PUBLIC WORKS 2 0 1 7- 2 0 2 2
2022
Travis Nissen
Pr imitive Hut N o r th Sa le m Hi g h Sc h oo l Expan s ion G ard iner Mi d d le
PUBLIC WORKS
2 0 1 7- 2 0 2 2 Travis Nissen 4111 NE MLK JR AVE Apt. 420 Portland, OR 97211
Content Primitive Hut Wyly Theater Model Robotic Construction: Timber Villa North Salem High School Expansion Gardiner Middle School West Salem High School Milwaukie High School The Campus Amongst Us
TRAVIS NI SSE N , A I A
Email: nissen.travis@gmail.com Phone: +1 608/406.0810
I strives to develop, engage and lead participatory goal-driven design processes that advance equity, sustainability, and accessibility throughout all stages of a project. In pursuit of big ideas and simple details, My ideal environment is deeply collaborative, diverse, and engaging. I’m a member of the American Institute of Architects, and a Registered Architect in Oregon.
EDUCATION: Cornell University, College of Art, Architecture and Planning M.ARCH I Honors: Thesis Travel Research Grant Department Merit Scholarship Tui Pranich & Lucilo Pena Graduate Award
University of Wisconsin-Milwaukee, School of Architecture and Urban Planning Bachelor of Science - Architectural Studies, Magna cum Laude, 1-year exchange at T.U. Darmstadt Honors : UWM Superjury Award UWM Superjury Award SURF Research Grant
PRACTICE: BRIC Architecture (Associate) - Portland, OR At BRIC, I held responsibilities across all phases of the architectural process, including client and consultant communication and coordination. For the last 3 years, I’ve coordinated the BRIC Internship Program and redesigned the structure and format to provide more engagement with project teams. In addition, I have held a number of responsibilities in the marketing department, organized around awards, content marketing, and has supported project acquisition efforts. List of Selected Projects: North Salem High School Expansion (Staff) Landscape, Lighting & Woodshop Coordination, Envelope Development and Detailing Gardiner Middle School (Staff) Building and Site Design, Programming, Community Engagement Process Ogden Middle School (Staff) Concept Development, Interior Design & Detailing, Construction Documents West Salem High School Expansion (Project Architect) Construction Documents, Construction Administration Beaverton High School Assisted Successful Acquisition of 200m Project Additional Responsibilities include: Internship Coordinator, and Marketing Liason
2018-PRES
PRACTICE CONTINUED: Caroline O’Donnell Architecture - Ithaca, NY
2016 - 18
Notable Projects: Primitive Hut (ART OMI), Tripe, Zimmer Concept Development, Documentation and Presentation, Fabrication and Construction
2014-15
City of Knoxville - Office of Neighborhoods - Knoxville, TN Americorps Member Small Grants Coordination, Blight Remediation Committee Coordinator, GIS Mapping
ENGAGEMENT & TEACHING: Alberta Street Cooperative Grocery - Portland, OR
2020 -21
Board Member
International Owl Center Jury Member - Houston, MN
2021
Ideas competition for future building project
Teaching Assistant
2016 -17
Spring 2017 ARCH 1301: Introduction to Architecture [Vince Mulcahy] Fall 2017 ARCH 5113: M.Arch Core Design Studio III [Martin Miller & Peter Stec]
Invited Critic University of Wisconsin Milwaukee, Cornell University, Portland State University University of Oregon
EXHIBITIONS & PUBLICATIONS: CORNELL AAP WEBSITE, Featured Project: The Campus Amongst Us Wyly Theatre Model, Structural Systems Exhibition, AAP / Cornell University (2016) Fabricating Wilderness, Architecture Fellow Exhibition, SARUP/UWM (2014) O'Donnell, Caroline, and José Ibarra. “Werewolf : The Architecture of Lunacy, Shapeshifting, and Material Metamorphosis.” Oro Editions, 16 Nov. 2021.
PROFICIENCIES: Revit, Rhino, Grasshopper, SketchUp, the full Adobe graphics suite, ArcGIS. Vray, Enscape, model-making, woodshop and metalshop certified, laser cutting proficient, 3D printing, CNC mill, AutoCAD
2021
PRIMITIVE HUT
Primitive Hut is a temporary pavilion that questions architecture’s relationship with time through an exploration of growth and decomposition. The structure evolves between states of solid, frame, and void, while— through its decay—it nourishes the trees and plants which will replace the geometric form with a new living form. Alluding to the frontispiece for Laugier’s essay on architecture, Primitive Hut recasts the original shelter as a efficient structural lattice providing a platform for vegetal growth.
2017
Left: Speculative Cycle The structure evolves between states of solid, frame, and void. Through its decay, it nourishes the trees replacing the geometric form with a living one. Lower Left: Frontispiece of Marc-Antoine Laugier: Essai sur l’architecture 2nd ed. 1755 by Charles Eisen (1720–1778). Allegorical engraving of the Vitruvian primitive hut. Below: Primitive Hut and Evitim - a pavilion made from the offcuts of Primitive Hut.
Composted Manure Cylinders
6 weeks
Biodegradible Soy Resin
Plywood Matrix
3 years
Red Maples
Above: Biodegradable Axon Left: Pavilion after installation Right: Detail
Right: Front Elevation Recalling Charles Eisen’s Frontispiece for Marc-Antoine Laugier’s Essai sur l’architecture Left: Construction & Installation Details
Wyly Theater Structure Model The Dee and Charles Wyly Theater is composed of several structural elements working together to unify the stage to the urban context. Maximum flexibility in theater’s configuration requires a free plan floor accomplished through several structural devices including a cantilevered belt truss, several angled columns and a sheer wall. To connect the belt truss to the concrete columns, segments of beam and gusset plates were cast into the columns. The model was exhibited in the 2015 Structural Systems Exhibition
Model installed in Sibley Hall’s Hartell Gallery
STRUCTURE FOR A FREE FLOOR PLAN
Work in Process: wire welding the belt truss
Detail
Overall View
Cladding
Sideboards
Primary Structure
Robotic Construction: Timber Villa
The structural organization of the villa is designed through the optimization of the timber cross section
Located on the shore of Lake Cayuga, Timber Villa explores the future of timber construction through robotic fabrication. This design organizes digitally scanned trees into a system of cantilevered timber trusses. In response, the villa’s domestic program is stacked vertically, providing each room with a connection to Lake Cayuga. Offcuts from the fabrication process are fashioned into a large screen, providing basic privacy and the dominant visual identity. Economic optimization provides a identifiable system that handles the whole tree as a usable resource.
Rendering of Timber Villa showing the bark cladding and the timber structure
Chainsaw Attachment Axon: The ergonomics of the chainsaw needed to be adapted for a robotic arm.
Portrait of a Young Artist The robotic arm with the chainsaw attachment and mobile base. The temporary base needed to provide stability from overturning forces.
3D Safety The robots cage was modeled to prevent collisions with walls, ducts and windows.
TIMBER VILLA Architectural Research in Robotic Timber Construction Cornell University, Department of Architecture Spring 2017
MALE FINGER JOINT
FEMALE FINGER JOINT
PLUNGE FINGER JOINT
COMBO
CONNECTION LOGIC
Travis Nissen
TIMBER VILLA Architectural Research in Robotic Timber Construction Cornell University, Department of Architecture Spring 2017
Log A
9”
Male
Log B
12”
Log C
Female
60°
90°
MODEL 2
Log C
MODEL 3 Log A 90°
Log B 60°
Travis Nissen
Left: Robotic Fabrication Process Low-tolerance timber spliced joints fabricated with chainsaw Right: Bark Privacy Screen Traditional waste material is used to create enclosure and the Villa’s visual identity.
The Entry plaza is bordered by the commons and the larger volume of the gym. The simple expression of the bay structure echoes the historic high school, and link the building with the landscape.
NORTH SALEM HIGH SCHOOL ADDITION
This project is a significant extension to a 1935 building that almost doubles the capacity of the existing school. With almost nowhere to develop on the site, the project team looked for ways to create a compact design while completing the major circulation “loop” and providing extensive daylight to the building’s interior. The extension hosts a blend of elements including academic, athletic, special needs, and gathering spaces. It contains 23 classrooms, areas to support special education, and the school’s indoor P.E. and athletic facilities. The result is a flexible and durable learning environment aligned with the school’s vision and goals.
2018
LINKING THE NEW ADDITION WITH THE HISTORIC SCHOOL
Above: Photo of addition from the track. The new classroom wings reference the historic entry. Right: Site Plan with arrival, drop-off and site design constraints noted. Below: Overall Exterior Elevation
CLOSING THE CIRCULATION LOOP
ADDITION COMPLETES THE LEVEL 2 WALKING “LOOP”
Existing Theater
1
Existing Cafeteria
2
9
5 7 4 6
SERVICE LANE FOR WOODSHOP AND FOOD SERVICE
Overall Exterior Elevation
3
CLASSROOM WINGS FRAME THE ATHLETIC COURTYARD
8
Level 1 Overall Plan
10
GYM VOLUME WORKS AS AN INTERIOR COURTYARD, PUSHING LIGHT DEEP INTO BUILDING
COMMONS CONNECTS TO WELCOME PLAZA
N Level 2 Overall Plan
1. Historic Entry
6. Service Alley
2. Existing Theatre
7. Elevated Walkway
3. Outdoor Plaza / Bioswale
8. Academic Courtyard
4. New Commons
9. Gymnasium
5. CTE / Woodshop
10. Wrestling Room
GARDINER MIDDLE SCHOOL
Located in Oregon City, OR, Gardiner Middle School is a regional prototype for 21st century education. At 150,000 square feet, the new school features six new learning communities, new athletic facilities and CTE spaces. At its core, the new middle school features an integrated stage, cafeteria, and library, known as the Timber Hall which has extensive views of Mt. Hood.
2019
M T. V HO IE O W D
A SPACE APART FROM THE CITY FOR STUDENTS TO GROW AND MAKE CHOICES
V IE OO W D
V
T. H M
W
Movement and View Logics shown at site scale
M
O
V
E
M
E
G A T
N
H
T
E
R
V
IE
W
M
O
V
E
G
M
E
A T
N
H
T
E
R
V
IE
W A VI R E N W E T R R M O D I . LN E
M
O
V
E
G
M
E
A T
W A VI R E N W E T R R M O D I . LN E
N
H
T
E
R
V
IE
W
M
T. H
IE OO W D
W A VI R E N W E T R R M O D I . LN E
Connections between the site and neighborhood.
Relationship between Building & Landscape
9
8 5
6
6 11
3
14
10
18
12
2
13
13
13
16 17
15
3
7
4
1
PROGRAM 1
Williams St. Entry
10 Main Entry
2
Visitor Parking
11. Wellness Center
3
Staff Parking
12
Timber Hall
4
Bus / Fire Dept. Turn Around
13
Learning Neighborhood
5
Bus Loop
14
The Promenade
6
Outdoor Learning
15
Music
7
Covered Play
16
Food Hall
8. Bioswale
17
Open Office
9 Multi-use field
18
Performance Lab
A SAFE, SECURE COMMUNITY SPACE FOR STUDENTS TO GROW, DEVELOP AND PLAY AREA DISTRIBUTION
RHOOD NEIGHBO LEARNING RHOOD NEIGHBO LEARNING
33,300 SF DIRECT INSTRUCTION FLEX LAB EX. LAB STUDIO
RHOOD NEIGHBO LEARNING
FLEX LAB ATION OPEN COLLABOR
IONAL INSTRUCT STUDIO
ACTIVE WELLNESS CENTER FLEX LAB ATION OPEN COLLABOR
IONAL INSTRUCT STUDIO
ION CIRCULAT
FLEX LAB VESTIBLE
22%
STOR.
ION CIRCULAT
Open
STAFF TOILET
STOR.
ION CIRCULAT STAFF TOILET
Open
TOILET
PROJECT LAB CONF.
TOILET
NCE CONFERE
L CUSTODIA
STAFF ATION COLLABOR
NCE CONFERE ORY LAB EXPLORAT
TOILET
AL ELECTRIC
STAFF ATION COLLABOR
GAME ROOM
L CUSTODIA
ELEVATOR
TOILET/ SHWR
STAFF ATION COLLABOR
ORY LAB EXPLORAT
TOILET
FITNESS STUDIO
ORY LAB EXPLORAT
TOILET
PROJECT LAB
TOILET
23,800 SF OPEN COLLABORATION
PROJECT LAB
ATION OPEN COLLABOR
PROJECT LAB
ATION OPEN COLLABOR
PROJECT LAB
STOR.
Open
ATION OPEN COLLABOR
STAFF PROJECT TOILET LAB
ATION OPEN COLLABOR
IONAL INSTRUCT STUDIO
IDF
Open
HUB WORKROOM
Open
Open STAFF CAFE
COLLAB CONF PE STORAGE
INDIVIDUAL STUDY
15%
INDIVIDUAL STUDY
INDIVIDUAL STUDY
COUNSELING
Open
Open
INDIVIDUAL STUDY
ACTIVE LEARNING CENTER
SPED
COUNSELING RECEPTION
TOILET
ALT LUNCH
PROJ LAB
OFFICE
CONF
OFFICE
CONF/TEST OFFICE
OFFICE
OFFICE
PROJ LAB
FLEX INSTRUCT
RESEARCH
OPEN COLLABORATION
RECORD STORAGE
AISP STORAGE
CONF
STORAGE
OFFICE
Open
Open Open Open
35,500 SF
COMMONS
Overall Second Floor Plan
TIMBER HALL GRAB ‘N’ GO LEARNING STAIR
GARDINER MIDDLE SCHOOL
LEVEL 2 7/25/2019
OREGON CITY SCHOOL DISTRICT
24%
STUDENT SUPPORT COUNSELING WELLNESS CENTER PERFORMANCE LAB CTE MUSIC LABS ADMIN AREA
OUTDOOR LEARNING LAB OUTDOOR LEARNING LAB
BUS ENTRY
OUTDOOR LEARNING LAB
FLEX LAB
FLEX LAB
OPEN ATION COLLABOR
IONAL INSTRUCT STUDIO
STAFF TOILET STOR STAFF TOILET
STAFF TOILET STOR
PROJECT LAB
TOILET PROJECT LAB
PROJECT LAB
CONF ATION OPEN COLLABOR
PROJECT LAB
AUX GYM
ATION OPEN COLLABOR
PROJECT LAB
ATION OPEN COLLABOR
PROJECT LAB
STOR
30%
OPEN ATION COLLABOR
IONAL INSTRUCT STUDIO
FLEX LAB
ATION OPEN COLLABOR
IONAL INSTRUCT STUDIO
VESTIBLE
LEARNING RHOOD NEIGHBO
LEARNING RHOOD NEIGHBO
LEARNING RHOOD NEIGHBO
ACTIVE WELLNESS CENTER
STAFF ATION COLLABOR
NCE CONFERE TOILET
ORY LAB EXPLORAT STAFF ATION COLLABOR
NCE CONFERE TOILET
ORY LAB EXPLORAT
TOILET
TOILET
TOILET GYM
CUST
ORY LAB EXPLORAT
STAFF ATION COLLABOR
IDF
SIDE FOLDING DOOR CUST ELEVATOR
TOILET OFFICE
GRAB - N - GO
SIDE FOLDING GRILLE
TOILET
OFFICE
STAIR
TOILET ROOM
CHANGING ROOM
PERFORMANCE LAB
TIMBER HALL
CHANGING ROOM
LOCKER ROOM
SIDE FOLDING GRILLE
TOILET TOILET
TOILET
SERVING
WALK-IN FREEZER
CUST OFFICE
WALK-IN COOLER
CUST STORAGE
WAREWASHING
MEDIUM CONF
SMALL CONF
SMALL CONF
MAKER LAB (ART)
HEALTH OFFICE
MEDIUM CONF
STAFF TOILET
HEALTH TOILET
SET STORAGE
MUSIC LAB (BAND)
MUSIC LAB (CHOIR) STAFF COLLAB
LAUNDRY
TOILET/ SHWR
STOR LARGE CONF
KITCH. OFF
TOILET
COVERED PLAY
TOILET
SPED STOR
MAKER LAB
MECH ROOM ELEC
INSTRUMENT STORAGE
RECEIVING
SMALL CONF
OFFICE WORK ROOM
WELCOME CENTER
SPED
CTE - ELECTIVES
DINING SUPPORT
Overall First Floor Plan GARDINER MIDDLE SCHOOL OREGON CITY SCHOOL DISTRICT
COSTUME
ENSEMBLE PRACTICE
LAUNDRY
STOR
SLC
MEDIUM CONF
KITCHEN PREP
TOILET DESIGN LAB
STAFF TOILET
HEALTH ROOM
TOILET
PRACTICE VESTIBLE
VESTIBULE
VESTIBULE
COMMUNITY ROOM
OPEN OFFICE
STORAGE
9%
MDF
COLLABORATION
WELCOME CENTER
MATERIAL STORAGE
BLDG SUPPORT
SIDE FOLDING DOOR SECURE VESTIBULE
STORAGE
ENTRANCE PLAZA
MAIN ENTRY
57,250 SF
LEVEL 1 7/25/2019
SERVICE ENTRY
MUSIC - ELECTIVES
Right: Rendering of front entry, with clear sight lines to admin area.
Left: View into courtyard play area and stage beyond. Rendering by others.
Top Right: View of Timber Hall to the stage and play area beyond. Rendering by others Left: View of Learning Stair Right: Diagrams looking at view and movement within Timber Hall.
IC
EM
AD AC
TY NI
MU
M CO
E
US
WEST SALEM HIGH SCHOOL ADDITION
This project is a significant extension to a 2000 building that eases overcrowding and significantly increases the capacity of the existing school. Lacking a flat site and easy points of connection to the original building, the new design adds a complement building, curved, and built into the hillside. The new and existing buildings are linked below grade. The extension hosts a blend of elements including academic, athletic, special needs, and commons spaces. It contains 20 classrooms, areas to support special education, career technical education spaces and a new commons. The result is a flexible and durable learning environment aligned with the district’s vision and goals.
2020-2022
STEPPED INTO THE HILLSIDE
?
Level 1 Daylight Autonomy 0% Daylit
Level 2 Daylight Autonomy 100% Daylit
0% Daylit
100% Daylit
?
Level 1
Level 2
AREA DISTRIBUTION
11,149 SF COMMUNITY BLACK BOX COMMONS KITCHEN
17%
29,992 SF GENERAL
INSTRUCTION CLASSROOMS SCIENCE CR SPED
D ATE Y ELEV WA LK WA
44%
Level 3 Daylight Autonomy 0% Daylit
100% Daylit
11,970 SF CAREER PREP CTE
18%
9,647 SF
EDUCATION SUPPORT
ATHLETIC SPRT LOCKER ROOM ADMIN
4,671 SF
D TE VA Y ELE WA LK WA
Level 3
BLDG SUPPORT
TOTAL SQUARE FEET 67,429
14%
7%
CONSTRUCTION PROGRESSPROGRESS
Shoring wall supporting the (e) auditorium. Temporary drainage in place to keep excavation as dry as possible.
Level 1 Retaining Wall with welded Nelson studs visible.
Pour of exterior Level 1 retaining wall that runs the length of the building. It was poured in 5 sections.
Level 2 deck pour with level 3 structure and termination of retaining wall visible.
Brace Frame Detail.
Brace Frame Detail.
Erection of level 2 commons structure
Finalizing sheet metal details for the Academic Addition
DOCUMENTATION & DETAILING LEGEND: f13 fA
OUT OF PLANE ELEVATION
f14 fB
f16 fC
f12 fD
f11 fE
CMU-2
BV-1
CMU VENEER
BRICK VENEER
SEE 4/A3.005
2
3
1
1
A3.208
A3.207
A3.101
A3.403
MWP-1
CMU-3 CMU VENEER
PREFINISHED METAL PANEL
CJ
CJ
JT
CJ
JT
JT
9 A8.403
9 _____ A8.402
f13 fA
OUT OF PLANE ELEVATION
f14 fB
A320
ADD 02
f16 fC
f12 fD
11 A8.401
2
3
A3.208
A3.207
SIM
f11 fE
A3.101 JT
JT
2 A8.703
A3.403
JT
A328
A8.402
CJ
Z
Y
A303
CJ
CJ
CJ
ADD 04
CJ
Z
Y
A303 A321
16 A8.202 BEYOND
SIM
11 _____ A8.205
CJ 8 _____
CJ
CJ
CJ
12 _____
CJ
CJ
A8.205
A8.205
ADD 02
ADD CJ A340 04 A333
Z
Y
A8.201
11 _____
7 _____
10' - 0"
A332
Z
A332
11 A8.401
CJ A320 A340 5 3 A8.701 ADD A8.704 04 Y
CJ
6 _____
SEE 1/A3.004 FOR REFERENCE
CJ
CJ
A8.303
CJ
JT
CURVED ELEVATION
ADD 02
JT SECTOR T1 SEE 1/A3.004
f15 f3
JT
SCALE: 1/8" = 1'-0"
A3.102
SCALE: 1/8" = 1'-0"
2' - 2 1/2"
U
CURVED ELEVATION
2'-8"
U V
ADD 04
CJ
CJ
CJ
f10 f1 2'-8"
U
CJ
f15 f3
7'-4"
V
ADD 04
CJ
CJ
CJ
CJ
3 A8.401
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
1 ADD 02
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
A004 CJ
CJ
A340 CJ
5 ADD A8.501 02 CJ
CJ
CJ
c6U V
CJ
CJ
CJ
2'-8"
CJ
CJ
CJ
CJ
2'-0" ADD 02V
V1
CJ
CJ
CJ
CJ
CJ
CJ
CJ
U V
ADD 02 V1
CJ
CJ
CJ
CJ
CJ U1
CJ V1
CJ
EQ CJ
c3
EQ CJ
CJ
U1 CJ
20'-0" ARC
CJ
CJ
V1 CJ
CJ
CJ
VCJ 2'-10"
CJ
CJ
c4
CJ U1
CJ
CJ
CJ
ADD 02
U CJ
EQ
CJ
CJ
V1 CJ
CJ
V1 CJ
CJ
c5
CJ
EQ
ADD 02
V1
CJ
V1
CJ
CJ
CJ
V1
CJ
CJ
V1
ADD 02
CJ
CJ
CJ
CJ
CJ
A8.401
CJ
U CJ
CJ
V1
CJ
CJ
ADD V 02
CJ
V1
c7
CJ
CJ
A327
20'-9 1/2" ARC
A354
20'-0" ARC CJ CJ
CJ
CJ
CJ
CJ
E1b
A3.206
V
CJ
CJ
c6
CJ
CJ
CJ
EQ V1
EQ
V
V1 V1
V
U
CJ
CJ
CJ
c7
CJ
V1
CJ
A355 ADD 02 CJ
V1
V
CJ
A333
CJ
CJ
CJ
CJ
U1
EQ
EQ
V
U1
EQ V1
EQ
V1
U1 V1
V
2'-10"
3
CJ
CJ
U
U1
V1
U V
V1 V1
EQ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
V1 V
EQ
EQ
U
V1
V1
A327
V
V1
V1
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
10 _____
EQ
EQ
V1
U1
V
2'-10"
A8.401
U1
U
V1
EQ
A333 V1
EQ
EQ
A8.402
A3.206
CJ
ADD V1 02
CJ
LEVEL 3 T.O. SLAB
SCALE: 1/8" = 1'-0"
f3
10 _____ A8.401
V1
CJ
VADD 02
CJ
f4 A008
3 _____ A8.403 A344
(E) LEVEL 2 15' - 0" T.O. SLAB
A349
CJ
CJ
A328
EXTERIOR ELEVATION SECTOR T1/T2 - WEST _____ 1 LEVEL 3 10
V1
SCALE: 1/8" = 1'-0"
3 30' - 0" T.O. SLAB _____
V1
10 _____
15 _____ A8.402
V
A008 A328
(E) LEVEL 2 LEVEL 3 T.O. SLAB SLAB 15' -- 0" 0" T.O. 30'
SEE 2/A3.005
A355
U
NOTE: CURVED ELEVATION SHOWN FLATTENEDA327 FOR REFERENCE ONLY. USE DIMENSIONS NOTED IN DRAWINGS. WORKING DIMENSIONS ARE NOT TO BE SCALED FROM DRAWINGS.
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
10 _____ A8.401
ELEVATION OUT OF PLANE
9 _____
A336
A333
15 _____
EXTERIOR ELEVATION SECTOR T1/T2 - WEST 1 A8.402
A008
SCALE: 1/8" = 1'-0"
CJ
2'-0"
A345
15 _____
CJ
CJ
CJ
A336
9 _____ U1
V1
CJ
A328
A344 A349
ADD
3
CJ
SCALE: 1/8" = 1'-0"
f4
SEE021/A3.005 FOR TYPICAL KEYNOTES
A8.401
V
A354 CJ
V
- 0" EXTERIOR ELEVATION SECTOR T1 30' - WEST 2 CJ
ADD 02 ADD 04
SEE 1/A3.005 FOR TYPICAL KEYNOTES 15' - 0" T.O. SLAB
ELEVATION OUT OF PLANE
ADD 02
CJ
3
A8.403
f3
A354
ALIGN V1
A8.401
CJ
V1
A8.401
A345
9'-0"
3 V1 A8.401
SEE 2/A3.005 V
V1
ADD V1 02
NOTE: CURVED ELEVATION SHOWN FLATTENED FOR REFERENCE ONLY. USE DIMENSIONS NOTED IN DRAWINGS. WORKING DIMENSIONS ARE NOT TO BE SCALED FROM DRAWINGS.
E1b CJ
10 _____
ADD 04
ELEVATION OUT OF PLANE A304
A333
revisio
1'-4"
V
ADD 02
CJ
(E) LEVEL LEVEL 2 3 T.O. SLAB SLAB 15' 30' -- 0" 0" T.O.
A344 A349
ADD 02
CJ
CJ
phase revisio
date02 ADD project ADD 04
EXTE SECT
A
revisio ADD 02 ADD 04
A8.403
ADD 02
2'-0"
A337
A8.401
V1
V
A354 A355
ADD 04
CJ
A3.206
ALIGN 9'-0"
LIGHTING DATUM
U1
KEYNOTES
1'-4"
CJ
CJ
V
ADD 02
ALIGN WITH C.L.INT. WALL
A336
A304 A337 A320 A321 A327 A328 A332 A333 A004 A336 A008 A340 A303 A341 A344 A304 A345 A320 A349 A321 A327 A354 A328 A355 A332 A333 A336 A340 A341 A337 A344 A345 A349 SEE
EXTERIOR ELEVATION SECTOR _____ T1 - WEST 2 (E) LEVEL 2
CJ V1
V1
1
9 _____
V
EQ
CJ
CJ
V
ADD 04
A304
ADD 02
CJ
KEYNOTES
A354 A355 A004 A008 A303
A333
ADD 3 02 A8.401 CJ CJ
7'-4"
V
V
CJ
A304
CJ
CJ
U
2'-8" ADD 04
RADIAL GRID
ALIGN WITH C.L.INT. WALL
RADIAL GRID
CJ
c6
CJ
1
ADD 02
CJ
CJ
CJ V1
20'-9 1/2" ARC
1'-2"
CJ
CJ
CJ
RADIAL GRID
V A340
V 3 A3.206
A3.206
CJ
V
CJ
c5 A004
1'-2"
1'-0"
A345 V1
CJ
CJ
V1
RADIAL GRID
RADIAL GRID U
V
f3 V
ADD 04
RADIAL GRID
c2
CJ
V1
c4
V
ADD 04
RADIAL GRID
CJ V1
V
RADIAL GRID
CJ
V1
E1b
RADIAL GRID
CJ
ADD 02
ADD 04
V1
c3
ALIGN
RADIAL GRID
CJ EQ CJ EQ V
V1
ADD 02
RADIAL GRID
9'-0"
c1
1'-0"
ADD 02
CJ U1
V1
V
c2
RADIAL GRID
V1
RADIAL GRID LIGHTING RADIAL DATUM GRID
ADD 04
LIGHTING DATUM
5/20/2021 8:21:30 AM 5/20/2021 8:21:30 AM 5/20/2021 8:21:30 AM BIM 360://19022 West Salem BIM 360://19022 HS/CENTRAL_W_Salem.rvt West Salem HS/CENTRAL_W_Salem.rvt BIM 360://19022 West Salem HS/CENTRAL_W_Salem.rvt
CJ V
CJ
7'-4"
ADD 02
CJ
CJ
ADD 04
V1
c7
U
2'-8"
ADD 02
U
c1
CJ
A333 2' - 2 1/2"
RADIAL GRID
ADD 04
20'-0" ARC
A3.206 ADD 02
CJ
2'-8"
RADIAL GRID
20'-9 1/2" ARC
1'-2" ADD 02
CJ
ADD 04
CMU-2 SLOPED SILL SIDING TRIMS AND ACCESSORIES TO MATCH SELECTED SIDING COLOR. PIPE DOWNSPOUT TRANSITION FROM DOWNSPOUT PIPE DOWNSPOUT EXTERIOR FINISH SHOWN RETURNS 90 TO DEGREES BACK TO PARALLEL WALL UNLESS OTHERWISESHEET NOTED. PREFINISHED METAL FASCIA W/ VERTICAL JOINTS 12'-0" OC TYP. OUTLINE OF BUILDING FOUNDATION, SEE STRUCTURAL OVERFLOW NOZZLES ARE TO BE MOUNTED AT 2'-8" A.F.F. UNLESS DASHED OUTLINE OF LOOSE LINTEL, SEE EXT. STOREFRONT DETAILS. SEE OTHERWISE NOTED. STRUCT. DWGS. FOR LINTEL SIZE. ING CMU-1 SPECIAL SHAPE WALL HYDRANT BOXES, SEE PLUMBING EXTERIOR METAL CANOPY FINISHED GRADE, SEE CIVIL/LANDSCAPE DWGS ROOF DRAIN OVERFLOW NOZZLE MOUNTED TO CMU RETURN, SEE PLUMBING MASONRY CONTROL JOINTS, TYP. 3 SEISMIC JOINT COVER W/ RATEDLEVEL FIRE BARRIER SLAB 30' HPC-X, - 0" T.O. METAL GUARDRAIL - PAINT TYP. UPPER EXTENT OF ANTI-GRAFFITI COATING MASONRY JOINT AT SHELF ANGLE / DEFLECTION JOINT, TYP. CMU COURSE, ALIGNED TO EXISTING, TYP. ROOF DRAIN OVERFLOW NOZZLE, SEE PLUMBING EXTERIOR METAL CANOPY CMU-2 SLOPED SILL FINISHED GRADE, SEE CIVIL/LANDSCAPE DWGS PIPE DOWNSPOUT ROOF DRAIN FROM OVERFLOW NOZZLETO MOUNTED TO CMU RETURN, SEE TRANSITION DOWNSPOUT PIPE DOWNSPOUT PLUMBING PREFINISHED SHEET METAL FASCIA W/ VERTICAL JOINTS 12'-0" OC TYP. MASONRY CONTROL JOINTS, TYP. OUTLINE OF BUILDING FOUNDATION, SEE2STRUCTURAL (E) LEVEL SEISMIC COVER W/ RATED FIRESEE BARRIER DASHED JOINT OUTLINE OF LOOSE LINTEL, SLABEXT. STOREFRONT DETAILS. SEE 15' HPC-X, - SIZE. 0" T.O. METAL GUARDRAIL - PAINT TYP. STRUCT. DWGS. FOR LINTEL UPPER EXTENT OF ANTI-GRAFFITI COATING ING CMU-1 SPECIAL SHAPE MASONRY JOINTBOXES, AT SHELF ANGLE / DEFLECTION JOINT, TYP. WALL HYDRANT SEE PLUMBING CMU COURSE, ALIGNED TO EXISTING, TYP. ROOF DRAIN OVERFLOW NOZZLE, SEE PLUMBING CMU-2 SLOPED SILL PIPE DOWNSPOUT TRANSITION FROM DOWNSPOUT TO PIPE DOWNSPOUT LEVEL 3 PREFINISHED SHEET METAL FASCIA W/ VERTICAL JOINTS 12'-0" OC TYP. 30' - 0" T.O. SLAB OUTLINE OF BUILDING FOUNDATION, SCALE: 1/8" = 1'-0" SEE STRUCTURAL DASHED OF LOOSE LINTEL, SEE EXT. STOREFRONT DETAILS. SEE 1/A3.005 FOROUTLINE TYPICAL KEYNOTES STRUCT. DWGS. FOR LINTEL SIZE. ING CMU-1 SPECIAL SHAPE f4 WALL HYDRANT BOXES, SEE PLUMBING
EXTERIOR ELEVATION SECTOR T1 - WEST 2 U
ALIGN WITH C.L.INT. WALL
RADIAL GRID
RADIAL GRID
RADIAL GRID
RADIAL GRID
RADIAL GRID
1'-0"
ADD 02
CJ
CJ
CJ
A3.102
5 A8.501
ADD 04
f4 f9
1'-4"
V
3 A3.206
4
A340
c5
f17 f2 V
ADD 04
ADD 02
c4
A341 8. A344 A345 9. A349
f4 f9
SEE 1/A3.005 FOR TYPICAL KEYNOTES
SEE 1/A3.004 FOR REFERENCE
c3
f17 f2
EXTERIOR ELEVATION SECTOR T1 - SOUTH 3
5 A8.501
SEE 1/A3.005 FOR TYPICAL KEYNOTES
MASONRY DIMENSIONS ARE NOMINAL
ALL PREFINISHED SHEET METAL FLASHING TO MATCH ADJACENT METAL LINTELS INDICATED WITH DASHED LINES FOR REFERENCE ONLY. CONFIRM PANEL FINISH, UNLESS OTHERWISE NOTED. LOCATIONS AND ATTACHMENT WITH STRUCTURAL. EXTERIOR METAL CANOPY SIDING TRIMS AND ACCESSORIES TO MATCH SELECTED SIDING COLOR. FINISHED GRADE, SEE CIVIL/LANDSCAPE CONTROL JOINTS SHOWN WHERE VISIBILE. SEEDWGS DETAILS ON A8.401 FOR MORE INFORMATION. ROOF DRAIN OVERFLOW NOZZLE MOUNTEDBACK TO CMU SEE EXTERIOR FINISH SHOWN RETURNS 90 DEGREES TORETURN, PARALLEL WALL PLUMBING UNLESS OTHERWISE NOTED. STOREFRONT WINDOW DETAILS PROVIDED ON A8.301-A8.303 MASONRY CONTROL JOINTS, TYP. OVERFLOW NOZZLES ARE TOW/ BERATED MOUNTED 2'-8" A.F.F. UNLESS SEISMIC JOINT COVER FIRE AT BARRIER FIELD VERIFYNOTED. ALL DIMENSIONS OTHERWISE METAL GUARDRAIL - PAINT HPC-X, TYP. UPPER EXTENT OFARE ANTI-GRAFFITI MASONRY DIMENSIONS NOMINAL COATING MASONRY JOINT AT SHELF ANGLE / DEFLECTION JOINT, TYP. ALL PREFINISHED SHEET METAL FLASHING MATCH ADJACENT METAL CMU COURSE, ALIGNED TO EXISTING,TO TYP. PANELROOF FINISH, UNLESS OTHERWISE NOTED. DRAIN OVERFLOW NOZZLE, SEE PLUMBING
A333 A336 7. A340
A3.206
4
FIELD VERIFY ALL DIMENSIONS
6. 1.
A327 5. A328 6. A332
3
ADD 04
c2
(E) LEVEL 1 0' - 0" T.O. SLAB
f15 f3
STOREFRONT WINDOW DETAILS PROVIDED ON A8.301-A8.303
5.
3. A304 9. A320 4. A321
(E) LEVEL LEVEL 2 1 (E) 0' -- 0" T.O. SLAB SLAB 15' 0" T.O.
SCALE: 1/8" = 1'-0"
f10 f1
CONTROL JOINTS SHOWN WHERE VISIBILE. SEE DETAILS ON A8.401 FOR MORE INFORMATION.
A004 7. A008 2. A303 8.
SEE 1/A3.005 FOR TYPICAL KEYNOTES
EXTERIOR ELEVATION SECTOR T2 - LOWER SOUTH 4
c1
f4 f9
EXTERIOR ELEVATION SECTOR T1 - SOUTH 3
(E) LEVEL 1 0' - 0" T.O. SLAB
LINTELS INDICATED WITH DASHED LINES FOR REFERENCE ONLY. CONFIRM LOCATIONS AND ATTACHMENT WITH STRUCTURAL.
2.
GENERAL NOTES KEYNOTES
ADD 02
2' - 2 1/2"
OVERFLOW NOZZLES ARE TO BE MOUNTED AT 2'-8" A.F.F. UNLESS OTHERWISE NOTED.
1.
4.
3 A3.206
A3.102
SEE 1/A3.004 FOR REFERENCE
A004
f17 f2
9.
3.
LEVEL 2 SEE 1/A3.005 FOR TYPICAL (E) KEYNOTES LEVEL 3 T.O. SLAB SLAB 15' -- 0" 0" T.O. 30'
A
CJ
ADD 04
SECTOR T1 SEE 1/A3.004
04
ADD 04
2 A8.703
A328 SCALE: 1/8" = 1'-0"
JT
U1
ADD 02
ADD 02
SCALE: 1/8" = 1'-0"
A332
A340
JT
B
f10 f1
CJ
SEE 1/A3.005 FOR TYPICAL KEYNOTES
A8.205
A320 5 A8.701 ADD
JT
4
CJ
Z
A8.205
A340 A333
JT
A
CJ
U1
EXTERIOR ELEVATION SECTOR T2 - LOWER SOUTH 4 A303
JT
SIDING TRIMS AND ACCESSORIES TO MATCH SELECTED SIDING COLOR. JT METAL WALL PANEL 90 DEGREES BACK TO PARALLEL WALL EXTERIOR FINISH SHOWN RETURNS REVEAL UNLESS OTHERWISE NOTED.
8.
GENERAL NOTES
0' - 0" T.O. SLAB
JT
ADD 02
(E) LEVEL LEVEL 2 1 (E) T.O. SLAB SLAB 0' -- 0" 15' 0" T.O.
A332
U1 1'-4"
04ADD 04
LEVEL 3 T.O. SLAB 30' -(E) 0" LEVEL 1
EXTERIOR ELEVATION SECTOR T1 - SOUTH 3
ADD 04
CURVED ELEVATION
11'-0"
6 _____
Y
CJ
SIM
1 A8.704
A8.205
11 A8.401
A341 CJ CJ
15 _____
CJ A8.402 CJ
CJ
7.
A8.403 ADD A328 A320
ADD 02
10'-4"
7 _____
CJ 11 A8.401
SCALE: 1/8" = 1'-0"
SEE 1/A3.005 FOR TYPICAL KEYNOTES (E) LEVEL LEVEL 3 2 15' -- 0" 0" T.O. T.O. SLAB SLAB 30'
C
MASONRY DIMENSIONS ARE NOMINAL CJ MASONRY OPERABLE ALL PREFINISHED SHEET JOINT METAL FLASHING TO MATCH ADJACENT METAL CONTROL ALUMINUM PANEL FINISH, UNLESS OTHERWISE NOTED. STOREFRONT PANEL
ANTI-GRAFFITI
A8.201 A8.204
CJ
3 A8.704 SIM
A8.205
6 _____ 3 _____
ADD 04
11 A8.401
U1
FIELD VERIFY ALL DIMENSIONS
5.
10'-4"
12 _____
A8.205
ADD 02
SIM
JT
B
U1
4.
ANTI-GRAFFITI
CJ
A8.303
U1 1'-4"
ADD 02
10' - 0"
CJ
6 _____
3.
(E) LEVEL 2 15' - 0" T.O. SLAB 2 A8.703 9
A8.402
ADD 04
0' - 0" T.O. SLAB
EXTERIOR ELEVATION SECTOR T2 - LOWER SOUTH 4 1 A8.704
8 _____
A8.402
T.O. SLAB 30' -(E) 0" LEVEL 1
11'-0"
A8.204
SECTOR JT T1 SEE 1/A3.004 9 _____
JT
CJ
CONTROL JOINTS SHOWN WHERE VISIBILE. SEE DETAILS ON A8.401 FOR JT MWP-1WALL PANEL CMU-3 METAL MORE INFORMATION. REVEAL CMU VENEER PREFINISHED STOREFRONT WINDOW DETAILS PROVIDED ON A8.301-A8.303 METAL PANEL
6.
LEVEL 3
SIM A320 A340 5 11 11 A8.701 ADD A8.401 04 A8.401 SIM SIM
ADD A320 02
ADD 02
2.
ADD 04
CMU VENEER
CJ CMU-2 MASONRY OPERABLE BV-1 CONTROL JOINT ALUMINUM VENEER LINTELS INDICATED WITH DASHED LINES FOR REFERENCECMU ONLY. CONFIRM STOREFRONT PANEL BRICK VENEER WITH STRUCTURAL. LOCATIONS AND ATTACHMENT
1.
9 A8.403
1 A3.403
A
CJ
15 _____
A332
A341
16 A8.202 BEYOND
3 _____
CJ
f11 fE
JT JT
C
11 A8.401
A340 A333 A321
CJ
CJ 11'-0"
A8.205
A8.205
CJ
A332
Z
11 _____
7 _____
CJ
CJ
f12 fD JT JT
9 _____
ADD 02
SIM
6 _____ A8.201
CJ
3 11 A8.704 A8.401 Y
A8.205
A8.205
CJ
JT JT
1
A3.101
A8.402
CJ
(E) LEVEL 2 15' - 0" T.O. SLAB
f16 fC
B
3 A3.207
10'-4"
CJ
CJ
ANTI-GRAFFITI
CJ
U1
PARALLEL GRID
CJ
11 A8.401
U1
ADD 02
SIM
ADD 04
f14 fB
ADD 04
6 U1 1'-4" CJ _____ 2 A8.303 A3.208
PARALLEL GRID
CJ
12 _____
f13 fA
LEGEND: GENERAL NOTES
PARALLEL GRID
CJ
11 A8.401
PARALLEL GRID
CJ
30' - 0" T.O. SLAB
11 A8.401
CMU-3
PREFINISHED METAL PANEL
ADD 04
LEVEL 3 30' - 0" T.O. SLAB
PARALLEL GRID
SIM
1 A8.704 8 _____
ADD 02
SIM
A321
16 A8.202 BEYOND
CJ
CMU VENEER
MWP-1
PARALLEL GRID
SEE 4/A3.005
10' - 0"
OUT OF PLANE ELEVATION
A8.204
CMU-2
BV-1
1
C 1
15 _____
LEVEL 3
A341
CJ
OPERABLE ALUMINUM STOREFRONT PANEL
METAL WALL PANEL REVEAL
BRICK VENEER
SEE 4/A3.005
3 _____
MASONRY CONTROL JOINT
LEGEND: JT
ADD 04
A355
(E) LEVEL 2 15' - 0" T.O. SLAB
SEE 2/A3.005
A8.401
NOTE: CURVED ELEVATION SHOWN FLATTENED FOR REFERENCE ONLY. USE DIMENSIONS NOTED IN DRAWINGS. WORKING DIMENSIONS ARE NOT TO BE SCALED FROM DRAWINGS.
EXTERIOR ELEVATION SECTOR T1/T2 - WEST 1 SCALE: 1/8" = 1'-0"
West Salem High School Addition Documentation & Detailing Examples
phase
date project
EXTE SECT
A
phase
date project
EXTE SECT
A
ADD 04
(E) CMU TO REMAIN (E) DAMPPROOFING TO REMAIN
L5X3X12 LLV GA. ANGLE W/ (2) #10 SCREWS IN VERTICAL LEG AT EACH STUD
CONTINUOUS BENT PLATE SEE STRUCTURAL
BACKER ROD AND SEALANT 1/2"
PRECAST CAP WITH DRIP EDGE. SEAL ALL PENETRATIONS.
1/4" SHIM AT EACH STUD
SS DRIP FLASHING - EXTEND INTO GROUT JOINT
3/4"
TOP RAIL
ADD 02
LAP SEALANT OVER TRIM
CONCRETE PAVERS
BACKER ROD AND SANDED SEALANT
PEDESTAL
SHIMS, EVERY 8" OC
COUNTERFLASHING SET IN SEALANT
VENT COURSE @ 24" O.C.
@ 6'-0" OC MAX
INTERMITTENT SPACER - SEE STRUCTURAL
L5 1/2 AN EM CO 18 PR-24 1/4 EM CO
FOS DIM
PR-24
PATCH (E) GYPSUM WALL BOARD AT ALL NEW STEEL PLATE LOCATIONS. PAINT TO MATCH EXISTING
6'-0" TALL POST
(E) CMU VENEER TO REMAIN
PE
CO SE
ADD 02
1"
1/4"= 1'-0" SLOPE
SOLID CMU BLOCK (TRIM TOP EDGE) 4"
LAP SEALANT OVER SAM & EXISTING DAMPPROOFNG
1 1/2"
3" FIBERBOARD INSULATION
3/8" SAM
4" MIN
SEE FLOOR PLAN FOR FLOOR TYPE
PEDESTAL
FOS DIM
PR-24
SCALE:
SAM
WP-5 1/2" MAX
@ 6'-0" OC MAX
1/4"
3/8"
2"
3" = 1'-0"
EXTERIOR
EXTERIOR
INTERIOR
FOS DIM
INTERIOR
SF BEYOND SF DOOR, SEE DOOR SCHEDULE GRIND DOWN (E) SLAB EDGE UNDER THERSHOLD FOR POSITIVE DRAINAGE OFFSET DOOR THERSHOLD SET IN CONT. BED OF SEALANT 2" MIN
TERMINATE PROTECTION SHEET 1" BELOW WP-5. ADHERE SAM
1/4"
2" MIN SEALANT
FOS DIM
1"
FOS DIM
SCALE:
3" = 1'-0"
SEE FLOOR PLAN FOR FLOOR TYP
5/16 5/16
STOREFRONT SILL AT ROOF PAVERS 5 GUARDRAIL @ BRICK
CONTINUOUS BENT PLATE WITH EXPANSION ANCHOR- SEE STRUCTURAL
/2" MAX
SEE
AD 0
SEE PLAN FOR WALL TYPE
INTERIOR
7 1/2" 6" MIN
2" MIN SEALANT
SAM
1/2"
TO. STEEL SEE SECTION
1/2"
SEE FLOOR PLAN FOR FLOOR TYPE
SEE FLOOR PLAN FOR FLOOR TYPE
PAVERS @ SF DOOR SILL @ (E) MTL DECK 8
WRB-2
BACKER ROD & SEALANT AROUND FULL PERIMITER OF PENETERATION
2 1/2" MIN SAM
PL 3/8 X 7 1/2"
WF BEAM AT NEW ARCADE, SEE PLAN
SCALE:
ADD 04
SLOPE SEE PLA
LAP SAM OVER WRB AND AROUND KNIFE PLATE
SEE FLOOR PLAN FOR CONCRETE ON METAL FLOOR DECKTYPE
3" FIBERBOARD INSULATION
4" MI SAM
7 1/2"
ADD 02
ASI-07
WF BEAM AND ANGLE - SEE STRUCT
STRUCT. ANGLESEE STRUCT
ANGLE, SEE STRUCT.
SLOPE SEE PLAN
SAM
2" MIN SAM
2" MIN
LAP WP-5 UP CONCRETE WALL
FLOOR LEVEL TO MASONRY
SAM
(E) WF BEAM
RUN WP-5 AND PROTECTION SHEET UP CONCRETE.
LAP PROTECTION SHEET OVER WP-5 2" MIN
SEC-01
(E) SLAB AND METAL DECK
PEDESTAL
SEE FLOOR PLAN FOR FLOOR TYPE
6'-0" TALL POST
FOS DIM
1"
SEE STRUCT
4" MIN
CONCRETE PAVERS
SAM THROUGH-WALL FLASHING W/ UPTURNED END DAMS
LAP SAM OVER WALL
ADD 02
7 1/2" SLAB STEP
CLOSURE PLATE, SEE STRUCT.
WP-5
SAM SAM
RUN WP-5 AND PROTECTION SHEET UP CONCRETE
FLOOR LEVEL
CONFIRM WITH EXISTING
VENT COURSE @ 24"
SOLDERED END CAP (DOWNTURNED) 1" O.C. CONCRETE PAVERS
1/4"= 1'-0" SLOPE
PEDESTAL
6" MIN
2" MIN
COUNTERFLASHING SET IN SEALANT
SLOPE SEE PLAN
SAM THROUGH-WALL FLASHING W/ UPTURNED END DAMS
LAP THROUGH-WALL SAM OVER PRIMER AND PROTECTION SHEET
3" = 1'-0"
ADD 02
PRIMER
PRIMER
WEEP VENT @ 24"OC MORTAR DIVERTER- 8" MIN SS DRIP FLASHING W/HEMMED EDGE W/ END DAMS TERMINATE PROTECTION SHEET 1" BELOW WP-5. ADHERE SAM FLASHING TO WP-5
PAVERS @ EXISTING CMU 15
INTERIOR
4"
LAP SEALANT OVER SAM & EXISTING DAMPPROOFNG
LAP SAM OVER SS DRIP FLASHING
2" MIN
1/2"
CONCRETE PAVERS
SOLID CMU BLOCK (TRIM TOP EDGE)
3" FIBERBOARD INSULATION
SEC-01
1/4"
FLOOR LEVEL LAP SEALANT OVER TRIM
3" = 1'-0"
EXTERIOR ALUMINUM TRIM SEALANT AND BACKER ROD ALUMINUM SF SYSTEM PR-24CONT. SF SILL ATTACHMENT ANGLE L5X3X12 LLV GA. MANUFACTURER'S SF BACK PAN ANGLE W/ (2) #10 TOP RAIL EVERY 8" OC SHIMS SCREWS IN VERTICALPROVIDE LEG AT EACH STUD SEALANT AND BACKER ROD PRECAST CAP WITH DRIP EDGE. SEAL ALL 1/4" SHIM AT EACH SS DRIPPENETRATIONS. FLASHING W/HEMED EDGE STUD ADD TERMINATE PROTECTION SHEET ADD 04 BACKER ROD AND CONCRETE PAVERS 1" BELOW WP-5. ADHERE SAM SANDED SEALANT 02 SLOPE SEE PLAN FLASHING TOEVERY WP-58" OC PEDESTAL SHIMS, FLOOR LEVEL
TERMINATE PROTECTION SHEET 1" BELOW WP-5. ADHERE SAM FLASHING TO WP-5
1/4"
1/2"
3/4"
1"
SAM
4" MIN SAM
4" MIN
1/4"
INTERIOR
4" MIN
1/2" MAX
LAPROD AND SEALANT BACKER SLOPE SEE PLAN
(E) INSULATION TO REMAIN
INTERIOR
SF BEYOND
MIN SS2" DRIP FLASHING - EXTEND INTO GROUT JOINT
(E) CMU VENEER TO REMAIN
(E) DAMPPROOFING TO REMAIN
(E) DAMPPROOFING TO REMAIN
SEE PLAN FOR WALL TYPE
GUARDRAIL @ BRICK 6 SCALE:
ADD 04
EXTERIOR
SF DOOR, SEE DOOR SCHEDULE (E) CMU VENEER TO REMAIN GRIND DOWN (E) SLAB EDGE PATCH (E) GYPSUM WALL BOARD AT ALL NEW STEEL UNDER THERSHOLD FOR PLATE LOCATIONS. PAINT TO MATCH EXISTING POSITIVE DRAINAGE INTERMITTENT SPACER - SEE STRUCTURAL OFFSET DOOR THERSHOLD CONTINUOUS BENT PLATE SET IN CONT. BED OF SEALANT SEE STRUCTURAL
CONTINUOUS BENT PLATE WITH EXPANSION ANCHOR- SEE STRUCTURAL
3" FIBERBOARD INSULATION WRB-2
1"
(E) CMU TO REMAIN
SAM
INTERIOR
FOS DIM
SEE FLOOR PLAN FOR FLOOR TYPE
SCALE:
6" MIN
5/16 5/16
SEE PLAN FOR WALL TYPE PR-24
Lower Right: West Salem High School Occupiable Roof Deck Details
SEE FLOOR PLAN FOR FLOOR TYPE
2"
1/2"
LAP SAM OVER WRB AND AROUND KNIFE PLATE
CONCRETE ON METAL DECK
(E) CMU TO REMAIN
LA SH LA CO PL 1/2 SC W PE ST SE PL PL 3/4 AN W SP LA W KN
ADD 02
SLOPE SEE PLAN
CONFIRM WITH EXISTING
TO. STEEL SEE SECTION
2 1/2" MIN SAM
PL 3/8 X 7 1/2"
2" MIN
LA BACKER ROD & SEALANT AROUND FULL PERIMITER OF PENETERATION
7 1/2"
ADD 02
PEDESTAL
PR-24
2" MIN SEALANT
STRUCT. ANGLESEE STRUCT
CONCRETE PAVERS
SLOPE SEE PLAN
FLOOR LEVEL TO MASONRY
1/2"
LAP WP-5 UP CONCRETE WALL
WP-5
6" MIN
FLOOR LEVEL
LAP PROTECTION SHEET OVER WP-5 SAM
2" MIN
LAP SAM OVER WALL
LAP THROUGH-WALL SAM OVER PRIMER AND PROTECTION SHEET
Right: North Salem High School Wall Sections
SAM
2" MIN
Left: Exterior Elevations from West Salem High School
2" MIN
SAM
SAM
SLOPE SEE PLAN
WEEP VENT @ 24"OC MORTAR DIVERTER- 8" MIN SS DRIP FLASHING W/HEMMED EDGE W/ END DAMS TERMINATE PROTECTION SHEET 1" BELOW WP-5. ADHERE SAM FLASHING TO WP-5
SAM
2" MIN
2" MIN
LAP SAM OVER SS DRIP FLASHING
SEE PLAN FOR WALL TYPE WRB-1 SEE EXT. ELEVATIONS FOR CMU TYPE LAP SEALANT OVER SAM
3" = 1'-0"
SEE PLAN FOR WALL TYPE
6
EXTERIOR ALUMINUM TRIM SEALANT AND BACKER ROD ALUMINUM SF SYSTEM CONT. SF SILL ATTACHMENT ANGLE MANUFACTURER'S SF BACK PAN PROVIDE SHIMS EVERY 8" OC SEALANT AND BACKER ROD SS DRIP FLASHING W/HEMED EDGE ADD TERMINATE PROTECTION SHEET ADD 04 1" BELOW WP-5. ADHERE SAM 02
INT
COMPLETED PROJECTS
Left: Entry Atrium with wood-clad volume of the maker space Right: Second level of circulation spine at library entry. Staircase ends under a skylight providing natural light. Lower Right: View of entry from academic plaza
THE CAMPUS AMONGST US
From Ludwig Hilberseimer’s 1924 manifesto, Hochhausstadt, to its modern day equivalent — the corporate urbanism of Silicon Valley. In the original manifesto, Hilberseimer vertically organizes the functions of a city into a series of stratified layers. Hilberseimer’s work anticipates the conditions that underpin Silicon Valley urbanism, including extreme mobility brought on by changing forms of labor. Campus Amongst Us questions the new forms of urbanism presented by corporate campuses and their friendly, cheerful appearance.
SPACES
-Published on Cornell AAP Student Work Website and in the Drawing City Manifestos Survey
3
1 4
ke yoru favorite AirBNB: Groceries, Laundry and Other Chores take care of themselves.
at Outside? Eat by the Soccer Field.....
a Variety of spaces to take a meeting
e that cars are lame.....thats why we have a network of pedestrian bridges so you e to leave the campus
2 AT FLUFFR, YOUR TIME IS PRECIOUS. WE TAKE CARE OF YOUR EVERY NEED, SO YOU NEVER HAVE TO LEAVE!
THE TEAM HELMUT
YANG
SALLY RUTH
-1-
5:00AM - 16th Street - The Mission - San Francisco
Hey there, Headed to Fluffr? I can show you the way....
5:40 100%
3 Hours Later..... Somewhere in central CA.
8:30PM - Home Life Click Click Click
NOON - Team Lunch
....
Click Click Click
Click Click Click
Me: Isn’t this place great? Before Fluffr, I was working as an intern at LinkedIn. We moved because the education at Fluffr is so much better...
I just moved from Google. The Apartments here are more spacious.
Super Modern Design! Vegetarian Non-GMO Super Healthy!
Vegetarian Non-GMO Super Healthy!
Do you want to go to the park? Lets go to the park.....
100% Super Healthy
Eat While You Work
8:00am - At Desk Ted got stuck in the Fishbowl again...
Beautiful weather we are having.
We have a variety of unique spaces to support collaboration There are “impromptu” dance parties every two hours!
12:30PM - Team Lunch
PARK
I always sneak in here when everyone is distracted. It’s the best opportunity to eat donuts without the judgment, you know?
5:30PM - Picking Up the Kids
There are “impromptu” dance parties every two hours!
Upper Left: Fluffr Campus Housing Left: Fluffr Cafeteria Lower Left: Team hangout in the Server Conservatory
Top: Conservatory with Landscaped servers Below: Waste heat from the servers is stored in concrete benches and released at night when the conservatory is coldest.