Skip to main content

Ken Yee Chew Design Portfolio 2021

Page 1

KEN YEE CHEW 2021 selected works


Ken Yee Chew Bachelor of Landscape Architecture Certificate in Public Policy and Administration University of Guelph

about the portfolio This portfolio contains work samples from my experience working in various architectural, landscape and urban design roles. The selection of work aims to highlight my experience and understanding of the site plan process, along with my ability to communicate complex planning and design concepts in a clear and thoughtful manner.

relevant skills and aptitudes working knowledge • Development Review Process • The Planning Act software • Accela • ArcGIS • Adobe Creative Suite • AutoCAD • SketchUp • Microsoft Office

technical • Graphic Design & Presentation • Drafting • Policy Analysis • Context and Spatial Analysis interpersonal • Multidisciplinary Coordination • Project Management • Organization & Work-flow efficiency


contents working drawings

academic and personal work

Huang Residence / Burnaby, BC 04 3 Storey Apartments / Cambridge, ON 06 Markham Lot Severances / Markham, ON 08

NCC Ottawa Riverfront Competition / Ottawa, ON 34

Ajax Townhouses / Ajax, ON 09

DX Boundless Competition / Guelph, ON 39

Dove Park Revitalization / Richmond Hill, ON 10

Photography / North America and Abroad 40

Schomberg Tennis Courts / Schomberg, ON 11 Pierce County Evaluation & Treatment Center / Parkland, WA

12

The Queen’s Gateway / Toronto, ON 38 BLA Honours Thesis / Klemtu, BC 39

Disclaimer Work samples from the City of Brampton do not reflect up-to-date planning decisions and should not be taken out of context. Illustrations are strictly for visualization and demonstration purposes only.

Taco Time North West / Shoreline, WA 14 North Bend Retail | Huxdotter Coffee / North Bend, WA 16

special studies and presentation materials Soundview Playfields Renovation / Seattle, WA 18 Erath Winery / Dundee, OR 19 Uptown Brampton / Brampton, ON 20 Queen Street East Precinct Plan / Brampton, ON 28 Downtown Brampton / Brampton, ON 32


Huang Residence 3750 Linwood Street | Burnaby, BC

Scope and Duties: • Design Development • Drafting and Building Code Review • Construction Tender Package

4


TOP OF ROOF

29.10"

24.00"

U/S OF CEILING

24.00"

15.00"

SECOND FLOOR

15.00"

12'

ROOF

EX PR . 25 O. 1.50 25 3. ' 2'

EX PR . 25 O. 4.00 25 2. ' 2'

4'

CL

BEDROOM 2 10x9

KITCHEN/LIVING 13x12

3185-8888 Odlin Crescent, Richmond, B.C. V6X 3Z8 T: (604) 813-6116 F: (604) 244-8388 W: www.heritagedc.ca E: chew@heritagedc.com

Design & Construction Management Inc.

Heritage 藝存 建築設計有限公司

Design & Construction Management Inc.

Heritage 藝存 建築設計有限公司

3185-8888 Odlin Crescent, Richmond, B.C. V6X 3Z8 T: (604) 813-6116 F: (604) 244-8388 W: www.heritagedc.ca E: chew@heritagedc.com

Design & Construction Management Inc.

Heritage 藝存 建築設計有限公司

3185-8888 Odlin Crescent, Richmond, B.C. V6X 3Z8 T: (604) 813-6116 F: (604) 244-8388 W: www.heritagedc.ca E: chew@heritagedc.com

29.10"

12'

CL

4'

BEDROOM 1 10x10 D/W

SUNKEN PATIO UP

This drawing is the exclusive property of Heritage Design & Construction Management Inc. and shall not be used or re-used without written permission.

REVISIONS

REVISIONS

O.

PR

'

PROJECT

4'

This drawing is the exclusive property of Heritage Design & Construction Management Inc. and shall not be used or re-used without written permission.

3.2

25

This drawing is the exclusive property of Heritage Design & Construction Management Inc. and shall not be used or re-used without written permission.

REVISIONS

FRONT ELEVATION DATE

11.30.2019 PROJECT NO.

BASEMENT FLOOR PLAN 1246.00 S.F.

SCALE: 1" = 1/8" DESIGN: C.S. CHEW DRAWN BY: KEN YEE CHEW SHEET TITLE

DATE

DATE

11.30.2019

11.30.2019

PROJECT NO.

PROJECT NO.

SCALE: 1" = 1/4"

SCALE: 1" = 1/4"

DESIGN: C.S. CHEW

DESIGN: C.S. CHEW

DRAWN BY: KEN YEE CHEW

DRAWN BY: KEN YEE CHEW

SHEET TITLE

SHEET TITLE

PROPOSED SITE PLAN

BASEMENT FLOOR PLAN

FRONT AND REAR ELEVATIONS

Heritage

Heritage

Heritage

Design & Construction

Design & Construction

© COPYRIGHT HERITAGE DESIGN & CONSTRUCTION, INC. ALL RIGHTS RESERVED

© COPYRIGHT HERITAGE DESIGN & CONSTRUCTION, INC. ALL RIGHTS RESERVED

© COPYRIGHT HERITAGE DESIGN & CONSTRUCTION, INC. ALL RIGHTS RESERVED

SHEET

SHEET

24x36

A1-7 CONSTRUCTION DOCUMENTS

6'

3185-8888 Odlin Crescent, Richmond, B.C. V6X 3Z8 T: (604) 813-6116 F: (604) 244-8388 W: www.heritagedc.ca E: chew@heritagedc.com

Design & Construction Management Inc.

Heritage 藝存 建築設計有限公司

Design & Construction Management Inc.

Heritage 藝存 建築設計有限公司

CONSTRUCTION DOCUMENTS

3185-8888 Odlin Crescent, Richmond, B.C. V6X 3Z8 T: (604) 813-6116 F: (604) 244-8388 W: www.heritagedc.ca E: chew@heritagedc.com

Design & Construction Management Inc.

Heritage 藝存 建築設計有限公司

A1-4 24x36

24x36

CONSTRUCTION DOCUMENTS

12'

FRONT YARD SETBACKS G/F/P

PROJECT NO.

SCALE: 1" = 1/4"

SCALE: 1" = 1/4"

DESIGN: C.S. CHEW

DESIGN: C.S. CHEW

DRAWN BY: KEN YEE CHEW

DRAWN BY: KEN YEE CHEW

SHEET TITLE

SHEET TITLE

© COPYRIGHT HERITAGE DESIGN & CONSTRUCTION, INC. ALL RIGHTS RESERVED

SHEET

O. PR

.1 54

.& EX

25

Heritage Design & Construction

© COPYRIGHT HERITAGE DESIGN & CONSTRUCTION, INC. ALL RIGHTS RESERVED

CONSTRUCTION DOCUMENTS

3185-8888 Odlin Crescent, Richmond, B.C. V6X 3Z8 T: (604) 813-6116 F: (604) 244-8388 W: www.heritagedc.ca E: chew@heritagedc.com

Design & Construction Management Inc.

Design & Construction Management Inc.

Heritage 藝存 建築設計有限公司

A1-8

WEST SIDE ELEVATION

Heritage 藝存 建築設計有限公司

24x36

EAST AND WEST SIDE ELEVATIONS

'

5.4

SHEET

CONSTRUCTION DOCUMENTS

3185-8888 Odlin Crescent, Richmond, B.C. V6X 3Z8 T: (604) 813-6116 F: (604) 244-8388 W: www.heritagedc.ca E: chew@heritagedc.com

Design & Construction Management Inc.

PR

A1-5

This drawing is the exclusive property of Heritage Design & Construction Management Inc. and shall not be used or re-used without written permission.

BATH

BATH

BEDROOM 2 10x13

This drawing is the exclusive property of Heritage Design & Construction Management Inc. and shall not be used or re-used without written permission.

LOWER ATTIC

REVISIONS

SECTION A'-A"

4.00"

PROJECT

BEDROOM 3 10x10

PROJECT

CL

D

GARAGE ELEVATION

REVISIONS

SECOND FLOOR PLAN

DATE

11.30.2019 PROJECT NO.

1114.00 S.F.

NEW CONSTRUCTION

7 TC 10"

W

3750 LINWOOD STREET, BURNABY, B.C.

MASTER BEDROOM 15x13

NEW CONSTRUCTION

KITCHEN/LIVING

PROJECT

16R @ 7.5"

CORRIDOR

3750 LINWOOD STREET, BURNABY, B.C.

0.00"

NEW CONSTRUCTION

FAMILY

4.00"

CORRIDOR

HUNG RESIDENCE

MIN. 6.66'

SHOWER

ENSUITE

BEDROOM 4 10x10

HUNG RESIDENCE

W.I.C.

LOWER ATTIC CL

BEDROOM 4

HUNG RESIDENCE

STAIRWELL

15.00"

17R @ 7.5"

.2

Design & Construction

© COPYRIGHT HERITAGE DESIGN & CONSTRUCTION, INC. ALL RIGHTS RESERVED

5

2 O.

' ' .0 54 3.2 . 2 25 EX O. PR

'

3.2

LOWER ATTIC

SHOWER

ROOF PLAN

'

Heritage

SHEET

F/P

BASEMENT

DRAWN BY: KEN YEE CHEW SHEET TITLE

MAIN FLOOR PLAN

EX .& 5.3 PR O. '

1246.00 S.F.

25

MAIN FLOOR PLAN

4'

LOWER ATTIC

MAIN FLOOR

PROJECT DATE

11.30.2019

PROJECT NO.

SCALE: 1" = 1/4" DESIGN: C.S. CHEW

12'

12' 4'

SECOND FLOOR

3750 LINWOOD STREET, BURNABY, B.C.

DATE

11.30.2019

PROJECT NO.

Heritage 藝存 建築設計有限公司 24.00"

NEW CONSTRUCTION

PROJECT

DATE

24x36

U/S OF CEILING

This drawing is the exclusive property of Heritage Design & Construction Management Inc. and shall not be used or re-used without written permission.

11.30.2019

CONSTRUCTION DOCUMENTS

29.10"

12' 6''

REVISIONS

A1-2

TOP OF ROOF

3750 LINWOOD STREET, BURNABY, B.C.

NEW CONSTRUCTION

REVISIONS

Design & Construction

DENOTES MANHOLE

HUNG RESIDENCE

This drawing is the exclusive property of Heritage Design & Construction Management Inc. and shall not be used or re-used without written permission.

REVISIONS

Heritage

DENOTES BOTTOM OF WALL

DEN 11x11

This drawing is the exclusive property of Heritage Design & Construction Management Inc. and shall not be used or re-used without written permission.

SURVEY NOTES

DENOTES TOP OF WALL

POWDER ROOM

EAST SIDE ELEVATION

HUNG RESIDENCE

GUARD RAIL

PROJECT

DENOTES MULTIBOLE

PANTRY 5x5

EX

UP 6R

EX

DENOTES TWINBOLE

WOK 9x5

ENTRY PORCH

9' ' .3 52 3.2 . 2 . 25 O PR

' ' .0 53 3.5 . 2 . 25 O PR

EX

24x36

DENOTES WITNESS

KITCHEN 17x10

W/S

DECK 9x12

FOYER 9x7

This drawing is the exclusive property of Heritage Design & Construction Management Inc. and shall not be used or re-used without written permission.

REVISIONS

DATE

DATE

11.30.2019

11.30.2019

PROJECT NO.

PROJECT NO.

SCALE: 1" = 1/4"

SCALE: 1" = 1/4"

SCALE: 1" = 1/4"

DESIGN: C.S. CHEW

DESIGN: C.S. CHEW

DESIGN: C.S. CHEW

DRAWN BY: KEN YEE CHEW

DRAWN BY: KEN YEE CHEW

DRAWN BY: KEN YEE CHEW

SHEET TITLE

SHEET TITLE

SHEET TITLE

ROOF PLAN AND SECTION A'-A"

SECOND FLOOR PLAN

GARAGE ELEVATION

Heritage

Heritage

Heritage

Design & Construction

Design & Construction

Design & Construction

© COPYRIGHT HERITAGE DESIGN & CONSTRUCTION, INC. ALL RIGHTS RESERVED

© COPYRIGHT HERITAGE DESIGN & CONSTRUCTION, INC. ALL RIGHTS RESERVED

© COPYRIGHT HERITAGE DESIGN & CONSTRUCTION, INC. ALL RIGHTS RESERVED

SHEET

SHEET

SHEET

CONSTRUCTION DOCUMENTS

A1-6 24x36

A1-3

CONSTRUCTION DOCUMENTS

A1-9 24x36

DENOTES SPIKE

5 TO 14"

3185-8888 Odlin Crescent, Richmond, B.C. V6X 3Z8 T: (604) 813-6116 F: (604) 244-8388 W: www.heritagedc.ca E: chew@heritagedc.com

DENOTES LEAD PLUG

NEW CONSTRUCTION

NOTES:

3750 LINWOOD STREET, BURNABY, B.C.

17 TC 7.5"

ALL LEGAL MONUMENTATION WAS FOUND IN PLACE AND UNDISTURBED AT THE TIME OF THE SURVEY. THE LEGAL EVIDENCE WAS SET ON POSTING PLAN BCP10161 AND SUBDIVISION PLAN LMP25188. ELEVATIONS ARE IN FEET TO CITY OF BURNABY CVD28GVRD2018 GEODETIC DATUM DERIVED FROM MONUMENT 81H4570 WITH ELEVATION=225.80. ALL TREES AND STUMPS HAVE BEEN PLOTTED AS REQUIRED BY BURNABY TREE BYLAW. BUILDING DIMENSIONS AND OFFSETS ARE TAKEN TO THE OUTSIDE FACE OF THE BUILDING. ALL DIMENSIONS OTHER THAN LOT DIMENSIONS ARE SHOWN TO THE NEAREST 0.1 FEET.

DENOTES IRON POST

DINING 12x10

W/S

LIVING 12x11

UP

HUNG RESIDENCE

LEGEND: DENOTES ELEVATION

G/F/P

FAMILY 17x4

GUARD RAIL

2 CAR GARAGE

EX PR . 25 O. 1.5 25 4' 3.2 '

NO 102 - 1537 W. 8th AVENUE, VANCOUVER ,B.C., V6J 1T5 TEL:737-8777 FAX:737-8794 email: lyon@telus.net LYON, FLYNN AND COLLINS 2019

EX PR . 25 O. 4.2 25 ' 4.9 '

ENGINEERING SURVEYS LTD.

3750 LINWOOD STREET, BURNABY, B.C.

CIVIC ADDRESS: 3750 LINWOOD STREET BURNABY, BC

24x36

Design & Construction

SHEET

A1-1

PLAN SHOWING LOCATION OF ELEVATIONS AND SETBACKS FOR LOT 14 BLOCK 5 DISTRICT LOT 68 GROUP 1 NEW WESTMINSTER DISTRICT PLAN 980

REAR ELEVATION SOUTH

3185-8888 Odlin Crescent, Richmond, B.C. V6X 3Z8 T: (604) 813-6116 F: (604) 244-8388 W: www.heritagedc.ca E: chew@heritagedc.com

2 CARS GARAGE

3750 LINWOOD STREET, BURNABY, B.C.

0.00"

NEW CONSTRUCTION

4.00"

BASEMENT

HUNG RESIDENCE

MAIN FLOOR

EX BASEMENT

.5

PROJECT

SHOWER

' ' .1 54 3.2 . 2 . 25 O PR

4.00"

0.00"

51

GAME ROOM

NEW CONSTRUCTION

MECH.

4 TC 8"

.2

BAR SINK

D

HUNG RESIDENCE

PROJECT

3750 LINWOOD STREET, BURNABY, B.C.

DECK

NEW CONSTRUCTION

SUNKEN PATIO

16R @ 7.5" W

BEDROOM 2 10x10

EX

PR O.

25 3.

2'

0'

4.

. 25

EX

CORRIDOR

HUNG RESIDENCE

EX PR . 25 O. 2.39 25 3. ' 2'

3750 LINWOOD STREET

3750 LINWOOD STREET, BURNABY, B.C.

SUMP

CONSTRUCTION DOCUMENTS

5


Cambridge Apartments 212 Queen Street West | Cambridge, ON

Scope and Duties: • Design Development • Site Plan Approval Submission • Tree Protection, Landscape, Details Plan • Rooftop Amenity Design • Cost Estimate

296.56mm 296.56

292.50 m

292.50 m

291.46 m

6


7


Markham Lot Severences 11 & 16 Riverbend Road, 3 & 5 Sabiston Drive | Markham, ON

Scope and Duties: • Design Development • Application for Consent Submission • Tree Protection, Landscape, Details Plan • Cost Estimate

8


Ajax Townhouses 361 Taunton Road | Ajax, ON

Scope and Duties: • Design Development • Site Plan Approval Submission • Tree Protection, Landscape, Details Plan • Cost Estimate

9


LEGEND

CO

LD

Dove Park Revitalization

ST

PROPERTY LINE

RE

AM

CHAIN LINK FENCE 225 Coldstream Crescent | Richmond Hill, ON CONCRETE Scope EXISTING and Duties: LEGEND • Design Development PROPOSED CONCRETE • Inventory and Analysis OPEN PLAZA • LEGEND Cost Estimate PROPERTY ASPHALT LINE MULTI-USE COURT

CO

LD

CO

LD

SOD /LINK LAWN CHAIN FENCE PROPERTY LINE

PLANT BED EXISTING CONCRETE CHAIN LINK FENCE

NATURALIZED / LID PLANTING PROPOSED CONCRETE EXISTING CONCRETE

ST

RE

AM

ST

CR

RE

ES

AM

CE

CR

ES

CR

ES

CE

NT

CE

NT

NT

EXISTING OPEN PLAZAWOOD FIBRE FITNESS CENTRE PROPOSED CONCRETE

PLAYGROUND ASPHALT MULTI-USE COURT OPEN PLAZA

SOD / LAWN ASPHALT MULTI-USE COURT SHADE STRUCTURE PLANT BED SOD / LAWN SEAT EDGE PLANT BED NATURALIZED / LID PLANTING GATHERING TABLE WITH NATURALIZED / LIDFIBRE PLANTING SHADE UMBRELLA EXISTING WOOD FITNESS CENTRE EXISTING WOOD FIBRE FITNESS CENTRE EXISTING BRIDGE PLAYGROUND PROPOSED CONIFEROUS PLAYGROUND TREE SHADE STRUCTURE PROPOSED DECIDUOUS SHADE STRUCTURE TREE SEAT EDGE EXISTING SEAT EDGE DECIDUOUS TREE GATHERING TABLE WITH

GATHERING TABLE WITH SHADE UMBRELLA EXISTING CONIFEROUS SHADE UMBRELLA TREE EXISTING BRIDGE EXISTING BRIDGE GROUPING OF EXISTING PROPOSED CONIFEROUS TREES PROPOSED CONIFEROUS TREE TREE PROPOSED DECIDUOUS TREE (SURVEY) PROPOSED EXISTING DECIDUOUS CONIFEROUS TREE TREE EXISTING DECIDUOUS EXISTING DECIDUOUS EXISTING DECIDUOUS TREE (SURVEY) TREE TREE EXISTING CONIFEROUS EXISTING CONIFEROUS TREE TREE GROUPING OF EXISTING GROUPING OF EXISTING TREES TREES

EXISTING CONIFEROUS TREE (SURVEY)

EXISTING CONIFEROUS TREE (SURVEY) EXISTING DECIDUOUS TREE (SURVEY)

EXISTING DECIDUOUS TREE (SURVEY) NORTH

10

1:750

DOVE PARK

PARK MASTER PLAN - CONCEPT A COLDSTREAM CRES, RICHMOND HILL L4S JUNE, 2021


Schomberg Tennis Courts WESTERN AVE

251 Western Avenue | Schomberg, ON

Scope and Duties: • Design Development • Landscape, Grading and Details Plan • Cost Estimate • Construction Tender Package

GENERAL CONSTRUCTION NOTES:

WESTERN AVE

1.

ENLARGEMENT AREA

THE CONTRACTOR, UPON ACCEPTANCE OF THE CONTRACT, ASSUMES COMPLETE RESPONSIBILITY

AND

LIABILITY

FOR

THE

JOB

SITE

DURING

THE

COURSE

OF

CONSTRUCTION, AND WILL ENSURE PUBLIC SAFETY AND CLEANLINESS OF MUNICIPAL

ROADS NEAR THE SITE. GENERAL CONSTRUCTION NOTES: 1. 2.

10 D-2

RIVERSTONE SUBDRAIN OUTFALL (PROVISIONAL)

CONSTRUCTION, AND WILL ENSURE PUBLIC CLEANLINESS MUNICIPAL BEFORE PROCEEDING. NO ALLOWANCE SHALL SAFETY BE MADEAND ON BEHALF OF THEOF CONTRACTOR ROADS NEAR TO THEDO SITE. FOR FAILURE SO. 2. 3.

10 D-2

RIVERSTONE SUBDRAIN 100mm DIA. PERFORATED OUTFALL (PROVISIONAL) DRAINAGE PIPE, DAYLIGHT.

4. 3. 5.

100mm DIA. PERFORATED DRAINAGE PIPE, DAYLIGHT.

7 D-1 6 7 D-1

D-1

4 6 D-1 D-1 3 4 D-1

D-1

ADJACENT RESIDENTIAL

3 D-1

DOUBLE GATE

TENNIS COURT PERIMETER FENCE DOUBLE GATE

TENNIS COURT LAYOUT TENNIS COURT PERIMETER FENCE TENNIS COURT SURFACE TENNIS COURT LAYOUT

TENNIS COURT SURFACE

ADJACENT RESIDENTIAL

4. 6.

ALL DIMENSIONS, GRADES OF ANDSURVEY SITE CONDITIONS BEFORE THE CONTRACTOR CONSULTANT SHALL IS NOTVERIFY RESPONSIBLE FOR ACCURACY OR ENGINEERING PROCEEDING WITHTO THE WORK, AND DRAWINGS REPORT ANY DISCREPANCIES TOWITH THETHE CONSULTANT DRAWINGS. REFER APPROPRIATE BEFORE PROCEEDING WORK. BEFORE PROCEEDING. NO ALLOWANCE SHALL BE MADE ON BEHALF OF THE CONTRACTOR ALL FAILURE CONSTRUCTION TO BE CARRIED OUT IN ACCORDANCE WITH THE MOST CURRENT FOR TO DO SO. PROVINCIAL AND MUNICIPAL STANDARDS AND SPECIFICATIONS. THE CONSULTANT IS NOT RESPONSIBLE FOR ACCURACY OF SURVEY OR ENGINEERING CONSTRUCTION MUST CONFORM TODRAWINGS ALL APPLICABLE AND REGULATIONS OF ALL DRAWINGS. REFER TO APPROPRIATE BEFORECODES PROCEEDING WITH THE WORK. AUTHORITIES HAVING JURISDICTION. ALL CONSTRUCTION TO BE CARRIED OUT IN ACCORDANCE WITH THE MOST CURRENT SITE SHALL AND BE MAINTAINED IN A CLEANAND AND ORDERLY STATE FOR THE DURATION OF PROVINCIAL MUNICIPAL STANDARDS SPECIFICATIONS.

5.

CONSTRUCTION; ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE CONSTRUCTION HEALTH MUST CONFORM TO ACT. ALL APPLICABLE CODES AND REGULATIONS OF ALL OCCUPATIONAL AND SAFETY

7. 6.

AUTHORITIES HAVING JURISDICTION. CONTRACTOR SHALL BE RESPONSIBLE TO CLEAN ROADS DAILY TO THE SATISFACTION OF SITE SHALL BE MAINTAINED THE CONSULTANT / OWNER. IN A CLEAN AND ORDERLY STATE FOR THE DURATION OF

7.

CONSTRUCTION; ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE DUST CONTROL:HEALTH THE CONTRACTOR OCCUPATIONAL AND SAFETYSHALL ACT. TAKE ALL NECESSARY MEASURES TO CONTROL DUST ON THIS PROJECT SITE ON A DAILY BASIS AND TO THE SATISFACTION OF THE CONTRACTOR CONSULTANT. SHALL BE RESPONSIBLE TO CLEAN ROADS DAILY TO THE SATISFACTION OF

9. 8.

THE CONSULTANT / OWNER. REFUELING, LUBRICATION AND/OR MAINTENANCE OF CONSTRUCTION VEHICLES IS NOT DUST CONTROL: THEUNLESS CONTRACTOR SHALL ALL NECESSARY MEASURES TO CONTROL PERMITTED ON SITE APPROVED BY TAKE THE OWNER IN WRITING.

8.

ENLARGEMENT AREA

THE CONTRACTOR CONTRACTOR, UPON ACCEPTANCE OF THE CONTRACT, COMPLETE SHALL VERIFY ALL DIMENSIONS, GRADES AND SITEASSUMES CONDITIONS BEFORE RESPONSIBILITY THE ANY JOBDISCREPANCIES SITE DURINGTOTHE COURSE OF PROCEEDING WITHAND THE LIABILITY WORK, ANDFOR REPORT THE CONSULTANT

KEY MAP

LEGEND:

N.T.S

1

DETAIL #

D-0

SHEET #

KEY MAP

LEGEND: 1

N.T.S

DETAIL # SHEET # LIMIT OF CONTRACT

D-0

LIMIT OF WORK 3M GALVANIZED CHAIN LINK FENCE LIMIT OF CONTRACT TERMINAL POST LIMIT OF WORK WALKWAY ASPHALT PAVING -3M MEDIUM DUTY CHAIN LINK FENCE GALVANIZED CONCRETE PAVING TERMINAL POST SOD RESTORATION, MINIMUM WALKWAY ASPHALT PAVING 150mm DEEP TOPSOIL - MEDIUM DUTY CONCRETE PAVING EXISTING CONIFEROUS TREE

DUST ON THIS PROJECT SITE ON A DAILY BASIS AND TO THE SATISFACTION OF THE 10. CONSULTANT. THE CONTRACTOR SHALL ESTABLISH ALL PROPERTY BOUNDARIES AND CORNER STAKES, AND SHALL BE RESPONSIBLE FOR ALL COSTS OF RE-ESTABLISHING THEM SHOULD THEY BE 9. REFUELING, DISTURBED. LUBRICATION AND/OR MAINTENANCE OF CONSTRUCTION VEHICLES IS NOT

SOD RESTORATION, MINIMUM 150mm DEEP TOPSOIL TREE EXISTING DECIDUOUS

PERMITTED ON SITE UNLESS APPROVED BY THE OWNER IN WRITING. 11. CONTRACTOR SHALL BE PERMITTED ONE (1) POINT OF ACCESS FROM WESTERN AVENUE. 10. CONTRACTOR THE CONTRACTOR SHALL ESTABLISH ALLFOR PROPERTY BOUNDARIES CORNER STAKES, SHALL BE RESPONSIBLE INSTALLING ONE (1) AND CONSTRUCTION GATE AND SHALL WITH LOCK. BE RESPONSIBLE FOR ALL COSTS OF RE-ESTABLISHING THEM SHOULD THEY BE

EXISTING CONIFEROUS TREE

DISTURBED. 12. THE CONTRACTOR SHALL BE REQUIRED TO HAVE A FLAGMAN DIRECTING ALL DELIVERIES 11. OF CONTRACTOR (1) POINT OF ACCESS FROM WESTERN AVENUE. BE PERMITTED MACHINERYSHALL OR MATERIALS TO THEONE SITE.

EXISTING DECIDUOUS TREE

CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING ONE (1) CONSTRUCTION GATE 13. STORAGE WITH LOCK.OF MATERIALS, VEHICLES AND EQUIPMENT SHALL NOT BE PERMITTED WITHIN

5

1%

4 D-1 5

1%

D-1 4 D-1

TENNIS COURT NET (2 SETS)

TENNIS COURT LINE PAINTING; REFER TO TENNIS COURT LAYOUT TENNIS COURT NET (2 SETS)

TENNIS COURT LINE PAINTING; REFER TO TENNIS COURT LAYOUT

THE MUNICIPAL ROAD ALLOWANCE OR ON PRIVATE PROPERTY. 15. THE CONTRACTOR SHALL NOTIFY CONSULTANT 48 HOURS PRIOR TO COMMENCEMENT OF 14. WORK AREASTO FOR THE STORAGE OF MATERIALS AND EQUIPMENT SHALL BE APPROVED BY COORDINATE INSPECTION SCHEDULES. INSPECTOR. MATERIAL AND EQUIPMENT STORAGE SHALL NOT BE PERMITTED WITHIN 10m 16. OF ALLRESIDENTIAL EXISTING UTILITIES LOTS. SHOWN ON THE DRAWINGS ARE FOR REFERENCE PURPOSES ONLY. THE CONTRACTOR SHALL CONTACT THE UTILITY COMPANIES FOR UTILITY STAKEOUT. THE 15. CONTRACTOR THE CONTRACTOR SHALL NOTIFY CONSULTANT HOURS CAUSED PRIOR TOTO COMMENCEMENT OF SHALL BE RESPONSIBLE FOR ANY 48 DAMAGES EXISTING UTILITIES WORK TO COORDINATE INSPECTION SCHEDULES. DURING CONSTRUCTION. THE CONTRACTOR SHALL GIVE UTILITIES ADVANCE NOTICE PRIOR

TO DIGGING AND SHALL ASSUME ALL LIABILITIES OF DAMAGE DURING CONSTRUCTION. 16. ALL EXISTING UTILITIES SHOWN ON THE DRAWINGS ARE FOR REFERENCE PURPOSES ONLY. CONTACT THE UTILITY UTILITYLOCATED STAKEOUT. THE 17. THE CONTRACTOR CONDITION OFSHALL CURBS, SIDEWALKS, STREETCOMPANIES TREES ANDFOR UTILITIES WITHIN CONTRACTOR SHALL BE SHALL RESPONSIBLE FOR ANY DAMAGES CAUSEDBETWEEN TO EXISTING THE MUNICIPAL R.O.W. BE REVIEWED AND DOCUMENTED ALL UTILITIES PARTIES DURING CONSTRUCTION. THE CONTRACTOR SHALL GIVE UTILITIES NOTICE PRIOR THE CONTRACTOR WILL ADVANCE RECTIFY ANY DAMAGES, PRIOR TO THE START OF CONSTRUCTION. TO DIGGING AND SHALL ALL LIABILITIES OF DAMAGE CONSTRUCTION. AT THEIR OWN COST, TOASSUME THE SATISFACTION OF THE OWNER /DURING MUNICIPALITY. 17. CONDITION OF CURBS,AND SIDEWALKS, STREET AND UTILITIES LOCATED WITHIN 18. THE ALL EXISTING VEGETATION UTILITIES SHALL BETREES PROTECTED BY THE CONTRACTOR FOR THE DURATION MUNICIPAL OF R.O.W. SHALL BE REVIEWED DOCUMENTED BETWEEN ALL PARTIES CONSTRUCTION. REFER TOAND DETAILS FOR APPROVED FENCING TYPES.

EXISTING SOD

2%

11

1%

D-2 EXISTING SOD

2%

8 11 D-1 D-2 2

2% 2%

2%

SOD RESTORATION, MINIMUM 150mm DEPTH TOPSOIL

2%

2%

2%

1%

user: kyeechew user: file:kyeechew L:\LPL_Projects\2021\2021-002 file: L:\LPL_Projects\2021\2021-002 - Schomberg Tennis - Schomberg Courts Tennis (King)\3.0 Courts Tender (King)\3.0 Phase\CAD\2021-002_210607_R00_TNDR\2021-002_210615_R00_TNDR.dwg Tender Phase\CAD\2021-002_210607_R00_TNDR\2021-002_210615_R00_TNDR.dwg plot: Jun 16, 2021 plot: -Jun 11:10am 16, 2021 - 11:10am

D-1

THE MUNICIPAL ROAD ALLOWANCE OR ON PRIVATE PROPERTY. 12. THE CONTRACTOR SHALL BE REQUIRED TO HAVE A FLAGMAN DIRECTING ALL DELIVERIES 14. OF AREAS FOR THE MACHINERY ORSTORAGE MATERIALSOF TOMATERIALS THE SITE. AND EQUIPMENT SHALL BE APPROVED BY INSPECTOR. MATERIAL AND EQUIPMENT STORAGE SHALL NOT BE PERMITTED WITHIN 10m 13. OF STORAGE OF MATERIALS, VEHICLES AND EQUIPMENT SHALL NOT BE PERMITTED WITHIN RESIDENTIAL LOTS.

D-1 8

BENCH WITH SHADE CANOPY (PROVISIONAL). POSTIONING TO BE DETERMINED BY LANDSCAPE ARCHITECT ON SITE CONCRETE BENCH WITHPAVING SHADE CANOPY (PROVISIONAL) POSTIONING TO (PROVISIONAL). BE DETERMINED BY LANDSCAPE ARCHITECT ON SITE SINGLE GATE

PRIOR TO THE START WILL RECTIFY ANY DAMAGES, ANY DAMAGES NOTEDOF TOCONSTRUCTION. BE RECTIFIED ATTHE THECONTRACTOR COST OF THE CONTRACTOR. AT THEIR OWN COST, TO THE SATISFACTION OF THE OWNER / MUNICIPALITY. 19. NO MACHINE ACCESS OR GRADE CHANGES ARE PERMITTED WITHIN THE DRIP LINE OF 18. EXISTING ALL EXISTING VEGETATION AND UTILITIES SHALL BE PROTECTED BY THE CONTRACTOR FOR TREES. ANY ROOTS OR BRANCHES WHICH EXTEND BEYOND THE TREE THE DURATION OF CONSTRUCTION. TOPLAN DETAILS FORREQUIRE APPROVED FENCING TYPES. PROTECTION HOARDING INDICATED REFER ON THIS WHICH PRUNING, MUST BE WITHIN THE DRIP LINE MUST BE HAND DUG. THE CONTRACTOR TO REMOVE AND DISPOSE 19. NO MACHINE ACCESS OR CONSTRUCTION GRADE CHANGES ARE PERMITTED WITHIN THE DRIP LINE OF HOARDING FENCING UPON COMPLETION. EXISTING TREES. ANY ROOTS OR BRANCHES WHICH EXTEND BEYOND THE TREE HOARDING INDICATED ON INCLUDING THIS PLAN TREE WHICH REQUIRE PRUNING, MUST BE 20. PROTECTION ALL TEMPORARY PROTECTIVE FENCING PROTECTIVE FENCING SHALL DONE IN ACCORDANCE WITH GOODTOARBORICULTURAL STANDARDS. ANY EXCAVATIONS MAINTAINED BY THE CONTRACTOR THE SATISFACTION OF THE INSPECTOR FOR THE WITHIN THEOF DRIP LINE MUST BE HAND DUG. THE CONTRACTOR TO REMOVE AND DISPOSE DURATION CONSTRUCTION AND REMOVED FOLLOWING SUBSTANTIAL COMPLETION HOARDING FENCING CONSTRUCTION COMPLETION. UPON APPROVAL BY UPON CONSULTANT; FENCING LOCATIONS TO BE REVIEWED AND APPROVED

CONCRETE PAVING (PROVISIONAL)

2%

92 D-1 D-1

SINGLE GATE MEDIUM DUTY ASPHALT PAVING (PROVISIONAL)

BY THEISCONTRACTOR THE SATISFACTION OF THE INSPECTOR FOR THE 21. MAINTAINED THE CONTRACTOR EXPECTED TOTO PROVIDE MODULAR HOARDING FENCE AROUND ALL DURATION OF CONSTRUCTION ANDTHE REMOVED FOLLOWING SUBSTANTIAL COMPLETION AREAS OF ACTIVE CONSTRUCTION. CONTRACTOR MAY REMOVE MODULAR FENCING

2%

9 D-1

GRADE SLOPE TO APPROX. 2%. SLOPE SHALL NOT EXCEED 5% MEDIUM DUTY ASPHALT PAVING (PROVISIONAL)

21. THEHOARDING CONTRACTOR IS EXPECTED TO PROVIDE MODULAR HOARDING FENCE AROUND ALL 22. NO FENCING COMPONENT, INCLUDING BRACES AND FOOT SUPPORTS, SHALL AREAS OF ACTIVE CONSTRUCTION. MAY REMOVE MODULAR FENCING ENCUMBER THE PUBLIC SIDEWALK ATTHE ANYCONTRACTOR TIME.

GRADE SLOPE TO APPROX. 2%. SLOPE SHALL NOT EXCEED 5%

PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. 20. ALL TEMPORARY PROTECTIVE FENCING INCLUDING TREE PROTECTIVE FENCING SHALL BE

UPON APPROVAL BY CONSULTANT; LOCATIONS TO BE REVIEWED AND APPROVED ONLY UPON WRITTEN APPROVAL OFFENCING THE CONSULTANT THAT ACTIVE CONSTRUCTION AREA PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. HAS BEEN SUBSTANTIALLY COMPLETED AND SAFE FOR PUBLIC USE.

ONLY UPON WRITTEN APPROVAL OF THE CONSULTANT THAT ACTIVE CONSTRUCTION AREA 23. HAS CONTRACTOR SHALL ENSURE THAT AND EXISTING RESIDENTIAL / SCHOOL FENCING IS BEEN SUBSTANTIALLY COMPLETED SAFE FOR PUBLIC USE. PROTECTED AT ALL TIMES DURING CONSTRUCTION. CONTRACTOR SHALL REPAIR AT THEIR 22. NO HOARDING FENCING COMPONENT, INCLUDING BRACES AND FOOT SUPPORTS, SHALL COST ANY DAMAGE ARISING DURING THE PARK CONSTRUCTION. ENCUMBER THE PUBLIC SIDEWALK AT ANY TIME. 24. ANY ACCESS FROM THE REAR YARDS OF RESIDENTIAL LOTS SHALL BE RESTRICTED BY 23. INSTALLING CONTRACTOR SHALL ENSURE THAT EXISTING RESIDENTIAL / SCHOOL FENCING IS WIRE ON GATES.

EXISTING SOD

EXISTING SOD

EXISTING PARKING LOT; NO ACCESS PERMITTED

EXISTING PARKING LOT; NO ACCESS PERMITTED

PROTECTED AT ALL TIMES DURING CONSTRUCTION. CONTRACTOR SHALL REPAIR AT THEIR 25. CONTRACTOR SHALL SUPPLY AND INSTALL FILTER FABRIC PROTECTION ON ALL EXISTING COST ANY DAMAGE ARISING DURING THE PARK CONSTRUCTION. CATCH BASINS AND UTILITIES THAT ARE TO REMAIN AND THAT MAY BE AFFECTED BY THE 24. CONSTRUCTION. ANY ACCESS FROM THE REAR YARDS OF RESIDENTIAL LOTS SHALL BE RESTRICTED BY INSTALLING WIRE ON GATES. 26. REMOVE AND DISPOSE OF ALL ITEMS NECESSARY TO PERMIT NEW CONSTRUCTION 25. CONTRACTOR SHALL SUPPLY AND INSTALL FILTER FABRIC PROTECTION ON ALL EXISTING 27. REMOVAL OF ITEMS FULL REMOVAL OF ANYAND FOOTINGS. CATCH BASINS AND INCLUDES UTILITIES THAT ARE TO REMAIN THAT MAY BE AFFECTED BY THE CONSTRUCTION. 28. REMOVE ALL SOD AND SOIL AS MAY REQUIRED TO PERMIT NEW CONSTRUCTION. 26. REMOVE AND DISPOSE OF ALL ITEMS NECESSARY TO PERMIT NEW CONSTRUCTION 29. THE COSTS ASSOCIATED WITH THE ABOVE ITEMS 1 THROUGH 28, WHERE SUCH COSTS ARE

ASPHALT SURFACE

IDENTIFIED SPECIFICALLY ON THE FORM OF (BID FORM) SHALL BE DEEMED TO 27. NOT REMOVAL OF ITEMS INCLUDES FULL REMOVAL OFTENDER ANY FOOTINGS. BE INCLUDED IN BID ITEM A.1. 28. REMOVE ALL SOD AND SOIL AS MAY REQUIRED TO PERMIT NEW CONSTRUCTION. 30. ALL DRAWINGS, SPECIFICATIONS AND RELATED DOCUMENTS ARE THE COPYRIGHT OF THE 29. CONSULTANT THE COSTS ASSOCIATED THE ABOVE ITEMS 1 THROUGH 28, WHERE SUCH ARE AND MUST WITH BE RETURNED UPON REQUEST. REPRODUCTION OF COSTS DRAWINGS, NOT IDENTIFIED SPECIFICALLY THE FORMIN OFWHOLE TENDER FORM) BE DEEMED TO SPECIFICATIONS AND RELATEDON DOCUMENTS OR(BID IN PART IS SHALL FORBIDDEN WITHOUT BE IN BID ITEM A.1. THEINCLUDED CONSULTANT'S PERMISSION. DRAWINGS ARE NOT TO BE SCALED.

CONSTRUCTION ACCESS ROUTE; ASPHALT SURFACE MAKE GOOD ANY DAMAGE

30. ALL DRAWINGS, SPECIFICATIONS AND RELATED DOCUMENTS ARE THE COPYRIGHT OF THE CONSULTANT AND MUST BE RETURNED UPON REQUEST. REPRODUCTION OF DRAWINGS, SPECIFICATIONS AND RELATED DOCUMENTS IN WHOLE OR IN PART IS FORBIDDEN WITHOUT THE CONSULTANT'S PERMISSION. DRAWINGS ARE NOT TO BE SCALED.

CONSTRUCTION ACCESS ROUTE; MAKE GOOD ANY DAMAGE

2021-06-15 2021-04-30 date

KYC KYC by

THESE DRAWINGS ARE THE PROPERTY OF LANDSCAPE PLANNING LIMITED AND SHALL NOT BE ALTERED, MODIFIED, 2021-06-15 R2 ISSUED TENDERWITHOUT THE WRITTEN KYC REVISED ORFOR CHANGED CONSENT OF CLIENTLIMITED. REVIEW SEAL IS NOT2021-04-30 KYC R1 ISSUED FOR LANDSCAPE PLANNING VALID WITHOUT by revision date no. SIGNATURE OF THE LANDSCAPE ARCHITECT. DRAWINGS

CANNOT BE USED FOR TENDER/CONSTRUCTION UNTIL SIGNED BY LANDSCAPE ARCHITECT. THESE DRAWINGS ARE THE PROPERTY OF LANDSCAPE PLANNING LIMITED AND SHALL NOT BE ALTERED, MODIFIED, REVISED OR CHANGED WITHOUT THE WRITTEN CONSENT OF LANDSCAPE PLANNING LIMITED. SEAL IS NOT VALID WITHOUT SIGNATURE OF THE LANDSCAPE ARCHITECT. DRAWINGS CANNOT BE USED FOR TENDER/CONSTRUCTION UNTIL SIGNED BY LANDSCAPE ARCHITECT. NO

RTH

ANY DAMAGES NOTED TOWITH BE RECTIFIED AT THE COST OF THE CONTRACTOR. DONE IN ACCORDANCE GOOD ARBORICULTURAL STANDARDS. ANY EXCAVATIONS

D-1

SOD RESTORATION, MINIMUM 150mm DEPTH TOPSOIL

R2 ISSUED FOR TENDER R1 ISSUED FOR CLIENT REVIEW revision

no.

NO

RT

H project number

2021-002

project number

2021-002

project title

SCHOMBERG TENNIS

project title

SCHOMBERG TENNIS client

THE TOWNSHIP OF KING

tender number client

2021-T21 THE TOWNSHIP OF KING

drawing title tender number

LANDSCAPE / 2021-T21

SURFACE MATERIALS PLAN LANDSCAPE / drawn by reviewedMATERIALS by drawing number: SURFACE KYC PG PLAN

drawing title

date drawn by

MAY 2021 KYC date

MAY 2021

scale reviewed by

1:150 PG scale

1:150

L-1

drawing number:

L-1

11


Pierce County Evaluation & Treatment Center 7224 Pacific Highway East | Parkland, WA Scope and Duties: • Design Development • Landscape, Irrigation, Details Plan • Design Development • Construction Tender Package

12


13


Taco Time North West 15010 Aurora Avenue. | Shoreline, WA

Scope and Duties: • Design Development • Landscape, Irrigation, Details Plan • Site Plan Approval • Construction Tender Package

14


15


North Bend Retail | Huxdotter Coffee 101 West Park Street | North Bend, WA

Scope and Duties: • Design Development • Landscape, Irrigation, Details Plan • Design Development • Construction Tender Package

16


17


10’ 10’HT HTC.L. C.L.FENCING FENCING

00 3636 LALLL A BB OTOT FOFO

MO

20’ 20’HT HTC.L. C.L.BACKSTOP BACKSTOP (6.6% (6.6%SLOPE) SLOPE)

LL OOOO CCHH 00’ ’ S S SOFTBALL SOFTBALL LITTLE HH 1199 / /LITTLE xx HHIGIGLEAGUE 00’ ’ LEAGUE FIELD FIELD D D 2 2 E E 3 3 II DDIFIF MMOO

DUGOUT

DUGOUT

SEC SECTIO TION NB B

SEC SECTIO TION NB B

DUGOUT

Scope and Duties: • Design Development • Community Engagement • Master Plan Rendering

DUGOUT DUGOUT

590 NW 90th Street. | Seattle, WA

SECTION B

Soundview Playfields Renovation

WHITMAN MIDDLE SCHOOL

DUGOUT DUGOUT

LITTLE LITTLELEAGUE LEAGUE NEW NEW10’ 10’WIDE WIDEADA ADA HANDRAILS HANDRAILS 60’ 60’BASELINE BASELINE CONCRETE CONCRETE PATH PATH SECTION SECTION A A PROJECT LIMITS RETAINING WALL EX TREES TO BE(6.6% REMOVED (6.6%SLOPE) SLOPE) SYNTHETIC TURF WITH FIELD STRIPING OLOL HCOHO ’ ’ 126661 SF C SOFTBALL SOFTBALL LITTLE H HS S 19109/0 /LITTLE NEW NEW10’ 10’WIDE WIDEADA ADA HANDRAILS HANDRAILS ’0x’ x FIELD HIHGIGLEAGUE LEAGUE FIELD 0 CONCRETE CONCRETEPATH PATH D D IEIE 3232 PROPOSED FIELD LOL DOIDFIF (6.6% (6.6%SLOPE) SLOPE) O O SYNTHETIC SYNTHETIC TURF TURF WITH WITHFIELD FIELD STRIPING STRIPING LIGHTING POLE, TYP. O O MM HH NEWSF 12’ OVERLOOK SCSC 909’0’ 126661 126661 SF WIDE CONCR H H 11 HANDRAILS HANDRAILS ADA PATH (3.0% SLOPE STORMWATER FACILITY HIHGIG ’ x’ x EFIDED 323020 I PROPOSED FIELDDUGOUT NEW CONCRETE STAIRS F 10’ WIDE ADA ACCESIB II ’ ODOD SYNTHETIC SYNTHETICTURF TURFWITH WITHFIELD FIELDSTRIPING STRIPING LIGHTING POLE, TYP. PATH (4.9% SLOPE) 60 MM 1 x 126661 126661SFSF 10’ HT C.L. FENCING CHEEK WALL ALONG PA 0’ 20’ HT C.L. BACKSTOP 36 BABE RUTH BA L L A LITTLE LEAGUE TB 90’ BASEL O PROPOSED PROPOSEDFIELD FIELD FO SYNTHETIC SYNTHETICTURF TURFWITH WITHFIELD FIELDSTRIPING STRIPING 60’ BASELINE LIGHTING LIGHTING POLE, POLE, TYP. TYP. SECTION A 126661 126661SFSF BABE RUTH BASEBALL 90’SOFTBALL BASELINE / LITTLE NEW 10’ WIDE ADA PROPOSED PROPOSEDFIELD FIELD NEW VAN ADA PARKING STALLS LEAGUE FIELD CONCRETE PATH LIGHTING LIGHTINGPOLE, POLE,TYP. TYP. (11 x 19) (6.6% SLOPE) BASEBALL FIE OL O BABE BABERUTH RUTHBASEBALL BASEBALL CH 0’ S 9 HANDRAILS 90’ 90’BASELINE BASELINE IGH ’ x 1 PROPOSED PROPOSEDFIELD FIELD D H 320 E I LIGHTING LIGHTINGPOLE, POLE,TYP. TYP. F I D NEW A BASEBALL FIELD MO BABE BABERUTH RUTHBASEBALL BASEBALL 90’ 90’BASELINE BASELINE 1 SYNTHETIC TURF WITH FIELD STRIPING NEW ADA ACCESSIBLE PATH 6 BASEBALL BASEBALL FIELD FIELD NEW CONCRETE AROUND BABE BABERUTH RUTHBASEBALL BASEBALL 126661 SF COMFORT STATION 90’ 90’BASELINE BASELINE EXISTING STATION 30’ HTCOMFORT C.L. BACKSTOP 10’ HT C.L. FENCING DUGOUT DUGOUT

SECTION B

DUGOUT DUGOUT

DUGOUT DUGOUT

6’ HT C.L. FENCING W/ GATE

30’ HT C.L. BACKSTOP

PROPOSED FIELD LIGHTING NEW ADA ACCESSIBLE PATH POLE, TYP.

NEW ADA ACCESSIBLE PATH BASEBALL BASEBALL FIELD FIELD 10’ HT C.L. FENCING NEW 12’ WIDE CONCRETE ADA PATH (3.0% SLOPE)

DUGOUT

10’ 10’HT HTC.L. C.L.FENCING FENCING30’ 30’HT HTC.L. C.L.BACKSTOP BACKSTOP 6’6’HT HTC.L. C.L.FENCING FENCING W/ W/GATE GATE

NEW NEWADA ADAACCESSIBLE ACCESSIBLEPATH PATH DUGOUT

30’ 30’HT HTC.L. C.L.BACKSTOP BACKSTOP NEW NEWADA ADAACCESSIBLE ACCESSIBLEPATH PATH BASEBALL FIELD

10’ HT C.L. FENCING

DUGOUT

EXISTING TREES

EXISTING TREES TO BE REMOVED

PROPOSED TREES

LEGEND LEGEND LEGEND LEGEND

18

EXISTING EXISTINGTREES TREES

LEGEND LEGEND

RELOCATED VAN ADA PARKING STALLS 11’ X 19’

EXISTING EXISTINGTREES TREES

NW 90TH STREET

EXISTING EXISTINGTREES TREESTO TO BEBEREMOVED REMOVED

NEW CONCRETE PAVING

EX TREE TO BE REMOVED EXISTING EXISTINGTREES TREES

LEGEND

LEGEND RELOCATED RELOCATEDVAN VANADA ADA PARKING PARKINGSTALLS STALLS11’ 11’X X19’ 19’

EXISTING TREES

NW NW90TH 90THSTREET STREET

NEW ADA ACCESSIBLE PATH

10’ 10’HT HTC.L. C.L.FENCING FENCING

DUGOUT DUGOUT

LEGEND

6’ HT C.L. FENCING W/ GATE

DUGOUT DUGOUT

PROJECT LIMITS

NW 90TH STREET

10’ HT C.L. FENCING

30’ HT C.L. BACKSTOP

6’6’HT HTC.L. C.L.FENCING FENCING W/ W/GATE GATE

30’HT HTC.L. C.L.BACKSTOP BACKSTOP DUGOUT DUGOUT 10’ 10’HT HTC.L. C.L.FENCING FENCING30’ RELOCATED VAN ADA 6’6’HT HTC.L. C.L.FENCING FENCING NEW NEWADA ADAACCESSIBLE ACCESSIBLEPATH PATH UPPER FIELD EX TREE TO BE REMOVED 10’ 10’HT HTC.L. C.L.FENC FEN PARKING STALLS 11’ X 19’ W/ W/GATE GATE (NOT INCLUDED IN SCOPE OF WORK)

BABE RUTH BASEBALL 90’ BASELINE

LEGEND

10’ 10’HT HTC.L. C.L.FENCING FENCING

10’ WIDE ADA ACCESIBLE PATH (4.9% SLOPE) CHEEK WALL ALONG PATHS

BASEBALL BASEBALLFIELD FIELD

SYNTHETIC FIELD TURF

RELOCATED RELOCATEDVAN VANADA ADA PARKING PARKINGSTALLS STALLS11’ 11’X X19’ 19’

NEWEX CONCRETE EXTREE TREETO TOAROUND BEBEREMOVED REMOVED COMFORT EXISTINGSTATION TREES EXISTING COMFORT STATION

NW NW90TH 90THSTREET STREET

PROJECT PROJECTLIMITS LIMITS EXISTING TREES TO BE REMOVED NEW LANDSCAPE

RELOCATED RELOCATEDVAN VANADA ADA PARKING PARKINGSTALLS STALLS11’ 11’XX19’ 19’

EXEXTREE TREETO TOBEBEREMOVED REMOVED EXISTING TREES

NW NW 90TH 90TH STREET STREET

PROJECT PROJECTLIMITS LIMITS EXISTING TREES TO BE REMOVED

PROPOSED TREES

PROPOSED FIELD LIGHTING

EXISTING EXISTINGTREES TREESTO TO BE BEREMOVED REMOVED

PROPOSED PROPOSEDTREES TREES

NEWCONCRETE CONCRETEPAVING PAVING NEW

PROJECT LIMITS EXISTING EXISTINGTREES TREESTO TO BEBEREMOVED REMOVED

PROPOSED PROPOSEDTREES TREES

NEW NEWCONCRETE CONCRETEPAVING PAVING

SYNTHETICFIELD FIELDTURF TURF SYNTHETIC

PROPOSED PROPOSEDTREES TREES

NEW NEWCONCRETE CONCRETEPAVING PAVING

SYNTHETIC SYNTHETICFIELD FIELDTURF TURF

NEWLANDSCAPE LANDSCAPE NEW


11 12 11 1211 12 11 12

March , 12 2018 / Site, Exterior and Pavilion Concept , 12 2018 / Site, Exterior and Pavilion �arc�March � �� ���� � �ra�� ��ner� �c�ematic �es�gnConcept Pac�age

�rctic ��re

Planting Plan &Exterior Reference Images �arc� � ��, ���� � �ra�� ��ner� �c�ematic �es�gn Pac�age March 12 2018 / Site, and Pavilion Concept Planting Plan & Reference Images Planting Plan & Reference Images DESIGN �arc� � �� ���� � �ra�� ��ner� �c�ematic �es�gn Pac�age Planting Plan & Reference Images DESIGN DESIGN Planting Plan & Reference Images March , 12 2018 / Site, Exterior and Pavilion Concept DESIGN Planting Plan & Reference Images DESIGN �arc� � �� ���� � �ra�� ��ner� �c�ematic �es�gn Pac�age DESIGN Knight’s Gambit Vineyard NEPlanting Fairview Drive | Dundee, Images OR Plan & Reference Planting Plan & Reference Images DESIGN

Erath Winery Tasting Room and Production Facility Blue Oat Grass

English

Big Blue Lilyturf

�rctic ��re

Quaking Aspen

Vehicular Exit

Davidii Viburnum

Japanese Snowbell

00 1

SHRUBS

�ati�e �rass �ee� ��� English

QuakingiAspen dwinter

Vine Maple

Spring Bouquet

BIO-RETENTION

2

�rctic ��re

Midwinter Fire

00 10 1

13

e Mapl

Blue Oat Grass sh

e

English

g li

Lave

n

12

English Rosemary dish Asp Vine Maple Grass See ing Bouqu e pr w March , 12 2018 / Site, Exterior and Pavilion Concept e English Midwinter Fire

2

Kelseyi Dogwood

3

Midwinter Fire Dogwood

�ati�e �rass �ee� ���

English Lavender

et

S

4

���ti� ���e ��g����

d

en

Drop off

�rctic ��re

Midwinter Fire

12

Blue Oat Grass

7

Midwinter Fire

00 2

11

Golden Variegated

Blue Oat Grass

r de

re

SITE FURNISHING

�rctic ��re

Vin

FiRosemary

M

Gates & Perimeter Fencing

00 11

�rctic ��re

6

Quaking Aspen

�a��� � �� ���� � ��a�� ��ne�� ���emati� �es�gn Pa��age Shrubs DESIGN Planting Images

Feather Reed Grass

B

1

Quaking Aspen

March , 12 2018 / Site, Exterior and Pavilion Concept

Oat Gra s

S

Feather Reed Grass

Nativ

Davidii Viburnum

Spring Bouquet

lue

s

Japanese Snowbell

en

Davidii Viburnum

Japanese Snowbell

em Ros ary

king Asp ua

Blue Oat Grass

Feather Reed Grass English 00 15 Feather Reed Grass

Q

Davidii Viburnum

En

Vehicular Entry

00 14

Japanese Snowbell

Kelseyi

Mix

March , 12 2018 / Site, Exterior and Pavilion Concept �arc� � �� ���� � �ra�� ��ner� �c�ematic �es�gn Pac�age �arc� � �� ���� � �ra�� ��ner� �c�ematic �es�gn Pac�age

Planting Plan Plan & & Reference Reference Images Images Planting Planting Plan & Reference Images DESIGN 13 8 3 DESIGN Plan & Reference Images 00 3 Planting Plan & Reference Images MAIN PLAZAPlanting DESIGN Planting Plan & Reference Images DESIGN DESIGN Bouquetand Pavilion Concept March , 12 2018 / Spring Site, Exterior

Swedish Aspen

Big Blue Lilyturf Varieg

n de

Big Blue Lilyturf

Lookout Patio

�rctic ��re 00 17

00 18

Spring Bouquet

�ati�e �rass �ee� ���

Vine Maple

v Pa

ber Co l

Rosemary

16 g vin

T L AW N

BENCHES AND FIRE PITS PAVERS

illion Eve

17

15 1

door Fire ut

18

Blue Oat Grass Site Furnishings Blue Oat Grass DESIGN

March , 12 2018 / Site, Exterior and Pavilion Concept

March 7, 2018 / Erath Winery

Treatm e

19

2

Benches

ion Fenc ab

SITE FUNISHINGS

20

cre

te Seatw a ll

PA TH

Tim

DESIGN

e

EA

Blue Oat Grass

RT

Rosemary 00 21 Turf Lookout

Blue Oat Grass

V I N E YA R D DI

�rctic ��re

WĂǀŝůŝŽŶ /ŶƐƉŝƌĂƟŽŶ /ŵĂŐĞƐ

nt

GR

00 20

16

March , 12 2018 / Site, Exterior and Pavilion Concept

Golden Variegated

Golden Variegated

Rosemary

Vine Maple

EAST ELEVATION

March 7, 2018 / Erath Winery

t Pi

�ati�e �rass �ee�ELEVATION ��� EAST

00 19

Vine Maple

MATERIALS PALETTE

Golden Variegated

s

�ati�e �rass �ee� ���

Feather Reed Grass

March , 12 2018 / Site, Exterior and Pavilion Concept

Site Furnishings SitePavers Furnishings DESIGN DESIGN Benches March 7, 2018 / Erath Winery

SITE FUNISHINGS SITE FUNISHINGS

OVERLOOK Rosemary

�rctic ��re Davidii Viburnum �rctic ��re

s

Vine Maple

15

March , 12 2018 / Site, Exterior and Pavilion Concept

n um

�ati�e �rass �ee� ���

r Reed G

EAST ELEVATION

Japanese Snowbell Golden Variegated

Mas s

Spring Bouquet

Kelseyi

Pa

Spring Bouquet

EAST ELEVATION

e th

21

English English

English

WA Y

19 BENCHES AND FIRE PITS Spring Bouquet Spring Bouquet

English Spring Bouquet

Rosemary

Japanese Snowbell Japanese Snowbell Feather Reed Gras

Davidii Viburnum

Fea

10

Big Blue Lilyturf

THE PAVILLION

tic Fire

21

s

5

A rc

at

rnu

s ra

00 6

English

14

Kelseyi Japanese Snowbell Kelseyi

Go l

Kelseyi

Big Blue Lilyturf

ed

00 8

English

00 5

DESIGN 00 7

9

4

DESIGN

Spring Bouquet

O

English

ii vid Spring Bouquet Da

Bi

�arc� � �� ���� � �ra�� ��ner� �c�ematic �es�gn Pac�age

Planting Plan & Reference Images 00 16 Planting Plan & Reference Images DESIGN

DESIGN

Exterior Finishes

����ng �����e� �a��estin�s

Spring Bouquet Vine Maple Vibu

rf

00 4

Exterior Finishes

English

March , 12 2018 / Site, Exterior and Pavilion Concept Swedish Aspen

March , 12 2018 / Site, Exterior and Pavilion Concept

00 13

8

Davidii Viburnum

m

00 9 March , 12 2018 / Site, Exterior and Pavilion Concept

Blue Oat Grass

7

Service Access elseyi lue Lilytu�ati�e �rass �ee�K��� SwedishBAspen g

DESIGN

00 12

Blue Oat Grass

Swedish 6 Rosemary Aspen

Oregon Grape

Co n

5

G

Blue Oat Grass

Fairview Drive

�arc� � �� ���� � �ra�� ��ner� �c�ematic �es�gn Pac�age

Blue Oat Grass

Spring Bouquet

�rctic ��re

PLANTING PALETTE�rctic ��re

DESIGN

Scope and Duties: Kelseyi • Design Development and Visioning Kelseyi • Client Presentation Kelseyi • Master Plan Rendering

Kelseyi


Uptown Brampton

Illustration for internal discussions and visualization purposes only.

McLaughlin Ro

ad South

Brampton, Ontario

McMurchy

West

Scope and Duties: • Design Development and Visioning • Conceptual Illustrations • Internal Department Coordination • Urban Design Review / Recommendations

th

Steele s

Avenu e

Malta Avenue

Avenue S ou

rio Stree

ur

tB

lvd

var d

t

Co

Main Str

Co

un

ty

eet Sout

Placemaking and Vision

h

Wayfinding around Uptown Brampton Identifying vital connections within the areas

1

Professor’s Lake

Trail Segments, Loops, and Linkages

Recreational Trail

Bovaird Recreational Trail

EXISTING CONDITIONS Chinguacousy Recreational Trail

Etobicoke Creek

Recreational Trail

Esker Lake Recreational Trail

Flower City Community Campus Cassie Campbell Community Centre

Assessibility and Wayfinding Improvements

Cassie Campbell Community Centre

Professor’s Lake Trail 0.6 km Bovaird Trail

0.5 km

Chinguacousy Trail

0.8 km

East

As of today, both the Fletcher’s and Etobicoke natural corridors have multi-use trails that run alongside the creeks. While these trails are well-used and paved, they lack connections in certain areas, particularly behind Sheridan College on Fletchers Creek and at Steeles Avenue and Etobicoke Creek. Furthermore, Uptown today lacks east-west trail connections, particularly a trail that can connect the two environmental corridors. Cycling trail connections into the adjacent neighbourhoods can also be improved, as existing trails along both creeks act more so as thoroughfares rather than have strong relationships with neighbouring districts. PROPOSED LINKAGES

Steele s

Avenu e

The proposed trail network fills in missing linkages, particularly around Sheridan College. The future proposal also puts a strong emphasis on the east-west connections, with trail connections prioritized in Uptown Brampton redevelopments. Additionally, the hydro corridor and highway connecting segment to the Kennedy-Steeles corridor provides a large complete connection around all the communities in Uptown.

20

NOTE: This rendering is conceptual and requires further coordination with the City of Brampton and its partners to reflect the City’s vision for the Community Hub/Park blocks.

Additional Signage along the Etobicoke Creek trailhead leading to Steeles Park from Steeles Avenue would be appropriate for this location especially once development breaks ground.

Ba

rtle

yB

ull

Pk wy

Charolais Boule

Huronta


Uptown Development Interest

Illustration for internal discussions and visualization purposes only. Banting Park

00 1

Timberlane Park

McLaugh

Bridekirk Park

lin Road S

k Cr ee

Ravenswood Ravine Sheridan Lakeside

Ray Lawson Valley

F

Meadowlark Park

le

er h tc

’s

00 2

Steeles Avenue West

Peelton Hills Park

Sheridan College Davis Campus Master Plan Fletcher’s Green Community Park

outh

Bach Park

South Fletcher’s Creek Park

Curtis Park

Roehampton Park

Sparrow Park

Sheridan College Master Plan

00 2

245 Steeles Avenue West

00 3

225 Malta Avenue

00 4

210-220 Steeles Avenue West

00 5

Shoppers World RedevelopmentHavelock Park

00 6

7800-7900 Hurontario Street

00 7

2 County Court

00 8

1 Steeles Avenue & 1 Bartley Bull Pwky

00 9

2 Bartley Bull Pwky

00 10

227-229 Main Street South

Outdoor Educational Park

South

00 4

New Community Park

Hurontar

io Street

Caruso Park

00 7

00 10 Turtle Creek Park

C ou

nty Court Blvd.

Rio-Can Shoppers World

00 6

00 8

County Court Park

Urban Community Hub

Elgin Drive

00 5

Charolais Blvd.

Malta Avenue

00 8

00 9

Bob Reid Park

bi Eto

00 1

y Avenue

co ke C

Peel Village Golf Course

r e ek

Steeles Avenue East

Development Applications

McMurch

00 3

Ray Lawson Blvd.

Highway 407

Cherrytree Park

Kiwanis Memorial Park

Seasonal Cherry Blossoms

Main Stree

Charles F. Watson and Family Park

t South

Steeles Park

0

100m

300m

Community Facilities Property Line

21


The Etobicoke Creek Interface

Illustration for internal discussions and visualization purposes only.

00 D

00 A

00 D 00 F 00 B

00 A

00 C 00 B

00 E 00 C 00 G

Existing Conditions

00 A Overgrown brush

00 B

No safe access to the creek

00 C

Hidden creek

00 D

Concrete bridge interface

Improved Conditions

00 A Trail Assessiblity from development interface

00 B

Interpretive signage with audio voice over

00 C

Lighting bollards

00 D Bridge interface upgrades

00 E

Access to the water’s edge

00 F

Underpass Public Art

00 G Native planting

Multi-use path lighting

00 C Street Lighting

00 A 00 C

00 A

Existing Lighting Conditions

22

00 A

Lack of lighting along the trail and creek interface

00 B

Full Built Out Lighting Conditions

00 A

Frontage Lighting

00 B


Shoppers World Redevelopment

Illustration for internal discussions and visualization purposes only.

K

ON PT

R PA

AM

CONN ECTI O

N TO

EH RO TRAIL S

UE

N VE YA

E N T R Y WAY

EN

H UT

T R Y WA Y

SO

CH UR

E N T R Y WA Y

M Mc

CARUSO PARKBI-DIRECTIONAL CYCLE TRACK

COMMUNITY SERVICES

EN

ARD LEV BOU

NE

KA

Servin OFFICE AND INSTITUTIONAL USE reside reside BUS TRANSIT emplo HURONTARIO LRT walk.

AIS OL AR CH

K

R PA FF

T R Y WA Y

B

U YH

IT

UN

EIG

N TO

M

M CO

R ST DE

PE

E N T R Y WAY

S

OD

HO

R OU HB

N

IA

EXTENDED STUDY BOUNDARY

EL

HIGH STREET

ES AV E

E

BU S

RO U

STR

K

E RE

M

EC

OK IC

CO NN EC

TE

S AIL TR O T

E

AIN

TH

OU

S ET

G AT E WAY

N CO

NECTION

NU

E

AD EN OM PR

ST E

E N T R Y WA Y

LS TION TO TRAI

OB ET

PARKS AND OPEN SPACE

• Allto, INTERCONNECTED PUBLIC SPACES net ACTIVE FRONTAGES

COMMUNITY HUB PARCEL

• Exp COMMUNITY HUB faci ACTIVE DEVELOPMENT APPLICATIONS attr

ST. KEVIN PUBLIC SCHOOL OUR LADY OF FATIMA CHURCH

K AR P G

E

TIN XIS

TA

RIO

H

ON UR

T LR

CALVARY BAPTIST CHURCH

• “Ur cha Hur

WILLIAM G. DAVIS SR. PUBLIC SCHOOL NORTH PEEL VILLAGE GOLF COURSE

23


Illustration for internal discussions and visualization purposes only.

Phasing Strategy Existing Mall Phase One TH

OU

ES

U EN

TH

OU

ES

NU

VE YA

Phase Two

V YA

TH

OU

ES

NU

VE YA

H RC MU

H RC MU

Mc

Mc

H RC MU

CARUSO PARK

CARUSO PARK

Mc

R PA

K

R PA

ARD LEV BOU

FF

NE

KA

ARD LEV BOU

FF

NE

KA

AIS OL AR CH

AIS OL AR CH

K

CARUSO PARK

AIS OL AR CH

K

AR FP

GM

IN IST

EX

F NE

ES AV E

NU

IO

R TA

N RO

E

BU S

TR NS

OB ET

SR OU

T LR WILLIAM G. DAVIS SR. PUBLIC SCHOOL

CALVARY BAPTIST CHURCH

PEEL VILLAGE GOLF COURSE

Full Built Out

OU

TS

EK

RE

C KE

TH

OU

ES

NU

VE YA

TH

OU

ES

NU

VE YA

H RC

H RC

MU

MU

Mc

O IC

TE

N RO

HU

PEEL VILLAGE GOLF COURSE

Mc

OB ET

RO U

IO

R TA

WILLIAM G. DAVIS SR. PUBLIC SCHOOL

EK

RE

EC

OK IC

BU

E

TH

I

NU

T LR

CALVARY BAPTIST CHURCH

TH

OU

TS

TE

Phase Four MA

ES AV E

NU

STR

L

EE

EL

ES AV E

OB ET

SR OU

IN

MA

EL

AL

M

E

ST E

CR

EE

ST E

K

EE

E OK IC

TE

HU

G TIN XIS

STR

BU

E

ARD LEV BOU

KA

IN

MA

EL

TH

OU

TS

EE

ST E

L

AL

L

AL

GM

IN IST

EX

CARUSO PARK

CARUSO PARK

R PA

AIS OL AR CH

AIS OL AR CH

K

K

R PA

ARD LEV BOU

FF

NE

KA

ARD LEV BOU

FF

NE

KA

L

AL

GM

IN IST

EX

IN

MA

EL

IO

RO

AR NT

HU

24

ES AV E

NU

T LR

CALVARY BAPTIST CHURCH

E

BU S

G AT E WAY

RO U

TE

STR

TH

OU

TS

EE

ST E

O IC

ES AV E

NU

OB ET

IN

EL

E

BU S

MA

G AT E WAY

RO U

TE

STR

TH

OU

TS

EE

ST E

EK

RE

C KE

EK

RE

EC

OK IC

OB ET

WILLIAM G. DAVIS SR. PUBLIC SCHOOL PEEL VILLAGE GOLF COURSE

IO

R TA

N RO

HU

T LR

CALVARY BAPTIST CHURCH

WILLIAM G. DAVIS SR. PUBLIC SCHOOL PEEL VILLAGE GOLF COURSE

IO

R TA

N RO

HU

T LR

CALVARY BAPTIST CHURCH

WILLIAM G. DAVIS SR. PUBLIC SCHOOL PEEL VILLAGE GOLF COURSE


Full Built Out Demonstration Plan

Illustration for internal discussions and visualization purposes only.

School Amenities

Urban Community Hub

New Community Park

COMMUNITY HUB

Steeles Avenue West

OFFICE AND INSTITUTIONAL USE

BI-DIRECTIONAL CYCLE TRACK

C

h a r ola is

BUS TRANSIT

Bo u l evar d

HURONTARIO LRT

BI-DIRECTIONAL CYCLE TRACK RIO-CAN SHOPPERS WORLD BOUNDARY

Main Str eet Sout

h

NORTH

25


Neighbourhood Lighting Strategy 00 1

Vandal Proof Light Fixtures

00 2

Playfields Lighting for organized night recreation

00 3

Lighting along tree rows and POPs to define public realm

Illustration for internal discussions and visualization purposes only.

00 2

00 1

Playfields

Playfields

Community Hub Playfields Lighting

In-ground luminaire

Option 3

In-ground luminaire

Open Space Corridors

en Square and Ken Whillans Square Conceptual Design Report | May 24, 2019 | DTAH

Sculptural Luminare

00 3

Hig

C

tre hS

h a r ola

R.O.W. Lighting (10-12m)

t

e

is

Steeles Avenue West

Indirect Luminare

60

Bo u l evar d

Street Luminare

Pole mounted Luminare

Main Str eet Sout

h

26

NORTH


Community Hub Facility Fit

Community Hub Drop Off

Illustration for internal discussions and visualization purposes only.

New Community Park 00 1

00 2

00 3

00 7

Shared Street

00 4

Shared S treet

New Shared S

treet

00 5

00 1

Entry Plaza with Gateway Fountain Feature

00 2

Conifer Tree for Holiday Events Lighting

00 3

Bi-Directional Cycle Track

00 4

Overhang Canopy

00 5

Large Capacity Event Area (2000sq.m)

00 6

Large Passive Lawn

00 7

Fitness Stations

00 8

Splash Pad

00 9

Reflecting Fountain & Winter Skating Rink

00 10

Urban Plaza

00 11

School Drop Off Area

00 4

00 6

School Board Amenities 00 1 00 2

00 3

00 1

Kindergarten Play

00 2

Daycare Play

00 3

Hard & Soft Surface Play (3000m2)

00 4

School Playfields (5000m2 )

00 9

Kaneff Park Enhancements

00 10 00 8 7 00

00 1

00 2 00 12 00 3

00 4

00 5

00 1

Ride-Share Drop off and Entrance

00 2

Multi-use Sports Court

00 3

Playground

00 4

Pedestrian Walkway

00 5

Cherry Blossom Promenade

00 6

Optional Leash Free Area

00 7

Fitness Stations

00 6

00 7

00 11

Drop Off

BI-DIRECTIONAL CYCLE TRACK

NORTH

27


Queen Street East Precinct Plan

Illustration for internal discussions and visualization purposes only.

Centre Street - Highway 410, Brampton, ON

Scope and Duties: • Design Development and Visioning • Conceptual Illustrations • Internal Department Coordination

OFFICE/LIVEWORK OR RFE HTEH UT

RRU

RD

FO

RD

HI

RO AD

N

N

YR ED

NN

RO AD

10

SE

KE D OA

DISTRICT ENERGY

COMMUNITY HUB

H

AN

Y4 WA

GH

SCHOOL

N

N

ST A E ET

RE T S EN

D K BLV

CLAR

FO

ER D OA

R RD S

AD RO S

AD RO DY

E NN S

UE

BLUE-GREEN INFRASTRUCTURE

ACTIVE RECREATION

RE ST

T

ET

EE

R ST

AN

RE

M

NT

LYNCH STREET

AVE

KE

TR

CE S

IC OB ET E OK

EE K

EN NS

N N TER EAS

28

HA

T

EE

R ST

REGIONAL TRANSIT

CR

AVE

TH

RE

NT

CE

ERN EAST

N

ENSIO

D EXT

K BLV

CLAR

RU

QUE

+

HOSPITAL

PARKS AND OPEN SPACE


Land Use and Built Form

Illustration for internal discussions and visualization purposes only.

Total Population

Civic & Institutional Space

Features:

23,400

66,000m2

Urban Community Hub

Retail & Restaurant

Public Parks

Public and Catholic Schools

85,000m2

14,7000m2

Indoor Farmers' Market

Office & Live-work 170,000m2

Design elements centre on the need for residential development to have access to a variety of amenities that support healthy living for all members of a family nuclei. This complete community responds to the intergenerational makeup of Brampton households by providing larger sized units, integrated access to day-care facilities, local parks, and a vibrant mix of dynamic retail. The design of this district also provides for a variety of opportunities for cultural activities. This includes two linear plazas that can be activated for street festivals, a library and community centre, and the potential for a year round indoor farm that would support a year-round farmers’ market.

Retail

Live Work

Office

Residential

Community Facilities

29


Public Realm Demonstration Plan Zone 1

Illustrations for internal discussions and visualization purposes only.

Zone 3 00 1

00 2

00 3 00 5

00 6

Zone 4

00 7 00 8

N e i g h b o u r h o o d Tr a i l

00 4

N e i g h b o u r h o o d Tr a i l 00 1 00 3

Zone 2

00 2 00 1

00 4

00 6 00 8

00 1 00 7 00 9

00 5

QUEE N STRE ET EAST

Bus Rapid Transit

ff Zone

South

00 3

Secure School Grounds

00 3

Eastern Av

enue

Creeksid

e Prome na

hared

00 1

Street

outh

C he rr y Bl os so m Ro w

00 4

New S

Zone 5

Rutherford Street S

00 2

Bus Rapid Transit

Community Hub

School Drop O

00 4

Hansen Road

Ke n n e d y R o ad South

00 2

00 10

00 2 00 4

00 5

00 3

de 00 6

BI-DIRECTIONAL CYCLE TRACK

Zone 1

Zone 2

New Adventure Playground and Community Park

Zone 3

Clark Bo ulevard Extensio Zone 4 n

North-South Linear Corridor 1

North-South Linear Corridor 2

00 1 Fitness Stations

00 5

Swing Set

00 1 Trees in above grade planters

00 1 Sculpture

00 1 District Energy

00 6 Cantilevered Boardwalk

00 2 Tower Slide

00 6

Multi-Use Courts

00 2 Overhead Sculptural Canopy

00 2 Central Plaza with Seatwall

00 2 Concrete Steps

00 7 Exposed SWM Swale

00 3 Play Structure

00 7

Neighbourhood Trail

00 3 Stormwater Retention Fountain

00 3 Ornamental Tree Planting

00 3 Playground

00 8 Spillout Promenade

00 4 Park Entrance

00 8

00 4 Creekside Promenade

00 4 Fountain and Courtyard

30

Tree Fencerow

New Community Park

00 8

Zone 5

00 7

00 9

Playfields and Urban C Park

lark Boule 00 6

varPromenade d Creekside

00 2 Skating Rink

00 7

Bridge

00 3 Multi-Use Courts

00 8

Cantilevered Boardwalk

00 4 Dry Meadow / Berm 00 9 Outdoor Farmers’ Market

00 4 Soccer Field

00 9

Creek Channel

00 5 Sculptural Planting

00 5 Trail and Retail Spillout

00 10

Naturalized Greenway

00 10 Bus Rapid Transit

00 1 Urban Plaza

00 10


POPs

The Commons

Privately Owned Publicly-Assessible Spaces

Linear Public Open Spaces

KEY MAP

KEY MAP

Integration

Built Form

Circulation

Sidewalk Bike Lane

Hardscape Spillout Softscape

Permeability

Stormwater flow Rain absorption

Pedestrian High Street

Meandering Spine

Building porosity

Circulation

31 Private Open Space

Pedestrian High Street

Mid-Rise Built Form


Downtown Brampton

Illustration for internal discussions and visualization purposes only.

Brampton, ON

Scope and Duties: • Preparation for CFI and CN/Metrolinx Discussions • Design Development and Context Analysis • Conceptual Illustrations • Internal Department Coordination

PARKS AND OPEN SPACE

ETO BIC OKE

ACTIVE RECREATION

SCHOOL

Our Lady of Fatima School

Tr ai l

CRE E

K OFFICE/LIVEWORK

Lacrosse Park

BUS TERMINAL

ille Int er ur ba n

Queen Street East Precinct

Duggan Park

Downtown Brampton

Or an ge v

Central Public School

LANDMARK ARCHITECTURE

REGIONAL TRANSIT

Rosalea Park Brampton Caledon Community Living

Chris Gibson Recreation Centre

Peel Art Gallery, Museum + Archives

Gage Park

st

e tW

BLUE-GREEN INFRASTRUCTURE

e tre S n

PLAYFIELDS

e ue

Q

Memorial Park Brampton Curling Club

Active Development Applications

HOSPITAL

Cardinal Leger Secondary School

K

Alderlea

32

+

Rose Theatre Garden Square

City Hall

CR E E

tre nS

Peel Memorial Centre

t

s Ea

ee

Qu Centre for Innvovation

E R’ S

et

YMCA

Pedestrian Bridge

FLETC H

Central Peel Secondary School

Community Facilities

Designated Heritage

M

ain

St re

et

So

ut

h

McHugh Public School Brampton Memorial Arena

LRT Extension

NORTH Future BRT


Downtown Destinations

Activities and Events

Celebration Grounds Capacity SIZE m²

EVENT STAGING

Ra

ilr

oa

dS

t.

Ra

ilr

Train Station

oa

dS

t.

Train Station

Train Station

Rosalea Park

Future Centre for Innovtion

Rosalea Park

Ln

.

YMCA

YMCA Parking Lot

Diplock Lane

Queen Street W.

Garden Square

Byng Ave.

First Baptist Church

Alderlea

Wellington St. W.

Ln

.

YMCA

Garden Square

St. Paul’s United Church

John St.

First Baptist Church

Ken Whillians Square

Wellington St. W.

Gage Park

16,470

12,353

2

2K

3K

N/A

N/A

N/A

Ken Williams Square

4,000

3,000

2

500

750

1,500

2,000

7K

Diplock Lane

9,045

6,784

3

1,131

1,696

3,392

4,523

16K

Garden Square

5,670

4,253

2

709

1,063

2,126

2,835

10K

Rosalea Park

20,900

15,675

4

2,613

3,919

7,838

10K

N/A

YMCA

14,300

10,725

3

1,788

2,681

5,363

7K

N/A

Event Space Size

Event Type

2,000 m² (50 x50 m)

1. Local Gatherings/ Private Events

6,000 m² (75 x50 m)

2. Community Events

12,000 m² (110 x110 m)

3. Regional Events

25,000 m² (160 x160 m)

4. National Events and Festivals

Peel Art Gallery, Museum + Archives

Gage Park Peel Art Gallery, Museum + Archives

Peel Ave. Alderlea

Peel Ave.

Gage Park

Low

Armstrong St.

Peel Art Gallery

LOW MEDIUM HIGH 6 m²/p 4 m²/p 2 m²/p 1.5 m²/p 0.4 m²/p

Wellington St. W.

Gage Park

Ken Whillians Square

City Hall

Main St. S.

Main St. S.

George St. S.

St. Paul’s United Church

St. Paul’s United Church

John St.

First Baptist Church

Ken Whillians Square

tre

Rose Theatre

Christ Church

George St. S.

Main St. S.

George St. S.

City Hall

City Hall

ea

Queen Street W.

Queen Street W. Byng Ave.

Th

Diplock Lane

Garden Square

Chapel St.

Christ Church Diplock Lane Christ Church

tre

Rose Theatre

Main St. N.

YMCA Theatre

St N.

Ln . Rose

MAX EVENT

Rosalea Park

George

tre

St N.

St N.

Main St. N.

George

ea

Main St. N.

Th

ea

George

Future Centre for Innovation

Th

Chapel St.

Future Centre for Innovtion

75% NET m²

High

Medium

Armstrong St.

Alderlea Etobicoke Creek

Event Capacity

Mary St.

Elizabeth St.

Mill St.

Mary St.

Elizabeth St.

Mill St.

500M

Priority Street Enhancements

500M

Destinations

Celebration Grounds Staging at Full Capacity GAGE PARK: 2K

KEN WHILLIANS SQUARE: 7K

GARDEN SQUARE: 10K

Main Street

Main Street

George Street S

Wellington Street

Wellington Street

Gage Park Festival Concerts Picnic Ice Skating

Ken Whillians Square Festival Fountain Display Ceremonies

George and Main St. Street Festivals Parades Parklets

Queen St. W. Street Festivals Parades Parklets

DIPLOCK LANE: 16K

ROSALEA PARK: 10K

YMCA: 7K

Garden Square Festival Large TV Display Fountain

YMCA Parking Lot

Rosalea Park

Diplock Lane

Festival Concert Farmers’ Market

Concerts Festival Picnic Walks

Mural Display Farmers’ Market Food Vendors Outdoor Movie Screening

Main Street N

George Street

N

Nelson Street W.

Queen Street W.

Service Road

Event Space

Vehicular Circulation

m²/p

Pedestrian Circulation

Entry Way

Site Boundary

33


Nicolas Island

The Parkdale Gateway

Merill Island

Livability at the heart of the Ottawa River

A-A”

National Capital Commission Riverfront Competition + BLA 19’ Capstone, SEDRD, University of Guelph

Confederation Line West (LRT) Extension Sir. John. A. MacDonald Freeway Intersection Realignment

C

A”

00 2

The Lookout

’ION A SECT

neighbourhood integration 00 1

urban design 00 3 00 4 00 5 00 6

Bell Island

D

The Bog Cascade The Woonerf Canada Place Market Plaza Anishinabe First Nations Discovery Centre

00 4

00 3

ecological engineering 00 7

C”

00 6

C’

l

00 1

B

00 10

.J S ir

00 9

nd a dl

TRANS

-CANA

DA TRA IL

est r Fo View Point

Em

ue

n Ave

Perspective

ue

ven rd A

wa

nro

lde

Go

ay

vew

ri dD

me

n rso

For

A

.

r Pa

nue Ave

34

.A

o cD Ma

ld na

00 2

le kda Par

Th eW oo

00 11

Lazy Bay Archipelago

00 8

w do a e M e ay Th kw n oh

rai aT

Tra

l

rai aT

d

na

Ca ns-

ad

00 11

00 5

an

00 10

00 7

s-C

00 9

naturalized trail system riparian park wet meadow linear park existing marsh woodland forest

n Tra

00 8

A-A”

North


Design Development The Ottawa River Watershed

Vision and Parti

Policy Frameworks

W W AA TT EE RR

Gatineau Declaration

1. RIVERFRONT PARK SYSTEM

The Parkdale Node aims to serve as a gateway for the greater Riverfront Park system.

Guiding Principles

HERITAGE

Environment

The Ottawa River South Shore Riverfront Park Plan is a comprehensive guiding document for development of the riverfront lands abutting Sir John A. MacDonald Parkway.

Ottawa

This plan contains proposed design implementation for the “Parkdale Node,” listed as Sector D, in accordance to the vision and guiding principles similar to what is proposed in this document.

Watershed Conservation Authorities Abitibi-Témiscamingue Gatineau Du Lièvre

The Ottawa River South Shore Riverfront Park Plan also contains design strategies for ecological enhancements and protection, land use, circulation and vegetation which has heavily influenced the programming for the Parkdale Gateway.

Rouge Du Nord Rideau Valley Conservation Authority Mississpippi Valley Conservation

Municipal Signatories

The Tunney’s Pasture Master Plan contains guiding principles that are amiable to the proposed guiding principles of the Parkdale Node. As the Tunney’s Pasture houses the intersection loop, strategies for connecting existing roadways to the reoriented vehicular lane were taken into consideration for this project.

Enhance and protect surrounding ecological features.

The Ottawa River has been of significant cultural relevance to Canada’s Capital. As early as 8,000 years ago, the Algonquin Anishinaabe people settled along the water’s edge of the river. Fast forward to the early years leading up to Canadian confederation, European explorers and settlers seeking furs, timber and land settled amongst the land.

Celebrate the cultural heritage of Canada’s past, present and future.

Precedent

South Nation Conservation Authority

2. TUNNEY PASTURE MASTER PLAN

Water plays an essential role for the everyday functioning of our cities. It is a vital resource that runs beneath our urban landscape. It also has a great influence on the design of the Parkdale Gateway and it has become this project’s driving theme and parti. The regional watershed is studied and Blue-Green infrastructure techniques are implemented as a proposal for how the site can work with water.

Waterfront Reconnect the nation’s capital to its water’s edge.

Heritage Connections

Improve public access and mobility

Site Analysis

Bishan-Ang Mo Kio Park, Bishan, Singapore. Designer: Ramboll Studio Dreiseitl Pte. Redevelopment Completed: March 17, 2012

*Ratified on May 29, 2015 at the Ottawa River Summit

TIMISKAMING, QB VILLE-MARIE, QB KIPAWA, QB

PAPINEAU-CAMERON, ON

North

DUHAMEL, QB

GRENVILLE, QB

GATINEAU, QB

Sewer and Stormwater

2/19/2019 Site Visit

Existing Conditions Land Use and Zoning LAROCHE PARK TUNNEY’S PASTURE

THE PARKDALE NODE

RIVERFRONT PARK SYSTEM

AFTER

The Living Shoreline System Overview The living shoreline is a blue-green infrastructure technique that uses a combination of elements to stabilize the shoreline. These elements includes: the planting of native vegetation along the edge to stabilize the soil, rip raps to defend the coastline against harsh river currents and storms, a riparian buffer to proliferate native naturalization along the water’s edge and naturalized retention basins for on-site water filtration and gradual detention. The living shoreline is a natural alternative to traditional ‘hard’ shoreline stabilization methods. In the case for the Parkdale Gateway, ultimately this shoreline aims to provide numerous environmental benefits that includes pollution filtration, fish habitat regeneration and the buffering of shoreline from waves and storms.

4. SUPPLEMENTARY DOCUMENTS • The City of Ottawa OP, Laroche Park • The NCC Plan for the Capital 2017-2067

BEFORE

The Parkdale Gateway Riverfront Park

THE CITY OF OTTAWA

THE PARKDALE NODE

Mobility Network 2KM WALKING DISTANCE PARKDALE NODE SITE PUBLIC TRANSIT

ADA

CAN

NS-

TRA

AY RKW

CAN

ADA

TRA

IL

E

Ottawa Riverfront South Shore Park System Tunney Pastures, National Capital Commission Laroche Park, City of Ottawa

NS-

A LD P

ONA

ACD

A. M

TRA

U AVEN DALE PARK

OHN

SIR J

IL

TRA

NORTH

NTS

Soil Reinforcement

Riprap/Stepping Stones

Riparian Buffer

Naturalized Storm Retention

35


The Naturalized Shoreline “Back to the water’s edge” D D

NATURAL STEPPING STONES

Native Species and Planting Palette

Habitat Revitalization The creation of soft natural materials will be utilized for the lake edge to encourage aquatic ecosystem growth. The goal is to create a healthy vegetation buffer at the edge of the water. Planting will include reeds, rushes, floating aquatic plants and algae which will be submerged below the normal high water mark. Shallow reefs, shaded shoreline areas, deep pools and sheltered inlets will promote diversity and support fish habitats for species such as the Pumpkinseed Sunfish, Black Crappie and Brown Trout.

Pumpkinseed Sunfish Black Crappie

AMERICAN ELM

AMERICAN BEECH

ALT. LEAF DOGWOOD

BASSWOOD

BUR OAK

PIN CHERRY

Brown Trout

Environment

Shoreline Features and Targets

Waterfront

Heritage

Connections

RIPARIAN CORRIDOR

15M BU FFER

filtratio n RIPRAP

AQUATIC HABITAT

STEPPING STONES

RIPRAP

NATIVE PLANTING

TRANS-CANADA TRAIL

VIEW VISTAS

Vistas and Boardwalks The curvilinear boardwalks help to define the view points that are strategically placed amongst the most desirable views along the Ottawa River. These boardwalks are connected by the existing Trans-Canada trail-head. As the pedestrian walks along the boardwalk, they will experience walking over the water’s edge and in turn have the opportunity to be immersed around the surrounding landscape from a unique vantage point.

Circulation

36

Connectivity along the waterfront is integral to the design of the Parkdale Gateway. The main pedestrian trail is along the existing Trans-Canada trail head and will serve as the main pedestrian arterial road that connects and unifies the different nodes along the park system.

Stepping Stones The stepping stone platforms will act as an entry way for people to access the water’s edge. This feature in the landscape is designed for people to have the opportunity to interact with the water and experience the natural heritage of the Ottawa River.

Riprap The riprap will serve as a protective layer to break water and mitigate erosion along the water’s edge. The development of the riprap will help reduce the cost of shoreline maintenance as the breaking of the waves will disperse debris collected from the river’s currents.

Native Ground Cover The introduction of concentrated native planting will help repeal invasive such as the Common Buckthorn and rejuvenate the shoreline ecology. The goal is to revitalize the landscape to the natural heritage of times dating back to the Algonquin Anishinabe peoples settlement.


The Lookout CANTILEVERED LOOKOUT

FARMERS’ MARKET

NATURALIZED RETENTION

EMBASSY OF INDONESIA

SHARED STREET THE RETENTION PLAZA SEEMLESS ARCHITECTURE

LRT STATION

NATURALIZED EDGE

SECTION A’-A” CIRCULATION

RIP RAP

STEPPING STONES

TRANS-CANADA TRAIL

THE RETENTION PLAZA

00 11

Stormwater Fountain and Plaza

5 6 7 8 9 10 11

00 6 00 7

Winter Programming along the Trans-Canada Trail.

Entrance to the Restored Woodland Forest.

Materials Palette

Interpretive Signage

PRECAST CONCRETE

00 5

00 3

UNILOCK PAVERS

CONCRETE BRICK

ROLLED CONCRETE CURB

TURF

Site Amenities 00 4

00 2

SENTINEL BOLLARD

MAGLIN BIKE RACKS THE PARKDALE GATEWAY

00 1

GRETCHEN RECEPTACLE

GRETCHEN BENCH

KAYAK LAUNCH

THE PARKDALE GATEWAY

View from the stepping stones, looking out towards Merill Island

THE PARKDALE GATEWAY THE PARKDALE GATEWAY

THE PARKDALE GATEWAY

THE PARKDALE GATEWAY

THE PARKDALE GATEWAY THE PARKDALE GATEWAY

THE PARKDALE GATEWAY

*Original working specs & environmental graphics by Michael Herbert. Details modified for the Parkdale Gateway project. 00 10 1m

5m

10m

20m

L-101 00 8

0m

10m

00 9

THE PARKDALE GATEWAY

4

5m

C

THE PARKDALE GATEWAY

3

0 1m

B

THE PARKDALE GATEWAY

Market stalls Plaza Main Entrance Fountain Supply Line Filtration Bog Supply Line Permeable Pavers Bog Threshold Bridge Fountain Bridge Turf Lawn Turbulence Fountain Pool Precast Concrete Wall Maple leaf Mosaic

2

CONFEDERATION LINE WEST LRT EXTENTION + TRANSIT HUB

A

“The Bog Cascade” 1

DISCOVERY CENTRE

THE PARKDALE GATEWAY

THE OTTAWA RIVER

North

SHELTER

WAYFINDING

37


Green & Open Spaces

Green & Open Spaces Green & Open Spaces Green & Open Spaces

Proposed site diagrams

Land Use Land Use Mobility Networks

Block Plan Building Plan

Mobility Networks

Green & Open Spaces

Existing site diagrams

Mobility Networks

Neighbourhood Framework Mobility Networks

The Queen’s Gateway

Neighbourhood and Landmarks

Mobility Networks Mobility Networks

Block Plan

Block Plan Block Plan

Block Plan Block Plan BUILDING PLAN

at east bayfront

MOBILITY

MIXED-USE, PRIMARY COMMERCIAL

GreenMULTI & Open Spaces FAMILY RESIDENTIAL Green & Open Spaces

Mobility Networks Mobility Networks

HEAVY VEHICULAR

Mobility Networks

Building Heights

VICTORIA SOYA MILLS

Building Heights

Land Use

COMMERCIAL OFFICE

Mobility Networks

LIGHT VEHICULAR

Building Heights Building Heights 11 m and higher

HERITAGE MIXED USE, PRIMARY RESIDENTIAL

LIGHT RAIL TRANSIT

11 m and higher 11 m and higher 11 m and higher

MIXED USE, COMMUNITY RESIDENTIAL

Mobility Networks Mobility Networks

BICYCLE LANES

OFFICE

MARTIN GOODMAN TRAIL EXTENSION

TRANSIT HUB COMMERCIAL RETAIL

Block Plan Mobility Networks Block Plan Mobility Networks

NEIGHBOURHOOD BLOCK

Green & Open Spaces

A’

NEW BLDG

PUBLIC REALM

BIKE LANE

BIKE LANE

COMMERCIAL / RETAIL

QUEEN’S QUAY

LOOKOUT BERMS

A”

WATERFRONT BOARDWALK

SIGNIFICANT GREEN SPACE

Building Heights

MIXED-USE COMMERCIAL

Building Heights

MULTI FAMILY RESIDENTIAL COMMERCIAL OFFICE

OPEN SPACE / PAVERS

Mobility Networks

PUBLIC REALM

11 m and higher

Placemaking along the water’s edge

11 m and higher Block Plan

A Melting Pot of Districts

Vision

Located along the water’s edge, The Queen’s Gateway aims to be a melting pot for recreation, commerce and residential living within the 5 kilometre radius along Queen’s Quay. This vision is achieved by creating distinct mini-districts, inspired by the site’s impressive surroundings: The Entertainment District, Sugar Beach, The Distillery District and Co-op Housing.

A

Mobility Networks Mobility Networks Building HeightsCommunities by the water’s edge Complete Building Heights

M I X ED-U SE

HEA LT H & WELLBEI NG

Concept Development

Site Analysis

Mobility Networks

Building Heights

Precedents MARINE GATEWAY, VANCOUVER BC.

GAS WORKS PARK, SEATTLE WA.

7F

COMMERCIAL SPILL OUT ZONES

SIGNIFICANT PUBLIC GREEN SPACE

OLYMPIC VILLAGE, VANCOUVER BC. COMMUNITY ORIENTATED BUILDING FORM

r ine

rd Ga

GASTOWN, VANCOUVER BC. HERITAGE CHARACTERISTICS

re Exp A’

p

7F

tial

tial

l

entia

esid

r 7F /

5F /

38

7F /

ce

5F/

uay

l

om

c 2F/

9 7

l

ntia

side

re 5F/

re

r cial mer

10

ial

dent

resi

Amalgamating the Surroundings

al

nti side l

etai

ntia

side

re 5F/

8

4F/

al

nti side

re

tial

iden

es F/ r

5

al

enti

esid

r 5F/

Create distinct districts within the site while maintaining a unifying theme. This can be done by expanding the co-op housing neighbourhood and distillery district in the North-East & North-West.

1

Entrance Plaza

2 LRT + Transit Hub

Key Design Considerations

3 Raised Overlook Platform

The creation of mini-districts and maintaining off-site view corridor to the waterfront.

4 Outdoor Rink and Splash Pad

l

5 Multi-Use Courts

resi

l entia

id / res

l

entia

esid

r 5F /

4F

x-u / mi

com se /

ity mun

re

cent

5

L

e k a

O

a nt

rio

8

MIXED USE

Victory Soya Mills Silo

9 Public Parking at Grade 10 Distilley District Extension

View Points

Design Metrics Building Use / Sq.ft.

7 Lookout Berms

A”

6

e d-us

mixe

11 m and higher

6 Lookout Bridge

ial dent

5F 5F /

id / res

ntia side

re 5F /

tial

iden

res 7F /

l entia

4

iden

res 5F /

e

sQ en’

l offi

ercia

m / com

3

2

ial

dent

esi F/r

den resi

c

1

7F 5

9F /

9F

al erci omm

Qu

F p 7

co-o

y

ntial

co-o

7F

a ssw

de

resi

9F /

7F /

D ESTIN ATIO N

CO N N ECTIVITY

11 m and higher 11 m and higher

North

BLDG 1 / 8052 BLDG2/ 3441 BLDG 3 / 2888 BLDG 4 / 5134 BLDG 5 / 2867 BLDG 6/ 9579 BLDG 7/ 3977 BLDG 8 / 5730 TOTAL:

44% 31% 41,668 sq.ft

57,457 sq.ft

PUBLIC REALM PLAZA / 17,755 VSM PARK / 30,786 SPORTS / 8916 TOTAL

57,457 sq.ft

RESIDENTIAL

25%

41,668 sq.ft. 33,309 sq.ft

BLDG 1 / BLDG 2 / BLDG 3 / BLDG 4 /

15383 442 7795 9689

TOTAL

33,309 sq.ft


DX Boundless Competition

BLA Honours Thesis

LARC 4710 - Capstone Design Studio / University of Guelph

Salmon Aquaculture Environmental Policy Analysis / University of Guelph

a b stract

title page

THE WOONERF

Salmon is a staple source of food in many people’s diet. As

at MacDonell St.

a living street for mental wellness

global demands for salmon continue to rise, utilizing the most efficient practices for farming salmon is imperative. Net-Penned Salmon Aquaculture is currently the conven-

enconce tran ts pt s um m ar y

THE SALMON AQUACULTURE LANDSCAPE

tional use for salmon production as it is cheap and effective. Unfortunately this method of production is causing significant environmental impacts to the coastal ocean ecosystem. This thesis will explore the environmental repercussions of the widely practiced Net-Penned Aquaculture, followed by a

Ken Yee Chew, Lowes Wu, Martin Hong The Woonerf is a street design based on the Dutch concept of 50“a Stone Road East, living street.” The aim of the woonerf is to create an equitable Guelph, N1G 2W1 rather than the car. This is space that ON, prioritizes the pedestrian achieved eliminating the division between cars, cyclists and PO Box:by340408 people with four main principles: Create well defined entrances, University of Guelph create a shared, well-marked space, create physical barriers to Bachelor of Landscape Architecture slow traffic and enhance driver focus and landscape and furnish

Designing an alternative solution to Ocean Net Salmon Farms

brief environmental assessment and feasibility examination of the Land-Based Closed-Containment Facilities as an alternative method for salmon farming. By exploring alternative salmon farming methods, we will be able to discuss tangible

the street.

con cep t s tatemen t

ways to better stewarding the aquatic ecosystem in which the salmon lives.

The Woonerf not only is a practical solution that provides refuge

pre face This thesis is inspired by my trip with my dad to Klemtu, BC

1

condensed layout overview

back in April, 2016. During this trip we met with Chief Doug

PART I

Neasloss and Deputy Chief Darren Edgar to learn about the Kitasoo band’s economic development and resource stew-

WHAT IS NET-PENNED SALMON AQUACULTURE?

THE POLICY PROBLEM

ardship initiatives. One of the band’s main sources of income was through the Kitasoo Seafoods LP, a fish hatchery that

The Woonerf is ait also streetscape design based on the Dutch concept of “a living to Guelph citizens, but satisfies the vision of the Downtown Guelph Secondary Plan: to improve upon theis historic Mcstreet”. The aim of The Woonerf to create an equitable space that prioritizes Donell Main Street. By bicycle prioritizing the pedestrian, thiswhile opens upalso accomodating easy flow of vehicular pedestrian and circulation a range of flexible programming: from street festivals, farmers’ traffic. markets and daytime social gathering. ADOA standards have

Net-Penned Salmon Aquaculture, an approach to fish farming that has become the global standard in the fish industry, is concerning for a number of interrelated reasons: the pens’ location, its’ effects on the local ecosystem and the associated waste and diseases that come with the aquaculture practice. With net-penned aquaculture, farmed salmon are grown, particularly along the location of coastal areas within the migratory path of wild salmon and

“Cooke’s disregard caused this disaster and recklessly put our state’s aquatic ecosystem at risk.” (Smith, 2017)

traditional marine life.

also been taken into consideration, with the strategic place-

Washington State Public Lands Commissioner Hilary Franz

Net-Penned Salmon Aquaculture

THE POLICY PROBLEM

“Because salmon farm cages are simply suspended in the water and no barrier exists between the farm and the surrounding environment, they are often referred to as open net-cages.” - Watershed Watch Salmon Society, 2013 16

17

Image Source: / WA STATE DEPT OF NATURAL RESOURCES

Image / 8 / Fish farms suspended in open ocean nets.

25

operates six net-penned fish farm sites. Fast forward to 2018,

THE P OT E NT I A L SOLUTION

PART I I

I thought it would be worth further exploring conventional salmon farming practices and their environmental footprint.

NAMGIS FIRST NATIONS LAND-BASED SALMON FARM

AN ALTERNATIVE Land-Based Closed-Containment Facilities

Namgis First Nations

To address the issues raised in Part I, Land Based Closed Containment facilities are the most viable alternative to replace the net-penned containment systems.

Kuttera is a land-based salmon farm based out in

The closed containment facilities addresses a myriad of issues raised by the net-

the Namgis First Nation near Port McNeill, BC. The

by the government and charity investments, to

from the ocean. In addition, the benefits of the land-based system includes: Better

test the viability of land-based salmon farming on

bio-security, no interaction with wild species, greater control over optimal growing

a commercial scale.

conditions, and most importantly allows the production and supply of salmon to be regulated based off of consumer demands for salmon. (Morton, 2015)

Designing Land Based Containment Facilities

23

salmon farm was initiated as a project subsidized

penned farms. Being located on land, the farmed salmon are effectively separated

Kuttera has had its’ share of success, achieving

Images / top to bottom 23 / Context map of the Namgis First Nations

a partnership with Albion Fisheries, a seafood

24 / Safeway flyer from smartcanucks.ca

wholesaler based in Richmond, BC. So far, Kuterra

25 / Albion Farms & Fisheries & Kuterra logos

has had their salmon featured in Safeway stores in BC, Alberta and Manitoba.

Upon further research, I quickly discovered the risks and im-

18

19

20

24

Images / from left to right, the Namgis First Nations

THE ALTERNATIVE SOLUTION GOVERNMENT LEADERSHIP

18 / Kuterra Fish Farm Facility

25

19 / Atlantic Salmon being processed at Kuterra.

20 / Aerial of Kuterra’s land-based fish farm facility

pacts that net-penned salmon farming poises to the aquatic

28

29

recommendations from the Report of the Standing Committee on Fisheries and Oceans on Closed Containment Salmon Aquaculture, the federal government

Based off of the analysis, the recommended action would be to continue

commitment to further investments for closed containment systems apart from

investments for technology towards land-based farming investments. Despite

funding various aquaculture projects with partners from First Nations, coastal,

federal government take the mantel of leadership on this issue, by perhaps using

The Government of Canada however has continued it’s position of making a

the different market instruments at their disposal to influence change in the global

REC OM M EN DATI ON S

commitment to “work with industry to review and identify funding options along

Salmon farming industry.

the research-development-commercialization pathway.” (Fisheries and Oceans Canada, Communications Branch., 2013)

“Canada is currently the fourth largest producer of Salmon worldwide, behind Norway, Chile and Scotland. Canada is therefore well positioned to help supply the growing global demand for fish and seafood and to do so in a sustainable manner.” (Manning, & Hubley, p.13, 2015)

arding the environment and promoting sustainability is at the

2

By setting stringent rules and regulations on offshore licenses, Canada has the capability to influence the global salmon market and supply chain.

forefront of the profession. While I am no environmentalist,

Image / right

ASPHALT

28 / Senate Standing Committee session Image Source / STEVE DUCHARME

40

British Columbia

ronmental stewardship of our ocean waters is an important

43

41

Meanwhile at the provincial level, the B.C. government has expressed interest

CO N CLU S I O N

in committing to move net-penned fish farms onto land. “BC’s Minister of Forest, Lands and Natural Resource Operations and Rural Development Doug

42

6

3

4

and rural communities, like that of Kuterra.

the lack of a market for land-based salmon farming, it is recommended that the

2

1

has acknowledged many of the recommendations but has yet to demonstrate

a landscape architecture student, I have learned that stew-

I believe opening up dialogue and conversation for envi-

Ultimately, the Woonerf works as a practical and cost-effective means that can satisfy the following fundamental goal: Provide for the greatest demographics, especially for individuals facing mental illness.

Based off of the Canadian government’s response to the Senate’s

& INVESTMENT

PART I I I

5

to increase visibility and delineation of pathways.

35

AGREEMENT ON GOALS

31

ecosystem which is emphasized immensely in this thesis. As

Byment prioritizing pedestrian, the Woonerf works to accomodate all types of travel, of tactile strips,the sensory gardens, defined entryways and coloured pavers.the division between cars, cyclists and people. This is done with bylighteliminating four main principles: Create well defined entrances, create a shared, well-marked m ate r i a l sphysical p a l e t te space, create barriers to slow traffic and enhance driver focus, landscape Light coloured textures are proposed for the Woonerf design and furnish the streetscape.

In an interview to CBC News, Donaldson expresses the B.C. Government’s concern over protecting wild salmon and the migratory routes and thus the

Implementation

government is committed to “moving to closed containment where feasible.” As

While it does not look like there is a short term

a sign of commitment Donaldson has pledged for the summer of 2018 to review

solution present to stop the practice of net-penned

Donaldson publicly stated that though the option to ban Atlantic salmon farming

permits “for 22 fish farms in the province that come up for renewal and plans to

salmon farming, it is imperative that the federal

is not currently available to him, as it is regulated by the federal government,

move as many as possible to contained farming systems.” (Fisher, 2018)

government and businesses in the salmon farming

he is in favour of phasing out ocean-based salmon farming, in favour of closed

4

industry take concrete steps in the development

containment.

ROLLED CURB

TACTILE STRIP

5

3

1

6

of land based systems such as monitoring

Image / 29 / The Legislative Assembly of British Columbia

technology, to move in the direction of phasing out net-penned farms. From an environmental

issue that does not get nearly enough attention as it should.

standpoint, research has concluded that the local ecosystem of wild salmon populations are being negatively impacted by net-penned practices. It will only be a matter of time when the general public and mass consumer becomes aware of the environmental implications of the present day Net-penned Salmon farming practices and demand change in the trajectory of environmental sustainability.

Positives steps Despite that salmon farming is not currently an

“Our industry continues to invest in technological improvements to land-based salmon farming systems because we recognize its proven technology....” - Cooke Aquaculture, Washington

UNILOCK PAVER (LIGHT RED)

economically viable option for consumers, Cooke

44

46

45

Aquaculture, a major Aquaculture enterprise, has acknowledged the value of land-based salmon farming and has committed to investing in technological improvements for land-based systems.

47

UNILOCK PAVER (LIGHT GREY)

PEDESTRIAN CROSSING (WHITE)

39 NORTH


40


41


Thank you! 778-888-0080 chewkenyee@gmail.com

KYC kenyeechew.com linkedin/in/kenyeechew instagram.com/kenyeechew

42


Turn static files into dynamic content formats.

Create a flipbook
Ken Yee Chew Design Portfolio 2021 by Ken Yee Chew - Issuu