance standards while executing increasingly complex scopes within compressed schedules. Those requirements come with real costs,” she states. “When work is bid below sustainable market levels, it creates challenges not only for contractors but for the industry as a whole.” Mario Subijana says that Lezama shares the optimism, predicting a reliable volume of industrial demolition and decommissioning work in Spain and the rest of Europe. He notes that the company also expects to find more opportunities in South America, where some countries are starting the same decarbonisation processes seen across Europe. “However, opportunities do not automatically guarantee good conditions for contractors,” he adds. “Project delays, lengthy procurement processes, aggressive pricing and the transfer of excessive risk to demolition companies may continue to affect margins and project delivery.” Stephen McCann describes the South American market as slowly opening, with Brazil likely to be the main regional driver. Major projects in the region include the Los Colorados mine in Chile’s Atacama Desert, but he predicts that, “The continent faces significant instability due to political realignment and economic strain, which will slow down this growth.” Turning to Australia, McCann says the market is currently in a growth phase as the country closes major coal-fired power stations and mines, and embarks on major redevelopment in Melbourne, where some 40 tower blocks are earmarked for demolition. “This boom has drawn the attention of international contractors, all looking to secure work in the area,” he says. Volvo’s Tony den Hoed too is optimistic about 2027. He says, “There will be challenges around labour and rising costs, but overall, I expect demand for specialised demolition equipment to remain healthy. I also think we will continue to see more focus on high-reach machines, technology and material recovery as the industry evolves.” Olivier Rasmont at Kobelco is more reserved in his outlook for Europe, noting, “Forecasting demand for dedicated

demolition machines is a major challenge, contributing to a cautious outlook for 2027.” He adds that because many customers are also involved in projects outside Europe, political instability is affecting their plans and that makes it difficult to predict the direction of the market. “One of the key challenges is helping demolition contractors solve increasingly complex jobsite requirements with a complete solution rather than providing a single machine or attachment,” says JeanChristophe Etienne, Caterpillar, adding, “Looking ahead to 2027, what we’re hearing from our customers is that they want to further improve safety on jobsites and deliver higher productivity, with more machine uptime and improved lifecycle cost efficiency.”

EVOLVING ROLE

When listening to various stakeholders, the consensus is that the demolition contractor’s role is evolving. Those we spoke to for this feature agree. “It is no longer simply about removing structures, but about recovering assets and materials, supporting future redevelopment and providing clients with technically sound, safe and environmentally responsible solutions,” says Mario Subijana. Sarah Marcone agrees that the industry is advancing, moving beyond the mere removal of assets to a much more complex process. She explains that major projects require not only extensive preplanning and engineering expertise but also deep knowledge of all environmental aspects, including recycling and material recovery. “We also need sophisticated equipment and constant coordination with owners and construction managers to succeed,” she says. “We are increasingly being brought into projects earlier to help identify challenges, develop demolition sequencing and provide constructability input. That early involvement can have a major impact on safety, schedule and overall project success.” This is also the feedback from Tony den Hoed, who says, “There’s a clear shift toward selective dismantling and material recovery rather than traditional demolition methods.” Productivity remains the leading investment priority, with reliability, uptime, service support and parts availability often carrying more weight than purchase price, he notes. Reflecting on the uncertainty of the UK market and what it means for the industry in the near future, Danny Byng concludes, “Ultimately, greater confidence across the construction and development pipeline would benefit the entire supply chain. In the meantime, contractors need to remain flexible, commercially disciplined and focused on the areas where their expertise provides genuine value.” ■ 2026 d&ri 23


POWER TO PROFIT WITH CAT ® HIGH-PERFORMANCE NEXT GENERATION DEMOLITION EQUIPMENT.

© 2026 Caterpillar. All Rights Reserved. CAT, CATERPILLAR, LET’S DO THE WORK, their respective logos, “Caterpillar Corporate Yellow”, the “Power Edge” and Cat “Modern Hex” trade dress as well as corporate and product identity used herein, are trademarks of Caterpillar and may not be used without permission.

CAT-5301-003 DemolitionPrintAd_DPS_DoublePageSpread_vM.indd All Pages


MULTIPROCESSORS

352 UHD 8–9 STORIES

CONCRETE PULVERIZERS

SORTING GRAPPLES 340 UHD 6–7 STORIES

SWITCH ATTACHMENTS IN SECONDS WITH ONE OF OUR AUTOMATIC HYDRAULIC COUPLING SOLUTIONS.

SHEARS

330 UHD 5–6 STORIES

ROTARY CUTTERS

HCS COUPLERS

352 SB 4–5 STORIES

HAMMERS

340 SB 3–4 STORIES

QUICK COUPLERS

330 SB 2–3 STORIES

SKELETON BUCKETS

HCCW COUPLERS

VISIT CAT.COM/DEMOLITION FOR MORE INFORMATION

9/28/26 2:06 PM


DEMOLITION MAXIMUM PERFORMANCE LOWEST OPERATIONAL COSTS HIGHEST RELIABILITY


HEADLINE SPONSOR

DIAMOND SPONSOR

DEMOLITION SUMMIT2O26

PLATINUM SPONSORS

GOLD SPONSORS

SILVER SPONSORS

AWARDS DRINK RECEPTION

NETWORKING DRINKS

MADRID Conference programme The speakers and presentations awaiting attendees to the

POST DINNER DRINKS

18th World Demolition Summit in Madrid. Page 28

Demolition Awards

BRONZE SPONSORS

Presenting the demolition projects and product innovations shortlisted for an award in the 12 categories. Page 34 WATER SPONSOR

BREAKFAST SPONSOR

POWERED BY

CREATED BY

#WORLDDEMOLITIONSUMMIT

LANYARD SPONSOR IN PARTNERSHIP WITH

APP SPONSOR

www.demolitionandrecycling.media

IN COOPERATION WITH

SUPPORTING ASSOCIATIONS

WELLNESS PARTNER


WORLD DEMOLITION SUMMIT 2026

Innovation, safety a W

DS 2026 will gather demolition and recycling specialists in Madrid in early November, with a conference programme focused on innovation, safety and sustainability. Presentations will range from the complex removal of the steel liner from Canada’s Sudbury Superstack, the demolition of an elevated water tower and the transformation of Oslo’s former American Embassy through selective demolition to controlling squat risk of modern concrete stacks, and the use of robotics and AI in material recovery. The programme also includes a keynote on the explosive demolition of two historic NASA test structures at Marshall Space Flight Center, alongside case studies on the dismantling of the RheinbrückeNeuenkamp bridge in Germany, circular demolition in Argentina, exclusion-zone management in North Wales, and a Spanish project reporting an exceptionally high material recovery rate. And finally, value creation through recycling will be put under the spotlight with a dedicated panel discussion that will examine the practical challenges and opportunities around recovering, processing and finding new uses for materials from demolition projects.

WEDNESDAY 4 NOVEMBER Inside the Sudbury Superstack project

Andy Fournier, site manager, and Sienna Boyuk, project coordinator, ICCCommonwealth Andy and Sierra will share the story behind the three-and-a-half-year project to dismantle the deteriorating flue liner inside the Sudbury Superstack, which was once Canada’s tallest chimney, the country’s second tallest structure and the second tallest chimney in the world. The work involved removing a 381-metre (1,250-ft) steel liner weighing more than 2,000 tonnes, along with its supporting steelwork, all housed inside the 53-year-old concrete chimney structure. Using real project examples, the presentation will explore innovative dismantling methods, heavy-lift operations and risk management strategies relevant to aging industrial infrastructure worldwide. 28 d&ri 2026

The World Demolition Summit 2026 presents the line up for the 18th edition of this leading global event. Demolition as an enabler of circular construction

Are Strøm, CEO, Urban Reuse and EVP, NG Nordic Are will present the transformation of the former American Embassy in Oslo, designed by architect Eero Saarinen and opened in 1959. One of Norway’s most important postwar modernist buildings, the protected landmark has been carefully adapted for new public, hospitality and office uses while preserving its architectural and cultural significance. He will explore how selective demolition, temporary works and major structural interventions enabled the creation of new space beneath and within the existing building, highlighting how demolition can serve as a tool for transformation and circularity, extending the life and value of historic buildings.

From demolition waste to valuable resource

Jim Graham, principal, EVP Winter Environmental

(moderator); Kasper Sørensen, production director, Tscherning A/S; Marianne Hedberg, independent environmental consultant; Eunan Kelly, business development director, CDE As demolition moves beyond waste management towards resource recovery, the panellists will explore the opportunities and challenges of keeping materials in circulation. They will debate the economics of reuse and high-quality recycling, how greater

www.demolitionandrecycling.media


WORLD DEMOLITION SUMMIT 2026

y and sustainability THURSDAY 5 NOVEMBER Best of the Best 2025

Delegates at WDS 2024 in Stockholm demand for recovered materials can be created, and the importance of collaboration across the value chain. The discussion will also look ahead to how resource recovery could reshape the demolition industry over the next decade.

Robotics and AI in sustainable material recovery

Dr Eng Mohanad Abukmeil, industrial AI scientist, TU Delft Mohanad will show how

using robotics and AI can improve sustainable waste recovery. His presentation will explore how robotics and artificial intelligence are transforming demolition and deconstruction through real-time identification of valuable and reusable building materials before work begins. The presentation will focus on the EU-funded DISCOVER project and the development of the Pokeye robotic drilling platform which combines AI, cameras and sensing technologies to classify materials on site. It will provide a practical look at how AI-driven technologies could reshape the demolition industry over the next decade.

Snelgrove elevated water tank

Chris Dowdell, senior remediation manager at Koch Industries, spoke about safe job sites at WDS 2025

Camille Atrache, CEO, and Rachelle Atrache, COO, Tri-Phase Group Camille and Rachelle will discuss the demolition of the Snelgrove elevated water tank, in Ontario, Canada, a complex, high-risk infrastructure removal that required specialised planning, engineered methodology and strict safety execution. The structure posed several unique constraints, including significant working height at 43 metres (141 ft), which ruled out conventional high-impact demolition methods. Instead, a phased demolition approach centred on controlled deconstruction, precision sequencing and continuous risk assessment was deployed.

John Patist, COO, and Jorn Vermeer, commercial manager, DDM John and Jorn will present the Rheinbrücke-Neuenkamp bridge dismantling project, which was crowned Best of the Best at the World Demolition Awards 2025. The 777-metre-long (2,550 ft), cable-stayed bridge spanned the River Rhine near Duisburg, in Germany, and formed part of the A40 motorway. This highly complex demolition was completed while maintaining active river traffic and operation of the newly constructed adjacent bridge. The presentation will examine the reverse-order dismantling strategy, innovative temporary support systems and strict environmental and safety controls required throughout the project.

Controlling squat risk in concrete stack demolition

Mark Ramun, VP industrial services, Jackson Demolition Mark will present engineering strategies used to control squat risk during the demolition of modern thinwalled concrete stacks. He will examine a 200-metre (650 ft) concrete stack demolition where progressive collapse modelling identified a high risk of hinge instability due to wall thickness transitions and material variability. The session will discuss the engineered steel hinge reinforcement system developed to stabilise the structure and ensure controlled centre-of-gravity transfer within a restricted fall zone. It will focus on squat mechanics, modelling insights, reinforcement design methodology and field performance compared to predicted behaviour.

KEYNOTE: Decommissioning NASA’s test stands at MSFC

Megan Vansant, lead architect and demolition programme manager, and Justin Taylor, master planner and experimental facility development, NASA MSFC;

>31

2026 d&ri 29


Meet us at World Demolition Summit

Changing powered work tools

IN SECONDS Steelwrist SQ is a high performing automatic oil connection technology used in quick couplers and tiltrotators on excavators to connect hydraulic work tools. Easily change between breaker, crusher, shear, grapple as well as mechanical work tools in only seconds – all without leaving the cab! Making sure you are always using the right work tool for the job. SQ40–SQ90 automatic couplers, excavators up to 70 tonnes Outstanding flow capacities LockSense safety solution for SQ60 and up Common Open-S V14 electrical connector Complies with the Open-S standard for automatic quick couplers

Wireless LockSense wedges

Member of Open-S Alliance

steelwrist.com


WORLD DEMOLITION SUMMIT 2026 Austin Hays, VP business development, and James JJ Martin, director of federal & special projects, Target Contractors; and Ron Gilbert, VP blasting operations, DetX The panel will discuss the demolition of the Dynamic Test Stand and the Propulsion and Structural Test Facility (T-Tower), at NASA’s Marshall Space Flight Center in Huntsville, Alabama. This unique project was carried out on an active NASA test site, meaning the team had to negotiate a complex, multilayered and long planning process involving numerous stakeholders and an extremely tight schedule. Both test towers were successfully brought down on 10 January 2026 using explosive demolition, but not before the team had gone through an exceptional range of challenges that threatened the viability of the whole project.

Complex exclusion zone management

Mike Kehoe, MD, C&D Engineering Consultants Mike will discuss the explosive demolition of a 107-metre (350 ft) chimney on the Isle of Anglesey, North Wales, which was carried out in a highly complex operational environment adjacent to a live site. Although the demolition itself was straightforward, the real challenge was coordination, balancing tightly controlled timing with critical infrastructure, transport routes, aviation restrictions and emergency service requirements on a constrained island site.

Building circularity in informal and volatile contexts

Miguel Ippolito, director of management, Grupo Mitre Miguel will present how Mitre developed Argentina’s first private C&D waste recycling facility and examine

Conference schedule 3 NOVEMBER

EXCLUSIVE VIP DAY 13.30–17.00 Guided tour of Madrid including visit to Santiago Bernabéu stadium 18.30–20.00 VIP networking reception for invited guests only

4 NOVEMBER

12.00–13.15 Registration and networking buffet lunch 13.15–13.20 Welcome Neel Madsen, D&Ri editor and chair 13.20–13.40 Official welcome Patrick Frye, EDA president 13.40–14.10 Removing the Sudbury Superstack flue liner Andy Fournier and Sienna Boyuk, ICC-Commonwealth 14.10–14.40 Demolition as enabler of circularity Are Strøm, Urban Reuse 14.40–15.10 PANEL: From waste to valuable resource Jim Graham, Winter Environmental; Kasper Sørensen, Tscherning;

Marianne Hedberg, Miljöbygge; Eunan Kelly, CDE Group 15.10–16.00 Coffee break and networking 16.00–16.30 Robotics and AI for sustainable material recovery Dr Eng Mohanad Abukmeil, TU Delft 16.30–17.00 The Snelgrove elevated water tank project Camille and Rachelle Atrache, Tri-Phase Group 17.00–17.05 End of day remarks 17.45–20.00 Official welcome drinks

5 NOVEMBER

08.00–09.40 Registration and coffee 09.40–09.45 Welcome from the chair 09.45–10.15 Best of the Best 2025 John Patist and Jorn Vermeer, DDM 10.15–10.45 Controlling squat risk in concrete stack demolition Mark Ramun, Jackson Demolition

All information is correct at the time of going to press, but details and timings may be subject to change.

the technical, financial and cultural challenges in a country with limited regulation and low incentives. He will explain how private-sector leadership, sustainable financing and innovative recycling systems enabled the recovery of materials, highlighting measurable outcomes, transformation strategies and lessons for advancing circular demolition in emerging economies.

Thank you to our sponsors ... Headline: Volvo Construction Equipment Diamond: Komatsu Platinum: Caterpillar, Kobelco, Steelwrist Gold: Case Construction, OilQuick Silver: Beilite, Laurini, Lehnhoff, Montabert, Rusch, and Sennebogen Bronze: CEJN, Genesis, LaBounty, Liebherr, Rotar, and SEG www.demolitionandrecycling.media

10.45–11.30 Coffee break and networking 11.30–12.15 KEYNOTE: Decommissioning NASA MSFC test stands Megan Vansant and Justin Taylor, NASA; Austin Hays and James ‘JJ’ Martin, Target Contractors; Ron Gilbert, DetX 12.15–12.45 Complex exclusion zone management Mike Kehoe, C&D Engineering Consultants 12.45–14.15 Lunch and networking 14.15–14.45 Resilient demolition and recycling in Argentina Miguel Ippolito, Grupo Mitre 14.45–15.15 Demolition without a footprint Jose Carlos Juan Muñoz, Erri Berri 15.15–15.30 World Demolition Awards preview and final remarks 15.30–16.00 Coffee and networking 18.45–23.00 Awards Gala Dinner

Networking Drinks: Fortress by ShearCore Awards Drinks: Demarec Post Dinner Drinks: SAEclimber Breakfast: Kocurek Excavators Lanyards: Steelwrist App: Open-S Water: Delsan-AIM Wellness Partner: Skelligs Retreat

Demolition without a footprint

Jose Carlos Juan Muñoz, site manager, Erri Berri Jose Carlos will explore how circular demolition can transform one of the construction industry’s most waste-intensive sectors. He will present the company’s circular demolition model and its continuous progress in material recovery, achieving a 98.56% recovery rate in 2025, alongside major reductions in water consumption and emissions. The session will examine the practical realities of delivering these results through process innovation, operational efficiency and smarter resource management. It will provide valuable lessons on how circular principles can be successfully implemented on complex demolition projects while ■ reducing environmental impact. 2026 d&ri 31


ADVERTORIAL

B B

ALLU ALLU ALLU CONCRETE CONCRETE CONCRETE Tight Tightsite+Fines+Rebar site+Fines+Rebar==No Noproblem problem Tight site+Fines+Rebar = No problem EXCAVATOR EXCAVATOR

MAX. MAX. PRESSURE PRESSURE

t t EXCAVATOR lbslbs

barMAX. bar PRESSURE psipsi

25-45 55,000 -lbs 100,0000 - 100,0000 320 t25-45 55,000 bar320

4,600 4,600 psi

25-45 55,000 - 100,0000 320 VOLUME VOLUME OILOIL FLOW FLOW

4,600 WEIGHT WEIGHT

3 mVOLUME m3 cu yd cu yd

OIL FLOW l/min l/min gpm gpm

kgWEIGHT kg lbslbs

3 0.7-1 0.9-1.3 350-400 350-400 90-105 90-105 2,500 2,500 5,500 5,500 m0.7-1 cu0.9-1.3 yd l/min gpm kg lbs

0.7-1

0.9-1.3

350-400

90-105

2,500

5,500

www.allu.net www.allu.net info@allu.net info@allu.net www.allu.net info@allu.net

Production Productionup uptoto100 100t/h t/h Production up to 100 t/h Handles Handlesrebar rebarand andsteel steel Handles rebar and steel 5050mm mmand and100 100mm mmoutput output 50 mm and 100 mm output Less Lesshauling, hauling,more moresavings savings Less hauling, more savings

J fJ A f sA o s co tc rt ar ta t T rT fr cf c F d F cd ac p a cp fc af u a eu e

W W


ADVERTORIAL

“We’ve “We’ve “We’ve “We’ve been been been been extremely extremely extremely extremely happy happy happy happy with with with with the the the the end end end end result. result. result. result. The The The The production production production production capacity capacity capacity capacity isisis is “We’ve been extremely happy with the remarkably remarkably remarkably remarkably higher higher higher higher than than than than with with with with aajaw aajaw jaw jawis end result. The production capacity crusher crusher crusher crusher attachment attachment attachment attachment and and and and only only only only 2.5 2.5 2.5 ttweight tweight tweight weight remarkably higher than with a2.5 jaw makes makes makes makes it it it stable it stable stable stable to to to to handle handle handle handle and and and and you you you you can can can can crusher attachment and only 2.5 t weight reach reach reach reach further further further with with with with 35 35 35 35 ttexcavator” texcavator” texcavator” excavator” makes itfurther stable to handle and you can reach further with 35 t excavator” Jonathan Jonathan Jonathan Jonathan Bjon, Bjon, Bjon, Bjon, CEO, CEO, CEO, CEO, Ursa Ursa Ursa Ursa Demolition Demolition Demolition Demolition Jonathan Bjon, CEO, Ursa Demolition

Beyond Beyond Beyond Beyondthe the the theJaw: Jaw: Jaw: Jaw:Rethinking Rethinking Rethinking Rethinkingthe the the theCrusher Crusher Crusher CrusherBucket Bucket Bucket Bucket Beyond the Jaw: Rethinking the Crusher Bucket Jaw Jaw Jaw Jaw crusher crusher crusher crusher attachments attachments attachments attachments are are are are aaaa This This This This means means means means the the the the whole whole whole whole feed feed feed feed does does does does For For For For demolition demolition demolition demolition contractors contractors contractors contractors familiar familiar familiar familiar tool tool tool tool ininin in demolition. demolition. demolition. demolition. The The The not not not not have have have have to toto to go go go go through through through through the the the the same same same same processing processing processing processing pulverized pulverized pulverized pulverized concrete, concrete, concrete, concrete, Jaw crusher attachments are aThe This means the whole feed does For demolition contractors ALLU ALLU ALLU ALLU Concrete Concrete Concrete Concrete Bucket Bucket Bucket Bucket tackles tackles tackles tackles the the the crushing crushing crushing crushing action. action. action. Material Material Material Material that that that that isisisis that that that that means means means means less less less less time time time time preparing preparing preparing preparing aaaa familiar tool in demolition. Thethe not have action. to go through the same processing pulverized concrete, same same same same material material material material with with with with a a different a a different different different already already already already fine fine fine fine can can can can leave leave leave leave the the the the bucket bucket bucket bucket perfectly perfectly perfectly perfectly clean clean clean clean feed feed feed feed pile pile pile pile before before before before ALLU Concrete Bucket tackles the crushing action. Material that is that means less time preparing a operating operating operating operating principle: principle: principle: principle: instead instead instead of ofof of quickly, quickly, quickly, quickly, while while while while the the the the larger larger larger larger fragments fragments fragments crushing crushing crushing crushing and and and and aafeed practical aapractical practical practical way way way way to toto to same material with ainstead different already fine can leave thefragments bucket perfectly clean pile before crushing crushing crushing crushing between between between between jaws, jaws, jaws, jaws, it it it uses it uses uses uses remain remain remain remain in in in in the the the the crushing crushing crushing crushing zone. zone. zone. zone. For For For For deal deal deal deal with with with with the the the the smaller smaller smaller smaller pieces pieces pieces pieces of of of of operating principle: instead of quickly, while the larger fragments crushing and a practical way to three three three three rotating rotating rotating rotating drums drums drums drums fitted fitted fitted fitted with with with with fines-heavy fines-heavy fines-heavy fines-heavy pulverized pulverized pulverized pulverized demolition demolition demolition demolition reinforcement reinforcement reinforcement reinforcement that that that that inevitably inevitably inevitably inevitably remain remain remain crushing between jaws, it uses remain in the crushing zone. For deal with the smaller pieces ofremain replaceable replaceable replaceable replaceable carbide carbide carbide carbide picks picks picks picks to to to to screen screen screen screen concrete, concrete, concrete, concrete, this this this this helps helps helps helps keep keep keep keep material material material material after after after after primary primary primary primary demolition demolition demolition demolition and and and and steel steel steel steel three rotating drums fitted with fines-heavy pulverized demolition reinforcement that inevitably remain and and and and crush crush crush crush the the the the material material material material as asas as ititit moves itscreen moves moves moves moving moving moving moving and and and and allows allows allows allows the the the the crushing crushing crushing crushing recovery. recovery. recovery. recovery. replaceable carbide picks to concrete, this helps keep material after primary demolition and steel through through through through the the the the bucket. bucket. bucket. bucket. action action action action to to to to focus focus focus focus where where where where it it it is it is is actually is actually actually actually and crush material as it moves moving and allows the crushing recovery. needed. needed. needed. needed. Built Built Built Built for for for for 25-45 25-45 25-45 25-45 tonne tonne tonne tonne excavators, excavators, excavators, excavators, through the bucket. action to focus where it is actually That That That That difference difference difference difference becomes becomes becomes becomes particularly particularly particularly particularly needed. the the the the 2.5-tonne 2.5-tonne 2.5-tonne 2.5-tonne bucket bucket bucket bucket accepts accepts accepts accepts feed feed feed feed Built for 25-45 tonne excavators, relevant relevant relevant relevant when when when when the the the the feed feed feed feed contains contains contains contains Rebar Rebar Rebar Rebar isisis handled ishandled handled handled differently differently differently differently too. too. too. too. up up up up to toto to 300 300 300 300 mm. mm. mm. mm. Changeable Changeable Changeable Changeable counter counter counter That difference becomes particularly the 2.5-tonne bucket acceptscounter feed fines, fines, fines, fines, rebar rebar rebar rebar and and and and other other other other steel steel steel steel Rather Rather Rather Rather than than than than requiring requiring requiring requiring demolition demolition demolition demolition blades blades blades blades provide provide provide provide either either either either 0-50 0-50 0-50 0-50 mm mm mm mm or oror or relevant when the feed contains Rebar is handled differently too. up to 300 mm. Changeable counter contamination. contamination. contamination. contamination. concrete concrete concrete concrete to toto to be be be be completely completely completely completely free free free free 0-100 0-100 0-100 0-100 mm mm mm mm output, output, output, output, with with with with processing processing processing processing fines, rebar and other steel Rather than requiring demolition blades provide either 0-50 mm or of ofof of steel steel steel steel before before before before processing, processing, processing, the the the the capacity capacity capacity capacity reaching reaching reaching reaching up up up to toto to 100 100 100 100 tonnes tonnes tonnes tonnes contamination. concrete to be processing, completely free 0-100 mm output,up with processing Fines Fines Fines Fines pass pass pass pass quickly quickly quickly quickly through through through through the the the the ALLU ALLU ALLU ALLU Concrete Concrete Concrete Concrete Bucket Bucket Bucket Bucket is is is designed is designed designed designed per per per per hour hour hour hour ininin in suitable suitable suitable suitable materials materials materials and and and and of steel before processing, the capacity reaching upmaterials to 100 tonnes drums, drums, drums, drums, while while while while larger larger larger larger pieces pieces pieces pieces are are are are to toto to tolerate tolerate tolerate tolerate rebar rebar rebar rebar and and and and other other other other steel steel steel steel conditions. conditions. conditions. conditions. Fines pass quickly through the ALLU Concrete Bucket is designed per hour in suitable materials and carried carried carried carried towards towards towards towards the the the the crushing crushing crushing crushing plates plates plates objects objects objects objects ininin in the the the the feed. feed. feed. feed. drums, while larger pieces areplates to tolerate rebar and other steel conditions. and and and and reduced reduced reduced reduced by by by by the the the carbide-tipped carbide-tipped carbide-tipped carbide-tipped On On On On confined confined confined confined demolition demolition demolition demolition sites, sites, sites, sites, the the the the carried towards the crushing plates objects in the feed. picks. picks. picks. picks. Two-way Two-way Two-way Two-way drum drum drum drum rotation rotation rotation rotation Steel Steel Steel Steel fragments fragments fragments fragments can can can can pass pass pass pass advantage advantage advantage advantage is is is straightforward: is straightforward: straightforward: straightforward: the the the the and reduced by the carbide-tipped On confined demolition sites, changes changes changes changes the the the the direction direction direction direction of ofof of material material material material through through through through with with with with the the the the material material material material oror or be be be be excavator excavator excavator excavator already already already working working working working the the the the pile pile pile pile picks. Two-way drum rotation Steel fragments can pass or advantage isalready straightforward: the flow flow flow flow and and and and brings brings brings brings both both both both the the the the upper upper upper upper separated separated separated separated and and and and discarded discarded discarded discarded as as as as rejects, rejects, rejects, rejects, can can can can also also also also process process process process it. it. it. it. That That That That can can can can reduce reduce reduce reduce changes the direction of material through with the material or be excavator already working the pile and and and and lower lower lower lower crushing crushing crushing crushing plates plates plates plates into into into into allowing allowing allowing allowing processing processing processing processing to toto to continue continue continue continue hauling, hauling, hauling, hauling, double double double double handling handling handling handling and and and and the the the the flow and brings both the upper separated and discarded as rejects, can also process it. That can reduce use, use, use, use, helping helping helping helping distribute distribute distribute distribute the the the the material material material material without without without without the the the the repeated repeated repeated repeated stop-andstop-andstop-andstop-andneed need need need to to to to position position position position additional additional additional additional crushing crushing crushing crushing and lower crushing plates into allowing processing to continue hauling, double handling and the evenly evenly evenly evenly and and and and prevent prevent prevent prevent blockages. blockages. blockages. blockages. clear clear clear clear interruptions interruptions interruptions interruptions that that that that steel steel steel steel equipment equipment equipment equipment on on on on site. site. site. site. use, helping distribute the material without the repeated stop-andneed to position additional crushing contamination contamination contamination contamination can can can can cause. cause. cause. cause. evenly and prevent blockages. clear interruptions that steel equipment on site. It’s It’s It’s It’s not not not not aajaw aajaw jaw jaw crusher crusher crusher crusher bucket bucket bucket bucket with with with with aaaa contamination can cause. different different different different shape. shape. shape. shape. It’s It’s It’s It’s a a different a a different different different way way way way It’s not a jaw crusher bucket with a of ofof of processing processing processing processing demolition demolition demolition demolition concrete. concrete. concrete. concrete. different shape. It’s a different way of processing demolition concrete.

Watch Watch Watch Watch ititit it work! work! work! work! Visit Visit Visit Visit website website website website Watch it work! Visit website


WORLD DEMOLITION AWARDS 2026

Madrid calling Excellence will be in the spotlight at the World Demolition Awards 2026

E

very year, the World Demolition Awards create a real buzz in the industry, attracting dozens of entries from across the globe. Demolition contractors compete across ten categories covering large and smallscale projects, explosive demolition, those in industrial, civil or urban settings, safety and training, recycling and environmental aspects, and collaboration between stakeholders. Two separate categories invite OEMs to demonstrate innovation in plant, equipment, tools and attachments. The most outstanding entry is awarded the ‘Best of the Best’ trophy. Presented to the highest scoring category winner, it is given to the project that demonstrates the highest levels of safety, environmental performance and technical excellence. The winners of the WDA 2026 will be crowned on 5 November during the gala dinner held at the World Demolition ■ Summit in Madrid, Spain.

The World Demolition Awards 2026 judges Henrik Bonnesen, COWI: An environmental and demolition consultant with more than 25 years’ experience, Henrik specialises in contaminated buildings, demolition planning and the reuse of materials. He is also an inspector for the Danish Demolition Association and has led major international environmental projects. Leonard Cherry, Cerise Family LLP: Leonard has over 42 years’ experience in the industry, having 34 d&ri 2026

The 2025 winners

built Cherry Companies into one of the largest demolition contractors and waste recyclers in the US. A former president of the National Demolition Association (NDA), he now provides demolition consultancy services. Francisco Cobo, independent consultant: Francisco is a practising lawyer and founder of the Spanish Association of Demolition Contractors (AEDED). He served as president of the European Demolition Association (EDA) from 2018 to 2022 and is a former president of the European Decontamination Institute (EDI). Dan Costello, Costello Dismantling: Dan founded the company more than 40 years ago and has built a reputation for delivering complex

demolition, dismantling and environmental projects. He was inducted into the Construction & Demolition Recycling Association Hall of Fame in 2022. Clinton Dick, Liberty Industrial: Clinton is the founding director of Liberty Industrial and a civil engineer specialising in large-scale demolition and remediation. With over 25 years of experience, he has overseen major industrial projects in Australia and internationally. Patrick Frye, Cardem: Patrick has worked in demolition since 1986 and leads major international projects for Cardem, part of the Vinci Group. As president of the EDA, he is a strong advocate for innovation, technical excellence and the sharing of best practice. www.demolitionandrecycling.media


WORLD DEMOLITION AWARDS 2026 Matt Dawson in action during the World Cup 20

AWARDS HOST Matt Dawson MBE

DDM was awarded Best of Best 2025

Jim Graham, Winter Environmental: Jim has nearly five decades of experience in remediation, demolition and decommissioning, overseeing projects across the US and Caribbean. His expertise spans contaminated site remediation, industrial dismantling and emergency response. Ben Hayden, Hayden Wrecking: Ben is vice president of Hayden Wrecking, a family business with a long history in industrial demolition. As NDA president, he is focused on workforce development, safety, training and attracting the next generation of professionals. Scott Laird, Trifecta www.demolitionandrecycling.media

Laurini won an innovation award in 2025

Services: Scott has spent 45 years in the demolition industry, progressing from site labourer to senior management roles with several leading US contractors. A former NDA convention chair, he now drives strategic growth for Trifecta. Bill Moore, independent consultant: Bill is a respected demolition safety specialist and former NDA president. Following a distinguished career with Brandenburg and ERM, he continues to advise as an expert witness while remaining passionate about education and training. Michele O’Rourke, O’Rourke Wrecking: Michele has led the business since 2019, overseeing demolition and remediation projects across the US. She serves on

Widely regarded as one of the world’s finest scrum-halves, Matt played a pivotal role in England’s 2003 Rugby World Cup-winning campaign, with his pass setting up Jonny Wilkinson’s famous match-winning drop goal in the final. During his rugby union career, Matt played for Northampton Saints and London Wasps. He is one of England’s most capped players, earning 77 international caps between 1995 and 2006. He also toured with the British & Irish Lions on three occasions, in 1997, 2001 and 2005. Following his retirement from rugby, Matt has built successful careers in media and business. Since 2007, he has been a rugby commentator and pundit for major UK broadcasters, including TNT Sports (formerly BT Sport) and BBC Radio 5 Live. On television, he is perhaps best known as the longest-serving team captain on the BBC quiz show A Question of Sport, where his sharp banter with opposing captain and international cricketer Phil Tufnell became legendary. Other media appearances include Celebrity MasterChef and Strictly Come Dancing, where Matt won his series of the UK cooking show, while coming second in the popular dancing competition. several industry boards, including the NDA awards committee and State of Ohio governor’s workforce board. David Sinclair, Safedem: David is a demolition engineer with over 55 years of extensive experience in all aspects of the industry. He is regarded as a leader in the global demolition industry and has been recognised for his focus on training and education of demolition operatives in the UK, Europe and the US. 2026 d&ri 35


WORLD DEMOLITION AWARDS 2026

CIVILS DEMOLITION

ALL IMAGES © COMPANY LISTED

ARMAC DEMOLITION

COUNTRY United Kingdom PROJECT Clifton Bridge CLIENT Network Rail, Skanska The demolition of Clifton Bridge in Cumbria, UK, involved the removal of a 140-metre long post-tensioned concrete structure spanning the M6 motorway during a closure coordinated with a West Coast main line possession. Armac worked with Skanska, Network Rail, National Highways, Andun Engineering and Ramboll to develop a methodology that addressed the deteriorating structure while protecting existing piers and bearing shelves for reuse. With reliable as-built drawings unavailable, investigations during demolition identified significant differences from previous assessments, including 11 unreinforced joints rather than four and a structure approximately 18% heavier than assumed. Work was suspended while the structural behaviour was reassessed and the temporary works and demolition sequence revised. The resulting methodology incorporated progressive de-stressing of the posttensioning, validated temporary support systems and coordinated working platforms, allowing demolition to proceed within strict structural loading limits while retaining the ■ required substructures.

OR

36 d&ri 2026

CMA CONTRACTING

COUNTRY Australia PROJECT CD1C Fixed Asset Closure CLIENT Rio Tinto Iron Ore This industrial demolition and rehabilitation project was carried out within Cape Lambert operational iron ore export port in Australia, alongside live rail and port operations. It included demolition of above and below ground infrastructure, permanent closure of a 37-metre deep rail car dumper vault and 160-metre underground conveyor tunnel, complex structural modifications to operational infrastructure, hydrocarbon remediation, civil construction and rehabilitation of over 15,000 sqm of land. A specialist Controlled Low Strength Material mix and placement methodology was developed to stabilise the underground structures, with over 7,400 cubic metres of engineered grout placed during a continuous 14-day programme, with more than 100 truckloads per day. The works required management of brownfield interfaces, live rail operations and confined-space risks, supported by engineering and monitoring systems. Revised sequencing, digital quality management and an alternative contaminated-soil remediation method also reduced hazardous waste disposal by ■ approximately 600 cubic metres.

DESPE

COUNTRY Italy PROJECT Via Lampedusa Complex CLIENT Colliers Global Investors Italy The ‘zero-impact’ demolition of three reinforced concrete towers in the financial centre of Milan was carried out alongside the operational four star Quark Hotel. The restricted location required extensive measures to control dust, noise and vibration while neighbouring activities continued. To avoid conventional top-down deconstruction, the two levels of underground parking were reinforced with a dense temporary shoring system. This approach allowed a 100-tonne Case CX 800 high-reach excavator with a 40-metre boom to operate above them. The tower closest to the hotel was isolated using corrugated metal-sheet scaffolding and an HDPE protection panel positioned by mobile crane to contain demolition debris and reduce noise. Following removal of the above-ground structures, the two basement levels were demolished using mini excavators. Selected beams and columns were retained during this phase to counteract soil pressure in accordance with the structural design. The demolition programme was completed ■ within the required time scale.

RK & CO

COUNTRY India PROJECT Mokama Railway Over Bridge CLIENT Afcons Infrastructure (IRCON International) The controlled dismantling of the Mokama Railway Overbridge in Bihar, India, involved the removal of a 51.214 m-long and 10.9 m-wide prestressed concrete structure above an operational railway corridor. RK & Co removed four 33 m-long PSC girders weighing approximately 98 tonnes each, together with the deck slab, diaphragms, portal beams and associated structural elements. Restricted railway traffic blocks required detailed sequencing and coordination with railway authorities to maintain operations. The deck slab was removed using floor-saw cutting, while diamond wire-sawing was used for controlled structural separation. A purposebuilt spreader beam system enabled the girders to be lifted out as complete units using cranes. The project was completed within 33 days with no lost-time injuries or railway incidents. ■ www.demolitionandrecycling.media


WORLD DEMOLITION AWARDS 2026

COLLABORATION IN DEMOLITION

ALL IMAGES © COMPANY LISTED

GRUPO MITRE

COUNTRY Argentina PROJECT La Plata Warehouse CLIENT Municipality of La Plata Following a major fire at an electrical appliance warehouse in central La Plata, Argentina, this emergency demolition operation required close collaboration between Grupo Mitre, the municipality, civil defence, fire department, police and structural engineering specialists. Located within a densely populated area with heavy pedestrian and vehicle traffic, commercial premises, residential buildings and critical urban infrastructure, the firedamaged structure presented a significant collapse risk. Drone surveys and continuous structural monitoring were used to identify unstable areas and inform the demolition sequence, alongside perimeter exclusion zones and dynamic safety measures. In the highest-risk areas, a remotecontrolled demolition robot was suspended from a 160-tonne mobile crane, allowing work to proceed without exposing any personnel to the highly unstable structure. The demolition was completed without incidents, uncontrolled collapses or damage to neighbouring buildings. Dust suppression and material recovery measures were also implemented, with 1,395 tonnes of material recovered for reuse and recycling. ■

JBV GROUP

COUNTRY United Kingdom PROJECT Sellafield East Blower House CLIENT Sellafield Cumbria Nuclear Solutions (CNSL), appointed by Sellafield Ltd and led by Shepley Engineers, contracted JBV Group Holdings to deliver the demolition of the Pile 1 Reactor Blower House at the Sellafield nuclear site in Cumbria. Constructed in 1950 as part of Britain’s first generation of plutonium-production reactors, the East Blower House was in a constrained area adjacent to legacy ponds and silos containing radioactive waste, with contaminated cooling ducts beneath the building. The project required close collaboration between Sellafield, CNSL and JBV to manage radiological, structural and logistical risks under regulatory oversight from the Office for Nuclear Regulation. A safety-case-led, bespoke methodology, supported by engineering calculations and temporary works designs, enabled demolition to proceed in controlled phases while protecting adjacent nuclear assets. The project commenced in April 2017 and ran through to June 2026, with more than 60,000 hours worked without a losttime injury, accident, reportable event or environmental incident. ■

THOMPSONS OF PRUDHOE

COUNTRY United Kingdom PROJECT CAD Towers CLIENT North Lanarkshire Council The demolition of the former Coursington, Allan & Draffen (CAD) Towers in Motherwell, Scotland, was delivered through the collaboration between North Lanarkshire Council, Perses Group, Thompsons of Prudhoe and PDC Explosives Engineering. Built in 1970, the three 20-storey residential towers had been local landmarks for more than 50 years. Following unsuccessful work by a previous contractor, the project inherited partially completed demolition, structural instability, incomplete asbestos removal and the discovery of post-tensioned concrete construction. The partners developed a programme to stabilise the structures, remove hazardous materials and prepare the towers for demolition. On the basis of detailed assessment of the buildings, explosive blowdown was selected as the safest and most viable demolition method. Preparatory works included strip-out, removal of glazing and cladding, structural modifications and blast modelling. All three towers were demolished in a single controlled operation without damage to neighbouring properties or reported incidents. ■ >38

PRIESTLY DEMOLITION

COUNTRY Canada PROJECT UTHSC Medical Tower CLIENT Colliers Global Investors Italy The deconstruction of the UTHSC Medical Tower saw Priestly Demolition, Green City Demolition, Tiny’s Demolition, Aegis and Flintco collaborate in a coordinated programme covering abatement, interior strip-out and structural demolition. Tiny’s Demolition completed the interior demolition, while Aegis carried out the required abatement works ahead of structural demolition by the Priestly and Green City team. Flintco provided local expertise, industry relationships and coordination support. Sequencing and communication between the project partners allowed each phase to progress while maintaining the overall demolition programme and addressing site-specific challenges. The works were completed with zero lost-time incidents. Material recovery was also incorporated: 100% of the steel and concrete generated was recovered for recycling. ■ www.demolitionandrecycling.media

2026 d&ri 37


WORLD DEMOLITION AWARDS 2026

CONTRACT OVER US$ 1 MILLION BRANDENBURG INDUSTRIAL SERVICE COMPANY

COUNTRY United States PROJECT Ford Louisville Assembly Plant Interior CLIENT Abel Construction, Ford The interior demolition and strip-out at Ford’s active Louisville Assembly Plant in Kentucky was completed during a seven-week winter shutdown. It covered 1.1 million sq ft of body assembly and almost 944,000 sq ft of final assembly, more than two-thirds of the manufacturing footprint, and included the removal of equipment, conveyors, mezzanines, structural platforms, HVAC systems, utility piping, lighting and assembly infrastructure across more than 1,100 individual bays. Over a year of preconstruction planning was undertaken to develop the sequencing, logistics and utility isolation procedures. ■

ALL IMAGES © COMPANY LISTED

DEM-MASTER DEMOLITION

COUNTRY United Kingdom PROJECT Jackson Court Coatbridge CLIENT North Lanarkshire Council The demolition of Jackson Court in Coatbridge, Scotland, involved an 18-storey, 52 m-high residential tower constructed using Large Panel System (LPS) techniques. Appointed by North Lanarkshire council, Dem-Master carried out asbestos removal, soft strip, structural demolition, waste processing and site clearance within a constrained urban location. Challenges included concealed asbestos insulation board fire breaks within structural wall joints and proximity to occupied homes, a nursery, businesses, the A89 (Main St) and an operational petrol station. Following structural investigations, a bespoke methodology was developed combining scaffold-encapsulated top-down deconstruction, engineered temporary works, crane-assisted material removal and ■ ultra-high-reach demolition.

DESPE

COUNTRY Italy PROJECT Georges Besse Cooling Towers CLIENT Orano Démantèlement The dismantling of two cooling towers at Orano’s Tricastin nuclear site in France brought together Orano and Despe to remove structures more than 120 metre high at the former Georges Besse I uranium enrichment plant. A selective top-down methodology using the Fly Demolition System enabled the towers to be progressively dismantled while controlling vibration, dust and risks to surrounding operational facilities. The system incorporated a 124-metre crane, supported on purpose-built foundations. Perimeter trenches and containment systems were also used to control falling debris. Detailed coordination was required to plan the works within the constraints of an active nuclear site. The towers were dismantled without significant incidents or ■ disruption to operations.

LIBERTY INDUSTRIAL

COUNTRY Australia PROJECT Groote Eylandt Wharf CLIENT McConnell Dowell, South 32 The removal of a cyclone-damaged wharf structure required Liberty Industrial to mobilise personnel and equipment to a remote island location and undertake demolition within a sensitive marine environment. The 14 month project involved removing structurally compromised wharf sections to enable subsequent reconstruction of the infrastructure. A marine-only methodology eliminated the need for land-based access and reduced disturbance to the surrounding area. Engineering-led planning was supported by 3D imaging and sonar to assess the damaged structure and plan the works. Precision subsea demolition was carried out using underwater remotely operated vehicles. The structural instability, subsea demolition, remote logistics and environmental constraints required close coordination. ■

GRANT MACKAY DEMOLITION

COUNTRY United States PROJECT George Bush Intercontinental Airport, Terminal B CLIENT Clark Construction The demolition package for the Terminal B redevelopment at IAH Houston involved the removal of over 350,000 sq ft of infrastructure while operations continued. Grant Mackay tackled two 300 ft-long pedestrian tunnels above roadways carrying 12,000 vehicles daily, an elevated arrivals roadway above critical airport utilities, and two 98 ft-high Helix structures above active train lines and passenger routes. Working with Sigma Engineering, phased demolition and temporary shoring systems were developed to maintain structural stability and protect operational infrastructure. ■ 38 d&ri 2026

www.demolitionandrecycling.media


WORLD DEMOLITION AWARDS 2026

CONTRACT UNDER US$ 1 MILLION CARDEM

COUNTRY France PROJECT MAGUE Port Crane Emergency CLIENT Port de Sète Sud de France Following the collapse of a 630-tonne port crane onto a cargo vessel, the project team faced an unstable structure supported by both the vessel and quay. Drone surveys and digital modelling were used to evaluate three recovery options before a land-based dismantling was selected. A key challenge involved a 247-tonne section just 16 cm from its tipping point once surrounding sections were removed. Four engineered restraint systems were installed before the section was removed in a single lift using cranes and bespoke rigging. Despite adverse weather, critical lifting operations were completed in two days rather than the four planned. ■

ALL IMAGES © COMPANY LISTED

COLEMANS

COUNTRY United Kingdom PROJECT DF69 Altitude Test Facility CLIENT Rolls-Royce Plc Colemans carried out the deconstruction of Rolls-Royce Building DF69 (the Altitude Test Facility exhauster station), in Derby, within a live aerospace manufacturing environment where production remained operational during the 32-week programme. The works involved dismantling more than 2,000 tonnes of structural steel, removing a 100-tonne overhead gantry crane and deconstructing a 25-metre high structure. The digital-led approach combined 3D laser scanning, BIM modelling, Ground Penetrating Radar surveys and structural analysis to plan and monitor the works. Real-time monitoring covered structural movement, dust, vibration and noise, while a bespoke containment system was installed to limit airborne particles and protect neighbouring ■ ventilation and air intake systems.

DELSAN-AIM

COUNTRY Canada PROJECT WESPs at CEZinc Facility CLIENT Canadian Electrolytic Zinc The demolition of three wet electrostatic precipitators at Canadian Electrolytic Zinc chemical plant, in Salaberry-de-Valleyfield, Quebec, required the controlled dismantling of heavily corroded, lead-contaminated process vessels within an operational facility. Engineering controls included detailed demolition sequencing, lift studies, lockout/ tagout systems and hazardous material management procedures. Remote-controlled equipment was used in the higher-risk areas, while the lead lining was cut using specialist handheld tools to reduce worker exposure. Each WESP contained 126 process tubes, individually severed in a controlled sequence alongside continuous debris management and structural monitoring. Engineering inspections were carried out throughout to assess structural behaviour and introduce ■ reinforcement where required.

DESPE

COUNTRY Italy PROJECT Lake Maggiore Villa CLIENT Private The demolition and rock excavation of a lake-side villa presented a logistical and technical challenge. Access via a narrow road with a max width of 2.60 metres prevented use of conventional machinery. A continuous flow of smaller vehicles, each with a capacity of 4 cubic metres, was used to remove material and keep the site clear. The restricted access, building height and unstable ground required two spider excavators with independent hydraulic legs and removable wheels to dismantle the villa while operating on a slope over a void. The second phase involved excavating 2,000 cubic metres of fissured rock. To avoid vibrations, a chain saw was used to make preliminary orthogonal cuts. As excavation progressed, the rock face was secured with anchors with surveying used to continuously ■ >40 verify excavation dimensions.

TINY’S DEMOLITION & RECYCLING

COUNTRY United States PROJECT DSCO Detention Center, Harding Place CLIENT Capital Project Solutions The demolition of the former Detention Center in Nashville involved the removal of a 146,000 sq ft facility while surrounding buildings on the campus remained operational. The project required close coordination with Metro Nashville and the Sheriff ’s Office, particularly during the staged removal and replacement of the perimeter security fencing. An initial soft demolition phase separated materials before structural work began, with over 634 tonnes of ferrous and non-ferrous metals recovered and diverted from landfill. The project was completed on schedule and budget with zero recordable safety incidents. ■ www.demolitionandrecycling.media

2026 d&ri 39


WORLD DEMOLITION AWARDS 2026

ENVIRONMENTAL CARDEM

COUNTRY France PROJECT Fresnes-en-Saulnois Wind Turbine CLIENT Cube Green Energy The dismantling of a damaged 100-metre wind turbine used a crane-free methodology. It combined drone-assisted inspection and cable installation, computer-controlled remote oxy-cutting (TACLES), structural engineering, remote-controlled equipment and cableassisted controlled felling. By eliminating the use of heavy lifting cranes, this apporach reduced heavy transport movements, fuel consumption, the site footprint and disturbance to surrounding agricultural land. All 466.6 tonnes of waste went to recovery or recycling, with 73.1% directly recycled and none sent to landfill. ■

DESPE

COUNTRY Italy PROJECT Gela Power Station Pontiletto CLIENT Eni Rewind The project comprised some 14 pipelines supported by steel structures extending 300 metres into the sea and resting on reinforced concrete supports. Preliminary works included removing pipework and technical lines, surveying the seabed by ROV and extracting residual process fluids. Reinforced concrete sections were cut into blocks, secured with slings and lifted by crane from a barge before being transferred ashore for processing and material recovery. An containment tank was positioned on a vessel to capture potential spills or debris, supported by floating booms, skimmers, collection tanks and absorbent materials. ■

EXPLOSIVE DEMOLITION PDC EXPLOSIVES ENGINEERING

ALL IMAGES © COMPANY LISTED

AHTNA-TARGET JV

COUNTRY United States PROJECT MSFC 4550 and 4572 CLIENT NASA The implosion of the Saturn V Dynamic Test Stand and Saturn I Static Test Stand at NASA’s Marshall Space Flight Center at Redstone Arsenal, Alabama, required two independently designed explosive demolitions to be executed simultaneously within an active aerospace facility. Both structures collapsed within their designed footprints without damage to the adjacent NASA infrastructure or any reported safety incidents during almost 30,000 worker hours. More than 90% of the 29,700 tonnes of material was recycled, while vibration monitoring confirmed the low-impact ■ nature of the implosions.

40 d&ri 2026

PDC EXPLOSIVES ENGINEERING

COUNTRY United Kingdom PROJECT Aberthaw B Chimney CLIENT Erith Group The explosive demolition of the 156 metre, 18,000-tonne multiflue chimney at the former Aberthaw B power station in South Wales required a bespoke methodology due to site constraints. The chimney stood just 55 m from the adjacent boiler house and close to live substations, making a conventional lean-over felling unsuitable. PDC instead developed a three-band telescoping technique to achieve a controlled vertical implosion within a compact debris footprint. The chimney, the heaviest ever demolished by the company and the tallest structure felled by explosives in Wales, collapsed within 25 m of its base. ■

COUNTRY United Kingdom PROJECT Naga Smokestack CLIENT Aboitiz Thermal The demolition of the smokestack at the Naga Thermal Power Complex on the island of Cebu in the Philippines, marked only the second use of explosives to fell a chimney in the country. Strengthened with four large seismic buttresses, the 110-metre high concrete structure had resisted three previous mechanical demolition attempts by other contractors. PDC, working with Megabuild 101, designed a demolition sequence that accounted for the chimney’s seismic reinforcement while maintaining stability until detonation. The chimney collapsed as planned within the prepared exclusion zone, closely matching the predicted collapse sequence. The works were completed without reported safety incidents or damage to surrounding infrastructure, with all materials processed ■ locally following the demolition. www.demolitionandrecycling.media


WORLD DEMOLITION AWARDS 2026

INDUSTRIAL DEMOLITION CARDEM

COUNTRY France PROJECT Navy Warships, Bordeaux-Bassens Dry Dock CLIENT French Navy, Fleet Support Service (DSSF) The deconstruction of eight French navy vessels required adapting industrial demolition techniques to a naval environment. Comprising over 30,000 tonnes of steel structures, each needed detailed engineering studies, stability assessments and carefully sequenced dismantling. Conducted within a live commercial port, the programme combined mechanical demolition, oxy-fuel cutting, heavy lifting and cable-pulling techniques to create a repeatable dismantling process. More than 25,000 hours were worked without a lost-time injury, major safety incident or environmental incident. ■

ALL IMAGES © COMPANY LISTED

DDM DEMONTAGE

COUNTRY The Netherlands PROJECT Terminal Hamburg Harburg CLIENT Shell DDM dismantled a 55-hectare tank storage facility to prepare the site for future development. This comprised around 90 storage tanks (including units up to 52 metres in diameter and underground tanks with wall thicknesses of up to 30 mm), more than 125 km of pipelines and the internal cleaning of 100 km of pipework. The project also included the dismantling of the Europabrücke bridge spanning active road and rail links, and the management of PFAS contamination, hydrocarbons, asbestos, man-made mineral fibres and unexploded ordnance. Completed over four years, the project recorded more than 155,000 accident-free working hours while recovering more than 24,000 tonnes of scrap and processing significant quantities of hazardous waste ■ and contaminated soil.

DESPE

COUNTRY Italy PROJECT Gela Refinery SNOX Plant CLIENT Eni Rewind This project combined hazardous material remediation with the dismantling of an industrial facility under challenging conditions. Unstable sheet metal and inaccessible structures had to be made safe using operators on telescopic platforms ahead of the removal of man-made vitreous fibres (MMVF) and plant decontamination. Demolition was undertaken using a fleet of heavy equipment led by a 351-tonne Cat excavator, capable of reaching 48 metres and equipped with a 10-tonne shear, allowing the works to be completed without manual operations at height. Challenges included the removal of MMVF from unstable structures using a zero-contact vacuum system, recovery of 10,000 four-metre glass cylinders from distillation towers, and construction of a 4,000 cubic metre containment structure. ■

HUGHES & SALVIDGE

COUNTRY United Kingdom PROJECT Matosinhos Refinery CLIENT Galp Energia The demolition of the Matosinhos Refinery in Porto, Portugal, formed the most technically demanding phase of a threestage closure programme. Covering a 2.37 million sqm site, it required the removal of redundant process plants, tanks, pipework and structures, together with hazardous materials, within a live Seveso-regulated environment. The demolition was carried out across 18 process areas adjacent to operational refinery assets, residential neighbourhoods, a public beach, a hospital and Porto Airport. A significant challenge was a cooling tower containing 280 tonnes of asbestos cement packing. H&S developed and secured regulatory approval for Portugal’s first mechanically demolished asbestos-packed cooling tower, creating a safe and fully ■ >42 controlled methodology.

INDEPENDENCE EXCAVATING

COUNTRY United States PROJECT Homer City Generating Station CLIENT Homer City Redevelopment The demolition at Homer City involved the dismantling of one of the largest former coalfired power plants in eastern US under a compressed programme. Independence carried out structural demolition, environmental decommissioning, foundation removal, concrete processing and scrap recycling. Around 130 personnel and over 65 major items of plant operated across multiple shifts. The project also overcame a nationwide shortage of explosives by developing alternative implosion methods together with engineering and blasting partners, and, where required, adopting remote-controlled techniques. ■ www.demolitionandrecycling.media

2026 d&ri 41


WORLD DEMOLITION AWARDS 2026

INNOVATION: PLANT & EQUIPMENT CASE CONSTRUCTION EQUIPMENT

PRODUCT CASE CX135E XRD Compact High-Reach Excavator The CX135E XRD is a compact demolition excavator developed for urban sites where access and working space are restricted. Its retractable undercarriage reduces the machine’s width to 2.32 m, while a maximum working height of 14 m allows it to tackle typical two- and three-storey structures. In its dual-arm configuration, the machine combines a high-reach demolition arm with a standard two-piece boom for excavation and lower-level demolition. A hydraulic arm-change system, incorporating quick coupling and grouped hose connections, enables switching between configurations. Other features include a 30-degree tilting cab, demolition cameras, protection guards and an overload sensing alarm. Its extended reach can also reduce the need for machine repositioning or debris-built working platforms, while the optional OilQuick OQ45 coupler enables attachments to be changed from the cab. ■

ALL IMAGES © COMPANY LISTED

FIRSTGREEN INDUSTRIES

PRODUCT Elise 500 Electric Compact Skid Steer Loader This compact electric cab skid steer loader has been developed for confined demolition, renovation and material handling applications. Designed around an electric architecture, the machine is 1,380 mm wide and 1,945 mm high, allowing access to indoor and restricted working areas. The electric drivetrain provides zero local exhaust emissions and reduced operating noise, while simplifying maintenance. It supports selected electrically powered attachments alongside conventional attachment options. The enclosed cab provides operator protection in applications where smaller machines may offer limited protection. ■

KOBELCO CONSTRUCTION MACHINERY

PRODUCT SK650DLC-11 Building Demolition Machine The SK650DLC-11 excavator offers four front attachment configurations for different structure heights and demolition methods. A shared main boom enables high-reach and separate-boom arrangements on the same base machine. Front attachments use hydraulic pin connections, while a one-touch bayonet quick coupler allows tool-less replacement. The hydraulically variable undercarriage extends from 3.2 to 4.2 metres via a switch inside the cab, which tilts by up to 30 degrees. A cross-cylinder arrangement on the high-reach attachment reduces transport height and simplifies tie-down operations. ■

P OLESEN & SØNNER

PRODUCT Mobile Brick Cleaner The mobile brick cleaning machine is designed to process recovered bricks directly on site, removing mortar without damaging the bricks thereby allowing them to be reused in new construction. The electrically powered machine produces no local exhaust emissions and reduces operating noise compared with diesel-powered equipment, while the integrated swing crane reduces repetitive lifting and manual material handling during the cleaning process. The cleaner has demonstrated the ability to recover up to 80% of intact bricks for direct reuse. The machine can also be connected to an industrial vacuum system to capture dust and fine particles, including quartz dust. ■

RUSCH CRANES

PRODUCT RS 7500-L High-Reach Demolition Machine The Rusch RS 7500-L is a high-reach demolition machine based on a modified Liebherr R9150 and developed to handle heavy demolition tools at significant working heights. In its four-part knuckle-boom configuration, it can carry a 15-tonne shear or crusher to 52 metres and a 25-tonne tool to 42 metres. It can also be equipped with a three-part knuckle boom or a telescopic boom extending to 90 metres. A widened undercarriage with outriggers and an approximately 45-tonne counterweight provide stability and allow consistent load-radius performance through 360 degrees. A load-moment protection system continuously monitors the machine and restricts movements when stability limits are reached. The 30-degree tilting cab and three cameras improve visibility during high-reach operations, while an integrated dust suppression system delivers water to nozzles on the working end. ■ 42 d&ri 2026

www.demolitionandrecycling.media


WORLD DEMOLITION AWARDS 2026

INNOVATION: TOOLS & ATTACHMENTS PLATTNER

PRODUCT DSW 5030-CA Diamond Wire Saw The DSW 5030-CA electro-pneumatic diamond wire saw has been developed for large-scale demolition and civil engineering applications, including subsea cutting, hydroelectric dam dismantling and structural decommissioning. The machine provides 50 kW of cutting power and 30 metres of onboard wire storage, combined with a three-motor drive and pneumatic wire storage system designed to improve cutting performance and wire life. Its CutAssist control algorithm automatically adjusts drive parameters during operation, reducing the level of operator input required to maintain cutting performance. A purpose-built GUI on the wireless remote control allows the saw to be operated from a distance, while an integrated cooling system maintains performance in high ambient temperatures. Despite its cutting capacity, the machine has also been designed for mobility and rapid deployment between applications and sites. ■

ALL IMAGES © COMPANY LISTED

ALLU FINLAND

PRODUCT ALLU Concrete Bucket The new bucket is an excavator-mounted screening and crushing attachment for demolition and recycling. Designed for 25-45 tonne excavators it crushes and screens pulverised rubble such as concrete, brick and large asphalt fragments. By processing on site, it helps reduce double handling, limit material transport and simplify operations. The bucket accepts material up to 300 mm, reaching capacities of 100 t/hr. Output size is controlled through a changeable counter blade system for either 0–50 mm or 0–100 mm material. A heavy-duty frame, 40 mm cutting edge, 30 mm side cutters and replaceable carbide picks support continuous crushing, rapid fines screening and field maintenance. ■

CEJN GROUP

PRODUCT BLX Hydraulic Quick Coupling The BLX hydraulic quick coupling is designed for demolition, recycling and other heavy-duty applications, combining high surge-flow capacity with faster connection and disconnection of hydraulic tools. Its bayonet locking mechanism has a foldable lever for one-handed operation, including when residual pressure is present in the system. The design provides an alternative to conventional threaded couplings. The BLX has undergone over one million pressure cycles and testing under severe side-load conditions. Its high surge-flow capacity also allow smaller coupling sizes in some applications. Fully protected seals prevent exposure to high-velocity hydraulic fluid and reduce the risk of damage. ■

SHEARCORE

PRODUCT Fortress FC75 Processor The Fortress FC75 is a concrete processor for primary demolition and secondary processing of reinforced concrete. Its modular tooth system allows different functions to be carried out using a single fixed-jaw attachment. Operators can change tooth configurations to switch between structural demolition and secondary pulverisation. The design incorporates tip-based rebar cutting at the teeth and blades, alongside revised jaw geometry. An active lubrication system is used to reduce pivot wear, while improved access is simplify maintenance and rebuilding. The tool also uses a weld-minimised structure, including a continuous plate from the cylinder pin through the pivot to the lower jaw. ■ >44

www.demolitionandrecycling.media

JULY-SEPTEMBER 2025

A KHL Group publication

Global demolition leaders to descend on Nashville EXPLOSIVE DEMOLITION

Inside a historymaking project

HIGH-REACH EXCAVATORS

Power and reach at new heights

C O N T E N T Y O U R W A Y , S U B S C R I B E T O D A Y www.khl.com/free-subscription

DEMOLITION MANAGEMENT

New EDA President outlines his vision


WORLD DEMOLITION AWARDS 2026

RECYCLING

ALL IMAGES © COMPANY LISTED

DEMEX

COUNTRY Australia PROJECT M4 Wharf Hamilton CLIENT BMD Group The complete demolition of the 302 metrelong M4 Wharf at Northshore Hamilton on the Brisbane River comprised aged timber piles and girders supporting a reinforced concrete deck. Working over water in a tidal environment, the project involved deteriorated structures, asbestos contamination, live site conditions and unstable ground. Demolishing from the wharf rather than using a land-based crane allowed joists, girders and piles to be removed in full lengths, recovering more than 34,000 linear metres of Ironbark and Tallowood timber for reuse in building and landscaping applications. The alternative land-based methodology was estimated to limit timber recovery to around 60%. All 16,266 tonnes of concrete and brick were crushed and reused on site as subgrade, avoiding the export of waste and import of virgin fill, as well as an estimated 1,200 heavy vehicle movements. Reinforcing steel was also fully recovered, with effectively no ■ demolition material sent to landfill.

DESPE

COUNTRY Italy PROJECT CISE Nuclear Research Site CLIENT Cyrusone Italy I The demolition of the former CISE nuclear research site in Segrate, Italy, covered approximately 72,000 sqm, including 55 buildings comprising industrial units, offices, laboratories, warehouses and plant towers. The works combined demolition, soft strip-out, asbestos remediation and excavation over one year, with material recovery integrated into the planning and demolition sequence. Around 250,000 tonnes of material were generated during from demolition works, soft strip-out activities, asbestos remediation and excavation works, while a further 30,000 sqm of certified material was used for backfilling. Recycling objectives in accordance with Despe’s green demolition philosophy were incorporated into the engineering, site logistics and sequencing from the outset of the project to maximise recovery and minimise disposal. Almost all the material was recovered and diverted from landfill, resulting in a verrified landfill diversion rate ■ of close to 100%.

TSCHERNING

COUNTRY Denmark PROJECT TT Slab Recovery and Reuse CLIENT Copenhagen Municipality The project involved the selective dismantling and reuse of approximately 22 precast concrete TT slabs from an industrial building in Ishøj, Denmark. Rather than crushing the concrete for use as recycled aggregate, the slabs were removed while retaining their structural integrity and repurposed as urban furniture. Following limited adaptation, the recovered elements were used to create benches and integrated planting structures installed at six public locations across Copenhagen. Material assessment and planning for reuse were incorporated at an early stage to allow the slabs to be safely extracted, transported and adapted for their new purpose. The project brought together demolition contractors, designers and municipal stakeholders to coordinate the recovery and reuse process. By retaining the concrete elements in their original form, the project avoided additional processing and reduced the requirement for newly manufactured ■ materials.

GRUPO MITRE

COUNTRY Argentina PROJECT Oscar and Juan Gálvez Race Circuit CLIENT UTE COARCO – Inmac – SE.MI.S.A. The demolition works at the racetrack in Buenos Aires included more than 12,800 sqm of buildings and grandstands and 63,000 sqm of pavements. A circular economy strategy centred on processing and reusing demolition materials directly on site. In total, 24,762 tonnes of material were recovered, representing 94% of all materials generated by the works. This included 14,091 tonnes of concrete, 10,584 tonnes of asphalt and 86.63 tonnes of steel. Concrete and asphalt were crushed and processed on site to produce recycled aggregates for use in the racetrack’s new infrastructure. The recovered material was used as base material for the new training track, secondary roads and pit facilities, as well as for the foundations of new buildings. On-site processing also reduced waste transportation and the requirement for imported virgin aggregates. ■ 44 d&ri 2026

www.demolitionandrecycling.media


WORLD DEMOLITION AWARDS 2026

SAFETY & TRAINING ADAMO DEMOLITION

OCOUNTRY United States PROJECT City of Detroit Commercial Blight Removal Project Covering five former educational and industrial properties across Detroit, the programme comprised a range of ageing and historically significant structures, including the 57,250 sq ft Monnier Elementary School, built in the 1920s; Oakman Elementary School, a single-storey reinforced concrete structure dating from 1929; Jamieson Elementary School; the former Burt Elementary School, a 1920s Gothic Revival-style building, and the historic Packard Automotive Plant, the 3.5 million sq ft former car manufacturing complex designed by Albert Kahn and opened in 1903. Once covering around 40 acres and comprising approximately 80 buildings, the Packard site had become one of Detroit’s largest abandoned industrial properties. Adamo carried out the works under the City’s ordered demolition programme, recording 11,022 working hours across the five projects without a single health and safety incident. ■

ALL IMAGES © COMPANY LISTED

CARDEM

COUNTRY France PROJECT Damaged Wind Turbine Cardem demolished a damaged wind turbine in Trancoso, Portugal, using its patented TACLES methodology, combining controlled traction, remote cutting and engineered collapse to minimise personnel exposure. Drone-assisted installation of the traction system reduced work at height. Operators controlled a computer-assisted cutting platform from outside the hazard zone via live video feeds. Traction forces were continuously monitored, with firesuppression measures in place. Personnel received training in remote cutting, risk assessment and exclusionzone management. No reportable incidents occurred during the project. ■

DESPE

COUNTRY Italy PROJECT BREATH Project The project at Chiesi Farmaceutici plant, near Milan, combined decommissioning, strip-out and structural demolition while managing multiple hazardous materials. At peak activity, up to 400 workers and 50 contractors were involved, with risks including asbestos, man-made glass fibres, lead-based paints and contamination from active pharmaceutical ingredients (APIs). Safety controls included 42 projectspecific RAMS approved by the safety coordinator, more than 280 daily toolbox talks and over 500 work permits. Site access required a safety induction and written test, alongside specific training in Category 3 personal protective equipment. ■

TINY’S DEMOLITION

COUNTRY United States PROJECT Stevenson Center No 6 The demolition of the 11-storey Stevenson Center 6 in Nashville involved removing a reinforced concrete tower connected at every level to an occupied neighbouring building. A steel-framed protective screen enclosed the tower. The elevator shaft became a debris chute, while remote-controlled equipment removed floors 11 to three, supported by engineered post-shoring. Vibration monitoring protected sensitive equipment in five adjacent buildings, while dust controls and restricted hours limited campus disruption. Floors 11 to three were removed in 33 working days, recovering around 400 tons of ferrous metal. ■ >47

TRIFECTA SERVICES COMPANY

COUNTRY United States PROJECT CertainTeed Westrock The project combined demolition and asbestos abatement of coal-fired boilers and precipitators, wood digesters, a former recycling plant and pump house within an active industrial facility. The two-year project averaged 12 personnel and recorded more than 21,000 working hours. Key risks included live electrical systems, an adjacent active CSX rail line, asbestos and ongoing plant operations. A site-specific safety programme incorporated mandatory orientation, a mobile elevated work platform rescue plan, silica controls, electrical detection training and hot-work procedures. Railway-specific training was also provided, with demolition taking place only a few feet from the CSX yard. When supports protecting a live cable tray began to shift, work was stopped until they were reinforced. The project removed 2,115 tons of concrete and brick, 1,713 tons of scrap metal, 227 tons of C&D material and eight 53 ft trailers of asbestos waste. ■ www.demolitionandrecycling.media

2026 d&ri 45


Leading international consulting, demolition & remediation contractor. We have carried out some of the largest and most complex projects in mining, oil and gas, energy and defence sectors. Partner with the experts. Safety | Innovation | Sustainability | Proven delivery www.libertyindustrial.com

SHORTLISTED

Groote Eylandt Wharf Demolition Project

L1815 - Liberty Industrial - D&RI Magazine Advertisement 3.indd 1

2/10/2026 8:42 am


WORLD DEMOLITION AWARDS 2026

URBAN DEMOLITION COLEMANS

CARDEM

COUNTRY France PROJECT Kennedy Tower CLIENT Partenord Habitat (France) This demolition in Loos, northern France, involved the controlled explosive demolition of the 95-metre-high Kennedy residential tower located in a dense urban environment, with surrounding structures as close as 20 metres. An engineered collapse was designed and executed using a combination of structural modelling, high-precision drilling and electronic detonator sequencing. Maintaining structural stability throughout the preparatory works required advanced engineering solutions and careful control of load paths. Environmental impacts were actively managed through real-time monitoring of vibration and noise, combined with dust ■ control and protective systems.

ALL IMAGES © COMPANY LISTED

DESPE

COUNTRY Italy PROJECT Palazzo Marini CLIENT Deacapital R.E. SGR SPA This project in central Rome required the preservation of historic façades while removing structures up to 30 metres high. With surrounding activities and traffic operational, it used a targeted methodology designed to control dust, vibration and noise. Structures were dismantled selectively, including by hand, with diamond cutting separating critical sections. A tower crane moved equipment between floors and lowered material to ground level. Multiple teams worked across the site to meet the restricted programme. ■ www.demolitionandrecycling.media

COUNTRY United Kingdom PROJECT Northampton Town Centre CLIENT West Northamptonshire Council The 37-week demolition and deconstruction programme in Northampton town centre included soft strip, asbestos removal, structural demolition and site clearance adjacent to the Grosvenor Shopping Centre. Works were planned to maintain uninterrupted retail and residential operations, with engineered structural separations used to protect adjoining units. Laser scanning and a digital twin supported 4D BIM sequencing, while permanent and mobile monitoring systems were used to manage dust, noise and other environmental impacts. More than 37,000 tonnes of arisings were processed, achieving a 98% recycling rate.

■

DELSAN-AIM

COUNTRY Canada PROJECT Quartier des Lumières CLIENT Pomerleau Construction The demolition of the former Maison de Radio-Canada complex involved some 102,190 sqm of structures across a 418,000 sqm site as part of the $1-billion Quartier des Lumières redevelopment project in Montreal’s Centre-Sud district. The works included removal of around 90% of the podium structures, including below-grade levels, footings and foundations, while retaining the 24-storey office tower, occupied sections of the podium and surrounding infrastructure. Completed within 16 months, the project handled more than 195,000 tonnes of demolition materials and achieved a 95.5% recycling rate.

ECO DEMOLIZIONI

COUNTRY Italy PROJECT Via Boncompagni Complex CLIENT Renco Spa The selective demolition of a city block in Rome’s Ludovisi district formed part of a large redevelopment programme. Extending over eight above-ground floors and five underground levels, the works required precise demolition to allow new seismic-resistant cores to be installed while retaining substantial sections of the reinforced concrete structures. Protected elements, including a church façade and ancient Roman walls, required temporary support systems and coordination with heritage authorities. ■

■

TINY’S DEMOLITION

COUNTRY United States PROJECT Legislative Plaza Nashville CLIENT Skanska This demolition combined interior, structural and external works within an active government complex. A key element was the removal of the pedestrian bridge connecting the plaza with the Performing Arts Center. Comprising sixteen 90 ft box beams and a concrete topping slab, it was demolished during a one-week programme involving street closures, temporary scaffolding and shoring, excavators and remote-controlled demolition equipment. Works also had to be coordinated around asbestos abatement and public activity. ■ 2026 d&ri 47


HIGH-REACH EXCAVATORS

Manufacturers explain how high-reach excavators help contractors tackle demolition’s toughest challenges while keeping safety at the forefront.

Reaching high while keeping stable

W

orking at maximum height with heavy tools attached – often on hazardous ground in dense urban environments or at large-scale industrial sites – requires the ultimate in precision and risk management. “In demolition, machines must deliver the right balance between stability, reach, work tool capability and transportability – all while achieving productivity goals and maintaining safety,” says Caterpillar’s demolition segment specialist, JeanChristophe Etienne.

STABILITY CRITERIA

But achieving greater reach is only half the equation according to Olivier Rasmont, general manager marketing and engineering

at Kobelco Construction Machinery Europe. “The real challenge lies in maintaining stability and precision at full extension. Every additional meter amplifies forces throughout the machine, so structural design and counterweight strategy are absolutely critical.” Peter Bauer, segment leader at Volvo Construction Equipment, highlights the varied demands demolition contractors face across different applications and regions, “The biggest challenge is meeting, and ideally exceeding, customer expectations on performance, handling and operation. “Because the applications vary so much across regions, attachments and real site conditions, we need a very strong understanding of the customer’s business.” Volvo’s EC950 High Reach excavator, introduced in the US earlier this year, is built to meet the company’s Ultra High Reach (UHR) stability criteria. These focus on maintaining balance at height with heavy tools using a new reinforced undercarriage

Kobelco SK650DLC-11 PHOTO: KOBELCO

Cat 340 PHOTO CATERPILLAR

48 d&ri 2026

K

design, a 38.1-ton removable counterweight, specialised ring gear and a purposebuilt upper frame with a boom adapter.

HYDRAULIC PERFORMANCE

Consistent hydraulic performance plays a crucial role, controlling movement to avoid instability during operation and ensuring that large tools remain productive at height. “Advanced hydraulic systems allow operators to maintain accuracy even at extreme heights,” says Rasmont, highlighting how modern machine design is pushing precision further in high-reach demolition. “At high reach, hydraulic responsiveness isn’t just about efficiency, it’s about control and confidence for the operator. Fine movements at 40 or 50 metres must feel as predictable as they do at ground level.” Kobelco’s new SK650DLC-11 high-reach demolition machine has been nominated in the World Demolition Awards 2026. It offers four front attachment configurations, allowing it to be adapted to different structure heights and demolition methods. A shared main boom enables both highreach and separate-boom arrangements to be used on the same base machine. In highreach configuration, it provides a maximum arm pin height of 28.2 m and can handle tools weighing up to 3.7 tonnes. www.demolitionandrecycling.media


HIGH-REACH EXCAVATORS

Komatsu PC490LC HRD PHOTO: KHL

Hitachi ZX600 with boom options PHOTO: HITACHI CM

Volvo EC750 High Reach PHOTO: KHL

CONTROLLING THE LOAD

Careful load control strategies must be implemented. Distribution load and resistance to tipping are managed on the excavator by counterweights and by extending the undercarriage. Meanwhile, digital systems provide continual support for operators by tracking factors such as boom angle, reach, attachment configuration and machine load. This reduces the risk of overloading or unsafe operating positions, while also providing alerts or operational data that can be used to improve site safety and operator awareness. “Our integrated systems, such as stability monitoring, help keep operators informed about their work tool position, ensuring they stay within the safe working range and provide warnings as the machine approaches stability limits during operation,” explains Caterpillar’s Etienne. The company’s Cat Payload system for its UHD (Ultra High Demolition) excavators provides on-the-go weighing to help avoid overloading, underloading or misloading materials. It also allows operators to achieve precise loading targets (typically within 1%). The system relies on sensors that calculate material weight during lifting which Cat says can boost productivity by up to 25% and reduce fuel consumption. www.demolitionandrecycling.media

Italian contractor ECORIF chose a Develon DX140RDM-7 excavator for the demolition of a 19th-century building in the centre of Caserta, close to the city’s Royal Palace. The 15 metre high tuff structure was surrounded by occupied buildings on a site with restricted access and limited working space. To accommodate this, the machine’s variable-width undercarriage was retracted to 2.5 m for access before being extended to 3.7 m to provide additional stability during operation. “The DX140RDM-7 gave us the manoeuvrability and precision required for such a confined site, while remaining stable during highlevel demolition,” said Nicola Autieri, managing director. “Its variable-width undercarriage also made transporting and the deployment of the machine considerably easier.”

Develon DX140RDM-7 PHOTO: DEVELON

EFFICIENT OPERATION

The balancing act between safety and uptime is always a challenge, one made even harder in demolition because, as Matt Buerstatta, product marketing manager at Komatsu, explains, “High reach excavators work on sites that are uniquely challenging in that there is a certain amount of chaos that demolition brings – from falling debris

and risk of impact to mixed construction materials, curious neighbours and members of the public.” Operating heavy machinery in these demanding environments requires a combination of precision, operator comfort and equipment versatility, he said, adding that “the ability to quickly and efficiently transition between the correct attachments with a quick coupler is also important.” Alongside attachment versatility, visibility is another critical factor, as operators need a clear understanding of the work area above and around them, as well as awareness of nearby workers and equipment. “Any design element that improves visibility, communications or overall awareness of the demolition site will help ensure efficient operation, and that you are creating the opportunity for there to be a safer work environment,” he says. Looking at the impact of unwanted downtime, Buerstatta notes, “The cost of downtime can multiply quickly, so the more data the operator or fleet manager can pull off the machine to get ahead of preventive maintenance or identify potential machine failures the better.” To support this, Komatsu’s PC490LC HRD features a special HMI (human machine interface) screen that serves as the main control hub for all the extended reach components.

MONITORING SYSTEMS

Hitachi’s ZX400MC-7 and ZX600MC-7 demolition excavators feature stability monitoring systems, along with additional counterweights and hydraulically adjustable undercarriages that extend to improve stability before retracting for easier transport. Akarsh Shetty, product manager – special applications and new technologies at Hitachi Construction Machinery (Europe), agrees that digital technologies play a critical role in high-reach demolition scenarios. “Digital technologies such as telematics, sensors and remote diagnostics enhance safety through load and stability monitoring, improve performance using data-driven insights and reduce downtime through faster troubleshooting and more efficient servicing,” he notes. “They also help businesses monitor machines in real time, enabling them to identify issues before they become major problems and carry out predictive maintenance more effectively.” Liebherr’s high-reach demolition range comprises the R 940, R 950, R 960 and R 980 Demolition, with maximum working heights ranging from 23 to 60 m, depending on the model and configuration. Designed for selective dismantling, the >51 machines feature Liebherr Demolition 2026 d&ri 49


OVER 75 YEARS OF EXPERIENCE INDUSTRIAL

Thompsons of Prudhoe are firmly established as one of the UK’s most trusted specialist demolition contractors. Our skills, knowledge and experience provide our clients with a safe and assured service.

PETROCHEMICAL OIL & GAS NUCLEAR OFFSHORE COMMERCIAL RESIDENTIAL

T +44(0)1661 832 422

| thompsonsofprudhoe.com

|

E info@thompsonsofprudhoe.com


HIGH-REACH EXCAVATORS Sennebogen 870 E Demolition PHOTO: SENNEBOGEN

booms and exchangeable bushings. The operator’s cab can be tilted through 30° and is equipped with emergency lowering valves. A camera can be installed on the boom for a closer view of the working area, while a load management indicator provides safe working load data in all boom configurations, with overload and over pressure warnings.

COMPACT HIGH REACH

German contractor METZNER used a 117-tonne Sennebogen 870 E Demolition excavator to dismantle an 11-storey residential building in Hoyerswerda, Germany. The reinforced-concrete structure stood more than 33 m tall on a confined urban site. Equipped with a boom offering up to 36 m of reach and 3.1-tonne shears, the machine enabled controlled removal of the building’s concrete slabs and walls. A spray system fitted directly to the demolition tool helped suppress dust, while cameras and work-area lighting supported operator visibility. Meanwhile, transport was simplified by the machine’s ability to separate into three main components: the base machine, demolition equipment and counterweight. Control, which monitors the position of the equipment to support safe operation, and cabs that tilt by up to 30° for improved visibility. They have adjustable undercarriages and removable counterweights to help simplify transport, while optional water spray systems provide dust suppression. Hercal Diggers in Spain invested in the first Liebherr R 980 200-tonne demolition excavator in the Iberian Peninsula back in 2025 “to be at the forefront of circular demolition,” according to CEO Marcos Calleja. The contractor went on to add a R 940 model this summer to fill a gap in its lineup of equipment which encompasses 23 Liebherr machines across various applications. Hyundai Construction Equipment Europe introduced its new HX520A HRD excavator in April, its first in-house highreach machine developed in cooperation with Dutch demolition specialist STC. The excavator uses a modular quick boom connect system with hydraulically operated locking for easy changing between layouts as well as transport racks for both www.demolitionandrecycling.media

Interestingly, the high-reach market is expanding at both ends. While some are pushing factory machines towards the 50-metre class, Case Construction Equipment has chosen to introduce HRD to the compact machine segment with the CX135E XRD, developed for sites where

access and working space are restricted. With its undercarriage retracted, the machine is just 2.32 m wide, making it easier to work in confined urban sites, while a maximum working height of 14 m gives it the reach to tackle typical two- and threestorey structures. The machine is shortlisted in the innovation category at the World Demolition Awards 2026. It can be supplied with two front-end configurations: a highreach demolition arm and a conventional two-piece boom for excavation and lowerlevel demolition. A hydraulic arm-change system, with quick couplings and grouped hose connections, is designed to make switching between the two configurations ■ straightforward.

SIMEX.IT

I F

RE CYCLI N G I S YOUR JOB, YOU K N OW THE ANSWER

SCREENING BUCKETS VSE TORNADO The new line designed to maximize performance in green area maintenance, land clearing and compost aeration.

8 models for excavators from 1.5 to 18 t 2-, 3- and 4-shaft configuration with intersecting star-shaped elements (polyurethane or steel tools depending on the application) Effective on both dry and damp ground Patented system for rapid shaft replacement directly on site Made for those who work outside every day.

WATCH IT IN ACTION

2026 d&ri 51


starting from 0 % interest

For further information sennebogen.com/demolition

DEMOLITION MACHINES FOR DEMANDING TASKS Highest performance for demanding demolition work: Ranges of up to 36 m Multifunctional machines: Quick change of different attachments Versatile use for selective dismantling and sorting tasks Compact, safe and easy to transport Best overview with elevating and tilting cab

Sebastian Loibl

Telehandler

SENNEBOGEN Maschinenfabrik GmbH 94315 Straubing, Germany sebastian.loibl@sennebogen.de

Balancer

Material Handling Duty Cycle Crane Crawler Crane Telescopic Crane Mobile Harbour Crane


INTERVIEW

Mental health matters CEO Mark Coleman talks to Neel Madsen about Colemans’ dedication to the welfare of its staff and how to support mental health in the construction and demolition industries Mental health is becoming a more prominent issue. How significant is the challenge across construction and demolition?

We have been talking about mental health for well over a decade and awareness is better. We have policies and strategies in place, including dedicated mental health first aiders, but I’m not convinced we have changed enough of what makes people struggle in the first place. Our industry is short of time, people and money. Workloads are uncertain, projects stop and start, and the cost of living is putting pressure on families. In England and Wales, 3,931 construction companies entered insolvency in 2025. That affects people well beyond the businesses that fail. Across Great Britain, HSE estimated that 964,000 workers suffered work-related stress, depression or anxiety in 2024/25. Those are wider industry figures, but they show why this cannot be treated as a small issue.

Are there particular aspects of demolition that can place additional pressure on people’s mental health?

Absolutely. You may not know where you are working from one week to the next or how secure your job is. You arrive on site and the plan changes because a project has been delayed, information is missing or the work has not been organised well enough. Demolition also demands your full attention. We plan for the hazards and make the work safe, but people still need to be alert. If someone is worried about money, relationships or what is happening at home, that can affect their concentration. Stability, respect and trust are important to both wellbeing and safety. Being trusted matters a great deal to people in this industry. www.demolitionandrecycling.media

Do people feel more able to speak openly when they are struggling or is there still a stigma surrounding mental health?

Yes, I believe they do and that is real progress. People talk more openly about mental health and know more about the support that is available. But it is one thing to discuss mental health in general and another to tell the people you work with that you are struggling. Someone in the middle of it may keep quiet and hope it passes. We still have work to do to make that conversation easier.

What signs might suggest that a colleague is struggling, and how should managers approach someone they are concerned about? Look for changes in someone you know. They might start missing work or seem

Stability, respect and trust are important to wellbeing and safety. Being trusted matters a great deal to people in this industry. MARK COLEMAN, CEO, Colemans

tired, distracted, unhappy or forgetful. They may have more near misses or be on their phone constantly because something is happening at home. Find a quiet moment to sit down with them over a cup of tea. Don’t summon them to an office or ask, “What’s wrong with you?” Simply say, “I wanted to catch up. How are things? Is everything okay at work and at home?” Then you listen. Managers need the training and support to decide what follows. This may be another chat, an adjustment to work, time off or help finding specialist support. People also need to trust that a private conversation will stay private, while any immediate safety concern is dealt with.

What practical measures and initiatives have Colemans introduced to support employees’ mental health?

For me, this starts with the relationship between the business and its people. They need to know what is happening, feel able to speak honestly and see that we act on what they tell us. Our employee representative groups include people from site and different parts of management raising problems and working through solutions together. Taking those issues away and actioning solutions is the critical bit. If people raise a concern and nothing happens, they stop speaking up. They also need a way to do so anonymously and confidence that managers will not turn a private conversation into gossip. We make a real effort to bring people together beyond the job. That might be charity >54 2026 d&ri 53


INTERVIEW Skelligs Retreat sits on the Irish coast looking out towards Skellig Michael, a UNESCO World Heritage Site fundraising, social events or doing a workout together. We give every employee an equal opportunity to attend major industry events and celebrations, fully funded by the company, with attendees selected at random. Every three years, we hold a Colemans’ Celebration Day and bring all our employees together. This year, we hired the Everyman Cinema at the Mailbox in Birmingham. We talked openly about what is happening in the business, the challenges we face and how we can move forward together. We had open forums, sessions on subjects of interest, including wellbeing where relevant, and games in the afternoon. There was food throughout the day, followed by an evening to catch up socially. Members of staff have also gone away on wellbeing retreats. Our investment in Skelligs Retreat in Ireland grew out of the tragedies the demolition industry experienced in 2016. We saw the benefit of getting away from the workplace, spending time together and doing activities that taught us more about looking after our mental health and overall wellbeing. That stayed with me. Skelligs will be open to the wider community, but the idea is also to offer retreats for construction companies and for people across our own group. Giving people time and space to be together can make a real difference.

What advice would you give to a company that is only just beginning to address the subject?

Look closely at the working day we ask people to live with. Are they getting breaks and holidays? Are the hours reasonable?

I’m not convinced we have changed enough of what makes people struggle in the first place. MARK COLEMAN 54 d&ri 2026

SKELLIGS RETREAT is being developed on 200 acres of farmland on the Iveragh Peninsula in County Kerry, southwest Ireland. The land has been passed down through Mark Coleman’s family, and work to restore the original farm buildings and construct new facilities began in 2022. The wellness retreat and sanctuary is due to open in 2027, welcoming people from the local community and around the world. sharing is another idea worth considering, so employees can share in the success they help create. We should also look at the practical things that make a difference to people day to day. Providing good-quality fleeces, hoodies and waterproofs beyond basic PPE is one simple way of looking after people and helping with the cost of living.

What do you believe needs to change in the way work is planned and delivered to better protect people’s mental health?

Colemans on site in Northampton How much travelling are they doing before a shift even starts? I know of people being collected at three in the morning on a chain of pick-ups in order to get to site for seven, so they arrive shattered. We use multiple vehicles so people can travel more directly, and we look at working patterns when distance is an issue. Travel, site hours and overtime must be considered together. Working away needs thought too. If people are away from family all week, give them access to activities rather than leaving the pub as the only place to go in the evening. A gym membership may help. So can time to exercise, eat well and spend time with colleagues. More fundamentally, people need reliable work and pay, protected holidays, pensions and benefits they can build a life around. They should earn enough to do more than cover each month’s bills. Profit

A lot of good work is being done to help people talk about mental health. But we are still better at responding when somebody is struggling than we are at changing the conditions that put them under pressure. The problem is the ‘always-on’ mentality. A job is delayed for months then everybody is expected to start immediately and recover the time. Work goes from feast to famine. People move between sites, spend time away from family and worry about the next job. We need modern-day thinking about how we run the industry. To me that means planning earlier, involving the people who will deliver the work, using better information and technology, and setting programmes that can actually be achieved. When the economy gets difficult, construction and demolition are often treated as though they can simply be switched off and back on, but the people, skills and businesses needed to deliver cannot work like that. These industries need to be treated as essential infrastructure alongside food, energy and security. If we want better mental health, we also need to create more stability ■ for the people who work in them. www.demolitionandrecycling.media


Demolition and Sorting Grabs, DRG

2001 2003

Multi-Quick Processors, MQP

2004 2008

Mobile Scrap Shears, DRS

2-Cylinder Concrete Crushers, DCC

2018 2019 2020

As a result of DemaPower 2.0 System DCC Concrete Crushers achieves a performance to crushers one to two sizes larger. 25% more cylinder power will be 100% transformed to 25% more closing force.

DEMAREC Head Office, De Hork 32, 5431 NS Cuijk, the Netherlands. Tel. +31 (0) 485 442300, info@demarec.com DEMAREC UK Mutley Plant Service Ltd, Aylesham Industrial Estate, Aylesham, Canterbury CT3 3EP, Tel. +44 (0) 1304 840621, sales@demarecuk.com DEMAREC USA 6420 Inducon Drive - Suite G, Sanborn, NY, 14132. Tel. +1 (716) 731 4333, sales-usa@kinshofer.com DEMAREC Canada Mainway Drive, Unit #11 - Burlington, ON L7L 7G5. Tel. +1 (905) 335 2856, sales-northamerica@kinshofer.com DEMAREC Deutschland Im Rohnweiher 14, D-53797 Lohmar, Germany. Tel. +49 2205 920270, info@demarec-deutschland.deå

Rail Cutters, RC

2014 2017

Multi-Shears, DMS

Dedicated Demolition Line, DRC-DRD-DRP

2010 2012

Rotatable Pulverizers, DSP

Static Pulverizers, DSP

demarec.com

Mobile Scrap Shears, DXS


THE INSTITUTE OF DEMOLITION ENGINEERS

Fifty years of demolition engineering I n 2026, the Institute of Demolition Engineers (IDE) celebrates a remarkable milestone: its 50th anniversary. Founded in 1976 to promote demolition engineering as a distinct professional discipline, the Golden Jubilee gifts us an opportunity not only to reflect on five decades of achievement, but also to recognise how much our industry has changed and, importantly, consider where we go next. Demolition today bears little resemblance to the industry I grew up in or the perceptions that surrounded it. Modern demolition is a highly technical discipline where teams are taking on increasingly complex decommissioning projects in sectors such as oil and gas, petrochemicals and renewable energy. That calls for expertise in structural behaviour, temporary works, hazardous materials, environmental impacts, recycling, specialist plant and techniques, occupational health and safety. This evolution is precisely why the IDE remains so important, but professional membership must mean more than letters after one’s name; it should represent independent, verifiable evidence of knowledge, experience, competence and,

About the IDE Established to recognise demolition engineering as a specialist discipline, the Institute of Demolition Engineers was established in 1976 by members of the National Federation of Demolition Contractors. With over 400 members, it promotes professional standards, training and career development through qualifications, examinations, seminars and the sharing of knowledge.

■ For more details, please visit:

ide.org.uk www.demolitionandrecycling.media

most importantly, the commitment to professional standards. Clients, contractors, regulators and other professionals need confidence that those advising on, designing or managing demolition work have the necessary understanding and experience to do so safely and effectively. Through professional assessment, examinations, interviews, continuing professional development and our code of professional conduct, the IDE provides a framework through which demolition engineers can demonstrate that competence. One of my key priorities has always been education and the transfer of knowledge. Our industry contains some outstanding engineers and demolition professionals with decades of experience gained on some of the most unusual and technically challenging projects imaginable. We have a responsibility to ensure that knowledge does not disappear as experienced professionals retire. In my view, this is the biggest threat to our industry: industries have no memory. There are no more legends left, and unfortunately once they are gone, the knowledge disappears along with them. That brings me to another major priority for my presidency: the institute’s international development. We have already taken significant steps towards becoming a more international organisation, including the establishment of two branches: one in the Asia-Pacific region and the other covering mainland Europe. We are also seeing increasing interest across North America and in the Middle East. By encouraging the international exchange of knowledge, experience and best practice, we can help raise standards across the globe; an outlook that will be particularly important when the industry gathers at the World Demolition Summit 2026 in Madrid. The WDS will give the IDE an excellent opportunity to strengthen existing relationships, develop new ones and provide a platform to promote the

Stephen McCann (right) with outgoing president Adrian McLean

Demolition today bears little resemblance to the industry I grew up in or the perceptions that surrounded it. benefits that professional demolition engineering can bring to projects worldwide. I want the IDE to be visible, engaged and actively involved in the international conversation on the future of demolition and the rise of global professionalism. But growth must never come at the expense of professional standards and the credibility of the IDE built up over the past halfcentury. Our task is to preserve the institute’s heritage while continuing to respond to new technologies, changing legislation, evolving construction methods, increasingly complex structures and rising expectations regarding competence and professional accountability. The demolition industry is becoming increasingly sophisticated, competitive and global. In this environment, the principles on which the IDE was founded – competence, knowledge, professionalism and continuous improvement – are more important today than they have ever been. Regards, Stephen McCann FIDE, ■ president IDE

Contact: info@ide.org.uk | +44 (0) 1634 790 548 2026 d&ri 57


EUROPEAN DEMOLITION ASSOCIATION NEWS

A year of conversations and practical work

A

Patrick Frye

Demolition is a diverse sector, and the challenges faced by companies are not always the same.

About the EDA

s we approach the end of another busy year for the EDA, I have been reflecting on what we have achieved together and, perhaps more importantly, on the conversations that have shaped our work throughout the year. One of the things I value most about being part of EDA is the opportunity to bring people from different countries and different parts of our industry together. Demolition is a diverse sector, and the challenges faced by companies are not always the same. Yet many of the questions we are dealing with are shared: how regulations are changing, how we can improve safety on site, how to manage materials and waste, how new technologies are affecting our work, and how our industry can attract and retain the next generation of professionals. These are the subjects that come up in our meetings, working groups and, particularly, in the conversations between our members. They are often practical discussions, based on what companies are experiencing in their day-to-day work. I believe these exchanges are one of the main reasons for having a European association. We can learn from what others are doing, compare approaches and bring those experiences back to our own countries. Our annual convention in Dublin in June was a very good example of this. More than 250 participants from more than 19 countries came together for two days of presentations, workshops and discussion. We talked about issues ranging from machinery and explosive demolition to nuclear decommissioning, circular economy and digitalisation. But, as always, some of the most interesting conversations continued outside the sessions. I was particularly pleased to see the strong participation from our members. The success of the convention was the result of their involvement, together with the work of our speakers, sponsors and partners. I would like to thank all of them for their contribution. After the great experience in Dublin, we are already preparing for the 2027 convention in Athens on 10–12 June, organised with PEDMEDE, the Greek member association. Throughout the year, the EDA has also continued to work on subjects where our members have identified a need for practical guidance. Our new ‘Guide on Dust in Demolition’ is one example. Dust is an issue that can affect workers, neighbouring communities and the environment, and something that demolition companies have to consider throughout their projects. This month also sees the launch of the EDA Yearbook 2026, our annual publication which includes contributions from across our network and reflects some of the work carried out by the association and its members during the year. Finally, I would like to thank everyone who has contributed to the EDA during the past year. An association is built through the participation of its members, and I am grateful for the time, knowledge and ideas that so many people continue to share. I look forward to continuing these conversations in the year ahead, and to seeing many of you in Athens. ■ Regards, Patrick Frye, president EDA

The European Demolition Association (EDA) was founded in 1978 and is the European platform for national demolition associations, demolition contractors and suppliers. It organises annual events to bring together the demolition industry from all over Europe. The most important one is the Annual Convention, a meeting that includes technical presentations about key topics as well as optional leisure activities. The EDA represents thousands of companies through its national associations and direct memberships. Demolition & Recycling International is the international media partner of the EDA.

■ For more details, please visit:

europeandemolition.org 58 d&ri 2026

Contact: Ms Paula Castillo | infouropeandemolition.org | (+34) 602 250 893 www.demolitionandrecycling.media


VISIONARIES IN DEMOLITION

The future of construction starts with demolition. Choose the people shaping it. The NFDC members do more than demolish. They plan, deliver practical solutions and manage risk, creating the safe and responsible foundations for what comes next.

NFDC members bring proven competence, specialist knowledge and high standards to every stage of the process.

From complex demolition challenges to major construction and regeneration projects,

When your project demands experience, capability and confidence, choose a contractor committed to driving the demolition industry forward.

www.demolition-nfdc.com

info@demolition-nfdc.com

BUILD WITH CONFIDENCE. START WITH AN NFDC MEMBER. Scan the QR code to find an NFDC member for your next project.

Need demolition? Think NFDC 01442 217 144 (Option 1)


Built to Reach. Engineered to Perform.

Designed for operator safety and maximum stability

Heavy breaking power with smooth controllability

Explore more

Low cab noise for less jobsite disturbance


Turn static files into dynamic content formats.

Create a flipbook
DRI WDS digital issue 2026 by KHL-Group - Issuu