

2.
REQUIRED TO DO ANY WORK NOR RENDER ANY OPINIONS RELATED TO ASBESTOS.
4. THE OWNER SHALL RETAIN AN INDEPENDENT CONSULTANT WHO IS TRAINED AND EXPERIENCED IN IDENTIFICATION AND SURVEY OF EXISTING SITES PRIOR TO START OF DEMOLITION CONSTRUCTION.
5. ALL CONTRACTORS AND SUBCONTRACTORS SHALL REPORT THE PRESENCE OF ANY MATERIAL OR ASSEMBLY SUSPECTED TO CONTAIN ASBESTOS UPON DISCOVERY. THE WORK SHALL BE CARRIED OUT PER THE CONSULTANTS' RECOMMENDATIONS.
1. PRIOR TO CORING, DRILLING, OR PERFORMING SELECTIVE DEMOLITION IN A MANNER THAT WILL COMPROMISE THE POST TENSIONED SLAB STRUCTURAL INTEGRITY, PLEASE BE ADVISED AS FOLLOWS:
2. REFERENCE STANDARDS: A. AMERICAN CONCRETE INSTITUTE (ACI) B. AMERICAN SOCIETY OF TESTING & MATERIALS C. INTERNATIONAL BUILDING CONFERENCE (ICBO) APPLICABLE UNIFORM BUILDING CODE STANDARDS D. POST-TENSIONING INSTITUTE (PTI)
3. OBTAIN FROM THE OWNER, BASE BUILDING STRUCTURAL DRAWINGS DOCUMENTING THE EXISTING POSTTENSIONED SLAB CONSTRUCTION IF AVAILABLE.
4. LOCATE EXISTING







LIGHTING SCHEDULE









CAFE - BUILT-IN WALL
REFRESHMENT

7 WORKSHOP - INSTALLATION
6 BREAK ROOM - CLOUD SEAT
5 FLEX CONFERENCE CIRCULATION


