MAKER DISTRICT WORKSHOP The workshop proposal is a superimposed axial intersection on the Somerset Bayswater site situated within the Hintonburg neighborhood. The proposal aims to carve an exciting new passage for pedestrian movement and maker activity. This urban axial approach creates new “streets” lined with workshops and art studios. The site’s workshops and residential facilities are separated by pedestrian paths. One of the paths form a shortcut from the western intersection of Hilda to Bayswater Avenue at the sites eastern edge. An outdoor public plaza enclaved by the artist studios and workshops create a second passage from Somerset to Wellington St W. The building also adapts to the seasons. In the summer large doors on the east-west axial path may be opened to let in fresh air and to encourage outdoor-indoor engagement. Through the workshop’s axial organization, the project aims to create a new artisanal district in the hopes of housing the up and coming craftsman within it’s innovative “streets”.
Wellington St W/ Somerset St W Ottawa, Ontario, Canada
NOTES 1. ALL DIMENSIONS IN METRIC. 2. GC TO FIELD VERIFY ALL DIMENSIONS. 3. DO NOT SCALE. 4. CHECK DRAWINGS AGAINST SPECIFICATIONS. 5. USE LATEST REVISED DRAWING ONLY. 6. REPORT ANY DISCREPANCIES TO THE ARCHITECT BEFORE PROCEEDING. 7. DRAWING & SPECIFICATIONS ARE THE PROPERTY OF THE ARCHITECT AND MUST BE RETURNED UPON COMPLETION OF WORK. 8. ALL SAFETY & O.B.C REQUIRMENTS SHALL BE STRICTLY FOLLOWED WITHOUT DEVIATION. 9. GC TO TAKE PHOTOS OF EXISTING SITE CONDITIONS PRIOR TO STARTS OF CONSTRUCTION AS RECORD
AXIS
1
EXTRUSION
KM DESIGN
MAKER DISTRICT
TRUE NORTH
PASSAGE
2
3 List of Drawing
Sheet Number
3
2
A000 A001 A002 A003 A101 A102 A103 A111
A112
A201 A301 A310 A321 A322 A323
1
A324 A325 A326 A401 A402
No.
Sheet Issue Date Sheet Name Title Page Site Plan Exit Route Schedule Ground Floor Second Floor Third Floor Detail Plan Ground Floor Detail Plan Second Floor Elevation Section Plan Axon Section Detail Detail Perspective Wall Assembly Callouts Detail Experiential Drawing Tectonic Bay Bathroom Detail Stair Detail
11/28/18 10/15/18 11/27/18 11/14/18 10/31/18 10/04/18 11/23/18 10/24/18
11/06/18
10/28/18 10/04/18 12/09/18 10/27/18
Sheet Number A601
A602
A603
M101 M102 M103 M111
M112
S201
Sheet Issue Date Sheet Name Reflected Cielling Plan Level 1 Reflected Cieling Plan Level 2 Reflected Cieling Plan Level 3 Level 1 Level 2 Level 3 Detail Mechanical Layout Building System Integration Structural Axonometric
11/18/18
11/18/18
11/18/18
11/28/18 11/28/18 11/28/18 11/06/18
11/26/18
10/31/18
Symbol Legend
Name Elevation Ref
1 A101
Elevation Tag
Workshop Project Title Page
Section Head Tag
1
Callout Tag
A101
Project number
Door Tag
Date
Room name 101
Room Tag
12/04/18
1t
Wall Tag
10/24/18
1t
Window Tag
11/24/18
School of Architecture
Ref
101
11/18/18 11/18/18
Date
List of Drawing
11/18/18 11/15/18
Description
Drawn by
Line Legend
Checked by
Fire Route
HVAC Return
Over Head
HVAC Supply
Clearance
Grid Lines
0001 10/31/18 Kareem Mitchell Maria Denegri & Tom Leung
A000 Scale
As indicated
12/16/2018 6:26:15 PM
SPACE