1 minute read

N.E. Perspective

Next Article
Site Analysis

Site Analysis

PROJECT REQUIREMENTS:

MAXIMIZE BUILDING SIZE OR SITE SHOULD STRICTLY FOLLOW DC ZONING REGULATIONS, CODES AND STANDARDS. COMPORT TO MASSING,

Advertisement

INCLUDE LIBRARY COLLECTION CATALOGUES VIA CLOUD, SEARCH STATIONS, AND STAFF-ASSISTED CATALOGUE LOCATIONS.

SETBACK AND HEIGHT CONTEXTS ESTABLISHED BY EXISTING BUILDING SURROUNDING (JUDICIARY SQUARE IN ACCORDANCE WITH NATIONAL BUILDING MUSEUM AS WELL AS THE CAPITAL ONE ARENA).

INCLUDE A LECTURE HALL ACCOMMODATING 100 PEOPLE. INCLUDE A CHAMBER MUSIC HALL FOR PERFORMANCE OF EXTENSIVE MUSIC COLLECTION,

INCLUDE TWO UNDERGROUND LEVELS PARKING IS EXCLUDED INCLUDE A VARIETY OF READING ROOMS (SIZE, CHARACTER, ETC.)

INCLUDE STACKS FOR THE LIBRARY S COLLECTIONS INCLUDE A GIFT STORE AND BUILDING SECURITY UNDER US CAPITOL POLICE.

This article is from: