DESIGN COORDINATION FEE
There is a non-refundable $25,000 design coordination fee (included in the floor plan price) for the NHC Team to perform the following work in order to receive the conceptual and final review for ARC approvals. This is paid at the time the survey/topo is received by the NHC Design Team and work begins to prepare documents for the review process. This nonrefundable fee is credited to your 15 % deposit.
The breakdown is as follows:
Advertisement
$10,000 - NHC Plan Designer attends the preliminary site meeting, conceptual & final review preparation meetings. They prepare all the documents for the two ARC meetings.
$3,250 - Landscape plan design & attendance at both the ARC meetings by NHC Landscape Architect.
$1,000 - Designer consultation with the client to select exterior colors, front door hardware & front porch lights. These selections are presented at the Final Review meeting.
$4,600 - Structural engineer draws plans required by the ARC.
$2,975 - Soils test
$2,500 - Staking the house and driveway on the homesite for ARC review.
$675 - Builder Administrator Fees
$25,000 - TOTAL FEES